Daidalos Framework for successful Testbed Integration Frances Cleary Grant Miguel Ponce de Leon TSSG – Waterford Institute of Technology Ireland
Daidalos WP5 Daidalos (49 partners), integration was an immense task  co-ordinated and implemented by WP5. Steps leading to Integration Integration Tasks Defining Integration Processes and Models Defining conformance test Specifications Test Site Planning,Deployment and Integration Test planning/scheduling/status report documentation Test case execution, fault detection, result reporting.
Nidaros Scenario WP2 Innovations WP3 Innovations WP4 Innovations The Integration of WP innovations were completed through the selected ‘Nidaros’ Scenario.
Nidaros scenario Describe nidaros scenario
Daidalos WP5 Task Forces To evolve and implement this  scenario, task forces were created  Scene analysis Task Force   (Input from all WP’s) Scene Step analysis Task Force (Input from WP5 step responsible) Mapping and Deployment Task Force
Daidalos Integration  Model Due to the complexity of the Daidalos Architecture, the integration model addressed the following main areas Integrated Testbed (2 integrated test sites)  Sophia Antopolis,France  Aveiro, Portugal Integration-oriented developments Intra work package integration activities Formalisation of Integration roles and processes Identification of best Integration and Testing strategy (i.e. sandwich testing) Conformance Test Specification Identification of Nidaros specific WP interfaces Definition of Scenario specific Conformance tests Test  Case Definition : Test Case Naming (e.g. N3:01), test summary, API’s & interfaces involved, initial conditions  Test Report : Verdicts, person executed test, any closure actions and impacts, comments and possible actions to be performed if test fails.
Daidalos Testbed Daidalos Testbed  Daidalos Physical Testbed Visualisation activities Validation activities and conclusions
Daidalos Physical Deployment
For European based conferences  the daidalos testbed was setup in a mobile Science Truck which demonstrated  Daidalos Innovations. Daidalos Mobile Testbed
Daidalos Visualisation Virtualisation Tool (DLR) Figure 8 we have shown the layout for the CarPC view (a similar view was prepared for the PDA view) after some messages have been passed. It shows the simulated status of the network components and the messages from the major WP4 subsystems and third party services. The colour of the arrows indicates the presence of recent message traffic over these connections.
Daidalos Visualisation Lucent Virtualisation Tool
Daidalos Integration Testing Validation of the Nidaros Integrated Demonstrator conformance tests  Sophia Antopolis in November 2005  ,  Aveiro in March 2006. The 1st validation could only produce very high-level results (i.e. pass/fail of TC). - Problems related to network layer, Mobile IP and WP2 network drivers which were unstable As issues were resolved we were able to validate the demonstrator  at a much lower level of detail. Conformance session in Aveiro up to 120 test cases were planned,  based on the Nidaros Test case specifications.
Integration Testing Example Test Case Bart is driving on the motorway, which triggers the launch of the Traffic information Service. Bart arrives at the airport, and continues to drive towards the car parking area of the airport. His car system screen shows the airport information carrousel. Information about all flights will be shown. Bart parks and leaves his car, taking his PDA with him. A transfer is invoked on the transferring components in the old service and starts the new service on PDA and stops the old service on CarPC. The airport arrivals information can now be seen on Barts PDA as he enters the airport arrival terminal.
Integration Issues Encountered Unstable MIPv6, switch from Mandrake to Ubuntu Machines crashing and rebooting became time consuming. Minor Errors encountered, led many times  to major complications. Initial steps and configurations unforeseen eroded  into valuable scheduled testing allocated time.
Conclusion and Results All tests performed on the test-bed successfully used Mobile IP, which remained very stable on Ubuntu in comparison to earlier attempts at using mobile IP on top of Mandrake. WP2 WLAN drivers were relatively stable compared to their earlier performance in Sophia. Route Optimisation worked over Mobile IP, with very noticeable performance improvements as compared to earlier tests on WP4 standalone test-beds. Registration module and several other components were dummy’s because of lack of integration on Ubuntu (previously worked under Mandrake). Communication was a main issue encountered during integration Key point - developers to meet iteration delivery deadlines Scenario step planning contributed positively to the integration process. The 1st successful integrated testing utilising all Work packages took place at Aveiro.
End Of Presentation   Thank You For Your Time   Contact details : Frances Cleary Grant, Miguel Ponce de Leon Organisation: TSSG ,  Waterford Institute Of Technology

