Topics For Today’s Discussion
Project Schedule Management
Schedule Management Overview
Schedule Management Processes
Copyright © 2018, edureka and/or its affiliates. All rights reserved.
Project Schedule Management
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Schedule Management
Schedule Management is one of the most important Knowledge Area in Project Management
It refers to the skills, tools, & techniques used to manage time when accomplishing specific
tasks, projects and goals
Schedule management describes how to monitor and control time spent within a project
It also explains the processes that are required to manage the timely completion of the project
Copyright © 2018, edureka and/or its affiliates. All rights reserved.
Schedule Management Overview
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project
Information
Scheduling
Method
Project Schedule Management Overview
Scheduling
Tool
Schedule
Model
ProjectSchedule
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tailoring Considerations
All the processes of Schedule Management are applied in a tailored way to make it a unique project
Life Cycle
Approach
Resource
Availability
Project
Dimensions
Technology
Support
Copyright © 2018, edureka and/or its affiliates. All rights reserved.
Schedule Management Processes
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Schedule Management Processes
Plan Schedule Management1
Define Activities2
Sequence Activities3
Estimate Activity Durations4
Develop Schedule5
Control Schedule6
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
Plan Schedule Management
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
• Plan Schedule Management is the process of establishing the policies, procedures,
and documentation
• It helps in planning, developing, managing, executing, and controlling the project
schedule
• It provides guidance and direction on how the project schedule will be managed
throughout the project
Description
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
✓ Scope baseline
✓ Other information
Project Management
Plan
✓ It defines the summary
milestone schedule and
project approval
Project Charter
✓ Organizational culture &
structure
✓ Resource availability
✓ PM Software
✓ Published commercial
information
Enterprise
Environmental
Factors
✓ Monitoring & Reporting
tools
✓ Historical information
✓ Project closure guidelines
✓ Change & Risk Control
procedure
Organizational
Process Assets
Inputs
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
Expert Judgement Meetings
Data Analysis
Tools &
Techniques
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
3 62 41 5
Project Schedule Model
Development
Level Of Accuracy
Units Of Measure
Organizational
Procedures Links
Project Schedule Model
Maintenance
Control Thresholds
Outputs
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Plan Schedule Management
87 9
Rules Of Performance
Measurement
Release & Iteration
Length
Reporting Formats
Outputs
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Define Activities
Define Activities
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Define Activities
• Define Activities is the process of identifying and documenting the specific actions
that need to be performed to produce the project deliverables
• It breaks down the work packages into activities
• It provides a basis for estimating, scheduling, executing, monitoring, and controlling
the project work
Description
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
✓ Prescribed level necessary
details to manage the work
Project Management
Plan
✓ Organizational culture &
structure
✓ Published commercial
information
✓ Project management
information system
Enterprise
Environmental
Factors
✓ Templates with standard
activity list
✓ Standardized Processes
✓ Learned knowledge base
✓ Formal and informal activity
planning
Organizational
Process Assets
Define Activities
Inputs
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Expert
Judgement
Define Activities
Decomposition
Rolling Wave
Planning
Tools &
Techniques
Meetings
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Activity List Milestone List
Activity Attributes
Define Activities
Outputs
Project Management
Plan Updates
Change Requests
321 4 5
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Sequence Activities
Sequence Activities
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Sequence Activities
Description
• Sequence Activities is the process of identifying and documenting relationships
among various project activities
• It helps in defining the logical sequence of the work to obtain the greatest
efficiency given all project constraints
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Inputs
Sequence Activities
✓ Project Management plan
components includes
Schedule management Plan
and Scope Baseline
Project Management
Plan
✓ Project Documents include:
• Activity Attributes
• Activity List
• Assumption log
• Milestone list
Project Documents
✓ Government/Industry
standards
✓ Project management
information system (PMIS)
✓ Scheduling tool
✓ Organization work
authorization systems
Enterprise
Environmental Factors
✓ Project files
✓ Templates
✓ Existing formal and
informal activity planning
Organizational
Process Assets
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Precedence
Diagramming
Method
Dependency
Determination
Leads & Lags
Sequence Activities
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Outputs
21
Project Schedule
Network Diagram
Project Documents
Updates
Sequence Activities
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Estimate Activity Duration
Estimate Activity Duration
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Description
• Estimate Activity Durations is the process of estimating the number of work periods
needed to complete individual activities with estimated resources
• It provides the amount of time each activity will take to complete
• It acts as a major input into the Develop Schedule process
Estimate Activity Duration
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Inputs
Estimate Activity Duration
✓ Project Management Plan
includes:
• Schedule Management Plan
• Scope Baseline
Project Management
Plan
✓Project Documents includes:
• Activity Attributes
• Activity List
• Assumption log
• Lessons Learned Register
• Milestone list
• Project team
Project Documents
✓ Duration estimating databases
✓ Productivity metrics
✓ Published commercial
information
✓ Location of team members
Enterprise
Environmental
Factors
✓ Historical duration information
✓ Project calendars
✓ Scheduling methodology
✓ Lessons learned
Organizational
Process Assets
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Estimate Activity Duration
Expert
Judgement
Parametric
Estimating
Meetings
3-Point
Estimating
Analogous
Estimating
Data Analysis
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Estimate Activity Duration
Decision Making
Bottom Up
Estimation
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Outputs
Estimate Activity Duration
Duration Estimates
Basis Of Estimates
Project Document
Updates
21 3
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Develop Schedule
Develop Schedule
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Description
• It is the process of analysing activity sequences, durations, resource requirements,
and schedule constraints to create the project schedule model.
