Files handed over between Lekha B S, Assistant Director, Canals and Nidhi S, Assistant Director,
Canals as per 1.GO (Rt) No 552/2019/WRD dated 30/7/2019 2. Order No. A3-24682/2019 dated
30/07/2019 of the Chief Engineer,Irrigation & Administration , Thiruvananthapuram.
CS-AD10
Sl
No. File No. File Name
MVIP-Constructing LBMC from ch.15741 m to 15847 m including
1 IDRB/DD/CD/CL/AD2/4028/89
CD works
2 IDRB/DD/CD/CL/AD2/292/90 MVIP-Constructing RBMC from ch.0m to 150 m Revised hydraulic
details
3 IDRB/DD/CD/CL/AD2/1771/90
Breaches in T.S Canals- rectification works-inspection
4 IDRB/DD/CD/CL/AD2/1365/91 Kayamkulam super thermal power project- remodelling of PIP
Canal at road crossing with a syphon.
5 IDRB/DD/CD/CL/AD2/508/90 MVIP-Constructing LBMC from ch.19420m to 21300m except
aqueduct from ch.19690 m to 19900 m including CD works
6 IDRB/DD/CD/CL/AD2/2311/91 KPIP-Lining work of LBMC from ch.0/610 to 1/1000km
7 IDRB/DD/CD/CL/AD2/2477/91 AVIP-Project Report revised design of canal-
Representation from Kuttanad Integral Development society
8 IDRB/DD/CD/CL/AD2/3549/91
dtd.14.09.91
9 IDRB/DD/CD/CL/AD2/1506/91 Kunnankattupathy Headworks Complaints
10 IDRB/DD/CD/CL/AD2/2425/92 MVIP-LBMC-Alignment of the canal from ch.27800m.
11 IDRB/DD/CD/CL/AD2/690/85 General file
MVIP-Constructing LBMC from ch.19420m to 21300m except
12 IDRB/DD/CD/CL/AD2/466/88
Pandapilly aqueduct stability analysis of embankment.
13 IDRB/DD/CD/CL/AD2/282/88 IIP-World bank Pipeline project- identification project report.
Leading channel to Thotapally spillway-Replies to comments of
14 IDRB/DD/CD/CL/AD2/583/88
Central Water Commission.
15 MVIP-PIDO/IV/10/114/79 MVIP-Canal lining.
16 IDRB/DD/CD/CL/AD2/2266/94 LA-Interpellation
Charge Handed Over Taken Charge
1
LEKHA B S NIDHI S
Sl
No. File No. File Name
17 IDRB/DD/CD/CL/AD2/3151/94 IIP-LLC Constructing CC channel of aqueduct from ch.92 to 703.
18 IDRB/DD/CD/CL/AD2/3170/94 Modification of chalakuzhy RBC system under IIP Design of canal
19 IDRB/DD/CD/CL/AD2/3339/94 IIP - Modification of LBC system of CRD scheme
Extension of effluent discharge pipeline of Hindustan Neswsprint
20 IDRB/DD/CD/CL/AD2/699/91
limited to Muvattupuzha .
21 IDRB/DD/CD/CL/AD2/3848/94 MVIP- Ettumanoor Branch canal constructing aqueduct at Ch.2140
m to 2275 m
22 IDRB/DD/CD/CL/AD2/3013/99 MVIP - Formation of Ettumanoor Branch canal from ch. 13204 to
13479m -Constructing cut & cover-Design particulars
23 PIDO/V/14/24/83 General File
24 IDRB/DD/CD/CL/AD2/134/98 KIP - RBC - Formation of of Kayamkulam Branch canal from ch.
4365 m to 5600 m including CD works
25 IDRB/DD/CD/CS/AD3/3065/04 Palakapandy Diversion scheme - construction of aqueduct between
Ch. 2120 to 2290m (part file )
26 IDRB/DD/CD/CL/AD2/1880/99 IIP - LLC Design of aqueduct from ch. 19050 to 19340 m
MVIP - LBC - Constructing Ezhuthonipadam aqueduct between ch .
