IMPROVEMENT OF BOLAPE MAHAMEDAGAMA
From (0 + 450 - 1 + 250 ) Km
BOQ1
ITEMHSR NO.
DESCRIPTION
1.1 MS-023 Cleaning
medium
Jungle
Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps or
by Cutting only as Directed
1.2
E1-027 Roadway Excavation in Unclassified Soil
Using Machineryincluding Loading , Piling
& transport (Cutting Measurement)
1.3 M1-012ADense Draded Aggregate Base
(Aggregate Vase Course) Seprading
watering and Compacting Graded 37.5
mm Aggregate to Form a Dense
Aggregate Base Using Machinery
Including Motor Grader & Roller Hire
Charges. [Link] (Loos)
UNIT QUANTITY RATE
9,428.00
AMOUNT
Km
0.800
7,542.400
m3
312.00
351.00
###
m3
255.00
4,585.00
###
1.4
A1-018 Piling Available Aggregate
m3
255.00
110.00
1.5
A1-010 37.5 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 : Table 17014
m3
182.00
4,208.00
A1-011 19 mm Aggregate, Single Size Crusher
Production Including Piling ,Loading &
transport [SSCM 404.1-406.1 ]
m3
19.00
4,506.00
m3
200.50
1,086.00
###
m2
2,920.00
83.77
###
m2
2,920.00
63.77
###
m2
785.00
37.00
29,045.000
m2
200.00
68.00
13,600.000
m3
4.00
741.00
2,964.000
m3
61.00
989.00
60,329.000
1.6
1.7 M1-004 Spreading & Compaction 50-19 mm New
Aggregate by Roller Including Watering
Hire, Etc. (Loose Volume) [SSCM 403.3(c)]
1.8 S1-001A
Bitumen Surface 1st Coat Using 2ltr/Sq.m
including Blinding with Sand @ the Rate of
125 Sq.m/Cu.m [SSCM 503.1]
(department Bitumen )([Link])
1.9 S1-008A Bitumen Surfacing 2nd/Subsequent Coat
using 1.0ltr/Sq.m including Blinding with
Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)] (department Bitumen
([Link])
1.10 S1-018A Tack Coat with 30% Cut Back Bitumen
Using 0.5 ltr/Sq.m Including Brushing and
Cleaning Road Surface (Manual)
Department bitumen
1.11 M1-002
1.12 DR-013
Braking Road Surface to 50 mm Depth by
Hand , Screen & Replace Old Aggregate
Clearing Choked Culverts (With Head
Room > 1m.)
1.13 DR-003 Cutting New Side Drains in Hard Soil
28,050.000
###
85,614.000
ITEMHSR NO.
DESCRIPTION
1.14 E1-012 Excavation Pit\Trench in Foundation in
Medium Soil not Exceeding 1.5m deep,
Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as
Directed. [SSCM 301.1-.3]
1.15 ST-055 Fabricate & Lay Tor Steel as
UNIT QUANTITY RATE
AMOUNT
m3
13.00
924.00
12,012.000
Reinforcement (incl. Transport)
Kg
72.00
236.00
16,992.000
1.16 ST-054 Fabricate & Lay M.S Bars as
Reinforcement (incl. Transport)
Kg
238.00
230.00
54,740.000
m2
166.00
1,002.00
m2
20.00
463.00
m3
Barrel
s
Day
10.00
###
51.00
1.00
183.35
7,425.00
Item
Allow
Sum
1.17 ST-057 Supplying & fixing 25 mm Thick Planks of
Class II Timber as Shuttering, Including
removing [1008.3(b)]
1.18 ST-112 Supplying and Fixing 25mm Thick Toung
and Groved Planks with 50x50mm Struts
of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains
1.19 ST-047 Mixing & Laying Using Concrete Mixer,
Cement Concrete [Link] (19 mm) (Volume
Batching) Using Crusher Run Aggregate
(incl. Transport )
1.20
1.21
1.22
Transport of Empty Barrels
Transport of Road Roller
Transport of JCB
TOTAL
###
9,260.000
###
9,350.850
7,425.000
10,000.000
###
CENTRAL PROVINCIAL ROAD DEVELOPMENT AUTHORITY
ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR : Improvement of BOLAPE MAHAMEDAGAMA
District :- Kandy
Divisional Secretary Area :- Pathahewahata
[Link] :- Kandy
ITEM
DESCRIPTION
ITEM
TOTAL
In Rs.
AMOUNT In Rs.
NO
This estimate provides for all labour, Meterial,
1
2
2,953,641.89
B.O.Q 1 Item No.1.1 to 1.22
Improvement of Bolape Mahamedagama
.
Class of road
:Total
Platform Width
Carriage way
Length Of Road
:::-
Transport of metal
:- 40km
Transport of Sand :80Km
Transport of Cement :- 10.0Km
Transport of soil
:01.0km
Cost of bitumen (51 @16470/=)
Cost of bitumen transport from sapugaskanda to
Office (51 @1021.35)
Total Civil Cost
2
3
4
Item allow for Administration charges (5.0%)
Item allow for VAT (12%)
Item allow for Contingencies -
2,953,641.89
839,970.00
52,088.85
3,845,700.74
192,285.04
461,484.09
10,530.13
TOTAL ESTIMATED COST
Divisional Office
Prepared by :Name
:- Sgd. M.K Samarasekara.
Designation :- T.O.
Signature
:Forwarded by :Name
:Designation :- T.O.
Signature
:Recommended &Submitted / Approved :Name
:- Sgd. [Link]
Designation :- EE
Signature
:-
3,845,700.74
664,299.26
4,510,000.00
Chief Engineer's Office
Head Office :-
Checked by :Name
:Designation :Signature :-
Checked by :Name
:Designation :Signature :- ..
Recommended & Submitted / Approved :Name
:- W.M.I.S.K Wijekoon
Designation :- Chief Engineer - Kandy
Signature :-
Recommended & Submitted / Approved :Name
:- A.M.M. Faleel
Designation :- General Manager
Signature :-
PROVINCIAL ROAD DEVELOPMENT AUTHORITY
CENTRAL PROVINCIAL COUNCIL
ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR :- IMPROVEMENT OF BOLAPE MAHAMEDAGAMA ROAD
From 0+450 -1+250 km
District :- Kandy
[Link] :-Kandy
Divisional Secretary Area :-Pathahewahata
ITEM
TOTAL
DESCRIPTION
ITEM
In
NO
This estimate provides for all labour, Meteri 1
Tools transport expenses necessary for the
AMOUNT In Rs.
Rs.
B.O.Q 1 Item No.1.1 to 1.22
3,364,799.05
IMPROVEMENT OF BOLAPE
MAHAMEDAGAMA ROAD
All works as per the body of this estimate.
Class of road
:Platform Width
Carriage way
Length Of Road
:::-
Total
3,364,799.05
2
3
Cost of Bitumen (51@16470)
Cost of Bitumen Transport (51@1021.35)
TOTAL COST OF CIVIL WORKS
839,970.00
52,088.85
Item
Item
Item
Item
403,775.89
&
212,842.90
126,523.32
Transport of metal
:- 30 km
5
6
Transport of sand
:- 80 km
Transport f Soil
:- 01 km
Transport of Cement :- 10km
allow
allow
allow
allow
for
for
for
for
VAT - (12%)
overserages & travelling expences
Administration charges (5%)
Contingencies - ( sum)
TOTAL ESTIMATED COST
892,058.85
4,256,857.90
743,142.10
5,000,000.00
Divisional Office
Chief Engineer's Office
Head Office :-
Prepared by :Name
:- [Link]
Designation
:- T.O.
Signature
:-
Checked by :Name
:- [Link]
Designation :-T.O.
Signature
:-
Checked by :Name
:- [Link]
Designation :- T.O.
Signature
:- ..
Checked by :Name
:Designation
:- T.O.
Signature
:-
Recommended & Submitted / Approved :-Compared by:Name
:- Sgd. [Link]
Name
:- [Link]
Designation :- Chife Engineer (Kandy)
Designation :- D'Man
Signature
:-.
Signature :-
Recommended &Submitted / Approved :Name
:- [Link]
Designation
:- Executive Engineer
Signature
:-
Recommended by:Name
:- [Link]
Designation :- Office Engineer
Signature :-
Approved :Name
:- [Link]
Designation :- General Manager (P.R.D.A.)
Signature :-
Designation :- General Manager (P.R.D.A.)
Original / Duplicate
Duplicate
Issued to Mr./Mrs. ....................................................................................................................
Address : ........................................................................................................................................
..............................................................................
Receipt. No. of REFUNDABLE tender deposit : .......................................................................
Receipt. No. of NON REFUNDABLE tender fee : ......................................................................
IMPROVEMENT OF BOLAPE MAHAMEDAGAMA
From (0 + 450 - 1 + 250 ) Km
BOQ1
ITEM HSR NO.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
DESCRIPTION
MS-023 Cleaning
medium
Jungle
Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps
or by Cutting only as Directed
E1-027 Roadway Excavation in Unclassified Soil
Using Machineryincluding Loading ,
Piling & transport (Cutting Measurement)
M1-012A Dense Draded Aggregate Base
(Aggregate Vase Course) Seprading
watering and Compacting Graded 37.5
mm Aggregate to Form a Dense
Aggregate Base Using Machinery
Including Motor Grader & Roller Hire
Charges. [Link] (Loos)
A1-018 Piling Available Aggregate
A1-010 37.5 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 : Table
1701-4
A1-011 19 mm Aggregate, Single Size Crusher
Production Including Piling ,Loading &
transport
404.1-406.1
] mm New
Spreading[SSCM
& Compaction
50-19
M1-004 Aggregate by Roller Including Watering
Hire, Etc. (Loose Volume) [SSCM
403.3(c)]
S1-001A Bitumen Surface 1st Coat Using
2ltr/Sq.m including Blinding with Sand @
the Rate of 125 Sq.m/Cu.m [SSCM
503.1] (department Bitumen )
([Link])
S1-008A Bitumen Surfacing 2nd/Subsequent Coat
using 1.0ltr/Sq.m including Blinding with
Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)] (department Bitumen
([Link])
UNIT QUANTITY
Km
0.800
m3
312.00
m3
255.00
m3
255.00
m3
182.00
m3
19.00
m3
200.50
m2
2,920.00
m2
2,920.00
[Link]
RATE
AMOUNT
ITEM HSR NO.
DESCRIPTION
1.10 S1-018A Tack Coat with 30% Cut Back Bitumen
Using 0.5 ltr/Sq.m Including Brushing
and Cleaning Road Surface (Manual)
Department bitumen
1.11 M1-002 Braking Road Surface to 50 mm Depth
by Hand , Screen & Replace Old
Aggregate
1.12 DR-013 Clearing Choked Culverts (With Head
Room > 1m.)
1.13 DR-003 Cutting New Side Drains in Hard Soil
1.14
1.15
1.16
1.17
1.18
1.19
UNIT QUANTITY
m2
785.00
m2
200.00
m3
m3
4.00
61.00
E1-012 Excavation Pit\Trench in Foundation in
Medium Soil not Exceeding 1.5m deep,
Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as
Directed. [SSCM 301.1-.3]
m3
13.00
ST-055 Fabricate & Lay Tor Steel as
Reinforcement (incl. Transport)
Kg
72.00
Kg
238.00
m2
166.00
ST-112 Supplying and Fixing 25mm Thick Toung
and Groved Planks with 50x50mm Struts
of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains
m2
20.00
ST-047 Mixing & Laying Using Concrete Mixer,
Cement Concrete [Link] (19 mm)
(Volume Batching) Using Crusher Run
Aggregate (incl. Transport )
m3
10.00
Barrels
51.00
ST-054 Fabricate & Lay M.S Bars as
Reinforcement (incl. Transport)
ST-057 Supplying & fixing 25 mm Thick Planks
of Class II Timber as Shuttering,
Including removing [1008.3(b)]
1.20
Transport of Empty Barrels
1.21
Transport of Road Roller
Day
1.00
1.22
Transport of JCB
Item
Allow
TOTAL
[Link]
RATE
AMOUNT
IMPROVEMENT OF BOLAPE MAHAMEDAGAMA
From (0 + 450 - 1 + 250 ) Km
Summary
B O Q 1 Item No 1.1 to 1.22
Rs
Tendered amount (Excluding VAT.) in words Rupees ..............................................................
............................................................................................................................................
Signature of Tenderer.............................................................................................................
Seal
Name of Tenderer..................................................................................................................
Address of Tenderer...............................................................................................................
VAT No ....................................................................
(If available)
VAT Amount : in figures Rupees.
VAT Amount in word Rupees ..................................................................................................
...............................................................................................................................................