More Related Content

PPT
Final ppt
PPT
SDT Blended Model V3 2009
DOCX
Mallikarjuna_Resume
DOCX
Kumarreddy(4+yrs)
PPTX
Ensuring Successful OPNFV-based NFV Deployments | QualiTest Group
PDF
An Alternative Approach to DO-178B
PDF
MMSys'21 - Multi-access edge computing for adaptive bitrate video streaming
PDF
MaxEye Set Top Box Test Solution
Final ppt
SDT Blended Model V3 2009
Mallikarjuna_Resume
Kumarreddy(4+yrs)
Ensuring Successful OPNFV-based NFV Deployments | QualiTest Group
An Alternative Approach to DO-178B
MMSys'21 - Multi-access edge computing for adaptive bitrate video streaming
MaxEye Set Top Box Test Solution

What's hot (20)

DOCX
Karan_Rane
PPT
Slide 4 v6
DOCX
Resume yuhong EN
PPTX
Politecnico di Torino Test Engineering Lecture
DOCX
Atul_Oracle Functional Distribution and WMS Consultant
DOC
SenthilkumarR
PDF
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
DOC
Anindam_Resume
DOC
Unusdeen
PPTX
Arizona State University Test Lecture
RTF
Kapil_Resume
PPT
RapidRma
PDF
10_years_Experience_in_Automation
PPT
Use Models for Extending IEEE 1687 to Analog Test
PPTX
Automating your EdI Testing in Healthcare | QualiTest Group
DOCX
Pm0017 –project quality management
DOCX
UvaisMohammed_Auto
DOCX
Munish_Updated Resume
PDF
Siddharth more resume_obj_c
DOC
Latest Resume latest uploaded wala
Karan_Rane
Slide 4 v6
Resume yuhong EN
Politecnico di Torino Test Engineering Lecture
Atul_Oracle Functional Distribution and WMS Consultant
SenthilkumarR
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
Anindam_Resume
Unusdeen
Arizona State University Test Lecture
Kapil_Resume
RapidRma
10_years_Experience_in_Automation
Use Models for Extending IEEE 1687 to Analog Test
Automating your EdI Testing in Healthcare | QualiTest Group
Pm0017 –project quality management
UvaisMohammed_Auto
Munish_Updated Resume
Siddharth more resume_obj_c
Latest Resume latest uploaded wala
Ad

Viewers also liked (7)

PDF
My life with Android @ JUG Torino 2012
PDF
Mobile marketing - Italia 2013
PDF
Terugblik els 2010 londen
PPT
Power point presentations dos and don’ts
DOCX
Deepaksingh Jadon Resume
PDF
Google Play (Android Market) visto da sviluppatore
PPTX
Batman. trabajo jose.
My life with Android @ JUG Torino 2012
Mobile marketing - Italia 2013
Terugblik els 2010 londen
Power point presentations dos and don’ts
Deepaksingh Jadon Resume
Google Play (Android Market) visto da sviluppatore
Batman. trabajo jose.
Ad

Similar to Daidalos Integration Framework TridentCom 2007 (20)

