Inspired by Perfection!
© 2015 Locanis AG
The IntelliGent
Warehouse Execution System!
PROBABLY THE MOST ADVANCED AND STANDARDIZED 100%
REAL-TIME 3D CLOUD BASED WAREHOUSE EXECUTION
SYSTEM ON THE MARKET TODAY FOR AUTOMATION AND
OPTIMIZATION OF ALL YOUR INDOOR & OUTDOOR
WAREHOUSE PROCESSES
© 2015 Locanis AG / Site Optimizer Presentation
“High Automation and Integration with
AGVs and Robotics”
“Product Tracking Without Labels and
Scanning”
“Multilevel Site and Order Structure
Functionality in One Software”
INTRODUCTION
“Guaranteed Results and CO2 Emission
Reductions”
“Double-Deep Functionality Without
Labels and Scanning”
NEXT GENERATION 4.0
WAREHOUSE EXECUTION
SYSTEM
EXECUTIVE SUMMARY
ALL YOU NEED IN ONE
STANDARDIZED
SOFTWARE, TIER1,
TIER2, TIER3, RETAIL
AND DOTCOM
HIGH RESILIENCE AND
STAND-ALONE
FUNCTIONALITY
ENSURE 100% UPTIME
INCREASED
WAREHOUSE
UTILIZATION,
REDUCTION OF
INVENTORY AND
TOTAL COST OF
OWNERSHIP
CLOUD & SAAS
FUNCTIONALITY
NEEDING LEAN IT
INFRASTRUCTURE &
BACKUP SYSTEMS
100% REAL-TIME DATA
AVAILABILITY,
PROCESS
TRANSPARENCY,
DECISION SUPPORT
AND REPORTING
AUTOMATION &
ROBOTICS
GUARANTEE
EFFICIENCY
INCREASE, COST
SAVINGS,
AND CO2 DECREASE
AUTOMATION AND
OPTIMIZATION OF ALL
YOUR INDOOR &
OUTDOOR LOGISTICS
PROCESSES
Page 1© 2015 Locanis AG / Site Optimizer Presentation
35-45% LESS IN COST
TO IMPLEMENT AND
RUN THAN A
TRADITIONAL
BEST-IN-CLASS WMS
Site Optimizer
Warehouse Management System
Production Planning System
Material Execution System
Yard Management System
Transport Management System
Resource Management System
Safety Management System
100% Real-Time Analytics
100% Real-Time Visualization
Forklift Guidance System
Forklift Navigation System
Site Optimizer Global Template
Sensor Technology Indoor
DGPS Technology Outdoor
AGV Integration (Automated Guided Vehicles)
Robotics Integration
ALL YOU NEED IN ONE SOFTWARE
ERP
STANDARD
Page 2© 2015 Locanis AG / Site Optimizer Presentation
 MULTILEVEL SITES & ORDER
STRUCTURES
 LOW/MEDIUM/HIGH COMPLEXITY SITES
 LOW/MEDIUM/HIGH VOLUME SITES
 DOMESTIC/INTERNATIONAL/RETAIL/DO
TCOM
INTERFA
CE
ROBOTICS AGVSTANDARDINTERFACE
STANDAR
D
INTERFA
CE
Site Optimizer G40
G40 is a scan solution with
100% real-time inventory
visualization.
Site Optimizer G60
G60 is using the Locanis
patented laser sensor
technology. All indoor
movements is made without
scanning and all analytics and
visualization is 100% real-time.
Site Optimizer GFLEX
GFLEX is using the Locanis
patented laser sensor and
DGPS Technology. All indoor
and outdoor movements is
made without scanning and all
analytics and visualization is
100% real-time.
