This document proposes a methodology for incorporating uplink delay constraints into LTE cell planning for smart grid applications. It presents the following:
1) A semi-analytical approach is proposed to evaluate uplink transmission delays considering buffering delays before scheduling, packet transmission/retransmission delays over the air interface, and constraints from smart grid standards.
2) Analytical models are used to estimate buffering delays before scheduling based on queue length and service rate. Packet transmission delays are estimated considering packet segmentation, link adaptation, resource block allocation and retransmissions.
3) A cell planning algorithm is analyzed that incorporates these delay metrics to validate compliance with smart grid delay constraints defined in standards. Path loss, interference