Witness
1. Signature :...............................................
Name & Address :
2. Signature : .....................................
Name & Address :
[Link]
NT OF BOLAPE MAHAMEDAGAMA
om (0 + 450 - 1 + 250 ) Km
[Link]
HIGHWAY SCHEDULE OF RATES-2013
Section 1 - Transport
See Section 1 of General Notes for Selection of Mode of Transport
Item No
Description
Unit
Rate Rs
T1-001
Transport of Soil beyond 25m and up to and including100 m by
Any Means (including Loading and Unloading)
Cu.m
284.00
T1-002
Transport beyond 100m and up to and including0.5km by Any
Means (Excluding Loading)
Cu.m
315.00
T1-003A
Transport beyond 0.5km and up to and including 1.0km by Any
Means.(Excluding Loading)
Cu.m
337.00
T1-003B
Transport of each 1km beyond 1.0 to 8.0 km by Any Means
(Excluding Loading)
Cu.m
52.00
T1-003C
Transport of Each Subsequent 1km beyond 8km by Any Means
(Excluding Loading)
Cu.m
35.00
T1-006
Transport of Material in Bulk Excluding Loading (for 1st
kilometer)
[Link]
635.00
T1-007A
Transport of Material in Bulk Excluding Loading (from 1stkm upto
10km Distance )
[Link]
212.00
T1-007B
Transport of Material in Bulk Excluding Loading (for Distance
more than 10 Kilometers )
[Link]
38.00
T1-009
Transport of Premix in Bulk, Excluding Loading other than at
Mixing Plant (from 1st km upto 10km Distance )
TonKm
212.00
T1-010A
Transport of Barrels of Bitumen for First 1.0km of Transport
(Excluding Loading and Unloading)
BrlKm
47.00
T1-010B
Transport of Barrels of Bitumen for Each Subsequent 1.0km
From 1.0km - 9.0km (Excluding Loading and Unloading)
BrlKm
9.00
T1-010C
Transport of Barrels of Bitumen for Each Subsequent 1.0km
Beyond 9.0km (Excluding Loading and Unloading)
BrlKm
7.00
T1-010E
Transport of empty Barrels of Bitumen for First 1.0km of
Transport (Excluding Loading and Unloading)
BrlKm
12.00
T1-010F
Transport of empty Barrels of Bitumen for Each Subsequent
1.0km From 1.0km - 8.0km (Excluding Loading and Unloading)
BrlKm
4.00
T1-010G
Transport of empty Barrels of Bitumen for Each Subsequent
1.0km Beyond 8.0km (Excluding Loading and Unloading)
BrlKm
7.00
T1-010H Loading empty barrels of Bitumen
Brls
3.00
T1-010J Unloading empty barrels of Bitumen
Brls
1.50
T1-010K Cutting & straightening empty barrels of Bitumen
Brls
92.00
Brls
18.00
T1-013
Loading Barrels of Bitumen Inclusive of Rolling upto 25m
T1-014
Unloading Barrels of Bitumen Inclusive of Rolling and Stacking
Brls
8.00
Transport of Hume Pipes 152mm diameter for 1st 1.0km of
Transport (Excluding Loading and Unloading)
[Link]
35.00
Transport of Hume Pipes 152mm diameter for Each Subsequent
T1-015B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)
[Link]
8.00
Transport of Hume Pipes 152mm diameter for Each Subsequent
T1-015C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)
[Link]
5.00
Transport of Hume Pipes 229mm diameter for 1st 1.0km of
Transport (Excluding Loading and Unloading)
[Link]
39.00
Transport of Hume Pipes 229mm diameter for Each Subsequent
T1-018B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)
[Link]
8.00
Transport of Hume Pipes 229mm diameter for Each Subsequent
T1-018C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)
[Link]
6.00
Transport of Hume Pipes 305mm diameter for 1st 1.0km of
Transport (Excluding Loading and Unloading)
[Link]
52.00
Transport of Hume Pipes 305mm diameter for Each Subsequent
T1-021B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)
[Link]
11.00
Transport of Hume Pipes 305mm diameter for Each Subsequent
T1-021C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
8.00
Transport of Hume Pipes 457mm diameter for 1st 1.0km of
Transport(Excluding Loading and Unloading)
[Link]
78.00
Transport of Hume Pipes 457mm diameter for Each
T1-024B Subsequeent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)
[Link]
17.00
Transport of Hume Pipes 457mm diameter for Each Subsequent
T1-024C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
12.00
Transport of Hume Pipes 610mm diameter for 1st 1.0km of
Transport(Excluding Loading and Unloading)
[Link]
104.00
Transport of Hume Pipes 610mm diameter for Each Subsequent
T1-027B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
23.00
Transport of Hume Pipes 610mm diameter for Each Subsequent
T1-027C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
16.00
Transport of Hume Pipes 915mm diameter for 1st 1.0km of
Transport(Excluding Loading and Unloading)
[Link]
156.00
T1-015A
T1-018A
T1-021A
T1-024A
T1-027A
T1-030A
Transport of Hume Pipes 915mm diameter for Each Subsequent
T1-030B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
34.00
Transport of Hume Pipes 915mm diameter for Each Subsequent
T1-030C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)
[Link]
24.00
Transport of Hume Pipes 1220mm diameter for 1st 1.0km of
Transport(Excluding Loading and Unloading)
[Link]
336.00
Transport of Hume Pipes 1220mm diameter for Each
T1-033B Subsequent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)
[Link]
91.00
Transport of Hume Pipes 1220mm diameter for Each
T1-033C Subsequent 1.0km Beyond 8.0km of Transport(Excluding Loading
and Unloading)
[Link]
65.00
No
54.00
No
64.00
No
126.00
No
210.00
No
273.00
No
504.00
No
1,008.00
T1-033A
T1-036
T1-037
T1-038
T1-039
T1-040
T1-041
T1-042
Loading and Unloading 152mm diameter 2.44m Long Hume Pipes
Loading and Unloading 229mm diameter 2.44m Long Hume Pipes
Loading and Unloading 305mm diameter 2.44m Long Hume Pipes
Loading and Unloading 457mm diameter 2.44m Long Hume Pipes
Loading and Unloading 610mm diameter 2.44m Long Hume Pipes
Loading and Unloading 915mm diameter 2.44m Long Hume Pipes
Loading and Unloading 1220mm diameter 2.44m Long Hume Pipes
T1-043
Transport of Recast Kerb Stones (All Types) for Road Works,
Including Loading and Unloading
[Link]
1.00
T1-044
Transport of Recast Kerb Stones for Bridge Works, Including
Loading and Unloading
[Link]
1.30
T1-045
Transport of Precast Concrete Handrails, Up Rights and Joints
for Bridge Works, Including Loading and Unloading
[Link]
2.25
T1-046
Transport of Precast Concrete Slabs 450x450x50 mm for Foot
Walks, Including Loading and Unloading
[Link]
3.00
T1-047
Transport of Precast Concrete Standard Boundary Markers
Including Unloading Only
[Link]
1.20
T1-048
Transport of Emulsion
100ltr km
2.00
T1-049
Transport of Gabion Mesh 4x1x1 meters
No km
0.75
T1- 050
Transporting Road Roller up to 25 km
No
7,425.00
T1- 050A
T1- 051
Additional cost for Transporting Road Roller beyond 25 km
Transport of cement 1st km including loading and unloading
T1- 052
9.00
1 bags(50kg)
2.00
Transport of cement each Subsequent 1.0km beyond 9.0km by
1 bags(50kg)
any means
1.20
Transport of steel 1st km including loading and unloading
T1- 052A Transport of steel beyond 1.00 km to 9km by any means
T1- 052B
303.00
1 bags(50kg)
T1- 051A Transport of cement beyond 1.00 km to 9km by any means
T1- 051B
km
Transport of steel each Subsequent 1.0 km to 9.0 km by any
means
50kg
12.40
50kg
2.40
50kg
1.80
Section 2 - Excavation
Roadway and Foundation Excavation (Including Loading, Unloading, and Transporting within 25 meters
Distance Unless Otherwise Specified)
Description
Item No
E1-001
Unit
Excavation in Loose Soil (Dry) [SSCM 301.2(IV)]
Rate Rs
Cu.m
376.00
E1-002
Excavation in Loose Soil (Wet) in Slips [SSCM 301.3(0)]
Cu.m
467.00
E1-003
Excavation in Ordinary Soil (Cutting Measurement) [SSCM
301.2(V)]
Cu.m
559.00
E1-004
Excavation in Ordinary Soil [Vehicle Measurement] [SSCM
301.2(V)]
Cu.m
491.00
E1-005
Excavation in Medium Soil (Cutting Measurement) [SSCM
301.2(VI)]
Cu.m
741.00
E1-006
Excavation in Medium Soil (vehical Measurement) [SSCM
301.2(VII)]
Cu.m
630.00
E1-007
Excavation in
301.2(VII)]
Hard
Soil
(Cutting
Measurement)
[SSCM
Cu.m
1,106.00
E1-008
Excavation in
301.2(VII)]
Hard
Soil
(Vehicle
Measurement)
[SSCM
Cu.m
940.00
E1-009
Excavation in Unclassified Soil (Cutting Measurement) [SSCM
301.2 a(1)]
Cu.m
802.00
E1-010
Excavation in
301.2(VII)]
Cu.m
1,197.00
Soft
Rock
(Cutting
Measurement)
[SSCM
Excavation in Mud\Marshy Material (Cutting Measurement)
E1-010A [SSCM 301.2(VII)]
Cu.m
924.00
E1-011
Excavation Pit\Trench for Foundation in Ordinary Soil not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]
Cu.m
741.00
E1-012
Excavation Pit\Trench in Foundation in Medium Soil not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]
Cu.m
924.00
E1-013
Excavation Pit\Trench in Foundation in Hard Soil not Exceeding
1.5m deep, Including Leveling and Ramming Bottom, Exc.
Material Deposited within 25m or as Directed. [SSCM
Cu.m
1,289.00
E1-014
Excavation Pit\Trench in Foundation in Unclassified Soil not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
Cu.m
984.00
E1-015
Excavation Pit\Trench in Foundation in Mud/Marsh not
Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
Cu.m
1,106.00
E1-019
Excavation Soft Rock not Exceeding 1.5m depth [SSCM
301.2(II)]
Cu.m
1,471.00
E1-021
Piling Available Soil
Cu.m
91.00
Cu.m
120.00
E1-022
Loading Available Soil to a Tractor or Equivalent
E1-023
Excavating Rock Requiring Blasting, for Roadway for Boulders,
Excluding Dozing Away [SSCM 301.2(III) & 306.1-306.4]
Cu.m
1,080.00
E1-024
Boulders, Sledging Piling etc
Cu.m
1,862.00
E1-025
Rock Requiring Blasting
Cu.m
1,888.00
E1-026
Rock Requiring Blasting and Piling (Bank Measurement)
Cu.m
2,837.00
E1-027
Roadway Excavation in Unclassified Soil Using Machinery
Excluding Loading and Piling (Cutting Measurement)
Cu.m
177.00
E1-028
Loading Materials by Machinery in Roadway Excavations (Cutting
Measurement)
Cu.m
174.00
E1-029
Trimming / Cambering by Motor Grader (Cutting Measurement)
Cu.m
32.00
E1-029A Trimming / Cambering by Motor Grader (Cutting Measurement)
Sq.m
6.40
Section 3 - Aggregate/Rubble Piling
Aggregate / Rubble Piling Including Loading
Item No
Description
Unit
Rate Rs
A1-001
Sledging Available Rock 150-225mm Rubble including Piling and
Loading
Cu.m
1,534.00
A1-002
Blasting etc and Piling 150-225mm Rubble including Loading
Cu.m
2,326.00
Cu.m
2,289.00
Blasting Sledging etc. and Piling 150-225mm Rubble using
A1-002A Compressor and Hand Held Drills including Loading
A1-003
Blasting etc. and Piling 100mm Aggregate including Loading
Cu.m
2,525.00
A1-004
Blasting etc and Piling 75mm Aggregate incl/Loading
Cu.m
2,890.00
Cu.m
3,437.00
Cu.m
3,985.00
A1-005
A1-006
Blasting etc and Piling 50mm Aggregate incl/Loading
Blasting etc and Piling 37.5mm Aggregate incl/Loading
A1-007
Blasting etc and Piling 25mm Aggregate incl/Loading
Cu.m
4,898.00
A1-008
Blasting etc and Piling 19mm Aggregate incl/Loading
Cu.m
6,905.00
A1-009
50 mm Aggregate, Single Size Crusher Production Including
Piling and Loading[SSCM 404.1-406.1 : Table 1701-4
Cu.m
2,138.00
A1-010
37.5 mm Aggregate, Single Size Crusher Production Including
Piling and Loading [SSCM 404.1-406.1 : Table 1701-4
Cu.m
2,512.00
A1-011
19 mm Aggregate, Single Size Crusher Production Including
Piling and Loading [SSCM 404.1-406.1 ]
Cu.m
2,810.00
A1-012
12 mm Aggregate, Single Size Crusher Production Including
Piling and Loading [SSCM 404.1-406.1 : Table 1701-4
Cu.m
2,459.00
A1-013
Aggregate 37.5 mm Down Graded (SSCM-Table 1701.5 )
Including Piling and Loading
Cu.m
2,565.00
A1-014
Crusher Fines 6.3 mm Down, Including Piling and Loading for 1.0
cu.m
Cu.m
2,180.00
Crusher Fines
cu.m
Cu.m
1,390.00
A1-014A
(DUST), Including Piling and Loading
for 1.0
A1-015
Aggregate 19 mm for Seal Coat Treatments as per SSCM Table
1701-8, Including -Do-
Cu.m
2,965.00
A1-016
Aggregate 12.5 mm for Seal Coat Treatments as per SSCM
Table 1701-8, Including -Do-
Cu.m
2,390.00
A1-018
A1-019
A1-020
Piling Available Aggregate
Piling Available Rubble
Loading Available Aggregate / Rubble
Cu.m
110.00
Cu.m
219.00
Cu.m
183.00
Section 4 - Earth Filling & Compaction
Approved Earth Filling and Compaction
Item No
Description
Unit
Rate Rs
Approved Soil (Type I & II Materials) Excavation for Bases &
EW-001 Shoulder Construction Including Loading and Piling (Loose
Volume) [SSCM 601.4]
Cu.m
1,066.00
EW-002 Spreading Piled Approved Soil (Loose Volume)
Cu.m
123.00
Approved Soil Spread & Rolled Including Roller Hire Charges,
EW-003 Fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
Cu.m
307.00
Approved Soil Spread & Rolled Using Machinery Including Motor
EW-003A Grader & Roller Hire Charges, fuel & Watering (Loose Volume)
[SSCM 601.1 - 4]
Cu.m
232.00
Cu.m
384.00
Cu.m
382.00
Cu.m
400.00
Spreading , Leveling and Compacting Manually Using Standard
EW-008 Cast Iron Stamper or Equivalent and Filling in 150-225 mm Thick
Layers (Loose Volume)
Cu.m
411.00
Trimming
,
Leveling
and
Compaction
of
Original
EW-009 Ground/Subgrade to 100 % STD Density [SSCM 304.3(c)]
Sq.m
63.00
Trimming
,
Leveling
and
Compaction
of
Original
EW-010 Ground/Subgrade to 95 % STD Density [SSCM 304.3(c)]
Sq.m
57.00
Approved Soil Spread & Rolled in Strips Where Average Width
is less than 1.2 meters for Road Widening including Roller Hire
EW-004
Charges, fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in Places Behind Abutments
and Structures, Shoulders about Sub Bases level and in Service
EW-006 line Trenches, Using 1/2 to 1 Ton Vibrating Roller Including
Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in 150 to 225 mm Thick
EW-007 Layers Using Machine Rammer at Narrow Places (Loose Volume)
Approved Soil Excavation for Embankment Filling Including
EW-011 Loading and Piling (Loose Volume) [SSCM 601.1 TO 601.4]
Approved Soil (Type I & II Materials) Excavation using
Machinery for Bases & Shoulder Construction Including Loading
EW-013
and Piling (Loose Volume) [SSCM 601.1 - 4]
Approved Soil (Type I & II ) Excavation using Machinery for
EW-014 Embankment filling Including Loading and Piling (Loose Volume)
[SSCM 601.1 - 4]
EW-015
Grading and Spreading by motor grader
Cu.m
888.00
Cu.m
390.00
Cu.m
390.00
Cu.m
61.00
Unit
Rate Rs
Section 5 - Rubble Pitching/Paving
Rubble to be Paid Separately
Item No
Description
P1-001
Pitched Paving 225 mm Thick(Excluding cost of rubble)
Sq.m
267.00
P1-002
Pitched Paving 150 mm Thick -do -
Sq.m
200.00
P1-003
Flat Paving 150 mm Thick - do--
Sq.m
134.00
Sq.m
178.00
P1-004
Flat Paving 225 mm Thick - do--
Section 6 - Aggregate Spreading & Rolling
Aggregate Spreading and Compaction - Cost of Water to be Deducted from Rate if not Carried Out
under the Relevent Items
Item No
Description
Unit
Rate Rs
M1-001
Spreading , Watering & Rolling 100 mm Aggregate Including Hire
Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]
Cu.m
736.00
Spreading , Watering & Rolling 100 mm Aggregate Including Hire
M1-001A Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]below
11.32 Cum
Cu.m
1,141.00
Braking Road Surface to 50 mm Depth by Hand , Screen &
M1-002 Replace Old Aggregate
Sq.m
68.00
Scarifying Road Surface to 50 mm Depth by roller, Screen, &
M1-003 Replace Old Aggregate.