27 IDRB/DD/CD/CS/AD3/3427/96
18065 to 18562m ( II volumes)
BSP - Padinjarathara Branch Canal Construction of aqueduct from
28 IDRB/DD/CD/CL/AD2/2033/04
ch. 2690 m to ch.3880 m
IIP - Constructing Main canal from ch.600m to 1000 m including
29 IDRB/DD/CD/CL/AD2/855/08
cut & cover from ch. 600 to 691m
IIP - LLC ch 0 to 70 m. Head Regulator, Drop, Link canal, Head
30 IDRB/DD/CD/CL/AD2/3004/96
Regulator Design - reg.
31 IDRB/DD/CD/Cl/AD2/1325/09 MVIP - Constructing Madakkathanam Minor distributory from ch. 0
- 3765 m
IDRB/DD/CD/CL/AD2/270/09
32 MVIP - Constructing Madakkathanam Minor distributory from ch. 0
(transferred to CS-AD9)
- 3765 m (Hydraulic Particulars)
Charge Handed Over Taken Charge
2
LEKHA B S NIDHI S
Sl
No. File No. File Name
IDRB/DD/CD/MFA/AD1/2967/95
33 IIP - LLC Constructing syphon well drop - II from ch. 3680 m to
(Part File)
3722.17 m
34 IDRB/DD/CD/CL/AD2/1121/09 General File
NABARD - RIDF XV - Constructing of VCB cum bridge across
35 IDRB/DD/CD/CL/AD2/3064/09
Kanjirapuzha at Nambooripotti Kalikkadavu in Chaliyar Panchayath
IIP - LLC Pressure syphon from ch.14783.5 m to 14862.9 (NH
36 IDRB/DD/CD/CL/AD2/904/2011
crossing)
37 IDRB/DD/CD/CL/AD2/1470/95 KARAPUZHA Irrigation Project
Chitturpuzha Project- Moolathara Regulator-Rectification work of
38 IDRB/DD/CD/CL/AD2/3699/92
the damaged portion.
Nabard RIDF XVII-Construction of checkdam across Kuthirapuzha
39 IDRB/DD/CD/CL/AD2/2199/12
at Ramankuth Valayankundu Kadavu in Nilambur Municipality
IDRB/DD/CD/CL/AD2/3300/12 Priority works under Minor Irrigation- Construction of checkdam
40
CS-AD10/7/2015-IDRB across Kabani River at Palvelicham in Mananthavady Panchayat.
Construction of a checkdam across Chandragiri River at Karichery
41 No.906/2013/IDRB/CL
Kizhakkukara in Pallikkara Panchayat.
Construction of Road bridge with footpath across Bhadakara Mahe
42 No.3480/2013/IDRB/CL
Canal at Parambil.
Construction of checkdam cum bridge across Kothamangalam river
43 No. 3769/2013/IDRB/PBD
at Kaniyankudy Eranakulam District.
CS-AD10/3/2015-IDRB Renovation of Modernization of Malampuzha garden -Phase 2
44
No.2053/2012/IDRB/DS1 (VOL I,II,III,IV,V)
CS-AD10/4/2015-IDRB
45 Tourism Development in Dams.
No.1100/2012/IDRB/DS1
CS-AD10/2/2015-IDRB
46 Reservoir based tourism-Chamravattom
No.558/2013/IDRB/CL
47 No.557/2013/IDRB/CL Reservoir based tourism- Malankara
Charge Handed Over Taken Charge
3
LEKHA B S NIDHI S
Sl
No. File No. File Name
48 CS-AD10/3/2016-IDRB Re-construction of Kallupalam Bridge across TS Canal at Kollam.
Pamba Irrigation Project-RBC-Extension of Kaviyoor canal beyond
Manimala river constructing an aqueduct between ch.3727 m to
49 CS-AD10/4/2016-IDRB
3914m and open canal at ch.4273 m to 4410m at the missed
portions and other allied works between ch.4000m to 4273m.
MIRPA-Construction of check dam across Bharathapuzha at
50 IDRB/DD/CD/CL/AD1/3868/10
Painkulam in Panjal Panchayath in Thrissur district
NABARB - RIDF XVI - Construction of Vented cross bar cum
51 No.4975/2014/IDRB/CL
dredge at Pady in Chengala Grama Panchayath
Koothumakkal - Chirakkal Cherupuzha Thodu Project
52 CS-AD10/1/2016-IDRB Augmentation scheme of painoor Kayal Lift Irrigation Project in
Edathiruthy Panchayath
Interlinking of Bharathapuzha and Biyyam lake in Ponnani taluk in
53 CS-AD10/1/2015-IDRB
Malappuram district.
