01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
HISTORY OF K UALA LUMPUR , HISTORY
OF T I T I W A N G S A L A K E G A R D E N
HISTORY
CRONOLOGY
1880 1887 1896 1957 1963
Kuala Lumpur becomes a
modern town when the
British representative
Frank Swettenham
develops the first city plan.
Selangor.
Kuala Lumpur becomes The Federated Malay
the capital of the state of States is formed by uniting
the Sultans of four
states. Kuala Lumpur
becomes capital of the
Federated Malay States.
Malaysia celebrates its
independence on August 31
after 151 years of British rule.
Kuala Lumpur becomes
capital of the Independent
Federation of Malaya
Kuala Lumpur
becomes capital of
Malaysia.
Kuala Lumpur is the largest city in Malaysia; it is also the nation's capital. The history of Kuala Lumpur began in the middle of the 19th century with the rise
of the tin mining industry, and boomed in the early 20th century with the development of rubber plantations in Selangor. It became the capital of Selangor,
later the Federated Malay States, and then Malayan Union, and finally Malaya and Malaysia.
Source : https://www.wonderfulmalaysia.com
Source : https://www.wonderfulmalaysia.com
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
HISTORY OF K UALA LUMPUR , HISTORY
OF T I T I W A N G S A L A K E G A R D E N
CRONOLOGY
1984 - 1999 2001-2020 PRESENT DAY – 2040
Era of Kuala Lumpur Structure Plan
2040 (PSKL2040) and Kuala Lumpur
City Plan 2040 (PBRKL2040)
Kuala Lumpur’s
popularity
continues to rise
along
with the facilities and
destinations it offers.
The preparation of the Kuala
Lumpur Structure Plan 2040.
(PSKL2040) needs to replace
PSKL2020 due to rapid economic.
Source : https://www.dbkl.gov.my/klmycity2040
Era of Kuala Lumpur Structure Plan
2020 (PSKL2020) and Kuala Lumpur
City Plan 2020 (PBRKL2020)
The opening of KL Sentral as Kuala
Lumpur's main transportation hub and the
largest integrated railway terminal in
Southeast Asia.
Construction of the Express Rail Link
(ERL) connecting KL Sentral
The opening of SMART which is the
longest water diversion tunnel in
Southeast Asia and the second longest
in Asia.
The Era of the Kuala
Lumpur Structure Plan
(PSKL 1984)
PSKL1984 was prepared by CHKL in
looking at the future development direction
for Kuala Lumpur. year 2000.
The federal administrative capital of
Malaysia moves to Putrajaya
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
KEYPLAN, SITEPLAN , LOCATION PLAN,
SITE B OUN DARY N SETBAC KS
K E Y P L A N : S E L A N G O R
Source : https://www.dbkl.gov.my/klmycity2040
S I T E P L A N : K U A L A L U M P U R
TOTAL AREA
8,104 km2
(3,129 sq mi)
TOTAL AREA
243 km2
(94 sq mi)
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
Source : https://www.expatgo.com/my/2015/01/05/8-parks-in-kl-you-should-visit/
P A R K S I N K U A L A L U M P U R
HISTORY OF K UALA LUMPUR , HISTORY
OF T I T I W A N G S A L A K E G A R D E N
T I T I W A N G S A L A K E G A R D E N
KEPONG
METROPOLITAN PARK
PUTERI LAKE
PARK
AMPANG PARK
TITIWANGSA LAKE
GARDEN
H I S T O R Y O F
Established on 1st February 1980 by
Allahyarham Tun Hussein Onn
Designed by Rio Takashi,
Japanese Landscape Architect
Upgraded on 2019-additional of
new and modern facilities
Natural area :
former mine pond
Total Area: 95 hectares
Lake Area: 57 hectares
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
KEYPLAN, SITEPLAN , LOCATION PLAN,
SITE B OUN DARY N SETBAC KS
01
A N A L Y S I S
The proposed site bring a few potential to derive into a strategic urban setup with
located at the commercial area that has been surrounded with the residential,
recreational and public services building. With some proper improvement of social
and community formation, this location could have a huge potential to be one of
smart urban place.
S Y N T H E S I S
Interaction between community and spaces could be lead by the proper planning of
the street zone in order to give an introduction vibe especially for the center area of
section 14 where there is a focal point for community to get a quality social life. Some
urban intervention and proposal will be located and 6 places that has been a linkage
of path from another section and zone to our proposed site and zone which is a
commercial and services zone.
R E S I D E N T I A L
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
H E A L T H C A R E
C O M M U N I T Y
E D U C A T I O N
.
C O M M E R C I A L
S E R V I C E / U T I L I T Y
O F F I C E
LEGENDS
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
KEYPLAN, SITEPLAN , LOCATION PLAN,
SITE B OUN DARY N SETBAC KS
01
SITE & REGULATORY
1. ZONING AND LAND USE
Site is zoned under Commercial use.
2. HORIZONTAL CONTROL
Total site area
Max. Plinth (60%)
: 6174.41 sqm/1.52 acres
: 3704.64 sqm
Area within setback : 1550.00 sqm
Greenbelt (10%) : 617.44 sqm
Non -Residential Development
Plinth area is allowed up to 60%
3. VERTICAL CONTROL
Plot ratio : 1 : 6 : 3
GFA project (max) : ............
Height limit project : 5 storeys
4. PARKING BAYS
Car Parking - GFA / 46.4 sqm + 20% : ..........
Motorcycle Parking - GFA / 89 sqm
Handicap car parking - 2%
: ..........
: ..........
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T SI TE REG ULATO RY (SPACE REQ UI REM ENT)
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T SI TE REG ULATO RY (SPACE REQ UI REM ENT)
01
2% of total GFA =
...sqm
Subjected to local
needs.
Separated restroom for gents
and ladies and complete with:
• Shower/
• Changing room/
• Nursing room/
• Diaper changing room/
• OKU toilet
Provided a proper lay-by.
Placed outside the
commercial complex
or at the roadside of the
main/secondary
road.
Well-planned walkway
with consideration
of the connectivity
between components
in the commercial
area.
Separated from the main
area.
Suitable to be placed at
the rear part
of the building.
Provided at a place
suitable for the
fire fighter access
according to the
Jabatan Bomba dan
Penyelamat
requirement.
Food Court
Taxi/Bus stop
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
Pedestrian Walkway
Fire hydrants and extinguishers
Loading Bay
Restroom
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
SITE SEC TION WITH CON TEXT , DRONE
VIEW , SKYLIN E
Source : https://www.dbkl.gov.my/klmycity2040
PROPOSED SITE
Y Y
PROPOSED SITE
JALAN
TEMBELING
JALAN
BESERAH
ADMINISTRATIONOFFICE
OF ISTANA BUDAYA
BUILDING HEIGHT RECOMMENDATION
(5 STOREY)
ISTANABUDAYA
ADMINISTRATION OFFICE OF ISTANABUDAYA
BUILDING HEIGHT RECOMMENDATION
(5 STOREY)
ASRAMA 1 MALAYSIA
TITIWANGSASTADIUM
X
X
SECTION Y-Y
SECTION X-X
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
S I T E A N D C O N T E X T
SITE SEC TION WITH CON TEXT, DRONE
VIEW , SKYLIN E
N O R T H V I E W
S O U T H V I E W
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
E A S T V I E W
W E S T V I E W
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
C U L T U RA L S T U D IE S T HEME : KUALA LU MPU R A HEALTHY &
VIB RAN T CITY
WELL LOVED
PLACES
HEALTHY AND
VIBRANT VIABILITY
GROWTH
ANALYSIS SYNTHESIS
Titiwangsa Lake Garden with any organism that is Increase more spaces of active and creative to attract
“pulsing with life,” the strength and health of the flow of people know more the identity and the place culture.
people is paramount to establishing the vibrancy of a city.
Titiwangsa Lake Garden is open, inclusive and Create more functional facilities of space and make it as
welcoming places with a wide variety of vibes. People are multipurpose kind of space.
drawn (and will come back) to places that make them feel
safe and welcome.
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
NORTH
VIEW
SOUTH
VIEW
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
C U L T U RA L S T U D I E S
TH EME : KUALA LU MPUR A HEALTHY &
VIB RAN T CITY
ANALYSIS SYNTHESIS
Titiwangsa Lake Garden with any organism that is
“pulsing with life,” the strength and health of the flow of
people is paramount to establishing the vibrancy of a city.
Increase more spaces of active and creative to attract
people know more the identity and the place culture.
Titiwangsa Lake Garden is open, inclusive and
welcoming places with a wide variety of vibes. People are
drawn (and will come back) to places that make them feel
safe and welcome.
