AP1000 Design Control Document Overview

This document is the table of contents for the AP1000 Design Control Document. It lists all sections and chapters in the document, along with page numbers. Some key sections include Chapter 1, which provides an introduction and general description of the plant. Appendix 1A addresses conformance with regulatory guides, and Appendix 1B discusses severe accident mitigation design alternatives for the AP1000. The table of contents provides a high-level overview of the organization and contents of the AP1000 Design Control Document.

Uploaded by

Bob Havr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
450 views32 pages

AP1000 Design Control Document Overview

This document is the table of contents for the AP1000 Design Control Document. It lists all sections and chapters in the document, along with page numbers. Some key sections include Chapter 1, which provides an introduction and general description of the plant. Appendix 1A addresses conformance with regulatory guides, and Appendix 1B discusses severe accident mitigation design alternatives for the AP1000. The table of contents provides a high-level overview of the organization and contents of the AP1000 Design Control Document.

Uploaded by

Bob Havr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS

Section Title Page

TIER 2 LIST OF EFFECTIVE PAGES .............................................................................. 1


LIST OF TIER 2 REVISION 1 PAGES ...................................................................... xxxiii
LIST OF TIER 2 REVISION 2 PAGES ......................................................................... xliii
TIER 2 REVISION 3 CHANGE ROADMAP ................................................................. xlv
TIER 2 REVISION 4 CHANGE ROADMAP ................................................................ lxiv
TIER 2 REVISION 5 CHANGE ROADMAP ............................................................... lxxv
TIER 2 REVISION 6 CHANGE ROADMAP ............................................................ lxxviii
TIER 2 REVISION 7 CHANGE ROADMAP .............................................................. lxxxi
TIER 2 REVISION 8 CHANGE ROADMAP .................................................................. xc
TIER 2 REVISION 9 CHANGE ROADMAP ............................................................. xcviii
TIER 2 REVISION 10 CHANGE ROADMAP ........................................................... xcviii
TIER 2 REVISION 11 CHANGE ROADMAP ............................................................. cviii
TIER 2 REVISION 12 CHANGE ROADMAP .............................................................. cxii
TIER 2 REVISION 13 CHANGE ROADMAP ............................................................. cxiv
TIER 2 REVISION 14 CHANGE ROADMAP ............................................................. cxvi
TIER 2 REVISION 15 CHANGE ROADMAP ............................................................. cxix
TIER 2 REVISION 16 CHANGE ROADMAP .............................................................. cxx
TIER 2 REVISION 17 CHANGE ROADMAP ............................................................. clxii
TIER 2 REVISION 18 CHANGE ROADMAP .............................................................ccvii
TIER 2 REVISION 19 CHANGE ROADMAP .............................................................cclvi

VOLUME 2

CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF THE PLANT .................... 1.1-1


1.1 Introduction ................................................................................................................... 1.1-1
1.1.1 Plant Location ............................................................................................... 1.1-1
1.1.2 Containment Type......................................................................................... 1.1-1
1.1.3 Reactor Type ................................................................................................. 1.1-1
1.1.4 Power Output ................................................................................................ 1.1-1
1.1.5 Schedule........................................................................................................ 1.1-1
1.1.6 Format and Content ...................................................................................... 1.1-2
1.1.7 Combined License Information..................................................................... 1.1-2
1.2 General Plant Description ............................................................................................. 1.2-1
1.2.1 Design Criteria, Operating Characteristics, and Safety Considerations ........ 1.2-1
1.2.2 Site Description........................................................................................... 1.2-13
1.2.3 Plant Arrangement Description ................................................................... 1.2-15
1.2.4 Nuclear Island ............................................................................................. 1.2-15
1.2.5 Annex Building........................................................................................... 1.2-22
1.2.6 Diesel Generator Building .......................................................................... 1.2-23
1.2.7 Radwaste Building ...................................................................................... 1.2-24
1.2.8 Turbine Building......................................................................................... 1.2-24
1.2.9 Combined License Information ................................................................... 1.2-25
1.3 Comparisons With Similar Facility Designs ................................................................. 1.3-1
1.4 Identification of Agents and Contractors ....................................................................... 1.4-1

Tier 2 Material i Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

1.4.1 Applicant – Program Manager ...................................................................... 1.4-1


1.4.2 Other Contractors and Participants ............................................................... 1.4-1
1.4.3 Combined License Information .................................................................... 1.4-3
1.5 Requirements for Further Technical Information .......................................................... 1.5-1
1.5.1 AP600 Safety-Related Tests ......................................................................... 1.5-1
1.5.2 AP600 Component Design Tests .................................................................. 1.5-7
1.5.3 Combined License Information .................................................................... 1.5-8
1.5.4 References .................................................................................................... 1.5-8
1.6 Material Referenced ...................................................................................................... 1.6-1
1.7 Drawings and Other Detailed Information .................................................................... 1.7-1
1.7.1 Electrical and Instrumentation and Control Drawings .................................. 1.7-1
1.7.2 Piping and Instrumentation Diagrams ........................................................... 1.7-1
1.7.3 Combined License Information .................................................................... 1.7-1
1.8 Interfaces for Standard Design ...................................................................................... 1.8-1
1.9 Compliance with Regulatory Criteria ............................................................................ 1.9-1
1.9.1 Regulatory Guides ........................................................................................ 1.9-1
1.9.2 Compliance With Standard Review Plan (NUREG-0800) ........................... 1.9-4
1.9.3 Three Mile Island Issues ............................................................................... 1.9-4
1.9.4 Unresolved Safety Issues and Generic Safety Issues................................... 1.9-25
1.9.5 Advanced Light Water Reactor Certification Issues ................................... 1.9-70
1.9.6 References................................................................................................... 1.9-99

APPENDIX 1A CONFORMANCE WITH REGULATORY GUIDES ................................................ 1A-1


1A.1 References ................................................................................................................... 1A-72

APPENDIX 1B SEVERE ACCIDENT MITIGATION DESIGN ALTERNATIVES .......................... 1B-1


1B.1 AP1000 SAMDA Evaluation ........................................................................................ 1B-1
1B.1.1 Introduction................................................................................................... 1B-1
1B.1.2 Summary ....................................................................................................... 1B-1
1B.1.3 Selection and Description of SAMDAs ........................................................ 1B-2
1B.1.4 Methodology ................................................................................................. 1B-9
1B.1.5 Summary of Risk Significant Enhancements .............................................. 1B-12
1B.1.6 Specific Site Characteristics........................................................................ 1B-13
1B.1.7 Value of Eliminating Risk........................................................................... 1B-13
1B.1.8 Evaluation of Potential Improvements ........................................................ 1B-15
1B.1.9 Results ........................................................................................................ 1B-17
1B.2 References ................................................................................................................... 1B-17

VOLUME 3

CHAPTER 2 SITE CHARACTERISTICS ............................................................................................ 2-1


2.1 Geography and Demography............................................................................................ 2-1
2.1.1 Combined License Information for Geography and Demography ................... 2-1
2.2 Nearby Industrial, Transportation, and Military Facilities................................................ 2-1

Tier 2 Material ii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

2.2.1 Combined License Information for Identification of Site-Specific


Potential Hazards ............................................................................................. 2-3
2.3 Meteorology ..................................................................................................................... 2-3
2.3.1 Regional Climatology ...................................................................................... 2-3
2.3.2 Local Meteorology ........................................................................................... 2-3
2.3.3 Onsite Meteorological Measurement Programs ............................................... 2-3
2.3.4 Short-Term Diffusion Estimates ...................................................................... 2-3
2.3.5 Long-Term Diffusion Estimates ...................................................................... 2-4
2.3.6 Combined License Information ....................................................................... 2-4
2.4 Hydrologic Engineering ................................................................................................... 2-5
2.4.1 Combined License Information ....................................................................... 2-5
2.5 Geology, Seismology, and Geotechnical Engineering ...................................................... 2-6
2.5.1 Basic Geological and Seismic Combined License Information ....................... 2-7
2.5.2 Vibratory Ground Motion ................................................................................ 2-7
2.5.3 Surface Faulting Combined License Information .......................................... 2-10
2.5.4 Stability and Uniformity of Subsurface Materials and Foundations .............. 2-11
2.5.5 Combined License Information for Stability of Slopes .................................. 2-20
2.5.6 Combined License Information for Embankments and Dams........................ 2-20
2.6 References ...................................................................................................................... 2-20

CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT


AND SYSTEMS ........................................................................................................... 3.1-1
3.1 Conformance with Nuclear Regulatory Commission General Design Criteria.............. 3.1-1
3.1.1 Overall Requirements ................................................................................... 3.1-1
3.1.2 Protection by Multiple Fission Product Barriers ........................................... 3.1-4
3.1.3 Protection and Reactivity Control Systems ................................................. 3.1-11
3.1.4 Fluid Systems.............................................................................................. 3.1-17
3.1.5 Reactor Containment .................................................................................. 3.1-28
3.1.6 Fuel and Reactivity Control ........................................................................ 3.1-32
3.1.7 Combined License Information................................................................... 3.1-35
3.1.8 References................................................................................................... 3.1-35
3.2 Classification of Structures, Components, and Systems ................................................ 3.2-1
3.2.1 Seismic Classification ................................................................................... 3.2-1
3.2.2 AP1000 Classification System ...................................................................... 3.2-3
3.2.3 Inspection Requirements ............................................................................. 3.2-12
3.2.4 Application of AP1000 Safety-Related Equipment and Seismic
Classification System .................................................................................. 3.2-13
3.2.5 Combined License Information ................................................................... 3.2-16
3.2.6 References................................................................................................... 3.2-16
3.3 Wind and Tornado Loadings ......................................................................................... 3.3-1
3.3.1 Wind Loadings.............................................................................................. 3.3-1
3.3.2 Tornado Loadings ......................................................................................... 3.3-1
3.3.3 Combined License Information ..................................................................... 3.3-4
3.3.4 References..................................................................................................... 3.3-5

Tier 2 Material iii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

3.4 Water Level (Flood) Design .......................................................................................... 3.4-1


3.4.1 Flood Protection ............................................................................................ 3.4-1
3.4.2 Analytical and Test Procedures ................................................................... 3.4-24
3.4.3 Combined License Information ................................................................... 3.4-24
3.4.4 References................................................................................................... 3.4-24
3.5 Missile Protection .......................................................................................................... 3.5-1
3.5.1 Missile Selection and Description ................................................................. 3.5-3
3.5.2 Protection from Externally Generated Missiles ........................................... 3.5-12
3.5.3 Barrier Design Procedures .......................................................................... 3.5-13
3.5.4 Combined License Information ................................................................... 3.5-15
3.5.5 References................................................................................................... 3.5-16
3.6 Protection Against the Dynamic Effects Associated with the Postulated
Rupture of Piping .......................................................................................................... 3.6-1
3.6.1 Postulated Piping Failures in Fluid Systems Inside and Outside
Containment.................................................................................................. 3.6-2
3.6.2 Determination of Break Locations and Dynamic Effects Associated
with the Postulated Rupture of Piping ........................................................ 3.6-11
3.6.3 Leak-before-Break Evaluation Procedures .................................................. 3.6-29
3.6.4 Combined License Information ................................................................... 3.6-35
3.6.5 References................................................................................................... 3.6-36
3.7 Seismic Design .............................................................................................................. 3.7-1
3.7.1 Seismic Input ................................................................................................ 3.7-1
3.7.2 Seismic System Analysis............................................................................... 3.7-7
3.7.3 Seismic Subsystem Analysis ....................................................................... 3.7-22
3.7.4 Seismic Instrumentation .............................................................................. 3.7-46
3.7.5 Combined License Information ................................................................... 3.7-49
3.7.6 References................................................................................................... 3.7-50