Warehouse Management System
Production Planning System
Material Execution System
Yard Management System
Transport Management System
Resource Management System
Safety Management System
100% Real-Time Analytics
100% Real-Time Visualization
Forklift Guidance System
Forklift Navigation System
Site Optimizer Global Template
Sensor Technology
Differential GPS Technology
AGV & Robotics Integration
Buy, Lease, User Fee Concept
Site Optimizer
G40
(Light)
Site Optimizer
G60
(Medium)
Site Optimizer
GFLEX
(High)Standard Key Features
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X
X
X X X
Page 3© 2015 Locanis AG / Site Optimizer Presentation
ALL-YOU-NEED IN ONE SOFTWARE COVERING
LIGHT, MEDIUM AND HIGH COMPLEXITY SITES
X X X
X XX
ONE STANDARDIZED SOFTWARE
MULTILEVEL SITES AND ORDER STRUCTURES
Tier1
Dotcom
Tier2
Tier3 Retail
Page 4© 2015 Locanis AG / Site Optimizer Presentation
“One standardized software with
+1000 pre-configured parameters that
you simply enable or disable when
needed, without any programming”
AGVs
Robotics
Step 4
ROI Concept
We will provide you with clear measurable guaranteed
improvements
ROI DRIVEN APPROACH,
WITH A UNIQUE GUARANTEE
Page 5© 2015 Locanis AG / Site Optimizer Presentation
The Process
Even before you install the Site Optimizer products we will tell you what results you will achieve in four
simple steps
Step 1
Questionnaire
We will receive information and logistics processes in a
structured document
Step 2
Site Analysis
On-site analysis of the information received and the
documented processes in order to make sure any
misunderstandings are cleared
Step 3
As Is / To Be
We will describe in detail what processes that will be
automated, consolidated, deleted or added and we will
recommend what Site Optimizer product to install to reach
optimal results
Resources:
Forklifts:
Hardware:
Loading
Errors:
Other Errors:
Energy Use:
Summary:
CO2
Emissions:
Resources:
Forklifts:
Hardware:
Loading
Errors:
Other Errors:
Energy Use:
Summary:
CO2
Emissions:
$3.429.600
$295.400
$76.320
$75.380
$126.340
$244.608
$4.247.648
(kg)672.67
0
$2.639.200
$152.700
$37.900
$0
$0
$174.720
$3.004.520
(kg)480.520
As
Is
To
Be
Savings Resources:
Savings Forklifts:
Savings Hardware:
Savings Loading Errors:
Savings Other Errors:
Savings Energy Use:
Total Savings Summary:
Decrease in CO2
Emissions:
$790.400
$142.700
$38.420
$75.380
$126.340
$69.888
$1.243.128
(kg)192.15
0
ROI Concept,
Guaranteed
The solution ... is
unique within our
group
Project Manager
“Customer”
Vertical
›Food & Beverages
Customer
›Global Beer Brewer
Goals
›Live & 3D Batch tracking without
scanning
›Online inventory management
›More articles moved with the same
amount of resources
›Optimal utilization of storage space
›Reduction in inventory levels
›Increase in utilization of the forklifts
+ 29% More bottled articles move
+ 6% Increase of articles in stock
+ 13% More storage turnover (HL)
+ 18% Amount of picks
(commissioning)
+ 23% Increase in storage capacity
GUARANTEED PROVEN MEASURABLE
RESULTS
Page 6© 2015 Locanis AG / Site Optimizer Presentation
Results
Site Optimizer G40
G40 is a scan solution with
100% real-time inventory
visualization.
Site Optimizer G60
G60 is using the Locanis
patented laser sensor
technology. All indoor
movements is made without
scanning and all analytics and
visualization is 100% real-time.
Site Optimizer GFLEX
GFLEX is using the Locanis
patented laser sensor and
DGPS Technology. All indoor
and outdoor movements is
made without scanning and all
analytics and visualization is
100% real-time.
