Maximo Oil and
Gas 7.6.1
Maximo HSE
Manager 7.6.1
Application
Overview
Asset List
Routes
Asset List
Example use cases:
1.Campaign maintenance
2.Relate multiple Assets and Locations
requiring common action in Action Tracking
2
List View
3
Asset List tab
4
Use these buttons
to quickly select a
related group of
Assets or Locations
Use these buttons
to quickly select a
related group of
Assets or Locations
Add a Campaign
reference if the Asset
List is being used to
support campaign
maintenance
Add a Campaign
reference if the Asset
List is being used to
support campaign
maintenance
Add Multiple
Locations/Assets
buttons
5
Select Locations
and Select Assets
dialogs are driven
from these
buttons
Select Locations
and Select Assets
dialogs are driven
from these
buttons
Routes clone
The following slide outlines the changes
made to the out of the box Routes
application
6
Changes to Route
tab, Route Stops
7
Additional fields
associated with
Oil and Gas/HSE
Job Plan clone
Additional fields
associated with
Oil and Gas/HSE
Job Plan clone
Preventive
Maintenance clone
The following slides outline the changes
made to the out of the box Preventive
Maintenance application.
8
PM tab changes
9
Crosses over
from Location
Crosses over
from Location
Add a Certification Template.
When a WO is generated a new
Certification record will be
created based on the template,
linked to the generated Work
Order
Add a Certification Template.
When a WO is generated a new
Certification record will be
created based on the template,
linked to the generated Work
Order
PM tab changes –
Work Order
Information
10
These fields
cross over
from the Job
Plan header
These fields
cross over
from the Job
Plan header
PM tab changes –
Production Impact
section
11
Use to identify the
impact of this PM when
work is generated.
Alternatively if different
Job Plans are applied as
part of a Job Plan
sequence use production
impact from the Job Plan
Use to identify the
impact of this PM when
work is generated.
Alternatively if different
Job Plans are applied as
part of a Job Plan
sequence use production
impact from the Job Plan
Changes to Job
Plan Sequence tab
12
These fields
cross over
from the Job
Plan Task
These fields
cross over
from the Job
Plan Task
Regulations tab
13
Add multiple
Regulations to
the PM
Add multiple
Regulations to
the PM

Maximo Oil and Gas 7.6.1 HSE: Asset List Routes

  • 1.
    Maximo Oil and Gas7.6.1 Maximo HSE Manager 7.6.1 Application Overview Asset List Routes
  • 2.
    Asset List Example usecases: 1.Campaign maintenance 2.Relate multiple Assets and Locations requiring common action in Action Tracking 2
  • 3.
  • 4.
    Asset List tab 4 Usethese buttons to quickly select a related group of Assets or Locations Use these buttons to quickly select a related group of Assets or Locations Add a Campaign reference if the Asset List is being used to support campaign maintenance Add a Campaign reference if the Asset List is being used to support campaign maintenance
  • 5.
    Add Multiple Locations/Assets buttons 5 Select Locations andSelect Assets dialogs are driven from these buttons Select Locations and Select Assets dialogs are driven from these buttons
  • 6.
    Routes clone The followingslide outlines the changes made to the out of the box Routes application 6
  • 7.
    Changes to Route tab,Route Stops 7 Additional fields associated with Oil and Gas/HSE Job Plan clone Additional fields associated with Oil and Gas/HSE Job Plan clone
  • 8.
    Preventive Maintenance clone The followingslides outline the changes made to the out of the box Preventive Maintenance application. 8
  • 9.
    PM tab changes 9 Crossesover from Location Crosses over from Location Add a Certification Template. When a WO is generated a new Certification record will be created based on the template, linked to the generated Work Order Add a Certification Template. When a WO is generated a new Certification record will be created based on the template, linked to the generated Work Order
  • 10.
    PM tab changes– Work Order Information 10 These fields cross over from the Job Plan header These fields cross over from the Job Plan header
  • 11.
    PM tab changes– Production Impact section 11 Use to identify the impact of this PM when work is generated. Alternatively if different Job Plans are applied as part of a Job Plan sequence use production impact from the Job Plan Use to identify the impact of this PM when work is generated. Alternatively if different Job Plans are applied as part of a Job Plan sequence use production impact from the Job Plan
  • 12.
    Changes to Job PlanSequence tab 12 These fields cross over from the Job Plan Task These fields cross over from the Job Plan Task
  • 13.
    Regulations tab 13 Add multiple Regulationsto the PM Add multiple Regulations to the PM