By: Anand bobade (nmbobade@gmail.com)
Game to remember activities in
each Process Group
By: Anand bobade (nmbobade@gmail.com)
INITIATING PROCESS GROUP
Select project manager
Determine company culture and existing systems
Collect processes, procedures and historical
information
Divide large project into phases
Understand the business case
Uncover initial requirements, assumptions,risks,
constraints and existing agreements
Assess project and product feasibility within the
given constraints
Create measurable objectives
Develop project charter
Identify stakeholders and determine their
expectations, influence and impact
By: Anand bobade (nmbobade@gmail.com)
PLANNING PROCESS GROUP
Determine how you will plan for each
knowledge area
Determine detailed requirements
Create project scope statement
Assess what to purchase and create
procurement document
Determine planning team
Create WBS and WBS dictionary
Create activity list
Create network diagram
Estimate resource requirements
Estimate time and cost
By: Anand bobade (nmbobade@gmail.com)
PLANNING PROCESS GROUP
Determine critical path
Develop schedule
Develop budget
Determine quality standards, processes and metrics
Create process improvement plan
Determine all roles and responsibilities
Plan communications and stakeholder engagement
Perform risk identification, qualitative &
quantitative risk analysis, & risk response planning
Go back-Iterations
Finalize procurement documents
By: Anand bobade (nmbobade@gmail.com)
PLANNING PROCESS GROUP
Create change management plan
Finalize the "how to execute and control"
parts of all management plans
Develop realistic and final PM plan and
performance measurement baseline
Gain formal approval of the plan
Hold kickoff meeting
By: Anand bobade (nmbobade@gmail.com)
EXECUTING PROCESS GROUP
Execute the work according to the PM plan
Produce product deliverables (product scope)
Gather work performance data
Request changes
Implement only approved changes
Continuously improve
Follow processes
Determine whether processes are correct and effective
(quality assurance)
Perform quality audits
Acquire final team
Manage people
By: Anand bobade (nmbobade@gmail.com)
EXECUTING PROCESS GROUP
Evaluate team and individual performance
Hold team-building activities
Give recognition and rewards
Use issue logs
Facilitate conflict resolution
Release resources as work is completed
Send and receive information and solicit
feedback
Report on project performance
Manage stakeholder engagement and
expectations
Hold meetings
Select sellers
By: Anand bobade (nmbobade@gmail.com)
MONITORING & CONTROLING PROCESS GROUP
Take action to control the project
Measure performance against the
performance measurement baseline
Measure performance against other metrics
in the PM plan
Analyze and evaluate performance
Determine if variances warrant a corrective
action or other change request
Influence the factors that cause changes
Request changes
Perform integrated change control
Approve or reject changes
Update the PM plan and project documents
By: Anand bobade (nmbobade@gmail.com)
MONITORING & CONTROLING PROCESS GROUP
Inform stakeholders of the results of change
requests
Monitor stakeholder engagement
Manage configuration
Create forecasts
Gain acceptance of interim deliverables from
the customer
Perform quality control
Perform risk reassessments and audits
Manage reserves
Control procurements
By: Anand bobade (nmbobade@gmail.com)
CLOSING PROCESS GROUP
Confirm work is done to requirements
Complete procurement closure
Gain final acceptance of the product
Complete financial closure
Hand off completed product
Solicit feedback from the customer about
the project
Complete final performance reporting
Index and archive records
Gather final lessons learned and update
knowledge base
By: Anand bobade (nmbobade@gmail.com)
“Picture is worth a thousand words”
I am big supporter of the Visual learning and it is reflected in my
PMP training martial and in workshops.
Contact Details:
• Anand Bobade (055 5932004)
• nmbobade@gmail.com
• https://ae.linkedin.com/in/anandbobade
• http://www.slideshare.net/anandbobade