VOLUME 4

3.8 Design of Category I Structures .................................................................................... 3.8-1


3.8.1 Concrete Containment................................................................................... 3.8-1
3.8.2 Steel Containment ......................................................................................... 3.8-1
3.8.3 Concrete and Steel Internal Structures of Steel Containment...................... 3.8-18
3.8.4 Other Category I Structures......................................................................... 3.8-42
3.8.5 Foundations................................................................................................. 3.8-65
3.8.6 Combined License Information ................................................................... 3.8-76
3.8.7 References................................................................................................... 3.8-77
3.9 Mechanical Systems and Components .......................................................................... 3.9-1
3.9.1 Special Topics for Mechanical Components ................................................. 3.9-1
3.9.2 Dynamic Testing and Analysis.................................................................... 3.9-28
3.9.3 ASME Code Classes 1, 2, and 3 Components, Component Supports,
and Core Support Structures ....................................................................... 3.9-43

Tier 2 Material iv Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

3.9.4 Control Rod Drive System (CRDS) ............................................................ 3.9-68


3.9.5 Reactor Pressure Vessel Internals ............................................................... 3.9-78
3.9.6 Inservice Testing of Pumps and Valves ...................................................... 3.9-84
3.9.7 Integrated Head Package ............................................................................. 3.9-93
3.9.8 Combined License Information ................................................................... 3.9-97
3.9.9 References................................................................................................... 3.9-99
3.10 Seismic and Dynamic Qualification of Seismic Category I Mechanical and
Electrical Equipment ................................................................................................... 3.10-1
3.10.1 Seismic and Dynamic Qualification Criteria ............................................... 3.10-2
3.10.2 Methods and Procedures for Qualifying Electrical Equipment,
Instrumentation, and Mechanical Components ........................................... 3.10-3
3.10.3 Method and Procedures for Qualifying Supports of Electrical
Equipment, Instrumentation, and Mechanical Components........................ 3.10-7
3.10.4 Documentation ............................................................................................ 3.10-7
3.10.5 Standard Review Plan Evaluation ............................................................... 3.10-8
3.10.6 Combined License Information Item on Experienced-Based
Qualification ............................................................................................... 3.10-8
3.10.7 References................................................................................................... 3.10-8
3.11 Environmental Qualification of Mechanical and Electrical Equipment ...................... 3.11-1
3.11.1 Equipment Identification and Environmental Conditions ........................... 3.11-1
3.11.2 Qualification Tests and Analysis................................................................. 3.11-3
3.11.3 Loss of Ventilation ...................................................................................... 3.11-4
3.11.4 Estimated Radiation and Chemical Environment........................................ 3.11-5
3.11.5 Combined License Information Item for Equipment Qualification File...... 3.11-5
3.11.6 References................................................................................................... 3.11-5

VOLUME 5

APPENDIX 3A HVAC DUCTS AND DUCT SUPPORTS.................................................................. 3A-1


3A.1 Codes and Standards ..................................................................................................... 3A-1
3A.2 Loads and Load Combinations ...................................................................................... 3A-1
3A.2.1 Loads ............................................................................................................ 3A-1
3A.2.2 Load Combinations ....................................................................................... 3A-2
3A.3 Analysis and Design ...................................................................................................... 3A-3
3A.3.1 Response Due to Seismic Loads ................................................................... 3A-3
3A.3.2 Deflection Criteria ........................................................................................ 3A-3
3A.3.3 Relative Movement ....................................................................................... 3A-3
3A.3.4 Allowable Stresses ........................................................................................ 3A-4
3A.3.5 Connections .................................................................................................. 3A-4

APPENDIX 3B LEAK-BEFORE-BREAK EVALUATION OF THE AP1000 PIPING ...................... 3B-1


3B.1 Leak-before-Break Criteria for AP1000 Piping............................................................. 3B-2
3B.2 Potential Failure Mechanisms for AP1000 Piping ........................................................ 3B-2
3B.2.1 Erosion-Corrosion Induced Wall Thinning ................................................... 3B-2

Tier 2 Material v Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

3B.2.2 Stress Corrosion Cracking ............................................................................ 3B-3


3B.2.3 Water Hammer .............................................................................................. 3B-5
3B.2.4 Fatigue .......................................................................................................... 3B-6
3B.2.5 Thermal Aging .............................................................................................. 3B-7
3B.2.6 Thermal Stratification ................................................................................... 3B-7
3B.2.7 Other Mechanisms ........................................................................................ 3B-9
3B.3 Leak-before-Break Bounding Analysis ......................................................................... 3B-9
3B.3.1 Procedure for Stainless Steel Piping ........................................................... 3B-10
3B.3.2 Procedure for Non-stainless Steel Piping .................................................... 3B-12
3B.3.3 Evaluation of Piping System Using Bounding Analysis Curves ................. 3B-14
3B.3.4 Bounding Analysis Results ......................................................................... 3B-16
3B.4 Differences in Leak-before-Break Analysis for Stainless Steel and Ferritic
Steel Pipe .................................................................................................................... 3B-16
3B.5 Differences in Inspection Criteria for Class 1, 2, and 3 Systems ................................. 3B-16
3B.6 Differences in Fabrication Requirements of ASME Class 1, Class 2, and
Class 3 Piping ............................................................................................................. 3B-17
3B.7 Sensitivity Study for the Constraint Effect on LBB .................................................... 3B-17
3B.8 References ................................................................................................................... 3B-17

APPENDIX 3C REACTOR COOLANT LOOP ANALYSIS METHODS........................................... 3C-1


3C.1 Reactor Coolant Loop Model Description ..................................................................... 3C-1
3C.1.1 Steam Generator Model ................................................................................ 3C-1
3C.1.2 Reactor Coolant Pump Model ....................................................................... 3C-2
3C.1.3 Reactor Pressure Vessel Model ..................................................................... 3C-2
3C.1.4 Containment Interior Building Structure Model ........................................... 3C-2
3C.1.5 Reactor Coolant Loop Piping Model ............................................................ 3C-3
3C.2 Design Requirements .................................................................................................... 3C-3
3C.3 Static Analyses .............................................................................................................. 3C-3
3C.3.1 Deadweight Analysis .................................................................................... 3C-3
3C.3.2 Internal Pressure Analysis ............................................................................. 3C-4
3C.3.3 Thermal Expansion Analysis ........................................................................ 3C-4
3C.4 Seismic Analyses........................................................................................................... 3C-4
3C.5 Reactor Coolant Loop Piping Stresses .......................................................................... 3C-5
3C.6 Description of Computer Programs ............................................................................... 3C-5

APPENDIX 3D METHODOLOGY FOR QUALIFYING AP1000 SAFETY-RELATED


ELECTRICAL AND MECHANICAL EQUIPMENT ................................................. 3D-1
3D.1 Purpose.......................................................................................................................... 3D-2
3D.2 Scope ............................................................................................................................. 3D-2
3D.3 Introduction ................................................................................................................... 3D-3
3D.4 Qualification Criteria..................................................................................................... 3D-3
3D.4.1 Qualification Guides ..................................................................................... 3D-3
3D.4.2 Definitions .................................................................................................... 3D-7

Tier 2 Material vi Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

3D.4.3 Mild Versus Harsh Environments ................................................................. 3D-7


3D.4.4 Test Sequence ............................................................................................... 3D-8
3D.4.5 Aging ............................................................................................................ 3D-9
3D.4.6 Operability Time ......................................................................................... 3D-12
3D.4.7 Performance Criterion ................................................................................. 3D-12
3D.4.8 Margin ........................................................................................................ 3D-12
3D.4.9 Treatment of Failures .................................................................................. 3D-15
3D.4.10 Traceability ................................................................................................. 3D-15
3D.5 Design Specifications .................................................................................................. 3D-16
3D.5.1 Normal Operating Conditions ..................................................................... 3D-17
3D.5.2 Abnormal Operating Conditions ................................................................. 3D-18
3D.5.3 Seismic Events ............................................................................................ 3D-19
3D.5.4 Containment Test Environment .................................................................. 3D-19
3D.5.5 Design Basis Event Conditions ................................................................... 3D-19
3D.6 Qualification Methods ................................................................................................. 3D-23
3D.6.1 Type Test .................................................................................................... 3D-23
3D.6.2 Analysis ...................................................................................................... 3D-24
3D.6.3 Operating Experience ................................................................................. 3D-28
3D.6.4 On-Going Qualification .............................................................................. 3D-28
3D.6.5 Combinations of Methods ........................................................................... 3D-28
3D.7 Documentation ............................................................................................................ 3D-29
3D.7.1 Equipment Qualification Data Package ...................................................... 3D-30
3D.7.2 Specifications .............................................................................................. 3D-30
3D.7.3 Qualification Program ................................................................................. 3D-32
3D.7.4 Qualification by Test................................................................................... 3D-32
3D.7.5 Qualification by Analysis ............................................................................ 3D-35
3D.7.6 Qualification by Experience........................................................................ 3D-35
3D.7.7 Qualification Program Conclusions ............................................................ 3D-35
3D.7.8 Combined License Information................................................................... 3D-35
3D.8 References ................................................................................................................... 3D-35

Appendix 3D-Attachment A – Sample Equipment Qualification Data Package (EQDP) ..................... 3D-61

Appendix 3D-Attachment B – Aging Evaluation Program ................................................................... 3D-79


B.1 Introduction ................................................................................................................. 3D-79
B.2 Objectives ................................................................................................................... 3D-79
B.3 Basic Approach ........................................................................................................... 3D-79
B.4 Subprogram A ............................................................................................................. 3D-80
B.4.1 Scope .......................................................................................................... 3D-80
B.4.2 Aging Mechanisms ..................................................................................... 3D-80
B.4.3 Time ............................................................................................................ 3D-80
B.4.4 Operational Stresses .................................................................................... 3D-80
B.4.5 External Stresses ......................................................................................... 3D-81
B.4.6 Synergism ................................................................................................... 3D-82

Tier 2 Material vii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

B.4.7 Design Basis Event Testing ........................................................................ 3D-82