Construction of checkdam at Aruvikuzhy in Chakkupallam
54 CS-AD10/5/2015-IDRB
panchayath.
WRD-IIP-Construction of bridge at ch.811 m to 851m including
55 CS-AD10/6/2015-IDRB
formation of canal and approach road.
56 CS-AD10/8/2015-IDRB Construction of checkdam at downstream of Peechi dam
State Horticulture Mission-Kerala-Implementation RKVY
57 CS-AD10/9/2015-IDRB Programme 2013-14-Construction of checkdam at Mechola in
Vattavada Panchayat,Idukki district.
Kasargod Development Package- Construction of checkdam across
58 CS-AD10/5/2016-IDRB Panathur river at Panamkode in Kodum-Belur Grama Panchayat in
Kasagod district.
Karappuzha Project- Padinjaraveedu Branch Canal ch.1110m to
59 CS-AD10/1/2017-IDRB
1210 m-Design of canal and protection wall.
CSIN-Construction of steel foot bridge across Badagara-Mahe canal
60 CS-AD10/2/2017-IDRB
at ch.461.550 KM AT Ottakandy Thazhe.
Providing drainage facilities by linking Vadai canal and Mammen
61 CS-AD10/3/2017-IDRB Edavazhithodu at ward near Alleppey Company in Alappuzha
Municipality in Alappuzha L.A.C
DRIP-Rehabilitation and Improvement of Basic Facilities of
62 CS-AD10/403/2017-IDRB
Chimony Irrigation Project-Design of flat type quarters building.
Charge Handed Over Taken Charge
4
LEKHA B S NIDHI S
Sl
No. File No. File Name
63 CS-AD10/1090/2017-IDRB
Neyyar Irrigation Project- Supreme Court of India-OS No.2/2012-
64 CS-AD10/1375/2017-IDRB
Cross Examination of TN-Documents furnishing.
65 CS-AD10/989/2018-IDRB PYIP-Rectification of breached portion of main canal at ch.1300m.
66 CS-AD10/1373/2018-IDRB
Flood 2018-Chalakudy River Diversion Scheme-Damage of LBMC
67 CS-AD10/1885/2018-IDRB
between ch.0/200 and 0/500 km.
CS-AD10/1879/2018-IDRB (File
68 MVIP-Urgent Rectification to the breached portion of kadappoor
transferred to CS-AD2 MFA)
distribution from ch.1410m to 1505m.
Proposed lift Irrigation scheme at Poovakkuzhy in Paradur
69 CS - AD10/85/2019 -IDRB
Panchayath, Palakkad
Construction of a vented weir cum bridge across Panathur river at
70 CS - AD9/645/2018 -IDRB
Chirankadavu at Panathady panchayath
71 CS - AD10/1795/2019 -IDRB Beautification of Dam Sites (NP)-sanction of FS & AS
KRBP-Construction of check dam at Idiyam Vayal across Anoth
72 CS - AD10/1925/2019 -IDRB
river in Pouzhuthana panchayath
Charge Handed Over Taken Charge
5
LEKHA B S NIDHI S
Sl
No. File No. File Name
MRVP - Construction of checkdam cum Bridge across Meenachil
83 CS/AD9/2/2017 IDRB river (Kalathukadavu) at Chillachibhagam in Thalappalam of
Moonnilavu Panchayath - Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor
84 CS/AD9/1/2017 IDRB
Chira- proposal returned.
