Key Skills
Strategic Planning & Management
Vendor Management
EPC Project Management
Site Management
Fabrication
Erection & Commissioning
Construction Management
Resource Optimization
Team Building & Leadership
“Versatile, high-energy professional, offering over 5 years of dynamic career in
Fabrication, Erection , Commissioning of Thermal & Gas Power plant HP,LP
Piping,scalingnewheights of success with hard work & dedication and leaving a
mark of excellence on each step”
Profile Summary
 Incisive acumen in managing EPC project life-cycle right from development
to delivery encompassing monitoring, inter-discipline co-ordination and
resource planning.
 Pivotal in preparing master schedules for all projects including resource
schedules, executionmethodologies,milestones,cash flow projections and budgets
 Profound experience in planning & executingfabrication functions,performing
tests & inspection for various processes and checking quality standards
 Leveraged skills in performing inspection for the fabricated
pipelinesand fittings; verifying piping material identity (pipe, valves &
fittings) and its conformance to the installation drawings
 Expertise in managing the Piping Fabrication & Site Installation with key focus
on top & bottom line profitability by ensuring optimal utilization of resources
 Showcased excellence in preparing project estimate, finalizing contractors,
checking the bills with estimated quantities and purchasing the materials for
the site.
 Track record of successful completion of projects by developing positive
rapport with architects, engineers, vendors & clients and controlling costs;
flair for adopting modern construction methodologies / techniques in
compliance with quality standards
 A leader with excellent communication, negotiation and relationship
building skills
Soft Skills
Timeline
XIIfrom West
Bengal Council of
HigherSecondary
Education
Diploma in
Mechanical
Engineering from
West Bengal State
Council of Technical
Education
Larsen &
Toubro Ltd.,
Location as
Site
Execution
Engineer -
Mechanical
2008 2011 Since Jul’11
SANDIP KARMAKAR
Piping Engineer Fabrication | Erection & Commissioning
sandipkarmakar85@gmail.com | sandip.karmakar@lntpower.com
+91 8670219586 | + 8801787664861 |+91 7720033694
Industry Preference: Manufacturing | Construction
Location Preference: India
Change Agent
Motivational
Leader
Thinker
Collaborator
Communicator
Planner
oto
Knowledge Purview
 Making fieldqualityplan,work Methodology, HIRA forbothunderground&above groundpiping.
 Preparationof P&IDdiagramfrom maindrawingforloophydrotest.
 Preparationof Bill of material (systemwise)forthe projectexecution&issuingmaterialfromstore.
 Marking the spools & jointnumbersinpiping isometricdrawings &preparingline historysheets.
 Checkingof isometrics&MTO w.r.t.P&IDs,line list,line sizing,equipmentdrawings,pipingmaterial
specification,etc
 Checkingof vendordrawings& directly assistinpurchasingof pipingmaterials, utilitypackages.
 Monitoringthe propererectionandcommissioningof the projects.
 Monitoringandprovidingtechnical directionandassignworktosupervisors&workers forspecificpiping
loops.
 Solvingthose problemsfacedbythe workersduringpiping execution&givingtechnical solutiontoincreasethe
productivity.
 Monitoringdailybase progressbymakingDailyprogressreport,Weeklyplanning,Monthlyplanning&3
monthsplanning.
 Directlyexecutingthe small bore,big bore,HP,Underground pipingspool fabrication&Erection byfollowing
isometricdrawing,P&ID,Plotplan GA,3D drawings.
 Installationof supports, valves,FT,orifice &otherelementsaccordingtodrawing.
 Fitup inspection, supports, valvesinstallation inspection,makingprotocols &getitapprovedfromclients.
 Givingfrontto heating, welding,cooling(if Alloyheavywall piping) or welding,weld visual,wrappingcoating,
Holiday testing,inside painting(if bigbore underground cspiping).
 Preparationof loopfieldtest(pneumaticorhydro) asper P&ID reference aftergettingmechanical clearance
papersignedfromclient.
 Handlingall pipingtechnical quarries, investigatingall fieldpipingrelated problems&givingresolutionto
workersbypapercommunicatingwithengineeringdepartment.