PPT
eChallenges e2006 Large scale interoperability, integrating the Daidalos pro...
PPTX
AGILE M18 – State of the “Nation”
PDF
AzMoC++Mt
PPT
Jian yu caise13-
PPT
Jian yu caise13-
DOC
Sandesh cv_Test Engineer
PDF
Technical Consultant - Oracle Technologies
DOCX
David nickerson resume--gd
PDF
Resume_Kavita
PPT
Innovate 2014 - DevOps Technical Strategy
DOC
Hitendra_Singh
DOC
Amaresh_Ku_Mishra_Resume
PPT
IPv6: the what, why and how
DOC
Meganathan_Profile
PPTX
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
DOCX
Amjad Resume Mar 2015
PPT
Specification and key points for gprs&edge cqt&dt v1.1
PPTX
nasrul presentation
PDF
Surekha_haoop_exp
PDF
UberCloud - From Project to Product
eChallenges e2006 Large scale interoperability, integrating the Daidalos pro...
AGILE M18 – State of the “Nation”
AzMoC++Mt
Jian yu caise13-
Jian yu caise13-
Sandesh cv_Test Engineer
Technical Consultant - Oracle Technologies
David nickerson resume--gd
Resume_Kavita
Innovate 2014 - DevOps Technical Strategy
Hitendra_Singh
Amaresh_Ku_Mishra_Resume
IPv6: the what, why and how
Meganathan_Profile
Alternatives to Legacy Tech Solutions: The Case of Micro Focus Webinar Presen...
Amjad Resume Mar 2015
Specification and key points for gprs&edge cqt&dt v1.1
nasrul presentation
Surekha_haoop_exp
UberCloud - From Project to Product

More from Miguel Ponce de Leon @ TSSG / Waterford Institute of Technology (20)

PPTX
PRISTINE: Perfect Pitch Net Futures 2015
PDF
PROSE: Empowering FLOSS in European Projects
PDF
RINA: Recursive Inter Network Architecture
PPT
2010 10 19 Open Source Research in FP7 Future Networks
PDF
Mobility Scenarios for the Future Internet: the 4WARD approach
PPT
A User Centric Always Best Connected Service Business Model for MVNOs
PDF
A Framework for In-Network Management in Heterogeneous Future Communication N...
PPT
Towards a New Architectural Framework – The Nth Stratum Concept Mobimedia 08
PPT
Services Of LivingLabs and the European Network of Living Labs (ENoLL)
KEY
PPT
FITCE 2007 Network Technology Trends Miguelpdl
PRISTINE: Perfect Pitch Net Futures 2015
PROSE: Empowering FLOSS in European Projects
RINA: Recursive Inter Network Architecture
2010 10 19 Open Source Research in FP7 Future Networks
Mobility Scenarios for the Future Internet: the 4WARD approach
A User Centric Always Best Connected Service Business Model for MVNOs
A Framework for In-Network Management in Heterogeneous Future Communication N...
Towards a New Architectural Framework – The Nth Stratum Concept Mobimedia 08
Services Of LivingLabs and the European Network of Living Labs (ENoLL)
FITCE 2007 Network Technology Trends Miguelpdl

Recently uploaded (20)

PDF
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
PDF
Early detection and classification of bone marrow changes in lumbar vertebrae...
PDF
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
PDF
Planning-an-Audit-A-How-To-Guide-Checklist-WP.pdf
PDF
Build Real-Time ML Apps with Python, Feast & NoSQL
PDF
Introduction to MCP and A2A Protocols: Enabling Agent Communication
PPTX
Build automations faster and more reliably with UiPath ScreenPlay
PDF
Auditboard EB SOX Playbook 2023 edition.
PDF
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
PDF
Lung cancer patients survival prediction using outlier detection and optimize...
PDF
Connector Corner: Transform Unstructured Documents with Agentic Automation
PDF
“The Future of Visual AI: Efficient Multimodal Intelligence,” a Keynote Prese...
PDF
A symptom-driven medical diagnosis support model based on machine learning te...
PPTX
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
PDF
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
PDF
Rapid Prototyping: A lecture on prototyping techniques for interface design
PDF
Co-training pseudo-labeling for text classification with support vector machi...
PDF
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
PDF
The AI Revolution in Customer Service - 2025
PPTX
Module 1 Introduction to Web Programming .pptx
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
Early detection and classification of bone marrow changes in lumbar vertebrae...
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
Planning-an-Audit-A-How-To-Guide-Checklist-WP.pdf
Build Real-Time ML Apps with Python, Feast & NoSQL
Introduction to MCP and A2A Protocols: Enabling Agent Communication
Build automations faster and more reliably with UiPath ScreenPlay
Auditboard EB SOX Playbook 2023 edition.
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
Lung cancer patients survival prediction using outlier detection and optimize...
Connector Corner: Transform Unstructured Documents with Agentic Automation
“The Future of Visual AI: Efficient Multimodal Intelligence,” a Keynote Prese...
A symptom-driven medical diagnosis support model based on machine learning te...
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
Rapid Prototyping: A lecture on prototyping techniques for interface design
Co-training pseudo-labeling for text classification with support vector machi...
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
The AI Revolution in Customer Service - 2025
Module 1 Introduction to Web Programming .pptx