Page 7
© 2015 Locanis AG / Site Optimizer Presentation
EXTREMELY HIGH LEVEL OF STANDARD KEY FEATURES
COMPARED* TO OTHER BEST-IN-CLASS-SYSTEMS
Site Optimizer HighJump TECSYS IBM Sterling INFOR
JDA Cloud
Saas & On-Site
Picking Technology
In/Outbound Management
Shipping
Order Management
Inventory Tracking
Labor Management
ERP Integration
Production Planning System
Material Execution System
Yard Management System
Transport Management System
Resource Management System
Safety Management System
100% Real-Time Analytics
100% Real-Time Decision Support
100% Real-Time Visualization
Forklift Guidance System
Forklift Navigation System
Optimizer Global Template
Position Sensor Technology Indoor
Position DGPS Technology Outdoor
Double-Deep Functionality Without Scanning
3D Product Tracking Without Labels and Scanning
AGVs & Robotics
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
---
YES
YES
YES
YES
YES
YES
YES
YES
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
YES
YES
YES
YES
YES
YES
YES
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
YES
YES
YES
YES
YES
YES
YES
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
YES
---
---
YES
YES
YES
YES
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
YES
YES
YES
YES
YES
YES
YES
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
*The key feature
functionalities in the
above comparison for
HighJump, TECSYS, IBM
Sterling, INFOR and JDA is
made by Business-
Software.com
http://www.business-
software.com/warehouse
management/
Remote
Access
Standardized
ERP Interface
Standardized
Software & Hardware
Cloud & SaaS
Compatible
Light Hardware &
Backup Systems
HIGH LEVEL OF STANDARDIZATION, AUTOMATION WITH LEAN IT
INFRASTRUCTURE AND POWERFUL CLOUD SOLUTION ENSURE
SCALABILITY
ERP Standard Interface
Page 8© 2015 Locanis AG / Site Optimizer Presentation
1 Week
AS IS / TO BE
PROCESS
PROJECT
START
GO LIVE
&
ROI
PERIOD
1 Week 2 Weeks 2 Weeks 4 Months 1 Month
Questionnaire
Receive information
about logistic
processes in a
structured
document
Site Analysis
On-site analysis of
the received
information to avoid
misunderstandings
As Is / To Be
Describe existing
processes that will
be automated,
deleted or added
and product
recommendations
ROI Concept
Provide the
customer with hard
facts
›Current Cost / Year
›Future Cost / Year
›One-off Investment
›Licensing Cost /
Year
›RETURN ON
INVEST
Implementation
Set-up of hardware
and software
structure and
connect with ERP
system
SIT & UAT
Systems Integration
Testing & User-
Acceptance-Testing
Optimization
ROI optimization
period
Implementation
of the agreed TO
BE concept and
ROI
Pilot Site takes
normally between 6-9
months, further sites
2,5-3 months.
2 Months
STANDARDIZED PRODUCTS, STANDARDIZED
IMPLEMENTATION PROCESS WITH CLEAR
MEASURABLE ADVANTAGES
Page 9© 2015 Locanis AG / Site Optimizer Presentation
EXTREMELY HIGH RESILIENCE
›Software updates is done inflight without downtime.
›Change requests is done without any system downtime.
›System updates are done inflight without downtime.
›Bug fixing are done inflight without downtime.
›Unique Version Management “Optimizer Global Template”
with over 1000 standardized parameters, enable & disable.
›One software for light, medium and high complexity sites.
BACKUP INSTANCE – AUTOMATIC FAILOVER SWITCH
›During software updates , backup instance automatically works in
full operation.
›Regular updates and changes are deployed in-flight without need
of backup instance for full operation.
›If primary hardware goes down, secondary instance will
automatically work in full operation.
LIGHT SOFTWARE SOLUTION
›Software requires very lean
hardware infrastructure to
support primary and backup
system.
›Software use very limited
bandwidth, low cost to maintain
and run.
MOBILITY
›On site access via Terminals
and off-site access via mobile
devices ensure real-time
decision support, real-time
reporting and 100% real-time
transparency of your global
operations.
STAND ALONE FUNCTIONALITY
›The application run operations
even if core functionalities in
ERP system is down.
›Application can run completely
alone without any ERP “Stand-
Alone-Functionality”.
STANDARDIZATION & AUTOMATION
›100% real-time 3D visualization.
›High Standardization “Plug & Play”,
Optimizer Global Template.
›Automation of all your indoor and
outdoor logistics processes.
›Enable and Disable menu system.
›Minimum of customizing needed.
