ECO PROTECTION ENGINEERS PRIVATE LIMITED
55 MLD SEWAGE TREATMENT PLANT, NELLORE
ADDITIONAL WORK ESTIMATION
Sl.No Description Unit Nos L B D
1 Kerb stone Nos 1 1 2 780 0.6
2 Walkway tiles
SBR Sqm 1 1 2 82.6 1.2
Sqm 1 1 2 82 1.2
Sqm 1 1 1 48.48 3.4
Sqm 1 1 1 31.52 1.2
Sqm 1 1 1 76.2 1.2
PTU Sqm 1 1 1 81.65 1.2
Sqm 1 1 1 28 1.5
Sqm 1 1 1 7.5 3
Sqm 1 1 1 28 2
Vertical 40 x 60 Sq.Pipe SBR Rmt 1 2 80 2.5
Horizontal pipe Rmt 1 2 3 80
Curve pipe 50x50 Sq pipe Rmt 1 1 32 3.9
Rmt 1 1 75 1.8
Vertical 40 x 60 Sq.Pipe PTU Rmt 1 2 73 2.5
Horizontal pipe Rmt 1 1 3 82
Curve pipe 50x50 Sq pipe Rmt 1 1 55 1.8
Horizontal pipe Rmt 1 2 4 28
Rmt 1 1 19 2.1
Rmt 1 1 19 2.6
Rmt 1 1 5 3.6
Total length
40x60 Sq.pipe Rmt 765 6.97
40x40 Sq.pipe Rmt 1416.1 6.97
Poly carbonate Roof sheet laying work
SBR Sqm 1 1 1 112 1.8
Sqm 1 1 1 48 4.1
Sqm 1 1 1 10 1.8
PTU Sqm 1 1 1 82 1.8
Sqm 1 1 1 28 2.1
Sqm 1 1 1 8 3.6
Sqm 1 1 1 28 2.6
CC ROAD WORK
Total Road Length - 780Mtr
Earth Murrum filling work Cum 1 1 1 780 6 0.6
PCC CONCRETE WORK
Cum 1 1 1 780 4.5 0.13
RCC Concrete work
Sqm 1 1 1 780 4.5 0.17
Pathway tiles laying work
Sqm 1 1 2 780 0.75
River sand filling work
Sqm 1 1 2 780 0.75 0.1
DRAIN WORK
Earth work excavation
Cum 1 1 1 1091 1 1.2
Rcc Hume pipe
200mm dia Rmt 1 1 1 1091
Man hole chamber
Earth work excavation
Cum 1 1 52 2.6 2.6 1.1
Pcc concrete work
Cum 1 1 52 1.8 1.8 0.1
Rcc concrete work
Raf Cum 1 1 52 1.6 1.6 0.15
Wall Cum 1 52 2 1.3 0.15 1
Cum 1 52 2 1 0.15 1
Shuttering work
Raf Sqm 1 52 4 1.6 0.15
wall Sqm 52 2 2 1.3 1
Sqm 52 2 2 1 1
Barbending work
Raf bottom rod -8mm Rmt 52 2 11 1.65
Wall vertical -8mm Rmt 52 4 9 1.3
Distributor -8mm Rmt 52 4 7 1.3
Total
MT
TOTAL AMOUNT IN RS (A)
Deduction Tender Qty
Road 350m x 3.75m
Bitumen laying work
Sqm 1 1 1 350 3.75
Pathway tiles laying work
Sqm 1 1 2 350 0.75
River sand filling work
Sqm 1 1 2 350 0.75 0.1
DRAIN WORK -350M length
Earth work excavation
Cum 1 1 1 700 1 1.2
Rcc Hume pipe
200mm dia Rmt 1 1 1 700
Man hole chamber
Earth work excavation
Cum 1 1 20 2.6 2.6 1.1
Pcc concrete work
Cum 1 1 20 1.8 1.8 0.1
Rcc concrete work
Raf Cum 1 1 20 1.6 1.6 0.15
Wall Cum 1 20 2 1.3 0.15 1
Cum 1 20 2 1 0.15 1
Shuttering work
Raf Sqm 1 20 4 1.6 0.15
wall Sqm 20 2 2 1.3 1
Sqm 20 2 2 1 1
Barbending work
Raf bottom rod -8mm Rmt 20 2 11 1.65
Wall vertical -8mm Rmt 20 4 9 1.3
Distributor -8mm Rmt 20 4 7 1.3
Total
MT
WALKWAY SCREED CONCRETE WORK
SBR Sqm 1 1 2 82.6 1.2
Sqm 1 1 2 82 1.2
Sqm 1 1 1 48.48 3.4
Sqm 1 1 1 31.52 1.2
Sqm 1 1 1 76.2 1.2
PTU Sqm 1 1 1 81.65 1.2
Sqm 1 1 1 28 1.5
Sqm 1 1 1 7.5 3
Sqm 1 1 1 28 2
TOTAL AMOUNT IN RS (B)
GRAND TOTAL C=(A-B)
Total Amount
Total Rate in Rs in Rs
936 676 632736
198.24
196.8
164.832
37.824
91.44
97.98
42
22.5
56
907.62 606.8 550741.39
400
480
124.8
135
365
246
99
224
39.9
49.4
18
5332.05 65 346583.25
9870.217 65 641564.11
201.6
196.8
18
147.6
58.8
28.8
72.8
724.4 1320 956208
2808 450 1263600
456.3 4200 1916460
596.7 5340 3186378
1170 600 702000
156 550 85800
1309.2 120 157104
1091 800 872800
386.672 120 46400.64
16.848 4600 77500.8
19.968
20.28
15.6
55.848 5700 318333.6
49.92
270.4
208
528.32 500 264160
1887.6
2433.6
1892.8
6214
2.45 48000 117817.44
12136187.2238
1312.5 1300 1706250
525 600 315000
70 550 38500
840 120 100800
700 800 560000
148.72 120 17846.4
6.48 4600 29808
7.68
7.8
6
21.48 5700 122436
19.2
104
80
203.2 500 101600
726
936
728
2390
0.94 48000 45314.4
198.24
196.8
164.832
37.824
91.44
97.98
42
22.5
56
907.62 500 453808
3491362.8
8644824.4238