JOB SAFETY ANALYSIS
Doc. No.:
Rev.: 00
Date:
Page: 1 of 2
Project: Ajyal international School Project
Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: Supervisor:
Job Description: Work at Height
Item
Detail of
Activity
Equipment &
Tools used
Risk Involved Control Measure
Responsible
Person
Severity
Rating
1
2
3
4
TRANSPORTING
SCAFFOLDING
MATERIAL AT
SITE.
UNLOADING OF
SCAFFOLDING
MATERIAL.
STORAGE OF
SCAFFOLD
MATERIAL.
ERECTION &
DISMANTLING
OF
SCAFFOLDING.
● VEHICLES.
● SCAFFOLDI
NG
MATERIALS
. (PIPES,
JOINTS,
PLANKS,
BASE
PLATE, TOE
BOARD &
etc.)
● .LEVEL
STRIP,
HAMMER,
METER TAP
& ROPE.
● MATERIAL CAN FALL.
● PERSONAL INJURY.
● UNAUTHORIZED /
UNTRAINED/
INEXPERIENCED
PERSONNEL ON THE JOB
● UNEVEN GROUND
● FAULTY/ POOR
CONDITION SCAFFOLDING
MATERIAL
● IMPROPER
SCAFFOLDING ERECTION
● TAG SYSTEM NOT
FOLLOWED.
● WRONG MATERIAL
HANDLING/ FALLING OBJECT
● PERSONNEL INJURY.
● PERSONNEL FALL.
● OBJECT FALL.
● PROPERTY LOSS
● MATERIAL WILL BE FASTENED PROPERLY BEFORE
TRANSPORTING TO SITE.
● ONLY EXPERIENCED, SKILLED AND TRAINED
PERSON SHOULD BE ALLOWED
● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO
START OF JOB
● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT
BE USED.
● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK
● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY
OUT THE TASK.
● MATERIAL WILL BE STORED IN A DESIGNATED AREA.
● MATERIAL WILL BE STORED ON SCAFFOLD RACKS.
● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED
● GROUND SURFACE SHOULD BE LEVELED
● RED TAG MUST BE PLACED/ HANGED AT THE START
OF SCAFFOLDING
● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK
IT WITH HAND LEVEL
● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED
● USE BRACING PIPES AND OUTERRIGGERS PIPES
WHERE NECESSARY.
● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE
JOB.
● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING
AT HEIGHT.
● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE
WITH DOUBLE LANYARD. 100%TIE OFF WILL BE
ENSURED.
● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED.
● HAND RAIL AND TOE BOARDS WILL BE INSTALLED
WITH SCAFFOLDING PLATFORM.
● ALL EMPLOYEES WILL WORK WITH PROPER PPES.
Area I/C
(Authorized
Person).
3
2
3
3
3
2
3
3
3
3
● ELECTRIC SHOCK DUE
TO POWER LINE
● LADDER SHOULD BE CONSTRUCTED AT SUITABLE.
● METAL PLANKS SHOULD BE PROERLY PLACED ON
PIPES WITH HOOKS AND USE BINDING WIRE FOR
BINDIND WHERE NECESSARY
● NO PERSON SHOULD GO IN DROP ZONE.
SCAFFOLDING AREA.
● AREA SHOULD BARRICATED WHILE ERECTION OR
DISMENTLING THE PLATFORM.
● AREA MUST BE CHECKED & FREE FROM ELECTRICAL
WIRES BEFORE ASSEMBLING TO THE CRANE.
OVERHEAD
ELECTRICAL
POWER LINES
● SCAFFOLD
STRUCTUR
E
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE OVERHEAD CLEARANCE WHILE
OPERATING THE EQUIPMENT
Area
Representative
5 NIGHT WORKING
ACTIVITIES
● LIGHTS
● STANDS
Trdsssssdrttt
● HAND INJURY/EYE
INJURY
● ELECTRIC SHOCK /
ELECTROCUTION
● IMPROPER ILLUMINATION
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE WORKERS ARE COMPLYING PPE’S
REQUIRED.
● EXTINGUISHER MUST BE PRESENT AT ALL
TIME
● LIGHT SHOULD BE PROPER PRIOR TO START
THE WORK.
● ALL POWER CABLES SHOULD BE INSPECTED
AND INSULATED.
● LIGHTS SHOULD BE INSTALLED OVER HEAD
HEIGHT TO AVOID GLARING TO PERSONAL.
● IF GENERATOR USE FOR ELECTRICITY SHOULD BE
PROPERLY GROUNDED
● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED
AND USE WHEREVER NECESSARY.
Area I/C
(Authorized
Person).
2
3
2
3
6
HOUSEKEEPING MANUAL CLEANING
OF AREA
● HOUSEKEEPING
● AREA BARRICADING
● PPE
● PROPERTY LOSS
● SLIP/TRIP
● FALL FROM HEIGHT
AREA IN-
CHARGE
3
2
3
Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident
Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?
_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

