CapstoneProject
This is a hands-on demonstration of student abilities as a technician and understandingof the concepts and technologies studied for
the past18 months. This is where you, the student, prove what you have learned by designinga fully functioningnetwork that
includes the items listed below. The student will givea presentation on their design that should includetheir thought process on the
project, and the strength and weakness of both the network and the student’s ability. The student will complete the network on his
own with very little assistance from Instructors or other students! Once the project is complete, student will schedulewith the
instructor a time to present, this should includebusinessdress and invitationsto all NetworkingInstructors. No preconfigured or
turnkey solution accepted and any negative effects on the lab performance such as IPs handed out, etc will result in loss of points.
 BuildCat5e cable to fittheirneed,be careful toterminate properly,andbe organized
 Install/Configure CiscoRouterStudentmayonlyuse 1 WAN IP to accomplishall below
 Install/Configure CiscoSwitch
 Studentwill create 2VLANSall servers, labdesktop computerand1Linux client will be onone andat leastone
WindowsClientonVLAN 2(student’slaptopisoktouse for thispurpose).
 Apache WebserverrunningonCentOS7available fromoutside firewall.Basicwebpage is OK
 RDP serveravailable from outside firewall usingport33890
 Internal DNSservertobe able toaccess webpage byname fromall clients
 Both VLAN will receive clientIP’sfromone DHCPserversoVLAN 2 computerswill needtoaccessDHCPon VLAN
1-- IPscheme shouldbe determinedusing subnettingskills
 AD controllerkeepinguptime andredundancyinmind
 At least25 Users,we will randomlypickusertotest.Needthese usersdistributedbetween4departments.(RD,
Accounting,Sales,Engineering)
 Personal Drivesmappedviagrouppolicyforall users toserver,shouldonlyhave accesstotheirs
 FolderRedirectionandOffline Filesimplemented
 Map a Printerforeach department andavailableforthose usersatlogon usinglogonscript
 PasswordPolicyforall users (8-characters,30 day expiration,defaultcomplexity)
 Once the studentsExchange serversare upand functioninginExchange class itshouldserve email tothe
networkusers included in project,each usershouldhave email accountanduse Outlook tosend/receive ona
windowsclient.
 Utilize WSUSserverwithWindowsUpdatesapprovedforclientsmachines.
 Use VeeamBackuptobackup yourVMs (A free editionisavailable.If usingatrial be mindful of yourtrial period.
It mustfunctionthroughcompletionof the projectforpoints)
 Create a disasterrecoveryplan.(Documentandorganize whatisneededtoensure thisnetworkwouldbe
available if facedwithadisaster.)
 Openfilershouldbe usedforaNFSsolutionforVMware andaddedto ESXi as Datastore
 Vmware vMotionconfigured usingvCenter
 PXE bootsolutionforrapiddeployment.Use FOGor Windows DeploymentServer.Sysprepimage andbe able to
demonstrate functionality.
 SQUID proxyserverformonitoringinternettraffic.Setsome rules andbe able toverifyoperation.
 SecurityAudit- Use Kali Linux toolssuchas nmap,OpenVAS,andNikto.Documentandapplyappropriate
securitymeasurestonetwork.Includebefore/afterauditreportswithdocumentationonce completedto
establishbaseline
 Thoroughnetworkdocumentation.Be able to answerquestionsduringpresentation.
 PresentationMUSTbe set byMay 2 or itwill be scheduledforyou.
This is the only grade for this class. As this is the final project, students should expect stringent grading of the above. A rubricfor
each step will be used for grading, failure to complete a step fully will results in a 0 for that entire task if completed successfully it
will be a 1.

More Related Content

DOCX
Capstone Project
PDF
Software architecture-patterns
PDF
CQRS recepies
PPTX
Software architecture patterns
PDF
Model-driven Distributed Software Deployment
PDF
Grokking Techtalk: Problem solving for sw engineers
DOC
Srividhya_pm_resume_latest
PDF
Anand madhab c linux
Capstone Project
Software architecture-patterns
CQRS recepies
Software architecture patterns
Model-driven Distributed Software Deployment
Grokking Techtalk: Problem solving for sw engineers
Srividhya_pm_resume_latest
Anand madhab c linux

Similar to Capstone Project (20)

