Cantidad Material Costo Pedido 1 Comprado Pedido 2

The document is an inventory and payment schedule for construction materials. It lists materials purchased for 8 orders so far totaling $18,807. An additional $1,320 is needed for electrical materials. Payment for the $51,807 materials and labor will be made in 5 weekly installments of $6,000, $6,000, $4,000, $5,000 and $11,000.

Uploaded by

felipe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views3 pages

Cantidad Material Costo Pedido 1 Comprado Pedido 2

The document is an inventory and payment schedule for construction materials. It lists materials purchased for 8 orders so far totaling $18,807. An additional $1,320 is needed for electrical materials. Payment for the $51,807 materials and labor will be made in 5 weekly installments of $6,000, $6,000, $4,000, $5,000 and $11,000.

Uploaded by

felipe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Cantidad Material Costo Pedido 1 Comprado Pedido 2

1 Camión arena azul y grava gris $820.00 1 $820.00 -


1 Camion arena y grava gris (2mts y 2mts) $1,120.00 - - -
65 varillas 3/8 $102.00 30 $3,060.00 -
850 blocks $0.60 800 $480.00 -
150 anillos 10X25 $4.20 150 $630.00 -
120 anillos 10X15 $3.15 120 $378.00 -
16 kg alambre $22.00 16 $352.00 8
1 kg clavo 3" $27.00 1 $27.00 -
1 kg clavo 2" $27.00 1 $27.00 -
25 mts manguera naranja $3.00 - - -
15 bultos de mortero $120.00 10 $1,200.00 3
36 cemento $145.00 10 $1,450.00 10
8 codos $3.00 - - -
4 cajas de luz $5.00 - - -
3 vidrio blocks $55.00 - - -
- cajas de luz $5.00 - - -
3 metros de pvc $50.00 - - -
3 cerofino $40.00 - - -
4 yeso $50.00 - - -
2 pega yeso $25.00 - - -
$8,424.00

TOTAL COMPRADO $18,807.00

MATERIAL QUE FALTA

Cantidad Material Costo Total

10 varillas 3/8 $102.00 $1,020.00


50 blocks $6.00 $300.00
* cable, soquets, apagadores y contactos
$1,320.00

SEMANA Pago Restan


1 1 AL 6 JULIO $6,000.00 $27,000.00
2 8 AL 13 JUL $6,000.00 $21,000.00
3 15 AL 20 JU $4,000.00 $17,000.00
4 22 AL 27 JU $5,000.00 $12,000.00
5 29 JULIO AL 03 AGOSTO
$11,000.00 $1,000.00
Comprado Pedido 3 Comprado Pedido 4 Comprado Pedido 5 Comprado Pedido 6

- - - - - - - -
- - - - - 1 $1,120.00 -
- - - 25 $2,550.00 - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
$176.00 - - - - - - 3
- - - 1 $27.00 - - -
- - - - - - - -
- - - 20 $60.00 - - -
$360.00 - - - - - - -
- 3 $465.00 - - - - 20
- - - 8 $24.00 - - -
- - - - - - - 4
- - - - - - - 3
- - - - - - - 3
- - - - - - - 3
- - - - - - - -
- - - - - - - -
- - - - - - - -
$536.00 $465.00 $2,661.00 $1,120.00

TOTAL MATERIAL $18,807.00


M.O $33,000.00
$51,807.00
Comprado Pedido 7 Comprado Pedido 8 Comprado

- - - - -
- - - 1.5 $480.00
- - - - -
- - - - -
- - - - -
- - - - -
$66.00 - - - -
- - - - -
- - - - -
- - - - -
- 5 $600.00 6 $720.00
$3,100.00 - - - -
- - - - -
$20.00 - - - -
$165.00 - - - -
- 5 $25.00 1 $5.00
- 1 $50.00 - -
- 3 - 3 $120.00
- 4 - 4 $200.00
- 2 - 2 $50.00
$3,351.00 $675.00 $1,575.00