Curriculum Vitae
Name : Muhammed Nour Othman Al
Mahmoud
Mobile : UAE 00971553377091
Tel :
E-mail : m.nour1983@yahoo.com
PERSONAL INFORMATION
Date of Birth : 1 April 1983
Place of Birth : Syria – Homs
Nationality : Syrian
Gender : Male
Marital status : Married
EDUCATION RECORD
Study : institute civil surveying - Albaath University - Homs - Syria.
Specialty : Surveying
Degree : Good.
Date of Graduation : 2006
WORK EXPERIENCE
United Arab Emirates:
COMPANY: al turath al aseel contracting
Position : Senior Surveyor
YAER: from 3/2/2014 up to now
1- PROJECT NAME AND LOCATION: 114 national house at Alriq – suhillah
With Ministry Of public Works building Department – UAE- DUBAI
2- PROJECT NAME AND LOCATION:pj10082 PROJECT NAME AND
LOCATION: emirats petroleum , EMARAT CENTRAL WORKSHOP
PROPOSED REDEVELOPMENT AT AL QUSAIS.
1
3- DUBAI MUNICIPALITY, PUBLIC HEALTH SERVICES DEPARTMENT AL
QOUZ ABATTOIR (PJ- 10063)
4- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY,
ADMIN.BUILDING + BOUNDARYWALL-JUMEIRA ARCHAEOLOGICAL SITE
5- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY, ANIMALS AND
BIRDS QUARANTINE (AL AWIR FIRST – DUBAI)
6- PROJECT NAME AND LOCATION: emirates transport , bus station AND
WORKSHOP IN HATTA
7- PROJECT NAME AND LOCATION: 11villas in jema dubai
Title: type-1 villa (GR+1) first floor framing and roof framing plan
With road work and infrastructure inside the project
Client :dubai municiplity
8- -32villas in old hatta Neighbour Hood Client: Dubai Municipality
Title: type-1 villa (GR+1) first floor framing and roof framing plan
With road work and infrastructure inside the project
Client :dubai municiplity
Main responsibilities
- Daly survey report to give consultant al the information abut surveyor work in the site.
- Coordinate with the Site Engineers for the priority of the project with regards to
implementation, changes of plans or deviations unusual activities or non-conformances
rectification work and Coordinate with the Consultant for the Inspection & Approval
-Monitoring, inspection, documentations and ensure quality of work is maintained in the
implementation of work as per plan and specifications
-Giving reference elevations for the embedded plates as per design and setting out of
coordinates, levels of GRE Pipe and Stainless Pipes with a great accuracy and marking the
wall elevation that will be used as a baseline for the carpenter / mason work
-Setting out / Stake out of all the coordinates project boundary & property lines alignments
and elevations for roads, swales, ditches and manholes, design elevations, structure
position, drains, center line and offset reference using the functions in Total Stations
-Set, Check line and grade of vertical structures using laser of electronic total stations.
-Computing the correct coordinates of the traverse using AutoCAD and TopSurv on board
-Getting the elevation of the ground that will be used for checking the elevation of the
building
-Setting the columns and wall alignment and after concreting, set again the column
coordinates and wall for checking using Total Station
COMPANY: S.MOKBEL&PARTNERR.UAE
2
Position : land Surveyor
YEAR: from 10/10/2012 up to 2/2/4014
PROJECT NAME AND LOCATION: DEVELOPMENT OF PLOT#C38
Sector e-40 danet, ,Abu dhabi
PROJECT DESCRIPTION:
3B+ G+ M+ 21 TYPICAL FLOORS+ ROOF+ health clap
All the surveyor work in the tour from b1 up to last floor
Company : ACTCO General Contracting Co.
Position : shif Surveyor
Year : from February 7, 2008 up to 28 /9/2012
(1) Project : Jebel Ali Power and Desalination Station “M” - DUBAI
Consultant : Fichtner Consulting Engineers
Main Contractor : Doosan Heavy Industrial Construction Co.
Owner : Dubai Electricity & Water Authority
Responsibilities include:
Surveyor and building constructor for Civil works in all project which includes the
following:
• Local Electrical Building.
• Transformer and fire walls.
• Industrial tanks and it’s band walls
• Pipe rack foundation in all the project and it’s pedestal
• Local Electrical Building for D.F.O Forwarding Station.
• D.F.O Forwarding Station & Common Station.
• Waste Water Treatment Plant.
• Sewage Treatment Plant.
• Fire Fighting Foam Station.
• D.F.O Storage Tanks with Bund Walls
• Pipe Racks & Cable Trenches & Manhole & Electrical Duct Banks
• Transformer and fire walls.
• EDG (Emergency Diesel Generator).
• Fire Fighting Pipe Station
• Road works
• See water intaic (pump house)
• Out full
• Pipe line for gas
(2) project name : khalefa port in abu dhabi
Syria:
3
Company: ANBOBA FACTORIES
Position: Site surveyor
Year: From October 2006 to May 2007
Project: Oil Factories
Responsibilities include:
Site surveyor for works in the building which include the following works:
• All the concrete &structural works
• All the external and internal finishing works
ALBAATH UNIVERSITY
Topography surveyor to Homs City in Syria and Hama May2007 to Feb2008
Good computer skills, with knowledge of:AutoCAD , Word, Excel, Access, PowerPoint, E-
mail, Internet.
Total station (Leica ts02 ultra7- leica Ts09 - Topcon GTS-235N, sokkia set2x - nikon),
Level machine ( manual , laser )
LANGUAGES
• Arabic; (my mother tongue)
• English; very good (writing & reading & communication)
Valid UAE Driving License
4

cv nour

  • 1.