B.4.8 Aging Sequence .......................................................................................... 3D-82
B.4.9 Performance Criterion ................................................................................. 3D-83
B.4.10 Failure Treatment ........................................................................................ 3D-83
B.5 Subprogram B ............................................................................................................. 3D-83
B.5.1 Scope .......................................................................................................... 3D-84
B.5.2 Performance Criteria ................................................................................... 3D-84
B.5.3 Failure Treatment ........................................................................................ 3D-84
Appendix 3D-Attachment C – Effects of Gamma Radiation Doses Below 104 Rads on the
Mechanical Properties of Materials ...................................................... 3D-87
C.1 Introduction ................................................................................................................. 3D-87
C.2 Scope ........................................................................................................................... 3D-88
C.3 Discussion ................................................................................................................... 3D-88
C.4 Conclusions ................................................................................................................. 3D-89
C.5 References ................................................................................................................... 3D-89
Appendix 3D-Attachment D – Accelerated Thermal Aging Parameters ............................................... 3D-94
D.1 Introduction ................................................................................................................. 3D-94
D.2 Arrhenius Model ......................................................................................................... 3D-94
D.3 Activation Energy ....................................................................................................... 3D-96
D.4 Thermal Aging (Normal/Abnormal Operating Conditions) ........................................ 3D-96
D.4.1 Normal Operation Temperature (T0) ........................................................... 3D-96
D.4.2 Accelerated Aging Temperature (Ti)........................................................... 3D-97
D.4.3 Examples of Arrhenius Calculations ........................................................... 3D-97
D.5 Post-Accident Thermal Aging ..................................................................................... 3D-98
D.5.1 Post-Accident Operating Temperatures ...................................................... 3D-98
D.5.2 Accelerated Thermal Aging Parameters for Post-Accident Conditions ...... 3D-98
D.6 References ................................................................................................................... 3D-99
Appendix 3D-Attachment E – Seismic Qualification Techniques ...................................................... 3D-105
E.1 Purpose...................................................................................................................... 3D-105
E.2 Definitions................................................................................................................. 3D-105
E.2.1 1/2 Safe Shutdown Earthquake ................................................................. 3D-105
E.2.2 Seismic Category I Equipment .................................................................. 3D-105
E.2.3 Seismic Category II Equipment ................................................................ 3D-105
E.2.4 Non-seismic Equipment ............................................................................ 3D-105
E.2.5 Active Equipment ..................................................................................... 3D-105
E.2.6 Passive Equipment .................................................................................... 3D-105
E.3 Qualification Methods ............................................................................................... 3D-106
E.3.1 Use of Qualification by Testing ................................................................ 3D-106
E.3.2 Use of Qualification by Analysis .............................................................. 3D-106
E.4 Requirements ............................................................................................................ 3D-107
E.4.1 Damping ................................................................................................... 3D-107
E.4.2 Interface Requirements ............................................................................. 3D-107

Tier 2 Material viii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

E.4.3 Mounting Simulation ................................................................................ 3D-107


E.4.4 1/2 Safe Shutdown Earthquake ................................................................. 3D-108
E.4.5 Safe Shutdown Earthquake ....................................................................... 3D-108
E.4.6 Other Dynamic Loads ............................................................................... 3D-108
E.5 Qualification by Test ................................................................................................. 3D-108
E.5.1 Qualification of Hard-Mounted Equipment .............................................. 3D-109
E.5.2 Qualification of Line-Mounted Equipment ............................................... 3D-110
E.5.3 Operational Conditions ............................................................................. 3D-112
E.5.4 Resonant Search Testing ........................................................................... 3D-112
E.6 Qualification by Analysis .......................................................................................... 3D-112
E.6.1 Modeling ................................................................................................... 3D-113
E.6.2 Qualification by Static Analysis ................................................................ 3D-113
E.6.3 Qualification by Dynamic Analysis .......................................................... 3D-113
E.7 Qualification by Test Experience .............................................................................. 3D-114
E.8 Performance Criteria ................................................................................................. 3D-115
E.8.1 Equipment Qualification by Test .............................................................. 3D-115
E.8.2 Equipment Qualification by Analysis ....................................................... 3D-115

APPENDIX 3E HIGH-ENERGY PIPING IN THE NUCLEAR ISLAND ........................................... 3E-1

APPENDIX 3F CABLE TRAYS AND CABLE TRAY SUPPORTS ................................................... 3F-1


3F.1 Codes and Standards ......................................................................................................3F-1
3F.2 Loads and Load Combinations .......................................................................................3F-1
3F.2.1 Loads .............................................................................................................3F-1
3F.2.2 Load Combinations ........................................................................................3F-2
3F.3 Analysis and Design .......................................................................................................3F-2
3F.3.1 Damping ........................................................................................................3F-2
3F.3.2 Seismic Analysis ............................................................................................3F-3
3F.3.3 Allowable Stresses .........................................................................................3F-3
3F.3.4 Connections ...................................................................................................3F-3

APPENDIX 3G NUCLEAR ISLAND SEISMIC ANALYSES ............................................................ 3G-1


3G.1 Introduction ................................................................................................................... 3G-1
3G.2 Nuclear Island Finite Element Models .......................................................................... 3G-1
3G.2.1 Individual Building and Equipment Models ................................................. 3G-2
3G.2.2 Nuclear Island Dynamic Models ................................................................... 3G-5
3G.2.3 Static Models ................................................................................................ 3G-7
3G.3 2D SASSI Analyses ...................................................................................................... 3G-8
3G.4 Nuclear Island Dynamic Analyses................................................................................. 3G-9
3G.4.1 ANSYS Fixed Base Analysis ....................................................................... 3G-9
3G.4.2 3D SASSI Analyses ...................................................................................... 3G-9
3G.4.3 Seismic Analysis ......................................................................................... 3G-10
3G.5 References ................................................................................................................... 3G-12

Tier 2 Material ix Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

APPENDIX 3H AUXILIARY AND SHIELD BUILDING CRITICAL SECTIONS ........................... 3H-1


3H.1 Introduction ................................................................................................................... 3H-1
3H.2 Description of Auxiliary and Shield Buildings ............................................................. 3H-1
3H.2.1 Description of Auxiliary Building................................................................. 3H-1
3H.2.2 Description of Shield Building ..................................................................... 3H-2
3H.3 Design Criteria .............................................................................................................. 3H-4
3H.3.1 Governing Codes and Standards ................................................................... 3H-5
3H.3.2 Seismic Input ................................................................................................ 3H-5
3H.3.3 Loads............................................................................................................. 3H-5
3H.3.4 Load Combinations and Acceptance Criteria ................................................ 3H-9
3H.4 Seismic Analyses......................................................................................................... 3H-10
3H.4.1 Live Load for Seismic Design ..................................................................... 3H-10
3H.5 Structural Design of Critical Sections ......................................................................... 3H-10
3H.5.1 Shear Walls ................................................................................................. 3H-11
3H.5.2 Composite Structures (Floors and Roof) ..................................................... 3H-14
3H.5.3 Reinforced Concrete Slabs .......................................................................... 3H-17
3H.5.4 Concrete Finned Floors ............................................................................... 3H-17
3H.5.5 Structural Modules ...................................................................................... 3H-18
3H.5.6 Shield Building Roof and Connections ....................................................... 3H-20
3H.5.7 Shield Building Cylinder (SC) .................................................................... 3H-22
3H.5.8 References................................................................................................... 3H-23

APPENDIX 3I EVALUATION FOR HIGH FREQUENCY SEISMIC INPUT .....................................3I-1


3I.1 Introduction .....................................................................................................................3I-1
3I.2 High Frequency Seismic Input ........................................................................................3I-1
3I.3 NI Models Used to Develop High Frequency Response .................................................3I-2
3I.4 Evaluation Methodology .................................................................................................3I-2
3I.5 General Selection Screening Criteria...............................................................................3I-3
3I.6 Evaluation .......................................................................................................................3I-3
3I.6.1 Building Structures .........................................................................................3I-4
3I.6.2 Primary Coolant Loop .....................................................................................3I-4
3I.6.3 Piping Systems ................................................................................................3I-5
3I.6.4 Electrical and Electro-Mechanical Equipment ................................................3I-5
3I.7 References .....................................................................................................................3I-10

CHAPTER 4 REACTOR .................................................................................................................... 4.1-1


4.1 Summary Description .................................................................................................... 4.1-1
4.1.1 Principal Design Requirements ..................................................................... 4.1-4
4.1.2 Combined License Information ..................................................................... 4.1-5
4.1.3 References..................................................................................................... 4.1-5
4.2 Fuel System Design ....................................................................................................... 4.2-1
4.2.1 Design Basis ................................................................................................. 4.2-2
4.2.2 Description and Design Drawings................................................................. 4.2-9

Tier 2 Material x Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

4.2.3 Design Evaluation ....................................................................................... 4.2-20


4.2.4 Testing and Inspection Plan ........................................................................ 4.2-31
4.2.5 Combined License Information................................................................... 4.2-36
4.2.6 References................................................................................................... 4.2-36
4.3 Nuclear Design .............................................................................................................. 4.3-1
4.3.1 Design Basis ................................................................................................. 4.3-1
4.3.2 Description .................................................................................................... 4.3-7
4.3.3 Analytical Methods ..................................................................................... 4.3-35
4.3.4 Combined License Information................................................................... 4.3-39
4.3.5 References................................................................................................... 4.3-39
4.4 Thermal and Hydraulic Design ..................................................................................... 4.4-1
4.4.1 Design Basis ................................................................................................. 4.4-1
4.4.2 Description of Thermal and Hydraulic Design of the Reactor Core ............. 4.4-4
4.4.3 Description of the Thermal and Hydraulic Design of the
Reactor Coolant System .............................................................................. 4.4-18
4.4.4 Evaluation ................................................................................................... 4.4-19
4.4.5 Testing and Verification ............................................................................. 4.4-27
4.4.6 Instrumentation Requirements .................................................................... 4.4-28
4.4.7 Combined License Information ................................................................... 4.4-31
4.4.8 References................................................................................................... 4.4-32
4.5 Reactor Materials .......................................................................................................... 4.5-1
4.5.1 Control Rod and Drive System Structural Materials ..................................... 4.5-1
4.5.2 Reactor Internal and Core Support Materials ................................................ 4.5-3
4.5.3 Combined License Information ..................................................................... 4.5-4
4.6 Functional Design of Reactivity Control Systems ......................................................... 4.6-1
4.6.1 Information for Control Rod Drive System................................................... 4.6-1
4.6.2 Evaluations of the Control Rod Drive System .............................................. 4.6-1
4.6.3 Testing and Verification of the Control Rod Drive System .......................... 4.6-2
4.6.4 Information for Combined Performance of Reactivity Systems .................... 4.6-2
4.6.5 Evaluation of Combined Performance .......................................................... 4.6-3
4.6.6 Combined License Information..................................................................... 4.6-4

CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS.......................... 5.1-1


5.1 Summary Description .................................................................................................... 5.1-1
5.1.1 Design Bases ................................................................................................. 5.1-1
5.1.2 Design Description ....................................................................................... 5.1-2
5.1.3 System Components...................................................................................... 5.1-4
5.1.4 System Performance Characteristics ............................................................. 5.1-7
5.1.5 Combined License Information ..................................................................... 5.1-8
5.2 Integrity of Reactor Coolant Pressure Boundary ........................................................... 5.2-1
5.2.1 Compliance with Codes and Code Cases ...................................................... 5.2-1
5.2.2 Overpressure Protection ................................................................................ 5.2-5
5.2.3 Reactor Coolant Pressure Boundary Materials .............................................. 5.2-9
5.2.4 Inservice Inspection and Testing of Class 1 Components ........................... 5.2-19