Sq.m
60.00
Spreading & Compaction 50-19 mm New Aggregate by Roller
M1-004 Including Watering Hire, Etc. (Loose Volume) [SSCM 403.3(c)]
Cu.m
1,086.00
Cu.m
1,688.00
Breaking 50 mm Additional Depth by Hand Screening &
M1-005 Replacing Old Aggregate
Sq.m
41.00
Scarifying 50 mm Additional Depth With Roller, Screening &
M1-006 Replacing Old Aggregate
Sq.m
50.00
Spreading Watering & Compacting 50-19 mm Aggregate in Edge
M1-007 Correction using roller Including Hire, Etc. (Loose Volume )
[SSCM 1103.3]
Cu.m
1,443.00
Spreading watering & Compacting 50-19 mm Aggregate in Edge
M1-008 Correction Using Roller Including Hire ,Etc (Loose Volume)
[SSCM 1103.3]
Cu.m
1,163.00
Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller
M1-009 After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately)
Cu.m
1,040.00
Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller
M1-009A After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately) below 9.91 cum within km
Cu.m
1,704.00
Water Bound Macadam Spreading watering and Compacting 5025 mm Aggregate and Filling the Voids to refusal with Crusher
fines by watering and rolling to form a water bound Macadam
Base Excluding transport for Aggregates and fines. Loose
Volume (SSCM 404.1)
Cu.m
5,092.00
Cu.m
4,813.00
Cu.m
2,889.00
Spreading & Compaction 50-19 mm New Aggregate For
M1-004A Extensive Patching by Roller Including Watering Hire, Etc.
(Loose Volume) [SSCM 403.3(c)]
M1-010
M1-011
Dry Bound Macadam Spreading watering and compacting 50-25
mm Aggregate and filling the voids to refusal with Crusher Fines
by Rolling with Vibrating Roller to Form a Dry Bound Macadam
base Excluding Transport for Aggregates and Fines (Loose
Volume) [404]
Dense Draded Aggregate Base (Aggregate Vase Course)
Seprading watering and Compacting Graded 37.5 mm Aggregate
M1-012A to Form a Dense Aggregate Base Using Machinery Including
Motor Grader & Roller Hire Charges. Transport of Aggregates
to be Paid Separately (Loos)
Dense Graded [Link] [ABC], Spreading Watering and
Compacting Graded 37.5mm Aggregate to form a Dense
Aggregate Base in Strips, Av Width not exeeding 1.2m for Road
Widening excl Transport of Aggregate(Loose Volume) [SSCM
405.1 -.4]
Cu.m
3,727.00
Graded 37.5 ABC Material Spread and Rolled in Strips, Average
Width not Exceeding 1.2m Using Machinery inch Motor Graders
M1-013A and Roller Hire Charges Fuel and Watering (Loose Vol) [SSCM
405.1-.4]
Cu.m
3,081.00
M1-013
Section 7 - Road Surface Treatment
Sand Transport up to 16 km Included in the Rates. Transport of Emulsion/Bitument to be Paid
Separately.
Item No
Description
Unit
Rate Rs
S1-001
Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
Sq.m
265.00
Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
S1-001A Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
(department Bitumen )
Sq.m
55.00
Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding
with Gravel where Sand is not Available within 16km.
Sq.m
267.00
Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding
S1-002A with Gravel where Sand is not Available within 16km.
(Department Bitumen)
Sq.m
56.00
S1-003
Double Bituminous Surface Treatment with Hot Bitumen
(Manual) including Internal Transport (Binder and Aggregate
Paid Separately) [SSCM 505.1-.5 and Table 505.1]
Sq.m
208.00
S1-004
Single Bituminous Surface Treatment with Hot Bitumen (Manual,
including Internal Transport) (Binder and Aggregate Paid
Separately) [SSCM 505.1-.5 and Table 505.1]
Sq.m
108.00
S1-005
Double Bituminous Surface Treatment with Emulsion (CRS-1)
(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)
Sq.m
204.00
S1-006
Single Bituminous Surface Treatment with Emulsion (CRS-1)
(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)
Sq.m
105.00
Sq.m
115.00
Sq.m
36.00
S1-002
S1-007
Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including
Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including
S1-007A Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
(Department Bitumen)
Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m
including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]
Sq.m
142.00
Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m
S1-008A including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]
Sq.m
37.00
Sq.m
116.00
Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including
S1-009A Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
Departmental bitumen.
Sq.m
38.00
Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m
including Blinding with Gravel where Sand is not Available within
16km (New Work) [SSCM 503.4(c)]
Sq.m
144.00
Sq.m
39.00
S1-011
Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with
3.5 ltr/Sq.m Including Blinding with Sand, @ 125 Sq.m/Cu.m
(Manual)
Sq.m
456.00
S1-012
Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with
3.5 ltr/Sq.m (Using Trolley, Emulsion) Including Blinding with
Sand, @ 125 Sq.m/Cu.m (Manual)
Sq.m
448.00
S1-013
Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent
Coat with .75 ltr/Sq.m Including Blinding with Sand, @ 125
Sq.m/Cu.m (Manual)
Sq.m
110.00
S1-014
Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent
Coat with .75 ltr/Sq.m (Using Trolley, Emulsion) Including
Blinding with Sand, @ 125 Sq.m/Cu.m
Sq.m
108.00
S1-015
Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m
inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]
Sq.m
74.00
S1-016
Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m
inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]
ltr
147.00
S1-017
Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.75 ltr/Sq.m
inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.1-503.3]
Sq.m
105.00
S1-008
S1-009
S1-010
Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including
Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m
including Blinding with Gravel where Sand is not Available within
S1-010A
16km (New Work) [SSCM 503.4(c)] Department bitumen
Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
Sq.m
73.00
Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
S1-018A Including Brushing and Cleaning Road Surface (Manual)
Department bitumen
Sq.m
37.00
S1-018
S1-019
Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
ltr
293.00
S1-020
Tack Coat with 30% Cut Back Bitumen Using 0.75 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual) [SSCM
503.4(d)]
Sq.m
100.00
Sq.m
10.00
S1-022
Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m
Including Blinding with Sand at The Rate of 250 Sq.m/Cu.m and
Brushing Cleaning and Moistening Road Surface
Sq.m
144.00
S1-022A
Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m
Part A of Item S1-022
Sq.m
140.00
S1-022B
Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m
Part B of Item S1-022
Sq.m
4.00
S1-023
Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m
without Blinding, but Inclusive of Brushing, Cleaning and
Moistening Road Surface
Sq.m
138.00
S1-024
Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
Including Blinding with Sand at the rate of 250 Sq.m/Cu.m and
Brushing, Cleaning and Mostening Road Surface
Sq.m
134.00
S1-025
Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
without Blinding but Inclusive Brushing, Cleaning and Mostening
Road Surface
Sq.m
126.00
S1-026
Sweeping Over Tarred Surface to Arrest Bleeding.
Sq.m
3.00
S1-027
Application of Asphalt Emulsion for Surface Treatment Using
CRS-1 (Using Plant) "Rate per Litre"
ltr
S1-028
Blinding the Bitumen Surfacing with Sand at the rate of 125
Sq.m1 Cu.m Using Material from Stock Pile
Sq.m
15.00
S1-029
Single Bituminous Surface Treatment With Emulsion (CRS-1)
Using Plant.(Binder and Aggregate Paid Separately) (Rate to
Include Transport cost of Aggregate up to 16KMS) [SSCM
505.5(b)]
Sq.m
56.00
S1-030
Double Bituminous Surface Treatment with Emulsion(CRS-1)
Using Plant. (Binder and Aggregate Paid Separately) (Rate of
include Transport cost of Aggregate up to 16 KMS)
Sq.m
117.00
S1-021
Rolling over Blinding Material Spread over Subsequent Bitumen
Surfacing using diesel Roller (8-10 Tones) [SSCM 503.4(d)]
126.00
S1-034
Lay and Compact Asphalt Premix Usign Paver (Cost of premix,
Aggregate Transport and premix transport to vbe paid
Separately)
[Link]
1,154.00
S1-035
Bitumen Surfacing (Sand Sealing -Manual) Using Emulsion (CRS
1) @ 1 LTR. /SQ.M Including Preparing Surface, Blinding with
Sand @ 4 CU.M/500 SQ.M and Pressing with hand Rollers.
(Patching pot holes if necessary & external transport to be pay
sep.
Sq.m
146.00
S1-035A
Patching Minor Pot Holes Using Sand Emulsion Mix 1:8 Where
Necessary, Prior to Sand Sealing.
Sq.m
16.00
S1-036
Sand Sealing with Emulsion CRS-1 at the Rate of 1Ltr,Sq.m
Using [Link],cleaning, Blinding. with Sand@ 125
[Link] Rolng. with pneumatic. roller & internal trnsport.[SSCM
504]
Sq.m
180.00
S1-037
Reconstruct Base With Penetration Macadam Using Nominal
Size 50mm Aggregate and 19mm Key Aggregate from Stock
Piles, to Accomplish 75mm on Existing Pavements[SSCM 406]
(Binder, Aggregate, Transport paid Separately)
Sq.m
120.00
S1-038
Reconstruct Base with Penetration Macadam Using Nominal Size
37.5 mm Aggregate and 12.5 mm Key Aggregate from Stock
Piles , to a compacted thickness of 55mm on existing pavements
[SSCM 406] cost of aggregate including transport to be paid
separately
Sq.m
169.00
S1-039
Correction of Corrugations, Depressions and Cambering road
Surfaces using asphalt Concrete compacted by Vibrating roller
Including Internal transport (application of tack coat and Supply
of Asphalt concrete to ve paid separately)
[Link]
1,656.00
Sq.m
135.00
Sq.m
135.00
S1-040
Sand sealing with emulsion crs-2 at the rate of .8 Ltr/Sq.m
using plant , and blinding with sand at the rate of 125Sq.m/Cu.m
on D.B.S.T./S.B.S.T. (Triple Seal) including Internal transport
(SSCM 504) binder transport to site to pay separately
S1-040A Sand sealing with emulsion crs-2 - Part A of Item S1-040
Section 8 - Road Maintenance
Internal Transport of Hot Bitumen up to 16km and Sand Transport up to 16km Included in the Rates.