More Related Content

DOCX
Hse alert 34 2018 safe use of cradles and exlusion zone
PDF
Job safety Analysis
DOCX
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
DOCX
4.6 working at heights and fall protection plan
PDF
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
DOCX
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
DOC
Aha sample-scaffolding
DOCX
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
Hse alert 34 2018 safe use of cradles and exlusion zone
Job safety Analysis
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
4.6 working at heights and fall protection plan
4 - SAFETY IS THE LIFELINE OF YOUR BUSINESS.pdf
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
Aha sample-scaffolding
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx

What's hot (20)

PDF
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
DOCX
6 excavations (temporary works) risk assessment templates
PPTX
Hot Work
PPT
HSE-INDUCTION-TRAINING.ppt
PDF
Risk assessment for testing & commissioning of cranes
PPTX
Health and safety induction
DOCX
16 scaffolding (temporary works) risk assessment templates
PDF
Hot Works Safety Training
PPT
Overhead Crane
DOCX
8 lifting operations with mobile crane risk assessment templates
PPT
Industrial safetY of height works
PPTX
Lifting Operation Safety ppt.pptx
PDF
Permit to work training
PDF
Haad height aware - eng
PPT
Scaffolding safety training.ppt
PDF
Overhead crane risk assessment
PPT
Working at heights
PPTX
Permit to Work Training
PDF
313440656 crane-lifting-calculation-sheet
PPTX
Lifting equipment at work
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
6 excavations (temporary works) risk assessment templates
Hot Work
HSE-INDUCTION-TRAINING.ppt
Risk assessment for testing & commissioning of cranes
Health and safety induction
16 scaffolding (temporary works) risk assessment templates
Hot Works Safety Training
Overhead Crane
8 lifting operations with mobile crane risk assessment templates
Industrial safetY of height works
Lifting Operation Safety ppt.pptx
Permit to work training
Haad height aware - eng
Scaffolding safety training.ppt
Overhead crane risk assessment
Working at heights
Permit to Work Training
313440656 crane-lifting-calculation-sheet
Lifting equipment at work
Ad

Similar to JSA For Work at Height.docx (20)

PDF
JSA for Lifting Activity.pdf file job safety analysis
PPT
SCAFFOLDING SAFETY TRAINING PPT FOR EMPLOYEES
PPT
The Scaffold safety for construction.ppt
PDF
Scaffold Awareness Training Document.pdf
PPTX
Scaffolding Training for Construction work.pptx
PPT
5. scaffolds ppt construction
PPT
HSE Scaffolding Access for Introduction & Fundametal
PPT
scaffolds safe erection and assembling.ppt
PPT
SCAFFOLDING SAFETY.ppt
PDF
TFI-HIRA-CEILING AND PAINTING WORK MS SCAFFOLD-0.1.pdf
PDF
Scaffold safety Procedure
PPT
Scaffolding Safety Training.ppt For scaffolders
DOCX
jsa for Scaffolding Erection.docx for construction
PPT
scaffoldingsafetytraining-221124050618-36ac1a86.ppt
PPT
Scaffolding Powerpoint presentation for training
PPT
Scaffolding Safety Precaution Hazard Identification
PPT
Work-at-Height-Training.ppt slides for sharing
PPTX
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
PPT
PPT
Work at height at industries and PPE.ppt
JSA for Lifting Activity.pdf file job safety analysis
SCAFFOLDING SAFETY TRAINING PPT FOR EMPLOYEES
The Scaffold safety for construction.ppt
Scaffold Awareness Training Document.pdf
Scaffolding Training for Construction work.pptx
5. scaffolds ppt construction
HSE Scaffolding Access for Introduction & Fundametal
scaffolds safe erection and assembling.ppt
SCAFFOLDING SAFETY.ppt
TFI-HIRA-CEILING AND PAINTING WORK MS SCAFFOLD-0.1.pdf
Scaffold safety Procedure
Scaffolding Safety Training.ppt For scaffolders
jsa for Scaffolding Erection.docx for construction
scaffoldingsafetytraining-221124050618-36ac1a86.ppt
Scaffolding Powerpoint presentation for training
Scaffolding Safety Precaution Hazard Identification
Work-at-Height-Training.ppt slides for sharing
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
Work at height at industries and PPE.ppt
Ad