Tier 2 Material xi Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

5.2.5 Detection of Leakage Through Reactor Coolant Pressure Boundary .......... 5.2-22
5.2.6 Combined License Information Items ......................................................... 5.2-31
5.2.7 References................................................................................................... 5.2-32
5.3 Reactor Vessel ............................................................................................................... 5.3-1
5.3.1 Reactor Vessel Design .................................................................................. 5.3-1
5.3.2 Reactor Vessel Materials............................................................................... 5.3-3
5.3.3 Pressure-Temperature Limits ...................................................................... 5.3-13
5.3.4 Reactor Vessel Integrity .............................................................................. 5.3-14
5.3.5 Reactor Vessel Insulation ............................................................................ 5.3-20
5.3.6 Combined License Information ................................................................... 5.3-23
5.3.7 References................................................................................................... 5.3-25
5.4 Component and Subsystem Design ............................................................................... 5.4-1
5.4.1 Reactor Coolant Pump Assembly.................................................................. 5.4-1
5.4.2 Steam Generators ........................................................................................ 5.4-10
5.4.3 Reactor Coolant System Piping................................................................... 5.4-21
5.4.4 Main Steam Line Flow Restriction ............................................................. 5.4-26
5.4.5 Pressurizer................................................................................................... 5.4-27
5.4.6 Automatic Depressurization System Valves ............................................... 5.4-34
5.4.7 Normal Residual Heat Removal System ..................................................... 5.4-36
5.4.8 Valves ......................................................................................................... 5.4-50
5.4.9 Reactor Coolant System Pressure Relief Devices ....................................... 5.4-59
5.4.10 Component Supports................................................................................... 5.4-62
5.4.11 Pressurizer Relief Discharge ....................................................................... 5.4-65
5.4.12 Reactor Coolant System High Point Vents ................................................. 5.4-67
5.4.13 Core Makeup Tank ..................................................................................... 5.4-70
5.4.14 Passive Residual Heat Removal Heat Exchanger........................................ 5.4-73
5.4.15 Combined License Information ................................................................... 5.4-75
5.4.16 References................................................................................................... 5.4-76

VOLUME 6

CHAPTER 6 ENGINEERED SAFETY FEATURES ........................................................................ 6-0.1


6.0 Engineered Safety Features ........................................................................................... 6-0.1
6.1 Engineered Safety Features Materials ........................................................................... 6.1-1
6.1.1 Metallic Materials ......................................................................................... 6.1-1
6.1.2 Organic Materials.......................................................................................... 6.1-5
6.1.3 Combined License Information Items ......................................................... 6.1-11
6.1.4 References................................................................................................... 6.1-11
6.2 Containment Systems .................................................................................................... 6.2-1
6.2.1 Containment Functional Design .................................................................... 6.2-1
6.2.2 Passive Containment Cooling System ......................................................... 6.2-17
6.2.3 Containment Isolation System..................................................................... 6.2-27
6.2.4 Containment Hydrogen Control System...................................................... 6.2-38
6.2.5 Containment Leak Rate Test System .......................................................... 6.2-44

Tier 2 Material xii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

6.2.6 Combined License Information for Containment Leak Rate Testing .......... 6.2-50
6.2.7 References................................................................................................... 6.2-51
6.3 Passive Core Cooling System ........................................................................................ 6.3-1
6.3.1 Design Basis ................................................................................................. 6.3-1
6.3.2 System Design .............................................................................................. 6.3-5
6.3.3 Performance Evaluation .............................................................................. 6.3-34
6.3.4 Post-72 Hour Actions .................................................................................. 6.3-46
6.3.5 Limits on System Parameters ...................................................................... 6.3-46
6.3.6 Inspection and Testing Requirements ......................................................... 6.3-47
6.3.7 Instrumentation Requirements .................................................................... 6.3-51
6.3.8 Combined License Information ................................................................... 6.3-55
6.3.9 References................................................................................................... 6.3-56
6.4 Habitability Systems ...................................................................................................... 6.4-1
6.4.1 Safety Design Basis ...................................................................................... 6.4-1
6.4.2 System Description ....................................................................................... 6.4-2
6.4.3 System Operation .......................................................................................... 6.4-8
6.4.4 System Safety Evaluation............................................................................ 6.4-10
6.4.5 Inservice Inspection/Inservice Testing ........................................................ 6.4-13
6.4.6 Instrumentation Requirements .................................................................... 6.4-15
6.4.7 Combined License Information ................................................................... 6.4-15
6.4.8 References................................................................................................... 6.4-15
6.5 Fission Product Removal and Control Systems ............................................................. 6.5-1
6.5.1 Engineered Safety Feature (ESF) Filter Systems .......................................... 6.5-1
6.5.2 Containment Spray System ........................................................................... 6.5-1
6.5.3 Fission Product Control Systems .................................................................. 6.5-5
6.5.4 Combined License Information ..................................................................... 6.5-6
6.5.5 References..................................................................................................... 6.5-6
6.6 Inservice Inspection of Class 2, 3, and MC Components .............................................. 6.6-1
6.6.1 Components Subject to Examination ............................................................ 6.6-1
6.6.2 Accessibility.................................................................................................. 6.6-1
6.6.3 Examination Techniques and Procedures ..................................................... 6.6-2
6.6.4 Inspection Intervals ....................................................................................... 6.6-2
6.6.5 Examination Categories and Requirements................................................... 6.6-3
6.6.6 Evaluation of Examination Results ............................................................... 6.6-3
6.6.7 System Pressure Tests ................................................................................... 6.6-3
6.6.8 Augmented Inservice Inspection to Protect against Postulated Piping
Failures ......................................................................................................... 6.6-3
6.6.9 Combined License Information Items ........................................................... 6.6-4

APPENDIX 6A FISSION PRODUCT DISTRIBUTION IN THE AP1000 POST-DESIGN


BASIS ACCIDENT CONTAINMENT ATMOSPHERE ......................................... 6A-1
6A.1 Design Basis Sequence Assumptions ............................................................................ 6A-1
6A.1.1 Break Size and Fission Product Release Location in Containment ............... 6A-2
6A.2 Containment Natural Circulation and Mixing ............................................................... 6A-4

Tier 2 Material xiii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

6A.3 Insights From the Passive Containment Cooling System Large Scale Test and
AP1000 Stratification Studies ....................................................................................... 6A-7
6A.4 Conclusions ................................................................................................................... 6A-8
6A.5 References ..................................................................................................................... 6A-9

CHAPTER 7 INSTRUMENTATION AND CONTROLS ................................................................. 7.1-1


7.1 Introduction ................................................................................................................... 7.1-1
7.1.1 The AP1000 Instrumentation and Control Architecture ............................... 7.1-2
7.1.2 Protection and Safety Monitoring System ..................................................... 7.1-5
7.1.3 Plant Control System .................................................................................. 7.1-10
7.1.4 Identification of Safety Criteria................................................................... 7.1-13
7.1.5 AP1000 Protective Functions ..................................................................... 7.1-14
7.1.6 Combined License Information................................................................... 7.1-15
7.1.7 References................................................................................................... 7.1-15
7.2 Reactor Trip .................................................................................................................. 7.2-1
7.2.1 Description .................................................................................................... 7.2-1
7.2.2 Analyses ...................................................................................................... 7.2-14
7.2.3 Combined License Information ................................................................... 7.2-16
7.2.4 References................................................................................................... 7.2-17
7.3 Engineered Safety Features ........................................................................................... 7.3-1
7.3.1 Description .................................................................................................... 7.3-1
7.3.2 Analysis for Engineered Safety Features Actuation .................................... 7.3-23
7.3.3 Combined License Information ................................................................... 7.3-25
7.3.4 References................................................................................................... 7.3-25
7.4 Systems Required for Safe Shutdown ........................................................................... 7.4-1
7.4.1 Safe Shutdown .............................................................................................. 7.4-3
7.4.2 Safe Shutdown Systems ................................................................................ 7.4-9
7.4.3 Safe Shutdown from Outside the Main Control Room ............................... 7.4-11
7.4.4 Combined License Information ................................................................... 7.4-14
7.4.5 References................................................................................................... 7.4-14
7.5 Safety-Related Display Information .............................................................................. 7.5-1
7.5.1 Introduction................................................................................................... 7.5-1
7.5.2 Variable Classifications and Requirements ................................................... 7.5-1
7.5.3 Description of Variables ............................................................................... 7.5-9
7.5.4 Processing and Display Equipment ............................................................. 7.5-11
7.5.5 Combined License Information ................................................................... 7.5-12
7.6 Interlock Systems Important to Safety........................................................................... 7.6-1
7.6.1 Prevention of Overpressurization of Low-Pressure Systems ......................... 7.6-1
7.6.2 Availability of Engineered Safety Features ................................................... 7.6-2
7.6.3 Combined License Information..................................................................... 7.6-6
7.7 Control and Instrumentation Systems............................................................................ 7.7-1
7.7.1 Description .................................................................................................... 7.7-2
7.7.2 Analysis ...................................................................................................... 7.7-20
7.7.3 Combined License Information ................................................................... 7.7-21

Tier 2 Material xiv Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

VOLUME 7

CHAPTER 8 ELECTRIC POWER..................................................................................................... 8.1-1


8.1 Introduction ................................................................................................................... 8.1-1
8.1.1 Utility Grid Description ................................................................................ 8.1-1
8.1.2 Onsite Power System Description ................................................................. 8.1-1
8.1.3 Safety-Related Loads .................................................................................... 8.1-2
8.1.4 Design Basis ................................................................................................. 8.1-2
8.1.5 Combined License Information..................................................................... 8.1-5
8.2 Offsite Power System .................................................................................................... 8.2-1
8.2.1 System Description ....................................................................................... 8.2-1
8.2.2 Grid Stability................................................................................................. 8.2-2
8.2.3 Conformance to Criteria................................................................................ 8.2-3
8.2.4 Standards and Guides ................................................................................... 8.2-3
8.2.5 Combined License Information for Offsite Electrical Power ........................ 8.2-4
8.2.6 References..................................................................................................... 8.2-4
8.3 Onsite Power Systems ................................................................................................... 8.3-1
8.3.1 AC Power Systems ....................................................................................... 8.3-1
8.3.2 DC Power Systems ..................................................................................... 8.3-15
8.3.3 Combined License Information for Onsite Electrical Power....................... 8.3-26
8.3.4 References................................................................................................... 8.3-26

CHAPTER 9 AUXILIARY SYSTEMS.............................................................................................. 9.1-1


9.1 Fuel Storage and Handling ............................................................................................ 9.1-1
9.1.1 New Fuel Storage.......................................................................................... 9.1-1
9.1.2 Spent Fuel Storage ........................................................................................ 9.1-5
9.1.3 Spent Fuel Pool Cooling System................................................................. 9.1-12
9.1.4 Light Load Handling System (Related to Refueling) .................................. 9.1-26
9.1.5 Overhead Heavy Load Handling Systems ................................................... 9.1-41
9.1.6 Combined License Information for Fuel Storage and Handling.................. 9.1-52
9.1.7 References................................................................................................... 9.1-53
9.2 Water Systems ............................................................................................................... 9.2-1
9.2.1 Service Water System ................................................................................... 9.2-1
9.2.2 Component Cooling Water System ............................................................... 9.2-7
9.2.3 Demineralized Water Treatment System..................................................... 9.2-17
9.2.4 Demineralized Water Transfer and Storage System .................................... 9.2-22
9.2.5 Potable Water System ................................................................................. 9.2-26
9.2.6 Sanitary Drainage System ........................................................................... 9.2-28
9.2.7 Central Chilled Water System ..................................................................... 9.2-30
9.2.8 Turbine Building Closed Cooling Water System ........................................ 9.2-36
9.2.9 Waste Water System ................................................................................... 9.2-40
9.2.10 Hot Water Heating System.......................................................................... 9.2-43
9.2.11 Combined License Information................................................................... 9.2-46
9.2.12 References................................................................................................... 9.2-47

Tier 2 Material xv Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

9.3 Process Auxiliaries ........................................................................................................ 9.3-1


