0% found this document useful (0 votes)
52 views34 pages

SCADA-PPC, UPS, and Transformer Issues

1. Several issues were reported with communications errors, damaged equipment, and transformers tripping unexpectedly. 2. Actions taken included replacing damaged parts, conducting testing on transformers, and scheduling repairs and replacements with suppliers. 3. Open issues that require ongoing communication and coordination with suppliers include resolving communication issues, replacing batteries, and treating transformer oil.

Uploaded by

vuduclam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views34 pages

SCADA-PPC, UPS, and Transformer Issues

1. Several issues were reported with communications errors, damaged equipment, and transformers tripping unexpectedly. 2. Actions taken included replacing damaged parts, conducting testing on transformers, and scheduling repairs and replacements with suppliers. 3. Open issues that require ongoing communication and coordination with suppliers include resolving communication issues, replacing batteries, and treating transformer oil.

Uploaded by

vuduclam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

No.

Phase Topic / Item Description


1 Operation SCADA-PPC Comms error in PPC

SCB monitors- Comms lost during early morning and


2 Operation
comms error late afternoon

3 Operation UPS 7 UPS 7 battery damaged,

4 Operation Panels damage-0517 Around 376 panels- damaged

Cooperation with SLC, Hard & soft


5 Operation PM schedule
copy

Toolist ready?, Plan? experienced


6 Operation Annual PM
technicians?

7 Operation Tx 6 & 7 relay

8 Operation Animal control Method to prevent animal/ insects

9 Operation UPS 5 UPS 5 battery damaged,

The master & slave


10 Operation The screen was on the blink
screens at SCADA
11 Operation HMI screen of CCTV The screen didn’t display anything
12 Operation CCTV 6 Lost signal on HMI
13 Operation TX 6, 7 T-Plug cable has damaged

Earthing cable
14 Operation Rusty bolts
terminal

15 Operation Panels at MVPS 7 Shading panel

16 Operation Transformers

17 Operation Transformers Tx 8 tripped 3 times on 11-Nov

18 Operation Transformers Tx 7 tripped 4 times on 27-Nov


18 Operation Transformers Tx 7 tripped 4 times on 27-Nov

19 Operation Monitor SCB Lost communication


Note by 2021-02-06
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


UPS still showed "fault" led after replacing batteries
parts. Replaced PE board of UPS

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-13
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS. UPS
UPS still showed "fault" led after replacing batteries
still showed "fault" led after replacing
and PE board.
PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6.
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-20
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon
spare part

Check with SCADA for warranty claim or battery


Already quoted price
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17/05? Any physical damage?

Team structure, document recording. Process monitoring

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS. UPS
UPS still showed "fault" led after replacing batteries still showed "fault" led after replacing
PE board.
_Ask supplier

The screens have damaged Replaced


The screen has damaged
Replaced
POE has damaged
T-Plug cable has damaged Replaced

SLC will schedule plan to replace bolts


Rusty bolts
and terminal connectors
SLC removed shading panel then fill
Shading panel
empty strings at MVPS 5

_TX 6 didn't meet the operational


_First priority: Repair TX6 or replace by new one? requirements after conducting TX
Work date of start - scheduled for 15th Nov. testing.
_ Progress of checking, testing, repairing, _ SMA will take a responsibility for lost
confirmation for re-energizing of TX6. production of SLC.
_ Is there any way that SMA could do to make Tx6 re- _12 Nov,2020 SMA will replace the
energize ASAP? Lost production. new TX at MVPS 6.
_ Repair Tx7 and Tx1 _12-Nov: Received the new TX.
_Tx2,3,4,5,8: need to conduct the transformer testing _13-Nov: Replaced the new TX
because total dissolved combustible (TDC) of all TXs _14-Nov: Energized the TX with no
are increased load about 4 hours. Then Energized
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Note by 2021-02-27
Start Date
Comment Action / To Do
Identify signal error from SCADA/ ENIC to grid Record issue in document.