 Ensuringthat all punchlistitemsare resolved &clienthandoverissatisfactorilyconcluded sothatthere isno
prolongationof the projects.
 Ensuringall the safetytothe workers bytakingpeptalk,make themeducatedaboutsafetyhazards& risks at
dailybasis.
 Implements‘’5S’’(sort, straighten, shine, standardize, sustain)conceptsatworkplace to improve safety&
Qualitystandards.
 Havingknowledge about SMAW,GMAW,FCAW,SAWweldingprocesscommonlyusedinthe powerprojects
 Havingknowledge aboutAWScodes,ASME codes B31.3,B16.4,B16.24,B36.19,B16.9 etc, IBR 1950 & familiar
WithASTM,BIS codes,Pipe fabricationinstitute,IEC,ISO,APIetc.
 MaintainingBOCWact (The BuildingandOtherConstructionWorkers,Regulationof Employmentand
Conditionsof Service) inprojectssite &maintainingSafetyMeasures.
 Havingknowledge of execution forthe HP(Main stream,HRH,CRH,BFP ) heavywall alloyP91,P22,P11,CSpipes
,weldingdone byinductionheatingmachine in660 MW Thermal PowerPlant.
 HavingKnowledge of executingforBoiler&TG LP piping( CS,SS,) both small bore& big bore in 660 MW Thermal
PowerPlant.
 HavingKnowledge of pipingmanufacturingof PowerPlant,refineryprojects(Powerpiping -HeavyWall,
processpiping, unitpiping, utilitypiping) fromraw pipe (P91,WB36,P92,CS,SS) inHaziraPipingCenter (L&T
Power’s Workshop).
 WorkedwithGRP ,CSUnderground –CW ,ACW lines,CPVC,UPVC –DMPlant,Fire ProtectionUnderground,Fuel
Oil pipingin360 & 210 mw Gas powerProjects.
 HavingKnowledge aboutblasting,painting,wrappingcoating,GRPpipingjoints.
 Associatedwiththe Cardboardblasting,Chemical Cleaning&steamblowingetccommissioningprocedures.
 Alsohavingknowledge aboutpreparingof workmeasurementsheet forClientbilling,Contractorsbillings.
WorkExperience
Since Jul’11 Larsen & Toubro Ltd, as Site Execution Engineer - Mechanical
Growth Path / Deputations:
Jul’11 – aug’14 Diploma Engineer Trainee & Mechanical Engineer, L&T TPPC Ltd at 3x660 MW Talwandi
Sabo Power Limited, Clint - SEPCO-1 (Owner-Vedanta), Bhatinda, Punjab, India
Aug’14 - Feb’15 Mechanical Engineer, 3x660 MW Koradi TPS Thermal Power Plant, (Owner - Mahagenco),
Nagpur, Maharashtra, India, India
Feb’15 - Sep’15 Piping production Engineer, Hazira Piping Center, L&T Power’s workshop,Surat, Gujrat
Sep’15-Oct’15 Site Execution Engineer – Mechanical - 225 MW Sikalbaha gas Power Plant(dual fuel)
EPC contractor-L&T Power Ltd (Clint-BPDB) Chittagong, Bangladesh
Oct’16 - present Site Execution Engineer – Mechanical - 360 MW Bheramara CCPP Power Plant(dual fuel)
EPC contractor-L&T Power Ltd (Clint-Marubeni Corporation, TEPSCO, Owner-NWPGCL) ,
Bangladesh
Key Result Areas:
 Administering activities like monitoring, weekly and monthly target preparation, calculation of ready work front
availability, allotting work material, reporting to clients about daily progress
 Mobilizing and demobilizing the required resources in line with the client’s safety & statutory requirements
 Working in coordination with contractor, vendors and client representation
 Preparing punch lists and following-up of the same, mechanical clearance of piping and inspection
 Coordinating the generation of procurement, fabrication and installation documentation (scopes of work, procedures,
drawings, sketches)
 Managing functions like contract management and contract administration including variation claims/change orders
 Identifying & providing resolutions for the technical queries and issues raised during the performance of offshore
construction and inspection activities .
