100% found this document useful (2 votes)
6K views28 pages

Inspection and Test Plan - Plumbing Works (Qcitp) : Material Inspections

The document is an inspection and test plan for plumbing works that lists 7 material inspections and 7 installation points to be checked. For each point, it specifies the acceptance criteria and reference documents, as well as which parties will perform and verify the inspections. The goal is to approve all materials and ensure proper installation of pipes, fixtures, and insulation according to approved design drawings and specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
6K views28 pages

Inspection and Test Plan - Plumbing Works (Qcitp) : Material Inspections

The document is an inspection and test plan for plumbing works that lists 7 material inspections and 7 installation points to be checked. For each point, it specifies the acceptance criteria and reference documents, as well as which parties will perform and verify the inspections. The goal is to approve all materials and ensure proper installation of pipes, fixtures, and insulation according to approved design drawings and specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

INSPECTION AND TEST PLAN -PLUMBING WORKS (QCITP)

Inspection Points(HOLD POINTS)


Activity and Characteristic to be Reference Documents (Codes/ Std/ Independe
No. Acceptance Criteria Verifying Document
Checked Spec. / Proc.) nt
Subcon CONTR.  RE / RTO SCC Laborator
y (3rd
Party)
1 MATERIAL INSPECTIONS

Material Inspection
Plumbing General Specifications: Approve Material by
1.1 Verify Materials type/size/quantity Report and Material I/H R S W
Materials 1&3, ASTM-D1785 Plumbing Consultancy
Certification
Material Inspection
Plumbing General Specifications, Approve Material by
1.2 Approval of Fire Stop Sealant Report and Material I/H R S W
ASTM-C24 Plumbing Consultancy
Certification
Approve Fabrication
Fabrication of Braces, Hangers and Plumbing General Specifications, Material Inspection
1.3 Methodoly by Plumbing I/H R S W W
Supports ANSI/MSS SP-58-2018 Report
Consultancy
Material Inspection
Plumbing General Specifications, Approve Material by
1.4 Approval of Valves Report and Material I/H R S W
ASME B31-31.8 & ASSE 1016 Plumbing Consultancy
Certification
Material Inspection
Plumbing General Specifications, Approve Material by
1.5 Approval of Overhead Tank Report and Material I/H R S W
NFPA-22 Plumbing Consultancy
Certification
Material Inspection
Approve Material by
1.6 Approval of Water Meter Plumbing General Specifications Report and Material I/H R S W
Plumbing Consultancy
Certification
Plumbing General Specifications, Material Inspection
Approve Material by
1.7 Approval of Plumbing Fixtures ANSI- A117.1, Z124.2, A112.18, Report and Material I/H R S W
Plumbing Consultancy
Z358.1 Certification

2 INSTALLATION

As per Approve Design


2.1 Pipe Elevation Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Consultancy
Pipe Braces, Hanger and Support in As per Approve Design
2.2 Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Accessible Area
Consultancy
Plumbing General Specifications, As per Approve Design
2.3 Pipe Connection Dwg. By Plumbing Site Inspection Report I/H R S W
ASME B31.3
Consultancy
As per Approve Design
2.4 Plumbing Fixture Proper Installation Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Consultancy
Plumbing Fixture Location and Plumbing General Specification As per Approve Design
2.5 Dwg. By Plumbing Site Inspection Report I/H R S W
Elevation Coordinated with Architectural Plans
Consultancy
Plumbing General Specifications, As per Approve Design
2.6 Pipe Insulation ASHRAE Standard 90.1-2010, Section Dwg. By Plumbing Site Inspection Report I/H R S W
[Link] HVAC System Pipe Insulation Consultancy
As per Approve Design
Plumbing General Specifications: 3.12 Dwg. By Plumbing
2.7 Pipe Sleeves Consultancy, following 1 Site Inspection Report I/H R S W
ROUGH-IN.
size higher of the pipe

3 Testing
As per Approve
Methodology by Plumbing
Plumbing General Specifications and, Consultancy, Following
3.1 Pressure Test +/- 5psig difference for Inspection Test Report I R S W W
ASME-B31 As per Approve
2hours test by Plumbing
Methodology
Plumbing General Specification, Consultancy, Following
3.2 Gravity/Water Test 5% difference after 24 Inspection Test Report I R S W W
ASTM-F2164
hours
As pertest
Approve
Plumbing General Specification: 5.5 Methodology by Plumbing
3.3 Slope Test Consultancy, Following Inspection Test Report I R S W W
Installtion
1.5% minimum slope
Excavation, Backfilling and Sand
4
Bedding