Waiting Longmax to send Monitor-


_Comms lost during early morning and late afternoon 18-May
spare part

Check with SCADA for warranty claim or battery


Already quoted price 2-Apr
replacement

SCB- surge arrestor status, fuse, lightning a lot on the Moved back to warehouse
17-May
17/05? Any physical damage?

Team structure, document recording. Process monitoring 1-Jun

Study manual first. Most cleaning job, dust removal.


Performed Annual PM at MVPS 6 1-Jun
Some night shift

Sent mail to SMA Waiting SMA to replace relay

Already sealed cables entry


Poison, catch, cat, electrical device Used mothballs to put in LV room at all 12-Jun
MVPSs.

_5-Jan-21: Received PE board spare


parts. Replaced PE board of UPS. UPS
UPS still showed "fault" led after replacing batteries still showed "fault" led after replacing 13-Jun
PE board.
_Ask supplier

The screens have damaged Replaced 15-Jun


The screen has damaged 27-Jun
Replaced
POE has damaged 27-Jun
T-Plug cable has damaged Replaced 27-Aug

SLC will schedule plan to replace bolts


Rusty bolts 28-Aug
and terminal connectors
SLC removed shading panel then fill
Shading panel 28-Aug
empty strings at MVPS 5

_TX 6 didn't meet the operational


requirements after conducting TX
_First priority: Repair TX6 or replace by new one?
testing.
Work date of start - scheduled for 15th Nov.
_ SMA will take a responsibility for lost
_ Progress of checking, testing, repairing,
production of SLC.
confirmation for re-energizing of TX6.
_12 Nov,2020 SMA will replace the
_ Is there any way that SMA could do to make Tx6 re-
new TX at MVPS 6. 13-Oct
energize ASAP? Lost production.
_12-Nov: Received the new TX.
_ Repair Tx7 and Tx1
_13-Nov: Replaced the new TX
_Tx2,3,4,5,8: need to conduct the transformer testing
_14-Nov: Energized the TX with no
because total dissolved combustible (TDC) of all TXs
load about 4 hours. Then Energized
are increased
the Tx with load

_ 11,12-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil 11-Nov
treatment
_17-Nov: DNH performed oil treatment

_ 27,28-Nov: Done vacumm following


SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment
_ 27,28-Nov: Done vacumm following
SMA's instruction then re-energized Tx,
Waiting for SMA to perform oil 27-Nov
treatment
_29-Nov: DNH performed oil treatment

_7-Jan-2021: received 20 spares


_ Communication of SCB monitor was not stable
Replaced monitors
Supporting
End Date Responsible Remark
Department
SCADA

ETIC & NANZI Trina, NANZI, Lam

9-Oct SLC & Trina Lam

APAC sales Gordon

1-Jun SLC Lam

30-Jun SLC Lam

IFC & SMA Lam

12-Jun ETIC & SLC Lam

ETIC & Trina Ella

7-Oct ETIC & Trina Hieu


ETIC & Trina Lam
12-Sep
ETIC & Trina Ella
ETIC, SMA,
1-Oct Hieu
DNH, IFC

SLC SLC

22-Oct SLC SLC

14-Nov SLC SLC

17-Nov SMA, DNH, IFC SMA, DNH, IFC

29-Nov SMA, DNH, IFC SMA, DNH, IFC


29-Nov SMA, DNH, IFC SMA, DNH, IFC

19-Jan SLC Hieu


Done
Open

Open

Close

Open

Close

Open

Open

Close

Open

Close
Close
Close
Close

Open

Close

Close

Close

Close
Close

Close
Total Power Number of Average
Bev Energy Day
Date Energy normal Energy per
average (kWh/m2)
(kWh) INVs Inverter