• It generates a schedule model with planned dates for completing project activities
Develop Schedule
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Inputs
Develop Schedule
✓ Project Management Plan
includes:
• Schedule Management Plan
• Scope Baseline
Project Management
Plan
✓Project Documents includes:
• Activity Attributes
• Activity List
• Assumption log
• Lessons Learned Register
• Milestone list
• Project team
Project Documents
• Details of to perform the
project work to meet
contractual commitments
Agreements
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Inputs
Develop Schedule
✓ Standards
✓ Communication channels
✓ Scheduling tool
Enterprise
Environmental
Factors
✓ Scheduling Methodologies
✓ Project Calendars
Organizational
Process Assets
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Develop Schedule
Schedule
Network Analysis
Data Analysis
Resource
Optimization
Critical Path
Method
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Develop Schedule
PMIS
Schedule
Compression
Agile Releasing
Plan
Leads and Lags
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Outputs
Develop Schedule
3 62 41 5
Schedule Baseline
Project Schedule
Schedule Data
Change Requests
Project Management
Plan Updates
Project Calendars
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Control Schedule
Control Schedule
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Description
• It is the process of analysing activity sequences, durations, resource requirements,
and schedule constraints to create the project schedule model.
• It generates a schedule model with planned dates for completing project activities
Control Schedule
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Inputs
Control Schedule
✓ Project Management Plan
includes:
• Schedule Management Plan
• Scope Baseline
Project Management
Plan
✓Project Documents includes:
• Activity Attributes
• Activity List
• Assumption log
• Lessons Learned Register
• Milestone list
• Project team
Project Documents
✓ Schedule control tools
✓ Monitoring & reporting
methods
✓ Existing formal & informal
schedule control-related
policies, procedures, &
guidelines
Organizational
Process Assets
✓ It refers to the information
about project progress
Work Performance
Data
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Tools &
Techniques
Control Schedule
Data Analysis PMIS
Resource
Optimization
Critical Path
Method
Schedule
Compression
Leads and Lags
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Outputs
Control Schedule
32 41 5
Work Performance
Information
Schedule Forecast
Change Requests
Project Documents
Updates
Project Management
Plan Updates
Project Time Management | Project Schedule Management | Edureka

Project Time Management | Project Schedule Management | Edureka

  • 1.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp
  • 2.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Topics For Today’s Discussion Project Schedule Management Schedule Management Overview Schedule Management Processes
  • 3.
    Copyright © 2018,edureka and/or its affiliates. All rights reserved. Project Schedule Management
  • 4.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Project Schedule Management Schedule Management is one of the most important Knowledge Area in Project Management It refers to the skills, tools, & techniques used to manage time when accomplishing specific tasks, projects and goals Schedule management describes how to monitor and control time spent within a project It also explains the processes that are required to manage the timely completion of the project
  • 5.
    Copyright © 2018,edureka and/or its affiliates. All rights reserved. Schedule Management Overview
  • 6.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Project Information Scheduling Method Project Schedule Management Overview Scheduling Tool Schedule Model ProjectSchedule
  • 7.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tailoring Considerations All the processes of Schedule Management are applied in a tailored way to make it a unique project Life Cycle Approach Resource Availability Project Dimensions Technology Support
  • 8.