Create more functional facilities of space and make it as
multipurpose kind of space.
HEALTHY AND
VIBRANT
WELL LOVED
PLACES
VIABILITY
GROWTH
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
C U L T U RA L S T U D I E S LEISU RE ATTRACTIONS
pinterest.com
0.45 km (6 min)
0.9 km (3 min)
National Art Gallery Titiwangsa Splash Park
nst.com.my
2.1 km (5 min)
1.2 km (14 min)
Saloma Bridge P. Ramlee Memorial
House
3.8 km (47 min)
4.5 km (10 min) 3.3 km (41 min)
6.2 km (11 min)
top-rated.online
malaysianflavours.com
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
01
3RD YEAR 2ND SEMESTER 2020/2021
W.P KUALA LU MPUR , 2020, TOTAL
POPU LATION(‘000 ): 1773.7
350
300
250
200
150
100
50
0
0-9 10.-14 15-24 25-34 35-44 45-54 55 and
above
AGES
AGES
63%
23%
6%
8%
ARC3015 ARCHITECTURAL STUDIO 5
C U L T U RA L S T U D I E S
ETHNIC GROUP
bumiputera
chinese
indians
non-Malaysian
citizens
51%
49%
GENDER
Male
Female
ANALYSIS
Source: Department of Statistics,Malaysia
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
Kuala Lumpur inhabited by more than half bumiputera
ethnic in the latest year 2020. While the least of ethnic
in Kuala Lumpur are Indians.
Kuala Lumpur number of populations in 2020 were
more in the ages of 25 years old to 44 years old.
However, the number populations of senior citizens
also higher than baby and children.
01
3RD YEAR 2ND SEMESTER 2020/2021
ARC3015 ARCHITECTURAL STUDIO 5
C U L T U RA L S T U D I E S
SU R VEY TAK EN FROM RESPONDENTS
FR OM TH E SITE
17%
50%
25%
8%
How often did you come to Titiwangsa
Lake Garden?
Every Day
Every Week
Monthly
1-5 times a year
25%
33%
17%
8%
17%
What activities that you enjoy when come
to Titiwangsa Lake Garden?
Picnic
Sport/jogging
Cyling/Rollerblading
Outdoor Shooting
Boating/Fishing
25%
42%
33%
Do you easily get parking area/spot
when visiting Titiwangsa Lake Garden?
Easy
Intermidiate
Hard
25%
75%
Had you visit Istana Budaya and
Titiwangsa Lake Garden on the same
day?
Yes
No
25%
17%
33%
25%
Range of users/visitors at Titiwangsa
Lake Garden
Children
Teenager
Adult
Senior citizen
SYNTHESIS
•Design facilities with multipurpose uses
that can attract every layer of ages to visit
Ttitiwangsa Lake Garden
•Increase more parking spot
•Create some connectivity between
Titiwangsa Lake Garden and Istana
Budaya
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
MUHAMMAD IRFAN BIN NASRUDIN 197428
01
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
01
C U L T U RA L S T U D IE S T HEME : KUALA LU MPU R A HEALTHY &
VIB RAN T CITY
NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 |
01
T I T I W A N G S A L A K E G A R D E N
05 INGRESS AND ENGRESS
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
RELATIVE DISTANCE
FROM
SHAH ALAM
33.6KM
FROM
PETALING JAYA
22.0KM
FROM
KEPONG
14.5KM
FROM
CHERAS
15.0KM
PROPOSED SITE
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ACCESSIBILITY - CONNECTIVITY
KTM LRT Rapid KL Bus monorail
MRT
S.W.O.T Analysis
S Variety of access from different
directions
W Lack of public transport direct access
to site
O Enhance pedestrian path to link from
nearest node
T Uncontrolled traffic during peak
hours
Duke
Jln Tun Razak
AKLEH
Jalan Kuching
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
PRIMARY INTERSECTION
LRT STATION
S.W.O.T Analysis Synthesis
S Traffic congestion during peak hour
quite far from site.
The primary intersections are quite far
from the site. Even less traffic
congestion near the site, it hardly to
get access for public transport and far
if by walking. Hence, dedicated bus
lane can be proposed and uses
during peak hour.
W Few excess to the primary road.
O Planning for dedicated bus lane.
T Limited lane for other vehicles.
LEGEND LEGEND
Primary road
Secondary road
Tertiary road
UTC SENTUL
1.0 KM
INSTITUT
JANTUNG NEGARA
3
By car
By walking
NATIONAL ART
GALLERY
4
0.5 KM
2
1
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
RELATIVE DISTANCE
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ACCESSIBILITY | NODES
S.W.O.T Analysis
S There are various nodes from different direction and
different transportations for both macro and micro
W Relatively inadequate of nodes at the northern east direction
of the site.
O Future MRT station may gather more crowd to the site.
T Pedestrian need to beware of the buses on the way walking
to the site
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
VEHICHULAR CIRCULATION (PRIMARY SECONDARY & TERTIARY)
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
PEDESTRIAN CIRCULATION
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
RELATIVE DISTANCE
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
PUBLIC TRANSPORT ( TRANSIT )
S.W.O.T Analysis
S Surrounded by transit stations.Easy access to the site.
W The transit stations are quite far from the site (walking distance)
O Pedestrian bridge can be built to link site to the stations
T Need maintenance fee for the pedestrian bridge
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
PUBLIC TRANSPORT ( BUS )
BUS STOP DISTANCE FROM SITE &
TIME TAKEN
E KL694 Sjkc Ciao
Nan
1.8km (21mins)
F KL650 SMK
B.Baru Sentul
1.9km (22mins)
G KL651 Pangsuri
SrI Perak
1.9km (22mins)
H KL1515 Menara
Orchid UTC
Sentul
2.6km (31mins)
BUS STOP DISTANCE FROM
SITE & TIME
TAKEN
A Shell 1.3 km (16mins)
B KL670
Titiwangsa
1.5km (17 mins)
C KL693
Titiwangsa
1.4km (15mins)
D KL669 Sjkc
Ciao Nan
1.1km (13mins)
BUS STOP DISTANCE
FROM SITE &
TIME TAKEN
I KL648 LRT
Sentul
Timur
2.6km
(31mins)
J KL1591
Perumahan
Sri N.S
2.3km
(28mins)
K KL2063
SPG Datuk
Seru
3.7km
(45mins)
L KL2053
BHP Sentul
3.6km
(44mins)
M KL643
Masjid Al-
Hidayah
Sentul
3.4km
(42mins)
N KL617 Sk
Sentul 2
3.6km
(44mins)
O KL607
Sentul
West
3.3km
(40mins)
BUS STOP DISTANCE
FROM SITE &
TIME TAKEN
P KL608 Hotel
Tropicana
3.3km
(40mins)
Q KL609 Sri
Thandayuth
apani
2.9km
(36mins)
R KL579 Sri
Thandayuth
apani
3.3km
(40mins)
S KL578 Sri
Dhanayutha
puma
2.9km
(36mins)
T KL1837
Istana
Budaya
1.2km
(15mins)
U KL273
Padang
HKL
2.6km
(32mins)
V KL1633
P.Darah
Negara
1.3km
(15mins)
S.W.O.T Analysis
S There is a lot of bus stop nearby to access to site
W Visitors need to walk a least 15mins (the nearest) to the site
O Enhance the transportation system to ease the public transport user.
T The road is quite narrow for the bus to pass through smoothly.
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ALERNATIVE TRANSPORT ( TAXI & BICYCLE )
Taxi waiting at the T
junction near Jalan Maran
A gazebo built for
passenger to shade while
waiting for taxi
Well planned bicycle track
within the park
Few stalls renting bicycle at the
entrance of the park
BICYCLE TAXI
S.W.O.T Analysis
S • Well-planned bicycle track
within park
• Can easily get taxi services
outside the park
W • No proper biocycle track
outside the park
• No proper taxi stops
O • Design proper bicycle track
outside the park
• Provide formal taxi stops
T Quite dangerous for those
who walk by the roadside
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ACCESIBILITY - PARKING
S.W.O.T Analysis Synthesis
S The numbers of public and private parking are balance
and scattered within walkable distance from site.
Proposed parking
strategies such as
parklets, curb bulbs.
W Lack existing parking spaces near to proposed site,
where a proposed egress is located.
O Encourage consumers and visitors to practice carpooling
to reduce the congestion on road during peak hours.
T Visitors might engage in illegal parking to walk a short
distance to visit the proposed site briefly.
05
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
URBAN INTERVENTION
• Design streets for
people such as
sidewalks and bicycle
lane in Jalan Beserah. ➢ Create new roads
and connection to
make for more easy
path to the site
➢ create connected
network which
allows cars and
buses to enter the
site.
