Software Engineering
College of Arts, Media and Technology ,CMU.

Kittitouch S.
1.2-26-11-12









The SQA system
Pre-project component
Software project life cycle components
Infrastructure components for error prevention and
improvement
Management SQA components
SQA standards, system certification, and
assessment components
Organizing for SQA
Considerations guiding construction of an
organization’s SQA system


Software is…
▪ High complexity.
▪ Invisible product.
▪ Hard to search and fix defect(bug).



SQA system components can be classified
into six classes:
Ch 4 components of the sqa system
resources required
–Reviews
–Expert opinions
–Software testing.

Operation
maintenance
to eliminate or at least
reduce the rate of errors
prevent or minimize
schedule and
budget failures and their
outcomes.
Ch 4 components of the sqa system


utilization of international professional
knowledge.



improvement of coordination of the
organizational quality systems with other
organizations.



assessment of the achievements of quality
systems according to a common scale.
initiate and support
the implementation
of SQA
components, detect
deviations from SQA
procedures and
methodology, and
suggest
improvements.
Ch 4 components of the sqa system


Contract- the development unit is committed to an
agreed-upon functional specification, budget and schedule.



examination of…
 the project proposal draft.
 the contract drafts.


Clarification of the customer’s requirements



Review of the project’s schedule and resource
requirement estimates



Evaluation of the professional staff’s capacity
to carry out the proposed project


Evaluation of the customer’s capacity to fulfill
his obligations



Evaluation of development risks.
a plan is prepared of the project (“development
plan”) and its integrated quality assurance
activities (“quality plan”). These plans include
additional details and needed revisions based
on prior plans that provided the basis for the
current proposal and contract.
It is quite common for several months to pass
between the tender submission and the
signing of the contract.







Schedules
Required manpower and hardware resources
Risk evaluations
Organizational issues: team
members, subcontractors and partnerships
Project methodology, development
tools, etc.
Software reuse plans.


Quality goals, expressed in the appropriate
measurable terms



Criteria for starting and ending each project
stage



Lists of reviews, tests, and other scheduled
verification and validation activities.


Read the examples of Project Plan and
Quality Plan in SQA. site.
Ch 4 components of the sqa system


Reviews



Expert opinions



Software testing



Software maintenance



Assurance of the quality of the subcontractors’
work and the customer supplied parts.


The design phase of the development
process produces a variety of documents.
The printed products include design reports,
software test documents, software installation
plans and software manuals, among others.
Reviews can be categorized as
 formal design reviews (DRs)
 peer reviews.


The committees are composed of senior
professionals, including the project leader
and, usually, the department manager, the
chief software engineer, and heads of other
related departments.



The DR report itself includes a list of required
corrections (termed “action items”).


When a design review committee sits in order to decide
upon the continuation of the work completed so far, one
of the following options is usually open for
consideration:
 Immediate approval of the DR document and continuation to

the next development phase.

 Approval to proceed to the next development phase after all

the action items have been completed and inspected by the
committee’s representative.

 An additional DR is required and scheduled to take place after

all the action items have been completed and inspected by the
committee’s representative.


Peer reviews (inspections and walkthroughs)
are directed at reviewing short
documents, chapters or parts of a report, a
coded printout of a software module.



usually, the reviewers are all peers, not
superiors, who provide professional
assistance to colleagues.


The main objective of inspections and
walkthroughs is to detect as many design and
programming faults as possible.



The output is a list of detected faults and, for
inspections, also a defect summary and
statistics to be used as a database for
reviewing and improving development
methods.


Expert opinions support quality assessment
efforts by introducing additional external
capabilities into the organization’s in-house
development process. Turning to outside
experts may be particularly useful in the
following situations:


Insufficient in-house professional capabilities
in a given area.



In small organizations in many cases it is
difficult to find enough suitable candidates to
participate in the design review teams.



In cases of major disagreement among the
organization’s


Software tests are formal SQA components
that are targeted toward review of the actual
running of the software. The tests are based
on a prepared list of test cases that represent
a variety of expected scenarios.