More Related Content

PDF
PMP chap 1 - PMP Introduction (PMBOK 6)
Anand Bobade
 
PDF
Chap 8.3 Control Quality
Anand Bobade
 
PDF
PMP Chap 5 - Project Scope Management - Part 2
Anand Bobade
 
PDF
PMP Chap 5 - Project Scope Management - Part1
Anand Bobade
 
PDF
PMP Chap 2- Org. Influence and Project Life Cycle
Anand Bobade
 
PDF
Chap 10.1 Plan Communication Management
Anand Bobade
 
PDF
PMP Chap4-Project Integration Management Details: Part-2
Anand Bobade
 
PDF
Chap 5.2 Collect requirements
Anand Bobade
 
PMP chap 1 - PMP Introduction (PMBOK 6)
Anand Bobade
 
Chap 8.3 Control Quality
Anand Bobade
 
PMP Chap 5 - Project Scope Management - Part 2
Anand Bobade
 
PMP Chap 5 - Project Scope Management - Part1
Anand Bobade
 
PMP Chap 2- Org. Influence and Project Life Cycle
Anand Bobade
 
Chap 10.1 Plan Communication Management
Anand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
Anand Bobade
 
Chap 5.2 Collect requirements
Anand Bobade
 

What's hot (20)

PDF
PMP Chap 6 - Project Time management - Part1
Anand Bobade
 
PDF
PMP Chap 10 - Project Communication Management Details
Anand Bobade
 
PDF
PMP Chap 7 - Project Cost Management - Part 2
Anand Bobade
 
PDF
Chap 9.3 Acquire Resources
Anand Bobade
 
PDF
Chap 8.1 Plan quality management
Anand Bobade
 
PDF
Chap 9.0 Project Resource Management overview
Anand Bobade
 
PDF
PMP Chap 8 - Project Quality Management
Anand Bobade
 
PDF
Chap 5.4 Create WBS
Anand Bobade
 
PDF
Chap 6.0 Schedule Management Overview
Anand Bobade
 
PDF
Chap 9.1 Pan Resource Management
Anand Bobade
 
PDF
PMP Chap 3 - Project Management Processes
Anand Bobade
 
PDF
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
Shamil Habet
 
PPTX
Project Management: Integration Management Knowledge Area
Joshua Render
 
PDF
Chap 12.2 Conduct Procurement
Anand Bobade
 
PDF
Pmp chap 11 - project risk management - Part 2
Anand Bobade
 
PDF
Chap 7.4 Control Cost
Anand Bobade
 
PDF
Chap 4.3 Direct and Manage Project work
Anand Bobade
 
PDF
The New PMP Exam: Changes and Implications (With Annotation)
CliffordEgbomeade
 
PDF
Chap 12.0 Procurement Management overview
Anand Bobade
 
PDF
PMP 47 process definitions
Anand Bobade
 
PMP Chap 6 - Project Time management - Part1
Anand Bobade
 
PMP Chap 10 - Project Communication Management Details
Anand Bobade
 
PMP Chap 7 - Project Cost Management - Part 2
Anand Bobade
 
Chap 9.3 Acquire Resources
Anand Bobade
 
Chap 8.1 Plan quality management
Anand Bobade
 
Chap 9.0 Project Resource Management overview
Anand Bobade
 
PMP Chap 8 - Project Quality Management
Anand Bobade
 
Chap 5.4 Create WBS
Anand Bobade
 
Chap 6.0 Schedule Management Overview
Anand Bobade
 
Chap 9.1 Pan Resource Management
Anand Bobade
 
PMP Chap 3 - Project Management Processes
Anand Bobade
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
Shamil Habet
 
Project Management: Integration Management Knowledge Area
Joshua Render
 
Chap 12.2 Conduct Procurement
Anand Bobade
 
Pmp chap 11 - project risk management - Part 2
Anand Bobade
 
Chap 7.4 Control Cost
Anand Bobade
 
Chap 4.3 Direct and Manage Project work
Anand Bobade
 
The New PMP Exam: Changes and Implications (With Annotation)
CliffordEgbomeade
 
Chap 12.0 Procurement Management overview
Anand Bobade
 
PMP 47 process definitions
Anand Bobade
 
Ad

Similar to PMPProcessGroupTasks (20)

PPTX
Project Management Processes
Joshua Render
 
PPTX
Basics of the PMP Process Group - Project Management
Mohit Budhiraja
 
PDF
Undestand PMBok 5th, Section 3
Amr Miqdadi
 
PPTX
Project Management Process for PMP Cert
PhuocNT (Fresher.VN)
 
