Environment, Health and Safety
Excavation Checklist Ref IM:
Name of Project : Location: Date & Time :
Compliant
No. Item Addressed Comments
Y N N/A
1 Is there evidence of an accepted and approved RA/MS setting down the safe system of work for Slurry or EPB TBM
Tunnel excavation, ground support, ground water management, settlement control, grouting, transport of segments
and spoil removal operations?
2 Is there evidence the RAMS in (1) above has been briefed out to tunnelling personel and all interested parties?
3 Is there evidence that Daily Activity Briefings (DABS) are given to each tunnel shift on the safe system of work
inclusive of segment handling restrictions in the magazine and build areas?
4 Is there evidence of an accepted (CRL) and approved (Contractor) RA/MS setting down the safe system of work for
excavation, initial ground support, profile control and spoil removal for SCL tunnels?
5 Other comments?