EXECUTIVE SUMMARY
Objective
The objective of this design is to support first of its kind human colonies in Mars until a
more permanent infrastructure will be built. Also build a messaging and collaboration
infrastructure on top of it for developing a warning system to give a more human touch to
residents in Mars.
Goals
Solution should be reliable, fits into smaller space and requires less cooling as these things
comes at a premium in Mars. Downtime should be negligible, as human lives are involved.
Solution
With the above goals in mind, the solution has been designed around the following key
elements:
All supporting key elements must be highly available within same enclosure to keep space
utilization to bare minimum.
 The physical and application infrastructure must be redundant with no single point
of failure as pods can sustain up to 20 min. with available oxygen.
 The application/messaging/collaboration framework must be able to warn living
beings when mechanical components are failing or have failed.
The physical infrastructure has been kept simple, and relies heavily on hyper converged
Infrastructure (HCI) systems. It is easy to rack, stack, and patch this design. The Nutanix
virtual computing platform was chosen as the scalable compute and storage systems, this
solution requires 90% lesser space compared to conventional server/storage
infrastructure. NX-6000 has been chosen for this task as it targets apps with heavy storage
requirements with 3x more storage capacity.
The virtualization infrastructure will be based on the VMWare vSphere, and will include a
highly available management cluster. The virtual servers supporting the Environmental
Support/Green House Control and messaging application will reside on a separate cluster
of nodes managed by VMware vSphere. We also kept future growth in our mind while
designing infra for deployment of any unknown business critical application.
PHYSICAL DESIGN
Overview
Virtual Design Master-Challenge 1
Harshvardhan Gupta
There will be three Data center in Mars, all are connected with 40 GBE leaf and spine
network.
The infrastructure and application design for these Human Colonies have been configured
in a highly available manner. It is the goal of this design to eliminate any potential single
points of failure, such that it is able to support the mission critical life sustaining
workloads.
The physical design of the infrastructure has been kept very low profile, so that resources
can be best utilized and kept operating with lower running cost.
Infrastructure
As noted earlier, the physical infrastructure follow KISS philosophy, and relies heavily on
HCI due to its easy implementation.
The physical node will reside in two separate racks (Half-height 21U) in each DC, supplied
by two redundant power sources. The configuration of both racks will closely resemble
one another, and will be used to provide physical separation of the key components in
support of a highly available architecture.
The racks will be interconnected via the 10 GBE switch (leaf and spine fashion), and each
rack will contain the required network equipment to provide Intranet.
The Cisco Nexus 5548UP was chosen as the top-of-rack switch, which provides ample
bandwidth and ports for the infrastructure, along with future expansion.
The Nutanix NX-6000 virtual computing platform was chosen as the scalable compute and
storage systems. Each of these systems contains four nodes, one of which will be used for
the management framework, and the balance to be used for the application framework.
The base configuration will utilize one NX-6000 in each rack, with plenty of room for
future growth.
Risks
There is an inherent risk, if one DC was destroyed due to natural calamity (Heavy
wind/storms), the mission critical application would be shifted by manual intervention,
even if the mechanical components was still available.
Assumptions
Virtual Design Master-Challenge 1
Harshvardhan Gupta
It is assumed that the human beings living in colonies situated in Mars, can handle or
operate a web based application i.e. Prism central UI for day-to-day task. In addition, there
is enough physical space, power and cooling capacity available to scale the physical
equipment if required although they come at a premium. DC’s will be situated in close
vicinity and have a subway underneath connecting colonies with each other.
Figure 1 - Physical Rack Layout
Figure 2 - High-Level Overview of Virtualization
Virtual Design Master-Challenge 1
Harshvardhan Gupta
LOGICAL DESIGN
Overview
The principle for this design is based on High Availability and Web Scale. The purpose of
this is to protect the critical components (i.e. environmental application workload and
data) at the human colonies, and ensure that the infrastructure can scale out quickly and
efficiently without fuzz, thanks to Nutanix inherent state-of the art technology.
The virtualization infrastructure will be based on the VMWare vSphere, and will include a
highly available management cluster. The virtual servers supporting the Environmental
Support/Green House Control/Unknown application will reside on a separate cluster of
nodes managed by VMware vSphere.