Item No
Description
Unit
Rate Rs
MN-001
Patching with Hot Bitumen Using 14 Liters per 1/2 km (SSCM
1102.1-3)
km
2,664.00
MN-002 Patching With hot Bitumen Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
3,997.00
MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
5,329.00
MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m
6,661.00
MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
7,993.00
MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
9,326.00
MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m.
1/2 K.m
10,658.00
1/2 K.m
1,332.00
MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m.
km
2,347.00
MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
3,520.00
MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
4,694.00
MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m
5,867.00
MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
7,040.00
MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
8,214.00
1/2 K.m
9,387.00
1/2 K.m
1,173.00
Cu.m
3,208.00
Cu.m
3,365.00
MN-008
MN-015
MN-016
Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen
Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m.
Extensive Patching for Every Additional 7 Ltrs. Cold Bitumen,
CRS-1
MN-017 50 mm-19mm Aggregate Roller Patching
MN-018
50 mm - 19mm Aggregate Stamped Patching
Section 9 - Road Side Drainage System
Rate to Include Spreading the Resulting Materials Suitably in the Vicinity Unless Otherwise
Directed.
Item No
Description
Unit
Rate Rs
Cutting New Side Drains in Ord. Soil
Cu.m
551.00
DR-002 Cutting New Side Drains in Med. Soil
Cu.m
770.00
DR-003 Cutting New Side Drains in Hard Soil
Cu.m
989.00
DR-004 Cutting New Side Drains in Soft Soil
Cu.m
1,099.00
DR-005 Cutting New Side Drains In Unclassified Soil
Cu.m
770.00
DR-001
Cutting side drains of std. Dimensions in unclassified soil using
DR-005A machine (Back hoe J.C.B) including shipping trimming and leveling
bottom manually
Cu.m
461.00
Cu.m
2,105.00
Sq.m
114.00
Watering and Maintaining Turf For Three Months Including
DR-008 Transport of Water
Sq.m
200.00
DR-009 Leveling & Trimming Earth
Sq.m
14.00
DR-006 Cutting New Side Drains in Rock
Turfing (Excluding Royalty,
DR-007 Maintenance) [SSCM 802.3 (a)]
Transport
and
Watering
DR-010
Clearing Silt Etc. from Kerbs & Channels (SSCM 12053)
L.m
9.00
DR-011
Cutting Scupper Drains on any Soil Other than Rock to and
Average width of 0.75 m with proper Gradient and Ave. Depth
of 100 mm (SSCM 1304.3)
L.m
70.00
DR-012
Clearing and Desilting of Culverts (SSCM 1303.3)
L.m
177.00
DR-013
Clearing Choked Culverts (With Head Room > 1m.)
Cu.m
741.00
DR-014
Cleaning desilting existing side drains and lead up drains to
proper shape and gradient and transport of excavated materials
from road side up to 100m
L.m
22.00
DR-015
Clearing Inlets and Outlets of Culverts
Culverts
160.00
Section 10 - Bridges & Culverts
Bridges Culverts and Retaining Walls etc.
Item No
Description
Unit
Rate Rs
ST-001
Demolishing Dry Coursed Masonry Including Stacking or
Loading ,(SSCM 202.2)
Cu.m
2,264.00
Demolishing Coursed Masonary in cement Mortar Including
ST-002 Stacking or Loading
Cu.m
2,629.00
Demolishing Random Rubble Masonry in cement Mortar Including
Stacking or Loading
Cu.m
1,242.00
Random Rubble Masonry, 150-225 mm Rubble in Approved
ST-004 cement & Sand Mortar 1:6 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]
Cu.m
7,830.00
Random Rubble Masonry, 150-225 mm Rubble in Approved
ST-005 cement & Sand Mortar 1:5 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]
Cu.m
8,181.00
ST-003
ST-006
Random Rubble Masonry, in Approved cement & Sand Mortar 1:6
With available Rubble 150-225mm
Cu.m
6,691.00
ST-007
Random Rubble Masonary in approved cement & sand Mortar 1:5
with Available Rubble 150-225 mm.
Cu.m
7,043.00
ST-008
Dry Masonry With available Heavy Rubble or Boulders(SSCM
1006.3)
Cu.m
4,018.00
ST-009
Dry Masonry With Rubble 150-225 mm (Excluding Transport of
Rubble & Piling)
Cu.m
4,102.00
ST-010
Dry Masonry With available Bubble 150-225mm
Cu.m
3,258.00
ST-011
Packing Available Rubble and Aggregate Filter Layers Behind
Masonry Walls.
Cu.m
650.00
ST-012
Clay Puddled & Layid Behind Masonry Walls([Link] of
Clay) [SSCM 705.3]
Cu.m
1,316.00
ST-013
Grouting Coursed Stone Masonry Joints With approved Cement
& Sand Mortar 1:3 (SSCM 804.2(c))
Sq.m
316.00
ST-014
Grouting Rubble Paving With Concrete Class C, [Link](19 mm)
(Excl. Transport of Aggr. For Concrete & Piling)
Cu.m
1,610.00
ST-015
Grouting Rubble Paving with approved cement & Sand mortar
(1:3)
Sq.m
530.00
ST-016
Forming weep Holes In Masonry Construction (Labour only)
[SSCM 706.3]
No
303.00
ST-017
Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less than
100mm Complete with Dripledge and Surround Finish Smooth.
L.m
647.00
ST-018
Shoring with 37.5 mm Thick Class II Timber Planks up to 3 m
Depth
Sq.m
763.00
ST-019
Supplying & Fixing class II Timber Struts Etc. For Shoring up to
3m Depth
Sq.m
56.00
Sq.m
903.00
Lifting Soil For Every 1.5 m Beyond the Initial 1.5m
Cu.m
365.00
ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m
Cu.m
1,095.00
ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m
Cu.m
548.00
Lowering Wedged Stones Evety 1.5m Beyond the Initial 1.5 m
Beyond the Initial 1.5 m
Cu.m
730.00
ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5 m
Cu.m
365.00
No
485.00
Supplying and Fixing Class II Timber in Shoing up to 3m Depth
ST-020 (Rate per Area Basis)
ST-021
ST-024
ST-026 PCC Beams(10.5m to 13.5m) Launched into Position
ST-027
Rendering 12.5 mm thick in cement sand Motar 1:2 mix (Smooth
Finish)
Sq.m
609.00
Sq.m
725.00
Sq.m
816.00
Sq.m
491.00
Sq.m
591.00
Sq.m
689.00
Rendering 19mm thick in cement sand Motar 1:3 mix (Smooth
finish)
Sq.m
779.00
Mixing & Laying Manually, cement Concrete [Link] (50 mm)
ST-034 (Volume Batching) Using Crusher run Aggregate (Excl. Transport
of Aggregate & Piling) [SSCM 1001.4]
Cu.m
9,458.00
Mixing & Laying Using Concrete Mixer,Cement Concrete [Link]
ST-035 (50 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling) (SSCM 1001.8 - 9)
Cu.m
8,647.00
Mixing & Laying Manually Cement Concrete [Link] (50 mm) with
ST-036 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)
Cu.m
8,499.00
Mixing & Laying Using Concrete Mixer, Cement Concrete [Link]
ST-037 (50 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)
Cu.m
8,179.00
Mixing & Laying Manually Cement Concrete [Link] (37.5 mm) with
ST-038 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)
Cu.m
9,125.00
Mixing & Laying Using Concrete Mixer, Cement Concrete [Link]
ST-039 (37.5 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)
Cu.m
8,800.00
Mixing & Laying Manually Cement Concrete [Link] (37.5 mm)
ST-040 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)[SSCM 1001.4]
Cu.m
11,015.00
Mixing & Laying Using Concrete Mixer, Cement Concrete [Link]
(37.5 mm) (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)
Cu.m
10,692.00
Mixing & Laying Using Concrete Mixer, Cement Concrete [Link]
ST-041A (37.5 mm) with 20% plums Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)
Cu.m
9,284.00
Mixing & Laying Manually Cement Concrete [Link] (19 mm)
ST-046 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)
Cu.m
12,296.00
ST-028 Rendering 19 mm thick in cement sand Motar 1:2 mix (Rough)
ST-029
Rendering 19 mm thick in cement sand Motar 1:2 mix (Smooth
finish)
ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough)
ST-031
Rendering 12.5mm thick in cement sand Motar 1:3 mix (Smooth
finish)
ST-032 Rendering 19 mm thick in cement sand Motar 1:3 mix (Rough)
ST-033
ST-041
Mixing & Laying Using Concrete Mixer, Cement Concrete [Link]
ST-047 (19 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)
Cu.m
12,317.00
Cu.m
13,368.00
Mixing & Laying Using Concrete Mixer (W/Batching), Cement
ST-048A Concrete for Grade 25 (70% 37.5 + 30% 19 mm) Using Crusher
Run Aggregate (excl. Transport of Aggregate & Piling)
Cu.m
12,375.00
Mixing & Laying Using Concrete Mixer (W/Batching), Cement
ST-049 Concrete for Grade 30 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)
Cu.m
15,124.00
Mixing & Laying Using Concrete Mixer (W/Batching), Cement
ST-050 Concrete for Grade 40 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)
Cu.m
16,925.00
Mixing & Laying Using Concrete Mixer (W/Batching), Cement
Concrete for Grade 25 (19 mm) Using Crusher Run Aggregate
ST-048
In Foundation and Floors. (excl. Transport of Aggregate & Piling)
ST-051
Mixing & Laying Using Concrete By Hand
Cu.m
3,529.00
ST-052
Mixing & Laying Using Concrete By Power Driven Concrete Mixer
V/Batching
Cu.m
3,207.00
ST-053
Curing of Concrete Decks, Slabs , Beams, Walls etc. [SSCM
1011.11]
[Link]
34.00
ST-054 Fabricate & Lay M.S Bars as Reinforcement (Excl. Transport)
kg
230.00
ST-055 Fabricate & Lay Tor Steel as Reinforcement (Excl. Transport)
kg
236.00
kg
167.00
ST-056
Cutting & Laying Reinforcment Fabric (Excluding Cost of
Reinforcement Fabric)
Supplying & fixing 25 mm Thick Planks of Class II Timber as
ST-057 Shuttering, Including removing [1008.3(b)]
Sq.m
1,002.00
Supplying & Fixing Class II Timber Bearers, Joists , Etc.
Including Dismantling in Shuttering (SSCM 1008.3 (a))
[Link]
46.00
L.m
70.25
L.m
82.00
ST-058
ST-059
ST-060
100-150 mm Dia. Round Jungle Timber Supplied & Fixed as Props
150-200 mm Dia. Round Jungle Timber Supplied & Fixed as Props
Formwork Smooth Finish With Class II Timber For Bridge
Beams, Bridge Deck Under Sides and Sides Including
Dismantling (SSCM 1008.3(b))
Sq.m
2,430.00
Formwork Smooth Finish With Class II Timber For Bridge
ST-062 Column Shafts Including Dismantling (SSCM 1008.3(b))
Sq.m
2,378.00
ST-061
Formwork Smooth Finish, Using Plywood (Shutter 15 mm) and
ST-063 Class II Timber Bearers, Joists and Jungle Timber Props for
Bridge Abutments, Wing walls Etc.