STANDARDIZATION, AUTOMATION,
RESILIENCE & UPTIME
Page 10© 2015 Locanis AG / Site Optimizer Presentation
BENGT TUNER
Chief Executive Officer
“Outstanding innovative people
combined with a passion for our
products is what inspire us to
constantly deliver guaranteed
measurable results to our customers”
© 2015 Locanis AG / Site Optimizer Presentation

Site Optimizer Presentation.ppt

  • 1.
    Inspired by Perfection! ©2015 Locanis AG The IntelliGent Warehouse Execution System!
  • 2.
    PROBABLY THE MOSTADVANCED AND STANDARDIZED 100% REAL-TIME 3D CLOUD BASED WAREHOUSE EXECUTION SYSTEM ON THE MARKET TODAY FOR AUTOMATION AND OPTIMIZATION OF ALL YOUR INDOOR & OUTDOOR WAREHOUSE PROCESSES © 2015 Locanis AG / Site Optimizer Presentation “High Automation and Integration with AGVs and Robotics” “Product Tracking Without Labels and Scanning” “Multilevel Site and Order Structure Functionality in One Software” INTRODUCTION “Guaranteed Results and CO2 Emission Reductions” “Double-Deep Functionality Without Labels and Scanning”
  • 3.
    NEXT GENERATION 4.0 WAREHOUSEEXECUTION SYSTEM EXECUTIVE SUMMARY ALL YOU NEED IN ONE STANDARDIZED SOFTWARE, TIER1, TIER2, TIER3, RETAIL AND DOTCOM HIGH RESILIENCE AND STAND-ALONE FUNCTIONALITY ENSURE 100% UPTIME INCREASED WAREHOUSE UTILIZATION, REDUCTION OF INVENTORY AND TOTAL COST OF OWNERSHIP CLOUD & SAAS FUNCTIONALITY NEEDING LEAN IT INFRASTRUCTURE & BACKUP SYSTEMS 100% REAL-TIME DATA AVAILABILITY, PROCESS TRANSPARENCY, DECISION SUPPORT AND REPORTING AUTOMATION & ROBOTICS GUARANTEE EFFICIENCY INCREASE, COST SAVINGS, AND CO2 DECREASE AUTOMATION AND OPTIMIZATION OF ALL YOUR INDOOR & OUTDOOR LOGISTICS PROCESSES Page 1© 2015 Locanis AG / Site Optimizer Presentation 35-45% LESS IN COST TO IMPLEMENT AND RUN THAN A TRADITIONAL BEST-IN-CLASS WMS
  • 4.
    Site Optimizer Warehouse ManagementSystem Production Planning System Material Execution System Yard Management System Transport Management System Resource Management System Safety Management System 100% Real-Time Analytics 100% Real-Time Visualization Forklift Guidance System Forklift Navigation System Site Optimizer Global Template Sensor Technology Indoor DGPS Technology Outdoor AGV Integration (Automated Guided Vehicles) Robotics Integration ALL YOU NEED IN ONE SOFTWARE ERP STANDARD Page 2© 2015 Locanis AG / Site Optimizer Presentation  MULTILEVEL SITES & ORDER STRUCTURES  LOW/MEDIUM/HIGH COMPLEXITY SITES  LOW/MEDIUM/HIGH VOLUME SITES  DOMESTIC/INTERNATIONAL/RETAIL/DO TCOM INTERFA CE ROBOTICS AGVSTANDARDINTERFACE STANDAR D INTERFA CE
  • 5.
    Site Optimizer G40 G40is a scan solution with 100% real-time inventory visualization. Site Optimizer G60 G60 is using the Locanis patented laser sensor technology. All indoor movements is made without scanning and all analytics and visualization is 100% real-time. Site Optimizer GFLEX GFLEX is using the Locanis patented laser sensor and DGPS Technology. All indoor and outdoor movements is made without scanning and all analytics and visualization is 100% real-time. Warehouse Management System Production Planning System Material Execution System Yard Management System Transport Management System Resource Management System Safety Management System 100% Real-Time Analytics 100% Real-Time Visualization Forklift Guidance System Forklift Navigation System Site Optimizer Global Template Sensor Technology Differential GPS Technology AGV & Robotics Integration Buy, Lease, User Fee Concept Site Optimizer G40 (Light) Site Optimizer G60 (Medium) Site Optimizer GFLEX (High)Standard Key Features X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Page 3© 2015 Locanis AG / Site Optimizer Presentation ALL-YOU-NEED IN ONE SOFTWARE COVERING LIGHT, MEDIUM AND HIGH COMPLEXITY SITES X X X X XX
  • 6.