➢ Proposed new
parking strategies
and redesign existing
parking facilities .
• Accomodate public
transport near site.
• Deal with parking
creatively
Issues
• Not enough sidewalks for
pedestrians in the
walkability radius of the
proposed site.
• Lack of public transport
direct access to site
• Lack existing parking
spaces near to proposed
site.
Proposed solution
➢ The rain trees around
the site will act as a
canopy to shade the
area
➢ Provide rumble strips
to slow down the
traffic at Jln Berserah.
T I T I W A N G S A L A K E G A R D E N
06 VEGETATION
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
06
LANDSCAPE
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
06
LANDSCAPE
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
06
SITE SECTION
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
S.W.O.T Analysis Synthesis
S • Provides good shading around the site.
• The trees surrounding the site creates barrier .
• The landscape diversity need to be maintained but
needs to remove certain trees in order to create more
than one entrance/exit for the site.
W • Too much trees surrounding the site creating a wall
with no real entrance or exit.
O • The large area in the site gives variety of options for
plants placement.
T • Many uncontrolled bushes in the site which can
attract dangerous animals.
06
HEIGTH OF TREES
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
06
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
GREENERY AREA, OPEN SPACE AND PARK
T I T I W A N G S A L A K E G A R D E N
Presented by :
MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
T I T I W A N G S A L A K E G A R D E N
04 SITE ZONING
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
04
SITE ZONING
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
04
SITE ZONING
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
04
SITE ZONING | MACRO
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
WAT MEH LIEW TEMPLE
HKL
UKM KAMPUS KUALA
LUMPUR
NATIONAL BLOOD CENTRE TITIWANGSA GOLF COURSE
RESTORAN D’SAJI
UNIT BERKUDA DBKL
NATIONAL HEART
INSTITUTE
SWOT ANALYSIS
STRENGTH WEAKNESS OPPORTUNITY THREAT
Walking distance from
nearby government and commercial
building in 200m distance
It will be pack on weekend with
visitors of all ages doing their
activities.
Surrounded by buildings that attract
locals and foreigners
Jalan Kuantan (main road) will be
busy at all time.
1KM 11MIN
2KM 22MIN
1.5KM 18MIN
2.5KM 29MIN
1.7KM 18MIN
850M 10MIN
850M 10MIN
2.3KM 28MIN
04
SITE ZONING | MICRO
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
1.0KM
SK. KUANTAN 2
ISTANA BUDAYA
STUDIO GRAPHIC SENI
REKA ISTANA BUDAYA
STADIUM TITIWANGSA
SMK. SERI
TITIWANGSA
CURRICULUM
CENTER
DOPLOHTIGO
NATIONAL ART
GALLERY
TAMAN TASIK
TITIWANGSA
APS GALLERY
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
400M 5MIN
260M 3MIN
180M 2MIN
700M 9MIN
550M 6MIN
290M 3MIN
1KM 10MIN
750M 9MIN
850M 10MIN
450M 6MIN
04
SITE ZONING | ANALYSIS & SYNTHESIS
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
• Sport facilities
 Students activating the area with
sports games and other activities at
night.
• Park vendors
 Scattered around the lake.
• Districts typology
 Classifying the districts by typology.
• Further enhance existing nightlife as well
make use of the nightlife to bring people
into our buildings, which is to the micro
site.
• Bring vendors into proposed building to
carry out their services in proper manner.
• Site can be interconnected with Istana
Budaya as well as food and hangout
centre to establish integrated cultural
community within the site .Engaging the
masses, people from different zones
comes together to form a community in
titiwangsa park.
ANALYSIS SYNTHESIS
04
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
OPTION A OPTION B
Give a sense of surprise once enter
the building
• Can give a better view with linear arrangement along the
circulation.
PRO’S • Can maximise the full view lake along the building
structure.
• The services is near the main entrance CON’S • The propose building will block a part of lake view
• Proposed a buffer zone at the entrance to cover services
area (vegetation)
SYNTHESIS • Able to have a double front façade to attract the visitors
P2
S
P
- PARKING - Y. CENTER S - SERVICE AREA
The side parking along building give a
sense of discovery for visitor
Eng.
Ing. Ing.
Eng.
PROPOSED POTENTIAL LOCATION
P
S
P2
P2
P
04
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
OPTION C OPTION D
Can provoke the visitors with a
glimpse of view.
• Secure the safety with the same entrance and exit PRO’S • A proper composition and layout in the site
• Not a pedestrian friendly road CON’S • First glimpse to rear view of the building
• Provide a zebra cross-walk SYNTHESIS • Proposed bold and catchy skim façade to attract visitors.
P2
S
P
- PARKING - Y. CENTER S - SERVICE AREA
Parking at the front will attract the
visitor towards P2
Ing.
Eng.
PROPOSED POTENTIAL LOCATION
P
S
P2
P2
P
Eng. & Ing.
T I T I W A N G S A L A K E G A R D E N
09 ENVIRONMENTAL STUDIES
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
09
CLIMATE DATA
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
HOURS OF SUNLIGHT
MAX : June 1st,
12 hr 18 min
MIN : December 21st,
11 hr 57 min
TEMPERATURE
MAX : 91 Farenheit
MIN : 73 Farenheit
RAINFALL
MAX : November 14th,
10.7 Inches
MIN : June 25th,
4.4 Inches
CLOUD COVER
MAX : Mostly Cloudy, 91%
MIN : Partly Cloudy, 9%
PRECIPITATION
MAX : November 14th, 63%
MIN : June 20th, 31%
SUNRISE
EARLIEST : October 29th,
6:56 A.M
LATEST : February 6th,
7:27 A.M
SUNSET
EARLIEST : November 8th,
6:56 P.M
LATEST : February 18th,
7:27 P.M
HUMIDITY
Does not vary significantly
throughout the year from
muggy, oppressive to
miserable
Datas of climate were retrieved from www.weather-my.com
09
CLIMATE | SHADOW ORIENTATION
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
JUNE
SOLSTICE
DECEMBER
SOLSTICE
09:00 A.M 12:00 P.M 04:00 P.M
STRENGTH WEAKNESS THREAT
OPPORTUNITY
• Normal level of wind
speed suitable for user’s
comfort
• The amount of
greeneries in the
surrounding offer sense
of calmness to users
NGTH
• High temperature during
the day
• High temperature and
high humidity can
increase number of
green design and
achieve higher Green
Building Index (GBI)
• Open space for natural
light
• Weather can be very hot
due to being situated in a
city
• Air pollution can come
from the main road
09
CLIMATE | ANALYSIS AND SYNTHESIS
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
• West-facing walls receive the strongest Sun at the
hottest part of the day.
• Excessive Solar radiation can result in glare and
overheating that leads to discomfort
• Utilizing sun shading such as,
louvers, vegetation, overhanging
eaves or balconies, solar control
glazing, curtains and blinds
• Face South or North to gain less
Solar heat
• Alternative: Face East. Absorb only
morning Sun
• According to wind rose diagram, the East,
West and South side have higher chances
to receive the highest wind breeze
throughout the year
• Building should be
design to have open
space facing the East,
West & South, allowing
wind breeze to flow
through & circulate into
the building for better
ventilation
NORTH
Morning & Afternoon
No direct Sunlight
WEST
Morning
No direct Sunlight
Afternoon
Receive Sunlight
SOUTH
Morning & Afternoon
No direct Sunlight
EAST
Morning
Direct Sunlight
Afternoon
Receive Sunlight
ANALYSIS
ANALYSIS
SYNTHESIS
SYNTHESIS
SUN DIRECTION
JAN
CLIMATE ANALYSIS TIMELINE
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SUNNY SEASON
The sky is clear, mostly
clear or partly cloudy 26%
of the time
WARMER TEMPERATURE
CLOUDY SEASON
COOLER
TEMPERATURE
The sky is overcast or mostly cloudy 91% of the time,
clear, mostly clear or partly cloudy 9% of the time
T I T I W A N G S A L A K E G A R D E N
03 SENSORY
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
03
SENSORY
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
T I T I W A N G S A L A K E G A R D E N
Presented by :
CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 |
CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
T I T I W A N G S A L A K E G A R D E N
7 TOPOGRAPHY
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
7
TOPOGRAPHY
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
MAIN
ROAD PROPOSED SITE
LAKE PARK MAIN ROAD ISTANA BUDAYA
FROM SEA LEVEL
Topographic Map (resource : https://en-gb.topographic-map.com)
Y
Y
X
X
PROPOSED SITE
KEY PLAN (scale n.t.s.)
SECTION X-X (scale n.t.s.)