 Monitoring the procurement & fabrication of the piping materials for ensuring the schedule, cost & quality standards are
being met sufficiently with the shut-down activities and normal construction execution.
 Responsible for working with construction supervisors during fabrication, erection, and testing, pre-commissioning &
commissioning activities, providing field engineering expertise on any installation problems
 Managing the preparation of fabrication and offshore construction "as-built" documentation packages.
Education
 Diploma in Mechanical Engineering from Sree Ramkrishna Shilpa Vidyapith, Suri, Birbhum, West Bengal State
Council of Technical Education with 81% in 2011
 XII from Dhaniakhali Mahamaya Vidyamandir, Hooghly, West Bengal Council of Higher Secondary Education with
81% in 2008
 X from Boso Priyanath high school, Hooghly Bengal Board of Secondary Education with 85% in 2006
IT Skills
 Microsoft Office (Word, Excel & PowerPoint),
 SAP
 Navisworks freedom review.
 AutoCAD (Package -2008 to 2015)
 Internet Applications
Personal Details
Date of Birth:18th October 1990
Languages Known: Bengali, Hindi & English
Address:Sandip Karmakar, Vill.+P.O-Boso, P.S-Dhaniakhali, Dist. Hooghly -712302, West Bengal, India
LinkedIn:https://bd.linkedin.com/in/sandip-karmakar-374032128
Skype: sandipkarmakar85@gmail.com
ANNEXURE: PROJECTS
Project Title: L&T Power Ltd. (EPC Contractor) at Bheramara CCPP Project (360 MW) Combined Cycle Gas Plant, NWPGCL,
Bangladesh
Period: Oct’2016 to till date
Responsibilities:
 Responsible for total fuel oil piping & fire protection piping of HSD tanks.
 Working with BOP rack piping including DM water transfer, Instrument air etc process piping & utility piping.
Project Title: L&T Power Ltd. (EPC Contractor) at Shikalbaha Project (225 MW) Combined Cycle Gas Plant, BPDB, Bangladesh
Period: Nov’2015 to oct’2016
Responsibilities:
 Worked as site piping in charge of total under-ground fire protection system , CW & ACW system.
 Also responsible for fuel oil piping & inter connecting piping of Gas module 1 to GBC & GBC to GCS 3.
Highlights:
Successfully accomplished:
 Fire Protection under-ground piping & above ground piping of main plant with successfully flushing, hydro test.
 Completed fuel oil piping with successfully hydro test.
Project Title: L&T Power Ltd. (CCU) at 3x660 MW Koradi TPS Thermal Power Plant,(Owner-MAHAGENCO) Nagpur,
Maharashtra, India
Period: Jun’15 – Nov’15
Responsibilities:
 Steered efforts in fabrication & erection of Boiler LP Pipe including shoot blower piping of unit 8.
Project Title: Hazira Piping Center (workshop), (Owner-L&T Power) Surat, Gujarat, India
Period: Jan’2015 - Jun’2015
Responsibilities:
 Acted as Shop Piping Production Engineer.
 Managed reliance J3 refinary & RRVUNL Power plant HP pipe fabrication work.
 Assisted in pipe fit up checking & welding inspection as per drawing.
Project Title: 3x660 MW Talwandi Sabo Power Limited, Clint – SEPCO - 1 (owner-Vedanta), Bhatinda, Punjab, India
Period: Jul’2011 - Jan’2015
Responsibilities:
 Worked as Diploma Engineer trainee in pressure parts fabrication & erection of upper straight wall, bottom spiral
water wall for first 6 months.
 Then shifted to Boiler piping work including Main steam, HRH,CRH, BFP heavy wall P91 & CS piping .there I learned
HP piping work with my team member.
 After completion my 18 months training then I took responsibility of BFP,CRH –heavy wall & boiler missleneous LP
piping work.
 After completion of HP piping I was responsible for TG steam extraction LP piping & CPU unit Piping (SS-big bore).
