P a g e 1 | 4
VIVEK KUMAR
(E) vivekkumarbgs455@gmail.com
(M) +91 9887689153
(M) +91 8867565969
Address: -
S/O Mr. Ranjeet Chaudhary
At-Rasalpur , P.O- Dahiya ,P.S –Bhagwanpur,
Dist- Begusarai , state- Bihar (851120)
CAREER OBJECTIVE
To secure a position where I can efficiently contribute my skills and abilities for the growth of the
organization and build my professional career. To evolve into a profession where with the help
of my hard work and honesty I could help contributing to the success of the organization and at
the same time explore my potential and nourish myself as an individual.
EXPERIENCE
 Certification Engineers International Ltd
As Engineer QA/QC (Mechanical) from 18th Dec 2024 to till Date
 Bonace Engineers Pvt ltd
As Mechanical Engineer -I from 22nd May 2023 to 15th Dec 2024
 Vision India Services Pvt Ltd.
As Jr. Executive form 16th Aug 2022 to 16th May 2023
 Gulf Lloyds Industrial services pvt Ltd
As sr. Inspection Engineer from 01st July 2022 to 12th Aug 2022.
 Phistream Consulting Pvt. Ltd.
As Inspection Engineer from 10th February 2022 to 30th June 2022.
 Likhitha Infrastructure Ltd.
As QA/QC Engineer from 19th July 2021 to 07th Februray 2022
 Tehran Jonoob Technical & Construction Private limited
As site engineer from 26th July 2020 to 25th May 2021.
 AEPL Infrastructure private limited
As site engineer from 02nd March 2020 to 25th July 2020.
 Mideast Pipeline Product
As site engineer from 01st December 2019 to 01st March 2020.
P a g e 2 | 4
CAREER SUMMARY
Around 5 years of cross-cultural experience in QA & QC / Project Management / Project Execution
in Oil & Gas sector for Long distance pipeline Project / City Gas distribution project &
SV/RT/DT/IP/CGS/CNG Stations Construction, Station Piping, Fabrication, Erection, Pipeline
construction, Non-Destructive Testing, Destructive Testing.
JOB ROLE
 Domestic & RLNG Gas Nomination Reconciliation & resolve leakages.
 Verification of Invoices, SES & MES preparation & bill verification
 Monitoring of CNG sales, Stock transfer “In & Out” against rebranding in 18000/18500
ODORANT Consumption Calculation PPAC data Monitoring
 Bare pipe Inspection at plant as per approved QAP/Specification.
 Bare pipe 3LPE coating inspection at plant as per approved QAP/Specification.
 Inspection of Materials, Equipment & Mechanical Construction Activities and accordingly
related Documents Preparation, Quality Progress.
 Reporting of Daily Observation & non-conformance to the Client.
 Preparation of weekly and monthly reports and scheduling look ahead plan and reporting
to client management.
 Inspection and verify calibration Certificate of tools involved in project.
 Witness / review of Job procedures, Inspection Test plan, PQT, WPS, PQR, WQT, EQT,
PMI, Destructive Testing as per respective codes.
 Monitoring & Reporting, Root Cause Analysis of defects, welder Performance, Witnessing
of Destructive Testing and Documents & Data Management.
 Witnessed of NDT (RT, UT, MPT, LPT, VT) and Destructive testing (Tensile, bend test,
Impact, Vickers hardness, Macro/Micro testing, Chemical, All weld test, Nick break test,
diffusible hydrogen test etc.)
 Familiar with all types of Welding Process such as SMAW, GTAW, FCAW, GMAW,
SAW.
 Familiar with construction drawings such as P&ID, Piping isometrics, Equipment,
Structural, GAD, Alignment Sheet.
 Familiar with PNGRB guidelines, T4S, ASME B31.3, ASME B31.1, ASME SEC- IX,
API 5L, API 1104, ASME 31.8, ASTM A370, ASME SEC-II PART-C, ASME SEC-VIII,
ASME SEC-V and client specification.
 Witness/Review of activities reports such as Line history sheet, pipe book, IMIR, material
reconciliation, As-built drawing, Alignment sheet.
P a g e 3 | 4
 Inspection and certification of activities like Station Piping fabrication & Erection, fit-up,
welding, NDT, RT film interpretation, hydrostatic test, cardboard blasting, Pneumatic Test,
Leak & Valve Functional/Passing check, venting, Drying, Metering skid Installation,
Stud/Bolt Torqueing, surface preparation, painting, piping supports, shut down, Hot
Tapping, Pre & Final commissioning, as per approved procedure, relevant code, standards
& isometric drawing / GAD Drawing.