8 UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
T I T I W A N G S A L A K E G A R D E N
8
UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ELECTRICAL SUPPLY
Site Area
Feeder Pillar
TNB Substation
Feeder pillar is to
distribute electrical
energy
TNB Substation
functioning as an
electrical controlling
point
8
UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
WATER SUPPLY
Site Area
Water Supply Pipe
Fire Hydrant
Water supply managed
by Syarikat Air Selangor
(SYABAS)
Water pipe for water
supply
8
UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
TELECOMMUNICATION SUPPLY
Site Area
TM Point
TM Distribution Point
TM Berhad
Distribution point as a
jumper for incoming
outcalling line
Fixed line telecom
provided by Telekom
Malaysia Berhad
8
UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
DRAINAGE & SEWERAGE SYSTEM
Site Area
Drainage Route
Sewerage Route
Manhole
Drainage route is
connected to Sg.
Bunus & Sg. Klang
Sewerage system
managed by Indah
Water Konsortium,
Bunus, KL
8
UTILITIES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
PROPOSED UTILITY
Double chamber substation stand-alone
Proposed Existing
Fire Prevention System
Sprinkler with riser
system
Hose Reel with
riser system
Suggested to have a toilet on
north side (Jalan Tembeling) since
the existing sewer pipe located at
that side
Underground sewerage carried
sanitary wastewater
Underground storm drain tunnel
that carried storm water from
catch basin
Water pipe for water supply
Fire hydrant belong to Studio
Senireka Grafik Istana Budaya
10 SUBURBAN FEATURES,
CHARACTERISTIC AND
MANMADE FEATURES
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
T I T I W A N G S A L A K E G A R D E N
PROPOSED SITE
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
SUBURBAN FEATURES
EXISTING BUILDING
Stadium Titiwangsa
National Art Gallery
Bangunan Pentadbiran
Istana Budaya
Istana Budaya
M
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
Radius 500 m
Facilities:
- Tennis
- Table tennis
- Gymnasium
- Squash
- Basketball
Sports CentreTitiwangsa
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ARCHITECTURAL PATTERNS
ISTANA BUDAYA
“Palace of Culture”
Built; 1995 (Architect Muhammad
Kamar Ya’akub) inspiration of
moon kite.
BANGUNAN PENTADBIRAN ISTANA BUDAYA
• Ornaments used are similar
to Malay traditional house
Sirih Junjung inspired roof shape (traditional
arrangement or a present made of betel leaves
used during Malay weddings). Serambi, rumah
ibu, rumah dapur layout.
Building design is based on the Malay
headgear of ‘tengkolok’ which is a
symbol of intellectual pride and respect
in Malay culture
This building act as administrative unit to Istana
Budaya. It manage all the cultural arts activities and
arts activities like dance and traditional music.
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ARCHITECTURAL PATTERNS
NATIONAL ART GALLERY STADIUM TITIWANGSA
• Architectural style of this building similar to Istana
Budaya, it is a blend of slate, tinted glass and clean
modern lines with traditional Malay design
prominent in the form of a light blue origami-style
metallic roof.
• Roof shape similar with others building to represent Malay
Treditional house and bring it on modern building
• This building used traditional idea for design and combined
with modern activities inside building
• The stadium Tititwangsa
is an indoor arena while
t h e a d j a c e n t s p o r t s
complex has facilities for
squash, tennis, table
tennis and basketball.
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
OFF- SITE FEATURES
Tactile pavement
Concrete stamping
Asphalt pavement Walkway & bicycle
pavement
Concrete pavement
Concrete stamping
1) PAVEMENT
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
Radius 500m
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
OFF- SITE FEATURES 2) URBAN FURNITURE / PUBLIC SEATING
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
PROPOSED SITE
Radius 500m
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
OFF- SITE FEATURES 3) INFRASTRUCTURES
Public toilet
On west side of lake
Bus stop
Infront of school
Astaka
On east side of lake
Taxi stop
In front of school
Surau
On west side of lake
Waterpark
Playground
Gazebo
Bus stop
At west of Istana Budaya
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
Radius 1KM
PROPOSED SITE
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
OFF- SITE FEATURES 4) BARRIER, LAMP POST AND WAY-FINDING
Barrier Lamp Post Way-finding
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
Radius 1KM
PROPOSED SITE
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
OFF- SITE FEATURES 5) EXISTING PUBLIC PARKING / PRIVATE PARKING
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
PROPOSED SITE
Existing Parking
-Near food court (58 bays)
Non-parking zone
-Near entrance to Istana Budaya Radius 500m
Private Parking
-Near to Bangunan Pentadbiran
Istana Budaya (40 bays)
Non-parking zone
-Near entrance to Taman Tasik Titiwangsa
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
FACILITIES
Education
• SMK Seri Titiwangsa
• SMK Puteri Titiwangsa
• SJK(T) Jalan Fletcher
• SMK Seberang Temerloh
• SK Jalan Kuantan 2
• Pusat Perkembangan
Pendidikan UKM
Hotel
• Bunker Hotel & Restaurant
• Rizcarton Capsule Hotel
• Le Ruiz Boutique Hotel
• Hotel Putra Kuala Lumpur
Medical Centre
• Kuala Lumpur Hospital
• National Heart Institute
• Respiratory Medicine Institute
• KPJ Tawakkal KL Specialist
Hospital
Restaurant
• Sany Char Koay Teow
• Cafe Istana Budaya
• Titiwangsa Wang Kopitiam
• Starbucks
• McDonald Titiwangsa DT
Gas Station
• Petronas Jalan Tun Razak
• Shell Titiwangsa Jalan Tun
Razak
• BH-Petrol Jalan Pahang
• Petron Jalan Pahang
Police Department
• Ibu Pejabat Polis Daerah Sentul • Balai Polis Komuniti Putra
Fire Rescue Department
• Titiwangsa Fire and Rescue
Station
• Sentul Fire and Rescue Station
Mosque/Surau Temple
• Surau Taman Tasik Titiwangsa
• Masjid Amru Ibni Al'-As Sentul
• Masjid Jalan Pahang
• Kuil Sri Thirumurugam
• Wat Meh Liew Thai Buddist
Temple
Bus Stop
Radius 1km
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
URBAN INTERVENTION
1) Pavement 2) Pedestrian walkway
• Differentiate routes according to appropriate functions
vehicle and bicycle
– walkway along Jalan Tembeling
• To provide safety respond for some areas near the site
• Giving visitors the opportunity to see the culture
around the site.
