0% found this document useful (0 votes)
1K views1 page

Nagpur Metro Rail Project: Systra-Aecom-Egis-Rites

This document provides design details for a 4 lane flyover. It includes 14 labeled sections from A to J. The drawing notes that the detailed design consultant is responsible for ensuring the accuracy, correctness and compliance of the design. It also notes that the drawing has been proof checked and found suitable for the Nagpur Metro Rail Project.

Uploaded by

arif_rubin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Nagpur Metro Rail Project: Systra-Aecom-Egis-Rites

This document provides design details for a 4 lane flyover. It includes 14 labeled sections from A to J. The drawing notes that the detailed design consultant is responsible for ensuring the accuracy, correctness and compliance of the design. It also notes that the drawing has been proof checked and found suitable for the Nagpur Metro Rail Project.

Uploaded by

arif_rubin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Technical Blueprint

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

H H

I I
AUTO PATH: Z:\2016 - 2017\C1163504 - DD NMRCL METRO FLYOVER\DRAWINGS\DESIGN DWGS\UNDER PREPARATION\SUPERSTRUCTURE\4 LANE - 16-02-2018-RA\28.60

J J

L&TIEL DWG. NO. - NMRCL/R-1/V/NCC(L&T IEL)/SS/DDI 1601

THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, THIS DRAWING INCLUDING ITS DESIGN AND THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS PROJECT:
NOTES: COMPLETENESS, INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN
RESPECT OF DESIGN, ANALYSIS & DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT /
DETAILING HAS BEEN PROOF CHECKED BEEN PROOF CHECKED/REVIEWED AND FOUND SUITABLE
COUNTER SIGNED BY
NAGPUR METRO RAIL
NAGPUR METRO RAIL PROJECT
INDEPENDENTLY AND FOUND SUITABLE FOR FOR THE EXECUTION PURPOSE AND ISSUED AS `GOOD FOR CORPORATION LTD. Metro House, 28/2, CK Naidu Marg, Anand Nagar,
DDC & CONTRACTOR. IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY
K APPROVED CR DWG NO. " ................ REV ..... " APPROVED ON DATE ................
THE EXECUTION PURPOSE AND IS CONSTRUCTION'/BEING GIVEN NO OBJECTION
Civil Lines, Nagpur - 440 001 K
RECOMMENDED FOR GFC / NO OBJECTION'
DDC / CONTRACTOR CONTRACTOR / DDC Phone No: 07122554217

SIGN: SIGN: SIGN: SIGN: SIGN: PROOF CONSULTANT GENERAL CONSULTANT TO NMRP CLIENT:
SIGN:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
DATE: 16-02-18 DATE: 16-02-18 DATE: 16-02-18 DATE: 16-02-18 DATE: SIGN: NATIONAL HIGHWAY
DATE:
NAME: AJI NAME: RKP NAME: MSP NAME: TPM NAME: DATE: AUTHORITY OF INDIA LOCATION: NAGPUR METRO REACH - 1 (DOUBLE DECKER)
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY NAME: NAME:
NUMERATION DETAILS OF PLAN AND ELEVATION -
TITLE:

L L&T Infra Engineering


Bungalow No. 2, Plot No. 159, 4 LANE - 28.600M AND 27.600M SPAN L
Shubhankar Apartments, Ambazari
A 16-02-2018 REVISED AS PER PC. COMMENTS NCC Limited SHIRISH PATEL & ASSOCIATES
SYSTRA-AECOM-EGIS-RITES Road, Ambazari Hill Top,VermaSCALE: AS SHOWN DATE: 16-02-2018 STATUS: FOR APPROVAL REVISION NO:
(FORMERLY NAGARJUNA CONSULTANTS PRIVATE LIMITED Church House, Above SBI Bank, Layout, Ram Nagar, Nagpur,
0 12-01-2018 FIRST SUBMISSION Sd/- C3-C7, 4TH FLOOR, TRITON SQUARE,
CONSTRUCTION COMPANY LTD.) BALSARA HOUSE, 3rd FLOOR, NAGINDAS ROAD, MUMBAI-400001 Maharashtra 440033 DRG NO: DDI 1601
GUINDY INDUSTRIAL ESTATE, CHENNAI-32 SHIVANGAON PHATA, WARDHA Phone No: 2263-0193, 2265-5039, FAX : 91-22-2265-2011
First floor, Civil Lines Nagpur- 440001 A
REV NO DATE DESCRIPTION SIGN ROAD, NAGPUR-440 025. WEBSITE : www.spacpl.com

1 2 3 4 5 6 7 8 9 10 11 12 plot scale
15 16
TBA 50mm

L&TIEL DWG. NO. - NMRCL/R-1/V/NCC(L&T IEL)/SS/DDI 1601
DDI 1601
THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURA

You might also like