After two and a half years of on-site explorations, surveys and careful analysis of these properties
Technologies, Inc. (TEGR) in New York to employ several cutting-edge remote satellite
potential and to identify specific high prospectivity areas of gold and ruby content for industrial
exploitation. MIG has collected and provide Terra with available geological information, geological
maps, samples analysis, photos and coordinates of sampled locations.
The multi-spectral analysis of satellite images is carried out in the 2 steps:
Phase 1 deliverables:
a. Map or maps indicating (mapping) contours of structures/anomalies, with scale 1:100,000 or
1:50,000 (depending of the size of detected structure(s)) in connection with possible gold
and ruby accumulation.
b. Recommendations on the Service Territory prospectivity with justifications and geological
conclusions drawn from the STeP findings.
c. Map(s) outlining all potential minerals (primarily gold and ruby) anomalies/structures, main
geological features, such as main faults or trend contours via STeP.
d. The report is anticipated to include, to the extent determined to be relevant:
(1) General assessment of gold and ruby prospectivity;
(2) Indication (mapping) of the contour of each structure, with scale 1:100,000 or 1:50,000
depending of the size of detected structure;
(3) Cartographic format of stress fields, structure contours;
Gemstone prospectivity contour view. Purple contours are areas of prospectivity according to
spectrometry.
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
32  
Contour view of potential gold deposit. Red contours primary, orange contours placer gold
deposits.
Target areas of gold and gemstone prospectivity for further exploration.
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
33  
Phase 2 report deliverables:
a. Indication of depth(s) of potential deposits via STeP, where applicable;
b. Identification, where applicable, of sampling and/or drilling locations with GPS coordinates;
c. Maps with the scale of 1:5,000 or 1:10,000 indicating the gold prospectivity of the territory;
d. Maps with the scale of 1:5,000 or 1:10,000 indicating the ruby prospectivity of the territory;
e. Certain geological conclusions, based on the reports and comments of the local exploration
and geological teams.
Gemstones
All of the areas, selected in the first Phase of the research, were analyzed in detail.
Location  of  sectors  with  potential  high  gems  concentration  
  
Sector 1
Gems  concentration  isolines  in  hardrock
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
34  
Sector 2
Gems  concentration  isolines  (Sector  2)  
  
Sector 3
Gems  concentration  isolines  (Sector  3)
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
35  
Sector 4
Gems  concentration  isolines  (Sector  4)  
  
Sector 5
Gems  concentration  isolines  (Sector  5)
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
36  
Sector 6
Gem  concentration  isolines  (Sector  6)  
  
Gold
Location  of  sectors  with  gold  mineralization  
  
  
Location  of  gold  mineralization  within  sectors  1  through  6.
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
37  
Sector 1
Isolines  of  gold  concentration  in  Sector  1  
  
Sector 2
Isolines  of  gold  concentration  of  Sector  2
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
38  
Sector 3
Isolines  of  gold  concentration  in  Sector  3  
  
Sector 4
Isolines  of  gold  concentration  in  Sector  4
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
39  
Intensive on-site exploration and survey work has been done within the 2 MIGPLC licensed areas
over the last three and half year period, including the collection and analysis of field samples.
These explorations and surveys were a major under taking to carry out standard geological
evaluation technologies to determine the gold and ruby bearing potential of these properties.
Hundreds of soil and gravel samples were gathered and evaluated. These field samples were
obtained by group sampling (pick-up from surface) and from cross section of core drilling and pit
excavations. Using a magnetometer, magnetic readings were also taken for geological evaluation
purposes andsubsequently interpreted by our field geologists.
square kilometers (10,000 Hectares) only as outlined in the
report while the entire our current MIGPLC mining concession size is 274.41 square kilometers.
So includes everything that Tera surveyed + much more they have not. Therefore our total
Based on t
team and strategic alliance partners conducted an intensive on site exploration for 45 days. This
included gathering samples, cross section core drilling and pit excavation on 11 locations of these
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
40  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
41  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
42  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
43  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
44  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
45  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
46  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
47  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
48  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
49  
1st
VISIT BY HELICORPTER
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
50  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
51  
2nd
FIEL VISIT BY HELICORPTER
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
52  
INFRASTRUCTURE
The road from Battambang to Samlot is covered with Tar and macadam 60km is being
constructed by the Japanese after the 1990 war. The road is now damage and need to
reconstruct and improve.
Due to the poor condition of roads, during the two years we used motor bikes and tractors to
conduct our on site mining explorations.
In order to conduct our mining businesses properly, we need to bring heavy equipments and
machineries, therefore we need to fix and maintain the main to the main gate of MIGPLC mining
concessions. MIGPLC senior management decided to fix and reconstruction the main road into
two phases in conjunction with local military engineers from 5th
Corp Tactical Zone and provincial
public works.
Phase I began September 2007 to July/2009.
Phase II began April 2011 to November 2011.
MIGPLC HEAVY EQUIPMENT
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
53  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
54  
ROAD BEFORE CONSTRUCTION PHASE I
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
55  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
56  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
57  
ROAD UNDER CONSTRUCTION PHASE I
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
58  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
59  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
60  
ROAD CONSTRUCTION COMPLETED PHASE I
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
61  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
62  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
63  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
64  
ROAD BEFORE RECONSTRUCTION PHASE II
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
65  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
66  
 
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
67  
 
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
68  
 
ROAD UNDER RECONSTRUCTION PHASE II
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
69  
 
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
70  
 
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
71  
 
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
72  
 
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
73  
 
  
74  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
 
  
  
75  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
 
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
76  
 
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
77  
 
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
78  
 
BRIDGES
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
79  
 
  
  
  
  
  
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
80  
 
DREDGER VESSEL
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
81  
 
  
  
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
82  
SOCIAL RELATIONSHIPS
Project exchange for Services: During the last four years MIGPLC cooperated closely with 5th
Corp Tactical Zone for the mutual benefits. For example when 5th
Corp need to build and
furnished its conference hall, MIGPLC did it for 5th
Corp in exchange 5th
Corp will do bomb and
clearing Mines, provide mining area sercurity protection for MIGPLC .. and so on ..
BATTALION HEADQUARTERS
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
83  
 
REGIMENT HEADQUARTERS
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
84  
 
5th
  TACTICAL REGION FIELD HEADQUARTERS
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
85  
 
GENERAL HEADQUARTERS OF ROYAL CAMBODIA ARMED FORCES (R.C.A.F) ARMY
HEADQUARTERS
  
  
  
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
86  
 
CAMBODIA BODYGUARD BRIGADE HEADQUARTERS
  
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
87  
 
FIELD VISIT BY SENIOR MIGPLC MANAGEMENT
THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
88  
US 19925 Stevens Creek Boulevard
Suite 100 Cupertino, California 95014 - USA
Tel: +408.973.7226 Fax: +408.370.7918
Toulkork District, Phnom Penh, Royal of Cambodia
Tel.: +855.2399.2329 Fax: +855.2399.2348
District 2, Ho Chi Minh City, Vietnam
Tel: +84(8)54022511 Fax: +84(8)37444921
www.millenniumig.com
UNITED STATES VIETNAM CAMBODIA CHINA CANADA AFRICA MYANMAR
 

MIGPLC PROFILE(EN)(P2)

  • 1.
    After two anda half years of on-site explorations, surveys and careful analysis of these properties Technologies, Inc. (TEGR) in New York to employ several cutting-edge remote satellite potential and to identify specific high prospectivity areas of gold and ruby content for industrial exploitation. MIG has collected and provide Terra with available geological information, geological maps, samples analysis, photos and coordinates of sampled locations. The multi-spectral analysis of satellite images is carried out in the 2 steps: Phase 1 deliverables: a. Map or maps indicating (mapping) contours of structures/anomalies, with scale 1:100,000 or 1:50,000 (depending of the size of detected structure(s)) in connection with possible gold and ruby accumulation. b. Recommendations on the Service Territory prospectivity with justifications and geological conclusions drawn from the STeP findings. c. Map(s) outlining all potential minerals (primarily gold and ruby) anomalies/structures, main geological features, such as main faults or trend contours via STeP. d. The report is anticipated to include, to the extent determined to be relevant: (1) General assessment of gold and ruby prospectivity; (2) Indication (mapping) of the contour of each structure, with scale 1:100,000 or 1:50,000 depending of the size of detected structure; (3) Cartographic format of stress fields, structure contours; Gemstone prospectivity contour view. Purple contours are areas of prospectivity according to spectrometry. THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       32  
  • 2.
    Contour view ofpotential gold deposit. Red contours primary, orange contours placer gold deposits. Target areas of gold and gemstone prospectivity for further exploration. THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       33  
  • 3.
    Phase 2 reportdeliverables: a. Indication of depth(s) of potential deposits via STeP, where applicable; b. Identification, where applicable, of sampling and/or drilling locations with GPS coordinates; c. Maps with the scale of 1:5,000 or 1:10,000 indicating the gold prospectivity of the territory; d. Maps with the scale of 1:5,000 or 1:10,000 indicating the ruby prospectivity of the territory; e. Certain geological conclusions, based on the reports and comments of the local exploration and geological teams. Gemstones All of the areas, selected in the first Phase of the research, were analyzed in detail. Location  of  sectors  with  potential  high  gems  concentration     Sector 1 Gems  concentration  isolines  in  hardrock THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       34  
  • 4.
    Sector 2 Gems  concentration isolines  (Sector  2)     Sector 3 Gems  concentration  isolines  (Sector  3) THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       35  
  • 5.
    Sector 4 Gems  concentration isolines  (Sector  4)     Sector 5 Gems  concentration  isolines  (Sector  5) THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       36  
  • 6.
    Sector 6 Gem  concentration isolines  (Sector  6)     Gold Location  of  sectors  with  gold  mineralization       Location  of  gold  mineralization  within  sectors  1  through  6. THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       37  
  • 7.
    Sector 1 Isolines  of gold  concentration  in  Sector  1     Sector 2 Isolines  of  gold  concentration  of  Sector  2 THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       38  
  • 8.
    Sector 3 Isolines  of gold  concentration  in  Sector  3     Sector 4 Isolines  of  gold  concentration  in  Sector  4 THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       39  
  • 9.
    Intensive on-site explorationand survey work has been done within the 2 MIGPLC licensed areas over the last three and half year period, including the collection and analysis of field samples. These explorations and surveys were a major under taking to carry out standard geological evaluation technologies to determine the gold and ruby bearing potential of these properties. Hundreds of soil and gravel samples were gathered and evaluated. These field samples were obtained by group sampling (pick-up from surface) and from cross section of core drilling and pit excavations. Using a magnetometer, magnetic readings were also taken for geological evaluation purposes andsubsequently interpreted by our field geologists. square kilometers (10,000 Hectares) only as outlined in the report while the entire our current MIGPLC mining concession size is 274.41 square kilometers. So includes everything that Tera surveyed + much more they have not. Therefore our total Based on t team and strategic alliance partners conducted an intensive on site exploration for 45 days. This included gathering samples, cross section core drilling and pit excavation on 11 locations of these THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       40  
  • 10.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       41  
  • 11.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       42  
  • 12.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       43  
  • 13.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       44  
  • 14.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       45  
  • 15.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       46  