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
• Kinetic energy pavement
- produce electric energy
- high tech pavement
- due to activity on site
• Propose a unique pavement design
- can attract along the sidewalk
- create a different mood to visitor
• Different design and colour for walkway
path and cycle path for safety purposes
10
SUBURBAN FEATURES, CHARACTERISTIC AND MANMADE FEATURES
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
URBAN INTERVENTION
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
3) Information Board 4) Entrance Structure / Arch
• Provide more reading material through
information boards especially for new visitor
• Example - History, health info, map, interesting
cultural area
• Gain knowledge while play sports or exercise at
the same time
• A great space for visitors to gather before
starting to explore our design project on site
• Intended as an entryway into the area
10
ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
ARCHITECTURAL
PATTERN
UTILITIES
Defines the locale architecture
Existing utilities are functioning
well
Modern buildings, glass and
steel highrises become eyesores
Additional utilities required near
the site
Embrace local architecture with
modern designs and materials
Provide improved utilities to
enhance the surrounding
Modern buildings lessens the
significance of local landmarks
Misplaced utilities - refuse area
near entrance is displeasing
SYNTHESIS
Future development should
consider surrounding landmarks
so not to tarnish its influence
Proper planning of utilities such
as drainange system to avoid
stagnant water, and relocation of
current utilities
S
W
O
T
OFF-SITE FEATURES
• No pedestrian pathing at jalan
tembeling (one way road)
• Car parks on one way road makes it
narrow, dangerous for pedestrians
• Abundance of signage, but very few on
information and location, really hard to
locate entrances
SOLUTIONS
• Consider to provide proper pedestrian
pathing along Jalan Tembeling
providing proper and easy access
• Provide a dedicated parking area near
the park, a multi-storey parking
recommended
I
S
S
U
E
S
SWOT ANALYSIS & SYNTHESIS
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 |
AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
T I T I W A N G S A L A K E G A R D E N
Presented by :
T I T I W A N G S A L A K E G A R D E N
Presented by :

Titiwangsa Lake Garden SITE ANALYSIS-FINAL - Copy.pdf

  • 1.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T HISTORY OF K UALA LUMPUR , HISTORY OF T I T I W A N G S A L A K E G A R D E N HISTORY CRONOLOGY 1880 1887 1896 1957 1963 Kuala Lumpur becomes a modern town when the British representative Frank Swettenham develops the first city plan. Selangor. Kuala Lumpur becomes The Federated Malay the capital of the state of States is formed by uniting the Sultans of four states. Kuala Lumpur becomes capital of the Federated Malay States. Malaysia celebrates its independence on August 31 after 151 years of British rule. Kuala Lumpur becomes capital of the Independent Federation of Malaya Kuala Lumpur becomes capital of Malaysia. Kuala Lumpur is the largest city in Malaysia; it is also the nation's capital. The history of Kuala Lumpur began in the middle of the 19th century with the rise of the tin mining industry, and boomed in the early 20th century with the development of rubber plantations in Selangor. It became the capital of Selangor, later the Federated Malay States, and then Malayan Union, and finally Malaya and Malaysia. Source : https://www.wonderfulmalaysia.com Source : https://www.wonderfulmalaysia.com NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 2.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T HISTORY OF K UALA LUMPUR , HISTORY OF T I T I W A N G S A L A K E G A R D E N CRONOLOGY 1984 - 1999 2001-2020 PRESENT DAY – 2040 Era of Kuala Lumpur Structure Plan 2040 (PSKL2040) and Kuala Lumpur City Plan 2040 (PBRKL2040) Kuala Lumpur’s popularity continues to rise along with the facilities and destinations it offers. The preparation of the Kuala Lumpur Structure Plan 2040. (PSKL2040) needs to replace PSKL2020 due to rapid economic. Source : https://www.dbkl.gov.my/klmycity2040 Era of Kuala Lumpur Structure Plan 2020 (PSKL2020) and Kuala Lumpur City Plan 2020 (PBRKL2020) The opening of KL Sentral as Kuala Lumpur's main transportation hub and the largest integrated railway terminal in Southeast Asia. Construction of the Express Rail Link (ERL) connecting KL Sentral The opening of SMART which is the longest water diversion tunnel in Southeast Asia and the second longest in Asia. The Era of the Kuala Lumpur Structure Plan (PSKL 1984) PSKL1984 was prepared by CHKL in looking at the future development direction for Kuala Lumpur. year 2000. The federal administrative capital of Malaysia moves to Putrajaya NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 3.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T KEYPLAN, SITEPLAN , LOCATION PLAN, SITE B OUN DARY N SETBAC KS K E Y P L A N : S E L A N G O R Source : https://www.dbkl.gov.my/klmycity2040 S I T E P L A N : K U A L A L U M P U R TOTAL AREA 8,104 km2 (3,129 sq mi) TOTAL AREA 243 km2 (94 sq mi) NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 4.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T Source : https://www.expatgo.com/my/2015/01/05/8-parks-in-kl-you-should-visit/ P A R K S I N K U A L A L U M P U R HISTORY OF K UALA LUMPUR , HISTORY OF T I T I W A N G S A L A K E G A R D E N T I T I W A N G S A L A K E G A R D E N KEPONG METROPOLITAN PARK PUTERI LAKE PARK AMPANG PARK TITIWANGSA LAKE GARDEN H I S T O R Y O F Established on 1st February 1980 by Allahyarham Tun Hussein Onn Designed by Rio Takashi, Japanese Landscape Architect Upgraded on 2019-additional of new and modern facilities Natural area : former mine pond Total Area: 95 hectares Lake Area: 57 hectares NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 5.
    3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T KEYPLAN, SITEPLAN , LOCATION PLAN, SITE B OUN DARY N SETBAC KS 01 A N A L Y S I S The proposed site bring a few potential to derive into a strategic urban setup with located at the commercial area that has been surrounded with the residential, recreational and public services building. With some proper improvement of social and community formation, this location could have a huge potential to be one of smart urban place. S Y N T H E S I S Interaction between community and spaces could be lead by the proper planning of the street zone in order to give an introduction vibe especially for the center area of section 14 where there is a focal point for community to get a quality social life. Some urban intervention and proposal will be located and 6 places that has been a linkage of path from another section and zone to our proposed site and zone which is a commercial and services zone. R E S I D E N T I A L NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 H E A L T H C A R E C O M M U N I T Y E D U C A T I O N . C O M M E R C I A L S E R V I C E / U T I L I T Y O F F I C E LEGENDS
  • 6.
    3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T KEYPLAN, SITEPLAN , LOCATION PLAN, SITE B OUN DARY N SETBAC KS 01 SITE & REGULATORY 1. ZONING AND LAND USE Site is zoned under Commercial use. 2. HORIZONTAL CONTROL Total site area Max. Plinth (60%) : 6174.41 sqm/1.52 acres : 3704.64 sqm Area within setback : 1550.00 sqm Greenbelt (10%) : 617.44 sqm Non -Residential Development Plinth area is allowed up to 60% 3. VERTICAL CONTROL Plot ratio : 1 : 6 : 3 GFA project (max) : ............ Height limit project : 5 storeys 4. PARKING BAYS Car Parking - GFA / 46.4 sqm + 20% : .......... Motorcycle Parking - GFA / 89 sqm Handicap car parking - 2% : .......... : .......... NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 7.
    3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T SI TE REG ULATO RY (SPACE REQ UI REM ENT) NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 01
  • 8.
    3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T SI TE REG ULATO RY (SPACE REQ UI REM ENT) 01 2% of total GFA = ...sqm Subjected to local needs. Separated restroom for gents and ladies and complete with: • Shower/ • Changing room/ • Nursing room/ • Diaper changing room/ • OKU toilet Provided a proper lay-by. Placed outside the commercial complex or at the roadside of the main/secondary road. Well-planned walkway with consideration of the connectivity between components in the commercial area. Separated from the main area. Suitable to be placed at the rear part of the building. Provided at a place suitable for the fire fighter access according to the Jabatan Bomba dan Penyelamat requirement. Food Court Taxi/Bus stop NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 Pedestrian Walkway Fire hydrants and extinguishers Loading Bay Restroom
  • 9.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T SITE SEC TION WITH CON TEXT , DRONE VIEW , SKYLIN E Source : https://www.dbkl.gov.my/klmycity2040 PROPOSED SITE Y Y PROPOSED SITE JALAN TEMBELING JALAN BESERAH ADMINISTRATIONOFFICE OF ISTANA BUDAYA BUILDING HEIGHT RECOMMENDATION (5 STOREY) ISTANABUDAYA ADMINISTRATION OFFICE OF ISTANABUDAYA BUILDING HEIGHT RECOMMENDATION (5 STOREY) ASRAMA 1 MALAYSIA TITIWANGSASTADIUM X X SECTION Y-Y SECTION X-X NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 10.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 S I T E A N D C O N T E X T SITE SEC TION WITH CON TEXT, DRONE VIEW , SKYLIN E N O R T H V I E W S O U T H V I E W NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 E A S T V I E W W E S T V I E W
  • 11.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 C U L T U RA L S T U D IE S T HEME : KUALA LU MPU R A HEALTHY & VIB RAN T CITY WELL LOVED PLACES HEALTHY AND VIBRANT VIABILITY GROWTH ANALYSIS SYNTHESIS Titiwangsa Lake Garden with any organism that is Increase more spaces of active and creative to attract “pulsing with life,” the strength and health of the flow of people know more the identity and the place culture. people is paramount to establishing the vibrancy of a city. Titiwangsa Lake Garden is open, inclusive and Create more functional facilities of space and make it as welcoming places with a wide variety of vibes. People are multipurpose kind of space. drawn (and will come back) to places that make them feel safe and welcome. NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 NORTH VIEW SOUTH VIEW
  • 12.
    01 NUR QARIRAH BINTIJASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 3RD YEAR 2ND SEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 C U L T U RA L S T U D I E S TH EME : KUALA LU MPUR A HEALTHY & VIB RAN T CITY ANALYSIS SYNTHESIS Titiwangsa Lake Garden with any organism that is “pulsing with life,” the strength and health of the flow of people is paramount to establishing the vibrancy of a city. Increase more spaces of active and creative to attract people know more the identity and the place culture. Titiwangsa Lake Garden is open, inclusive and welcoming places with a wide variety of vibes. People are drawn (and will come back) to places that make them feel safe and welcome. Create more functional facilities of space and make it as multipurpose kind of space. HEALTHY AND VIBRANT WELL LOVED PLACES VIABILITY GROWTH
  • 13.
    01 NUR QARIRAH BINTIJASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 3RD YEAR 2ND SEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 C U L T U RA L S T U D I E S LEISU RE ATTRACTIONS pinterest.com 0.45 km (6 min) 0.9 km (3 min) National Art Gallery Titiwangsa Splash Park nst.com.my 2.1 km (5 min) 1.2 km (14 min) Saloma Bridge P. Ramlee Memorial House 3.8 km (47 min) 4.5 km (10 min) 3.3 km (41 min) 6.2 km (11 min) top-rated.online malaysianflavours.com
  • 14.