1-Feb-21 242,092 15.00 16.1 7.2188


2-Feb-21 246,535 15.00 16.4 7.0156
3-Feb-21 230,003 15.00 15.3 7.1406
4-Feb-21 218,033 15.00 14.5 6.5000
5-Feb-21 228,518 15.00 15.2 6.9063
6-Feb-21 222,198 15.00 14.8 7.5625
7-Feb-21 188,744 15.00 12.6 6.5625
8-Feb-21 228,262 15.00 15.2 6.8438
9-Feb-21 216,590 15.00 14.4 7.5782
10-Feb-21 231,844 15.00 15.5 6.4219
11-Feb-21 155,625 15.00 10.4 6.6875
12-Feb-21 89,777 15.00 6.0 5.0469
13-Feb-21 117,813 15.00 7.9 7.4063
14-Feb-21 128,246 15.00 8.5 7.3438
15-Feb-21 141,258 15.00 9.4 7.5781
16-Feb-21 169,021 15.00 11.3 7.7031
17-Feb-21 240,189 15.00 16.0 7.7187
18-Feb-21 248,056 15.00 16.5 7.4219
19-Feb-21 276,520 15.00 18.4 7.5313
20-Feb-21 252,907 15.00 16.9 7.7031
21-Feb-21 202,282 15.00 13.5 7.3750
22-Feb-21 236,079 15.00 15.7 6.9687
23-Feb-21 246,419 15.00 16.4 7.5000
24-Feb-21 259,667 15.00 17.3 7.3750
25-Feb-21 255,360 15.00 17.0 7.0937
26-Feb-21 250,127 15.00 16.7 6.9844
27-Feb-21 248,525 15.00 16.6 6.8906
28-Feb-21 218,265 15.00 14.6 7.4219
Sum 5,988.955 199.4999
Average 213.891 7.1250

Note:
[Link] Energy is based on the 4 meters (471+ 472+473+474),total 15 INVs
[Link] no curtailment from A0 does not mean it don't have, also due to low energy ou
The subtotal is over estimation.
Estimated Total
Estimated Total Estimated Loss due
poweer energy based
Power Energy based to A0 Curtailment
if no IGBT failure
on Irradiation (MWh) (MWh)
(MWh)
273.22927 242.0920 31.1373
265.53822 246.5350 19.0
270.26943 230.0030 40.3
246.02292 218.0330 28.0
261.39935 228.5180 32.9
286.23821 222.1980 64.0
248.38853 188.7440 59.6
259.03375 228.2620 30.8
286.83055 216.5900 70.2
244.58603 231.8440 12.7
253.11974 155.6250 97.5
192.21554 89.7770 102.4
280.32419 117.8130 162.5
277.95859 128.2460 149.7
286.82866 141.2580 145.6
291.55987 169.0210 122.5
292.15033 240.1890 52.0
280.91654 248.0557 32.9
285.05729 276.5197 8.5
291.55987 252.9069 38.7
279.14139 202.2822 76.9
263.76307 236.0793 27.7
283.87260 246.4186 37.5
279.14139 259.6666 19.5
268.49428 255.3600 13.1
264.35541 250.1274 14.2
260.80701 248.5254 12.3
280.91654 218.2649 62.7
1,564.7640

NVs
Sub-total
ue to low energy output not reach the curtailment setting,
Estimated Estimated
Production Loss Production Loss
due to IGBT (MWh) due to IGBT (MWh)
42 MWh 47.3121 MWh
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0

0.0 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
28 29
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
15 15
CACULATE PR AND LOSS PRODUCTION

Project: Phong Phu Solar Farm Power


Location: Tuy Phong, Binh Thuan

Date Total Power kWh PR


1-Feb-21 181,182 70.70%
2-Feb-21 184,516 74.08%
3-Feb-21 172,025 67.86%
4-Feb-21 162,975 70.63%
5-Feb-21 170,525 69.55%
6-Feb-21 165,704 61.72%
7-Feb-21 140,280 60.21%
8-Feb-21 170,502 70.18%
9-Feb-21 161,043 59.86%
10-Feb-21 174,355 76.48%
11-Feb-21 115,533 48.66%
12-Feb-21 66,505 37.12%
13-Feb-21 87,030 33.10%
14-Feb-21 94,684 36.32%
15-Feb-21 104,378 38.80%
16-Feb-21 124,863 45.66%
17-Feb-21 178,439 65.12%