9.3.1 Compressed and Instrument Air System ....................................................... 9.3-1
9.3.2 Plant Gas System .......................................................................................... 9.3-6
9.3.3 Primary Sampling System ........................................................................... 9.3-10
9.3.4 Secondary Sampling System ....................................................................... 9.3-14
9.3.5 Equipment and Floor Drainage Systems ..................................................... 9.3-16
9.3.6 Chemical and Volume Control System ....................................................... 9.3-21
9.3.7 Combined License Information ................................................................... 9.3-42
9.3.8 References................................................................................................... 9.3-42
9.4 Air-Conditioning, Heating, Cooling, and Ventilation System ....................................... 9.4-1
9.4.1 Nuclear Island Nonradioactive Ventilation System ...................................... 9.4-1
9.4.2 Annex/Auxiliary Buildings Nonradioactive HVAC System ....................... 9.4-17
9.4.3 Radiologically Controlled Area Ventilation System ................................... 9.4-29
9.4.4 Balance-of-Plant-Interface .......................................................................... 9.4-38
9.4.5 Engineered Safety Features Ventilation System.......................................... 9.4-38
9.4.6 Containment Recirculation Cooling System ............................................... 9.4-39
9.4.7 Containment Air Filtration System ............................................................. 9.4-43
9.4.8 Radwaste Building HVAC System ............................................................. 9.4-52
9.4.9 Turbine Building Ventilation System ......................................................... 9.4-56
9.4.10 Diesel Generator Building Heating and Ventilation System ....................... 9.4-62
9.4.11 Health Physics and Hot Machine Shop HVAC System .............................. 9.4-68
9.4.12 Combined License Information ................................................................... 9.4-73
9.4.13 References................................................................................................... 9.4-74

VOLUME 8

9.5 Other Auxiliary Systems ............................................................................................... 9.5-1


9.5.1 Fire Protection System .................................................................................. 9.5-1
9.5.2 Communication System .............................................................................. 9.5-17
9.5.3 Plant Lighting System ................................................................................. 9.5-20
9.5.4 Standby Diesel Fuel Oil System.................................................................. 9.5-24
9.5.5 References................................................................................................... 9.5-30

APPENDIX 9A FIRE PROTECTION ANALYSIS .............................................................................. 9A-1


9A.1 Introduction ................................................................................................................... 9A-1
9A.2 Fire Protection Analysis Methodology .......................................................................... 9A-1
9A.2.1 Fire Area Description .................................................................................... 9A-1
9A.2.2 Combustible Material Survey ....................................................................... 9A-2
9A.2.3 Fire Severity Categorization.......................................................................... 9A-2
9A.2.4 Combustible Loading and Equivalent Fire Duration Calculations ................ 9A-2
9A.2.5 Fire Protection Adequacy.............................................................................. 9A-4
9A.2.6 Fire Protection System Integrity.................................................................... 9A-4
9A.2.7 Safe Shutdown Evaluation ............................................................................ 9A-4

Tier 2 Material xvi Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

9A.3 Fire Protection Analysis Results.................................................................................. 9A-10


9A.3.1 Nuclear Island ............................................................................................. 9A-11
9A.3.2 Turbine Building......................................................................................... 9A-85
9A.3.3 Yard Area and Outlying Buildings ............................................................. 9A-97
9A.3.4 Annex Building........................................................................................... 9A-97
9A.3.5 Radwaste Building .................................................................................... 9A-118
9A.3.6 Diesel Generator Building ........................................................................ 9A-120
9A.3.7 Special Topics ........................................................................................... 9A-125
9A.4 References ................................................................................................................. 9A-128

CHAPTER 10 STEAM AND POWER CONVERSION .................................................................... 10.1-1


10.1 Summary Description .................................................................................................. 10.1-1
10.1.1 General Description .................................................................................... 10.1-1
10.1.2 Protective Features ...................................................................................... 10.1-2
10.1.3 Combined License Information on Erosion-Corrosion Monitoring ............ 10.1-3
10.2 Turbine-Generator ....................................................................................................... 10.2-1
10.2.1 Design Basis ............................................................................................... 10.2-1
10.2.2 System Description ..................................................................................... 10.2-1
10.2.3 Turbine Rotor Integrity ............................................................................. 10.2-11
10.2.4 Evaluation ................................................................................................. 10.2-16
10.2.5 Instrumentation Applications .................................................................... 10.2-16
10.2.6 Combined License Information on Turbine Maintenance
and Inspection ........................................................................................... 10.2-18
10.2.7 References................................................................................................. 10.2-18
10.3 Main Steam Supply System......................................................................................... 10.3-1
10.3.1 Design Basis ............................................................................................... 10.3-1
10.3.2 System Description ..................................................................................... 10.3-4
10.3.3 Safety Evaluation ...................................................................................... 10.3-10
10.3.4 Inspection and Testing Requirements ....................................................... 10.3-11
10.3.5 Water Chemistry ....................................................................................... 10.3-12
10.3.6 Steam and Feedwater System Materials .................................................... 10.3-16
10.3.7 Combined License Information ................................................................. 10.3-16
10.3.8 References................................................................................................. 10.3-16
10.4 Other Features of Steam and Power Conversion System ............................................ 10.4-1
10.4.1 Main Condensers ........................................................................................ 10.4-1
10.4.2 Main Condenser Evacuation System........................................................... 10.4-3
10.4.3 Gland Seal System ...................................................................................... 10.4-6
10.4.4 Turbine Bypass System ............................................................................... 10.4-8
10.4.5 Circulating Water System ......................................................................... 10.4-11
10.4.6 Condensate Polishing System ................................................................... 10.4-16
10.4.7 Condensate and Feedwater System ........................................................... 10.4-18
10.4.8 Steam Generator Blowdown System ......................................................... 10.4-33
10.4.9 Startup Feedwater System ......................................................................... 10.4-41
10.4.10 Auxiliary Steam System ............................................................................ 10.4-49

Tier 2 Material xvii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

10.4.11 Turbine Island Chemical Feed .................................................................. 10.4-52


10.4.12 Combined License Information................................................................. 10.4-54
10.4.13 References................................................................................................. 10.4-55

VOLUME 9

CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT ............................................................. 11.1-1


11.1 Source Terms .............................................................................................................. 11.1-1
11.1.1 Design Basis Reactor Coolant Activity ....................................................... 11.1-1
11.1.2 Design Basis Secondary Coolant Activity................................................... 11.1-4
11.1.3 Realistic Reactor Coolant and Secondary Coolant Activity ........................ 11.1-4
11.1.4 Core Source Term ....................................................................................... 11.1-4
11.1.5 Process Leakage Sources ............................................................................ 11.1-4
11.1.6 Combined License Information................................................................... 11.1-4
11.1.7 References................................................................................................... 11.1-4
11.2 Liquid Waste Management Systems ........................................................................... 11.2-1
11.2.1 Design Basis ............................................................................................... 11.2-1
11.2.2 System Description ..................................................................................... 11.2-6
11.2.3 Radioactive Releases................................................................................. 11.2-18
11.2.4 Preoperational Testing .............................................................................. 11.2-19
11.2.5 Combined License Information................................................................. 11.2-20
11.2.6 References................................................................................................. 11.2-21
11.3 Gaseous Waste Management System .......................................................................... 11.3-1
11.3.1 Design Basis ............................................................................................... 11.3-1
11.3.2 System Description ..................................................................................... 11.3-4
11.3.3 Radioactive Releases................................................................................... 11.3-9
11.3.4 Inspection and Testing Requirements ....................................................... 11.3-10
11.3.5 Combined License Information................................................................. 11.3-11
11.3.6 References................................................................................................. 11.3-11
11.4 Solid Waste Management............................................................................................ 11.4-1
11.4.1 Design Basis ............................................................................................... 11.4-1
11.4.2 System Description ..................................................................................... 11.4-3
11.4.3 System Safety Evaluation.......................................................................... 11.4-13
11.4.4 Tests and Inspections ................................................................................ 11.4-13
11.4.5 Quality Assurance ..................................................................................... 11.4-13
11.4.6 Combined License Information for Solid Waste Management System
Process Control Program .......................................................................... 11.4-14
11.4.7 References................................................................................................. 11.4-14
11.5 Radiation Monitoring .................................................................................................. 11.5-1
11.5.1 Design Basis ............................................................................................... 11.5-1
11.5.2 System Description ..................................................................................... 11.5-2
11.5.3 Effluent Monitoring and Sampling ........................................................... 11.5-13
11.5.4 Process and Airborne Monitoring and Sampling ...................................... 11.5-13
11.5.5 Post-Accident Radiation Monitoring ........................................................ 11.5-13

Tier 2 Material xviii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

11.5.6 Area Radiation Monitors........................................................................... 11.5-14


11.5.7 Preoperational Testing .............................................................................. 11.5-17
11.5.8 Combined License Information ................................................................. 11.5-18

CHAPTER 12 RADIATION PROTECTION ..................................................................................... 12.1-1


12.1 Assuring that Occupational Radiation Exposures Are As-Low-As-Reasonably
Achievable (ALARA) ................................................................................................. 12.1-1
12.1.1 Policy Considerations ................................................................................. 12.1-1
12.1.2 Design Considerations ................................................................................ 12.1-2
12.1.3 Combined License Information ................................................................... 12.1-7
12.2 Radiation Sources........................................................................................................ 12.2-1
12.2.1 Contained Sources ...................................................................................... 12.2-1
12.2.2 Airborne Radioactive Material Sources ...................................................... 12.2-6
12.2.3 Combined License Information ................................................................... 12.2-7
12.2.4 References................................................................................................... 12.2-8
12.3 Radiation Protection Design Features ......................................................................... 12.3-1
12.3.1 Facility Design Features.............................................................................. 12.3-1
12.3.2 Shielding ..................................................................................................... 12.3-9
12.3.3 Ventilation ................................................................................................ 12.3-15
12.3.4 Area Radiation and Airborne Radioactivity Monitoring
Instrumentation ......................................................................................... 12.3-18
12.3.5 Combined License Information................................................................. 12.3-18
12.3.6 References................................................................................................. 12.3-19
12.4 Dose Assessment ......................................................................................................... 12.4-1
12.4.1 Occupational Radiation Exposure ............................................................... 12.4-1
12.4.2 Radiation Exposure at the Site Boundary ................................................... 12.4-5
12.4.3 Combined License Information ................................................................... 12.4-5
12.5 Health Physics Facilities Design ................................................................................. 12.5-1
12.5.1 Objectives ................................................................................................... 12.5-1
12.5.2 Equipment, Instrumentation, and Facilities................................................. 12.5-1
12.5.3 Other Design Features................................................................................. 12.5-3
12.5.4 Controlling Access and Stay Time .............................................................. 12.5-4
12.5.5 Combined License Information ................................................................... 12.5-4

CHAPTER 13 CONDUCT OF OPERATION....................................................................................... 13-1


13.1 Organizational Structure of Applicant............................................................................ 13-1
13.1.1 Combined License Information Item ............................................................. 13-1
13.2 Training .......................................................................................................................... 13-1
13.2.1 Combined License Information Item ............................................................. 13-1
13.3 Emergency Planning ...................................................................................................... 13-1
13.3.1 Combined License Information Item ............................................................. 13-2
13.4 Operational Programs ..................................................................................................... 13-2
13.4.1 Combined License Information Item ............................................................. 13-2

Tier 2 Material xix Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

13.5 Plant Procedures ............................................................................................................. 13-2


