DAILY FIT-UP/WELDING I
Report No: Supervisor Name: Area: MODULE B
Welder Stamp
Visual Insp
No
Sr Dia Thick Weld
Drawing No Line No Weld No
No inch (mm) Type
Fitup
R/H F/C Acc/Rej
Date
5
ABIS
NAME: NAME:
POSITION: POSITION:
DATE: DATE:
SIGNATURE: SIGNATURE:
Doc.No.QRD-QC-04
ELDING INSPECTION REPORT Page: 1 of 1
Rev: 00
Date: 14/12/10
Visual Inspection NDT
Welding RT Rep. UT Rep
Acc/Rej DPT Rep.No Acc/Rej Acc/Rej Acc/Rej Remark
Date No No.
PETROKEMYA
ALBARRAK INDUSTRIAL
Daily Welding Inspectio
Report No: Supervisor Name:
Sr Line/Iso/Dwng Dia Thk
Sh No Sp No Weld No
No No (Inch) (mm)
Prepared By ABIS QA/QC
Name: Name:
Signature: Signature:
Date: Date:
Doc.No.QRD-QC-12
INDUSTRIAL SERVICES Rev.:00
Page: 1 of 1
ding Inspection Report
DATE: 14/12/10
Area: Date:
Welder I.D Visual Inspection
WPS No
R/H F/C Fit Up Welding
QA/QC Client QA/QC
Name:
Signature:
Date:
-QC-12
/10
Remarks