PPTX
NSA Capstone Project III final pp
PDF
Identity based encryption
DOCX
DOC
V.S.VamsiKrishna
PDF
Project-based Training in Network Programming.pdf
DOCX
David nickerson resume--gd
DOC
Resume-Piyush_Agarwal (1)
PDF
Gervais Peter Resume Oct :2015
DOCX
9 yrs of Testing Exp_STB and DSL gateway products
PDF
Christopher_Reder_2016
DOC
Ajay Singh
DOC
Resume piyush agarwal (1)(1)
PDF
CHAT APPLICATION THROUGH CLIENT SERVER MANAGEMENT SYSTEM PROJECT REPORT
PDF
Lasitha_Konara_CV
DOCX
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
DOCX
Julio andradecv
PPT
How Freelancers Can Leverage Full-Stack Development.ppt
PDF
Chat application through client server management system project.pdf
DOC
Resume (5)
NSA Capstone Project III final pp
Identity based encryption
V.S.VamsiKrishna
Project-based Training in Network Programming.pdf
David nickerson resume--gd
Resume-Piyush_Agarwal (1)
Gervais Peter Resume Oct :2015
9 yrs of Testing Exp_STB and DSL gateway products
Christopher_Reder_2016
Ajay Singh
Resume piyush agarwal (1)(1)
CHAT APPLICATION THROUGH CLIENT SERVER MANAGEMENT SYSTEM PROJECT REPORT
Lasitha_Konara_CV
BMIS 520IT Infrastructure Project Designing LAN Networks Assign
Julio andradecv
How Freelancers Can Leverage Full-Stack Development.ppt
Chat application through client server management system project.pdf
Resume (5)
Ad

Capstone Project

  • 1. CapstoneProject This is a hands-on demonstration of student abilities as a technician and understandingof the concepts and technologies studied for the past18 months. This is where you, the student, prove what you have learned by designinga fully functioningnetwork that includes the items listed below. The student will givea presentation on their design that should includetheir thought process on the project, and the strength and weakness of both the network and the student’s ability. The student will complete the network on his own with very little assistance from Instructors or other students! Once the project is complete, student will schedulewith the instructor a time to present, this should includebusinessdress and invitationsto all NetworkingInstructors. No preconfigured or turnkey solution accepted and any negative effects on the lab performance such as IPs handed out, etc will result in loss of points.  BuildCat5e cable to fittheirneed,be careful toterminate properly,andbe organized  Install/Configure CiscoRouterStudentmayonlyuse 1 WAN IP to accomplishall below  Install/Configure CiscoSwitch  Studentwill create 2VLANSall servers, labdesktop computerand1Linux client will be onone andat leastone WindowsClientonVLAN 2(student’slaptopisoktouse for thispurpose).  Apache WebserverrunningonCentOS7available fromoutside firewall.Basicwebpage is OK  RDP serveravailable from outside firewall usingport33890  Internal DNSservertobe able toaccess webpage byname fromall clients  Both VLAN will receive clientIP’sfromone DHCPserversoVLAN 2 computerswill needtoaccessDHCPon VLAN 1-- IPscheme shouldbe determinedusing subnettingskills  AD controllerkeepinguptime andredundancyinmind  At least25 Users,we will randomlypickusertotest.Needthese usersdistributedbetween4departments.(RD, Accounting,Sales,Engineering)  Personal Drivesmappedviagrouppolicyforall users toserver,shouldonlyhave accesstotheirs  FolderRedirectionandOffline Filesimplemented  Map a Printerforeach department andavailableforthose usersatlogon usinglogonscript  PasswordPolicyforall users (8-characters,30 day expiration,defaultcomplexity)  Once the studentsExchange serversare upand functioninginExchange class itshouldserve email tothe networkusers included in project,each usershouldhave email accountanduse Outlook tosend/receive ona windowsclient.  Utilize WSUSserverwithWindowsUpdatesapprovedforclientsmachines.  Use VeeamBackuptobackup yourVMs (A free editionisavailable.If usingatrial be mindful of yourtrial period. It mustfunctionthroughcompletionof the projectforpoints)  Create a disasterrecoveryplan.(Documentandorganize whatisneededtoensure thisnetworkwouldbe available if facedwithadisaster.)  Openfilershouldbe usedforaNFSsolutionforVMware andaddedto ESXi as Datastore  Vmware vMotionconfigured usingvCenter  PXE bootsolutionforrapiddeployment.Use FOGor Windows DeploymentServer.Sysprepimage andbe able to demonstrate functionality.  SQUID proxyserverformonitoringinternettraffic.Setsome rules andbe able toverifyoperation.  SecurityAudit- Use Kali Linux toolssuchas nmap,OpenVAS,andNikto.Documentandapplyappropriate securitymeasurestonetwork.Includebefore/afterauditreportswithdocumentationonce completedto establishbaseline  Thoroughnetworkdocumentation.Be able to answerquestionsduringpresentation.  PresentationMUSTbe set byMay 2 or itwill be scheduledforyou. This is the only grade for this class. As this is the final project, students should expect stringent grading of the above. A rubricfor each step will be used for grading, failure to complete a step fully will results in a 0 for that entire task if completed successfully it will be a 1.