    01 NUR QARIRAH BINTIJASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 15.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 01
  • 16.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 01
  • 17.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 01
  • 18.
    01 3RD YEAR 2NDSEMESTER 2020/2021 W.P KUALA LU MPUR , 2020, TOTAL POPU LATION(‘000 ): 1773.7 350 300 250 200 150 100 50 0 0-9 10.-14 15-24 25-34 35-44 45-54 55 and above AGES AGES 63% 23% 6% 8% ARC3015 ARCHITECTURAL STUDIO 5 C U L T U RA L S T U D I E S ETHNIC GROUP bumiputera chinese indians non-Malaysian citizens 51% 49% GENDER Male Female ANALYSIS Source: Department of Statistics,Malaysia NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 Kuala Lumpur inhabited by more than half bumiputera ethnic in the latest year 2020. While the least of ethnic in Kuala Lumpur are Indians. Kuala Lumpur number of populations in 2020 were more in the ages of 25 years old to 44 years old. However, the number populations of senior citizens also higher than baby and children.
  • 19.
    01 3RD YEAR 2NDSEMESTER 2020/2021 ARC3015 ARCHITECTURAL STUDIO 5 C U L T U RA L S T U D I E S SU R VEY TAK EN FROM RESPONDENTS FR OM TH E SITE 17% 50% 25% 8% How often did you come to Titiwangsa Lake Garden? Every Day Every Week Monthly 1-5 times a year 25% 33% 17% 8% 17% What activities that you enjoy when come to Titiwangsa Lake Garden? Picnic Sport/jogging Cyling/Rollerblading Outdoor Shooting Boating/Fishing 25% 42% 33% Do you easily get parking area/spot when visiting Titiwangsa Lake Garden? Easy Intermidiate Hard 25% 75% Had you visit Istana Budaya and Titiwangsa Lake Garden on the same day? Yes No 25% 17% 33% 25% Range of users/visitors at Titiwangsa Lake Garden Children Teenager Adult Senior citizen SYNTHESIS •Design facilities with multipurpose uses that can attract every layer of ages to visit Ttitiwangsa Lake Garden •Increase more parking spot •Create some connectivity between Titiwangsa Lake Garden and Istana Budaya NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428
  • 20.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | MUHAMMAD IRFAN BIN NASRUDIN 197428 01
  • 21.
    ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 01 C U L T U RA L S T U D IE S T HEME : KUALA LU MPU R A HEALTHY & VIB RAN T CITY NUR QARIRAH BINTI JASMI 197145 | FARID AIMAN BIN MAHADI 197223 | NUR FAZLIN BINTI BAHARUDIN 197467 | AIEZAT BIN SULAIMAN 197483 | 01
  • 22.
    T I TI W A N G S A L A K E G A R D E N 05 INGRESS AND ENGRESS MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
  • 23.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 RELATIVE DISTANCE FROM SHAH ALAM 33.6KM FROM PETALING JAYA 22.0KM FROM KEPONG 14.5KM FROM CHERAS 15.0KM PROPOSED SITE
  • 24.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ACCESSIBILITY - CONNECTIVITY KTM LRT Rapid KL Bus monorail MRT S.W.O.T Analysis S Variety of access from different directions W Lack of public transport direct access to site O Enhance pedestrian path to link from nearest node T Uncontrolled traffic during peak hours Duke Jln Tun Razak AKLEH Jalan Kuching
  • 25.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 PRIMARY INTERSECTION LRT STATION S.W.O.T Analysis Synthesis S Traffic congestion during peak hour quite far from site. The primary intersections are quite far from the site. Even less traffic congestion near the site, it hardly to get access for public transport and far if by walking. Hence, dedicated bus lane can be proposed and uses during peak hour. W Few excess to the primary road. O Planning for dedicated bus lane. T Limited lane for other vehicles. LEGEND LEGEND Primary road Secondary road Tertiary road UTC SENTUL 1.0 KM INSTITUT JANTUNG NEGARA 3 By car By walking NATIONAL ART GALLERY 4 0.5 KM 2 1
  • 26.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 RELATIVE DISTANCE
  • 27.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ACCESSIBILITY | NODES S.W.O.T Analysis S There are various nodes from different direction and different transportations for both macro and micro W Relatively inadequate of nodes at the northern east direction of the site. O Future MRT station may gather more crowd to the site. T Pedestrian need to beware of the buses on the way walking to the site
  • 28.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 VEHICHULAR CIRCULATION (PRIMARY SECONDARY & TERTIARY)
  • 29.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 PEDESTRIAN CIRCULATION
  • 30.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 RELATIVE DISTANCE
  • 31.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 PUBLIC TRANSPORT ( TRANSIT ) S.W.O.T Analysis S Surrounded by transit stations.Easy access to the site. W The transit stations are quite far from the site (walking distance) O Pedestrian bridge can be built to link site to the stations T Need maintenance fee for the pedestrian bridge
  • 32.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 PUBLIC TRANSPORT ( BUS ) BUS STOP DISTANCE FROM SITE & TIME TAKEN E KL694 Sjkc Ciao Nan 1.8km (21mins) F KL650 SMK B.Baru Sentul 1.9km (22mins) G KL651 Pangsuri SrI Perak 1.9km (22mins) H KL1515 Menara Orchid UTC Sentul 2.6km (31mins) BUS STOP DISTANCE FROM SITE & TIME TAKEN A Shell 1.3 km (16mins) B KL670 Titiwangsa 1.5km (17 mins) C KL693 Titiwangsa 1.4km (15mins) D KL669 Sjkc Ciao Nan 1.1km (13mins) BUS STOP DISTANCE FROM SITE & TIME TAKEN I KL648 LRT Sentul Timur 2.6km (31mins) J KL1591 Perumahan Sri N.S 2.3km (28mins) K KL2063 SPG Datuk Seru 3.7km (45mins) L KL2053 BHP Sentul 3.6km (44mins) M KL643 Masjid Al- Hidayah Sentul 3.4km (42mins) N KL617 Sk Sentul 2 3.6km (44mins) O KL607 Sentul West 3.3km (40mins) BUS STOP DISTANCE FROM SITE & TIME TAKEN P KL608 Hotel Tropicana 3.3km (40mins) Q KL609 Sri Thandayuth apani 2.9km (36mins) R KL579 Sri Thandayuth apani 3.3km (40mins) S KL578 Sri Dhanayutha puma 2.9km (36mins) T KL1837 Istana Budaya 1.2km (15mins) U KL273 Padang HKL 2.6km (32mins) V KL1633 P.Darah Negara 1.3km (15mins) S.W.O.T Analysis S There is a lot of bus stop nearby to access to site W Visitors need to walk a least 15mins (the nearest) to the site O Enhance the transportation system to ease the public transport user. T The road is quite narrow for the bus to pass through smoothly.
  • 33.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ALERNATIVE TRANSPORT ( TAXI & BICYCLE ) Taxi waiting at the T junction near Jalan Maran A gazebo built for passenger to shade while waiting for taxi Well planned bicycle track within the park Few stalls renting bicycle at the entrance of the park BICYCLE TAXI S.W.O.T Analysis S • Well-planned bicycle track within park • Can easily get taxi services outside the park W • No proper biocycle track outside the park • No proper taxi stops O • Design proper bicycle track outside the park • Provide formal taxi stops T Quite dangerous for those who walk by the roadside
  • 34.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ACCESIBILITY - PARKING S.W.O.T Analysis Synthesis S The numbers of public and private parking are balance and scattered within walkable distance from site. Proposed parking strategies such as parklets, curb bulbs. W Lack existing parking spaces near to proposed site, where a proposed egress is located. O Encourage consumers and visitors to practice carpooling to reduce the congestion on road during peak hours. T Visitors might engage in illegal parking to walk a short distance to visit the proposed site briefly.
  • 35.
    05 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 URBAN INTERVENTION • Design streets for people such as sidewalks and bicycle lane in Jalan Beserah. ➢ Create new roads and connection to make for more easy path to the site ➢ create connected network which allows cars and buses to enter the site. ➢ Proposed new parking strategies and redesign existing parking facilities . • Accomodate public transport near site. • Deal with parking creatively Issues • Not enough sidewalks for pedestrians in the walkability radius of the proposed site. • Lack of public transport direct access to site • Lack existing parking spaces near to proposed site. Proposed solution ➢ The rain trees around the site will act as a canopy to shade the area ➢ Provide rumble strips to slow down the traffic at Jln Berserah.
  • 36.
    T I TI W A N G S A L A K E G A R D E N 06 VEGETATION MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
  • 37.