Chithupizha Project-Enhancement of storage Capacity- Digging of
85 CS/AD9/4/2017 IDRB Kambalathara Venkalakayam and Kunnampidari - file transfered to
investigation
Protecting erroded bank of Therlai island from Madhariveedu
86 CS/AD9/5/2017 IDRB kadavu to Valliyakunnu Kadavu & from Moideen Pallu Kadavu to
Therlayi Bridge
Reconstruction of box culvert at Ambanattuchira road near
87 CS/AD9/585/2018 IDRB
Chilavanoor in Ernakulam District- Design Approval
Charge Handed Over Taken Charge
6
LEKHA B S NIDHI S
Sl
No. File No. File Name
Construction of a weir across Thootha river at Kalikkadavu in
88 CS/AD10/2/2016 IDRB Aliparambu Panchayat in Malappuram District Transfered from
AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of
89 CS/AD9/1346/2018 IDRB
Moolathara Regulator - reg -Design approval
LLC aqueduct at ch: 3740m - installation of valve from Idamalayar
90 CS/AD9/675/2018 IDRB
Irrigation Project canal to Komarappadam branch canal
KIFBI-Construction of checkdam across Ithikkarayar at
mannayamkadavu for supplying water to Kalluvathukkal,Parippally
91 CS/AD9/584/2018 IDRB
and Velinalloor villages under samagrakudivellapadhathi reg. (File
transferred to MFA - AD3)
Construction of a weir across Kadalundi river near vattanikadavu
92 CS/AD9/1/2017 IDRB
(Irumbuzhi) in Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at
93 CS/AD9/3/2017 IDRB
Kaneeladukkam in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar
94 CS/AD9/645/2018/ IDRB Chirakadavu at Panathady Panchayath - file tranfered to AD10
canals
95 No.1593/2015/AD1/CL/IDRB KIP- Construction of syphon at 165 m in Kollaka Distributory reg.
96 No.1536/2013/IDRB/CL/BSP BSP Note File
IIP - Construction of LLC from Ch 10490 - 12000 m including CD
97 No. CS-AD9/2/2015-IDRB
works
Construction of checkdam cum bridge at vallakadavu Pareekkanni
98 No. 2777/2014/ IDRB /CL connecting Kavalangad and pullarimangalam Panchayath in
Ernakulam District
Construction of check dam at Mannathikadavu across Thoothapuzha
99 CS-AD9/1897/2018/IDRB
at Cherpulassery Muncipalty in Palakkad District
IDRB/DD/CD/CL/AD1/730/2002 IIP - LLC Construction of cut & cover from ch 10490m to 10599m
100
Vol II including MC road crossing and allied works ( Through EPC)
Charge Handed Over Taken Charge
7
LEKHA B S NIDHI S
Sl
No. File No. File Name
IDRB/DD/CD/CL/AD1/1235/88
101 Hydraulic Particulars of Attappady Valley Irrigation Project
( Volume II)
Charge Handed Over Taken Charge
8
LEKHA B S NIDHI S
LIST OF FILES (AD1/CANALS)
Old Ref. Sl No. File No.
4 1 IDRB/DD/CD/CL/AD1/1830/89
5 2 IDRB/DD/CD/CL/AD1/1235/88
6 3 IDRB/DD/CD/CL/AD1/654/88
7 4 IDRB/DD/CD/CL/AD1/2657/89
8 5 IDRB/DD/CD/CL/AD1/2657/89
9 6 IDRB/DD/CD/CL/AD1/457/87
10 7 IDRB/DD/CD/CL/AD1/3807/89
16 8 IDRB/DD/CD/CL/AD1/1046/90
17 9 IDRB/DD/CD/CL/AD1/149/87
18 10 IDRB/DD/CD/CL/AD1/283/87
19 11 PIDO/IV/10/113/79
20 12 PDN V - 40577/76
21 13 PDN V - 40577/76
22 14 PIDO/IV/10/111/79
23 15 PIDO/IV/10/113/79
24 16 W5-12321/84
25 17 PIDO/IV/11/1110/85
26 18 PIDO/111/8/115/80
27 19 PIDO/IV/10/113/79
28 20 IDRB/DD/CD/CL/AD1/227/87
29 21 IDRB/DD/CD/CL/AD1/1417/92
29 a 22 IDRB/DD/CD/CL/AD1/1417/94
30 23 IDRB/DD/CD/CL/AD1/2516/92
30a 24 IDRB/DD/CD/CL/AD1/2516/92
30b 25 IDRB/DD/CD/CL/AD1/2516/94
31 26 IDRB/DD/CD/CL/AD1/2006/89
32 27 IDRB/DD/CD/CL/AD1/3003/96