    Curriculum Vitae Name :Muhammed Nour Othman Al Mahmoud Mobile : UAE 00971553377091 Tel : E-mail : [email protected] PERSONAL INFORMATION Date of Birth : 1 April 1983 Place of Birth : Syria – Homs Nationality : Syrian Gender : Male Marital status : Married EDUCATION RECORD Study : institute civil surveying - Albaath University - Homs - Syria. Specialty : Surveying Degree : Good. Date of Graduation : 2006 WORK EXPERIENCE United Arab Emirates: COMPANY: al turath al aseel contracting Position : Senior Surveyor YAER: from 3/2/2014 up to now 1- PROJECT NAME AND LOCATION: 114 national house at Alriq – suhillah With Ministry Of public Works building Department – UAE- DUBAI 2- PROJECT NAME AND LOCATION:pj10082 PROJECT NAME AND LOCATION: emirats petroleum , EMARAT CENTRAL WORKSHOP PROPOSED REDEVELOPMENT AT AL QUSAIS. 1
  • 2.
    3- DUBAI MUNICIPALITY,PUBLIC HEALTH SERVICES DEPARTMENT AL QOUZ ABATTOIR (PJ- 10063) 4- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY, ADMIN.BUILDING + BOUNDARYWALL-JUMEIRA ARCHAEOLOGICAL SITE 5- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY, ANIMALS AND BIRDS QUARANTINE (AL AWIR FIRST – DUBAI) 6- PROJECT NAME AND LOCATION: emirates transport , bus station AND WORKSHOP IN HATTA 7- PROJECT NAME AND LOCATION: 11villas in jema dubai Title: type-1 villa (GR+1) first floor framing and roof framing plan With road work and infrastructure inside the project Client :dubai municiplity 8- -32villas in old hatta Neighbour Hood Client: Dubai Municipality Title: type-1 villa (GR+1) first floor framing and roof framing plan With road work and infrastructure inside the project Client :dubai municiplity Main responsibilities - Daly survey report to give consultant al the information abut surveyor work in the site. - Coordinate with the Site Engineers for the priority of the project with regards to implementation, changes of plans or deviations unusual activities or non-conformances rectification work and Coordinate with the Consultant for the Inspection & Approval -Monitoring, inspection, documentations and ensure quality of work is maintained in the implementation of work as per plan and specifications -Giving reference elevations for the embedded plates as per design and setting out of coordinates, levels of GRE Pipe and Stainless Pipes with a great accuracy and marking the wall elevation that will be used as a baseline for the carpenter / mason work -Setting out / Stake out of all the coordinates project boundary & property lines alignments and elevations for roads, swales, ditches and manholes, design elevations, structure position, drains, center line and offset reference using the functions in Total Stations -Set, Check line and grade of vertical structures using laser of electronic total stations. -Computing the correct coordinates of the traverse using AutoCAD and TopSurv on board -Getting the elevation of the ground that will be used for checking the elevation of the building -Setting the columns and wall alignment and after concreting, set again the column coordinates and wall for checking using Total Station COMPANY: S.MOKBEL&PARTNERR.UAE 2
  • 3.
    Position : landSurveyor YEAR: from 10/10/2012 up to 2/2/4014 PROJECT NAME AND LOCATION: DEVELOPMENT OF PLOT#C38 Sector e-40 danet, ,Abu dhabi PROJECT DESCRIPTION: 3B+ G+ M+ 21 TYPICAL FLOORS+ ROOF+ health clap All the surveyor work in the tour from b1 up to last floor Company : ACTCO General Contracting Co. Position : shif Surveyor Year : from February 7, 2008 up to 28 /9/2012 (1) Project : Jebel Ali Power and Desalination Station “M” - DUBAI Consultant : Fichtner Consulting Engineers Main Contractor : Doosan Heavy Industrial Construction Co. Owner : Dubai Electricity & Water Authority Responsibilities include: Surveyor and building constructor for Civil works in all project which includes the following: • Local Electrical Building. • Transformer and fire walls. • Industrial tanks and it’s band walls • Pipe rack foundation in all the project and it’s pedestal • Local Electrical Building for D.F.O Forwarding Station. • D.F.O Forwarding Station & Common Station. • Waste Water Treatment Plant. • Sewage Treatment Plant. • Fire Fighting Foam Station. • D.F.O Storage Tanks with Bund Walls • Pipe Racks & Cable Trenches & Manhole & Electrical Duct Banks • Transformer and fire walls. • EDG (Emergency Diesel Generator). • Fire Fighting Pipe Station • Road works • See water intaic (pump house) • Out full • Pipe line for gas (2) project name : khalefa port in abu dhabi Syria: 3
  • 4.
    Company: ANBOBA FACTORIES Position:Site surveyor Year: From October 2006 to May 2007 Project: Oil Factories Responsibilities include: Site surveyor for works in the building which include the following works: • All the concrete &structural works • All the external and internal finishing works ALBAATH UNIVERSITY Topography surveyor to Homs City in Syria and Hama May2007 to Feb2008 Good computer skills, with knowledge of:AutoCAD , Word, Excel, Access, PowerPoint, E- mail, Internet. Total station (Leica ts02 ultra7- leica Ts09 - Topcon GTS-235N, sokkia set2x - nikon), Level machine ( manual , laser ) LANGUAGES • Arabic; (my mother tongue) • English; very good (writing & reading & communication) Valid UAE Driving License 4