13.5.1 Combined License Information Item ............................................................. 13-3
13.6 Security .......................................................................................................................... 13-4
13.6.1 Combined License Information Item ............................................................. 13-4
13.7 References ...................................................................................................................... 13-4

CHAPTER 14 INITIAL TEST PROGRAM ....................................................................................... 14.1-1


14.1 Specific Information to be Included in Preliminary/Final Safety
Analysis Reports ......................................................................................................... 14.1-1
14.2 Specific Information to be Included in Standard Safety Analysis Reports .................. 14.2-1
14.2.1 Summary of Test Program and Objectives .................................................. 14.2-1
14.2.2 Organization, Staffing, and Responsibilities ............................................... 14.2-4
14.2.3 Test Specifications and Test Procedures ..................................................... 14.2-4
14.2.4 Compliance of Test Program with Regulatory Guides ................................ 14.2-6
14.2.5 Utilization of Reactor Operating and Testing Experience in the
Development of Test Program .................................................................... 14.2-6
14.2.6 Use of Plant Operating and Emergency Procedures .................................... 14.2-9
14.2.7 Initial Fuel Loading and Initial Criticality................................................... 14.2-9
14.2.8 Test Program Schedule ............................................................................. 14.2-12
14.2.9 Preoperational Test Descriptions .............................................................. 14.2-13
14.2.10 Startup Test Procedures ............................................................................ 14.2-88
14.3 Certified Design Material ............................................................................................ 14.3-1
14.3.1 CDM Section 1.0, Introduction ................................................................... 14.3-2
14.3.2 CDM Section 2.0, System Based Design Descriptions and ITAAC ........... 14.3-3
14.3.3 CDM Section 3.0, Non-System Based Design Descriptions
and ITAAC ............................................................................................... 14.3-10
14.3.4 Certified Design Material Section 4.0, Interface Requirements ................ 14.3-10
14.3.5 CDM Section 5.0, Site Parameters............................................................ 14.3-10
14.3.6 Initial Test Program .................................................................................. 14.3-11
14.3.7 Elements of AP1000 Design Material Incorporated into the
Certified Design Material ......................................................................... 14.3-11
14.3.8 Summary ................................................................................................... 14.3-12
14.3.9 References................................................................................................. 14.3-12
14.4 Combined License Applicant Responsibilities ............................................................ 14.4-1
14.4.1 Organization and Staffing ........................................................................... 14.4-1
14.4.2 Test Specifications and Procedures ............................................................. 14.4-1
14.4.3 Conduct of Test Program ............................................................................ 14.4-1
14.4.4 Review and Evaluation of Test Results....................................................... 14.4-1
14.4.5 Interface Requirements ............................................................................... 14.4-2
14.4.6 First-Plant-Only and Three-Plant-Only Tests.............................................. 14.4-2

APPENDIX 14A DESIGN ACCEPTANCE CRITERIA/ITAAC CLOSURE PROCESS .................. 14A-1

Tier 2 Material xx Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

VOLUME 10

CHAPTER 15 ACCIDENT ANALYSES........................................................................................... 15.0-1


15.0.1 Classification of Plant Conditions ............................................................... 15.0-1
15.0.2 Optimization of Control Systems ................................................................ 15.0-5
15.0.3 Plant Characteristics and Initial Conditions Assumed in the
Accident Analyses ...................................................................................... 15.0-5
15.0.4 Reactivity Coefficients Assumed in the Accident Analysis ........................ 15.0-7
15.0.5 Rod Cluster Control Assembly Insertion Characteristics ............................ 15.0-7
15.0.6 Protection and Safety Monitoring System Setpoints and
Time Delays to Trip Assumed in Accident Analyses.................................. 15.0-8
15.0.7 Instrumentation Drift and Calorimetric Errors, Power Range
Neutron Flux ............................................................................................... 15.0-8
15.0.8 Plant Systems and Components Available for Mitigation of
Accident Effects.......................................................................................... 15.0-9
15.0.9 Fission Product Inventories ......................................................................... 15.0-9
15.0.10 Residual Decay Heat ................................................................................... 15.0-9
15.0.11 Computer Codes Used .............................................................................. 15.0-10
15.0.12 Component Failures .................................................................................. 15.0-12
15.0.13 Operator Actions ....................................................................................... 15.0-13
15.0.14 Loss of Offsite ac Power ........................................................................... 15.0-13
15.0.15 Combined License Information................................................................. 15.0-14
15.0.16 References................................................................................................. 15.0-15
15.1 Increase in Heat Removal From the Primary System .................................................. 15.1-1
15.1.1 Feedwater System Malfunctions that Result in a Decrease in
Feedwater Temperature .............................................................................. 15.1-1
15.1.2 Feedwater System Malfunctions that Result in an Increase in
Feedwater Flow .......................................................................................... 15.1-2
15.1.3 Excessive Increase in Secondary Steam Flow ............................................. 15.1-6
15.1.4 Inadvertent Opening of a Steam Generator Relief or Safety Valve ............. 15.1-9
15.1.5 Steam System Piping Failure .................................................................... 15.1-12
15.1.6 Inadvertent Operation of the PRHR Heat Exchanger................................ 15.1-20
15.1.7 Combined License Information................................................................. 15.1-22
15.1.8 References................................................................................................. 15.1-22
15.2 Decrease in Heat Removal by the Secondary System.................................................. 15.2-1
15.2.1 Steam Pressure Regulator Malfunction or Failure that Results
in Decreasing Steam Flow .......................................................................... 15.2-1
15.2.2 Loss of External Electrical Load ................................................................. 15.2-1
15.2.3 Turbine Trip ................................................................................................ 15.2-3
15.2.4 Inadvertent Closure of Main Steam Isolation Valves .................................. 15.2-8
15.2.5 Loss of Condenser Vacuum and Other Events Resulting
in Turbine Trip ........................................................................................... 15.2-8
15.2.6 Loss of ac Power to the Plant Auxiliaries ................................................... 15.2-9
15.2.7 Loss of Normal Feedwater Flow ............................................................... 15.2-13

Tier 2 Material xxi Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

15.2.8 Feedwater System Pipe Break ................................................................... 15.2-16


15.2.9 Combined License Information................................................................. 15.2-20
15.2.10 References................................................................................................. 15.2-21
15.3 Decrease in Reactor Coolant System Flow Rate ......................................................... 15.3-1
15.3.1 Partial Loss of Forced Reactor Coolant Flow ............................................. 15.3-1
15.3.2 Complete Loss of Forced Reactor Coolant Flow ........................................ 15.3-3
15.3.3 Reactor Coolant Pump Shaft Seizure (Locked Rotor)................................. 15.3-5
15.3.4 Reactor Coolant Pump Shaft Break .......................................................... 15.3-10
15.3.5 Combined License Information................................................................. 15.3-11
15.3.6 References................................................................................................. 15.3-11
15.4 Reactivity and Power Distribution Anomalies ............................................................ 15.4-1
15.4.1 Uncontrolled Rod Cluster Control Assembly Bank Withdrawal
from a Subcritical or Low-Power Startup Condition .................................. 15.4-1
15.4.2 Uncontrolled Rod Cluster Control Assembly Bank Withdrawal
at Power ...................................................................................................... 15.4-5
15.4.3 Rod Cluster Control Assembly Misalignment (System Malfunction
or Operator Error) ..................................................................................... 15.4-11
15.4.4 Startup of an Inactive Reactor Coolant Pump at an Incorrect
Temperature .............................................................................................. 15.4-16
15.4.5 A Malfunction or Failure of the Flow Controller in a
Boiling Water Reactor Loop that Results in an Increased
Reactor Coolant Flow Rate ....................................................................... 15.4-16
15.4.6 Chemical and Volume Control System Malfunction that
Results in a Decrease in the Boron Concentration in the
Reactor Coolant ........................................................................................ 15.4-16
15.4.7 Inadvertent Loading and Operation of a Fuel Assembly in an
Improper Position ..................................................................................... 15.4-24
15.4.8 Spectrum of Rod Cluster Control Assembly Ejection Accidents .............. 15.4-26
15.4.9 Combined License Information ................................................................. 15.4-36
15.4.10 References................................................................................................. 15.4-36
15.5 Increase in Reactor Coolant Inventory ........................................................................ 15.5-1
15.5.1 Inadvertent Operation of the Core Makeup Tanks During
Power Operation ......................................................................................... 15.5-1
15.5.2 Chemical and Volume Control System Malfunction That Increases
Reactor Coolant Inventory .......................................................................... 15.5-5
15.5.3 Boiling Water Reactor Transients ............................................................... 15.5-9
15.5.4 Combined License Information ................................................................. 15.5-10
15.5.5 References................................................................................................. 15.5-10
15.6 Decrease in Reactor Coolant Inventory ....................................................................... 15.6-1
15.6.1 Inadvertent Opening of a Pressurizer Safety Valve or Inadvertent
Operation of the ADS ................................................................................. 15.6-1
15.6.2 Failure of Small Lines Carrying Primary Coolant Outside
Containment................................................................................................ 15.6-4

Tier 2 Material xxii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

15.6.3 Steam Generator Tube Rupture................................................................... 15.6-6


15.6.4 Spectrum of Boiling Water Reactor Steam System Piping
Failures Outside of Containment .............................................................. 15.6-16
15.6.5 Loss-of-Coolant Accidents Resulting from a Spectrum of
Postulated Piping Breaks Within the Reactor Coolant
Pressure Boundary .................................................................................... 15.6-16
15.6.6 References................................................................................................. 15.6-53
15.7 Radioactive Release from a Subsystem or Component ............................................... 15.7-1
15.7.1 Gas Waste Management System Leak or Failure ........................................ 15.7-1
15.7.2 Liquid Waste Management System Leak or Failure
(Atmospheric Release) ................................................................................ 15.7-1
15.7.3 Release of Radioactivity to the Environment Due to a
Liquid Tank Failure .................................................................................... 15.7-1
15.7.4 Fuel Handling Accident .............................................................................. 15.7-1
15.7.5 Spent Fuel Cask Drop Accident .................................................................. 15.7-5
15.7.6 Combined License Information ................................................................... 15.7-5
15.7.7 References................................................................................................... 15.7-5
15.8 Anticipated Transients Without Scram ....................................................................... 15.8-1
15.8.1 General Background ................................................................................... 15.8-1
15.8.2 Anticipated Transients Without Scram in the AP1000 ............................... 15.8-1
15.8.3 Conclusion .................................................................................................. 15.8-1
15.8.4 Combined License Information ................................................................... 15.8-1
15.8.5 References................................................................................................... 15.8-1

APPENDIX 15A EVALUATION MODELS AND PARAMETERS FOR ANALYSIS OF


RADIOLOGICAL CONSEQUENCES OF ACCIDENTS ..................................... 15A-1
15A.1 Offsite Dose Calculation Models ................................................................................ 15A-1
15A.1.1 Immersion Dose (Effective Dose Equivalent) ............................................. 15A-1
15A.1.2 Inhalation Dose (Committed Effective Dose Equivalent) ........................... 15A-1
15A.1.3 Total Dose (Total Effective Dose Equivalent) ............................................ 15A-2
15A.2 Main Control Room Dose Models .............................................................................. 15A-2
15A.2.1 Immersion Dose Models ............................................................................. 15A-2
15A.2.2 Inhalation Dose ........................................................................................... 15A-3
15A.2.3 Total Dose (Total Effective Dose Equivalent) ............................................ 15A-3
15A.3 General Analysis Parameters ....................................................................................... 15A-3
15A.3.1 Source Terms .............................................................................................. 15A-3
15A.3.2 Nuclide Parameters ..................................................................................... 15A-4
15A.3.3 Atmospheric Dispersion Factors ................................................................. 15A-5
15A.4 References ................................................................................................................... 15A-5