IDRB/DD/CD/CL/AD1/3003/96 - Part
33 28 file No-1
34 29 IDRB/DD/CD/CL/AD1/110/88
35 30 IDRB/DD/CD/CL/AD1/135/98
IDRB/DD/CD/CL/AD1/2516/94 (part
36 31 file -II)
37 32 IDRB/DD/CD/CL/AD1/1278
38 33 IDRB/DD/CD/CL/AD1/1750
39 34 IDRB/DD/CD/CL/AD1/3503/96
40 35 IDRB/DD/CD/CL/AD1/1436
32 IDRB/DD/CD/CL/AD1/1436
41 33 IDRB/DD/CD/CL/AD1/2085/97
34
43 35 IDRB/DD/CD/CL/AD1/449/96
44 36 IDRB/DD/CD/CL/AD1/1778/95
45 37 IDRB/DD/CD/CL/AD1/49/98
46 38 IDRB/DD/CD/CL/AD1/49/98-part-I
47 39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II
41 IDRB/DD/CD/CL/AD1/1184/2004
42 IDRB/DD/CD/CL/AD1/1530/2004
51 43 IDRB/DD/CD/CL/AD1/2049/2004
52 44 IDRB/DD/CD/CL/AD1/2212/2004
45 IDRB/DD/CD/CL/AD1/2034/2004
54 46 IDRB/DD/CD/CL/AD1/3077/2004
55 47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I
49 IDRB/DD/CD/CL/AD1/2665/2006
IDRB/DD/CD/CL/AD1/3003/96 Part
59 50 file No. II
60 51 IDRB/DD/CD/CL/AD1/1778/95 Vol II
61 52 IDRB/DD/CD/CL/AD1/260/95Vol - IV
62 53 IDRB/DD/CD/CL/AD1/1006/2007
54 IDRB/DD/CD/CL/AD1/2476/2008
64 55 IDRB/DD/CD/CL/AD1/360/2009
65 56 IDRB/DD/CD/CL/AD1/1289/2009
66 57 IDRB/DD/CD/CL/AD1/1339/2009
67 58 IDRB/DD/CD/CL/AD1/1561/2009
59 IDRB/DD/CD/CL/AD1/3868/2010
69 60 IDRB/DD/CD/CL/AD1/3170/2009
70 61 IDRB/DD/CD/CL/AD1/3065/2009
71 62 IDRB/DD/CD/CL/AD1/1146/2011
72 63 IDRB/DD/CD/CL/AD1/1146-1/2011
73 64 IDRB/DD/CD/CL/AD1/2085/97-Vol II
74 65 IDRB/DD/CD/CL/AD1/3838/2011
66 IDRB/DD/CD/CL/AD1/1146/2011
76 67 IDRB/DD/CD/CL/AD1/3494/2012
CS/AD9/1/2015-IDRB
77 68 (IDRB/DD/CD/CL/AD2/270/09)
78 69 CS/AD9/3/2015
70 CS/AD9/1/2016 IDRB
71 CS/AD9/2/2016 IDRB
80 72 CS/AD9/4/2016 IDRB
81 73 CS/AD9/2/2017 IDRB
82 74 CS/AD9/1/2017 IDRB
75 CS/AD9/585/2018 IDRB
84 76 CS/AD10/2/2016 IDRB
85 77 CS/AD9/1346/2018 IDRB
86 78 CS/AD9/675/2018 IDRB
87 79 CS/AD9/584/2018 IDRB
80 CS/AD9/1/2017 IDRB
81 CS/AD9/3/2017 IDRB
90 82 CS/AD9/645/2018/ IDRB
83 No.1593/2015/AD1/CL/IDRB
84 No.1536/2013/IDRB/CL/BSP
75 85 IDRB/DD/CD/CL/AD1/2821/2012
86 No. CS-AD9/2/2015-IDRB
78 87 No. 2777/2014/ IDRB /CL
88 CS-AD9/1897/2018/IDRB
LIST OF FILES (AD1/CANALS)
File Name
Water requirement calculation of Meenachil River valley Irrigation Project
Hydraulic Particulars of Attappady Valley Irrigation Project ( Vol I & Vol II)
MVIP Water requirement calculation Part file
Hydraulic Particulars of MVIP Left Bank Main Canal
Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel
from ch 21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project
L A Interpolation
Vamanapuram Irrigation Project
Inland water transport 7th Five Year Centrally sponsored scheme
MVIP Revised alignment of Vol II
MVIP - Vol I
MVIP - Vol II
MVIP Revised alignment Vol I
MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV
Flood in Cochin City
IIP -Hydraulic particulars
Karapuzha Irrigation Project,RBMC-Hydraulic particulars
MVIP- Revised alignment and LS of LBC Vol IV
Flood in Cochin City
Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II
Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars
from ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-25665 (Orginal chainage) Vol - I
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m
file-part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )
KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of
reinforced earth retaining wall.
KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC
retaining wall
Water requirement calculation of Banasurasagar Irrigation Project
KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m
Design of cut & cover from ch 36350m to 36800m .
Construction of Syphon in Kottiyam branch canal
PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP
Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC
and revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition
IIP Constructing LLC from ch 10490m to 19300 m Revision of HP
MVIP-LBMC Construction of flush escape -----file transferred
MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m
& ch 4391 m
IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from
12075m to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of
Moolathara RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA
KKIP - Extension of MRBC up to Velanthavalam
IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m
Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.
BSP- Venniyode Branch canal-aqueduct from ch 4340m
Diversion scheme from Palakapandy weir to Chulliyar dam.
MRVP-Approval of Hydraulic particulars ( ch. 0 m to ch .7000m)
IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M
WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC
IIP Constructing main canal from ch 23398 to to 23676m including transition .
IIP Constructing LLC from ch 7300m to ch 8100m including CD works.
Balance work revised HP due to introduction of flume and extension of flume
KIP-LBMC permanent measures to the collapsed embankment portion between
ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.
MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.
Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m
MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.
Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m
MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal
Panchayath in Trissur District
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.
MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No
14 of Elamkulam panchayath
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)
IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway
crossing) Revision of HP from ch 13822.5m to 13879.5m
Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in
Eramam Kuttoor Panchayath in Kannur District
Construction of VCB across Shriya river at Kalyate in Enmakaje Panchayath of
Kasargod Taluk in Kasarkode District.
NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at
Nambooripotty Kalikadavu in Chaliyar Grama Panchayath
MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m
including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m
Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-
Design approval
Hydraulicparticulars of proposed box structure of existing Vellayani Branch
canal for shifting to extreame edge of the row for four lane of existing TVPM
Bypass from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath
- Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval
Construction of a weir across Thootha river at Kalikkadavu in Aliparambu
Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara
Regulator - reg -Design approval
LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation
Project canal to Komarappadam branch canal
KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for
supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.
Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in
Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu
at Panathady Panchayath
KIP- Construction of syphon at 165 m in Kollaka Distributory reg.
BSP Note File
Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath
IIP - Construction of LLC from Ch 10490 - 12000 m including CD works
Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting
Kavalangad and pullarimangalam Panchayath in Ernakulam District
Construction of check dam at Mannathikadavu across Thoothapuzha at
Cherpulassery Muncipalty in Palakkad Distrit
Status
finished 6/4/2000
approved on 25/6/2002
UO Note to JD Dam safety on 3/10/2015
approved on 29/11/2018
Letter to The Superintending Engineer, Project Circle, Piravom
file with AD3 MFA
approved on 7/8/2004
finished
Reminder II to The CE. Revised alignment plan to be
