HASEEB AHMED, PMP®
Certified Project Management Professional, PMI-USA
Planning & Monitoring Engineer (Civil & MEP)
Charted Member of BM Toastmasters Club
+92 (323) 4259235 PROFILE:
Having a more than four (04) years of Civil & MEP
Haseeb_ahmad123@[Link] Experience under the domain of Planning & Monitoring.
Strongly convicted towards self-betterment and desire to
House No. 60, Ali Park, Harbunspura Road, deliver some inputs towards Project Management
Lahore, Pakistan Emerging Practices.
EDUCATION WORK EXPERIENCE
Certified Project Management
Professional. Manager, Planning & Monitoring.
Project Management Institute,
Banu Mukhtar Contracting (Pvt.) Ltd.
PA, USA.
(August, 2016 – Till Date)
(Achieved on Sept, 2019)
Masters in Construction & My Key Job Responsibilities are:
Engineering Management
Preparation of Response against the buyer's Request for Proposal
Superior University, Lahore. (EPC, Design & Build & Contracting Service) by bifurcating the
(2016 – 2018) responsibilities to a relevant department. Critically monitor the
activities to achieve deadline of response submission.
Bachelors of Science in Civil Be an active participant at Bidder Conferences/Pre Bid Meetings &
Engineering Pre Bid Site Visits for the clarification of Buyer's Scope of
Lahore Leads University, Lahore. Work/Requirements. Prepare Minutes of the said meeting for in
(2011 – 2015) house understanding. By collecting queries from relevant in house
department are also being asked from buyer for further scope study
KEY TECHNICAL SKILLS: via defined communication channel.
Certified Primavera P6 Major Components of Response is but not limited to Technical &
Financial for instance Priced Bill of Quantities, Proposed
Expert.
Construction Schedule/Timelines, Proposed Resource Histograms,
Microsoft Project 2016
Proposed Monthly Cash Flow, Proposed Cost S-Curve, Proposed
Operator. Tools & Plants, Proposed Organization Chart, Proposed Temporary
Scheduler Site Facilities etc.
MS Excel 2016 At post award stage, preparation of Scope Management Plan in
MS Word 2016 which detailed and previous un cleared requirements are acquired
Risk Analyst from Client/buyer. Preparation of Work Breakdown Structure (WBS)
AutoCAD 2013 for the establishment of Scope Baseline.
Pert master Risk Preparation of Schedule Management Plan in which WBS is
decomposed into more manageable parts (Define Activities) in
Analysis Software
accordance with contract relevant clause. Defined Activities are
Operator
then sequenced by giving them a logical dependencies and
Resource Analyzer and estimated duration. Primavera P6/Microsoft Project is then able to
Estimator develop a schedule and submitted to buyer for approval. Approved
schedule is termed as Schedule Baseline.
1|Page
Key participant for the preparation of Quality Management Plan.
Quality Metrics & Checklists are developed to ensure that processes
and deliverables are in conformity with standards/policies.
Preparation of Resource Management Plan (Human Resource,
MAJOR PROJECTS ARE: Machinery & Equipment) in which physical resources are estimated
in accordance with buyer's constraint and then act as an input in
Primavera P6/MS Project for activity duration estimate. For Human
Lays Plant PEPSICO, Resource, Responsibility & Assignment Plan is prepared,
Multan. recognitions & Rewards are also set for motivational purposes.
18 MW Harrapa Solar Preparation of Risk Management Plan in which negative risks are
Power Plant, Harrapa. to be mitigated and positive risks are to be enhanced/exploited.
Pioneer Cement Risks are identified/assessed as per past projects experience and
Factory, Khushab. stakeholder’s inputs. Probability & Impact Matrix is developed to
clearly notify the team which risks are to be avoided, mitigated,
Tariq Float Glass
transferred and accepted.
Factory, Sheikhupura
Preparation of Communication & Stakeholder Management Plan in
Road.
which stakeholders are identified and assessed by their interest,
Interloop Green Denim influence, power and stakes. During the life of project, they are
Plant, Manga Road. engaged and informed in accordance with their desired
Toyota Motors, Jhelum. communication channel.
Gate Health Care Preparation of Procurement Management Plan to support any
Hospital, Lahore. outsourced work within the life cycle of project. In which creation
Coca Cola Plant, Multan. of Work Orders, Procurement Statement of Work & RFQ’s are
taken care for prospective sellers. Upon outsourcing a part of
work, substantial monitoring is done on every process of seller plus
outcome which they (seller) have been selected. Their payments
and administrative claims are highly taken care. And also closing of
procurement is performed with authenticity.