 Inspection and certification of activities like pipeline construction, Stringing, Mainline
welding, RT film interpretation, NDT, Field Joint Coating, Trenching, Lowering, Cold
field Bending, Tie-In welding, HDD / Cased crossing, Bentonite Filling, Backfilling,
Cleaning & Gauging, EGP, Pre & Post Hydro test, Mainline hydrostatic Test, Golden Joint,
Cathodic protection, Dewatering, swabbing, Nitrogen purging, Pre & Final
commissioning, Gas-in, Shutdown, Review As Built Drawing.
SKILL
 Third party Inspection
 Welding Inspection (SMAW/GTAW/ FCAW/GMAW/SAW)
 Non-Destructive Testing(RT/UT/LPT/MPT/VT)
 Destructive Testing
 QAP, MTC, EQT, WPS, WQT, PQR
 Review IFC, GAD, Isometric Drawing, AS-BUILT Drawing.
 Cross-Country, City Gas Distribution, Station Piping.
PROFESSIONAL QUALIFICATION
 B. TECH from Arya Institute of Engineering & Technology in Mechanical Engineering
(2019) with aggregate 65.4% marks.
 12th from S.S.M.C.D College (2015) with aggregate of 60% marks.
 10th from Vikas Vidyalaya (2013) with aggregate of 8.0 CGPA.
INTERNSHIP UNDERTAKEN
Completed internship from “Indian Oil-Adani Gas Pvt. Ltd.” On project of “Pipe Line Natural
Gas”(PNG) of “City Gas Distribution Project”(CGDP).
P a g e 4 | 4
CERTIFICATION
 Non Distractive Testing level II in Ultrasonic test
 Non Distractive Testing level II in Radiography Test
 Non Distractive Testing level II in Liquid Penetrate Test
 Non Distractive Testing level II in Magnetic Particle Test
 Non Distractive Testing level II in Visual Test
TECHNICAL SKILLS
 SAP MODULES
 AutoCAD
 Solid Work,
 Ansys
PROJECT UNDERTAKEN
A Project on “Turbo Jet Engine ” which is design by the uses of turbo-charger. It works on
“Brayton Cycle” (open loop) and using “Liquefied Petroleum Gas” as working fuel.
PERSONAL DETAILS
 Date of Birth : 4th, May 1998
• Father’s name : Mr. Ranjeet Chaudhary
• Mother’s name : Mrs. Asha Devi
• Languages known : English, Hindi, Maithili.
DECLARATION
I hereby declare that the above-mentioned information is correct up to my knowledge and
I bear the responsibility for the correctness of the above-mentioned particulars.
Vivek kumar

vivek-c.v.pdf .

  • 1.
    P a ge 1 | 4 VIVEK KUMAR (E) [email protected] (M) +91 9887689153 (M) +91 8867565969 Address: - S/O Mr. Ranjeet Chaudhary At-Rasalpur , P.O- Dahiya ,P.S –Bhagwanpur, Dist- Begusarai , state- Bihar (851120) CAREER OBJECTIVE To secure a position where I can efficiently contribute my skills and abilities for the growth of the organization and build my professional career. To evolve into a profession where with the help of my hard work and honesty I could help contributing to the success of the organization and at the same time explore my potential and nourish myself as an individual. EXPERIENCE  Certification Engineers International Ltd As Engineer QA/QC (Mechanical) from 18th Dec 2024 to till Date  Bonace Engineers Pvt ltd As Mechanical Engineer -I from 22nd May 2023 to 15th Dec 2024  Vision India Services Pvt Ltd. As Jr. Executive form 16th Aug 2022 to 16th May 2023  Gulf Lloyds Industrial services pvt Ltd As sr. Inspection Engineer from 01st July 2022 to 12th Aug 2022.  Phistream Consulting Pvt. Ltd. As Inspection Engineer from 10th February 2022 to 30th June 2022.  Likhitha Infrastructure Ltd. As QA/QC Engineer from 19th July 2021 to 07th Februray 2022  Tehran Jonoob Technical & Construction Private limited As site engineer from 26th July 2020 to 25th May 2021.  AEPL Infrastructure private limited As site engineer from 02nd March 2020 to 25th July 2020.  Mideast Pipeline Product As site engineer from 01st December 2019 to 01st March 2020.
  • 2.