Highlights:
 Steered efforts in accomplishing:
o Successfully completed Main stream, HRH, CRH, BFP heavy wall piping including successfully Hydro test.
o Completed TG Steam extraction lines with 100% RT & handed over to Client.
o Successfully Completed the CPU system from installation to hydro test.
o Associated with the Boiler & TG LP piping Chemical Cleaning process including making temporary loops.

Piping Engineer CV -Sandip Karmakar

  • 1.
    Key Skills Strategic Planning& Management Vendor Management EPC Project Management Site Management Fabrication Erection & Commissioning Construction Management Resource Optimization Team Building & Leadership “Versatile, high-energy professional, offering over 5 years of dynamic career in Fabrication, Erection , Commissioning of Thermal & Gas Power plant HP,LP Piping,scalingnewheights of success with hard work & dedication and leaving a mark of excellence on each step” Profile Summary  Incisive acumen in managing EPC project life-cycle right from development to delivery encompassing monitoring, inter-discipline co-ordination and resource planning.  Pivotal in preparing master schedules for all projects including resource schedules, executionmethodologies,milestones,cash flow projections and budgets  Profound experience in planning & executingfabrication functions,performing tests & inspection for various processes and checking quality standards  Leveraged skills in performing inspection for the fabricated pipelinesand fittings; verifying piping material identity (pipe, valves & fittings) and its conformance to the installation drawings  Expertise in managing the Piping Fabrication & Site Installation with key focus on top & bottom line profitability by ensuring optimal utilization of resources  Showcased excellence in preparing project estimate, finalizing contractors, checking the bills with estimated quantities and purchasing the materials for the site.  Track record of successful completion of projects by developing positive rapport with architects, engineers, vendors & clients and controlling costs; flair for adopting modern construction methodologies / techniques in compliance with quality standards  A leader with excellent communication, negotiation and relationship building skills Soft Skills Timeline XIIfrom West Bengal Council of HigherSecondary Education Diploma in Mechanical Engineering from West Bengal State Council of Technical Education Larsen & Toubro Ltd., Location as Site Execution Engineer - Mechanical 2008 2011 Since Jul’11 SANDIP KARMAKAR Piping Engineer Fabrication | Erection & Commissioning [email protected] | [email protected] +91 8670219586 | + 8801787664861 |+91 7720033694 Industry Preference: Manufacturing | Construction Location Preference: India Change Agent Motivational Leader Thinker Collaborator Communicator Planner oto
  • 2.
    Knowledge Purview  Makingfieldqualityplan,work Methodology, HIRA forbothunderground&above groundpiping.  Preparationof P&IDdiagramfrom maindrawingforloophydrotest.  Preparationof Bill of material (systemwise)forthe projectexecution&issuingmaterialfromstore.  Marking the spools & jointnumbersinpiping isometricdrawings &preparingline historysheets.  Checkingof isometrics&MTO w.r.t.P&IDs,line list,line sizing,equipmentdrawings,pipingmaterial specification,etc  Checkingof vendordrawings& directly assistinpurchasingof pipingmaterials, utilitypackages.  Monitoringthe propererectionandcommissioningof the projects.  Monitoringandprovidingtechnical directionandassignworktosupervisors&workers forspecificpiping loops.  Solvingthose problemsfacedbythe workersduringpiping execution&givingtechnical solutiontoincreasethe productivity.  Monitoringdailybase progressbymakingDailyprogressreport,Weeklyplanning,Monthlyplanning&3 monthsplanning.  Directlyexecutingthe small bore,big bore,HP,Underground pipingspool fabrication&Erection byfollowing isometricdrawing,P&ID,Plotplan GA,3D drawings.  Installationof supports, valves,FT,orifice &otherelementsaccordingtodrawing.  