Campbell Corporation conducted a study of DuraVent's manufacturing facility in Vacaville, California that had challenges with layout, material handling, and process flow. Campbell quickly implemented "Just Do It" solutions to eliminate bottlenecks in the paint line, increasing efficiency by 115%. Campbell then collected additional data and analyzed DuraVent's complex product lines. Campbell proposed a new facility layout that would increase material flow and equipment efficiency, yielding a return on investment within 1.68 years. The redesign was projected to improve DuraVent's overall production efficiency by 26.4% and free up 25.5% more production space.