QC CIVIL INSPECTOR
Rafi Ullah
Nationality Pakistan
Profession QC Civil Inspector
Date of Birth 14 April, 1989
Marital status Single
E-mail rafijadeed@gmail.com
Mobile Number +971507035471
Language English, Urdu and Hindi
Professional Profile
 A qualified DAE(Civil Engineer) having more than 6 years’ experience as QA/QC Inspector&
Site Supervision in infrastructure projects having knowledge of Road construction including
subgrade, base course, Asphalt base & wearing course, drainage work & underground utilities,
Bridge Construction, Offshore Marine construction, Earth Work, Offshore Runway Extension
through the knowledge of Inspect, test, sort, sample, material testing of site and laboratories
well versed in specification standards
Educational and Professional Qualification:
ď‚· Diploma of Civil Engineer(2007-2009) from Board of Technical Education Peshawar
ď‚· Bachelor of Arts (2012-2014) from University of Peshawar Pakistan
ď‚· SSC (2006)from Government High School, Peshawar Pakistan
Skills:
ď‚· Ability to work independently and in team
ď‚· Creative and innovative
ď‚· Strong logical and reasoning abilities
ď‚· Ability to analyze and interpret information
ď‚· Adopt new concept quickly while working under pressure
ď‚· Auto Cad 2D+3D
ď‚· Total Station ,Automatic Level &GPS
ď‚· Laboratory Testing (Soil, Concrete & Asphaltic)
Experience:
ARCHIRODON CONSTRUCTION COMPANY (OVERSEAS) ,UAE
Project Name: SARB (Sath Al Razboot) Zirku Island Package No.01 EPC Works
Client: Abu Dhabi Marine operating Company (ADMA OPCO)
Position: QC Inspector
Duration: September, 2013 onwards
Project Details:
ď‚· Construction of Airport Runway, Base, Sub base, Asphalt of Runway Earth work and Asphalt
for internal roads, Concrete Barrier and guard rail, Infrastructure, open drainage system for
QC CIVIL INSPECTOR
hilly area, Road Crossing ducts, Runway lighting system with underground, marine work for
the Runway, Construction of jetty and seawater Intake
Airport Runway:
ď‚· Coordinate with QA/QC Manager for all project execution activities.
ď‚· To Raise Inspection request as per the approved ITP for the action code
ď‚· To identify areas of inspection and prepare daily inspection plan & checklist as per project
requirements.
ď‚· Supervise materials approval processing for Asphalt work
ď‚· Joint Inspection with client and ITL for Mix Design of Asphalt and other parameters
according to specification and standards
ď‚· Supervision of Asphalt pavement construction
ď‚· Inspection of Routine testing for Asphalt pavement at Site Laboratory
1. Preparing marshal mold, bitumen extraction, gradation, Gmm, marshal bulk specific
gravity, VIM, VMA, VFB, stability, flow and stiffness as per specification
Revetment and Ground Improvement for Airport Runway:
ď‚· To ensure the revetment works according to marine specifications.
ď‚· Checking of quarry run rocks, armor rocks and Under Layer rocks placing and their
arrangement as per specified coordinates in approved drawing
ď‚· Checking of profile to prior placing of core, filter and Geotextile material as per design slop.
ď‚· Checking level of material dump into the sea prior to start Dynamic Compaction
ď‚· Monitoring and execution of dynamic compaction process at Airport runway as per
specification and monitoring of excess pore water pressure to be backfilled and re-dynamic
compacted
ď‚· Conducting of Induce settlement, heave test, SPT ,In-Situ CBR and Zone Load testing for the
quality assurance
ď‚· Conducting field density test inspection for backfilling on area which is dynamically compacted
Infrastructure Work:
ď‚· Conducting Inspection of material, bought out item and review of material test certificate and
the specification requirements
ď‚· Verify correct materials are utilized for work carried out
ď‚· Inspection of Sewer, drainage and sweet water and pipeline work
ď‚· Sewer main lines house connection and manhole
ď‚· Taking sample of material for Frequency tests as per approved ITP
ď‚· Conducting field density test for trench formation and for layer by layer backfilling, exfiltration
test for pipes, flow test for sewer and drainage work, pull-off and dry film thickness of water
proofing for drainage work
ď‚· Preparing documentation and compile test packs for all jobs to meet client requirement as per
specification
ď‚· Ensuring the completion, updating and distribution of the Quality Inspection Plan in the field
and verifying and its application
ď‚· Interface and coordinate with Client for QC matter and coordinate with Third party inspection
for all related Inspection activity
ď‚· Conducting pre concrete inspection for blinding and Concrete surrounding for underground
ducts, form work, Rebar and the concrete placing in accordance with approved drawing
QC CIVIL INSPECTOR
Jetty and Sea Water Intake Construction:
ď‚· To ensure the revetment and quay wall works according to marine specifications
ď‚· Individual inspection of quay wall blocks, capping blocks, manhole and outfalls at
precast yard
ď‚· Inspection of dredging for quay wall foundation trench and for placing crushed stone
foundation layer and of placing quay wall blocks
ď‚· Inspection for break water work, bedding and under layer for CLI units (accropode)
placing.