Sq.m
2,136.00
Supplying & fixing 25mm Thick Planks and Struts of Class II
ST-064 Timber as Formwork Rough Finish, in Foundation Etc. Including
Removing (SSCM 1008.3(b))
Sq.m
1,068.00
Formwork Smooth Finish for General Purposes, Using 25mm
ST-065 Thick Planks & Struts of Class II Timber and Round Jungle
Timber Props 100 - 150 mm Dia. Including Dismantling
Sq.m
1,470.00
Laying & Jointing 152mm Dia. Concrete Pipes (Transport and
ST-066 Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
2,039.00
ST-067
Lalying & Jointing 229mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
2,652.00
ST-068
Laying & Jointing 305mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
3,008.00
ST-069
Laying & Jointing 457mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
4,238.00
Laying & Jointing 610mm Dia. Concrete Pipes (Transport and
ST-070 Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
5,699.00
ST-071
Laying & Jointing 915mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
9,768.00
ST-072
Laying & Jointing 12205mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
14,370.00
ST-073
Laying & Jointing 152 mm Dia. Available Concrete Pipes and
Collars
L.m
493.00
ST-074
Laying & Jointing 229 mm Dia. Available Concrete Pipes and
Collars
L.m
536.00
ST-075
Laying & Jointing 305-450 mm Dia. Available Concrete Pipes and
Collars
L.m
578.00
ST-076
Laying & Jointing 610 mm Dia. Available Concrete Pipes and
Collars
L.m
1,103.00
ST-077
Laying & Jointing 915 mm Dia. Available Concrete Pipes and
Collars
L.m
1,850.00
ST-078
Laying & Jointing 1220 mm Dia. Available Concrete Pipes and
Collars
L.m
2,675.00
ST-079
Fixing new Bridge Planks Runners and Stacking old Planks
(Available) [SSCM 1402.2(a)]
No
648.00
No
405.00
No
84.00
No
3,518.00
ST-080 Removing & Re-Setting old Bridge Planks
ST-081
Supplying & Fixing new Bridge Planks of Class I Timber
ST-082 Supplying & Fixing 31 mm Thick Deck Planks of Class I Timber
ST-083
Fixing New Chequered or M.S. Plates on Timber - Decked Bridge
[SSCM 1402.2(d)]
L.m
956.00
ST-084
Removing & Refixing Chequered M.S. Plates on Timber-Decked
Bridge
L.m
1,274.00
ST-085 Tightening Bolts & nuts of Chequered of M.S. Plates
L.m
186.00
ST-086 Removing & Refixing "U" Clips. [SSCM 1402.2(b)]
L.m
143.00
Sq.m
184.00
Sq.m
133.00
ST-087
ST-088
Cleaning, Wire Brushing & Painting Steelwork, One Coat Enamel
Paint
Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat
ST-089
Cleaning, with Cotton Waste and Painting Steel Work with
Enamel Paint, One Coat
Sq.m
123.00
ST-090
Chipping to Bare Metal etc. & Painting with Anticorrosive Paint,
One Coat
Sq.m
593.00
Painting with One Coat of Enamel Paint after Cleaning, Derusting
& Application of One Coat Anticorrosive Paint[SSCM 1401.3(C)]
Sq.m
436.00
Painting with Two Coats of Enamel Paint, after Cleaning,
ST-092 Degusting & Application of One Coat Anticorrosive Paint
Sq.m
546.00
ST-093 Oiling Steel Cables on Suspension Bridges [SSCM 1405.3]
Sq.m
576.00
ST-091
Cleaning Booms of Steel Bridges including Scaffolding where
Necessary [SSCM 1401.3]
L.m
50.00
Demolishing Unreinforced Cement Concrete Including Cleaning
ST-095 of Debris in Foundation and Superstructure in Dry Condition
Excluding Under Water Structures [SSCM 202.2]
Cu.m
2,041.00
ST-096 Demolishing Reinforced Concrete and Debris Cleared
Cu.m
2,954.00
Demolishing Reinforced Concrete in Very Heavy Structures
ST-097 Build Up of Grade 30 Above Concrete in Work Such As Bridge
Beams & Deck Slabs, Including Collecting and Removing
Cu.m
8,523.00
Supplying and Fixing M.S. Dowels Spliced and Dove Tailed with
ST-098 Wedge at One End, 16mm dia, and 1m long, Boring Holes to 0.3m
Depth in Fixing
No
612.00
Supplying and Fixing M.S. Dowels, Spliced and Dove Tailed with
ST-099 Wedge at One End, 20mm dia, and 1m Long, Boring Holes to
0.3m Depth in Fixing.
No
788.00
Supplying & Fixing [Link], Spliced and Dove Tailed with
Wedge at One End, 25mm dia, and 1m Long. Boring Holes to 0.3m
Depth in Fixing.
No
1,083.00
ST-094
ST-100
ST-101
Lay Standard Type Road Kerbs(125mmX900mm) Set on19mm
thick 1:3 Cement Mortar Layer on 150mm X 275mm [Link](19)
Concrete Foundation With av. 157mm X 150mm Backing
L.m
1,760.00
ST-102
Lay Standard Precast Bridge Kerbs [Type Drawing No T/B/106Rev 1 of RDA](Cost of Precast Kerbs & Transport to be Paid
Separately)
L.m
349.00
ST-103
Constructing 150x50mm thick Inset Lower Kerb in Grade
20(14mm) Concrete for Bridges: ( Aggregate Transport to be
Paid Separately)
L.m
210.00
ST-104
Laying 450 X 450 X 50 mm Precast Concrete Slabs on Foot
Walks Including av. 40mm Thick 1:3 Cement Mortar Bedding
(Cost of Sabs & Transport Paid Separately)
Sq.m
1,168.00
Cu.m
13,706.00
ST-105
Laying 450 x 450 x 50 mm Precast Concrete Slabs on Foot
Walks Including av.40mm Thick Sand Bedding (Cost of Precast
Slabs and Transport to be Paid Separately)
Sq.m
671.00
ST-106
Fixing Precast Hand Railing and Uprights Using Grade 25(19)
Concrete Including Formworks for Pockets (Precast Items &
Transport and [Link] paid Separately)[Type Dwg No
T/B/102/B]
L.m
1,088.00
No
37,172.00
ST-108
Construction of RCC Grade 25(19mm) End Pillaster, Type II
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]
No
41,060.00
ST-109
Construction of RCC Grade 25(19mm) End Pillaster, Type III
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]
No
22,264.00
ST-110
Construction of RCC Grade 25(19mm) End Pillaster, Type IV
(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]
No
24,080.00
ST-111
Laying of Grade 20 Concrete Precast pin Kerbs in Grade 20(19)
Concrete Foundation as Edging (Aggregate transport to be Paid
Separately)
L.m
592.00
ST-112
Supplying and Fixing 25mm Thick Toung and Groved Planks with
50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains
Sq.m
463.00
ST-104A Mixing Cement Sand Mortar Using a Mixer
ST-107
Construction of RCC Grade 25(19mm) End Pillaster, Type 1(Agg.
Transport to be Paid Separately) [Type Dwg No T/B/106-Rev 1]
Supplying and Fixing 25mm Thick Toung and Groved Planks with
ST-112A 50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains(for 13.38 Sq.m)
use
4,743.00
ST-113
Supply and Packing 50-200 mm Dry Stone lining Behind
Abutments and wind walls (Aggregate Transport to pay
separately)
Cu.m
2,240.00
ST-114
Laying Geotextile on Prepared Surface Supply and Transport to
pay Separately
Sq.m
41.00
ST-115
Construction of Gabion Wall Using 4x1x1m Mesh Including
Lacing Wire on Prepared Ground.(Supply and Transport of
Gabion Mesh to be Paid Separately);
Cu.m
4,151.00
ST-116
Construction of Gabion wall Using 4x1x0.5 m mesh including
Lacing Wire on Prepared Ground (Supply and Transport of
Gabion Mesh to be Paid Separately)
Cu.m
4,366.00
ST-117
Construction of Kerb Inlet as per Drawing Type - K1/T1 With
Cover Slabs. Aggregate Transport to pay Separately
L.m
8,708.00
ST-118
Additional Labour For Pouring, Compacting
Concrete in Screed Under Foundation Slabs
Cu.m
625.00
ST-119
Additional Labour For Pouring, Compacting Concrete in
Abutments , Wingwalls, Capping Beams of Piers and Foot walks
of Bridges
Cu.m
209.00
ST-120
Additional Labour For Pouring, Compacting and Levelling infiller
Concrete between Bridge Beams including Creed of Bridge
Decks.
Cu.m
918.00
ST-121
Leveling Ready mixed Grade Concrete Including Vibration
(Supply of Concrete to be Paid Separately)
Cu.m
1,465.00
ST-122
Supplying and laying Approved Hard Rubber Bearing Pads 75mm
x 12mm Over Capping Beams and Under the Approach Slabs
m.
1,017.00
ST-123
Bituminous Sealing Material Supplied and Laid Under Beam ends
to Prevent Grout leak on to Capping Beam Transport of Emulsion
Included.
L.m
110.00
ST-124
230mm Dia. Polythene Displacers Supplied and Filled with Saw
Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately
L.m
94.00
ST-125
325mm Dia Polythene Displacers Supplied and Filled with Saw
Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately
L.m
165.00
No
4,616.00
ST-126
PCC Beams(10.5m to 13.5m) Launching into Position
and
Levelling
ST-127
M.S. Angle Iron and Hard Rubber Expansion Joints as Per
Drawing No T/B/107 Rev. 1
L.m
5,940.00
Unit
Rate Rs
Section 11 - Road Furniture Items
Kilometer Posts and Guard Stones
Item No Description
RF-001
White Washing, Two Coats to Guide / Guard Stones
No
46.00
RF-002
Whitewashing Two Coats K.M. Stones inc. Numbering & Tar
Skirting.
No
479.00
RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos.
No
184.00
RF-004 Fixing Guard Stones in any Soil
No
129.00
Casting STD K.M. Stones with R.C.C. [Link](19 mm) & cement
RF-005 282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads
No
4,395.00
Casting STD K.M. Stones with R.C.C. [Link](19 mm) & cement
RF-006 282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads
No
2,948.00
RF-007 Fixing Standard Type K.M. Stones in Any Soil
No
975.00
Fixing new or Refixing Type Guard stones in Cement Concrete
RF-008 [Link](37.5mm) and Cement 219 KG/Cu.m ] With Min. Cover
75mmx 300 mm Depth
No
575.00
Casting Standard Type Guard Stones in Concrete [Link](19mm)
& Cement 282.5 KG / Cu.m]
No
1,511.00
Casting Standard Type
Guard Stones in Concrete
[G25(19mm)As
per
Drawing
No
T/B/100-Rev 1,For Bridges and
RF-009A
Culvers
No
2,471.00
RF-009
RF-010
Rout NumberingWith Reflective Paint on 2 sides
No
500.00
RF-011
Casting Standard Boundary Markers in Reinforced Concrete
[Link](19mm)] with Admixtures, Including 14 days Curing and
Loading to Vehicle at Yard (Agg. Transport paid Separately)
No
1,820.00
Section 12 - Notic Boards & Road Signs
[SSCM 810.2 AND 1501.3] - All Paints Should Conform to the Requirements of SLS as Given in SSCM
1707.
Item No Description
Unit
Rate Rs
Notice & Traffic Sign Boards Etc. Fixed in Concrete
[Link](37.5mm) and Cement 219 KG/Cu.m) (Excluding Transport
of Aggregate)
No
1,060.00
Cleaning & Whitewashing 2 Coat Town Name Boards (Inc. Tar
RS-002 Skirt)
No
262.00
Cleaning, Painting one Coat & Relettering Etc. Traffic sign
Boards inc. Paint Post in B/W
No
1,554.00
RS-001
RS-003
RS-004 Cleaning and painting 1 coat on Notice Board
Sq.m
236.00
RS-005 lettering & Numbering Below 50 mm
No
42.00
RS-006 Lettering and Numbering 50mm-75mm
No
50.00
RS-007 lettering & Numbering 75 mm - 150 mm
No
63.00
RS-008 lettering & Numbering 150 mm - 225 mm
No
83.00
RS-009
Painting 2 Coats Continuous Center Line,100 mm Wide With
Enamel Paint
L.m
101.00
RS-010
Painting 1 Coats Continuous Center Line,100 mm Wide With Road
Marking Paint (White)
L.m
94.00
RS-011
Painting 2 Coats Broken Center Line,100 mm Wide With Enamel
Paint
L.m
94.00
RS-012
Painting 1 Coats Continuous Center Line (Without Reflective
Studs),100 mm Wide, At 3 meter Intervals With Road Marking
Paint (White)
L.m
92.00
RS-013
Barricading With Empty (Hot Tar) Barrels Including White
Wash( ExcludingTransport) and Cost of Barrels
No
255.00
RS-014
Revetment to Banks etc. with Empty Barrels in Horizontal Tiers
with Vertical Batter(1:8) including Transport of Barrels
No
589.00
RS-015
Road Marking Continuous Center line 100 mm Width, using
Thermoplastic paint (White) , Inclusive Barricading.
Sq.m
274.00
RS-016
Road
Marking
Standard
Pedestrian
Crossing,
Thermoplastic paint (White) , Inclusive Barricading.
L.m
605.00
Unit
Rate Rs
Cu.m
13,420.00
using
Section 13 - Miscellaneous
Item No Description
MS-001
Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made)
Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made) with Department Bitumen
Cu.m
6,320.00
Patching Shallow Pot Holes. Depth Less 20mm using hot bitumen
1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu. deci m/sq.m
MS-002
incld. hand tamping (rat. inc. cost of bitumen & mater.) (Excl.
Transport. of Aggregate & Bitumen)
Sq.m
249.00
Patching road with premix after preparing surface with 30% cut
back
Cu.m
6,542.00
Cu.m
5,386.00
Sq.m
248.00
Sq.m
260.00
Sq.m
1,447.00
Patching Potholes of Medium Depth 20-75mm Using Graded
MS-007 Aggregate 19-12.5mm With Hot Bitumen 1.75 ltr/Sq.m and Blot.
