Contact
Mumtaz Abbas
[Link]/in/mumtaz- Operations | Power Plants | CCPP | CCGT | Simple Cycle
abbas-2b715a7a (LinkedIn) Amwaj
Top Skills Summary
Power Generation
I have working experience in power plants (Combined Cycle Power
Energy
Plant CCPP, Combined Cycle Gas Turbine CCGT, Simple Cycle/
Gas Turbines
Open Cycle Power Plants.
Languages
Experience in following Gas Turbines:
Punjabi (Professional Working)
• General Electric Frame 9FA (250MW*08 Units)
English (Full Professional)
• General Electric Frame 9E (125MW*10 Units)
Urdu (Professional Working)
Certifications Experience in following Steam Turbines:
• General Electric C7 (250MW*04 Units)
Lockout Tagout Authorised training
Secondment Acknowledgement
• Fuji Electric Multi Stage Condensing type (64MW*01 Unit)
Course
Lone Worker Course Experience in following HRSG:
Defensive Driving Course • Made by Doosan Dual Pressure (232Ton/hr*01 Units)
Welding, Cutting & Brazing Course • Made by CMI Dual Pressure (310Ton/hr*08 Units)
Key Skills:
• Operation& troubleshooting of Gas Turbine (Startup, Shutdown).
• Operation& troubleshooting of Steam Turbine (Startup, Shutdown).
• Operation & troubleshooting of HRSG (Startup, Shutdown).
• Operation & troubleshooting of BOP (Startup, Shutdown).
• Operation & troubleshooting of Water Treatment Plant (Startup,
Shutdown).
• Operation & troubleshooting of LV/MV/Switch yard (6.6kv, 220kv,
400kv)
• Operation & troubleshooting of Gas Processing Systems (KOD,
Water Bath Heaters, Filter Separators, Gas Pressure reducing Skids,
Gas Chromatography).
• Operation & troubleshooting of DCS (Honeywell, Mark Vie,
Emerson Ovation).
• Troubleshoot operational problems and initiate service requests
with Maximo.
• Ensure the plant and associated equipment is operated in
compliance with applicable regulations.
Page 1 of 5
• Maintain an overall awareness of the status of the plant and
associated equipment.
• Development of short and long term operation strategy for the plant
and the development of a capable shift engineer and operator team
to support that strategy.
• Day to day plant operation, safely and efficiently, according to
good utility practice, dispatch instructions, the company rules and
procedures.
• Ensure that plant meets safety, availability, reliability, efficiency,
generation and budget targets.
Experience
FieldCore
Control Room Engineer
June 2018 - July 2019 (1 year 2 months)
Iraq
Operation& troubleshooting of Gas Turbine GE Frame (8*240 MW Frame 9FA
Gas Turbine)
• Operation& troubleshooting of Steam Turbine GE C7 (4*260 MW)
• Operation & troubleshooting of HRSG (CMI 310T/HR*8)
• Troubleshoot operational problems and initiate service requests with Maximo
• Ensure the plant and associated equipment is operated in compliance with
applicable regulations.
• Exercise sound judgment and take timely actions as needed to ensure
personnel safety, to remain in
compliance with regulations and to prevent equipment damage.
• Maintain an overall awareness of the status of the plant and associated
equipment.
• Perform other duties related to operations including assisting with
maintenance planning and
coordination, training of operators, investigating loss events, and developing
and reviewing
procedures.
• Development of short and long term operation strategy for the plant and the
development of a
capable shift engineer and operator team to support that strategy.
• Day to day plant operation, safely and efficiently, according to good utility
practice, dispatch
Page 2 of 5
instructions, the company rules and procedures.
• Ensure that plant meets safety, availability, reliability, efficiency, generation
and budget targets.
Shamara Holding Group
Control Room Engineer
May 2017 - May 2018 (1 year 1 month)
Basra,Iraq
• Startup of Block 1 to 5 with (2*125 MW Frame 9E Gas Turbine)
• Offline Water Wash of frame 9E 10*125MW turbines
(Every 250 Hours of HFO Fuel, Offline Water wash)
• Energization of Block through 132 KV line through (SAT 132 to 6KV
Transformer) & LV from 6 to
0.4KV AUT (Transformers), Synchronizing the Units with 400KV gird and
transmit power according
to NCC demand.
• Operation of Purification of Crude oil through Centrifuge Separation (Through
PLC)
• Operation of Storage of LDO and HFO in Tanks (Data logging and Records)
• Operation of Boiler for maintaining the temperature of HFO to all GT’s
according to demand.
• During Black out Energization of BSEDG and EDG Operation.
• Commissioning of Frame 9E on (LDO, HFO and Natural Gas with RTR)
• Production of Demineralization and RO water
(Clarification System, Pressure Sand Filters Back washing ,Activated Carbon
Filters+ Back washing,
RO Units+ Dosing+ Chemical Cleaning, De-gasifier , Mixed Bed Ion Exchanger
+ Regeneration)
• Startup of BOP related things
(Air Compressors, Cooling tower, Water of Water Bath Heaters, Boiler for the
temperature rising of
HFO)
Korea Electric Power Corporation (KEPCO)
3 years 11 months
Field Operation Engineer
July 2014 - April 2017 (2 years 10 months)
Pakistan
• To Start-up, shutdown process control and emergency handling operation
of the Combined Cycle Power Plant, Gas Turbine, Steam Turbine, HRSG,
Page 3 of 5
Switching of HV KV Yard AIS-11KV-6KV-0.4KV Switch gears. MCC, Diesel
Generators, Water Treatment RO, Operations &Utility + Auxiliaries.
• Assist Shift Engineer on problem analysis and troubleshoot.
• Confirm and carry out safe isolation and normalizing of equipment’s.
• Prepare & Isolation of PTW on as per Standard Operating Procedures
(LOTO).
• Handling of emergencies during plant shut down and black out condition.
• Maintain proper logs of activities and record the operating conditions in order
to compare and analyze with the running parameters for easy trouble shooting.
• Maintain the equipment and accessories in safe; clean and healthy operating
conditions in order to achieve reliable operation.
• Implement scheduled and emergency equipment changeovers / testing in
order to ensure healthy condition of the equipment.
• 1*120.9MW GE Frame MS9001E Gas Turbine with NOX Control System
• 64MW Fuji electric made Steam Turbine
• Auxiliary Boilers + Dearator & BFW System
• Dual Pressure HRSG 232 t/h
• Steam & Water Injection
• 220kV, 11KV, 0.6kV, 0.4KV AIS Switch Gears, MCC Electrical, Safety &
Isolating Switching of (HV/MV/LV Switchgears)
• 2X 2758KW Black Start Diesel Generator & 2X1458KW Emergency Diesel
Generators
• Uninterrupted Power System (UPS), Batteries, Rectifiers, Inverters, Battery
Chargers,
• Induced Draft Cooling Tower with Side stream Filtration with chemistry
control
• AUXILIRIES & Utility System
• Purification of Raw Gas
• Instrument & Plant Air System
• Water Treatment Plant, Canal/Well Water Treatment (clarification, Demin
water, Reverse Osmosis)
• Sea Water Desalination Units, Ultra .Sand. Active Carbon Filtration.
Trainee Field Operation Engineer
June 2013 - June 2014 (1 year 1 month)
Pakistan
Page 4 of 5
Education
Rahim Yar Khan Collage of technology
Associate's degree, Mechanical · (2009 - 2012)
Aga Khan Education Service, Pakistan
Marticulation, Computer Science · (1996 - 2009)
Page 5 of 5