Itp-Inspection & Test Plan: Containment Installation

1) This document is an inspection and test plan (ITP) for cable containment installation that references requirements from the employer's contract. 2) It lists items that require documentation submittals, inspections, or testing before commencing works. This includes permits, method statements, design documents, material specifications, and safety induction. 3) Acceptance criteria and frequency are provided for each item. Records like statements of no objection, approvals, and calibration certificates must be obtained and maintained to demonstrate compliance. Responsible parties for inspections include the quality manager, construction manager, site engineer, and HSE staff.

Uploaded by

wagwahkiabathe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views1 page

Itp-Inspection & Test Plan: Containment Installation

1) This document is an inspection and test plan (ITP) for cable containment installation that references requirements from the employer's contract. 2) It lists items that require documentation submittals, inspections, or testing before commencing works. This includes permits, method statements, design documents, material specifications, and safety induction. 3) Acceptance criteria and frequency are provided for each item. Records like statements of no objection, approvals, and calibration certificates must be obtained and maintained to demonstrate compliance. Responsible parties for inspections include the quality manager, construction manager, site engineer, and HSE staff.

Uploaded by

wagwahkiabathe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Inspection and Test Plan: Defines the inspection and testing procedures for a project, detailing roles, responsibilities, and processes involved.

page 1 of 1

ITP- INSPECTION & TEST PLAN


Ref. Vol 4 - Employer's Requirements - General, Sec. 2.4
Contract [Link]/082/2013

METHOD STATEMENT REF. No.: ITP No.: Rev.


TITLE / NAME: Method Statement of Cable (refer to latest revision)
Containment Installation DATE:
Inspection Parties / Type of
Test or Inspection
Item Records
Activity description Reference documents inspection Acceptance Criteria Frequency
No. action
method RESPONSIBLE
SITE QA/QC
1 Documentation
QCS Section 1 Clause 19.1.3
Granted
1.1 Permits to work MS Clause 9.1 submittal Relevant permits and licenses shall be acquired Prior to commencing the works H W HSE/Quality Manager
permits/licenses
Volume 4 Clause 16.2

1.2 Method Statement Volume 7 Clause 16.1.3 submittal Obtain a statement of no objection of the Contractor Prior to commencing the works SONO H H Quality Manager
QCS Section1 Clause 8.2.4
Engineer's prior written approval shall be obtained
Volume 3 Clause 4.7.3 MEP Construction
1.3 Subcontractor submittal unless otherwise instructed by the Contractor Prior to commencing the works Written approval H W
Manager
Volume 4 Clause 12.3 & 12.13
MEP Construction
1.4 Design documents and DVE Design Verification submittal Check the status of shop drawing prepared by Prior to commencing the works SONO H W Manager / Site
Volume 3 Clause 5.1.2 (k) subcontractors to be “Issued for Construction" Engineer

MEP Construction
Volume 7 Clause 1.1.3 Obtain a statement of no objection of the Manager / Site
1.5 Materials & Workmanship Specifications submittal Prior to commencing the works SONO H H
Supervision Engineer Engineer / QC
Engineer
QCS Section 1 Clause 8.7.7 MEP engineer/QC
1.6 Calibration of instruments and Survey Equipment inspection As recommended by the manufacturer Prior to commencing the works SONO H H
Volume 7 Clause 14.7.1 engineer
2 Site Works
Volume 4 Clause 20.7.4
Safety induction and training is provided to Induction attendance
2.1 Safety Induction QCS Section 11 Clause 1.1.5 Not Applicable Prior to commencing the works W H HSS / Site Engineer
personnel records
MS Clause 9.2

Induction attendance
Volume 4 Section 2.8 Quality induction and training is provided to HSE & Construction
2.2 Quality induction Not Applicable Prior to commencing the works records, MS briefing W H
personnel Department/QA QC
sheets
QCS Section 1 Clause 8.3.8
2.3 Tool Box Talk Not Applicable Briefing for daily tasks Prior to commencing the works Tool box records H R Site Engineer
MS Section 9.2
No damage and compliance with specifications at
MS Section 5 time of delivery, otherwise replaced
Handling and storage of materials MEP Engineer/QC
2.4 inspection Each section Inspection records H H
(Sample MIR Form Attached ) QCS Section 5 Clause Engineer
14.1.6,14.1.7,Section 21 Clause
9.1.6

Before work will proceed, pre inspection on all


MS Clause 5.3.1
materials
Inspection records, MEP Engineer/QC
2.5 Cable Tray and Trunking inspection Each section H H
photos Engineer
QCS Section 21 Section 9.1.6 Cable Tray/Ladder and trunking as per specification

MS Clause 11.3 ,11.4


H W
Marking of location and Routing of Cable Tray shall
MEP Engineer / QC
2.6 Installation Procedures inspection be done as per drawings or guidelines of Each section Inspection Records
Engineer
QCS Section 21 Clause Supervision Engineer
9.3,9.3.2
R R

Notice is given to the Supervision Engineer to carry MEP Engineer / QC


3 Notice to the Engineer Volume 3 Clause 7.3 inspection Before casting Notice records H W
out inspection without unreasonable delay Engineer
3 In-Situ Testing
1- Installation as per
Approved Shop Drawings Earthing Testing
2-fixings
Inspection & fastenings trays, Trunking Inspection Records /
& channel supports Earthing System
QCS Section 21, Clause 9.3.3 Each section of installation as work MEP Engineer / QC
3.1 (Sample IR 3-deposits of test Continuity Test H H
MS Clause 11.2 progresses / as per site condition Engineer
foreign objects and debris Tester shall be calibrated. Testing operative is checksheet/ Installation
Form Attached ) 4- certified. Checksheet
Installation of Earth Links 5-
identification labels

MS: method statement - Volume xx: refers to Contract No.: RTC/082/2013 (DESIGN & BUILD PACKAGE, GREEN LINE ELEVATED & AT GRADE) - QCS: Qatar Construction Specifications 2014
H:Hold Point - W: Witness Point - R:Review records

Prepared by: Reviewed by:

Signature: Signature:

Form No.: Rev. No.0 Issued Date

PSH-QMS-ITP-Q-27 Any work item that does not meet the acceptance criteria shall be reworked and reinspected; failure to satisfactorily rework deficient items shall result in the raising of NCR. Rev.02, 14May2014