This document section describes design considerations for precast pretensioned concrete girders. It discusses typical girder sections and common span ranges. The key stages in precast girder design are described as transfer (when prestressing force is transferred to the concrete), service (when self-weight and permanent loads are considered), and ultimate (to resist factored loads). Three stages of stress development are discussed: transfer when prestressing occurs, stage IIA when the girder is erected and before the composite deck is cured, and stage IIB when the composite section develops. Standard precast girder types used in California include I-girders, bulb-tees, bath-tubs, and wide-flange sections,