received
file closed on 11/8/2009
Letter to The Superintending Engineer, Project Circle,
Piravom
work with in the power of the SE ( 20/3/2013)
drawing forwarded on 19/7/2007
file retured on 19/3/2009
approved on 10/3/2011
letter to the CE, P II
approved on 15/5/2009
approved on 1/7/2009
approved on 1/7/2009
approved on 17/8/2009
design and drawing approved on 18/8/2010
proposal retured on 23/6/2012
approved on 26/9/2011
approved on 9/2/2012
design and drawing approved on 2/7/2012
approved on 8/10/2013
approved on 15/5/2009
approved on 22/2/2016
Orginal proposal returned
on going
approved on 22/5/2017
approved 7/2/2018
approved 30/4/2018
approved 13/12/2018
Finsihed
on going
on going
on going
on going
infromed to the CE , P2 on 14/10/2015
Letter to The CE, P1
file retured on 10/10/2012
hydraulic particluars to be recevied letter on 22/12/2018
approved on 2/12/2014
work progress
\
1 IDRB/DD/CD/CL/AD1/1830/89
2 IDRB/DD/CD/CL/AD1/1235/88
3 IDRB/DD/CD/CL/AD1/654/88
4 IDRB/DD/CD/CL/AD1/2657/89
5 IDRB/DD/CD/CL/AD1/2657/89
6 IDRB/DD/CD/CL/AD1/457/87
7 IDRB/DD/CD/CL/AD1/3807/89
8 IDRB/DD/CD/CL/AD1/1046/90
9 IDRB/DD/CD/CL/AD1/149/87
10 IDRB/DD/CD/CL/AD1/283/87
11 PIDO/IV/10/113/79
12 PDN V - 40577/76
13 PDN V - 40577/76
14 PIDO/IV/10/111/79
15 PIDO/IV/10/113/79
16 W5-12321/84
17 PIDO/IV/11/1110/85
18 PIDO/111/8/115/80
19 PIDO/IV/10/113/79
20 IDRB/DD/CD/CL/AD1/227/87
21 IDRB/DD/CD/CL/AD1/1417/92
22 IDRB/DD/CD/CL/AD1/1417/94
23 IDRB/DD/CD/CL/AD1/2516/92
24 IDRB/DD/CD/CL/AD1/2516/92
25 IDRB/DD/CD/CL/AD1/2516/94
26 IDRB/DD/CD/CL/AD1/2006/89
27 IDRB/DD/CD/CL/AD1/3003/96
28 IDRB/DD/CD/CL/AD1/3003/96 - Part file No-1
29 IDRB/DD/CD/CL/AD1/110/88
30 IDRB/DD/CD/CL/AD1/135/98
31 IDRB/DD/CD/CL/AD1/2516/94 (part file -II)
32 IDRB/DD/CD/CL/AD1/1278
33 IDRB/DD/CD/CL/AD1/1750
34 IDRB/DD/CD/CL/AD1/3503/96
35 IDRB/DD/CD/CL/AD1/1436
32 IDRB/DD/CD/CL/AD1/1436
33 IDRB/DD/CD/CL/AD1/2085/97
34
35 IDRB/DD/CD/CL/AD1/449/96
36 IDRB/DD/CD/CL/AD1/1778/95
37 IDRB/DD/CD/CL/AD1/49/98
38 IDRB/DD/CD/CL/AD1/49/98-part-I
39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II
41 IDRB/DD/CD/CL/AD1/1184/2004
42 IDRB/DD/CD/CL/AD1/1530/2004
43 IDRB/DD/CD/CL/AD1/2049/2004
44 IDRB/DD/CD/CL/AD1/2212/2004
45 IDRB/DD/CD/CL/AD1/2034/2004
46 IDRB/DD/CD/CL/AD1/3077/2004
47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I
49 IDRB/DD/CD/CL/AD1/2665/2006
50 IDRB/DD/CD/CL/AD1/3003/96 Part file No. II
51 IDRB/DD/CD/CL/AD1/1778/95 Vol II
52 IDRB/DD/CD/CL/AD1/260/95Vol - IV
53 IDRB/DD/CD/CL/AD1/1006/2007
54 IDRB/DD/CD/CL/AD1/2476/2008
55 IDRB/DD/CD/CL/AD1/360/2009
56 IDRB/DD/CD/CL/AD1/1289/2009
57 IDRB/DD/CD/CL/AD1/1339/2009
58 IDRB/DD/CD/CL/AD1/1561/2009
59 IDRB/DD/CD/CL/AD1/3868/2010
60 IDRB/DD/CD/CL/AD1/3170/2009
61 IDRB/DD/CD/CL/AD1/3065/2009
62 IDRB/DD/CD/CL/AD1/1146/2011
63 IDRB/DD/CD/CL/AD1/1146-1/2011
64 IDRB/DD/CD/CL/AD1/2085/97-Vol II
65 IDRB/DD/CD/CL/AD1/3838/2011
66 IDRB/DD/CD/CL/AD1/1146/2011
67 IDRB/DD/CD/CL/AD1/3494/2012
CS/AD9/1/2015-IDRB
68 (IDRB/DD/CD/CL/AD2/270/09)
69 CS/AD9/3/2015
70 CS/AD9/1/2016 IDRB
71 CS/AD9/2/2016 IDRB
72 CS/AD9/4/2016 IDRB
73 CS/AD9/2/2017 IDRB
74 CS/AD9/1/2017 IDRB
75 CS/AD9/585/2018 IDRB
76 CS/AD10/2/2016 IDRB
77 CS/AD9/1346/2018 IDRB
78 CS/AD9/675/2018 IDRB
79 CS/AD9/584/2018 IDRB
80 CS/AD9/1/2017 IDRB
81 CS/AD9/3/2017 IDRB
82 CS/AD9/645/2018/ IDRB
83 No.1593/2015/AD1/CL/IDRB
84 No.1536/2013/IDRB/CL/BSP
85 IDRB/DD/CD/CL/AD1/2821/2012
86 No. CS-AD9/2/2015-IDRB
87 No. 2777/2014/ IDRB /CL
LIST OF FILES (AD1/CANALS)
Water requirement calculation of Meenachil River valley Irrigation Project
Hydraulic Particulars of Attappady Valley Irrigation Project
MVIP Water requirement calculation Part file
Hydraulic Particulars of MVIP Left Bank Main Canal
Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel from ch
21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project
L A Interpolation
Vamanapuram Irrigation Project
Inland water transport 7th Five Year Centrally sponsored scheme
MVIP Revised alignment of Vol II
MVIP - Vol I
MVIP - Vol II
MVIP Revised alignment Vol I
MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV
Flood in Cochin City
IIP -Hydraulic particulars
Karapuzha Irrigation Project,RBMC-Hydraulic particulars
MVIP- Revised alignment and LS of LBC Vol IV
Flood in Cochin City
Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II
Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars from
ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
25665 (Orginal chainage) Vol - I
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m file-
part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )
KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of
reinforced earth retaining wall.
KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC
retaining wall
Water requirement calculation of Banasurasagar Irrigation Project
KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m
Design of cut & cover from ch 36350m to 36800m .
Construction of Syphon in Kottiyam branch canal
PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP
Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC and
revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition
IIP Constructing LLC from ch 10490m to 19300 m Revision of HP
MVIP-LBMC Construction of flush escape -----file transferred
MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m &
ch 4391 m
IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from 12075m
to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of Moolathara
RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA
KKIP - Extension of MRBC up to Velanthavalam
IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m
Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.
BSP- Venniyode Branch canal-aqueduct from ch 4340m
Diversion scheme from Palakapandy weir to Chulliyar dam.
MRVP-Approval of Hydraulic particulars
IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M
WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC
IIP Constructing main canal from ch 23398 to to 23676m including transition .
IIP Constructing LLC from ch 7300m to ch 8100m including CD works. Balance
work revised HP due to introduction of flume and extension of flume
KIP-LBMC permanent measures to the collapsed embankment portion between
ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.
MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.
Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m
MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.
Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m
MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal
Panchayath in Trissur District
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.
MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No 14
of Elamkulam panchayath
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)
IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway
crossing) Revision of HP from ch 13822.5m to 13879.5m
Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in
Eramam Kuttoor Panchayath in Kannur District
Construction of VCB across Shriya riverat Kalyate in Enmakaje Panchayath of
Kasargod Taluk in Kasarkode District.
NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at Nambooripotty
Kalikadavu in Chaliyar Grama Panchayath
MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m
including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m
Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-
Design approval
Hydraulicparticulars of proposed box structure of existing Vellayani Branch canal
for shifting to extreame edge of the row for four lane of existing TVPM Bypass
from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath -
Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval
Construction of a weir across Thootha river at Kalikkadavu in Aliparambu
Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara Regulator -
reg -Design approval
LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation
Project canal to Komarappadam branch canal
KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for
supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.
Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in
Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu at
Panathady Panchayath
KIP- Construction of syphon at 165 m in Kollaka Distributory reg.
Note File
Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath
IIP - Construction of LLC from Ch 10490 - 12000 m including CD works
Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting
Kavalangad and pullarimangalam Panchayath in Ernakulam District