Tier 2 Material xxiii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

APPENDIX 15B REMOVAL OF AIRBORNE ACTIVITY FROM THE CONTAINMENT


ATMOSPHERE FOLLOWING A LOCA .............................................................. 15B-1
15B.1 Elemental Iodine Removal .......................................................................................... 15B-1
15B.2 Aerosol Removal ......................................................................................................... 15B-1
15B.2.1 Mathematical Models.................................................................................. 15B-2
15B.2.2 Other Removal Mechanisms ....................................................................... 15B-6
15B.2.3 Validation of Removal Mechanisms ........................................................... 15B-6
15B.2.4 Parameters and Assumptions for Calculating Aerosol Removal
Coefficients ................................................................................................. 15B-6
15B.2.5 Aerosol Removal Coefficients .................................................................... 15B-8
15B.3 References ................................................................................................................... 15B-8

VOLUME 11

CHAPTER 16 TECHNICAL SPECIFICATIONS


16.1 TECHNICAL SPECIFICATIONS ............................................................................. 16.1-1
16.1.1 Introduction to Technical Specifications..................................................... 16.1-1
16.1.2 References................................................................................................... 16.1-2
1.0 Use and Application ............................................................................ 1.1-1
2.0 Safety Limits (SLs) ............................................................................. 2.0-1
3.0 Limiting Conditions for Operation (LCO) Applicability..................... 3.0-1
3.0 Surveillance Requirement (SR) Applicability ..................................... 3.0-4
3.1 Reactivity Control Systems .............................................................. 3.1.1-1
3.2 Power Distribution Limits ................................................................ 3.2.1-1
3.3 Instrumentation ................................................................................ 3.3.1-1
3.4 Reactor Coolant System (RCS) ........................................................ 3.4.1-1
3.5 Passive Core Cooling System (PXS) ................................................ 3.5.1-1
3.6 Containment Systems ....................................................................... 3.6.1-1
3.7 Plant Systems ................................................................................... 3.7.1-1
3.8 Electrical Power Systems ................................................................. 3.8.1-1
3.9 Refueling Operations ....................................................................... 3.9.1-1
4.0 Design Features ................................................................................... 4.0-1
5.0 Administrative Controls ...................................................................... 5.1-1
B 2.0 Safety Limits (SLs) ................................................................................ B 2.1.1-1
B 3.0 Limiting Conditions for Operation (LCO) Applicability .......................... B 3.0-1
B 3.0 Surveillance Requirement (SR) Applicability......................................... B 3.0-13

VOLUME 12

16.2 DESIGN RELIABILITY ASSURANCE PROGRAM ............................................... 16.2-1


16.3 INVESTMENT PROTECTION ................................................................................. 16.3-1
16.3.1 Investment Protection Short-Term Availability Controls ............................ 16.3-1
16.3.2 Combined License Information .................................................................. 16.3-2

Tier 2 Material xxiv Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

CHAPTER 17 QUALITY ASSURANCE ............................................................................................. 17-1


17.1 Quality Assurance During the Design and Construction Phases .................................... 17-1
17.2 Quality Assurance During the Operations Phase............................................................ 17-1
17.3 Quality Assurance During Design, Procurement, Fabrication, Inspection and/or
Testing of Nuclear Power Plant Items ............................................................................ 17-1
17.4 Design Reliability Assurance Program ........................................................................... 17-2
17.4.1 Introduction.................................................................................................... 17-2
17.4.2 Scope ............................................................................................................. 17-2
17.4.3 Design Considerations ................................................................................... 17-3
17.4.4 Relationship to Other Administrative Programs ............................................ 17-3
17.4.5 The AP1000 Design Organization ................................................................. 17-3
17.4.6 Objective ........................................................................................................ 17-4
17.4.7 D-RAP ........................................................................................................... 17-5
17.4.8 Glossary of Terms .......................................................................................... 17-9
17.5 Combined License Information Items ............................................................................ 17-9
17.6 References .................................................................................................................... 17-11

CHAPTER 18 HUMAN FACTORS ENGINEERING ....................................................................... 18.1-1


18.1 Overview .....................................................................................................................18.1-1
18.1.1 References................................................................................................... 18.1-3
18.2 Human Factors Engineering Program Management .................................................... 18.2-1
18.2.1 Human Factors Engineering Program Goals, Scope,
Assumptions, and Constraints..................................................................... 18.2-1
18.2.2 Human System Interface Design Team and Organization .......................... 18.2-4
18.2.3 Human Factors Engineering Processes and Procedures ............................ 18.2-11
18.2.4 Human Factors Engineering Issues Tracking............................................ 18.2-16
18.2.5 Human Factors Engineering Technical Program and Milestones ............. 18.2-17
18.2.6 Combined License Information ................................................................ 18.2-18
18.2.7 References ................................................................................................ 18.2-19
18.3 Operating Experience Review ..................................................................................... 18.3-1
18.3.1 Combined License Information .................................................................. 18.3-1
18.3.2 References .................................................................................................. 18.3-1
18.4 Functional Requirements Analysis and Allocation ..................................................... 18.4-1
18.4.1 Combined License Information .................................................................. 18.4-2
18.4.2 References .................................................................................................. 18.4-2
18.5 AP1000 Task Analysis Implementation Plan .............................................................. 18.5-1
18.5.1 Task Analysis Scope ................................................................................... 18.5-1
18.5.2 Task Analysis Implementation Plan ............................................................ 18.5-2
18.5.3 Job Design Factors...................................................................................... 18.5-4
18.5.4 Combined License Information Item .......................................................... 18.5-4
18.5.5 References .................................................................................................. 18.5-5
18.6 Staffing........................................................................................................................18.6-1
18.6.1 Combined License Information Item .......................................................... 18.6-1
18.6.2 References .................................................................................................. 18.6-1

Tier 2 Material xxv Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

18.7 Integration of Human Reliability Analysis with Human Factors Engineering ............ 18.7-1
18.7.1 Combined License Information .................................................................. 18.7-1
18.7.2 References .................................................................................................. 18.7-2
18.8 Human System Interface Design ................................................................................. 18.8-1
18.8.1 Implementation Plan for the Human System Interface Design ................... 18.8-3
18.8.2 Safety Parameter Display System (SPDS) ................................................ 18.8-10
18.8.3 Operation and Control Centers System ..................................................... 18.8-15
18.8.4 Human Factors Design for the Non-Human-System Interface
Portion of the Plant ................................................................................... 18.8-19
18.8.5 Combined License Information ................................................................ 18.8-22
18.8.6 References ................................................................................................ 18.8-23
18.9 Procedure Development .............................................................................................. 18.9-1
18.9.1 Combined License Information .................................................................. 18.9-1
18.9.2 References .................................................................................................. 18.9-1
18.10 Training Program Development ................................................................................ 18.10-1
18.10.1 Combined License Information ................................................................ 18.10-1
18.10.2 References ................................................................................................ 18.10-1
18.11 Human Factors Engineering Verification and Validation ......................................... 18.11-1
18.11.1 Combined License Information ................................................................ 18.11-1
18.11.2 References ................................................................................................ 18.11-1
18.12 Inventory ...................................................................................................................18.12-1
18.12.1 Inventory of Displays, Alarms, and Controls ............................................ 18.12-1
18.12.2 Minimum Inventory of Main Control Room Fixed Displays,
Alarms, and Controls ................................................................................ 18.12-1
18.12.3 Remote Shutdown Workstation Displays, Alarms, and Controls.............. 18.12-7
18.12.4 Combined License Information ................................................................ 18.12-8
18.12.5 References ................................................................................................ 18.12-8
18.13 Design Implementation ............................................................................................. 18.13-1
18.13.1 References ................................................................................................ 18.13-1
18.14 Human Performance Monitoring ............................................................................... 18.14-1
18.14.1 References ................................................................................................ 18.14-1

CHAPTER 19 PROBABILISTIC RISK ASSESSMENT................................................................... 19.1-1


19.1 Introduction ................................................................................................................. 19.1.1
19.1.1 Background and Overview.......................................................................... 19.1.1
19.1.2 Objectives ................................................................................................... 19.1.1
19.1.3 Technical Scope .......................................................................................... 19.1.2
19.1.4 Project Methodology Overview .................................................................. 19.1.3
19.1.5 Results ........................................................................................................ 19.1.4
19.1.6 Plant Definition ........................................................................................... 19.1.6
19.1.7 References................................................................................................... 19.1.6
19.2 Internal Initiating Events ............................................................................................. 19.2-1
19.3 Modeling of Special Initiators ..................................................................................... 19.3-1
19.4 Event Tree Models ...................................................................................................... 19.4-1

Tier 2 Material xxvi Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

19.5 Support Systems .......................................................................................................... 19.5-1


19.6 Success Criteria Analysis ............................................................................................ 19.6-1
19.7 Fault Tree Guidelines .................................................................................................. 19.7-1
19.8 Passive Core Cooling System - Passive Residual Heat Removal ................................ 19.8-1
19.9 Passive Core Cooling System - Core Makeup Tanks .................................................. 19.9-1
19.10 Passive Core Cooling System - Accumulator ............................................................ 19.10-1
19.11 Passive Core Cooling System - Automatic Depressurization System ........................ 19.11-1
19.12 Passive Core Cooling System - In-Containment Refueling Water Storage Tank ...... 19.12-1
19.13 Passive Containment Cooling ................................................................................... 19.13-1
19.14 Main and Startup Feedwater System ......................................................................... 19.14-1
19.15 Chemical and Volume Control System ..................................................................... 19.15-1
19.15.1 System Description ................................................................................... 19.15-1
19.15.2 System Operation ...................................................................................... 19.15-1
19.15.3 Performance during Accident Conditions ................................................. 19.15-1
19.15.4 Initiating Event Review ............................................................................ 19.15-1
19.15.5 System Logic Models................................................................................ 19.15-1
19.16 Containment Hydrogen Control System .................................................................... 19.16-1
19.17 Normal Residual Heat Removal System ................................................................... 19.17-1
19.18 Component Cooling Water System ........................................................................... 19.18-1
19.19 Service Water System ............................................................................................... 19.19-1
19.20 Central Chilled Water System ................................................................................... 19.20-1
19.21 ac Power System ....................................................................................................... 19.21-1
19.22 Class 1E dc & UPS System ....................................................................................... 19.22-1
19.23 Non-Class 1E dc & UPS System ............................................................................... 19.23-1
19.24 Containment Isolation ............................................................................................... 19.24-1
19.25 Compressed and Instrument Air System ................................................................... 19.25-1
19.26 Protection and Safety Monitoring System ................................................................. 19.26-1
19.27 Diverse Actuation System ......................................................................................... 19.27-1
19.28 Plant Control System ................................................................................................. 19.28-1
19.29 Common Cause Analysis .......................................................................................... 19.29-1
19.30 Human Reliability Analysis ...................................................................................... 19.30-1
19.31 Other Event Tree Node Probabilities ........................................................................ 19.31-1
19.32 Data Analysis and Master Data Bank ........................................................................ 19.32-1
19.33 Fault Tree and Core Damage Quantification ............................................................. 19.33-1
19.34 Severe Accident Phenomena Treatment .................................................................... 19.34-1
19.34.1 Introduction............................................................................................... 19.34-1
19.34.2 Treatment of Physical Processes ............................................................... 19.34-1
19.34.3 Analysis Method ....................................................................................... 19.34-6
19.34.4 Severe Accident Analyses ......................................................................... 19.34-6
19.34.5 Insights and Conclusions .......................................................................... 19.34-7
19.34.6 References................................................................................................. 19.34-7
19.35 Containment Event Tree Analysis ............................................................................. 19.35-1

