1) There are various biological, engineering, temporary and permanent measures that can be used for gully control. Biological methods use vegetation while engineering methods use structures.
2) Permanent structures for gully control include drop spillways, drop inlet spillways, and chute spillways. These structures are designed based on hydrologic, hydraulic, and structural factors.
3) Drop spillways, drop inlet spillways, and chute spillways each have different characteristics regarding things like maximum drop height and ability to provide upstream storage. Temporary gully control structures are used when locally available materials are suitable and can help establish vegetation until permanent structures are implemented.