Fitup inspection, supports, valvesinstallation inspection,makingprotocols &getitapprovedfromclients.  Givingfrontto heating, welding,cooling(if Alloyheavywall piping) or welding,weld visual,wrappingcoating, Holiday testing,inside painting(if bigbore underground cspiping).  Preparationof loopfieldtest(pneumaticorhydro) asper P&ID reference aftergettingmechanical clearance papersignedfromclient.  Handlingall pipingtechnical quarries, investigatingall fieldpipingrelated problems&givingresolutionto workersbypapercommunicatingwithengineeringdepartment.  Ensuringthat all punchlistitemsare resolved &clienthandoverissatisfactorilyconcluded sothatthere isno prolongationof the projects.  Ensuringall the safetytothe workers bytakingpeptalk,make themeducatedaboutsafetyhazards& risks at dailybasis.  Implements‘’5S’’(sort, straighten, shine, standardize, sustain)conceptsatworkplace to improve safety& Qualitystandards.  Havingknowledge about SMAW,GMAW,FCAW,SAWweldingprocesscommonlyusedinthe powerprojects  Havingknowledge aboutAWScodes,ASME codes B31.3,B16.4,B16.24,B36.19,B16.9 etc, IBR 1950 & familiar WithASTM,BIS codes,Pipe fabricationinstitute,IEC,ISO,APIetc.  MaintainingBOCWact (The BuildingandOtherConstructionWorkers,Regulationof Employmentand Conditionsof Service) inprojectssite &maintainingSafetyMeasures.  Havingknowledge of execution forthe HP(Main stream,HRH,CRH,BFP ) heavywall alloyP91,P22,P11,CSpipes ,weldingdone byinductionheatingmachine in660 MW Thermal PowerPlant.  HavingKnowledge of executingforBoiler&TG LP piping( CS,SS,) both small bore& big bore in 660 MW Thermal PowerPlant.  HavingKnowledge of pipingmanufacturingof PowerPlant,refineryprojects(Powerpiping -HeavyWall, processpiping, unitpiping, utilitypiping) fromraw pipe (P91,WB36,P92,CS,SS) inHaziraPipingCenter (L&T Power’s Workshop).  WorkedwithGRP ,CSUnderground –CW ,ACW lines,CPVC,UPVC –DMPlant,Fire ProtectionUnderground,Fuel Oil pipingin360 & 210 mw Gas powerProjects.  HavingKnowledge aboutblasting,painting,wrappingcoating,GRPpipingjoints.  Associatedwiththe Cardboardblasting,Chemical Cleaning&steamblowingetccommissioningprocedures.  Alsohavingknowledge aboutpreparingof workmeasurementsheet forClientbilling,Contractorsbillings.
  • 3.
    WorkExperience Since Jul’11 Larsen& Toubro Ltd, as Site Execution Engineer - Mechanical Growth Path / Deputations: Jul’11 – aug’14 Diploma Engineer Trainee & Mechanical Engineer, L&T TPPC Ltd at 3x660 MW Talwandi Sabo Power Limited, Clint - SEPCO-1 (Owner-Vedanta), Bhatinda, Punjab, India Aug’14 - Feb’15 Mechanical Engineer, 3x660 MW Koradi TPS Thermal Power Plant, (Owner - Mahagenco), Nagpur, Maharashtra, India, India Feb’15 - Sep’15 Piping production Engineer, Hazira Piping Center, L&T Power’s workshop,Surat, Gujrat Sep’15-Oct’15 Site Execution Engineer – Mechanical - 225 MW Sikalbaha gas Power Plant(dual fuel) EPC contractor-L&T Power Ltd (Clint-BPDB) Chittagong, Bangladesh Oct’16 - present Site Execution Engineer – Mechanical - 360 MW Bheramara CCPP Power Plant(dual fuel) EPC contractor-L&T Power Ltd (Clint-Marubeni Corporation, TEPSCO, Owner-NWPGCL) , Bangladesh Key Result Areas:  Administering activities like monitoring, weekly and monthly target preparation, calculation of ready work front availability, allotting work material, reporting to clients about daily progress  Mobilizing and demobilizing the required resources in line with the client’s safety & statutory requirements  Working in coordination with contractor, vendors and client representation  Preparing punch lists and following-up of the same, mechanical clearance of piping and inspection  Coordinating the generation of procurement, fabrication and installation documentation (scopes of work, procedures, drawings, sketches)  Managing functions like contract management and contract administration including variation claims/change orders  Identifying & providing resolutions for the technical queries and issues raised during the performance of offshore construction and inspection activities .  