More from FESTUS RICHARD SIAME (9)

PPTX
557778879-9-Unsafe-act-unsafe-condition-nearmiss-incidentaccident.pptx
PPTX
Training Requirements and Training Materials.pptx
PPTX
Employee-or-Contractor-Emergency-Procedures-Toolbox-Talk.pptx
PPTX
Eating-Drinking-and-Smoking-Toolbox-Talk.pptx
PPT
scp-course-powerpoint-slides-chapter-1.ppt
PDF
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
PDF
17 1 Drilling Operations Risk assessment
DOCX
270. ISO 45001 Audit Report Checklist Template.docx
PDF
The Requirements for Transporting Gas Cylinders in Vehicles.pdf
557778879-9-Unsafe-act-unsafe-condition-nearmiss-incidentaccident.pptx
Training Requirements and Training Materials.pptx
Employee-or-Contractor-Emergency-Procedures-Toolbox-Talk.pptx
Eating-Drinking-and-Smoking-Toolbox-Talk.pptx
scp-course-powerpoint-slides-chapter-1.ppt
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
17 1 Drilling Operations Risk assessment
270. ISO 45001 Audit Report Checklist Template.docx
The Requirements for Transporting Gas Cylinders in Vehicles.pdf

Recently uploaded (20)

PDF
Jim Kaskade Biography Highlighting A Career Journey August 21 2025
PPT
Software EffortEstimation and Risk Project Planning Activities Software Scope...
PPTX
3 Information Systems and AI in Change Management.pptx
PPTX
Supply Chain Management in Leadership.pptx
PPTX
EXT.-EDU-809-ACCOUNTABILITY-IN-EXTENSION.pptx
PDF
The Pearson Complete Course for CISM Certification: Unit 3
DOC
咨询WSU毕业证学历认证,多恩大学毕业证国外本科学位证
PDF
Jaito Morcha and Beyond - Bahga’s Legacy of Courage. .pdf
PPTX
Topic 3 - Project Management powerpoint
PDF
Leading with Empathy: How Bangladesh Can Build Inclusive Growth
PDF
Dynamic Capabilities: A System-level Approach To New Strategic Challenges
PPT
risk management (contd.) Risk Identification Risk Components and Drivers Risk...
PPTX
warehousing in material management
PPT
L6 - Diversity and Multicultural Teams.ppt
DOC
TAMUK毕业证学历认证,北科罗拉多大学毕业证文凭
PDF
Discover Electric Car´s Market updated for General Information
PPTX
EXT.-EDU-809-EXTENSION-POLICY-AND-GOALS-.pptx
PPTX
Career_Opportunities_Computer_Applications.pptx
PPT
L2 - Determinants and Dimensions of Culture.ppt
PPT
The Management Spectrum 4 Ps in Project Management
Jim Kaskade Biography Highlighting A Career Journey August 21 2025
Software EffortEstimation and Risk Project Planning Activities Software Scope...
3 Information Systems and AI in Change Management.pptx
Supply Chain Management in Leadership.pptx
EXT.-EDU-809-ACCOUNTABILITY-IN-EXTENSION.pptx
The Pearson Complete Course for CISM Certification: Unit 3
咨询WSU毕业证学历认证,多恩大学毕业证国外本科学位证
Jaito Morcha and Beyond - Bahga’s Legacy of Courage. .pdf
Topic 3 - Project Management powerpoint
Leading with Empathy: How Bangladesh Can Build Inclusive Growth
Dynamic Capabilities: A System-level Approach To New Strategic Challenges
risk management (contd.) Risk Identification Risk Components and Drivers Risk...
warehousing in material management
L6 - Diversity and Multicultural Teams.ppt
TAMUK毕业证学历认证,北科罗拉多大学毕业证文凭
Discover Electric Car´s Market updated for General Information
EXT.-EDU-809-EXTENSION-POLICY-AND-GOALS-.pptx
Career_Opportunities_Computer_Applications.pptx
L2 - Determinants and Dimensions of Culture.ppt
The Management Spectrum 4 Ps in Project Management