    Copyright © 2018,edureka and/or its affiliates. All rights reserved. Schedule Management Processes
  • 9.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Schedule Management Processes Plan Schedule Management1 Define Activities2 Sequence Activities3 Estimate Activity Durations4 Develop Schedule5 Control Schedule6
  • 10.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management Plan Schedule Management
  • 11.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management • Plan Schedule Management is the process of establishing the policies, procedures, and documentation • It helps in planning, developing, managing, executing, and controlling the project schedule • It provides guidance and direction on how the project schedule will be managed throughout the project Description
  • 12.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management ✓ Scope baseline ✓ Other information Project Management Plan ✓ It defines the summary milestone schedule and project approval Project Charter ✓ Organizational culture & structure ✓ Resource availability ✓ PM Software ✓ Published commercial information Enterprise Environmental Factors ✓ Monitoring & Reporting tools ✓ Historical information ✓ Project closure guidelines ✓ Change & Risk Control procedure Organizational Process Assets Inputs
  • 13.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management Expert Judgement Meetings Data Analysis Tools & Techniques
  • 14.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management 3 62 41 5 Project Schedule Model Development Level Of Accuracy Units Of Measure Organizational Procedures Links Project Schedule Model Maintenance Control Thresholds Outputs
  • 15.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Plan Schedule Management 87 9 Rules Of Performance Measurement Release & Iteration Length Reporting Formats Outputs
  • 16.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Define Activities Define Activities
  • 17.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Define Activities • Define Activities is the process of identifying and documenting the specific actions that need to be performed to produce the project deliverables • It breaks down the work packages into activities • It provides a basis for estimating, scheduling, executing, monitoring, and controlling the project work Description
  • 18.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp ✓ Prescribed level necessary details to manage the work Project Management Plan ✓ Organizational culture & structure ✓ Published commercial information ✓ Project management information system Enterprise Environmental Factors ✓ Templates with standard activity list ✓ Standardized Processes ✓ Learned knowledge base ✓ Formal and informal activity planning Organizational Process Assets Define Activities Inputs
  • 19.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Expert Judgement Define Activities Decomposition Rolling Wave Planning Tools & Techniques Meetings
  • 20.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Activity List Milestone List Activity Attributes Define Activities Outputs Project Management Plan Updates Change Requests 321 4 5
  • 21.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Sequence Activities Sequence Activities
  • 22.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Sequence Activities Description • Sequence Activities is the process of identifying and documenting relationships among various project activities • It helps in defining the logical sequence of the work to obtain the greatest efficiency given all project constraints
  • 23.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Inputs Sequence Activities ✓ Project Management plan components includes Schedule management Plan and Scope Baseline Project Management Plan ✓ Project Documents include: • Activity Attributes • Activity List • Assumption log • Milestone list Project Documents ✓ Government/Industry standards ✓ Project management information system (PMIS) ✓ Scheduling tool ✓ Organization work authorization systems Enterprise Environmental Factors ✓ Project files ✓ Templates ✓ Existing formal and informal activity planning Organizational Process Assets
  • 24.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Precedence Diagramming Method Dependency Determination Leads & Lags Sequence Activities
  • 25.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Outputs 21 Project Schedule Network Diagram Project Documents Updates Sequence Activities
  • 26.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Estimate Activity Duration Estimate Activity Duration
  • 27.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Description • Estimate Activity Durations is the process of estimating the number of work periods needed to complete individual activities with estimated resources • It provides the amount of time each activity will take to complete • It acts as a major input into the Develop Schedule process Estimate Activity Duration
  • 28.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Inputs Estimate Activity Duration ✓ Project Management Plan includes: • Schedule Management Plan • Scope Baseline Project Management Plan ✓Project Documents includes: • Activity Attributes • Activity List • Assumption log • Lessons Learned Register • Milestone list • Project team Project Documents ✓ Duration estimating databases ✓ Productivity metrics ✓ Published commercial information ✓ Location of team members Enterprise Environmental Factors ✓ Historical duration information ✓ Project calendars ✓ Scheduling methodology ✓ Lessons learned Organizational Process Assets
  • 29.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Estimate Activity Duration Expert Judgement Parametric Estimating Meetings 3-Point Estimating Analogous Estimating Data Analysis
  • 30.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Estimate Activity Duration Decision Making Bottom Up Estimation
  • 31.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Outputs Estimate Activity Duration Duration Estimates Basis Of Estimates Project Document Updates 21 3
  • 32.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Develop Schedule Develop Schedule
  • 33.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Description • It is the process of analysing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model. • It generates a schedule model with planned dates for completing project activities Develop Schedule
  • 34.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Inputs Develop Schedule ✓ Project Management Plan includes: • Schedule Management Plan • Scope Baseline Project Management Plan ✓Project Documents includes: • Activity Attributes • Activity List • Assumption log • Lessons Learned Register • Milestone list • Project team Project Documents • Details of to perform the project work to meet contractual commitments Agreements
  • 35.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Inputs Develop Schedule ✓ Standards ✓ Communication channels ✓ Scheduling tool Enterprise Environmental Factors ✓ Scheduling Methodologies ✓ Project Calendars Organizational Process Assets
  • 36.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Develop Schedule Schedule Network Analysis Data Analysis Resource Optimization Critical Path Method
  • 37.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Develop Schedule PMIS Schedule Compression Agile Releasing Plan Leads and Lags
  • 38.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Outputs Develop Schedule 3 62 41 5 Schedule Baseline Project Schedule Schedule Data Change Requests Project Management Plan Updates Project Calendars
  • 39.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Control Schedule Control Schedule
  • 40.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Description • It is the process of analysing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule model. • It generates a schedule model with planned dates for completing project activities Control Schedule
  • 41.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Inputs Control Schedule ✓ Project Management Plan includes: • Schedule Management Plan • Scope Baseline Project Management Plan ✓Project Documents includes: • Activity Attributes • Activity List • Assumption log • Lessons Learned Register • Milestone list • Project team Project Documents ✓ Schedule control tools ✓ Monitoring & reporting methods ✓ Existing formal & informal schedule control-related policies, procedures, & guidelines Organizational Process Assets ✓ It refers to the information about project progress Work Performance Data
  • 42.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Tools & Techniques Control Schedule Data Analysis PMIS Resource Optimization Critical Path Method Schedule Compression Leads and Lags
  • 43.
    PMP® CERTIFICATION EXAMTRAINING www.edureka.co/pmp Outputs Control Schedule 32 41 5 Work Performance Information Schedule Forecast Change Requests Project Documents Updates Project Management Plan Updates