RISK ASSESSMENT
PROJECT:
CE 0716A /2008
SITE :
CAMPUS
JOB UNDER RISK
ASSESSMENT:
PAINTING WORKS
DATE OF ASSESSMENT:
03rd Mar 2013
NAME OF THE ASSESSOR:
VIJAY KUMAR
POSITION OF THE
ASSESSOR:
EHS OFFICER
IDENTIFIED
HAZARD
Mixing the
paint
HAZARD
EFFECT
Body contact
while handling
INITIAL RISK RATING
NUM
BER
SEVE
RITY
LIKELI
HOOD
RISK
RATE
75
Skin Disease,
irritation,
Dermatitis, Eye
irritation.
Painting
work
Vapor inhalation
Asphyxiation,
Intoxication,
acute and
chronic chest
pain, Dizziness,
Nausea
EXISTING
CONTROL MEASURES & WHEHER
THE RISK IS ACCEPTABLE
Take special care while mixing of paints;
avoid contact with skin; wear PVC or
rubber hand gloves and coverall (MSDS
to be referred).
CONTROL
MEASURES ADDED
Strict supervisory
control ensured
MSDS to be referred
FINAL RISK RATING
REMARKS
NUMB
ER
SEVE
RITY
LIKELI
HOOD
RISK
RATE
Risk is
acceptable
Risk is
acceptable
Use safety goggles to avoid the paint
contact with eyes. Also Paints must be
handled properly to avoid any splash.
75
Ensure local Exhaust Ventilation/General
ventilation prior to start of the painting
job.
While painting always wear proper nose
mask (referred by manufacturers
instructions).
Refer MSDS (Material Safety Data
Sheet).
Display warning signs and make others
away from inhaling the vapors.
Page 1 of 2
Refer MSDS (Material
Safety Data Sheet) .
Display warning signs
and make others away
from inhaling the
vapors.
Strict supervisory
control ensured
Ref. no.: UES-09/ F-004
Issue date: 28.02.11
Form Rev. no.: 0
RISK ASSESSMENT
Working at
heights,
Fall of Materials
Fall of Persons
from scaffold /
Major
Injury/Fatal
Spillage of Paints
Slips, Fire,
Environmental
hazards
Continuous work
in hot
environment
Poor work
posture
Dehydration/heat
stress leading to
fainting.
Pain/strain in
neck and arms
75
25
25
All working platforms are erected by
competent personnel and all scaffolds
are erected by trained and certified
personnel. Scaff tag method is
adapted in all the access to working
platforms a height. Regular periodic
inspections on scaffolds are carried
out
Strict supervisory control
ensured
Ensure proper segregation of Empty and
full drums of paints Mixing must be
carried out on concrete floor or use of
polythene sheet. Clear spillage if any
immediately.
Follow safe clean up and disposal
procedures.
Strict supervisory
control ensured
Give sufficient rest in between the
painting job.
Change persons as and when required.
Ensure Provision of proper platform.
Strict supervisory
control ensured
Risk is
acceptable
Risk is
acceptable
Risk is
acceptable
Legal Require-ments
complied Yes.
Applicable legal requirements:
1) DM Code of construction safety
practice Chapter 18
2) DM Technical Guidelines- No.22
Signature of assessor
Date of review:
Page 2 of 2
02nd Sep 2013
Ref. no.: UES-09/ F-004
Issue date: 28.02.11
Form Rev. no.: 0