    06 LANDSCAPE MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 38.
    06 LANDSCAPE MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 39.
    06 SITE SECTION MOHAMAD FARIZBIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 S.W.O.T Analysis Synthesis S • Provides good shading around the site. • The trees surrounding the site creates barrier . • The landscape diversity need to be maintained but needs to remove certain trees in order to create more than one entrance/exit for the site. W • Too much trees surrounding the site creating a wall with no real entrance or exit. O • The large area in the site gives variety of options for plants placement. T • Many uncontrolled bushes in the site which can attract dangerous animals.
  • 40.
    06 HEIGTH OF TREES MOHAMADFARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 41.
    06 MOHAMAD FARIZ BINSAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 GREENERY AREA, OPEN SPACE AND PARK
  • 42.
    T I TI W A N G S A L A K E G A R D E N Presented by : MOHAMAD FARIZ BIN SAMUDIN 196272 | YOGENDRAN A/L PARTHIBAN 196402 | LIM MEI XIN 196616 | OOI CHIU MIN 197151 | KHOR MING SYUAN 197259
  • 43.
    T I TI W A N G S A L A K E G A R D E N 04 SITE ZONING CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
  • 44.
    04 SITE ZONING CHRISTINE GOHWUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 45.
    04 SITE ZONING CHRISTINE GOHWUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 46.
    04 SITE ZONING |MACRO CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 WAT MEH LIEW TEMPLE HKL UKM KAMPUS KUALA LUMPUR NATIONAL BLOOD CENTRE TITIWANGSA GOLF COURSE RESTORAN D’SAJI UNIT BERKUDA DBKL NATIONAL HEART INSTITUTE SWOT ANALYSIS STRENGTH WEAKNESS OPPORTUNITY THREAT Walking distance from nearby government and commercial building in 200m distance It will be pack on weekend with visitors of all ages doing their activities. Surrounded by buildings that attract locals and foreigners Jalan Kuantan (main road) will be busy at all time. 1KM 11MIN 2KM 22MIN 1.5KM 18MIN 2.5KM 29MIN 1.7KM 18MIN 850M 10MIN 850M 10MIN 2.3KM 28MIN
  • 47.
    04 SITE ZONING |MICRO ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 1.0KM SK. KUANTAN 2 ISTANA BUDAYA STUDIO GRAPHIC SENI REKA ISTANA BUDAYA STADIUM TITIWANGSA SMK. SERI TITIWANGSA CURRICULUM CENTER DOPLOHTIGO NATIONAL ART GALLERY TAMAN TASIK TITIWANGSA APS GALLERY CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 400M 5MIN 260M 3MIN 180M 2MIN 700M 9MIN 550M 6MIN 290M 3MIN 1KM 10MIN 750M 9MIN 850M 10MIN 450M 6MIN
  • 48.
    04 SITE ZONING |ANALYSIS & SYNTHESIS CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 • Sport facilities  Students activating the area with sports games and other activities at night. • Park vendors  Scattered around the lake. • Districts typology  Classifying the districts by typology. • Further enhance existing nightlife as well make use of the nightlife to bring people into our buildings, which is to the micro site. • Bring vendors into proposed building to carry out their services in proper manner. • Site can be interconnected with Istana Budaya as well as food and hangout centre to establish integrated cultural community within the site .Engaging the masses, people from different zones comes together to form a community in titiwangsa park. ANALYSIS SYNTHESIS
  • 49.
    04 ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 OPTION A OPTION B Give a sense of surprise once enter the building • Can give a better view with linear arrangement along the circulation. PRO’S • Can maximise the full view lake along the building structure. • The services is near the main entrance CON’S • The propose building will block a part of lake view • Proposed a buffer zone at the entrance to cover services area (vegetation) SYNTHESIS • Able to have a double front façade to attract the visitors P2 S P - PARKING - Y. CENTER S - SERVICE AREA The side parking along building give a sense of discovery for visitor Eng. Ing. Ing. Eng. PROPOSED POTENTIAL LOCATION P S P2 P2 P
  • 50.
    04 ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 OPTION C OPTION D Can provoke the visitors with a glimpse of view. • Secure the safety with the same entrance and exit PRO’S • A proper composition and layout in the site • Not a pedestrian friendly road CON’S • First glimpse to rear view of the building • Provide a zebra cross-walk SYNTHESIS • Proposed bold and catchy skim façade to attract visitors. P2 S P - PARKING - Y. CENTER S - SERVICE AREA Parking at the front will attract the visitor towards P2 Ing. Eng. PROPOSED POTENTIAL LOCATION P S P2 P2 P Eng. & Ing.
  • 51.
    T I TI W A N G S A L A K E G A R D E N 09 ENVIRONMENTAL STUDIES CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
  • 52.
    09 CLIMATE DATA CHRISTINE GOHWUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 HOURS OF SUNLIGHT MAX : June 1st, 12 hr 18 min MIN : December 21st, 11 hr 57 min TEMPERATURE MAX : 91 Farenheit MIN : 73 Farenheit RAINFALL MAX : November 14th, 10.7 Inches MIN : June 25th, 4.4 Inches CLOUD COVER MAX : Mostly Cloudy, 91% MIN : Partly Cloudy, 9% PRECIPITATION MAX : November 14th, 63% MIN : June 20th, 31% SUNRISE EARLIEST : October 29th, 6:56 A.M LATEST : February 6th, 7:27 A.M SUNSET EARLIEST : November 8th, 6:56 P.M LATEST : February 18th, 7:27 P.M HUMIDITY Does not vary significantly throughout the year from muggy, oppressive to miserable Datas of climate were retrieved from www.weather-my.com
  • 53.
    09 CLIMATE | SHADOWORIENTATION CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 JUNE SOLSTICE DECEMBER SOLSTICE 09:00 A.M 12:00 P.M 04:00 P.M STRENGTH WEAKNESS THREAT OPPORTUNITY • Normal level of wind speed suitable for user’s comfort • The amount of greeneries in the surrounding offer sense of calmness to users NGTH • High temperature during the day • High temperature and high humidity can increase number of green design and achieve higher Green Building Index (GBI) • Open space for natural light • Weather can be very hot due to being situated in a city • Air pollution can come from the main road
  • 54.
    09 CLIMATE | ANALYSISAND SYNTHESIS CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 • West-facing walls receive the strongest Sun at the hottest part of the day. • Excessive Solar radiation can result in glare and overheating that leads to discomfort • Utilizing sun shading such as, louvers, vegetation, overhanging eaves or balconies, solar control glazing, curtains and blinds • Face South or North to gain less Solar heat • Alternative: Face East. Absorb only morning Sun • According to wind rose diagram, the East, West and South side have higher chances to receive the highest wind breeze throughout the year • Building should be design to have open space facing the East, West & South, allowing wind breeze to flow through & circulate into the building for better ventilation NORTH Morning & Afternoon No direct Sunlight WEST Morning No direct Sunlight Afternoon Receive Sunlight SOUTH Morning & Afternoon No direct Sunlight EAST Morning Direct Sunlight Afternoon Receive Sunlight ANALYSIS ANALYSIS SYNTHESIS SYNTHESIS SUN DIRECTION JAN CLIMATE ANALYSIS TIMELINE FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC SUNNY SEASON The sky is clear, mostly clear or partly cloudy 26% of the time WARMER TEMPERATURE CLOUDY SEASON COOLER TEMPERATURE The sky is overcast or mostly cloudy 91% of the time, clear, mostly clear or partly cloudy 9% of the time
  • 55.
    T I TI W A N G S A L A K E G A R D E N 03 SENSORY CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
  • 56.
    03 SENSORY CHRISTINE GOH WUNJUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021
  • 61.
    T I TI W A N G S A L A K E G A R D E N Presented by : CHRISTINE GOH WUN JUN 196133 | NAYLI NAJWA BINTI MOHMAD YUSRI 196753 | NURFARAH HANIM BT MUHAMAD FADZIL 196895 | CALVEE ORNEE JUSTIN 197135 | SOFEA NAJIHAH BINTI SHUHAIMI 196652
  • 62.
    T I TI W A N G S A L A K E G A R D E N 7 TOPOGRAPHY SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
  • 63.
    7 TOPOGRAPHY ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 MAIN ROAD PROPOSED SITE LAKE PARK MAIN ROAD ISTANA BUDAYA FROM SEA LEVEL Topographic Map (resource : https://en-gb.topographic-map.com) Y Y X X PROPOSED SITE KEY PLAN (scale n.t.s.) SECTION X-X (scale n.t.s.)
  • 64.
    8 UTILITIES SYAMSUL DANIALANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 T I T I W A N G S A L A K E G A R D E N
  • 65.