ď‚· Checking armor rocks placing and accropode size and their arrangement as per specified
coordinates.
SKYWAYS CONSTRUCTION COMPANY ISLAMABAD PAKISTAN
Project Name: Construction of Mufti Mehmood Flyover and Rehman BABA Intersection
Client: PDA (Peshawar Development Authority) Project directed by Gov. of KPK.
Position: Site Supervisor
Duration: August, 2010 to August,, 2013
Project Details
• Construction of RCC Bridges at various Cities of Pakistan
• Inspection of construction activities such as layout of Deep Pile ,Pile Cap, Pair Shaft
,Transom ,Bearing pad Seat T-Girder and U-Girder Shape, Approach Slab ,Construction and
Expansion Joints , Concrete Barrier and parapet Wall ,Ramps abutment ,
• Excavation and backfilling for Infrastructure as per specification approved material
Responsibilities:
ď‚· Study the details about the foundation used (open foundation, pile foundation), drawings,
ď‚· soil testing reports, design mix reports
ď‚· Preparation of Daily Progress Report in accordance with B.O.Q.
ď‚· Daily Site visiting
ď‚· Preparing Work Permit for different work at site
ď‚· Preparing Bar Bending Schedule for the Structural elements
ď‚· Coordinate with Survey for checking of center line, leveling and calculation of quantities of
earth cutting and earth filling by using Auto level and Total Station.
ď‚· Reconciliation of materials including reinforcement, cement, fine aggregate, coarse
Aggregate and betonies etc.
ď‚· Laboratory testing of concrete, fine aggregate and coarse aggregate
 Checking of Rebar’s, shuttering and layouts
ď‚· Ensure quality of building material, concrete etc. through various tests
ď‚· Conversant with architectural & structural drawings
ď‚· Proper management of materials & workmanship
Reference:
Available upon request

CV of Rafi jadeed01

  • 1.
    QC CIVIL INSPECTOR RafiUllah Nationality Pakistan Profession QC Civil Inspector Date of Birth 14 April, 1989 Marital status Single E-mail [email protected] Mobile Number +971507035471 Language English, Urdu and Hindi Professional Profile ď‚· A qualified DAE(Civil Engineer) having more than 6 years’ experience as QA/QC Inspector& Site Supervision in infrastructure projects having knowledge of Road construction including subgrade, base course, Asphalt base & wearing course, drainage work & underground utilities, Bridge Construction, Offshore Marine construction, Earth Work, Offshore Runway Extension through the knowledge of Inspect, test, sort, sample, material testing of site and laboratories well versed in specification standards Educational and Professional Qualification: ď‚· Diploma of Civil Engineer(2007-2009) from Board of Technical Education Peshawar ď‚· Bachelor of Arts (2012-2014) from University of Peshawar Pakistan ď‚· SSC (2006)from Government High School, Peshawar Pakistan Skills: ď‚· Ability to work independently and in team ď‚· Creative and innovative ď‚· Strong logical and reasoning abilities ď‚· Ability to analyze and interpret information ď‚· Adopt new concept quickly while working under pressure ď‚· Auto Cad 2D+3D ď‚· Total Station ,Automatic Level &GPS ď‚· Laboratory Testing (Soil, Concrete & Asphaltic) Experience: ARCHIRODON CONSTRUCTION COMPANY (OVERSEAS) ,UAE Project Name: SARB (Sath Al Razboot) Zirku Island Package No.01 EPC Works Client: Abu Dhabi Marine operating Company (ADMA OPCO) Position: QC Inspector Duration: September, 2013 onwards Project Details: ď‚· Construction of Airport Runway, Base, Sub base, Asphalt of Runway Earth work and Asphalt for internal roads, Concrete Barrier and guard rail, Infrastructure, open drainage system for
  • 2.