    P a ge 2 | 4 CAREER SUMMARY Around 5 years of cross-cultural experience in QA & QC / Project Management / Project Execution in Oil & Gas sector for Long distance pipeline Project / City Gas distribution project & SV/RT/DT/IP/CGS/CNG Stations Construction, Station Piping, Fabrication, Erection, Pipeline construction, Non-Destructive Testing, Destructive Testing. JOB ROLE  Domestic & RLNG Gas Nomination Reconciliation & resolve leakages.  Verification of Invoices, SES & MES preparation & bill verification  Monitoring of CNG sales, Stock transfer “In & Out” against rebranding in 18000/18500 ODORANT Consumption Calculation PPAC data Monitoring  Bare pipe Inspection at plant as per approved QAP/Specification.  Bare pipe 3LPE coating inspection at plant as per approved QAP/Specification.  Inspection of Materials, Equipment & Mechanical Construction Activities and accordingly related Documents Preparation, Quality Progress.  Reporting of Daily Observation & non-conformance to the Client.  Preparation of weekly and monthly reports and scheduling look ahead plan and reporting to client management.  Inspection and verify calibration Certificate of tools involved in project.  Witness / review of Job procedures, Inspection Test plan, PQT, WPS, PQR, WQT, EQT, PMI, Destructive Testing as per respective codes.  Monitoring & Reporting, Root Cause Analysis of defects, welder Performance, Witnessing of Destructive Testing and Documents & Data Management.  Witnessed of NDT (RT, UT, MPT, LPT, VT) and Destructive testing (Tensile, bend test, Impact, Vickers hardness, Macro/Micro testing, Chemical, All weld test, Nick break test, diffusible hydrogen test etc.)  Familiar with all types of Welding Process such as SMAW, GTAW, FCAW, GMAW, SAW.  Familiar with construction drawings such as P&ID, Piping isometrics, Equipment, Structural, GAD, Alignment Sheet.  Familiar with PNGRB guidelines, T4S, ASME B31.3, ASME B31.1, ASME SEC- IX, API 5L, API 1104, ASME 31.8, ASTM A370, ASME SEC-II PART-C, ASME SEC-VIII, ASME SEC-V and client specification.  Witness/Review of activities reports such as Line history sheet, pipe book, IMIR, material reconciliation, As-built drawing, Alignment sheet.
  • 3.
    P a ge 3 | 4  Inspection and certification of activities like Station Piping fabrication & Erection, fit-up, welding, NDT, RT film interpretation, hydrostatic test, cardboard blasting, Pneumatic Test, Leak & Valve Functional/Passing check, venting, Drying, Metering skid Installation, Stud/Bolt Torqueing, surface preparation, painting, piping supports, shut down, Hot Tapping, Pre & Final commissioning, as per approved procedure, relevant code, standards & isometric drawing / GAD Drawing.  Inspection and certification of activities like pipeline construction, Stringing, Mainline welding, RT film interpretation, NDT, Field Joint Coating, Trenching, Lowering, Cold field Bending, Tie-In welding, HDD / Cased crossing, Bentonite Filling, Backfilling, Cleaning & Gauging, EGP, Pre & Post Hydro test, Mainline hydrostatic Test, Golden Joint, Cathodic protection, Dewatering, swabbing, Nitrogen purging, Pre & Final commissioning, Gas-in, Shutdown, Review As Built Drawing. SKILL  Third party Inspection  Welding Inspection (SMAW/GTAW/ FCAW/GMAW/SAW)  Non-Destructive Testing(RT/UT/LPT/MPT/VT)  Destructive Testing  QAP, MTC, EQT, WPS, WQT, PQR  Review IFC, GAD, Isometric Drawing, AS-BUILT Drawing.  Cross-Country, City Gas Distribution, Station Piping. PROFESSIONAL QUALIFICATION  B. TECH from Arya Institute of Engineering & Technology in Mechanical Engineering (2019) with aggregate 65.4% marks.  12th from S.S.M.C.D College (2015) with aggregate of 60% marks.  10th from Vikas Vidyalaya (2013) with aggregate of 8.0 CGPA. INTERNSHIP UNDERTAKEN Completed internship from “Indian Oil-Adani Gas Pvt. Ltd.” On project of “Pipe Line Natural Gas”(PNG) of “City Gas Distribution Project”(CGDP).
  • 4.
    P a ge 4 | 4 CERTIFICATION  Non Distractive Testing level II in Ultrasonic test  Non Distractive Testing level II in Radiography Test  Non Distractive Testing level II in Liquid Penetrate Test  Non Distractive Testing level II in Magnetic Particle Test  Non Distractive Testing level II in Visual Test TECHNICAL SKILLS  SAP MODULES  AutoCAD  Solid Work,  Ansys PROJECT UNDERTAKEN A Project on “Turbo Jet Engine ” which is design by the uses of turbo-charger. It works on “Brayton Cycle” (open loop) and using “Liquefied Petroleum Gas” as working fuel. PERSONAL DETAILS  Date of Birth : 4th, May 1998 • Father’s name : Mr. Ranjeet Chaudhary • Mother’s name : Mrs. Asha Devi • Languages known : English, Hindi, Maithili. DECLARATION I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Vivek kumar