18-Feb-21 185,215 70.29%


19-Feb-21 207,057 77.44%
20-Feb-21 188,996 69.11%
21-Feb-21 150,117 57.34%
22-Feb-21 176,328 71.27%
23-Feb-21 184,296 69.22%
24-Feb-21 194,682 74.36%
25-Feb-21 192,223 76.33%
26-Feb-21 187,623 75.67%
27-Feb-21 186,702 76.32%
28-Feb-21 163,445 62.03%
Note: + Total power valua is exprorted from 471+472+473 meter (for Inverter block 1,2,3,4,
+ Installed capacity = 35501.4 kWp

SUM 4,471,223
Average 159.687 63.05%
Monthly PR 63.13%
ATE PR AND LOSS PRODUCTION

35501.4
Reason Bev average (kWh/m2)
Limited by A0 from 10:34 to 13:00 7.2188
Limited by A0 from 10:46 to 13:00 7.0156
Limited by A0 from 10:10 to 13:06 7.1406
Limited by A0 from 10:23 to 13:43 6.5000
Tx1 has been tripped from 9:56 to 10:46 6.9063
Limited by A0 from 9:18 to 13:21 7.5625
Limited by A0 from 10:02 to 13:47 6.5625
Limited by A0 from 10:21 to 13:14 6.8438
Limited by A0 from 6:35 to 14:45 7.5782
Limited by A0 from 6:45 to 11:49 6.4219
Limited by A0 from 6:40 to 15:00 6.6875
Limited by A0 from 6:55 to 15:30
5.0469
Tx1 has been tripped from 11:43 to 12:29
Limited by A0 from 6:45 to 16:19 7.4063
Limited by A0 from 6:40 to 15:42 7.3438
Limited by A0 from 6:50 to 16:07 7.5781
Limited by A0 from 6:55 to 15:34 7.7031
Limited by A0 from 9:31 to 14:02
7.7187
Tx1 has been tripped from 13:41 to 14:14
Limited by A0 from 9:59 to 13:03 7.4219
Limited by A0 from 11:05 to 11:48 7.5313
Limited by A0 from 10:05 to 13:17 7.7031
Limited by A0 from 9:08 to 14:39 7.3750
Limited by A0 from 10:12 to 13:28
6.9687
Tx1 has been tripped from 7:35 to 8:11
Limited by A0 from 11:01 to 12:58 7.5000
Limited by A0 from 11:07 to 12:31 7.3750
7.0937
Limited by A0 from 11:20 to 12:35 6.9844
Tx1 has been tripped from 7:42 to 8:42 6.8906
Limited by A0 from 10:40 to 14:12 7.4219
m 471+472+473 meter (for Inverter block 1,2,3,4,6,7)
p

199.4999
7.1250
Bev block 3 Bev block 6 Date Total Power kWh
7.3438 7.0938 1-Feb-21 242,092
7.1250 6.9062 2-Feb-21 246,535
7.2500 7.0312 3-Feb-21 230,003
6.5938 6.4062 4-Feb-21 218,033
7.0000 6.8125 5-Feb-21 228,518
7.6875 7.4375 6-Feb-21 222,198
6.6250 6.5000 7-Feb-21 188,744
6.9375 6.7500 8-Feb-21 228,262
7.6875 7.4688 9-Feb-21 216,590
6.4688 6.3750 10-Feb-21 231,844
6.7812 6.5938 11-Feb-21 155,625
5.1562 4.9375 12-Feb-21 89,777
7.5000 7.3125 13-Feb-21 117,813
7.4375 7.2500 14-Feb-21 128,246
7.6562 7.5000 15-Feb-21 141,258
7.7812 7.6250 16-Feb-21 169,021
7.7812 7.6562 17-Feb-21 240,189

7.5000 7.3438 18-Feb-21 248,056


7.5938 7.4688 19-Feb-21 276,520
7.7812 7.6250 20-Feb-21 252,907
7.4375 7.3125 21-Feb-21 202,282
7.0312 6.9062 22-Feb-21 236,079
7.5625 7.4375 23-Feb-21 246,419
7.4375 7.3125 24-Feb-21 259,667
7.1562 7.0312 25-Feb-21 255,360
7.0312 6.9375 26-Feb-21 250,127
7.0000 6.7812 27-Feb-21 248,525
7.4688 7.3750 28-Feb-21 218,265
Note: + Total power valua is exprorted from 4
1,2,3,4,6,7,8)
+ Installed capacity = 47312.1 kWp

