The document summarizes the design process for the Bangalore International Centre (BIC) building project. It began as a dramatic competition scheme with a cantilevered mass but had to be modified for practical reasons. The final design features a concrete frame containing shared public spaces on multiple floors connected by a central promenade. While different from the initial vision, the completed building successfully expresses collaboration between architects and clients through a negotiated, shared design.