    ONE STANDARDIZED SOFTWARE MULTILEVELSITES AND ORDER STRUCTURES Tier1 Dotcom Tier2 Tier3 Retail Page 4© 2015 Locanis AG / Site Optimizer Presentation “One standardized software with +1000 pre-configured parameters that you simply enable or disable when needed, without any programming” AGVs Robotics
  • 7.
    Step 4 ROI Concept Wewill provide you with clear measurable guaranteed improvements ROI DRIVEN APPROACH, WITH A UNIQUE GUARANTEE Page 5© 2015 Locanis AG / Site Optimizer Presentation The Process Even before you install the Site Optimizer products we will tell you what results you will achieve in four simple steps Step 1 Questionnaire We will receive information and logistics processes in a structured document Step 2 Site Analysis On-site analysis of the information received and the documented processes in order to make sure any misunderstandings are cleared Step 3 As Is / To Be We will describe in detail what processes that will be automated, consolidated, deleted or added and we will recommend what Site Optimizer product to install to reach optimal results Resources: Forklifts: Hardware: Loading Errors: Other Errors: Energy Use: Summary: CO2 Emissions: Resources: Forklifts: Hardware: Loading Errors: Other Errors: Energy Use: Summary: CO2 Emissions: $3.429.600 $295.400 $76.320 $75.380 $126.340 $244.608 $4.247.648 (kg)672.67 0 $2.639.200 $152.700 $37.900 $0 $0 $174.720 $3.004.520 (kg)480.520 As Is To Be Savings Resources: Savings Forklifts: Savings Hardware: Savings Loading Errors: Savings Other Errors: Savings Energy Use: Total Savings Summary: Decrease in CO2 Emissions: $790.400 $142.700 $38.420 $75.380 $126.340 $69.888 $1.243.128 (kg)192.15 0 ROI Concept, Guaranteed
  • 8.
    The solution ...is unique within our group Project Manager “Customer” Vertical ›Food & Beverages Customer ›Global Beer Brewer Goals ›Live & 3D Batch tracking without scanning ›Online inventory management ›More articles moved with the same amount of resources ›Optimal utilization of storage space ›Reduction in inventory levels ›Increase in utilization of the forklifts + 29% More bottled articles move + 6% Increase of articles in stock + 13% More storage turnover (HL) + 18% Amount of picks (commissioning) + 23% Increase in storage capacity GUARANTEED PROVEN MEASURABLE RESULTS Page 6© 2015 Locanis AG / Site Optimizer Presentation Results
  • 9.
    Site Optimizer G40 G40is a scan solution with 100% real-time inventory visualization. Site Optimizer G60 G60 is using the Locanis patented laser sensor technology. All indoor movements is made without scanning and all analytics and visualization is 100% real-time. Site Optimizer GFLEX GFLEX is using the Locanis patented laser sensor and DGPS Technology. All indoor and outdoor movements is made without scanning and all analytics and visualization is 100% real-time. Page 7 © 2015 Locanis AG / Site Optimizer Presentation EXTREMELY HIGH LEVEL OF STANDARD KEY FEATURES COMPARED* TO OTHER BEST-IN-CLASS-SYSTEMS Site Optimizer HighJump TECSYS IBM Sterling INFOR JDA Cloud Saas & On-Site Picking Technology In/Outbound Management Shipping Order Management Inventory Tracking Labor Management ERP Integration Production Planning System Material Execution System Yard Management System Transport Management System Resource Management System Safety Management System 100% Real-Time Analytics 100% Real-Time Decision Support 100% Real-Time Visualization Forklift Guidance System Forklift Navigation System Optimizer Global Template Position Sensor Technology Indoor Position DGPS Technology Outdoor Double-Deep Functionality Without Scanning 3D Product Tracking Without Labels and Scanning AGVs & Robotics YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES --- YES YES YES YES YES YES YES YES --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- YES YES YES YES YES YES YES --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- YES YES YES YES YES YES YES --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- YES --- --- YES YES YES YES --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- YES YES YES YES YES YES YES --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- *The key feature functionalities in the above comparison for HighJump, TECSYS, IBM Sterling, INFOR and JDA is made by Business- Software.com http://www.business- software.com/warehouse management/
  • 10.