The test report will include a detailed list of
the faults detected and recommendations.


Software maintenance services vary in range
and are provided for extensive periods, often
several years. These services fall into the
following categories:

 Corrective maintenance – User’s support

services and correction of soft-ware code and
documentation failures
 Adaptive maintenance – Adaptation of

current software to new circumstances and
customers without changing the basic
software product.
 Functionality improvement maintenance –

The functional and performance related
improvement of existing software, carried
out with respect to limited issues.


Subcontractors and customers frequently
join the directly contracted developers (the
“supplier”) in carrying out software
development projects. The larger and more
complex the project, the greater the
likelihood that external participants will be
required, and the larger the proportion of
work trans-mitted to them
Ch 4 components of the sqa system







Procedures and work instructions
Templates and checklists
Staff training, retraining, and certification
Preventive and corrective actions
Configuration management
Documentation control.
Ch 4 components of the sqa system


Project progress control (including
maintenance contract control)



Software quality metrics



Software quality costs.
Ch 4 components of the sqa system


Quality management standards
 SEI CMM assessment standard
 ISO 9001 and ISO 9000-3 standards.



Project process standards
 IEEE 1012 standard
 ISO/IEC 12207 standard.
 ISO/IEC 29110 standard
Ch 4 components of the sqa system


Management’s role in SQA
 The responsibilities of top management



The SQA unit
 This unit and software testers are the only parts of

the SQA organizational base that devote
themselves full-time to SQA matters.


SQA trustees, committees and forums
 SQA trustees are members of development and

maintenance teams who have a special interest in
software quality and are prepared to devote part
of their time to these issues.
Ch 4 components of the sqa system


Decisions regarding the organization’s
software quality management sys-tem fall
into two main categories:

1.

The SQA organizational base
The SQA components to be implemented
within the organization and the extent of
their use.

2.


The type of software development clientele.



The type of software maintenance clientele.



The range of products.



The size of the organization.



The degree and nature of cooperation with other
organizations carrying out related projects.



Optimization objectives.


The level of software complexity and
difficulty.



The degree of staff experience with project
technology.



The extent of software reuse in new projects.


Professional qualifications.



Level of acquaintance with team members.


Chapter 4:Daniel Galin. SOFTWARE QUALITY ASSURANCE From
theory to implementation. Pearson Education Limited,2004.

More Related Content

PPT
McCall's Quality Factors
PPTX
Globalization issues in project management
PPTX
Ch 6 development plan and quality plan
PDF
Siber Güvenlik ve Etik Hacking Sunu - 2
PDF
Cambridge. grammar and vocabulary for advanced
PPT
Software Quality Challenge
PPTX
Ch 2 what is software quality
PPT
Activity planning
McCall's Quality Factors
Globalization issues in project management
Ch 6 development plan and quality plan
Siber Güvenlik ve Etik Hacking Sunu - 2
Cambridge. grammar and vocabulary for advanced
Software Quality Challenge
Ch 2 what is software quality
Activity planning

What's hot (20)

PPTX
Ch 5 contract review
PPTX
Ch 7 integrating quality activities in the projectlife cycle
PPTX
Staffing level estimation
PPT
Software Project Management
PDF
Software Engineering : Requirement Analysis & Specification
PPT
Object Oriented Analysis and Design
PPTX
software project management Artifact set(spm)
PPTX
Lect5 improving software economics
PPT
3.2 The design model & Architectural design.ppt
PPTX
Conventional software Management---.pptx
PPT
Chapter 13 software testing strategies
PPTX
Software development life cycle (SDLC)
PPTX
Defining the Problem - Goals and requirements
PPTX
Planning the development process
PPTX
WORKFLOW OF THE PROCESS IN SPM
PPT
Unit 5 testing -software quality assurance
PDF
Software Development Life Cycle (SDLC)
PPTX
Model Based Software Architectures
PPTX
Software Engineering Practice
PDF
Software quality management standards
Ch 5 contract review
Ch 7 integrating quality activities in the projectlife cycle
Staffing level estimation
Software Project Management
Software Engineering : Requirement Analysis & Specification
Object Oriented Analysis and Design
software project management Artifact set(spm)
Lect5 improving software economics
3.2 The design model & Architectural design.ppt
Conventional software Management---.pptx
Chapter 13 software testing strategies
Software development life cycle (SDLC)
Defining the Problem - Goals and requirements
Planning the development process
WORKFLOW OF THE PROCESS IN SPM
Unit 5 testing -software quality assurance
Software Development Life Cycle (SDLC)
Model Based Software Architectures
Software Engineering Practice
Software quality management standards
Ad