Network
Three DC’s will be connected by 40 GBE link and will utilize leaf and spine model, the links
will be redundant and will provide intranet for operating the DC’s under and extended
layer 2 domain.
Figure 2- High-Level Inter-DC Network Layout
Virtual Design Master-Challenge 1
Harshvardhan Gupta
Virtual Design Master-Challenge 1
Harshvardhan Gupta
VMware Management Cluster
The management cluster will reside on two physical nodes (Nutanix node 1, and node 5)
and is based on a HA application topology.
The chosen hypervisor version will be ESXi 5.5 U2 for the install, the management
components within the cluster will reside on virtual machines, running on top of the ESXi
hypervisor. The Operating system of choice would be windows 2012 R2 for key
components (like AD/DNS/SSO/vCenter/VUM/Veeam master/proxy etc.)
Application Cluster
The default choice for hypervisor will be ESXi 5.5 U2 for the install on Nutanix node 2-3-4,
and 6-7-8), and will be managed by Management Cluster. The environmental
support/green house application will utilize web scale architecture for high-availability
and distributed components architecture.
Messaging/Collaboration application
Environmental Management systems
Virtual Design Master-Challenge 1
Harshvardhan Gupta
Virtual Design Master-Challenge 1
Harshvardhan Gupta
Storage
The storage utilized by the physical nodes will be presented by the Nutanix HCI system in
the form of NFS shares. The management and application servers will reside on separate
mount points, as well as any additional special configuration required for the highly
available databases.
Virtual Design Master-Challenge 1
Harshvardhan Gupta
Backups
Due to the highly available nature of the architecture, and the ability to restore virtual
servers using Instant VM recovery, it was decided to backup the following components:
- Required images, virtual templates
- Virtual servers
- Application and management databases
To simplify the architecture, save resources and we utilize Veeam backup and recovery 8.
Assumptions
It is assumed that any of the DC’s, may lose connectivity with one or another. In the case of
temporary loss of connectivity, the DC’s will continue to support as they are fully
independent of one another.

#VirtualDesignMaster 3 Challenge 1 - Harshvardhan Gupta

  • 1.
    Virtual Design Master-Challenge1 Harshvardhan Gupta Virtual Design Master Challenge 1 Prepared for: VirtualDesignMaster.com Prepared by: Harshvardhan Gupta July 6, 2015
  • 2.
    Virtual Design Master-Challenge1 Harshvardhan Gupta EXECUTIVE SUMMARY Objective The objective of this design is to support first of its kind human colonies in Mars until a more permanent infrastructure will be built. Also build a messaging and collaboration infrastructure on top of it for developing a warning system to give a more human touch to residents in Mars. Goals Solution should be reliable, fits into smaller space and requires less cooling as these things comes at a premium in Mars. Downtime should be negligible, as human lives are involved. Solution With the above goals in mind, the solution has been designed around the following key elements: All supporting key elements must be highly available within same enclosure to keep space utilization to bare minimum.  The physical and application infrastructure must be redundant with no single point of failure as pods can sustain up to 20 min. with available oxygen.  The application/messaging/collaboration framework must be able to warn living beings when mechanical components are failing or have failed. The physical infrastructure has been kept simple, and relies heavily on hyper converged Infrastructure (HCI) systems. It is easy to rack, stack, and patch this design. The Nutanix virtual computing platform was chosen as the scalable compute and storage systems, this solution requires 90% lesser space compared to conventional server/storage infrastructure. NX-6000 has been chosen for this task as it targets apps with heavy storage requirements with 3x more storage capacity. The virtualization infrastructure will be based on the VMWare vSphere, and will include a highly available management cluster. The virtual servers supporting the Environmental Support/Green House Control and messaging application will reside on a separate cluster of nodes managed by VMware vSphere. We also kept future growth in our mind while designing infra for deployment of any unknown business critical application. PHYSICAL DESIGN Overview
  • 3.