201.8123 197.1874 5,988,955


7.2076 7.0424 213.891
47312.1
PR Reason Bev average (kWh/m2)
70.88% Limited by A0 from 10:34 to 13:00 7.2188
74.27% Limited by A0 from 10:46 to 13:00 7.0156
68.08% Limited by A0 from 10:10 to 13:06 7.1406
70.90% Limited by A0 from 10:23 to 13:43 6.5000
69.94% Tx1 has been tripped from 9:56 to 10:46 6.9063
62.10% Limited by A0 from 9:18 to 13:21 7.5625
60.79% Limited by A0 from 10:02 to 13:47 6.5625
70.50% Limited by A0 from 10:21 to 13:14 6.8438
60.41% Limited by A0 from 6:35 to 14:45 7.5782
76.31% Limited by A0 from 6:45 to 11:49 6.4219
49.19% Limited by A0 from 6:40 to 15:00 6.6875
Limited by A0 from 6:55 to 15:30
37.60% 5.0469
Tx1 has been tripped from 11:43 to 12:29
33.62% Limited by A0 from 6:45 to 16:19 7.4063
36.91% Limited by A0 from 6:40 to 15:42 7.3438
39.40% Limited by A0 from 6:50 to 16:07 7.5781
46.38% Limited by A0 from 6:55 to 15:34 7.7031
Limited by A0 from 9:31 to 14:02
65.77% 7.7187
Tx1 has been tripped from 13:41 to 14:14
70.64% Limited by A0 from 9:59 to 13:03 7.4219
77.60% Limited by A0 from 11:05 to 11:48 7.5313
69.39% Limited by A0 from 10:05 to 13:17 7.7031
57.97% Limited by A0 from 9:08 to 14:39 7.3750
Limited by A0 from 10:12 to 13:28
71.60% 6.9687
Tx1 has been tripped from 7:35 to 8:11
69.44% Limited by A0 from 11:01 to 12:58 7.5000
74.42% Limited by A0 from 11:07 to 12:31 7.3750
76.09% 0 7.0937
75.69% Limited by A0 from 11:20 to 12:35 6.9844
76.23% Tx1 has been tripped from 7:42 to 8:42 6.8906
62.16% Limited by A0 from 10:40 to 14:12 7.4219
s exprorted from 471+472+473+474 meter (for Inverter block

= 47312.1 kWp
63.37%
63.45%
Allocate capacity avoid overload
06h-07h 07h-08h 08h-09h 09h-10h 10h-11h 11h-12h
Phong Phú 4.3 22 25 33.9 36 38
Bình An 10 30 42 42 42 42
Phan Lâm 5 18 20 29.9 29.9 29.9
ity avoid overload
12h-13h 13h-14h 14h-15h 15h-16h 16h-17h 17h-18h
37 27 23 16.9 9 2.3
42 42 42 35 15 5
29.9 29.9 29.9 20 10 5
Robot Maintenance Schedule
Restart time in month
Vehicle number Status
Date Date
1 Done Done Good
2 13-Feb-21 Done 27-Feb-21 Done Good
3 Done Done Good
Schedule

Issue Solution recovery (If any)


Company Name Working days Job decription
Ella 0 O&M Ella
Trina
Trina 0 Trina Solar
Nam 0 Nam
Lam 11 Lam
Nghia 0 Nghia
ETIC Hieu 19 Hieu
Long 0 O&M Long
Dat 0 O&M Dat
Ha 0 O&M Ha
SMA SMA O&M ETC2
IFC IFC 0 O&M IFC
Dong Nam Hung DNH 0 DNH
Robot
SCADA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
25 26 27 28 Sum
0
0
0
1 1 1 11
0
1 1 1 1 19
0
0
0
0
0
0
30

You might also like