Similar to Ch 4 components of the sqa system (20)

PPTX
Components of the sqa system
PPT
Slides chapters 26-27
PPTX
SQA-Lecture-4.pptx
PPT
marghjjkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Software quality assurance
PPT
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
PPTX
Software Engineering
PPTX
Software Engineering
PPTX
STLC & SDLC-ppt-1.pptx
PPTX
SDLC comprises seven different stages: planning, analysis, design, developmen...
PPT
Planning for software quality assurance lecture 6
PPT
Quality Management
PPT
Ch27
PPT
Quality Mangt
PPT
CMM Capability maturity model for engg.ppt
PPT
PPT
Software Quality Assurance in software engineering
PPTX
Software quality assurance
PPTX
Lec 1-SOFTWARE QUALITY ENGINEERING introduction (1).pptx
PPTX
Quality Assurance and Testing services
Components of the sqa system
Slides chapters 26-27
SQA-Lecture-4.pptx
marghjjkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Software quality assurance
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Software Engineering
Software Engineering
STLC & SDLC-ppt-1.pptx
SDLC comprises seven different stages: planning, analysis, design, developmen...
Planning for software quality assurance lecture 6
Quality Management
Ch27
Quality Mangt
CMM Capability maturity model for engg.ppt
Software Quality Assurance in software engineering
Software quality assurance
Lec 1-SOFTWARE QUALITY ENGINEERING introduction (1).pptx
Quality Assurance and Testing services
Ad

More from Kittitouch Suteeca (20)

PPTX
Ch 10 cost of software quality
PPTX
Ch 9 traceability and verification
PPTX
Ch 8 configuration management
PPTX
Ch 3 software quality factor
PPTX
Ch 1 the software quality assurance challange
PPTX
Ch 0 introduction to se422
PPTX
Ch 12(spi)cm mi scampi
PPTX
Ch 11(spi)relationship pa
PPTX
Ch 10(spi)cm mi-cm-ppqa
PPTX
Ch 10(spi)cm mi-cm-ppqa
PPTX
Ch 9(spi)cm mi reqm
PPTX
Ch 8(spi)cm mi-pp
PPTX
Ch 7(spi)intro tocm-mi2013
PPTX
Se423mid term preview
PPTX
Se423mid term preview
PPTX
Data collection
PPTX
Ch6 performinng to asessment
PPTX
Ch5 software imprementation1.0
PPTX
Ch4 project management process
PPTX
Ch3 introduction to iso29110
Ch 10 cost of software quality
Ch 9 traceability and verification
Ch 8 configuration management
Ch 3 software quality factor
Ch 1 the software quality assurance challange
Ch 0 introduction to se422
Ch 12(spi)cm mi scampi
Ch 11(spi)relationship pa
Ch 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqa
Ch 9(spi)cm mi reqm
Ch 8(spi)cm mi-pp
Ch 7(spi)intro tocm-mi2013
Se423mid term preview
Se423mid term preview
Data collection
Ch6 performinng to asessment
Ch5 software imprementation1.0
Ch4 project management process
Ch3 introduction to iso29110

Recently uploaded (20)