Preparation of Change Management Plan in which changes during
life cycle are managed, controlled, approved and rejected after
their impact analysis on triple constraints.
Schedule is monitored and controlled on the said software and
projected completion of project is obtained. Change to the scope
and schedule is assessed and upon approval, incorporated in the
Schedule baseline.
Cost is monitored and controlled with Earned Value Management
to calculate SPI, CPI, SV, CV, EAC, ETC & TCPI. Change to the scope
is assessed and upon approval, incorporated in the Cost baseline.
Quality is monitored and controlled, any variation to the plan is
assessed and corrective and preventive actions are taken to adhere
the quality standards.
Changes are monitored and tracked and timely informed vertically
and horizontally. Unnecessary changes to the plan are mostly
prevented.
Extension of Time Claims and Cost Claims are prepared as per the
situation and timely submitted to buyer/Client.
Upon completion of project or phase, proper documentation is
maintained for archival and record management. Good and worst
lessons are annexed in repository for future projects.
2|Page
PLANNING ENGINEER
PROJECT: Maqbool Calsons (JV)
(January, 2016 – August, 2016)
Lahore Orange Line
Metro Train Project, My Key Job Responsibilities were:
Package-02, Lahore.
Preparation and submission of Level-4 Baseline Schedules
using Primavera P6 Professional keeping in view the available
resources.
Resource loading with calculated Budgeted units.
Cost loading for financial monitoring.
Critical Path Analysis.
Updating the Baseline schedules as per Actual progress
leading to Project monitoring and controlling.
Comparative statements of planned vs Actual progress.
Preparation of Look Ahead Schedules and Procurement plans.
Progress Monitoring using Earned Value Analysis.
Monthly Cash Flow Projections.
Preparation, monitoring and updating of Resource and Cost
Histograms.
Preparation and updating of Financial S-Curves.
Preparation of Weekly/Monthly Progress Reports.
Frequent Site visits to monitor the execution works.
Assisting the Execution Team regarding work in front in order
to increase the pace of progress and for successful completion
of Project within planned Time and Cost.
Preparation of Catch-Up / Recovery Schedules.
Attending Progress review meetings and Tender meetings and
delivering of presentations.
Providing technical input and advice as necessary.
Introducing improvements and innovations where
appropriate.
Determine the needs and requirements of upcoming and on-
going activities for procurement to avoid delays in completion
dates. Choose the appropriate suppliers to purchase materials
& goods. Do extensive industry research, meet with sales
people and compares their product, prices & quality. Once
selection vendor has been done, further negotiate to
purchase the required products. Own the responsibility for
managing supplier performance in terms of quality, cost,
delivery & responsiveness.
3|Page
SITE ENGINEER & PROGRESS REPORT OFFICER
PROJECT:
Professional Construction Services (Pvt.) Ltd.
(July, 2015 – December, 2015)
Aquatic Centre &
Gymnasium, LUMS,
Lahore. My Key Job Responsibilities were:
Site in charge during shift
Supervising the layouts
Execution of construction works from drawings
Reporting to the Construction Manager
Preparing Daily Progress Report by Considering Daily Concrete
AWARDS & HONORS: Report
Best Table Topic Speaker VISITING LECTURER
at Banu Mukhtar Preston Institute of Management Sciences and Technology PIMSAT.
Toastmasters Club, (January, 2016 – October, 2016)
Lahore.
Best Prepared Speaker at My Key Teaching Areas were:
Banu Mukhtar
Estimation & Final Year Project (Civil Technology)
Toastmasters Club,
Lahore.
CERTIFICATIONS & CREDENTIALS
Project Management Professional (PMI-USA)
Planning & Scheduling on Primavera P6 Software (Pakistan
Engineering Congress College, Lahore).
AutoCAD 2013 (PITAC, Lahore).
Structure Design & Analysis on ETABS 2013 (Pakistan
Engineering Congress College, Lahore).
References:
Language:
Atif Irfan Shiekh, Executive Director Banu Mukhtar (+92
Urdu
3034449823)
English
Tahir Ismail, Project Manager, Banu Mukhtar (+92 300
8441863)
Zeeshan Azhar, Executive Director, Banu Mukhtar Steel (+92
300 8435550
Saad Farooq Malik, Contracts & Proposal Engineer, (+92 347
7486667)
4|Page