PPTX
Project / Program / Portfolio Management and Processes Groups
Ahmed Alageed
 
PPT
process groups and knowledge areas
Universitas Bina Darma Palembang
 
PDF
Introduction to pmp
Duy Tan Geek
 
DOCX
Planning process group
Mudassir Iqbal
 
PPT
Process of Project Planning
Ashish Mittal
 
PDF
Pmp itto factors
Prem Kumar
 
PDF
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
PPTX
Chapter 3 Project Management process Groups.pptx
RajendraBahadurThapa1
 
PPTX
pmi project management principles.pptx
ssusere01f83
 
PPTX
Information Technology Project Management Process Groups
DawitTekie1
 
PPSX
DISE - Introduction to Project Management
Rasan Samarasinghe
 
PDF
Project managment 2
Абдулазіз Мухаммед
 
PDF
PMI Project Management fundamentos basicos
dannymerrii63
 
PPTX
Project management
Madhuri Chopurala, CSPO, CSM
 
PPT
5 Key Chart Project Management (TM) Methodology
jmcmahon89
 
PPTX
Project management processes ch3 (1)
hinasardar2
 
Project Management Processes
Joshua Render
 
Basics of the PMP Process Group - Project Management
Mohit Budhiraja
 
Undestand PMBok 5th, Section 3
Amr Miqdadi
 
Project Management Process for PMP Cert
PhuocNT (Fresher.VN)
 
Project / Program / Portfolio Management and Processes Groups
Ahmed Alageed
 
process groups and knowledge areas
Universitas Bina Darma Palembang
 
Introduction to pmp
Duy Tan Geek
 
Planning process group
Mudassir Iqbal
 
Process of Project Planning
Ashish Mittal
 
Pmp itto factors
Prem Kumar
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 
Chapter 3 Project Management process Groups.pptx
RajendraBahadurThapa1
 
pmi project management principles.pptx
ssusere01f83
 
Information Technology Project Management Process Groups
DawitTekie1
 
DISE - Introduction to Project Management
Rasan Samarasinghe
 
PMI Project Management fundamentos basicos
dannymerrii63
 
Project management
Madhuri Chopurala, CSPO, CSM
 
5 Key Chart Project Management (TM) Methodology
jmcmahon89
 
Project management processes ch3 (1)
hinasardar2
 
Ad

More from Anand Bobade (20)

