Bridge Needs Ratio - BNR
Bridge Needs Ratio - BNR
(BNR)
BRIDGE DATA PROCESSING
BMS Application
CONDITION SURVEY Condition No Bridge in good condition
By Accredited State Exclude
Bridge Inspector 2 & 3?
Compute
Ranking
BNR
BMS Reporting
No Engineering Yes
Inspection
Recommended Recommended
Required?
Intervention Intervention
Cost Type
Conduct Engineering
Inspection
Modify Modify
Intervention Cost Intervention Type Eng’g. Insp. Report
Recommendations
Scoring/
Prioritization
Bridge Programs
BRIDGE DATA PROCESSING
BMS Application
CONDITION SURVEY Condition No Bridge in good condition
By Accredited State Exclude
Bridge Inspector 2 & 3?
Compute Ranking
BNR
BMS Reporting
No Engineering Yes
Inspection
Recommended Recommended
Required?
Intervention Intervention
Cost Type
Conduct Engineering
Inspection
Modify Modify
Intervention Cost Intervention Type Eng’g. Insp. Report
Recommendations
Scoring/
Prioritization
Bridge Programs
Bridge Needs Ratio (BNR)
Objectives:
This procedure will provide a method for ranking of the
intervention needs requirement of each bridge based on
the calculated normalized Bridge Needs Ratio (BNR)
parameter.
Other
Calculate BMC Factors
Primary 1.00
Secondary 0.75
Tertiary 0.50
SPAN No. 1 (one set of forms for each span) Bridge ID B00239LZ Bridge Name TAGAS BR.
SPAN No. 2 (one set of forms for each span) Bridge ID B00239LZ Bridge Name TAGAS BR.
SPAN No. 3 (one set of forms for each span) Bridge ID B00239LZ Bridge Name TAGAS BR.
Condition State Ci
Element Attributes Wi S1 S2 S3
deck 3.0 0 0 0
main member 8.0 0 0 1
SPAN secondary/other 6.0 0 2 2
left railing 1.0 0 0 0
right railing 1.0 0 0 0
Data from Bridge Condition Survey
Condition State on Pier 1 & 2 of Tagas Br.
PIER ELEMENT - CONDITION
PIER No. 1 (one set of forms for each pier) Bridge ID B00239LZ Bridge Name TAGAS BR.
Scour/Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 3.1
Height, bridge deck to ground level, right, (m) 3.1
PIER No. 2 (one set of forms for each pier) Bridge ID B00239LZ Bridge Name TAGAS BR.
Scour/Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 2.9
Height, bridge deck to ground level, right, (m) 2.9
ABUTMENT No. 1 (one set of froms for each abutment) Bridge ID B00239LZ Bridge Name TAGAS BR.
Scour/ Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 3.2
Height, bridge deck to ground level, right, (m) 3.2
EXPANSION
Within 2 years
Within 10 years
2
1
assessed
Partially
Protective measures
Strengthen
Installation of Asphaltic Plug joint for
deteriorated sealant is recommended to
JOINT None 0 assessed Replace prevent water leakage
Not Applicable Not Other
assessed Total Estimated Cost 425,000.00
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
BEARING/ Within 10 years 1 Partially Strengthen
RESTRAINT None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
LEFT WING Within 10 years 1 Partially Strengthen
WALL None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
RIGHT WING Within 10 years 1 Partially Strengthen
WAL None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
SCOUR/BANK Within 10 years 1 Partially Strengthen
PROTECTION None 0
assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
BRIDGE Within 10 years 1 Partially Strengthen
APPROACH None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Data from Bridge Condition Survey
Condition State on Abutment 1 & 2 of Tagas Br.
ABUTMENT ELEMENT - CONDITION (1/2)
ABUTMENT No. 2 (one set of froms for each abutment) Bridge ID B00239LZ Bridge Name TAGAS BR.
Scour/ Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 3.2
Height, bridge deck to ground level, right, (m) 3.2
EXPANSION
Within 2 years
Within 10 years
2
1
assessed
Partially
Protective measures
Strengthen
Installation of Asphaltic Plug joint for
deteriorated sealant is recommended to
JOINT None 0 assessed Replace prevent water leakage
Not Applicable Not Other
assessed Total Estimated Cost 425,000.00
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
BEARING/ Within 10 years 1 Partially Strengthen
RESTRAINT None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
Within 10 years 1 Partially Strengthen
LEFT WING WALL
None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
Within 10 years 1 Partially Strengthen
RIGHT WING WAL
None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
SCOUR/BANK Within 10 years 1 Partially Strengthen
PROTECTION None 0
assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate
Within 2 years
3
2
Fully
assessed
Repair damage
Protective measures
BRIDGE Within 10 years 1 Partially Strengthen
APPROACH None
Not Applicable
0
assessed
Not
Replace
Other
assessed Total Estimated Cost
Data from Bridge Condition Survey
Condition State on Abutment 1 & 2 of Tagas Br.