CASE 1 - DALLU LAND POOLING
THE PRIMARY GOAL IS TO CREATE A BALANCED MIX
OF RESIDENTIAL AND COMMERCIAL SPACES,
ENHANCING URBAN LIVING AND SUPPORTING THE
LOCAL ECONOMY.
INFORMATION
• LOCATION: KATHMANDU, WARD 15, EASTERN SIDE OF
SWAYAMBHU
• PROJECT PERIOD: 2047-2058 BS.
• AREA: 396 ROPANI; 20 HA,201460SQM
• SETTLEMENT PATTERN : CONCENTRIC PLAN
• EXECUTING AGENCY : KVTSDC, KATHMANDU
• NO OF PLOTS: 750
• UPWARD SLOPE TOWARDS SOUTH.
• MIN AREA OF A PLOT: 80SQM REASONS FOR LAND POOLING
DALLU LAND BAGMATI 1. NARROW, WINDING ROADS THAT FOLLOW THE
SWAYAMBHUNATH RIVER
POOLING PATTERN OF FIELD BOUNDARIES.
2. ABSENCE OF PROPER DRAINAGE.
3. INCOMPLETE OR POORLY DESIGNED INFRASTRUCTURE.
4. INSUFFICIENT OPEN SPACE AND ABSENCE OF PUBLIC
FACILITIES.
5. EFFECTIVE USE OF LAND PARCELS.
SHREE BIRENDRA ARMY
HOSPITAL
LAND POOLING PROCESS IN KATHMANDU BEFORE LAND POOLING AND AFTER LAND POOLING
Before land pooling
Figure: Land Pooling Process
After land pooling
ZONING
OPEN SPACE COMMUNITY BUILDING
HOSPITAL CULTURAL SPACE
STREET
BANK
• RESIDENTIAL: 134052.22 SQ.M
• ROADWAYS: 47744.97 SQ.M
• OPEN SPACES:10683.48SQ.M
• MARKET AREA: 2034.95SQM.
• SCHOOL
SERVICES
• SOCIO CULTURAL SPACES
• FIRE SAFETY: PROVISION DEEP TANK UNDER CONSTRUCTION.
• COMMUNITY SPACE
• DRAINAGE : PUBLIC DRAIN
• WATER: DEEP WELLS AND WATER TANK
• WASTE DISPOSAL: MUNICIPALITY TRUCK IN EACH 2ND DAY.
ACTIVITIES
● MORE COMMERCIAL ACTIVITIES ARE N PRIMARY ROAD
● STREET VENDER AND SABJI MANDI IN NODES AREA
Figure: Road Figure: House Figure: Street Vendor
STREETS AND ROAD
HOUSING PATTERN • PRIMARY ROADS: 10M.
• ROW HOUSING IN THE MAIN ROAD AND DISPERSED IN • SECONDARY ROAD: 5M.
THE SECONDARY ROAD. • ROADS MEETING ON A CERTAIN NODE.
• 6 M MIN HOUSING FRONT FACE, 1.5M SET BACK. • 3M TURNING RADIUS.
• NO SEPTIC TANK; DIRECT PUBLIC DRAIN. • PLANNED ROAD NETWORK, NO DEAD END.
• DEEP WELL IN MAXIMUM HOUSE, TANK WATER • FOOTPATH IN BOTH SIDES 80CM.
PROVISION ONCE WEEK.
• COMPULSORY GREEN BELT IN EACH HOUSE.