PDF
Chap 12.3 Control Procurement
Anand Bobade
 
PDF
Chap 12.1 Plan Procurement Management
Anand Bobade
 
PDF
Chap 11.7 Monitor Risks
Anand Bobade
 
PDF
Chap 11.2 Identify Risks
Anand Bobade
 
PDF
Chap 10.3 Monitor Communication
Anand Bobade
 
PDF
Chap 10.2 Manage Communication
Anand Bobade
 
PDF
Chap 9.6 Control Resources
Anand Bobade
 
PDF
Chap 9.5 Manage Team
Anand Bobade
 
PDF
Chap 9.4 Develop Team
Anand Bobade
 
PDF
Chap 9.2 Estimate Activity Resource
Anand Bobade
 
PDF
Chap 7.2 Estimate Cost
Anand Bobade
 
PDF
Chap 7.3 Determine budget
Anand Bobade
 
PDF
Chap 7.1 Plan Cost Management
Anand Bobade
 
PDF
Chap 7.0 Project Cost Management Overview
Anand Bobade
 
PDF
Chap 6.6 Control Schedule
Anand Bobade
 
PDF
Chap 6.5 Define Schedule
Anand Bobade
 
PDF
Chap 6.4 Estimate Activity Duration
Anand Bobade
 
PDF
Chap 6.3 Sequence Activity
Anand Bobade
 
PDF
Chap 6.2 Define Activity
Anand Bobade
 
PDF
Chap 6.1 Plan Schedule Management
Anand Bobade
 
Chap 12.3 Control Procurement
Anand Bobade
 
Chap 12.1 Plan Procurement Management
Anand Bobade
 
Chap 11.7 Monitor Risks
Anand Bobade
 
Chap 11.2 Identify Risks
Anand Bobade
 
Chap 10.3 Monitor Communication
Anand Bobade
 
Chap 10.2 Manage Communication
Anand Bobade
 
Chap 9.6 Control Resources
Anand Bobade
 
Chap 9.5 Manage Team
Anand Bobade
 
Chap 9.4 Develop Team
Anand Bobade
 
Chap 9.2 Estimate Activity Resource
Anand Bobade
 
Chap 7.2 Estimate Cost
Anand Bobade
 
Chap 7.3 Determine budget
Anand Bobade
 
Chap 7.1 Plan Cost Management
Anand Bobade
 
Chap 7.0 Project Cost Management Overview
Anand Bobade
 
Chap 6.6 Control Schedule
Anand Bobade
 
Chap 6.5 Define Schedule
Anand Bobade
 
Chap 6.4 Estimate Activity Duration
Anand Bobade
 
Chap 6.3 Sequence Activity
Anand Bobade
 
Chap 6.2 Define Activity
Anand Bobade
 
Chap 6.1 Plan Schedule Management
Anand Bobade
 

Recently uploaded (20)

PPTX
Letter of credit which matters to Import and Export policy
atifaslam1482
 
PPTX
MFJDJSJSNXJCJJDJSNSKSDJNJCJSKSJAJSJDJKDKSJS
MaryanneRoseElder
 
PDF
SpatzAI Micro-Conflict Resolution Toolkit - Fairer Teamwork Globally
Desmond Sherlock
 
PPT
IHRM(international human resource management) PPT NEW.ppt
Sunaina44
 
PPTX
1_Introduction_African and Caribbean Literatures.pptx
POORNIMAN26
 
PDF
Asia’s Health Titans - Meet the Hospital CEOs Revolutionizing Care Across the...
Gorman Bain Capital
 
PDF
PMI UK 31st July 2025 Presentation...pdf
PMIUKChapter
 
PDF
250726-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PDF
250621-WHO-UMC Causality Assessment-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PPTX
Empowering Women Achieving Dreams Setting and Reaching Your Personal Profess...
Muhammad Musawar Ali
 
PDF
SpatzAI is a self-managed micro-conflict toolkit that helps teams resolve one...
Desmond Sherlock
 
PDF
OBSTRUCTIONS OF TURKISH PUBLIC ORGANIZATIONS GETTING ISO/IEC 27001 CERTIFIED
ijmvsc
 
PDF
Handbook of Procurement (Nicola Dimitrig
vakankwatsa
 
PDF
250712-Role Plays for Hands on Exercise-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PDF
250719-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PPTX
SAP Security Road Map with the Strategic move
tomar2000
 
PDF
2024_10 Approach to selecting a CPM Application
tanbir16
 
PDF
250628-Challenges of Field Offices in Pharmacovigilance-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
PDF
The Crystal Ball Chronicles - Battle of the Healers - Tran Quoc Bao the winner
Gorman Bain Capital
 
PDF
250628-Training of Field Offices-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
Letter of credit which matters to Import and Export policy
atifaslam1482
 
MFJDJSJSNXJCJJDJSNSKSDJNJCJSKSJAJSJDJKDKSJS
MaryanneRoseElder
 
SpatzAI Micro-Conflict Resolution Toolkit - Fairer Teamwork Globally
Desmond Sherlock
 
IHRM(international human resource management) PPT NEW.ppt
Sunaina44
 
1_Introduction_African and Caribbean Literatures.pptx
POORNIMAN26
 
Asia’s Health Titans - Meet the Hospital CEOs Revolutionizing Care Across the...
Gorman Bain Capital
 
PMI UK 31st July 2025 Presentation...pdf
PMIUKChapter
 
250726-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
250621-WHO-UMC Causality Assessment-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
Empowering Women Achieving Dreams Setting and Reaching Your Personal Profess...
Muhammad Musawar Ali
 
SpatzAI is a self-managed micro-conflict toolkit that helps teams resolve one...
Desmond Sherlock
 