PDF
CXOs-Are-you-still-doing-manual-DevOps-in-the-age-of-AI.pdf
PDF
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
PDF
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
PDF
Flame analysis and combustion estimation using large language and vision assi...
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PDF
STKI Israel Market Study 2025 version august
PDF
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
PDF
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
PPTX
Internet of Everything -Basic concepts details
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
The influence of sentiment analysis in enhancing early warning system model f...
PDF
Dell Pro Micro: Speed customer interactions, patient processing, and learning...
PDF
Five Habits of High-Impact Board Members
PDF
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
PPTX
Build Your First AI Agent with UiPath.pptx
PDF
Enhancing plagiarism detection using data pre-processing and machine learning...
PPTX
Custom Battery Pack Design Considerations for Performance and Safety
PPTX
Configure Apache Mutual Authentication
PPTX
Microsoft Excel 365/2024 Beginner's training
PPTX
Module 1 Introduction to Web Programming .pptx
CXOs-Are-you-still-doing-manual-DevOps-in-the-age-of-AI.pdf
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
Flame analysis and combustion estimation using large language and vision assi...
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
STKI Israel Market Study 2025 version august
Transform-Your-Supply-Chain-with-AI-Driven-Quality-Engineering.pdf
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
Internet of Everything -Basic concepts details
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
The influence of sentiment analysis in enhancing early warning system model f...
Dell Pro Micro: Speed customer interactions, patient processing, and learning...
Five Habits of High-Impact Board Members
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
Build Your First AI Agent with UiPath.pptx
Enhancing plagiarism detection using data pre-processing and machine learning...
Custom Battery Pack Design Considerations for Performance and Safety
Configure Apache Mutual Authentication
Microsoft Excel 365/2024 Beginner's training
Module 1 Introduction to Web Programming .pptx