Material at 1 Cu.m/125 Sq.m and .75ltr/Sq.m Tack Coat(CSS-1)
Sq.m
722.00
Patching Potholes Deeper Than 75mm Using Premix Material
(Site Made) to a Depth of 37.5mm(Over the Prepared Surface
MS-008 with Aggregate and Gravel Paid Separately) Using 10-20%
Cutback 83.5Ltr/Cu.m of 19mm down Agg, .75Ltr/Sq.m Tack
coat
Sq.m
828.00
Patching pot holes more then 75mm deep with water bound
gravel material using 50mm or 12.5 mm single size aggregate
MS-009 along with useable old aggregate obtain from picking and
preparation of surface inc. laying watering Spreading gravel of
approved quality
Sq.m
38.00
Patching Ruts and Depressions Upto 75mm Depth Using Site
MS-010 Made Cold Mix (Cut Back) Material With the Surface and Edge
Prepared as Per Specifications .75Ltr/Sq.m Tack Coat
Sq.m
1,345.00
Sq.m
15.00
MS-001A
MS-002A
MS-002B
Patching road with premix after preparing surface
Patching Shallow Potholes, Depth Less Than 20mm Using 10-20%
Cutback Bitumen 1.2ltr/Sq.m and 12.5mm Chips, Single Size at
MS-003
13.75 CuDeci m/Sq.m including hand tamping (Excl. Tr. Agg,
Bitumen )
Patching shallow pot holes, depth less than 20mm using emulsion
(Crs1) @ 1.2Ltr/Sq.m & 12.5mm [Link] m/sqm including hand
MS-004 tamping transport of emulsion to site etc. Rate include cost of
emulsion and other materials) (Excl. transport of aggregate)
Patching pot holes of Medium ,depth of 20-75mm with Premix
(Site Made) using Cutback 10-20% at the Rate of 83.5 Ltr/Cu.m
MS-005 of 19mm Down Aggregate including preparation of Surface, Tack
Coat(CSS1) AT .75Ltr/Sq.m, Trimming Sides, Tamping etc
MS-010A Patching Ruts and Depressions Part 1 of Item MS-010
Patching Ruts and Depressions Deeper than 75mm Depth Using
50mm Down Aggregate, Top 40mm with Plant Made Cold Mix
MS-012 (Cut Back) Material with .75Ltr/Sq.m tack coat(CSS-1)(Premix
paid Separately)
Sq.m
1,044.00
Patching Ruts and Depressions Upto 75mm Deep with .
75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-013
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)
Sq.m
797.00
Patching Ruts and Depressions Deeper Than 75mm with .
75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-014
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)
Sq.m
885.00
Correcting and Strengthening Edges of the Road by Cold mix
40mm thick, Cutback 10-20%, at the rate of 83.5Ltr/Cu.m on
MS-015
19mm down Aggregate, Over 50mm down Aggregate, Tack coat .
75 Ltr/Sq.m(CSS 1)
Sq.m
1,230.00
Correcting and Strengthening Edges of Road by Cutback(1020%) Cold Mix 40mm thick with 83.5Ltr/Cu.m 19mm Down
MS-016 aggregate over .75Ltr/Sq.m Tack Coat(CSS-1) over 50 mm down
over Closely packed 100mm agg. with excavation width 225mm,
depth 225mm
Sq.m
1,397.00
Sq.m
1,112.00
Patch Sealing with emulsion painting the surface by spray of
MS-017 crs-1 @ .75ltr/sq.m squeeing the emulsion and spreading the
blotton material (Sand) at the rate of 1 Cu.m/125 Sq.m
Sq.m
125.00
Patch Sealing with hot Bitumen painting the surface by Using .
75ltr/sq.m squeeging the bitumen and spreading the blotton
MS-018 material (Sand) at the rate of 1 Cu.m/125 Sq.m (Transport of
bitumen paid separately)
Sq.m
119.00
Sq.m
268.00
Sq.m
15,673.00
MS-019B Patch Sealing of Pitted Surface, Part B of Item MS-019A
Sq.m
33.00
Patch Sealing of Pitted Surface With Emulsion Sand Slurry
MS-020 using CRS 1 or 2 at the Rate of 136.5Ltr/Cum of Sand Mix
Properly Laid, Leveled & Squeeged incl. Brushing and Cleaning
Sq.m
343.00
MS-016B
Correcting and Strengthening Edges Part B of the Item MS-016
Patch Sealing of Pitted Surface Using Hot Sand Bitumen Mix
104Ltr/Cu.m of Sand Spread and Hand Tamped Including
MS-019
Brushing and Cleaning The Surface (Excl Transport of Bitumen)
MS-019A
Patch Sealing of Pitted Surface, Part A of Item MS-019A
General upkeep of Road sides Including Maintaining the Right of
way in a Neat Condition by Trimming, Weeding & Clearing of the
MS-021 Road Sides, Drains , Drainage Structures, Scupper Drains &
Cleaning Minor Slips
Km
3,299.00
Km
6,845.00
Cleaning medium Jungle Including Removing High Growing Plants
and Trees of Girth < 300 mm other than those designated to
MS-023 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed
Km
9,428.00
Cleaning heavy Jungle Including Removing all High Growing Plants
and Trees of Girth < 300 mm other than those designated to
MS-024 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed
Km
12,011.00
Repairs to Damage of Shoulders verges and Embankments slopes
including making good depressions,ruts,holes and Erosion path
MS-025 with approved gravelly soil & compacting the same with roller(810 ton) as Directed(Gravel soil be paid separately if brought
outsid
Cu.m
380.00
Regarding and Regravelling of shoulders with gravel of approved
Quality , duly compacted with Roller (8-10 ton) as directed for
MS-026 Repairing high sides Caused by heaving deposits and
Construction Debris, to Required levels by using a grader (120
-140hp)
km
246.50
Regarding and Regravelling of shoulders with gravel of approved
Quality , duly compacted with Roller (8-10 ton) as directed for
MS-027 Repairing high sides Caused by heavings deposits and
Construction Debris, to Required levels manually Gravel (loose
volume)
km
431.00
Cleaning ordinary Jungle Including Removing High Growing Plants
and Trees of Girth < 300 mm other than those designated to
MS-022 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed (SSCM 1203.2)
Replacing Damaged Cracked Concrete Slabs in Foot Walks with
Precast/Cast insitu Concrete [Link](19mm), with 50mm minimum
MS-028 thickness including fixing in position with Cement Mortar 1.3 mix
(Excluding Transport of Aggregate) (SSCM 1204.3)
Cutting and Removing Fallen Trees upto 600 mm Girth Including
Cutting into Required number of Pieces Including Disposal as
MS-029
Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)
Sq.m
1,561.00
No
452.00
Cutting and Removing Fallen Trees 600 - 900 mm Girth Including
Cutting into Required number of Pieces Including Disposal as
MS-030 Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)
No
646.00
Culverts
136.00
Cu.m
974.00
No
255.00
Cu.m
382.00
Cu.m
564.00
Cu.m
747.00
Cu.m
929.00
Cu.m
1,915.00
Sq.m
31.00
Sq.m
52.00
White Washing 1 Cote to Parapets of Bridges and Culverts after
MS-041 cleaning Attending to minor Repairs
Sq.m
75.00
White Washing 2 Cote to Parapets of Bridges and Culverts
after cleaning Attending to minor Repairs
Sq.m
97.00
Painting with Emulsion 1 Coat to Parapets of Bridges and
MS-043 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]
Sq.m
181.00
Painting with Enamel 1 Coat to Parapets of Bridges and Culverts,
MS-044 Guard Stones and KM Posts After Cleaning and Attending to
Minor Repairs [ SSCM 1501.3(a)-(v)]
Sq.m
197.00
Painting with Enamel 2 Coats to Parapets of Bridges and
MS-045 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]
Sq.m
309.00
Painting with Emulsion 2 Coat to Parapets of Bridges and
MS-046 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]
Sq.m
290.00
MS-031
Weeding Masonry Culverts Small Bridges and Retaining Walls
(SSCM 1303.3)
Masonry Random Rubble with Boulders including Collect (SSCM
MS-032 1006.3(b))
Fixing cats Eyes in Tar Macadam Including Breaking road
MS-033 Surface, Barricade etc. [SSCM 810-.3(c)]
MS-034 Reducing High Sides in Ordinary Soil [SSCM 301.3/1201.3(c)]
MS-035
MS-036
MS-037
MS-038
Reducing High Sides in Medium Soil
Reducing High Sides in Hard Soil
Reducing High Sides in Soft Rock
Reducing High Sides in Rock Requiring Blasting
White Washing 1 Cote to Parapets of Bridges and Culverts
MS-039 (SSCM 1403.3(e))
MS-040
MS-042
White Washing 2 Cotes to Parapets of Bridges and Culverts
Painting with Emulsion 1 Coat to Parapets of Bridges and
MS-047 Culverts, Guard Stones and KM Posts Including Preparing
Surface of Old Work [ SSCM 1501.3(b)-(v)]
Sq.m
142.00
Painting Sub Coat Emulsion to Parapets of Bridges and Culverts,
MS-048 Guard Stones and KM Posts Including Preparing Surface [SCM
1501.3(b)-(v)]
Sq.m
125.00
Painting 1 Coat Emulsion Paint to Parapets of Bridges and
MS-049 Culverts, Guard Stones and KM Posts Including Preparing
Surface of New Work [ SSCM 1501.3(b)-(v)]
Sq.m
132.00
MS-050
Cleaning & Painting 100mm wide stripe for skirting to guard
stones. {SSCM 1501.3(b)(v)}
L.m
57.00
MS-051
Painting 2 Coats Standard Pedestrian Crossing for Carriageway
[SSCM 810.2(c)]
L.m
1,472.00
MS-052
Painting 1 Coat Standard Pedestrian Crossing for Carriageway
Using Road Marding Paints [SSCM 810.2(c)]
Sq.m
1,275.00
Erecting, Barricading in Jungle Timber 75-100 mm Dia, Vertical
MS-053 Posts at .9m Centers and 1.2 Above Ground including White
Washing. [SSCM 1709]
L.m
Temporary Scaffolding for Painting or Tarring Bridges and for
MS-054 Weeding on Bridges or Retaining wall Including Dismantling
after work. [SSCM 1008.3(a)]
Sq.m
98.00
Roughening Existing Smooth tarred Metalled Carriageway by
MS-055 hand for Bonding , Collecting Disposal of all Loose Materials
[SSCM 03.3(b)]
Sq.m
13.00
MS-056 Supply of Diesel for Machineries
ltr
278.00
102.00
Patching road with Premix (Loose Volume) after Prep, Surface
with Emulsion (CSS-1) at .75 ltr/sq.m at tack Coat Including
MS-057 internal Transport and Hand Stamping. (Supply of premix (Loose
Volume) Paid Separately) [SSCM 1102.3(b)]
Cu.m
5,211.00
Patching Road With Premix After Preparing Surface With
Emulsion (CSS-1) at .75 ltr/sq.m as Tack Coat, Including
MS-058
Internal Transport and Stamping with Machine (Supply of
Premix Paid Separately) [SSCM 1102.3(b)(i)]
[Link]
5,124.00
Painting two Coats Enamel Paint on Kerbs, After Cleaning and
Preparing Surface
Sq.m
294.00
Preparing and Stock Piling Premix at Site Using 12.5 mm
MS-060 Aggregate and Emulsion (CSS-1) (Excluding Transport of
Aggregate)
Cu.m
15,358.00
Breaking Manually Asphalt layer 2"-3" Thick on the Carriageway
MS-061 for Kerb Laying
L.m
329.00
MS-059
Section 14 - Survey & Day Works
Description
Item No
SV-001
Supply of Unskilled Labour
Unit
Rate Rs
Days
1,008.00
SV-002 Supply of Semiskilled Labour
Days
1,210.00
SV-003 Supply of Skilled "A" Grade Labour
Days
1,775.00
SV-004 Supply of Skilled "B" Grade Labour
Days
1,512.00
SV-005
Clearing jungle (Light) to a Width of 1.22 meters for Survey
work
km
3,850.00
SV-006
Clearing jungle (Medium) to a Width of 1.22 meters for Survey
work
km
6,163.00
SV-007
Clearing jungle (Heavy) to a Width of 1.22 meters for Survey
work
km
7,700.00
SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging
km
1,156.00
Leveling Chaining and Pegging and Establish Bench Marks on
SV-009 Concrete Rock or Pegs and Checking Back Levels
km
2,311.00
km
2,311.00
km
3,081.00
SV-010
SV-011
Surveying Including Fixing Pickets & Taking Angles
Changing Traverse Lines and Taking off-sets
Rate Rs
284.11
314.60
337.07
52.43
35.21
635.25
211.75
37.51
211.75
46.82
9.46
6.51
Rate Rs
132.3
110.7
118.7
18.5
12.4
72.6
24.2
24.2
24.2
16.8
3.6
2.5
11.72
4.10
7.04
3.17
1.34
91.84
17.64
8.2
7.56
34.76
8.5
12.5
7.54
2.9
5.29
2.1
39.10
14.1
8.48
3.3
5.96
2.3
52.14
18.8
11.31
4.4
7.94
3.1
78.21
28.2
16.99
6.6
11.91
4.7
104.27