    Remote Access Standardized ERP Interface Standardized Software &Hardware Cloud & SaaS Compatible Light Hardware & Backup Systems HIGH LEVEL OF STANDARDIZATION, AUTOMATION WITH LEAN IT INFRASTRUCTURE AND POWERFUL CLOUD SOLUTION ENSURE SCALABILITY ERP Standard Interface Page 8© 2015 Locanis AG / Site Optimizer Presentation
  • 11.
    1 Week AS IS/ TO BE PROCESS PROJECT START GO LIVE & ROI PERIOD 1 Week 2 Weeks 2 Weeks 4 Months 1 Month Questionnaire Receive information about logistic processes in a structured document Site Analysis On-site analysis of the received information to avoid misunderstandings As Is / To Be Describe existing processes that will be automated, deleted or added and product recommendations ROI Concept Provide the customer with hard facts ›Current Cost / Year ›Future Cost / Year ›One-off Investment ›Licensing Cost / Year ›RETURN ON INVEST Implementation Set-up of hardware and software structure and connect with ERP system SIT & UAT Systems Integration Testing & User- Acceptance-Testing Optimization ROI optimization period Implementation of the agreed TO BE concept and ROI Pilot Site takes normally between 6-9 months, further sites 2,5-3 months. 2 Months STANDARDIZED PRODUCTS, STANDARDIZED IMPLEMENTATION PROCESS WITH CLEAR MEASURABLE ADVANTAGES Page 9© 2015 Locanis AG / Site Optimizer Presentation
  • 12.
    EXTREMELY HIGH RESILIENCE ›Softwareupdates is done inflight without downtime. ›Change requests is done without any system downtime. ›System updates are done inflight without downtime. ›Bug fixing are done inflight without downtime. ›Unique Version Management “Optimizer Global Template” with over 1000 standardized parameters, enable & disable. ›One software for light, medium and high complexity sites. BACKUP INSTANCE – AUTOMATIC FAILOVER SWITCH ›During software updates , backup instance automatically works in full operation. ›Regular updates and changes are deployed in-flight without need of backup instance for full operation. ›If primary hardware goes down, secondary instance will automatically work in full operation. LIGHT SOFTWARE SOLUTION ›Software requires very lean hardware infrastructure to support primary and backup system. ›Software use very limited bandwidth, low cost to maintain and run. MOBILITY ›On site access via Terminals and off-site access via mobile devices ensure real-time decision support, real-time reporting and 100% real-time transparency of your global operations. STAND ALONE FUNCTIONALITY ›The application run operations even if core functionalities in ERP system is down. ›Application can run completely alone without any ERP “Stand- Alone-Functionality”. STANDARDIZATION & AUTOMATION ›100% real-time 3D visualization. ›High Standardization “Plug & Play”, Optimizer Global Template. ›Automation of all your indoor and outdoor logistics processes. ›Enable and Disable menu system. ›Minimum of customizing needed. STANDARDIZATION, AUTOMATION, RESILIENCE & UPTIME Page 10© 2015 Locanis AG / Site Optimizer Presentation
  • 13.
    BENGT TUNER Chief ExecutiveOfficer “Outstanding innovative people combined with a passion for our products is what inspire us to constantly deliver guaranteed measurable results to our customers” © 2015 Locanis AG / Site Optimizer Presentation