Daidalos Integration Framework TridentCom 2007

  • 1. Daidalos Framework for successful Testbed Integration Frances Cleary Grant Miguel Ponce de Leon TSSG – Waterford Institute of Technology Ireland
  • 2. Daidalos WP5 Daidalos (49 partners), integration was an immense task co-ordinated and implemented by WP5. Steps leading to Integration Integration Tasks Defining Integration Processes and Models Defining conformance test Specifications Test Site Planning,Deployment and Integration Test planning/scheduling/status report documentation Test case execution, fault detection, result reporting.
  • 3. Nidaros Scenario WP2 Innovations WP3 Innovations WP4 Innovations The Integration of WP innovations were completed through the selected ‘Nidaros’ Scenario.
  • 4. Nidaros scenario Describe nidaros scenario
  • 5. Daidalos WP5 Task Forces To evolve and implement this scenario, task forces were created Scene analysis Task Force (Input from all WP’s) Scene Step analysis Task Force (Input from WP5 step responsible) Mapping and Deployment Task Force
  • 6. Daidalos Integration Model Due to the complexity of the Daidalos Architecture, the integration model addressed the following main areas Integrated Testbed (2 integrated test sites) Sophia Antopolis,France Aveiro, Portugal Integration-oriented developments Intra work package integration activities Formalisation of Integration roles and processes Identification of best Integration and Testing strategy (i.e. sandwich testing) Conformance Test Specification Identification of Nidaros specific WP interfaces Definition of Scenario specific Conformance tests Test Case Definition : Test Case Naming (e.g. N3:01), test summary, API’s & interfaces involved, initial conditions Test Report : Verdicts, person executed test, any closure actions and impacts, comments and possible actions to be performed if test fails.
  • 7. Daidalos Testbed Daidalos Testbed Daidalos Physical Testbed Visualisation activities Validation activities and conclusions
  • 9. For European based conferences the daidalos testbed was setup in a mobile Science Truck which demonstrated Daidalos Innovations. Daidalos Mobile Testbed
  • 10. Daidalos Visualisation Virtualisation Tool (DLR) Figure 8 we have shown the layout for the CarPC view (a similar view was prepared for the PDA view) after some messages have been passed. It shows the simulated status of the network components and the messages from the major WP4 subsystems and third party services. The colour of the arrows indicates the presence of recent message traffic over these connections.
  • 11. Daidalos Visualisation Lucent Virtualisation Tool
  • 12. Daidalos Integration Testing Validation of the Nidaros Integrated Demonstrator conformance tests Sophia Antopolis in November 2005 , Aveiro in March 2006. The 1st validation could only produce very high-level results (i.e. pass/fail of TC). - Problems related to network layer, Mobile IP and WP2 network drivers which were unstable As issues were resolved we were able to validate the demonstrator at a much lower level of detail. Conformance session in Aveiro up to 120 test cases were planned, based on the Nidaros Test case specifications.
  • 13. Integration Testing Example Test Case Bart is driving on the motorway, which triggers the launch of the Traffic information Service. Bart arrives at the airport, and continues to drive towards the car parking area of the airport. His car system screen shows the airport information carrousel. Information about all flights will be shown. Bart parks and leaves his car, taking his PDA with him. A transfer is invoked on the transferring components in the old service and starts the new service on PDA and stops the old service on CarPC. The airport arrivals information can now be seen on Barts PDA as he enters the airport arrival terminal.
  • 14. Integration Issues Encountered Unstable MIPv6, switch from Mandrake to Ubuntu Machines crashing and rebooting became time consuming. Minor Errors encountered, led many times to major complications. Initial steps and configurations unforeseen eroded into valuable scheduled testing allocated time.
  • 15. Conclusion and Results All tests performed on the test-bed successfully used Mobile IP, which remained very stable on Ubuntu in comparison to earlier attempts at using mobile IP on top of Mandrake. WP2 WLAN drivers were relatively stable compared to their earlier performance in Sophia. Route Optimisation worked over Mobile IP, with very noticeable performance improvements as compared to earlier tests on WP4 standalone test-beds. Registration module and several other components were dummy’s because of lack of integration on Ubuntu (previously worked under Mandrake). Communication was a main issue encountered during integration Key point - developers to meet iteration delivery deadlines Scenario step planning contributed positively to the integration process. The 1st successful integrated testing utilising all Work packages took place at Aveiro.
  • 16. End Of Presentation Thank You For Your Time Contact details : Frances Cleary Grant, Miguel Ponce de Leon Organisation: TSSG , Waterford Institute Of Technology