37.6
22.62
8.8
15.89
6.3
156.48
56.4
33.92
13.2
23.82
9.4
335.54
123.3
90.61
37.1
64.59
26.6
54.43
63.50
125.99
209.65
273.15
503.97
1007.93
0.86
1.32
2.24
3.30
1.18
25.3
29.6
58.7
97.6
127.2
234.7
469.5
1
1.4
2
2.4
1.3
1.57
0.9
0.74
0.6 fuel
7425.00
6,750.00
salary
100
0thers
150
150
302.50
8.78
1.52
1.21
12.41
2.42
1.82
Rate Rs
376.01
467.28
558.54
491.20
741.07
629.99
1106.14
940.19
801.92
1197.40
275
7.98
1.38
1.1
11.28
2.2
1.65
923.61
741.07
923.61
1288.67
984.45
1106.14
1471.20
91.27
120.47
1079.61
1862.13
1887.61
2836.86
176.87
174.34
32.09
6.42
Rate Rs
1533.66
2325.64
2288.62
2524.61
2889.67
3437.27
3984.86
704.8
1,039.70
1,054.80
1,139.30
1,309.40
1,564.40
1,819.50
4897.52
2,244.60
6905.37
3,179.80
2138.07
1,270.50
2511.96
1,308.90
2808.41
1,615.10
2458.72
1,154.40
2565.20
1,270.50
2180.42
1389.08
940.2
641.3
2964.50
1,793.70
2389.75
1,368.70
109.56
219.13
182.53
50.6
101.2
85
Rate Rs
1066.25
502.9
123.28
61.3
307.45
197.1
195.99
118.9
384.41
234.7
382.27
224.5
399.56
285.2
410.70
191.3
62.60
23.4
56.91
21.3
888.35
358.4
390.14
254.1
390.14
254.1
60.50
39.5
Rate Rs
267.01
123.4
200.26
92.5
133.50
61.7
177.56
82
Rate Rs
736.44
368.8
1140.79
566.5
67.90
33.4
60.27
29.5
1086.15
520.1
1688.43
808.5
40.94
19.3
50.16
24.4
1442.80
697.7
1162.58
560.8
1040.46
493.6
1704.05
806.1
5091.70
2,310.90
4813.40
2,186.70
2888.52
1,414.30
3727.00
1,823.90
3081.13
1,515.80
Rate Rs
265.26
111.5
54.89
29.6
266.86
110.9
56.49
29
208.43
109.7
107.94
54.7
204.42
106.7
105.17
54.7
114.73
50
35.84
19.3
142.41
61.2
37.22
20.2
116.38
49.7
37.50
18.7
144.06
60.6
38.88
19.7
456.15
129.3
447.79
125
110.07
34.5
107.86
33.1
73.53
22.7
147.06
45.4
105.29
31.7
73.33
33.4
36.51
19
293.32
135.1
99.55
45
9.77
4.8
144.19
44.6
140.33
3.86
43
1.7
137.58
40.8
133.64
61
126.45
56.8
2.82
126.40
15.29
1.3
37.7
8.2
55.86
29.2
116.63
62.85
1153.59
690
145.91
44.6
15.73
6.2
180.09
53.2
120.12
57.5
168.56
80.7
1656.35
713.6
135.09
62.75
134.91
Rate Rs
2664.43
47.2
Rate Rs
1,146.70
3996.65
5328.87
6661.08
7993.30
9325.51
10657.73
1332.22
2346.76
3520.13
4693.51
1,720.10
2,293.40
2,866.80
3,440.20
4,013.50
4,586.90
573.4
754.4
1,131.60
1,508.80
5866.89
1,886.10
7040.27
2,263.30
8213.65
5,281.00
9387.02
1173.38
3207.68
3364.84
Rate Rs
3,017.70
377.2
1,492.60
1,564.60
Rate Rs
551.06
280.5
770.18
381.7
989.31
483
1098.87
770.18
533.6
381.7
461.36
222.9
2104.65
964
114.36
52.9
200.33
91.1
14.38
8.74
6.9
4.1
69.76
32.6
177.31
741.08
84.7
349.8
21.90
10.4
159.62
76.3
Rate Rs
2263.57
1,052.70
2628.63
1,222.70
1241.56
575
7829.67
4,002.00
8181.13
4,203.50
6691.29
7042.75
4017.66
4102.39
3257.96
649.81
1316.21
316.18
1609.50
530.36
303.24
3,048.70
3,203.50
1,653.30
2,030.00
1,322.60
307.3
621.6
149.5
828.7
249.7
120.9
647.33
373.2
763.08
56.26
370.1
25.4
902.90
433.2
365.06
170
1095.19
510.1
547.59
255.1
730.13
365.06
485.33
340.1
170
232.8
609.16
725.29
815.72
491.33
591.28
688.56
779.12
290
349
391.4
232.6
280.5
329.1
371.5
9458.29
4,939.80
8647.09
4,961.00
8498.83
4,552.80
8179.00
4,107.00
9124.92
4,914.20
8798.94
4,765.70
11014.88
5,830.90
10691.83
5,683.15
9283.64
4,835.80
12296.47
6,705.10
12316.80
6,672.10
13367.51
7,356.90
12375.23
6,713.40
15123.62
8,370.60
16924.99
9,375.00
3528.93
3207.07
34.10
1,620.80
1,474.60
13.6
230.03
121.4
235.59
121.4
166.61
70.9
1002.07
481.4
45.95
70.15
82.38
20.8
35.8
46
2430.27
1,175.70
2377.59
1,113.00
2136.15
995.75
1068.31
496.9
1469.70
690
2038.60
1,186.70
2651.59
3008.01
4237.85
1,289.30
1,418.00
2,009.00
5698.65
2,926.75
9768.11
14370.26
493.02
535.74
578.10
1103.30
1850.22
2675.24
647.62
404.76
84.05
3518.41
4,916.90
7,931.50
230.9
252.1
277.3
503.3
898.7
1,162.40
281.3
175.8
53.5
2,036.70
955.50
1274.00
186.34
142.63
183.77
132.97
122.99
593.02
415.1
553.4
90.4
59.6
90.4
59.6
60.7
273.9
435.55
204.6
546.44
576.12
50.19
289.4
149.7
23.6
2040.95
939.9
2953.82
1,340.40
8523.25
4,526.30
611.60
287.7
787.86
379
1082.93
529.8
1760.19
881.2
348.89
157.8
209.68
101.9
1168.03
586
13705.67
7,668.80
671.11
310
1087.87
503.4
37171.64
18,999.50
41060.07
21,021.60
22263.57
12,217.90
24079.80
13,161.30
592.38
301.4
462.90
447.5
4742.54
2,906.60
2240.44
1,088.80
41.21
18.4
4151.48
1,948.30
4366.10
2,069.00
8708.15
625.18
4,399.50
274.8
208.83
83.3
918.39
388.5
1464.81
610.2
1016.57
659.7
109.73
44.6
93.86
67
164.65
117.7
4615.99
2,351.30
5940.02
3,004.70
Rate Rs
45.95
478.59
23
224.65
184.03
87.2
129.14
60.2
4395.28
2228..8
2948.49
1,498.00
975.48
454.6
574.90
295.8
1511.07
764.8
2470.67
1,316.60
500.36
213.7
1820.12
885.2
Rate Rs
1060.53
521.3
262.47
1554.06
138.1
672.3
235.65
114.2
41.69
16.8
50.02
20.1
62.53
25.2
83.37
33.5
100.87
93.73
94.14
50.3
51.6
46.6
92.37
48
255.06
589.43
273.56
101.7
280.8
132.7
604.62
317
Rate Rs
13419.13
6,438.20
6320.05
3,673.90
248.63
104.8
6542.23
5386.07
2213.2
2107.75
248.39
108.4
260.13
89.1
1447.15
643.5
722.06
306.5
827.82
361.5
38.21
17.8
1345.19
596
14.81
6.9
1043.72
461.8
797.38
1414.3
884.70
381.9
1230.25
549.6
1397.31
628.1
1112.07
520.8
125.48
41.7
118.53
51.5
268.43
117.5
15673.26
33.34
6,803.60
15.4
342.62
112.6
3298.91
1,539.00
6845.40
3,179.70
9428.23
4,382.70
12011.05
5,585.80
380.41
183.9
246.71
148.2
431.04
255.8
1561.44
776.3
451.99
210.5
645.71
300.8
136.13
60.9
973.96
389.1
255.17
115
381.50
564.03
746.57
929.10
1915.29
184.6
269.7
354.7
439.7
1,121.90
30.52
14.9
51.64
75.12
96.50
25.4
24.3
35.5
180.98
80.2
196.90
86.8
309.44
140
290.19
133.4
141.90
71.6
124.85
63.3
131.89
67.4
56.99
1471.97
1275.05
26.3
661.4
694
278.01
136.2
98.13
45.65
13.34
6.2
101.88
60.7
5211.29
2,080.00
5124.00
2,169.80
293.65
139.3
15357.36
5,173.60
329.02
150.8
Rate Rs
Rate Rs
1007.93
469.5
1210.00
559
1775.07
707.8
1512.50
636.5
3850.17
6162.73
7700.33
1155.51
1,793.40
2,391.10
3,586.70
533.9
2311.02
1,067.70
2311.02
3081.37
1,067.70
1,423.60
Highway Schedule of Rates - 2013
Road Development Authority - Central Province
PROPOSED BASIC RATES
Description
Item No
FOR 2013
Unit
Rate (Rs.)
B0-001
Labour Skilled A (SK A)
Day
1,467.00
B0-002
Labour Skilled B (SK B)
Day
1,250.00
B0-003
Labour Semi Skilled (S/SK)
Day
1,000.00
B0-004
Labour Unskilled (U/SK)
Day
833.00
B0-101
Tar Boiler (Heating with firewood) (Less Operator)
Day
220.00
B0-102
Concrete / asphalt mixer (400 ltrs)
Day
5,500.00
B0-103
Bitumen sprayer (Less Operator)
Day
220.00
B0-104
Water tank+50mm pump (Less Operator)
Day
1,320.00
B0-105
Welding plant with generator
Day
6,000.00
B0-106
Porker vibrator (90 kg) (Less Operator)
Day
2,500.00
B0-107
Plate vibrator (90 kg) (Less Operator)
Day
2,300.00
B0-108
Vibrating rammer (60kg)(Less Operator)
Day
2,500.00
B0-109
Vibrating roller (1/2-1 ton)
Day
4,500.00
B0-110
Vibrating roller (smooth-10 tons)
Day
20,000.00
B0-111
Smooth/road roller (8-10 tons) static
Day
9,000.00
B0-112
Pneumatic road roller (8-10 tons)
Hour
3,700.00
B0-113
Motor grader (65 HP)
Day
25,000.00
B0-114
Motor grader (120-140 HP)
Day
28,000.00
B0-115
Backhoe loader (2 WD)
Day
20,500.00
B0-116
Wheel loader (1.4 cu.m)
Day
24,000.00
B0-116A
Wheel Loader (1.7 cu.m)
Day
26,000.00
B0-117
Tractor & trailor (75 cube:)
Day
6,500.00
B0-118
Lorry /Tipper/ Dump truck (exceeding 1.0 km)- Rate for 1
km
KM/Cu.m
31.00
B0-119
Lorry /Tipper /Dump truck Rate for Up to 1 km
KM/Cu.m
175.00
B0-120
Transport of premix by dump truck-Rate for 1 km
KM/m.t
175.00
B0-120A
Transport of Emulsion per 100 litres
B0-121
Sand/chip spreader-propelled
Day
23,000.00
B0-121a
Sand/chip spreader-towed
Day
800.00
B0-122
Farm tractor & broom
Day
8,200.00
B0-123
Emulsion sprayer self prop.(4000 litres)
Day
1,600.00
B0-124
Wheel loader (2.7-3.1 cu.m)
Day
33,500.00
B0-124A
Wheel loader (2.0-2.3 cu.m)
Day
29,000.00
B0-125
Lorry 3 ton (2.5cu.m)
km
31.00
B0-126
Lorry 5 ton (3.5 cu.m)
km
31.00
B0-127
Lorry 7 ton (4.5 cu.m)
km
31.00
B0-128
Water bowser (6000 litres)
Day
9,500.00
B0-129
Asphalt paver (crawler)
hour
4,500.00
B0-129A
Asphalt paver (Wheel)
hour
4,200.00
B0-130
Tanker only (20000 litres)
hour
300.00
B0-131
Prime mover old (for 20000 L tanker)
hour
3,500.00
B0-132
Baby dumper 75 cu.m (Less Operator)
hour
1,000.00
B0-133
Water pump 4"(with Operator)
hour
900.00
B0-133A
Water pump 2" (less operater)
hour
312.00
B0-134
Sludge pump 4"(with Operator)
hour
1,100.00
km /100ltr
5.00
B0-135
Vibrating Roller (6-7 tons) tandem
hour
1,600.00
B0-136
Concrete mixer with weigh batcher 114/10 *
Day
8,000.00
B0-137
Trolley emulsion (less operator)
hour
150.00
B0-138
Sprayer emulsion hand cart
hour
600.00
B0-139
Road marker hand cart gas heater
hour
1,500.00
B0-140
Bitumen distributor 750 litres
hour
1,200.00
B0-141
Tank truck bitumen 10000 Ltr
hour
3,700.00
B0-142
Crusher stone 40t/h
hour
5,800.00
B0-143
Track drill crawler
hour
1,700.00
B0-144
Compressor air 750 cfm
hour
4,500.00
B0-145
Slurry sealing Machine
hour
7,400.00
B0-146
Backhoe JCB
Day
20,000.00
B0-147
Asphalt plant 60t/h hot mix
hour
15,000.00
B0-148
Cold mix plant 15t/h
hour
7,400.00
B0-149
Pick up truck 2 WD
km
B0-150
Farm tractor with water bowser
hour
B0-151
Lorry 17 ton Self Loading (wet)
km
B0-152
Tractor with Emulsion Bowser
B0-153
Emulsion Tank Truck (8000litres)
B0-154
Dozer (Crawler Tractor)D-4 D-41(80-100Hp)
hour
3,600.00
B0-155
Excavator Mobile
hour
4,200.00
B0-156
Air Compressor 250 CFM
hour
1,700.00
B0-157
Hand held Breaker (Demolisher) (less operater)
Day
400.00
B0-201
Approved soil type I & II for bases & shoulders
Cu.m
247.00 DAMBULLE
hour
km
78.20
1,025.00
175.00
1,025.00
104.00
B0-202
Approved soil type I & II for embankments
Cu.m
247.00
B0-301
(150mm-225mm) rubble- (vehicle measurement excluding
piling)
Cu.m
1,060.00
B0-302
(150mm -225mm) rubble piled
Cu.m
1,121.90
B0-303
Manually Production (100mm) Aggregate
Cu.m
1,590.00
B0-304
Manually Production (75mm) Aggregate
Cu.m
No rate
B0-305
Manually Production (50mm) Aggregate
Cu.m
1,767.00
B0-306
Manually Production (37.5mm) Aggregate
Cu.m
No rate
B0-307
Crusher Production (25mm) Aggregate
Cu.m
2,297.00
B0-308
Manually Production (19mm) Aggregate
Cu.m
No rate
B0-308A
Crusher Production (19mm) Aggregate
Cu.m
2,321.00
B0-309
Crusher Production (12.5mm) Aggregate
Cu.m
2,032.00
B0-310
Crusher Production (37.5mm)-do-(S.S.C.M.T:1701.4)
Cu.m
2,076.00
B0-311
Crusher Production (50MM)-do-(S.S.C.M.T:1701.4)
Cu.m
1,767.00
B0-312
Crusher fines(6.3 mm down wards)
Cu.m
1,802.00
883.34
B0-312A
Crusher fines(Quarry Dust)
Cu.m
1,148.00
530.00
B0-313
Crusher Produced (37.5mm)graded (table 1701.5 for ABC)
Cu.m
2,120.00
B0-314
Aggregate for seal coat 19mm (SSCM table 1701-8)
Cu.m
2,450.00
B0-315
Aggregate for seal coat 12.5mm (SSCM table 1701-8)
Cu.m
1,975.00
B0-316
Aggregate for seal coat 9.5 mm (SSCM table 1701-8)
Cu.m
1,700.00
B0-331
River sand for road surface (sscm table 1701-9)
Cu.m
1,060.00
B0-332
River sand for concrete & masonry work (sscm table 1701-2)
Cu.m
1,060.00
B0-340
Common burnt clay building bricks (SLS 39:1978)
No
6.50
B0-351
Bitumen 80/100 (200 Ltr drums) (ex-stockist)
ltr
91.50
B0-351A
Bitumen 60/70 (140 liter drums) (Ex Stock)
ltr
100.80
424.00
883.39
1590.11
1236.75
B0-352
Emulsion -C.S.S.1 (Excluding transp.)
