Ball Pen Plant Visual Slides

The document outlines a strategic investment proposal for a Ball Pen Production Plant in Ethiopia, highlighting a projected annual demand of 150 million pens and the creation of over 150 jobs within nine months. It includes a detailed project timeline, investment breakdown of $1.3 million, and financial projections indicating a break-even point in three years with a 35% gross margin. The proposal emphasizes alignment with local industrial policies and aims to mitigate potential risks associated with the project.

Uploaded by

asmeshayele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views13 pages

Ball Pen Plant Visual Slides

The document outlines a strategic investment proposal for a Ball Pen Production Plant in Ethiopia, highlighting a projected annual demand of 150 million pens and the creation of over 150 jobs within nine months. It includes a detailed project timeline, investment breakdown of $1.3 million, and financial projections indicating a break-even point in three years with a 35% gross margin. The proposal emphasizes alignment with local industrial policies and aims to mitigate potential risks associated with the project.

Uploaded by

asmeshayele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Cover Slide

• Map of Ethiopia + Ball pen icon overlay


• Title: Ball Pen Production Plant – Ethiopia
• Subtitle: Strategic Manufacturing Investment
Executive Summary
• Infographic with icons:
• - 150M annual demand (Pen icon)
• - Local plant in 9 months (Factory icon)
• - 150+ jobs (Workers icon)
• - ROI in 2.5 years (Dollar icon)
Market Justification
• Bar chart: Import vs Local Production
• Map with logistics bottlenecks
Strategic Alignment
• Puzzle pieces:
• - Industrial Policy
• - Education Growth
• - Import Substitution
• - Employment
Project Objectives
• Timeline with milestones:
• - M1: Setup
• - M4: Construction
• - M6: Pilot run
• - M9: Full launch
Activities Breakdown
• 6 icon blocks:
• Feasibility | Land Prep | Equipment | Hiring |
Training | Pilot
Project Timeline
• Gantt-style bar chart over 9 months:
• Planning → Construction → Equipment →
Hiring → Production
Investment Breakdown
• Pie chart:
• - Machinery: 45%
• - Construction: 30%
• - Working Capital: 25%
• Total: $1.3M
Resources
• Icons with labels:
• - 25 technicians
• - 6 managers
• - 3 raw material streams
• - 1 assembly line
Financial Projections
• Line chart: Revenue over 3 years
• Break-even in Year 3
ROI & Margins
• ROI gauge or meter graphic:
• - 35% Gross Margin
• - 2.5-Year Payback
Risks & Mitigation
• Two-column table:
• Risks (alert icons) and Mitigation (shield icons)
Call to Action
• Visuals: Handshake + Dollar icon
• Text overlay: Be part of Ethiopia’s industrial
future