JSA For Work at Height.docx

  • 1. ● JOB SAFETY ANALYSIS Doc. No.: Rev.: 00 Date: Page: 1 of 2 Project: Ajyal international School Project Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job, Access control authority would be DEL Site Manager/Site Engineer Date: Supervisor: Job Description: Work at Height Item Detail of Activity Equipment & Tools used Risk Involved Control Measure Responsible Person Severity Rating 1 2 3 4 TRANSPORTING SCAFFOLDING MATERIAL AT SITE. UNLOADING OF SCAFFOLDING MATERIAL. STORAGE OF SCAFFOLD MATERIAL. ERECTION & DISMANTLING OF SCAFFOLDING. ● VEHICLES. ● SCAFFOLDI NG MATERIALS . (PIPES, JOINTS, PLANKS, BASE PLATE, TOE BOARD & etc.) ● .LEVEL STRIP, HAMMER, METER TAP & ROPE. ● MATERIAL CAN FALL. ● PERSONAL INJURY. ● UNAUTHORIZED / UNTRAINED/ INEXPERIENCED PERSONNEL ON THE JOB ● UNEVEN GROUND ● FAULTY/ POOR CONDITION SCAFFOLDING MATERIAL ● IMPROPER SCAFFOLDING ERECTION ● TAG SYSTEM NOT FOLLOWED. ● WRONG MATERIAL HANDLING/ FALLING OBJECT ● PERSONNEL INJURY. ● PERSONNEL FALL. ● OBJECT FALL. ● PROPERTY LOSS ● MATERIAL WILL BE FASTENED PROPERLY BEFORE TRANSPORTING TO SITE. ● ONLY EXPERIENCED, SKILLED AND TRAINED PERSON SHOULD BE ALLOWED ● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO START OF JOB ● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT BE USED. ● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK ● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY OUT THE TASK. ● MATERIAL WILL BE STORED IN A DESIGNATED AREA. ● MATERIAL WILL BE STORED ON SCAFFOLD RACKS. ● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED ● GROUND SURFACE SHOULD BE LEVELED ● RED TAG MUST BE PLACED/ HANGED AT THE START OF SCAFFOLDING ● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK IT WITH HAND LEVEL ● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED ● USE BRACING PIPES AND OUTERRIGGERS PIPES WHERE NECESSARY. ● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE JOB. ● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING AT HEIGHT. ● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE WITH DOUBLE LANYARD. 100%TIE OFF WILL BE ENSURED. ● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED. ● HAND RAIL AND TOE BOARDS WILL BE INSTALLED WITH SCAFFOLDING PLATFORM. ● ALL EMPLOYEES WILL WORK WITH PROPER PPES. Area I/C (Authorized Person). 3 2 3 3 3 2 3 3 3 3
  • 2. ● ELECTRIC SHOCK DUE TO POWER LINE ● LADDER SHOULD BE CONSTRUCTED AT SUITABLE. ● METAL PLANKS SHOULD BE PROERLY PLACED ON PIPES WITH HOOKS AND USE BINDING WIRE FOR BINDIND WHERE NECESSARY ● NO PERSON SHOULD GO IN DROP ZONE. SCAFFOLDING AREA. ● AREA SHOULD BARRICATED WHILE ERECTION OR DISMENTLING THE PLATFORM. ● AREA MUST BE CHECKED & FREE FROM ELECTRICAL WIRES BEFORE ASSEMBLING TO THE CRANE. OVERHEAD ELECTRICAL POWER LINES ● SCAFFOLD STRUCTUR E ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE OVERHEAD CLEARANCE WHILE OPERATING THE EQUIPMENT Area Representative 5 NIGHT WORKING ACTIVITIES ● LIGHTS ● STANDS Trdsssssdrttt ● HAND INJURY/EYE INJURY ● ELECTRIC SHOCK / ELECTROCUTION ● IMPROPER ILLUMINATION ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE WORKERS ARE COMPLYING PPE’S REQUIRED. ● EXTINGUISHER MUST BE PRESENT AT ALL TIME ● LIGHT SHOULD BE PROPER PRIOR TO START THE WORK. ● ALL POWER CABLES SHOULD BE INSPECTED AND INSULATED. ● LIGHTS SHOULD BE INSTALLED OVER HEAD HEIGHT TO AVOID GLARING TO PERSONAL. ● IF GENERATOR USE FOR ELECTRICITY SHOULD BE PROPERLY GROUNDED ● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED AND USE WHEREVER NECESSARY. Area I/C (Authorized Person). 2 3 2 3 6 HOUSEKEEPING MANUAL CLEANING OF AREA ● HOUSEKEEPING ● AREA BARRICADING ● PPE ● PROPERTY LOSS ● SLIP/TRIP ● FALL FROM HEIGHT AREA IN- CHARGE 3 2 3
  • 3. Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage (3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks? _______________________________ __________________________ AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE