Page 1 of 7
Egypt Address : 30 Baker Hassan St. Faysal, Giza, Egypt.
KSA current address : North Region Cement Company Senior Camp.
Mobile : +966 54 037 61 86 or +966 535 173 174
Passport no : 0775285
Personal- mail : m.a.saa3d@hotmail.com or moh.ahm.saad@gmail.com
Work - mail : masaad@nrc.com.sa
Major : Electrical Engineer
Position : Electrical section head
Egypt Address : 30 Baker Hassan St. Feisal, Giza, Egypt.
OBJECTIVE
A responsible position in a high caliber, well established company with
promotional career in the field of Electrical Engineering. Willing to build a career with
leading corporate with committed and dedicated people, which will help me to explore
myself fully and realize my potential.
Personal Information
- Nationality : Egypt
- Birth date : 11th
,Feb, 1984
- Gender : Male
- Marital Status : Married
- Military Status : Exempted
Work Experience
Current Employer : North Region Cement Company (NRCC).
Employer Country : Saudi Arabia.
Job title : promoted up to Section Head.
Previous job : ASEC AUTOMATION Co. (ASA). Cairo.
Job title : Electric Shift Leader Engineer.
Employer : National Cement Company (NCC) project.
Employer Country : Egypt.
Previous job : Delta Trading Company.
Employer Country : Egypt.
 North Region Cement Company (NRCC). July, 2009 till Now
- Holding a large volume of responsibilities NRCC , SAUDIA Arabia
- Electrical (Section Head) for Both lines (6000+3000) TPD Plants.
- Fault analysis using the Root Cause Analysis, fish bone and SWAT methodology.
- Implement S5 Japanese’s management technique.
- (Certified Lecturer) of National Electrical Training program(Blue CAP).
- SAP (system Application in data process) Electrical Section head User.
- Implement SAP (System Application in Data process) Software for Notifications, PM
work orders, technical confirmation TECO , Material Reservation , work orders.
- Planning the preventive, corrective, predictive, break down, shutdown , calibration
orders and Special Event maintenance.
- Create, Implement and supervising HSE “OSHA Safety instruction and Closely
monitor PPE for Electrical team strictly.
Page 2 of 7
- Prepare monthly, annual Energy Consumption reports and prepared Consumption
analysis report .
- Energy Saving use the consumption analysis report. Hence we reached to optimum
Consumption rate 90 KWH/Ton.
- ISO 9001-2008 Certified Internal auditor and Documents controller.
- Planning Annual Maintenance Schedule for Electrical Department.
- prepare and submit Annual Electrical Maintenance Budget report.
- Create, Implement and supervising thermal image IR (INFRA RED) Technique for
electrical equipment, hence increase the life time of Equipment.
- Maintenance and troubleshooting MV Slip ring motor up to 6.3 MW.
- Maintenance and troubleshooting MV Squirrel Cage Motor up to 2150 MW.
- Experience of MV Motor bearing, Housing and bearing replacement.
- Experience in Maintenance and troubleshooting MV Vacuum Circuit Breaker Merlin
Gerin17.5 kV.
- Relay coordination project, Modify Trip Setting, configure and programming Siemens
SIPROTEC 47SJ62 Multifunction Protection Relays .Using DEGISI software and
power plant Feeder protection relays MICOM P21.
- Make the necessary modification of Plant protection type from definite time (DMT) to
inverse time current (IDMT) C/Cs saving 600,000 SAR for NRCC.
- Make the necessary changes for relay coordination between down & up stream.
- Experience in Maintenance and troubleshooting Changeover switches ATYS Up to
3200 A.
- Maintenance Diesel emergency generator up to 1000 KVA.
- Main co-coordinator between both lines & Power plant capacity 63 MVA.
- Synchronization and De-Synchronization process, Operate both units in BASE LOAD
and ISOCHRONOUS modes.
- Modified the power factor correction system and improve it from 0.75 to 0.95.
- Implement Energy saving technique using VFD.
- Pre-planning task assignments for major shutdown maintenance activities A-Z.
- On call, Emergency maintenance works of the plant.
- Configure and parameter setting for Power factor Controller ABB Type RVT.
- Aware by Maintenance, Configuration, programming and parameterize LOW
VOLTAGE IINVERTER types
 ABB : ACS 550-01, ACS 800 and ACS850,
 Schneider Electrical : Aptiva® 31 (Telemecanique),
 AB: power Flex 700s (ALLEN Bradley)
 VACON: NX & NXP,
 SIEMENS SIMOVERT Master drive.
- Aware by Maintenance, Configuration, programming and parameterize for Medium
Voltage Frequency Drive
 AB : power Flex 7000 Air cooling
 Siemens : ROBICON Perfect Harmony -s
- Maintenance and Spare parts controller for Medium Voltage Frequency Drive.
Page 3 of 7
- Expertise of Maintenance, Configuration, programming and parameterize LOW
VOLTAGE
 ABB PST30…300 , PSTB370…1050
 Telemecanique Altistart 48
- Modified with IKN great cooler Controller System.
- Configure and parameterize ABB (MCU) MOTOR CONTROL UNIT in (MCC).
- Aware about PLC S7-200, 300 and 400 and its interface PCS7.
- Prepare Monthly Electric power point presentation for Upper management.
- Electrical Member for Annual Auditing .
- Implement a lot of modification of the plant such as bearing housing of RM main
drive, calibration Belts, ESP Drive, Kiln Drive Cooling system.
- Commissioning IKN new clinker crusher system.
- Capable to test all Mechanical & Electrical apparatus.
- Proceed the complete Purchasing cycle for the spare parts & equipments from the local
market either from the foreign manufacturer’s agents or import overseas.
- Technical evaluation of proposal, Budget preparation, preparing the vendor list, tender
enquiry for the control system, special instrument, instrument, Sub control system etc.
- Finalization and follow-ups. Basic and Detailed Engineering, procurement and MRP
- Overseeing the PLC/DCS system (SIEMENS S7 -300 and S7-400 Version 6.6, WINCC),
- Programming, Troubleshooting and Maintenance of the DCS/PLC system.
- Operation, maintenance and network Administration of the system.
- Planning for the execution of modification and new jobs.
- S7-200 PLC base and LOGO 230RC base problem’s troubleshooting PLC/DCS system.
- Human Machine Interface (HMI), Operator Interface devices parameter’s Maintain
and keeps its proper record, supporting documentation Provide technical support to
customers.
Working In following Instrumentation
 HASLER Weighing Feeder (Germany)
 SAIMO Weighing Feeder (Australia)
 Belt Scale (Schenk) Germany
 Kiln Feed Hasler (Germany)
 Gas Analyzer Siemens (China)
 Pillard System of HFO system (Pillard), Raytek Shell scanner
 Troubleshooting Weigh Bridge calibration on Avery Weigh Tronix Controller base
 Multi turns actuator, calibration and maintenance.
 Gamma Matrics (Cross belt on line Analyzer), for Lime stone.
 Auto sampling system. (FLS)
 X-RAY Analyzer (thermo fisher)
 Different types of Pressure/Temp/Flow Transmitter calibration and maintenance
Page 4 of 7
Line two 3000T/D testing, Commissioning then maintenance:
- Erecting, installation & Commissioning of HT/ LT Switchgears, Transformers and
related Electrical Works. Tender QS/QA/QC Review preparation, Computerized
Planning and drawings.
- SIEMENS SIMOVERT MASTERDRIVES & MICOMASTER for motors from 450
KW for E.P filter and kiln main drive, drive setting parameterization and maintenance,
replacement of IGBT Cards.
Testing &Commissioning the Additional three Engine project.
RESPONSIBILITY:
- Project site supervision and Project management of Electrical contractors in all aspects
related to execution of Electrical equipment installation .Review of Engineering
drawings and Quality control plan and process Control and equipment manufacture
QS/QA/QC Review.
- Jointing line I & Line II bus electrically through bus couplers and test and
commissioning the protection relay, adjust the differential protection relay.
- Setting of AREVA MICOM P255 3 Phase Induction Motor Protection Relay with
MICOM S1 Support Software.
- SIEMENS SMART MOTOR CONTROLLERS SIMCODE PRO 3UF7 parameter
setting, fault Finding and Profibus connections
- Monitor of (3 and 7MW) Power plant erecting, commissioning by WARTSILA
ENGINES.
WORK AS a Consultant Engineer for Roller press project. Pre grinding 2013
RESPONSIBILITY
- Check with the supplier the design and change as per NRCC requirement.
- Design the electrical substation, switchgear and MCC.
- Testing and commissioning the electrical equipment.
- Prepare and submit the punch list.
- Erecting, installation , testing and Commissioning of roller pressure system (pre
grinding) which increase the cement mill production from 160 ton/hr to 250 ton/hr
- Instructor of @ (Blue CAP) Internal Saudi National training course
Course included ( generation, transmission , Transformers, Loads, switch gears,
Distribution, protection and Drive July 2014 to October 2014.
 Arab Swiss Engineer Company ASEC in (National cement Co.).
Responsibility in ASEC AUTOMATION: Dec, 2006 till July, 2009
- Electric Shift Leader Engineer.
- Preventive & emergency maintenance for M.V & L.V systems
- AC motors (up to 2MW / 6.3KV) and DC motors with their feeding panels Up
to 1360KW.
- Modifications necessary to improve the system behavior and keep minimize
down time.
Page 5 of 7
- Troubleshooting for Instrumentation Faults like” Level, Pressure, Flow, and
Temperature.
- Prepare the necessary reports and overhauling schedules.
- Programmable logic controllers PLCs "Siemens and Procontic.
- Responsible for plant to prevent problems and failures of any equipment to maintain
all working cement process.
- Responsible for all 2 dry lines areas during shift, working in medium voltage breakers,
motors and protection relays ,low voltage motors and it's MCC control ,to
instrumentation level of temp , pressures ,flow and speed, and deal with plc of many
types.
- Attend a lot of certified training courses in Cement industrial .
 Delta Trading & Commerce Company
 July 2006 To Aug 2007 Full time.
 Aug 2006 To August 2008 part Time.
Responsibility in Delta Trading Company
- Technical support and Service Engineer.
- Install 2 new cardboard complete lines.
- Responsible about all paper converting Section.
- Install 2 new cardboard complete lines.
- Install one offset printing machine.
- Study the Tender related to paper converting section.
- Make the necessary Quotation for customer .
- Clear the technical points for customers.
- Install and maintenance more than 50 strapping machine.
Practical Technical training Summary
- Gulf of Suez Petroleum Company (GUPCO).
- Network Training center (NTC).
- Arab Medical Company.
- Panasonic.
- SKF
- SIEMENS MV Motors, Dresden , Germany .
Previous courses:
1- Design of electrical Works inside Building.
2- Microprocessor and Microcontroller in Panasonic.
3- AUTOCAD 2D.
4- Ordinary Automatic Control.
5- Maintenance and operation for ACS (550 -800) ABB frequency drive.
6- Programming with programmable logic control "PLCs".
7- English courses until level (302=nine) AUC.
8- STRATEGIC MANAGEMENT" How to build your career “ITC Certificate”.
9- OSHA industrial safety course.
Page 6 of 7
10- Programming PLC Siemens Step 7.
11- Problem Solving& Creative Thinking ‘international course’.
12- Function and maintenance poles and Drive of Siemens 3AC –CB.
13- SKF seminar for Electrical motor bearing.
14- Attend M/S “VACON” frequency drive Middle East seminar.
15- On line AC drive training course from M/s “Schneider Electrical “.
16- Powers flex 700S frequency drive (VSD) Allen Bradley.
17- ISO 9001/2008 internal auditing certified by (Moody) international co.
18- Attend witness Factory acceptance test FAT of
 Raw mill main drive 3300KW, 13.8KV, 60 Hz @ VEM, Dresden, Germany.
19- Attend witness solo run test of for Slip ring motors @ ISCOSA WS in Dammam.
 Cement Mill (6300KW, 13800 V, 311 Amp).
 Raw Mill Fan (3500 KW, 13800V, 174 Amp).
 Raw Mill Min drive (3300KW , 13800V, 164 Amp).
20- Workshop Smart Solution: enabling mobility in Large.
Languages
 Arabic : Mother tongue.
 English : Fluent in both verbal & written
 Deutsch : Good
Education
- University Degree : B.Sc. Engineering
- University : Helwan University
- Faculty : Engineering
- Major : Electrical Engineering
- Graduation project : A microcontroller Based control unit of two levels
current source Inverter (CSI) Closed loop.
- Project grade : Excellent
- B.SC. year grade : very Good
- Cumulative Grade : Good
- Graduation year : 2006
- Grade : 94%
- Preparing Master Degree in Cairo University 2008.
Qualifications:
- Qualified to work at any modern Automation Systems , Cement dry process,
Electromechanical systems, Different Utilization system, management and under
pressure.
Other Skills
- Advanced user for windows, Microsoft® Office, Mat lab, Internet Application.
- AutoCAD
- Electrical MATLAB "SIMOLINK",
Page 7 of 7
- “Siemens” DEGSI 4.8,
- Fluke power log,
- “ABB drive ware” Drive window light 2 & Drive size,
- “Allen Bradley” Drive executive,
- “ABB” MCU,
- “Siemens” SIMCODE PRO 3UF7 ,
- “LUST” VecWin 10.49
- Management software SAP (system Application in data process).
Key Competence:
- Detailed design of P.D system, Cable sizing, MV, LV switchgears and MCCs.
- Lightning protection system, grounding system, electric heat tracing, fire alarm
system, lighting illumination, Calculations, tray layouts, etc.
- Familiar with electrical systems case studies for Load Flow, Short Circuit/Fault
- Calculations, large motor start-up using PowerStation ETAP software.
- Familiar with NEMA, ASTM, IEEE and IEC based electrical codes, standards and
regulations also NFPA 16, NFPA 25 .
- Experience in field inspection and acceptance testing of electrical equipment.
- Development of power system single-line diagrams and cable and conduit schedules.
- Preparation of cable tray fill and conduit calculations, etc.
- Design physical layout of electrical equipment, and grounding plans.
- Project execution and supervision in Cement plants.
- Electrical / instrumentation & telecommunication Quantity Survey or Re-
measurements, Conducted electrical Inspections and tests on electro-mechanical
equipment such as transformers, motor control centers, switchgears, motors, motor
drives and power cables.
- Designed power distribution systems involving cable ampere ratings, cable voltage
drops, motor and motor drive sizing, sizing of electrical protective devices, lighting,
and industrial control.
- Developed electrical facility layout drawings using Auto-cad software. Performed
electrical power demand analyses on electrical facilities.
Declaration
- Above mentioned all information are correct
Reference :
- Engr. Mohamed Al-Desh NRCC Electrical Manager Mob: 00966540375904
- Engr. Issam Bader NRCC Maintenance Manager Mob: 00966540380128
- Engr. Mustafa Muhessin NRCC Ass. General director Mob: 00966500146663

Mohamed_Saad

  • 1.
    Page 1 of7 Egypt Address : 30 Baker Hassan St. Faysal, Giza, Egypt. KSA current address : North Region Cement Company Senior Camp. Mobile : +966 54 037 61 86 or +966 535 173 174 Passport no : 0775285 Personal- mail : [email protected] or [email protected] Work - mail : [email protected] Major : Electrical Engineer Position : Electrical section head Egypt Address : 30 Baker Hassan St. Feisal, Giza, Egypt. OBJECTIVE A responsible position in a high caliber, well established company with promotional career in the field of Electrical Engineering. Willing to build a career with leading corporate with committed and dedicated people, which will help me to explore myself fully and realize my potential. Personal Information - Nationality : Egypt - Birth date : 11th ,Feb, 1984 - Gender : Male - Marital Status : Married - Military Status : Exempted Work Experience Current Employer : North Region Cement Company (NRCC). Employer Country : Saudi Arabia. Job title : promoted up to Section Head. Previous job : ASEC AUTOMATION Co. (ASA). Cairo. Job title : Electric Shift Leader Engineer. Employer : National Cement Company (NCC) project. Employer Country : Egypt. Previous job : Delta Trading Company. Employer Country : Egypt.  North Region Cement Company (NRCC). July, 2009 till Now - Holding a large volume of responsibilities NRCC , SAUDIA Arabia - Electrical (Section Head) for Both lines (6000+3000) TPD Plants. - Fault analysis using the Root Cause Analysis, fish bone and SWAT methodology. - Implement S5 Japanese’s management technique. - (Certified Lecturer) of National Electrical Training program(Blue CAP). - SAP (system Application in data process) Electrical Section head User. - Implement SAP (System Application in Data process) Software for Notifications, PM work orders, technical confirmation TECO , Material Reservation , work orders. - Planning the preventive, corrective, predictive, break down, shutdown , calibration orders and Special Event maintenance. - Create, Implement and supervising HSE “OSHA Safety instruction and Closely monitor PPE for Electrical team strictly.
  • 2.
    Page 2 of7 - Prepare monthly, annual Energy Consumption reports and prepared Consumption analysis report . - Energy Saving use the consumption analysis report. Hence we reached to optimum Consumption rate 90 KWH/Ton. - ISO 9001-2008 Certified Internal auditor and Documents controller. - Planning Annual Maintenance Schedule for Electrical Department. - prepare and submit Annual Electrical Maintenance Budget report. - Create, Implement and supervising thermal image IR (INFRA RED) Technique for electrical equipment, hence increase the life time of Equipment. - Maintenance and troubleshooting MV Slip ring motor up to 6.3 MW. - Maintenance and troubleshooting MV Squirrel Cage Motor up to 2150 MW. - Experience of MV Motor bearing, Housing and bearing replacement. - Experience in Maintenance and troubleshooting MV Vacuum Circuit Breaker Merlin Gerin17.5 kV. - Relay coordination project, Modify Trip Setting, configure and programming Siemens SIPROTEC 47SJ62 Multifunction Protection Relays .Using DEGISI software and power plant Feeder protection relays MICOM P21. - Make the necessary modification of Plant protection type from definite time (DMT) to inverse time current (IDMT) C/Cs saving 600,000 SAR for NRCC. - Make the necessary changes for relay coordination between down & up stream. - Experience in Maintenance and troubleshooting Changeover switches ATYS Up to 3200 A. - Maintenance Diesel emergency generator up to 1000 KVA. - Main co-coordinator between both lines & Power plant capacity 63 MVA. - Synchronization and De-Synchronization process, Operate both units in BASE LOAD and ISOCHRONOUS modes. - Modified the power factor correction system and improve it from 0.75 to 0.95. - Implement Energy saving technique using VFD. - Pre-planning task assignments for major shutdown maintenance activities A-Z. - On call, Emergency maintenance works of the plant. - Configure and parameter setting for Power factor Controller ABB Type RVT. - Aware by Maintenance, Configuration, programming and parameterize LOW VOLTAGE IINVERTER types  ABB : ACS 550-01, ACS 800 and ACS850,  Schneider Electrical : Aptiva® 31 (Telemecanique),  AB: power Flex 700s (ALLEN Bradley)  VACON: NX & NXP,  SIEMENS SIMOVERT Master drive. - Aware by Maintenance, Configuration, programming and parameterize for Medium Voltage Frequency Drive  AB : power Flex 7000 Air cooling  Siemens : ROBICON Perfect Harmony -s - Maintenance and Spare parts controller for Medium Voltage Frequency Drive.
  • 3.
    Page 3 of7 - Expertise of Maintenance, Configuration, programming and parameterize LOW VOLTAGE  ABB PST30…300 , PSTB370…1050  Telemecanique Altistart 48 - Modified with IKN great cooler Controller System. - Configure and parameterize ABB (MCU) MOTOR CONTROL UNIT in (MCC). - Aware about PLC S7-200, 300 and 400 and its interface PCS7. - Prepare Monthly Electric power point presentation for Upper management. - Electrical Member for Annual Auditing . - Implement a lot of modification of the plant such as bearing housing of RM main drive, calibration Belts, ESP Drive, Kiln Drive Cooling system. - Commissioning IKN new clinker crusher system. - Capable to test all Mechanical & Electrical apparatus. - Proceed the complete Purchasing cycle for the spare parts & equipments from the local market either from the foreign manufacturer’s agents or import overseas. - Technical evaluation of proposal, Budget preparation, preparing the vendor list, tender enquiry for the control system, special instrument, instrument, Sub control system etc. - Finalization and follow-ups. Basic and Detailed Engineering, procurement and MRP - Overseeing the PLC/DCS system (SIEMENS S7 -300 and S7-400 Version 6.6, WINCC), - Programming, Troubleshooting and Maintenance of the DCS/PLC system. - Operation, maintenance and network Administration of the system. - Planning for the execution of modification and new jobs. - S7-200 PLC base and LOGO 230RC base problem’s troubleshooting PLC/DCS system. - Human Machine Interface (HMI), Operator Interface devices parameter’s Maintain and keeps its proper record, supporting documentation Provide technical support to customers. Working In following Instrumentation  HASLER Weighing Feeder (Germany)  SAIMO Weighing Feeder (Australia)  Belt Scale (Schenk) Germany  Kiln Feed Hasler (Germany)  Gas Analyzer Siemens (China)  Pillard System of HFO system (Pillard), Raytek Shell scanner  Troubleshooting Weigh Bridge calibration on Avery Weigh Tronix Controller base  Multi turns actuator, calibration and maintenance.  Gamma Matrics (Cross belt on line Analyzer), for Lime stone.  Auto sampling system. (FLS)  X-RAY Analyzer (thermo fisher)  Different types of Pressure/Temp/Flow Transmitter calibration and maintenance
  • 4.
    Page 4 of7 Line two 3000T/D testing, Commissioning then maintenance: - Erecting, installation & Commissioning of HT/ LT Switchgears, Transformers and related Electrical Works. Tender QS/QA/QC Review preparation, Computerized Planning and drawings. - SIEMENS SIMOVERT MASTERDRIVES & MICOMASTER for motors from 450 KW for E.P filter and kiln main drive, drive setting parameterization and maintenance, replacement of IGBT Cards. Testing &Commissioning the Additional three Engine project. RESPONSIBILITY: - Project site supervision and Project management of Electrical contractors in all aspects related to execution of Electrical equipment installation .Review of Engineering drawings and Quality control plan and process Control and equipment manufacture QS/QA/QC Review. - Jointing line I & Line II bus electrically through bus couplers and test and commissioning the protection relay, adjust the differential protection relay. - Setting of AREVA MICOM P255 3 Phase Induction Motor Protection Relay with MICOM S1 Support Software. - SIEMENS SMART MOTOR CONTROLLERS SIMCODE PRO 3UF7 parameter setting, fault Finding and Profibus connections - Monitor of (3 and 7MW) Power plant erecting, commissioning by WARTSILA ENGINES. WORK AS a Consultant Engineer for Roller press project. Pre grinding 2013 RESPONSIBILITY - Check with the supplier the design and change as per NRCC requirement. - Design the electrical substation, switchgear and MCC. - Testing and commissioning the electrical equipment. - Prepare and submit the punch list. - Erecting, installation , testing and Commissioning of roller pressure system (pre grinding) which increase the cement mill production from 160 ton/hr to 250 ton/hr - Instructor of @ (Blue CAP) Internal Saudi National training course Course included ( generation, transmission , Transformers, Loads, switch gears, Distribution, protection and Drive July 2014 to October 2014.  Arab Swiss Engineer Company ASEC in (National cement Co.). Responsibility in ASEC AUTOMATION: Dec, 2006 till July, 2009 - Electric Shift Leader Engineer. - Preventive & emergency maintenance for M.V & L.V systems - AC motors (up to 2MW / 6.3KV) and DC motors with their feeding panels Up to 1360KW. - Modifications necessary to improve the system behavior and keep minimize down time.
  • 5.
    Page 5 of7 - Troubleshooting for Instrumentation Faults like” Level, Pressure, Flow, and Temperature. - Prepare the necessary reports and overhauling schedules. - Programmable logic controllers PLCs "Siemens and Procontic. - Responsible for plant to prevent problems and failures of any equipment to maintain all working cement process. - Responsible for all 2 dry lines areas during shift, working in medium voltage breakers, motors and protection relays ,low voltage motors and it's MCC control ,to instrumentation level of temp , pressures ,flow and speed, and deal with plc of many types. - Attend a lot of certified training courses in Cement industrial .  Delta Trading & Commerce Company  July 2006 To Aug 2007 Full time.  Aug 2006 To August 2008 part Time. Responsibility in Delta Trading Company - Technical support and Service Engineer. - Install 2 new cardboard complete lines. - Responsible about all paper converting Section. - Install 2 new cardboard complete lines. - Install one offset printing machine. - Study the Tender related to paper converting section. - Make the necessary Quotation for customer . - Clear the technical points for customers. - Install and maintenance more than 50 strapping machine. Practical Technical training Summary - Gulf of Suez Petroleum Company (GUPCO). - Network Training center (NTC). - Arab Medical Company. - Panasonic. - SKF - SIEMENS MV Motors, Dresden , Germany . Previous courses: 1- Design of electrical Works inside Building. 2- Microprocessor and Microcontroller in Panasonic. 3- AUTOCAD 2D. 4- Ordinary Automatic Control. 5- Maintenance and operation for ACS (550 -800) ABB frequency drive. 6- Programming with programmable logic control "PLCs". 7- English courses until level (302=nine) AUC. 8- STRATEGIC MANAGEMENT" How to build your career “ITC Certificate”. 9- OSHA industrial safety course.
  • 6.
    Page 6 of7 10- Programming PLC Siemens Step 7. 11- Problem Solving& Creative Thinking ‘international course’. 12- Function and maintenance poles and Drive of Siemens 3AC –CB. 13- SKF seminar for Electrical motor bearing. 14- Attend M/S “VACON” frequency drive Middle East seminar. 15- On line AC drive training course from M/s “Schneider Electrical “. 16- Powers flex 700S frequency drive (VSD) Allen Bradley. 17- ISO 9001/2008 internal auditing certified by (Moody) international co. 18- Attend witness Factory acceptance test FAT of  Raw mill main drive 3300KW, 13.8KV, 60 Hz @ VEM, Dresden, Germany. 19- Attend witness solo run test of for Slip ring motors @ ISCOSA WS in Dammam.  Cement Mill (6300KW, 13800 V, 311 Amp).  Raw Mill Fan (3500 KW, 13800V, 174 Amp).  Raw Mill Min drive (3300KW , 13800V, 164 Amp). 20- Workshop Smart Solution: enabling mobility in Large. Languages  Arabic : Mother tongue.  English : Fluent in both verbal & written  Deutsch : Good Education - University Degree : B.Sc. Engineering - University : Helwan University - Faculty : Engineering - Major : Electrical Engineering - Graduation project : A microcontroller Based control unit of two levels current source Inverter (CSI) Closed loop. - Project grade : Excellent - B.SC. year grade : very Good - Cumulative Grade : Good - Graduation year : 2006 - Grade : 94% - Preparing Master Degree in Cairo University 2008. Qualifications: - Qualified to work at any modern Automation Systems , Cement dry process, Electromechanical systems, Different Utilization system, management and under pressure. Other Skills - Advanced user for windows, Microsoft® Office, Mat lab, Internet Application. - AutoCAD - Electrical MATLAB "SIMOLINK",
  • 7.
    Page 7 of7 - “Siemens” DEGSI 4.8, - Fluke power log, - “ABB drive ware” Drive window light 2 & Drive size, - “Allen Bradley” Drive executive, - “ABB” MCU, - “Siemens” SIMCODE PRO 3UF7 , - “LUST” VecWin 10.49 - Management software SAP (system Application in data process). Key Competence: - Detailed design of P.D system, Cable sizing, MV, LV switchgears and MCCs. - Lightning protection system, grounding system, electric heat tracing, fire alarm system, lighting illumination, Calculations, tray layouts, etc. - Familiar with electrical systems case studies for Load Flow, Short Circuit/Fault - Calculations, large motor start-up using PowerStation ETAP software. - Familiar with NEMA, ASTM, IEEE and IEC based electrical codes, standards and regulations also NFPA 16, NFPA 25 . - Experience in field inspection and acceptance testing of electrical equipment. - Development of power system single-line diagrams and cable and conduit schedules. - Preparation of cable tray fill and conduit calculations, etc. - Design physical layout of electrical equipment, and grounding plans. - Project execution and supervision in Cement plants. - Electrical / instrumentation & telecommunication Quantity Survey or Re- measurements, Conducted electrical Inspections and tests on electro-mechanical equipment such as transformers, motor control centers, switchgears, motors, motor drives and power cables. - Designed power distribution systems involving cable ampere ratings, cable voltage drops, motor and motor drive sizing, sizing of electrical protective devices, lighting, and industrial control. - Developed electrical facility layout drawings using Auto-cad software. Performed electrical power demand analyses on electrical facilities. Declaration - Above mentioned all information are correct Reference : - Engr. Mohamed Al-Desh NRCC Electrical Manager Mob: 00966540375904 - Engr. Issam Bader NRCC Maintenance Manager Mob: 00966540380128 - Engr. Mustafa Muhessin NRCC Ass. General director Mob: 00966500146663