    Virtual Design Master-Challenge1 Harshvardhan Gupta There will be three Data center in Mars, all are connected with 40 GBE leaf and spine network. The infrastructure and application design for these Human Colonies have been configured in a highly available manner. It is the goal of this design to eliminate any potential single points of failure, such that it is able to support the mission critical life sustaining workloads. The physical design of the infrastructure has been kept very low profile, so that resources can be best utilized and kept operating with lower running cost. Infrastructure As noted earlier, the physical infrastructure follow KISS philosophy, and relies heavily on HCI due to its easy implementation. The physical node will reside in two separate racks (Half-height 21U) in each DC, supplied by two redundant power sources. The configuration of both racks will closely resemble one another, and will be used to provide physical separation of the key components in support of a highly available architecture. The racks will be interconnected via the 10 GBE switch (leaf and spine fashion), and each rack will contain the required network equipment to provide Intranet. The Cisco Nexus 5548UP was chosen as the top-of-rack switch, which provides ample bandwidth and ports for the infrastructure, along with future expansion. The Nutanix NX-6000 virtual computing platform was chosen as the scalable compute and storage systems. Each of these systems contains four nodes, one of which will be used for the management framework, and the balance to be used for the application framework. The base configuration will utilize one NX-6000 in each rack, with plenty of room for future growth. Risks There is an inherent risk, if one DC was destroyed due to natural calamity (Heavy wind/storms), the mission critical application would be shifted by manual intervention, even if the mechanical components was still available. Assumptions
  • 4.
    Virtual Design Master-Challenge1 Harshvardhan Gupta It is assumed that the human beings living in colonies situated in Mars, can handle or operate a web based application i.e. Prism central UI for day-to-day task. In addition, there is enough physical space, power and cooling capacity available to scale the physical equipment if required although they come at a premium. DC’s will be situated in close vicinity and have a subway underneath connecting colonies with each other. Figure 1 - Physical Rack Layout Figure 2 - High-Level Overview of Virtualization
  • 5.
    Virtual Design Master-Challenge1 Harshvardhan Gupta LOGICAL DESIGN Overview The principle for this design is based on High Availability and Web Scale. The purpose of this is to protect the critical components (i.e. environmental application workload and data) at the human colonies, and ensure that the infrastructure can scale out quickly and efficiently without fuzz, thanks to Nutanix inherent state-of the art technology. The virtualization infrastructure will be based on the VMWare vSphere, and will include a highly available management cluster. The virtual servers supporting the Environmental Support/Green House Control/Unknown application will reside on a separate cluster of nodes managed by VMware vSphere. Network Three DC’s will be connected by 40 GBE link and will utilize leaf and spine model, the links will be redundant and will provide intranet for operating the DC’s under and extended layer 2 domain. Figure 2- High-Level Inter-DC Network Layout
  • 6.
    Virtual Design Master-Challenge1 Harshvardhan Gupta
  • 7.
    Virtual Design Master-Challenge1 Harshvardhan Gupta VMware Management Cluster The management cluster will reside on two physical nodes (Nutanix node 1, and node 5) and is based on a HA application topology. The chosen hypervisor version will be ESXi 5.5 U2 for the install, the management components within the cluster will reside on virtual machines, running on top of the ESXi hypervisor. The Operating system of choice would be windows 2012 R2 for key components (like AD/DNS/SSO/vCenter/VUM/Veeam master/proxy etc.) Application Cluster The default choice for hypervisor will be ESXi 5.5 U2 for the install on Nutanix node 2-3-4, and 6-7-8), and will be managed by Management Cluster. The environmental support/green house application will utilize web scale architecture for high-availability and distributed components architecture. Messaging/Collaboration application Environmental Management systems
  • 8.
    Virtual Design Master-Challenge1 Harshvardhan Gupta
  • 9.
    Virtual Design Master-Challenge1 Harshvardhan Gupta Storage The storage utilized by the physical nodes will be presented by the Nutanix HCI system in the form of NFS shares. The management and application servers will reside on separate mount points, as well as any additional special configuration required for the highly available databases.
  • 10.
    Virtual Design Master-Challenge1 Harshvardhan Gupta Backups Due to the highly available nature of the architecture, and the ability to restore virtual servers using Instant VM recovery, it was decided to backup the following components: - Required images, virtual templates - Virtual servers - Application and management databases To simplify the architecture, save resources and we utilize Veeam backup and recovery 8. Assumptions It is assumed that any of the DC’s, may lose connectivity with one or another. In the case of temporary loss of connectivity, the DC’s will continue to support as they are fully independent of one another.