  • 16.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       47  
  • 17.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       48  
  • 18.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       49  
  • 19.
    1st VISIT BY HELICORPTER THE MILLENNIUM  INTERNATIONAL  GROUP  PLC      THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       50  
  • 20.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       51  
  • 21.
    2nd FIEL VISIT BYHELICORPTER THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       52  
  • 22.
    INFRASTRUCTURE The road fromBattambang to Samlot is covered with Tar and macadam 60km is being constructed by the Japanese after the 1990 war. The road is now damage and need to reconstruct and improve. Due to the poor condition of roads, during the two years we used motor bikes and tractors to conduct our on site mining explorations. In order to conduct our mining businesses properly, we need to bring heavy equipments and machineries, therefore we need to fix and maintain the main to the main gate of MIGPLC mining concessions. MIGPLC senior management decided to fix and reconstruction the main road into two phases in conjunction with local military engineers from 5th Corp Tactical Zone and provincial public works. Phase I began September 2007 to July/2009. Phase II began April 2011 to November 2011. MIGPLC HEAVY EQUIPMENT THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       53  
  • 23.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       54  
  • 24.
    ROAD BEFORE CONSTRUCTIONPHASE I THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       55  
  • 25.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       56  
  • 26.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       57  
  • 27.
    ROAD UNDER CONSTRUCTIONPHASE I THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       58  
  • 28.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       59  
  • 29.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       60  
  • 30.
    ROAD CONSTRUCTION COMPLETEDPHASE I THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       61  
  • 31.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       62  
  • 32.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       63  
  • 33.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       64  
  • 34.
    ROAD BEFORE RECONSTRUCTIONPHASE II THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       65  
  • 35.
    THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       66  
  • 36.
      THE  MILLENNIUM  INTERNATIONAL GROUP  PLC       67  
  • 37.
              THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       68  
  • 38.
      ROAD UNDER RECONSTRUCTIONPHASE II     THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       69  
  • 39.
        THE  MILLENNIUM INTERNATIONAL  GROUP  PLC       70  
  • 40.
          THE MILLENNIUM  INTERNATIONAL  GROUP  PLC       71  
  • 41.
              THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       72  
  • 42.
          THE MILLENNIUM  INTERNATIONAL  GROUP  PLC       73  
  • 43.
        74   THE MILLENNIUM  INTERNATIONAL  GROUP  PLC      
  • 44.
          75  THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC      
  • 45.
              THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       76  
  • 46.
        THE  MILLENNIUM INTERNATIONAL  GROUP  PLC       77  
  • 47.
              THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       78  
  • 48.
      BRIDGES   THE  MILLENNIUM INTERNATIONAL  GROUP  PLC       79  
  • 49.
                        THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       80  
  • 50.
      DREDGER VESSEL   THE MILLENNIUM  INTERNATIONAL  GROUP  PLC       81  
  • 51.
                  THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       82  
  • 52.
    SOCIAL RELATIONSHIPS Project exchangefor Services: During the last four years MIGPLC cooperated closely with 5th Corp Tactical Zone for the mutual benefits. For example when 5th Corp need to build and furnished its conference hall, MIGPLC did it for 5th Corp in exchange 5th Corp will do bomb and clearing Mines, provide mining area sercurity protection for MIGPLC .. and so on .. BATTALION HEADQUARTERS   THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       83  
  • 53.
      REGIMENT HEADQUARTERS     THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       84  
  • 54.
      5th  TACTICAL REGIONFIELD HEADQUARTERS   THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       85  
  • 55.
      GENERAL HEADQUARTERS OFROYAL CAMBODIA ARMED FORCES (R.C.A.F) ARMY HEADQUARTERS         THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       86  
  • 56.
      CAMBODIA BODYGUARD BRIGADEHEADQUARTERS   THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       87  
  • 57.
      FIELD VISIT BYSENIOR MIGPLC MANAGEMENT THE  MILLENNIUM  INTERNATIONAL  GROUP  PLC       88  
  • 59.
    US 19925 StevensCreek Boulevard Suite 100 Cupertino, California 95014 - USA Tel: +408.973.7226 Fax: +408.370.7918 Toulkork District, Phnom Penh, Royal of Cambodia Tel.: +855.2399.2329 Fax: +855.2399.2348 District 2, Ho Chi Minh City, Vietnam Tel: +84(8)54022511 Fax: +84(8)37444921 www.millenniumig.com UNITED STATES VIETNAM CAMBODIA CHINA CANADA AFRICA MYANMAR
  • 60.