PRMIT Test for Dormitory Project

The document contains two inspection reports from GMAP Innovation and Construction Corp. for a proposed six-story residential dormitory project in Makati. The first report details an inspection of the building foundation and provides recommendations. The second report is a concrete pouring permit application specifying the area and schedule for a concrete pour, and checks that safety and quality requirements are met.

Uploaded by

Jamjam & Fam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views2 pages

PRMIT Test for Dormitory Project

The document contains two inspection reports from GMAP Innovation and Construction Corp. for a proposed six-story residential dormitory project in Makati. The first report details an inspection of the building foundation and provides recommendations. The second report is a concrete pouring permit application specifying the area and schedule for a concrete pour, and checks that safety and quality requirements are met.

Uploaded by

Jamjam & Fam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

GMAP INNOVATION AND CONSTRUCTION CORP.

#2746 Carreon Bldg Unit 101 Zenaida St. Brgy. Poblacion, Makati City
• (02)808-77-03 • 09435451628 • idesignplanner@[Link]

"We shape and build your dreams"

Project: Proposed Six storey Residential Dormitory with Roofdeck


Location: # 2990 Balabac st., Brgy. Pinagkaisahan , Makati
Owner: Canopy Properties Inc.

Checklist and Scope of Inspection

Foundation

Findings

Not
Items Description Comlied Specify;
Complied
Footing/ Foundation
1 (Dimension and Depth of
Exca.)
2 Reiforcing bar use ( Main bar
and Stirrups)
3 Gravel Beddings

4 Minimum Required clearance


( Atleast 3")

Recommendation;

___________________________________________________________________________
_____________________________________________________________________

Inspected By;

Engr. Dennis U. Aguilar/ Engr. Melvic S. Grave


Project Structural Consultant

Received and Noted by:


Engr. Rex Ponce
Contractor/ Representative

GMAP INNOVATION AND CONSTRUCTION CORP.


#2746 Carreon Bldg Unit 101 Zenaida St. Brgy. Poblacion, Makati City
• (02)808-77-03 • 09435451628 • idesignplanner@[Link]

"We shape and build your dreams"

CONCRETE POURING PERMIT

Project: Proposed Six storey Residential Dormitory with Roofdeck


Location: # 2990 Balabac st., Brgy. Pinagkaisahan , Makati
Owner: Canopy Properties Inc.

Part of Structure to be Poured :____________________Estimated Volume: ________ Cu. M


Station Limits/Grade/ Section :____________________
Schedule Date of Pouring :____________________

Checklist of Requirements Required


1 Concrete Vibrator
2 Toos and Equipment
3 Falsework/ Formworks Adeqaucy
4 Lighting system
5 Personal Protective Equipment
6 Warning Sign & Barricades
7 Curing Materials
8 Cylinder Molds
Quality of Materials Used ( Rebars and Concrete (
9
Test Reports/ Certtification)
10 Line and Grade Allignment

Remarks/ Recommendations; Ok for pouring

Engr. Dennis U. Aguilar/ Engr. Melvic S. Grave Date:________________________


Project Structural Consultant

Request