OBSTRUCTIONS OF TURKISH PUBLIC ORGANIZATIONS GETTING ISO/IEC 27001 CERTIFIED
ijmvsc
 
Handbook of Procurement (Nicola Dimitrig
vakankwatsa
 
250712-Role Plays for Hands on Exercise-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
250719-Individual Case Safety Reports-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
SAP Security Road Map with the Strategic move
tomar2000
 
2024_10 Approach to selecting a CPM Application
tanbir16
 
250628-Challenges of Field Offices in Pharmacovigilance-CQS.pdf
Obaid Ali / Roohi B. Obaid
 
The Crystal Ball Chronicles - Battle of the Healers - Tran Quoc Bao the winner
Gorman Bain Capital
 
250628-Training of Field Offices-CQS.pdf
Obaid Ali / Roohi B. Obaid
 

PMPProcessGroupTasks

  • 1. By: Anand bobade ([email protected]) Game to remember activities in each Process Group
  • 2. By: Anand bobade ([email protected]) INITIATING PROCESS GROUP Select project manager Determine company culture and existing systems Collect processes, procedures and historical information Divide large project into phases Understand the business case Uncover initial requirements, assumptions,risks, constraints and existing agreements Assess project and product feasibility within the given constraints Create measurable objectives Develop project charter Identify stakeholders and determine their expectations, influence and impact
  • 3. By: Anand bobade ([email protected]) PLANNING PROCESS GROUP Determine how you will plan for each knowledge area Determine detailed requirements Create project scope statement Assess what to purchase and create procurement document Determine planning team Create WBS and WBS dictionary Create activity list Create network diagram Estimate resource requirements Estimate time and cost
  • 4. By: Anand bobade ([email protected]) PLANNING PROCESS GROUP Determine critical path Develop schedule Develop budget Determine quality standards, processes and metrics Create process improvement plan Determine all roles and responsibilities Plan communications and stakeholder engagement Perform risk identification, qualitative & quantitative risk analysis, & risk response planning Go back-Iterations Finalize procurement documents
  • 5. By: Anand bobade ([email protected]) PLANNING PROCESS GROUP Create change management plan Finalize the "how to execute and control" parts of all management plans Develop realistic and final PM plan and performance measurement baseline Gain formal approval of the plan Hold kickoff meeting
  • 6. By: Anand bobade ([email protected]) EXECUTING PROCESS GROUP Execute the work according to the PM plan Produce product deliverables (product scope) Gather work performance data Request changes Implement only approved changes Continuously improve Follow processes Determine whether processes are correct and effective (quality assurance) Perform quality audits Acquire final team Manage people
  • 7. By: Anand bobade ([email protected]) EXECUTING PROCESS GROUP Evaluate team and individual performance Hold team-building activities Give recognition and rewards Use issue logs Facilitate conflict resolution Release resources as work is completed Send and receive information and solicit feedback Report on project performance Manage stakeholder engagement and expectations Hold meetings Select sellers
  • 8. By: Anand bobade ([email protected]) MONITORING & CONTROLING PROCESS GROUP Take action to control the project Measure performance against the performance measurement baseline Measure performance against other metrics in the PM plan Analyze and evaluate performance Determine if variances warrant a corrective action or other change request Influence the factors that cause changes Request changes Perform integrated change control Approve or reject changes Update the PM plan and project documents
  • 9. By: Anand bobade ([email protected]) MONITORING & CONTROLING PROCESS GROUP Inform stakeholders of the results of change requests Monitor stakeholder engagement Manage configuration Create forecasts Gain acceptance of interim deliverables from the customer Perform quality control Perform risk reassessments and audits Manage reserves Control procurements
  • 10. By: Anand bobade ([email protected]) CLOSING PROCESS GROUP Confirm work is done to requirements Complete procurement closure Gain final acceptance of the product Complete financial closure Hand off completed product Solicit feedback from the customer about the project Complete final performance reporting Index and archive records Gather final lessons learned and update knowledge base
  • 11. By: Anand bobade ([email protected]) “Picture is worth a thousand words” I am big supporter of the Visual learning and it is reflected in my PMP training martial and in workshops. Contact Details: • Anand Bobade (055 5932004) • [email protected] • https://ae.linkedin.com/in/anandbobade • http://www.slideshare.net/anandbobade