Plumbing General Specification, As per Approve Design


4.1 Excavation Depth Dwg. By Plumbing Site Inspection Report I R S W
ASTM-F3097
Consultancy
Plumbing General Specification, As per Approve Design
4.2 Backfilling Material Dwg. By Plumbing Site Inspection Report I R S W
ASTM-D4253 / ASTM-D698
Consultancy
Plumbing General Specification, As per Approve Design
4.3 Bedding Material and Thickness Dwg. By Plumbing Site Inspection Report I R S W
ASTM-D4253
Consultancy

LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance     W : Witness    H : Hold Point

RE/RTO: Resident Engineers/Resident Technical Officer

Prepared by: Noted by: Approved by:


Mr. Jomari Chris Beron Engr. Bernard Unabia Engr. Ariel Cantil
PDPM-QC Mechanical Engineer PDPM-QC Civil Engineer PDPM-PM
INSPECTION TEST PLAN FOR HOUSING P
Reference Documents
No. Activity and Characteristic to be Checked (Codes/ Std/ Spec. /
Proc.)

1 Material Receiving Inspection

- Receiving Inspection of Materials SUT1-Z05-Q 00-4-023/ASTM E1492


1.1

- Confirm material storage condition Site Receiving InspectiinProcedure

SUT1-Z05-Q 00-4-023-
1.2 Receipt inspection of welding consumables

Site Receiving Inspection
Procedure

2 Welding/ Welders Qualifications

SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)
SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)

SUT1-Z05-Q00-4-030  Welder &
Welding
Operator qualificationProcedure
2.2 Cofirmed Welders(Welders Qualification Test & Contro)

SUT1-Z05-Q00-4-021 General
Welding Procedure

3 Foundation Preparation

Approved Construction 
3.1 Confirmation acceptance of foundation

Drawing - (IFC)
Approved Construction 
3.2 Control foundation level pad elevation & location Drawing - (IFC)

4 Inspection of Fabricated Items

4.1 Confirm Dimension Verification,(Before Erection) SUTO-ALL-C08-4-004

4.2 Visual inspection of workmanship including weld quality SUTO-ALL-C08-4-004

5 Steel Works Erection


5.1 Confirm column plumbness SUTO-ALL-C08-4-004

5.2 Confirm bracings are properly insta SUT0-All-C08-4-004lled SUTO-ALL-C08-4-004

5.3 Confirm handrails, gratings, & stairways are correctly installed SUTO-ALL-C08-4-004

6 Bolting

6.1 Confirm all nuts, bolts & washers have been fitted. SUTO-ALL-C08-4-004

Confirm erection bolts have been replaced with high strength


6.2 SUTO-ALL-C08-4-004
bolts(where applicable)

6.3 Confirm bolt torque SUTO-ALL-C08-4-004

7 Field Welding (As per Drawing- Field Points)

Confirm welding works is carried out in SUT1-Z05-Q00-4-


7.1
 accordance with approved procedures 006 WPS & PQR procedure
SUT1-Z05-Q00-4-006  -WPS & PQR
7.2 Visual Inspection of welding
Pprocedure

SUT1-Z05-Q00-4-006 -WPS & PQR
Non Destructive Testing (NDT) of welding works
7.3 Procedure

   (As per 11.0 NDE) SUT0-All-C08-4-004

8 Grouting

Approved Construction Drawing –


8.1 Confirm grouting is complete
Issued for Construction (IFC)

Approved Construction Drawing –


8.2 Confirm final anchor bolt torque after grouting
Issued for Construction (IFC)

9 Final Inspection

9.1 Carry out Final inspection of the structure Approved Construction Drawings

10 Repair/ Adjustment  & Re-fabrication


Confirmed material Site Receiving Procedure (SUT1-
10.1
Z05-Q 00-4-023)

- Receiving Inspection of Materials

SUT1-Z05-Q00-4-005 WPS(AWS
10.2 Marking & Cutting
D1.1 Prequalified)

SUT1-Z05-Q00-4-005 WPS (AWS


10.3 Fit up Check
D1.1 Prequalified)

10.4 Confirm Final Dimension Check SUTO-ALL-C08-4-004

Welding Visual Inspection SUT1-Z05-Q00-4-005(WPS)


- Full Penetration welds 100% (AWS D1.1 Prequalified)
10.5
- Partial penetration welds 50%
- Fillet welds 25%

11 NDE
RT or  UT - Full penetration Butt Welds  50 % and Magnetic(MT) or Dye
penetrant testing (PT) 50%  (for site welds the above will be 100%)

11.1 UT  or M/ PT - Partial penetration Butt Welds Min.25% & MT/PT  25% (for SUTO-ALL-C08-4-004
site welds the above will be 50%)