    QC CIVIL INSPECTOR hillyarea, Road Crossing ducts, Runway lighting system with underground, marine work for the Runway, Construction of jetty and seawater Intake Airport Runway: ď‚· Coordinate with QA/QC Manager for all project execution activities. ď‚· To Raise Inspection request as per the approved ITP for the action code ď‚· To identify areas of inspection and prepare daily inspection plan & checklist as per project requirements. ď‚· Supervise materials approval processing for Asphalt work ď‚· Joint Inspection with client and ITL for Mix Design of Asphalt and other parameters according to specification and standards ď‚· Supervision of Asphalt pavement construction ď‚· Inspection of Routine testing for Asphalt pavement at Site Laboratory 1. Preparing marshal mold, bitumen extraction, gradation, Gmm, marshal bulk specific gravity, VIM, VMA, VFB, stability, flow and stiffness as per specification Revetment and Ground Improvement for Airport Runway: ď‚· To ensure the revetment works according to marine specifications. ď‚· Checking of quarry run rocks, armor rocks and Under Layer rocks placing and their arrangement as per specified coordinates in approved drawing ď‚· Checking of profile to prior placing of core, filter and Geotextile material as per design slop. ď‚· Checking level of material dump into the sea prior to start Dynamic Compaction ď‚· Monitoring and execution of dynamic compaction process at Airport runway as per specification and monitoring of excess pore water pressure to be backfilled and re-dynamic compacted ď‚· Conducting of Induce settlement, heave test, SPT ,In-Situ CBR and Zone Load testing for the quality assurance ď‚· Conducting field density test inspection for backfilling on area which is dynamically compacted Infrastructure Work: ď‚· Conducting Inspection of material, bought out item and review of material test certificate and the specification requirements ď‚· Verify correct materials are utilized for work carried out ď‚· Inspection of Sewer, drainage and sweet water and pipeline work ď‚· Sewer main lines house connection and manhole ď‚· Taking sample of material for Frequency tests as per approved ITP ď‚· Conducting field density test for trench formation and for layer by layer backfilling, exfiltration test for pipes, flow test for sewer and drainage work, pull-off and dry film thickness of water proofing for drainage work ď‚· Preparing documentation and compile test packs for all jobs to meet client requirement as per specification ď‚· Ensuring the completion, updating and distribution of the Quality Inspection Plan in the field and verifying and its application ď‚· Interface and coordinate with Client for QC matter and coordinate with Third party inspection for all related Inspection activity ď‚· Conducting pre concrete inspection for blinding and Concrete surrounding for underground ducts, form work, Rebar and the concrete placing in accordance with approved drawing
  • 3.
    QC CIVIL INSPECTOR Jettyand Sea Water Intake Construction:  To ensure the revetment and quay wall works according to marine specifications  Individual inspection of quay wall blocks, capping blocks, manhole and outfalls at precast yard  Inspection of dredging for quay wall foundation trench and for placing crushed stone foundation layer and of placing quay wall blocks  Inspection for break water work, bedding and under layer for CLI units (accropode) placing.  Checking armor rocks placing and accropode size and their arrangement as per specified coordinates. SKYWAYS CONSTRUCTION COMPANY ISLAMABAD PAKISTAN Project Name: Construction of Mufti Mehmood Flyover and Rehman BABA Intersection Client: PDA (Peshawar Development Authority) Project directed by Gov. of KPK. Position: Site Supervisor Duration: August, 2010 to August,, 2013 Project Details • Construction of RCC Bridges at various Cities of Pakistan • Inspection of construction activities such as layout of Deep Pile ,Pile Cap, Pair Shaft ,Transom ,Bearing pad Seat T-Girder and U-Girder Shape, Approach Slab ,Construction and Expansion Joints , Concrete Barrier and parapet Wall ,Ramps abutment , • Excavation and backfilling for Infrastructure as per specification approved material Responsibilities:  Study the details about the foundation used (open foundation, pile foundation), drawings,  soil testing reports, design mix reports  Preparation of Daily Progress Report in accordance with B.O.Q.  Daily Site visiting  Preparing Work Permit for different work at site  Preparing Bar Bending Schedule for the Structural elements  Coordinate with Survey for checking of center line, leveling and calculation of quantities of earth cutting and earth filling by using Auto level and Total Station.  Reconciliation of materials including reinforcement, cement, fine aggregate, coarse Aggregate and betonies etc.  Laboratory testing of concrete, fine aggregate and coarse aggregate  Checking of Rebar’s, shuttering and layouts  Ensure quality of building material, concrete etc. through various tests  Conversant with architectural & structural drawings  Proper management of materials & workmanship Reference: Available upon request