    8 UTILITIES SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ELECTRICAL SUPPLY Site Area Feeder Pillar TNB Substation Feeder pillar is to distribute electrical energy TNB Substation functioning as an electrical controlling point
  • 66.
    8 UTILITIES SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 WATER SUPPLY Site Area Water Supply Pipe Fire Hydrant Water supply managed by Syarikat Air Selangor (SYABAS) Water pipe for water supply
  • 67.
    8 UTILITIES SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 TELECOMMUNICATION SUPPLY Site Area TM Point TM Distribution Point TM Berhad Distribution point as a jumper for incoming outcalling line Fixed line telecom provided by Telekom Malaysia Berhad
  • 68.
    8 UTILITIES SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 DRAINAGE & SEWERAGE SYSTEM Site Area Drainage Route Sewerage Route Manhole Drainage route is connected to Sg. Bunus & Sg. Klang Sewerage system managed by Indah Water Konsortium, Bunus, KL
  • 69.
    8 UTILITIES SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 PROPOSED UTILITY Double chamber substation stand-alone Proposed Existing Fire Prevention System Sprinkler with riser system Hose Reel with riser system Suggested to have a toilet on north side (Jalan Tembeling) since the existing sewer pipe located at that side Underground sewerage carried sanitary wastewater Underground storm drain tunnel that carried storm water from catch basin Water pipe for water supply Fire hydrant belong to Studio Senireka Grafik Istana Budaya
  • 70.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 T I T I W A N G S A L A K E G A R D E N
  • 71.
    PROPOSED SITE 10 SUBURBAN FEATURES,CHARACTERISTIC AND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 SUBURBAN FEATURES EXISTING BUILDING Stadium Titiwangsa National Art Gallery Bangunan Pentadbiran Istana Budaya Istana Budaya M SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 Radius 500 m Facilities: - Tennis - Table tennis - Gymnasium - Squash - Basketball Sports CentreTitiwangsa
  • 72.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ARCHITECTURAL PATTERNS ISTANA BUDAYA “Palace of Culture” Built; 1995 (Architect Muhammad Kamar Ya’akub) inspiration of moon kite. BANGUNAN PENTADBIRAN ISTANA BUDAYA • Ornaments used are similar to Malay traditional house Sirih Junjung inspired roof shape (traditional arrangement or a present made of betel leaves used during Malay weddings). Serambi, rumah ibu, rumah dapur layout. Building design is based on the Malay headgear of ‘tengkolok’ which is a symbol of intellectual pride and respect in Malay culture This building act as administrative unit to Istana Budaya. It manage all the cultural arts activities and arts activities like dance and traditional music. SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
  • 73.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 ARCHITECTURAL PATTERNS NATIONAL ART GALLERY STADIUM TITIWANGSA • Architectural style of this building similar to Istana Budaya, it is a blend of slate, tinted glass and clean modern lines with traditional Malay design prominent in the form of a light blue origami-style metallic roof. • Roof shape similar with others building to represent Malay Treditional house and bring it on modern building • This building used traditional idea for design and combined with modern activities inside building • The stadium Tititwangsa is an indoor arena while t h e a d j a c e n t s p o r t s complex has facilities for squash, tennis, table tennis and basketball. SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
  • 74.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 OFF- SITE FEATURES Tactile pavement Concrete stamping Asphalt pavement Walkway & bicycle pavement Concrete pavement Concrete stamping 1) PAVEMENT SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 Radius 500m
  • 75.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 OFF- SITE FEATURES 2) URBAN FURNITURE / PUBLIC SEATING SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 PROPOSED SITE Radius 500m
  • 76.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 OFF- SITE FEATURES 3) INFRASTRUCTURES Public toilet On west side of lake Bus stop Infront of school Astaka On east side of lake Taxi stop In front of school Surau On west side of lake Waterpark Playground Gazebo Bus stop At west of Istana Budaya SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 Radius 1KM PROPOSED SITE
  • 77.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 OFF- SITE FEATURES 4) BARRIER, LAMP POST AND WAY-FINDING Barrier Lamp Post Way-finding SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 Radius 1KM PROPOSED SITE
  • 78.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 OFF- SITE FEATURES 5) EXISTING PUBLIC PARKING / PRIVATE PARKING SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 PROPOSED SITE Existing Parking -Near food court (58 bays) Non-parking zone -Near entrance to Istana Budaya Radius 500m Private Parking -Near to Bangunan Pentadbiran Istana Budaya (40 bays) Non-parking zone -Near entrance to Taman Tasik Titiwangsa
  • 79.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 FACILITIES Education • SMK Seri Titiwangsa • SMK Puteri Titiwangsa • SJK(T) Jalan Fletcher • SMK Seberang Temerloh • SK Jalan Kuantan 2 • Pusat Perkembangan Pendidikan UKM Hotel • Bunker Hotel & Restaurant • Rizcarton Capsule Hotel • Le Ruiz Boutique Hotel • Hotel Putra Kuala Lumpur Medical Centre • Kuala Lumpur Hospital • National Heart Institute • Respiratory Medicine Institute • KPJ Tawakkal KL Specialist Hospital Restaurant • Sany Char Koay Teow • Cafe Istana Budaya • Titiwangsa Wang Kopitiam • Starbucks • McDonald Titiwangsa DT Gas Station • Petronas Jalan Tun Razak • Shell Titiwangsa Jalan Tun Razak • BH-Petrol Jalan Pahang • Petron Jalan Pahang Police Department • Ibu Pejabat Polis Daerah Sentul • Balai Polis Komuniti Putra Fire Rescue Department • Titiwangsa Fire and Rescue Station • Sentul Fire and Rescue Station Mosque/Surau Temple • Surau Taman Tasik Titiwangsa • Masjid Amru Ibni Al'-As Sentul • Masjid Jalan Pahang • Kuil Sri Thirumurugam • Wat Meh Liew Thai Buddist Temple Bus Stop Radius 1km
  • 80.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 URBAN INTERVENTION 1) Pavement 2) Pedestrian walkway • Differentiate routes according to appropriate functions vehicle and bicycle – walkway along Jalan Tembeling • To provide safety respond for some areas near the site • Giving visitors the opportunity to see the culture around the site. SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 • Kinetic energy pavement - produce electric energy - high tech pavement - due to activity on site • Propose a unique pavement design - can attract along the sidewalk - create a different mood to visitor • Different design and colour for walkway path and cycle path for safety purposes
  • 81.
    10 SUBURBAN FEATURES, CHARACTERISTICAND MANMADE FEATURES ARC3015 ARCHITECTURAL STUDIO 5 3RD YEAR 2ND SEMESTER 2020/2021 URBAN INTERVENTION SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 3) Information Board 4) Entrance Structure / Arch • Provide more reading material through information boards especially for new visitor • Example - History, health info, map, interesting cultural area • Gain knowledge while play sports or exercise at the same time • A great space for visitors to gather before starting to explore our design project on site • Intended as an entryway into the area
  • 82.
    10 ARC3015 ARCHITECTURAL STUDIO5 3RD YEAR 2ND SEMESTER 2020/2021 ARCHITECTURAL PATTERN UTILITIES Defines the locale architecture Existing utilities are functioning well Modern buildings, glass and steel highrises become eyesores Additional utilities required near the site Embrace local architecture with modern designs and materials Provide improved utilities to enhance the surrounding Modern buildings lessens the significance of local landmarks Misplaced utilities - refuse area near entrance is displeasing SYNTHESIS Future development should consider surrounding landmarks so not to tarnish its influence Proper planning of utilities such as drainange system to avoid stagnant water, and relocation of current utilities S W O T OFF-SITE FEATURES • No pedestrian pathing at jalan tembeling (one way road) • Car parks on one way road makes it narrow, dangerous for pedestrians • Abundance of signage, but very few on information and location, really hard to locate entrances SOLUTIONS • Consider to provide proper pedestrian pathing along Jalan Tembeling providing proper and easy access • Provide a dedicated parking area near the park, a multi-storey parking recommended I S S U E S SWOT ANALYSIS & SYNTHESIS SYAMSUL DANIAL ANIQ BIN SHAMSUL HAZRI 195971 | NURUL NUR FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786
  • 83.
    SYAMSUL DANIAL ANIQBIN SHAMSUL HAZRI 195971 | NURUL FARHANA BINTI ROSLAN 196911 | KHAIRUN NAJMI BIN JASNI 196115 | AHMAD LUTFI BIN AMRAN 196815 | NURATHIRAH BINTI MAZWIN 197786 T I T I W A N G S A L A K E G A R D E N Presented by :
  • 84.
    T I TI W A N G S A L A K E G A R D E N Presented by :