Hydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease Separator
1 System Grease Separator (YSWSTW)(YSWSTW)(YSWSTW)(YSWSTW)
2 Application Free overfall on sharp crested weir without any side contraction
3 Formula Weissbach Equation:
Q = 2/3 · µ · b · (2g)
1/2
· [(v
2
/ 2g)
3/2
- (v
2
/ 2g)
3/2
]
Variables mPD Water Channel m
1 Q Volumetric flow rate, m
3
/s 0.0105530.0105530.0105530.010553 m
3
/s
2 µ discharge coefficient, dimensionless 0.6351840.6351840.6351840.635184 - 4.7367
3 g acceleration due to gravity 9.819.819.819.81 m/s2
overfall 0.0367 h
4 v mean velocity 0.0127270.0127270.0127270.012727 m/s
5 h overfall height 0.0367 m weir 1 M
6 b width of channel (weir) 0.80.80.80.8 m 3.7
7 M height of the weir crest above the headwater bottom 1 m 0.8
Design Parameters
1 Q0 Sewage Flow 912 m3
/day = 0.010555556 m
3
/s
2 L0 FSL at the entrance of GS 3.7 mPD
3 M + h weir + overfall 1.03671.03671.03671.0367 m
4 L1 FSL at the exit of GS 4.73674.73674.73674.7367 mPD
5 V0 Capacity of GS at L0 52.67 m3
6 V1 Capacity of GS at L1 76.4104376.4104376.4104376.41043 m3
7 vb Bubble rising velocity 0.350.350.350.35 m/s (The equipment suplier defined)
8 n No. of GS chamber in operation 1111
Surface Scum Scrapper Induced Air Aerator
FSL Influent Channel Effluent Channel Effective Volume
1000
5.20 mPD
4.74 mPD 76.41 m3
3.70 mPD M 52.67 m3
14.73 m3
1.9 mPD
1.4 mPD
Grease Separator
2500 mm
4000 mm
5400 mm
The depth for the bubble reaction = 4.74 m
Bubble rising time = 13.53 s
Wastewater detention time = 7238.883 s ( 120.648 mins )
Bubble reaction time = 1395.474 s ( 23.25789 mins )

More Related Content

PDF
Detritor Design
PDF
Grit Design
PDF
Discharge Over a Vee-Notch Weir | Jameel Academy
PPT
China flue gas treatment industry report, 2011
PDF
Digester Feed
PDF
FGT_Plant_of_STF
PDF
ANDRITZ Company Slides
PPTX
An overview of steam powerplant
Detritor Design
Grit Design
Discharge Over a Vee-Notch Weir | Jameel Academy
China flue gas treatment industry report, 2011
Digester Feed
FGT_Plant_of_STF
ANDRITZ Company Slides
An overview of steam powerplant

Similar to Head Loss on Weir_Modification_Rev2 (19)

PDF
Quishpe mireya practica6
PDF
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
PPT
Power Electronics fundamentals for the Engineerng
PDF
IGV-assembly procedure of General Electric HDGT
PDF
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Minitab - Graphical...
PDF
Sachpazis Cantilever Retaining Wall, In accordance to IBC 2012 and ASCE 7-10 ...
PDF
MJK Electromagnetic Flowmeter Magflux2025
PDF
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3620019-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3630024-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3620019-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3630024-ct...
PDF
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
PDF
Staf staf sg-en_main
Quishpe mireya practica6
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
Power Electronics fundamentals for the Engineerng
IGV-assembly procedure of General Electric HDGT
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Minitab - Graphical...
Sachpazis Cantilever Retaining Wall, In accordance to IBC 2012 and ASCE 7-10 ...
MJK Electromagnetic Flowmeter Magflux2025
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3610008-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3620019-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3630024-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3620019-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3630024-ct...
Claas celtis 456 426 ra rc rx tractor parts catalogue manual (sn ct3640012-ct...
Staf staf sg-en_main
Ad

Head Loss on Weir_Modification_Rev2

  • 1. Hydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease SeparatorHydraulic Head Calculations on the Grease Separator 1 System Grease Separator (YSWSTW)(YSWSTW)(YSWSTW)(YSWSTW) 2 Application Free overfall on sharp crested weir without any side contraction 3 Formula Weissbach Equation: Q = 2/3 · µ · b · (2g) 1/2 · [(v 2 / 2g) 3/2 - (v 2 / 2g) 3/2 ] Variables mPD Water Channel m 1 Q Volumetric flow rate, m 3 /s 0.0105530.0105530.0105530.010553 m 3 /s 2 µ discharge coefficient, dimensionless 0.6351840.6351840.6351840.635184 - 4.7367 3 g acceleration due to gravity 9.819.819.819.81 m/s2 overfall 0.0367 h 4 v mean velocity 0.0127270.0127270.0127270.012727 m/s 5 h overfall height 0.0367 m weir 1 M 6 b width of channel (weir) 0.80.80.80.8 m 3.7 7 M height of the weir crest above the headwater bottom 1 m 0.8 Design Parameters 1 Q0 Sewage Flow 912 m3 /day = 0.010555556 m 3 /s 2 L0 FSL at the entrance of GS 3.7 mPD 3 M + h weir + overfall 1.03671.03671.03671.0367 m 4 L1 FSL at the exit of GS 4.73674.73674.73674.7367 mPD 5 V0 Capacity of GS at L0 52.67 m3 6 V1 Capacity of GS at L1 76.4104376.4104376.4104376.41043 m3 7 vb Bubble rising velocity 0.350.350.350.35 m/s (The equipment suplier defined) 8 n No. of GS chamber in operation 1111 Surface Scum Scrapper Induced Air Aerator FSL Influent Channel Effluent Channel Effective Volume 1000 5.20 mPD 4.74 mPD 76.41 m3 3.70 mPD M 52.67 m3 14.73 m3 1.9 mPD 1.4 mPD Grease Separator 2500 mm 4000 mm 5400 mm The depth for the bubble reaction = 4.74 m Bubble rising time = 13.53 s Wastewater detention time = 7238.883 s ( 120.648 mins ) Bubble reaction time = 1395.474 s ( 23.25789 mins )