Monitoring the procurement & fabrication of the piping materials for ensuring the schedule, cost & quality standards are being met sufficiently with the shut-down activities and normal construction execution.  Responsible for working with construction supervisors during fabrication, erection, and testing, pre-commissioning & commissioning activities, providing field engineering expertise on any installation problems  Managing the preparation of fabrication and offshore construction "as-built" documentation packages. Education  Diploma in Mechanical Engineering from Sree Ramkrishna Shilpa Vidyapith, Suri, Birbhum, West Bengal State Council of Technical Education with 81% in 2011  XII from Dhaniakhali Mahamaya Vidyamandir, Hooghly, West Bengal Council of Higher Secondary Education with 81% in 2008  X from Boso Priyanath high school, Hooghly Bengal Board of Secondary Education with 85% in 2006 IT Skills  Microsoft Office (Word, Excel & PowerPoint),  SAP  Navisworks freedom review.  AutoCAD (Package -2008 to 2015)  Internet Applications Personal Details Date of Birth:18th October 1990 Languages Known: Bengali, Hindi & English Address:Sandip Karmakar, Vill.+P.O-Boso, P.S-Dhaniakhali, Dist. Hooghly -712302, West Bengal, India LinkedIn:https://bd.linkedin.com/in/sandip-karmakar-374032128 Skype: [email protected]
  • 4.
    ANNEXURE: PROJECTS Project Title:L&T Power Ltd. (EPC Contractor) at Bheramara CCPP Project (360 MW) Combined Cycle Gas Plant, NWPGCL, Bangladesh Period: Oct’2016 to till date Responsibilities:  Responsible for total fuel oil piping & fire protection piping of HSD tanks.  Working with BOP rack piping including DM water transfer, Instrument air etc process piping & utility piping. Project Title: L&T Power Ltd. (EPC Contractor) at Shikalbaha Project (225 MW) Combined Cycle Gas Plant, BPDB, Bangladesh Period: Nov’2015 to oct’2016 Responsibilities:  Worked as site piping in charge of total under-ground fire protection system , CW & ACW system.  Also responsible for fuel oil piping & inter connecting piping of Gas module 1 to GBC & GBC to GCS 3. Highlights: Successfully accomplished:  Fire Protection under-ground piping & above ground piping of main plant with successfully flushing, hydro test.  Completed fuel oil piping with successfully hydro test. Project Title: L&T Power Ltd. (CCU) at 3x660 MW Koradi TPS Thermal Power Plant,(Owner-MAHAGENCO) Nagpur, Maharashtra, India Period: Jun’15 – Nov’15 Responsibilities:  Steered efforts in fabrication & erection of Boiler LP Pipe including shoot blower piping of unit 8. Project Title: Hazira Piping Center (workshop), (Owner-L&T Power) Surat, Gujarat, India Period: Jan’2015 - Jun’2015 Responsibilities:  Acted as Shop Piping Production Engineer.  Managed reliance J3 refinary & RRVUNL Power plant HP pipe fabrication work.  Assisted in pipe fit up checking & welding inspection as per drawing. Project Title: 3x660 MW Talwandi Sabo Power Limited, Clint – SEPCO - 1 (owner-Vedanta), Bhatinda, Punjab, India Period: Jul’2011 - Jan’2015 Responsibilities:  Worked as Diploma Engineer trainee in pressure parts fabrication & erection of upper straight wall, bottom spiral water wall for first 6 months.  Then shifted to Boiler piping work including Main steam, HRH,CRH, BFP heavy wall P91 & CS piping .there I learned HP piping work with my team member.  After completion my 18 months training then I took responsibility of BFP,CRH –heavy wall & boiler missleneous LP piping work.  After completion of HP piping I was responsible for TG steam extraction LP piping & CPU unit Piping (SS-big bore). Highlights:  Steered efforts in accomplishing: o Successfully completed Main stream, HRH, CRH, BFP heavy wall piping including successfully Hydro test. o Completed TG Steam extraction lines with 100% RT & handed over to Client. o Successfully Completed the CPU system from installation to hydro test. o Associated with the Boiler & TG LP piping Chemical Cleaning process including making temporary loops.