MT  or PT - Fillet Welds  Min 20% (for site welds the above will be 50%)

Re-Painting/ Galvanizing  (Touch up - Cold )


11.2 - Surface preparation Approved MS for Painting Works
- Thickness of Zinc Coating/ Painting Cointing Dry film
SUTO-ALL-C08-4-004
11.3 Adhesion Test(If necessary –Random sample Test)
SUTO-ALL-P08-4-008

LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance

11.0 Attachments

              Attachment 1 –   ITR  -QGI-001           Notification (Request) for Inspection


Attachment 2 –   ITR -QGI-002          Release Note

Attachment 3 –   ITR -QMI-001         Receiving Inspection Report


PLAN FOR HOUSING PROJECTS-CIVIL WORKS (WELDING)
Inspection Points(HOLD PO
Acceptance Criteria Verifying Document

Subcon CONTR.

Approved Construction Drawing – Issued for Construction (IFC) & Mill


Certificates & Factory Production Control Certificates (FPC), No
physical defects, Safeguards against adverse environment ITR-QMI-001-Receiving
I W/R
Inspection Report

Low hydrogen/min. Tensile strength 480N/mm². As per manufacturers ITR-QMI-001- Receiving


I R
recommendations. Storage-Temp. & Humidity control environment Inspection Report

ITR-QCI-011 Structural Steel


Approved WPS & PQR
Checklist(para. 2 & 4)

I R
ITR-QCI-016- Steel Structure I R
Fabrication

Approved Construction Drawing – Issued for Construction (IFC)

ITR-QCI-0011 Structural Steel


Checklist- para. 2 & 4)

Conforming the AWS D1.1, Approved WPS & PQR I W/R

Welder or Welding Operator


Performance Qualification
Record

Signed “Release Form” from Concrete casting subcontractor/contractor QGI-002  Release Note I R

ITR-QCI-020- Foundation Pad


Elevation tolerance EL. ± 2mm., As per specification I W/R
Inspection Report

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011- Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011 Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)
ITR-QCI-0018 Installation
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Record For Structural Steel

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/W
Steel Checklist(para. 3)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/R
Steel Checklist(para. 3)

ITR-QCI-0017  Bolt Torque


Approved Construction Drawing – Issued for Construction (IFC) Inspection record for I W/R
Structural Steel

Conforming the AWS D1.1 ITR-QCI-0019 Welding


I S/R
Approved WPS & PQR Inspection Record
Conforming the AWS D1.1 ITR-QCI-0011 Structural Steel
I W/R
Checklist(para 4)

Approved WPS & PQR

ITR-QCI-0019 Welding
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Inspection Record

Grout Inspection & Test


Grouting must be done after column verticality is plumbed I W
reports

ITR-QCI-025- Final inspection


Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel

ITR-QCI-025- Final inspection
Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel
Approved Construction Drawing – Issued for Construction (IFC) & Mill
ITR-QMI-001- Receiving
Certificates & Factory Production Control Certificates (FPC), No I W/R
Inspection Report
physical defects, Safeguards against adverse environment

Approved Construction Drawing – Issued for Construction (IFC), ITR-QCI-016- Steel Structure
I W
Approved tolerance – ASCI specification for Structural Steel Buildings Fabrication

ITR-QCI-016- Steel Structure


Approved joint detail As per WPS. I W
Fabrication

ITR-QCI-016- Steel Structure


Approved Construction Drawing – Issued for Construction (IFC) I W
Fabrication

AWS D1.1 Tabl;e 6.1 & 6.2


All lifting lugs 100% MPI Test ITR-QCI-016- Steel Structure
I W/R
- Verify NDT % has been completed Fabrication
AWS D1.1 Tabl;e 6.1 & 6.2 NDE Report I W/R

Approved Materials Specification ,  Material Brochure  & Catalogue ITR-QCI-023 Painting


I S/R
Specification Inspection Report

As per ASTM D-3359/ISO 2409 (Type Type) or ITR-QCI-023 Painting


I W/R
As per ASTM D-4541/ISO 2624 ( Dolly pull-off)) Inspection Report

nd Test      R: Review    S: Surveillance     W: Witness    H : Hold

ification (Request) for Inspection
     Release Note

iving Inspection Report


pection Points(HOLD POINTS)

RE/RTO SCC Lab

W/R S

S S

R R
R R

W R

R R

W/R R

R S

S S
W/R S

S S

S S

S S

S/R S

W/R R

S/R S
W/R S

W/R S/R

S S

R S

R W
W/R S

S S

S S

S S

W/R S
W/R S

S/R S/R

W/R S