Editor's Notes

  • #3: With the Daidalos Architecture consisting of 3 technical work packages WP2 “ Network Integration” WP3 “Service and Network Management” WP4 “ Pervasive Systems” WP5 “Integrated System Evaluation” aim was to materialise the achievements of work packages into practical assessment to allow for concept validation.
  • #4: With the Daidalos Architecture consisting of 3 technical work packages WP2 “ Network Integration” WP3 “Service and Network Management” WP4 “ Pervasive Systems” WP5 “Integrated System Evaluation” aim was to materialise the achievements of work packages into practical assessment to allow for concept validation.
  • #5: Other task forces were also created as required , for example inventory control checkers task force.
  • #6: With the Daidalos Architecture consisting of 3 technical work packages WP2 “ Network Integration” WP3 “Service and Network Management” WP4 “ Pervasive Systems” WP5 “Integrated System Evaluation” aim was to materialise the achievements of work packages into practical assessment to allow for concept validation.
  • #8: Other task forces were also created as required , for example inventory control checkers task force.
  • #11: Other task forces were also created as required , for example inventory control checkers task force.
  • #12: Other task forces were also created as required , for example inventory control checkers task force.
  • #13: The problems identified in 1st validation could only produce very high-level results (i.e. pass/fail of test cases). After these issues were resolved we were able to validate the demonstrator at a much lower level of detail, which has produced significant input to the technical work-packages Phase2. In a conformance session in Aveiro up to 120 test cases were planned based on the Nidaros Test case specifications. These covered the execution of multiple tests varying from step -1 to step 6 of the Nidaros scenario. Within in the first testing iteration 89 test cases were executed with 59 being successful.
  • #14: Unstable Mobile IP hindered conformance testing initially in Sophia, this was rectified in the Aveiro test bed by switching from Mandrake to Debian-based Ubunto Linux. Specific machines crashing and rebooting proved to be very time consuming. Minor Errors encountered, led many times to major complications in the whole Daidalos system due to the large amount of Daidalos components and their interconnections. Undocumented initial steps and configurations unforeseen prior to the testing phase, eroded into valuable scheduled testing allocated time, as these required configurations and steps had to be figured out and setup correctly for the test case to be executed.
  • #15: Unstable Mobile IP hindered conformance testing initially in Sophia, this was rectified in the Aveiro test bed by switching from Mandrake to Debian-based Ubunto Linux. Specific machines crashing and rebooting proved to be very time consuming. Minor Errors encountered, led many times to major complications in the whole Daidalos system due to the large amount of Daidalos components and their interconnections. Undocumented initial steps and configurations unforeseen prior to the testing phase, eroded into valuable scheduled testing allocated time, as these required configurations and steps had to be figured out and setup correctly for the test case to be executed.
  • #16: Communication was one of the main issues encountered during Daidalos Phase I integration, In phase I the integration wiki was not as effective as it should have been. It can be a powerful tool if used effectively and would have great potential for Phase II. Following the change from Mandrake to Ubunto in Aveiro , MIPv6 became a lot more stable, and it was possible to complete further testing than was previously capable in Sophia Antipolis conformance iteration. A key point realised is the importance for developers to meet iteration delivery deadlines, leading to early fault detection. Scenario step planning contributed positively to the integration process. The First successful integrated testing utilising all Work packages took place at Aveiro, demonstrating overall successful interoperability and integration.