ltr
105.00
B0-353
Emulsion -C.R.S.1 (Excluding transp.)
ltr
101.00
B0-354
Emulsion -C.R.S.2 (Excluding transp.)
ltr
110.00
B0-355
Bitumen80/100 [bulk] (ex refinery) for asphalt plant
kg
91.50
B0-355A
Bitumen 60/70 (Bulk) (Delivery at Site) for all asphalt plants
kg
100.80
B0-361
Asphalt concrete surfacing material binder80/1005%MIXdense [19mm] - Ex-plant
M.t
11,324.00
B0-361A
Asphalt Concrete Surfacing Material binder 60/70 5%
Mix-Dense (19MM)
M.t
10,900.00
B0-362
Asphalt concrete bound base material binder 3.53%MIXdense (37.5mm) - Ex-plant
M.t
9,300.00
B0-362A
Asphalt concrete binder course material: binder 60/70:
4.2% mix-dense (19mm)
M.t
No rate
B0-365
Asphalt concrete-cold mix with cut back20%-binder 5.5%
MIX*-dense (19mm) Ex-plant
M.t
No rate
B0-366
Cold mixed asphalt with emulsion CSS-1(6.67% by wgt of
agg.) &19mm Aggregate Ex-plant
M.t
B0-391
Sawn timber class 1 (local)-(incl transport)
[Link]
60.00
B0-392
Sawn timber class 2 (local)-(incl transport)
[Link]
59.00
B0-393
Timber round jungle-100mm minimum & 150 mm average
diameter (incl transport)
L.m
44.00
B0-394
Timber round jungle-150mm minimum & 200 mm average
diameter (incl transport)
L.m
90.00
B0-395
Firewood
Cu.m
1,100.00
B0-396
Plywood (MR) for formwork-15 mm thick (incl transport)
Sq.m
995.30
B0-397
Bamboo tree length greater than 8 meters
No
250.00
B0-401
Portland cement(50kg) (incl transport)
Bag
813.50
B0-411
Mild steel (incl transport)
kg
120.00
B0-411A
Tor steel (incl transport)
kg
124.00
B0-431
Binding wire (incl transport)
kg
170.00
B0-432
Wire nails [Link] & nuts (incl transport)
kg
200.00
B0-433
Stainless steel 20 mm dia.(for dowels) (incl transport)
L.m
2,200.00
10,850.00
B0-441
Reinforce concrete Pipe dia.(153mm)lenth(2438 mm)
No
2,900.00
B0-441B
Reinforce concrete Collar dia.(153mm)lenth(2438 mm)
No
325.00
B0-442
Reinforce concrete Pipe dia.(229mm)lenth(2438 mm)
No
4,000.00
B0-442B
Reinforce concrete Collar dia.(229mm)lenth(2438 mm)
No
400.00
B0-443
Reinforce concrete Pipe dia.(305mm)lenth(2438 mm)
No
4,500.00
B0-443B
Reinforce concrete Collar dia.(305mm)lenth(2438 mm)
No
600.00
B0-444
Reinforce concrete Pipe dia.(450mm)lenth(2438 mm)
No
6,780.00
B0-444B
Reinforce concrete Collar dia.(450mm)lenth(2438 mm)
No
900.00
B0-445
Reinforce concrete Pipe dia.(610mm)lenth(2438 mm)
No
8,600.00
B0-445B
Reinforce concrete Collar dia.(610mm)lenth(2438 mm)
No
1,000.00
B0-446
Reinforce concrete Pipe dia.(914mm)lenth(1219 mm)
No
6,900.00
B0-446B
Reinforce concrete Collar dia.(914mm)lenth(1219 mm)
No
1,300.00
B0-447
Reinforce concrete Pipe dia.(1219mm)lenth(1219 mm)
No
10,250.00
B0-447B
Reinforce concrete Collar dia.(1219mm)lenth(1219 mm)
No
1,850.00
B0-448
Stnadard road kerb 125x250x900 G20 concrete (Ex
factory)
No
540.00
B0-449
Paving slab 450x450x50mm G20 concrete
No
285.00
B0-450
Bridge kerb 915
No
1,224.00
B0-451
Standard uprights for bridges (new design)
No
1,530.00
B0-452
Standard Hand rails for bridges (new design)
No
1,530.00
B0-453
Coupling pairs for hand rails
B0-454
pair.
408.00
Rain water channels 609 mm long
No
204.00
B0-455
Cement sand Hollow block16"x8"x4"
No
45.00
B0-501
Blasting powder
kg
420.00
B0-502
Fuse wire
L.m
25.20
B0-503
Steel Jumper
kg
175.52
B0-504
Electric detonators
No
123.60
B0-505
Dyna cord
L.m
71.50
B0-506
Gelignite
kg
912.00
B0-507
Ammonium nitrate
kg
122.40
B0-508
Ordinary Detonator
No
36.90
B0-531
Bituminous emulsion (CRS-2)
ltr
110.00
B0-534
Glue
kg
90.00
B0-537
Lime - Boiled
kg
16.00
B0-541
Enamel paint
ltr
685.70
B0-542
Paint-anti corrosive
ltr
476.25
B0-543
Paint-reflective
ltr
760.00
B0-544
Paint-emulsion
ltr
541.00
B0-545
Rust remover
ltr
720.00
B0-546
Emulsion for exterior use (weathershield)
ltr
750.00
B0-547
Road marking paints (yellow)
Kg
147.00
B0-548
Road marking paints (white)
kg
147.00
B0-601
Industrial kerosene oil (Kandy)
ltr
71.40
B0-602
Mould oil (including transport)
ltr
197.00
B0-611
Lubricant (Oil)
ltr
351.60
B0-612
Auto Diesel (Kandy)
ltr
84.20
B0-613
Petrol (Kandy)
ltr
137.20
B0-614
Furnace oil for burners
ltr
B0-615
Gas
Kg
No rate
168.00
B0-616
Lubricant (Grease)
kg
540.00
B0-631
Baskets
No
76.90
B0-632
Gunny bags (large)
No
60.00
B0-632A
Poly sacs (65 kg capacity)
No
15.00
B0-633
Cotton waste
kg
50.00
B0-634
Salt
kg
26.00
B0-635
Empty tar barrels (140 ltrs)
No
200.00
B0-636
[Link] 110 mm dia type 250
L.m
414.70
B0-636B
[Link] 110 mm dia type 400
L.m
617.46
B0-637
[Link] 50 mm dia type 400
L.m
156.80
B0-638
Hard rubber 12 mm thick*75 mm wide
L.m
780.00
B0-639
Polythene 325 mm dia gauge 300 (flat width 505mm approx)
kg
218.00
B0-640
Alluminium sheet 24 SWG
Sq.m
901.00
B0-641
Angle Iron 50x50x6mm
L.m
928.00
B0-642
M.S. Plate 12mm thick
Sq.m
B0-643
Adhesive 250 GM tin
No
390.00
B0-704
Barricading (small work items )
Item
100.00
B0-705
Barricading lighting signalling
Day
1,300.00
B0-711
Cement sand & water for jointing hume pipes 152 mm
diameter
Joint
79.20
B0-712
Cement sand & water for jointing hume pipes 229 to 610 mm
diameter
Joint
160.00
B0-713
Cement sand & water for jointing hume pipes 915 mm
diameter
Joint
243.60
B0-714
Cement sand & water for jointing hume pipes 1220 mm
diameter
Joint
435.60
B0-715
Coir rope (for scaffolding 93 sq.m area)
Item
72.00
B0-716
Coir string for cutting side drains (per 2.83 cu.m)
Item
25.00
14,052.00
B0-717
Coir string for for fixing scaffolding (per 93 square meters)
Item
120.00
B0-718
Minor repairs parapets with cement sand and water (per
9.29 [Link])
Item
300.00
B0-720
Fuel(For loosening road surface in manual breaking 50mm
depth*307 sqm)
Item
31.60
B0-723
Fuel Forge etc.(per 2.83 cum blasting)
Item
50.00
B0-732
Ladders (per 93 square meters)
Item
150.00
B0-741
Paint (for lettering and numbering items)
Item
150.00
B0-746
Pegs (for turfing in 19 sq m area)
Item
75.00
B0-751
Sand paper and Cotton waste (per 9.29 sq meters)
Item
120.00
B0-752
Sharpening scarifier tynes ( for 307 [Link])
Item
50.00
B0-761
Timber planks & Bamboos (for 93 sqm)
Item
1,200.00
B0-762
Timber posts horizontal etc (for barricading work in 4
linear meters)
Item
300.00
B0-781
Allow for water for mixing by machine
Cu.m
25.00
B0-782
Allow for water for mixing concrete manually
Cu.m
25.00
B0-784
Allow water for Gravel Compaction
Cu.m
25.00
B0-785
Allow water for Aggregate Compaction
Cu.m
35.00
B0-786
Allow for moistening road surface
Item
100.00
B0-787
Allow for Water bucket and coir rope
Item
100.00
B0-788
Water for general purposes
ltr
1.50
B0-791
White washing empty barrels (pen grade)
No
125.00
B0-792
White washing timber posts horizontals ETC. (in 4 l.m
barricading)
Item
150.00
B0-800
Thermo plastic road marking material (white)
kg
147.00
B0-801
Thermo plastic road marking material (yellow)
kg
147.00
B0-802
Glass Beads
kg
142.80
B0-803
Cats eye 100mm*100mm
No
1,512.00
B0-901
75 x 8mmdia Nuts and Bolts
No
150.00
B0-902
Saw Dust
Cu.m
650.00
B0-907
Mild Steel Formwork for Standard Boundary Marker Stone
No
4,392.00
B0-956
Mobile Crane
Hrs
3,200.00
B0-957
Department Bitumen
lt
4.57
According to the letter no. CPC/HPCM/04/15/03/5/2008/1 and dated 2008.06.04 the
above basic rates ranging from BO-001 to BO-957 forwarded for approval
Hihgway schedule of rates committee
Name
Signature
1 Mr. H.M.G.I.D. Bandara
EE/ Naula
2 Mrs. [Link]
EE/ Kundasale
3 Mr. A.A.B. Fernando
EE/ Dimbula Pathana
4 Mr. M.C.S.M. Thowfeek
EE/ Gampola
5 Mr. G.N.S. Silva
T O/ Head office
6 Mr. A.S.B. Wijekoon
T O/ CE's Office Kandy
CRUSHER RATES KANDY
MATALE
WARIY MC GEETHIKA GEETH J
NALAWA [Link]
UDC METAL
600.00
795.00
600.00
636.04
6*9
883.40
1275.00
989.40
883.39
989.40
1095.41
989.40
1307.42
1875.00
1484.00
1484.00
1484.00 1
2120.00
1554.77
1925.00
1696.00
1696.11
1696.11 3**
1800.00
1201.00
1236.75
1342.76
1342.76 2*
1770.00
989.40
1201.41
1342.75
1378.09##
1240.00
1095.40
2000.00
1130.74
706.71
1420.00
530.00
1236.75
1236.75