Ch 4 components of the sqa system

  • 1. Software Engineering College of Arts, Media and Technology ,CMU. Kittitouch S. 1.2-26-11-12
  • 2.         The SQA system Pre-project component Software project life cycle components Infrastructure components for error prevention and improvement Management SQA components SQA standards, system certification, and assessment components Organizing for SQA Considerations guiding construction of an organization’s SQA system
  • 3.  Software is… ▪ High complexity. ▪ Invisible product. ▪ Hard to search and fix defect(bug).  SQA system components can be classified into six classes:
  • 7. to eliminate or at least reduce the rate of errors
  • 8. prevent or minimize schedule and budget failures and their outcomes.
  • 10.  utilization of international professional knowledge.  improvement of coordination of the organizational quality systems with other organizations.  assessment of the achievements of quality systems according to a common scale.
  • 11. initiate and support the implementation of SQA components, detect deviations from SQA procedures and methodology, and suggest improvements.
  • 13.  Contract- the development unit is committed to an agreed-upon functional specification, budget and schedule.  examination of…  the project proposal draft.  the contract drafts.
  • 14.  Clarification of the customer’s requirements  Review of the project’s schedule and resource requirement estimates  Evaluation of the professional staff’s capacity to carry out the proposed project
  • 15.  Evaluation of the customer’s capacity to fulfill his obligations  Evaluation of development risks.
  • 16. a plan is prepared of the project (“development plan”) and its integrated quality assurance activities (“quality plan”). These plans include additional details and needed revisions based on prior plans that provided the basis for the current proposal and contract. It is quite common for several months to pass between the tender submission and the signing of the contract.
  • 17.       Schedules Required manpower and hardware resources Risk evaluations Organizational issues: team members, subcontractors and partnerships Project methodology, development tools, etc. Software reuse plans.
  • 18.  Quality goals, expressed in the appropriate measurable terms  Criteria for starting and ending each project stage  Lists of reviews, tests, and other scheduled verification and validation activities.
  • 19.  Read the examples of Project Plan and Quality Plan in SQA. site.
  • 21.  Reviews  Expert opinions  Software testing  Software maintenance  Assurance of the quality of the subcontractors’ work and the customer supplied parts.
  • 22.  The design phase of the development process produces a variety of documents. The printed products include design reports, software test documents, software installation plans and software manuals, among others. Reviews can be categorized as  formal design reviews (DRs)  peer reviews.
  • 23.  The committees are composed of senior professionals, including the project leader and, usually, the department manager, the chief software engineer, and heads of other related departments.  The DR report itself includes a list of required corrections (termed “action items”).
  • 24.  When a design review committee sits in order to decide upon the continuation of the work completed so far, one of the following options is usually open for consideration:  Immediate approval of the DR document and continuation to the next development phase.  Approval to proceed to the next development phase after all the action items have been completed and inspected by the committee’s representative.  An additional DR is required and scheduled to take place after all the action items have been completed and inspected by the committee’s representative.
  • 25.  Peer reviews (inspections and walkthroughs) are directed at reviewing short documents, chapters or parts of a report, a coded printout of a software module.  usually, the reviewers are all peers, not superiors, who provide professional assistance to colleagues.
  • 26.  The main objective of inspections and walkthroughs is to detect as many design and programming faults as possible.  The output is a list of detected faults and, for inspections, also a defect summary and statistics to be used as a database for reviewing and improving development methods.
  • 27.  Expert opinions support quality assessment efforts by introducing additional external capabilities into the organization’s in-house development process. Turning to outside experts may be particularly useful in the following situations:
  • 28.  Insufficient in-house professional capabilities in a given area.  In small organizations in many cases it is difficult to find enough suitable candidates to participate in the design review teams.  In cases of major disagreement among the organization’s
  • 29.  Software tests are formal SQA components that are targeted toward review of the actual running of the software. The tests are based on a prepared list of test cases that represent a variety of expected scenarios.  The test report will include a detailed list of the faults detected and recommendations.
  • 30.  Software maintenance services vary in range and are provided for extensive periods, often several years. These services fall into the following categories:  Corrective maintenance – User’s support services and correction of soft-ware code and documentation failures
  • 31.  Adaptive maintenance – Adaptation of current software to new circumstances and customers without changing the basic software product.  Functionality improvement maintenance – The functional and performance related improvement of existing software, carried out with respect to limited issues.
  • 32.  Subcontractors and customers frequently join the directly contracted developers (the “supplier”) in carrying out software development projects. The larger and more complex the project, the greater the likelihood that external participants will be required, and the larger the proportion of work trans-mitted to them
  • 34.       Procedures and work instructions Templates and checklists Staff training, retraining, and certification Preventive and corrective actions Configuration management Documentation control.
  • 36.  Project progress control (including maintenance contract control)  Software quality metrics  Software quality costs.
  • 38.  Quality management standards  SEI CMM assessment standard  ISO 9001 and ISO 9000-3 standards.  Project process standards  IEEE 1012 standard  ISO/IEC 12207 standard.  ISO/IEC 29110 standard
  • 40.  Management’s role in SQA  The responsibilities of top management  The SQA unit  This unit and software testers are the only parts of the SQA organizational base that devote themselves full-time to SQA matters.
  • 41.  SQA trustees, committees and forums  SQA trustees are members of development and maintenance teams who have a special interest in software quality and are prepared to devote part of their time to these issues.
  • 43.  Decisions regarding the organization’s software quality management sys-tem fall into two main categories: 1. The SQA organizational base The SQA components to be implemented within the organization and the extent of their use. 2.
  • 44.  The type of software development clientele.  The type of software maintenance clientele.  The range of products.  The size of the organization.  The degree and nature of cooperation with other organizations carrying out related projects.  Optimization objectives.
  • 45.  The level of software complexity and difficulty.  The degree of staff experience with project technology.  The extent of software reuse in new projects.
  • 46.  Professional qualifications.  Level of acquaintance with team members.
  • 47.  Chapter 4:Daniel Galin. SOFTWARE QUALITY ASSURANCE From theory to implementation. Pearson Education Limited,2004.