Tier 2 Material xxvii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

19.36 Reactor Coolant System Depressurization ................................................................ 19.36-1


19.36.1 Introduction............................................................................................... 19.36-1
19.36.2 Definition of High Pressure ...................................................................... 19.36-1
19.36.3 References................................................................................................. 19.36-2
19.37 Containment Isolation ............................................................................................... 19.37-1
19.38 Reactor Vessel Reflooding ........................................................................................ 19.38-1
19.39 In-Vessel Retention of Molten Core Debris .............................................................. 19.39-1
19.39.1 Introduction............................................................................................... 19.39-1
19.39.2 Background on the Application of In-Vessel Retention
to the Passive Plant ................................................................................... 19.39-1
19.39.3 Application of In-Vessel Retention to the AP1000 Passive Plant ............. 19.39-2
19.39.4 Reactor Vessel Failure Criteria ................................................................. 19.39-2
19.39.5 In-Vessel Melt Progression and Relocation .............................................. 19.39-2
19.39.6 Application of Heat Transfer Correlations to the AP1000 ........................ 19.39-3
19.39.7 Quantification of Heat Load on the Reactor Vessel Wall ......................... 19.39-4
19.39.8 Reactor Coolant System Depressurization ................................................ 19.39-4
19.39.9 Reactor Cavity Flooding ........................................................................... 19.39-5
19.39.10 Reactor Vessel Insulation Design Concept ............................................... 19.39-5
19.39.11 Reactor Vessel Failure .............................................................................. 19.39-6
19.39.12 Summary ................................................................................................... 19.39-6
19.39.13 References................................................................................................. 19.39-6
19.40 Passive Containment Cooling ................................................................................... 19.40-1
19.41 Hydrogen Mixing and Combustion Analysis ............................................................ 19.41-1
19.41.1 Introduction............................................................................................... 19.41-1
19.41.2 Controlling Phenomena ............................................................................ 19.41-1
19.41.3 Major Assumptions and Phenomenological Uncertainties ........................ 19.41-3
19.41.4 Hydrogen Generation and Mixing ............................................................ 19.41-5
19.41.5 Hydrogen Burning at Igniters.................................................................... 19.41-5
19.41.6 Early Hydrogen Combustion..................................................................... 19.41-5
19.41.7 Diffusion Flame Analysis ......................................................................... 19.41-8
19.41.8 Early Hydrogen Detonation ...................................................................... 19.41-9
19.41.9 Deflagration in Time Frame 3 ................................................................... 19.41-9
19.41.10 Detonation in Intermediate Time Frame ................................................... 19.41-9
19.41.11 Safety Margin Basis Containment Performance Requirement .................. 19.41-9
19.41.12 Summary ................................................................................................. 19.41-10
19.41.13 References............................................................................................... 19.41-10
19.42 Conditional Containment Failure Probability Distribution........................................ 19.42-1
19.43 Release Frequency Quantification ............................................................................. 19.43-1
19.44 MAAP4.0 Code Description and AP1000 Modeling ................................................ 19.44-1
19.45 Fission Product Source Terms................................................................................... 19.45-1
19.46 Not Used
19.47 Not Used
19.48 Not Used

Tier 2 Material xxviii Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

19.49 Offsite Dose Evaluation ............................................................................................ 19.49-1


19.50 Importance and Sensitivity Analysis ......................................................................... 19.50-1
19.51 Uncertainty Analysis ................................................................................................. 19.51-1
19.52 Not Used
19.53 Not Used
19.54 Low Power and Shutdown PRA Assessment ............................................................ 19.54-1
19.55 Seismic Margin Analysis........................................................................................... 19.55-1
19.55.1 Introduction............................................................................................... 19.55-1
19.55.2 Calculation of HCLPF Values .................................................................. 19.55-1
19.55.3 Seismic Margin Model .............................................................................. 19.55-7
19.55.4 Calculation of HCLPF ............................................................................ 19.55-12
19.55.5 Sensitivity Analyses ................................................................................ 19.55-14
19.55.6 Results and Insights ................................................................................ 19.55-14
19.55.7 References............................................................................................... 19.55-16
19.56 PRA Internal Flooding Analysis ............................................................................... 19.56-1
19.57 Internal Fire Analysis ................................................................................................ 19.57-1
19.58 Winds, Floods, and Other External Events ............................................................... 19.58-1
19.58.1 Introduction............................................................................................... 19.58-1
19.58.2 External Events Analysis .......................................................................... 19.58-1
19.58.3 Conclusion ................................................................................................ 19.58-7
19.58.4 References................................................................................................. 19.58-8
19.59 PRA Results and Insights .......................................................................................... 19.59-1
19.59.1 Introduction............................................................................................... 19.59-1
19.59.2 Use of PRA in the Design Process ............................................................ 19.59-3
19.59.3 Core Damage Frequency from Internal Initiating Events at Power ........... 19.59-3
19.59.4 Large Release Frequency for Internal Initiating Events at Power ........... 19.59-15
19.59.5 Core Damage and Severe Release Frequency from Events at
Shutdown ................................................................................................ 19.59-18
19.59.6 Results from Internal Flooding, Internal Fire, and Seismic
Margin Analyses ..................................................................................... 19.59-22
19.59.7 Plant Dose Risk from Release of Fission-Products ................................. 19.59-25
19.59.8 Overall Plant Risk Results ...................................................................... 19.59-25
19.59.9 Plant Features Important to Reducing Risk............................................. 19.59-26
19.59.10 PRA Input to Design Certification Process ............................................. 19.59-35
19.59.11 References............................................................................................... 19.59-37

APPENDIX 19A THERMAL HYDRAULIC ANALYSIS TO SUPPORT SUCCESS


CRITERIA ............................................................................................................... 19A-1

APPENDIX 19B EX-VESSEL SEVERE ACCIDENT PHENOMENA ............................................. 19B-1


19B.1 Reactor Vessel Failure ................................................................................................ 19B-2
19B.2 Direct Containment Heating........................................................................................ 19B-4
19B.3 Ex-Vessel Steam Explosions ....................................................................................... 19B-5
19B.4 Core Concrete Interactions .......................................................................................... 19B-5

Tier 2 Material xxix Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

19B.4.1 Containment Pressurization due to Core Concrete Interactions .................. 19B-6


19B.5 Conclusions ................................................................................................................. 19B-7
19B.6 References ................................................................................................................... 19B-7

APPENDIX 19C ADDITIONAL ASSESSMENT OF AP1000 DESIGN FEATURES ..................... 19C-1

APPENDIX 19D EQUIPMENT SURVIVABILITY ASSESSMENT ................................................ 19D-1


19D.1 Introduction ................................................................................................................. 19D-1
19D.2 Applicable Regulations and Criteria ........................................................................... 19D-1
19D.3 Definition of Controlled, Stable State ......................................................................... 19D-2
19D.4 Definition of Equipment Survivability Time Frames .................................................. 19D-3
19D.4.1 Time Frame 0 - Pre-Core Uncovery ............................................................ 19D-3
19D.4.2 Time Frame 1 - Core Heatup ...................................................................... 19D-3
19D.4.3 Time Frame 2 - In-Vessel Severe Accident Phase ...................................... 19D-3
19D.4.4 Time Frame 3 - Ex-Vessel Severe Accident Phase ..................................... 19D-4
19D.5 Definition of Active Operation Time .......................................................................... 19D-4
19D.6 Equipment and Instrumentation for Severe Accident Management ............................ 19D-4
19D.6.1 Time Frames 0 and 1 - Accident Initiation, Core Uncovery and Heatup .... 19D-5
19D.6.2 Time Frame 2 - In-Vessel Core Core Melting and Relocation .................. 19D-10
19D.6.3 Time Frame 3 - Ex-Vessel Relocation ...................................................... 19D-13
19D.6.4 Summary of Equipment and Instrumentation............................................ 19D-16
19D.7 Severe Accident Environments ................................................................................. 19D-16
19D.8 Assessment of Equipment Survivability.................................................................... 19D-16
19D.8.1 Approach to Equipment Survivability....................................................... 19D-16
19D.8.2 Equipment Located in Containment.......................................................... 19D-17
19D.8.3 Equipment Located Outside Containment ................................................ 19D-21
19D.9 Conclusions of Equipment Survivability Assessment ............................................... 19D-21
19D.10 References ................................................................................................................. 19D-21

APPENDIX 19E SHUTDOWN EVALUATION................................................................................ 19E-1


19E.1 Introduction ................................................................................................................. 19E-1
19E.1.1 Purpose ....................................................................................................... 19E-1
19E.1.2 Scope .......................................................................................................... 19E-1
19E.1.3 Background ................................................................................................. 19E-1
19E.2 Major Systems Designed to Operate During Shutdown .............................................. 19E-2
19E.2.1 Reactor Coolant System .............................................................................. 19E-2
19E.2.2 Steam Generator and Feedwater Systems ................................................... 19E-6
19E.2.3 Passive Core Cooling System ..................................................................... 19E-8
19E.2.4 Normal Residual Heat Removal System ................................................... 19E-12
19E.2.5 Component Cooling and Service Water Systems ...................................... 19E-14
19E.2.6 Containment Systems................................................................................ 19E-15
19E.2.7 Chemical and Volume Control System ..................................................... 19E-16
19E.2.8 Spent Fuel Pool Cooling System............................................................... 19E-17
19E.2.9 Control and Protection Systems ................................................................ 19E-18

Tier 2 Material xxx Revision 19


Table of Contents AP1000 Design Control Document

TIER 2 MASTER TABLE OF CONTENTS (Cont.)

Section Title Page

19E.3 Shutdown Maintenance Guidelines and Procedures ................................................. 19E-18


19E.3.1 Maintenance Guidelines and Insights Important to
Reducing Shutdown Risk ......................................................................... 19E-18
19E.3.2 Shutdown Risk Management .................................................................... 19E-21
19E.3.3 Shutdown Emergency Response Guidelines Overview ............................ 19E-21
19E.4 Safety Analyses and Evaluations ............................................................................... 19E-22
19E.4.1 Introduction............................................................................................... 19E-22
19E.4.2 Increase in Heat Removal from the Primary System ................................. 19E-23
19E.4.3 Decrease in Heat Removal by the Secondary System ............................... 19E-27
19E.4.4 Decrease in Reactor Coolant Flow Rate.................................................... 19E-29
19E.4.5 Reactivity and Power Distribution Anomalies .......................................... 19E-30
19E.4.6 Increase in Reactor Coolant Inventory ...................................................... 19E-33
19E.4.7 Decrease in Reactor Coolant Inventory..................................................... 19E-34
19E.4.8 Loss-of-Coolant Accident Events in Shutdown Modes ............................ 19E-35
19E.4.9 Radiological Consequences ...................................................................... 19E-41
19E.4.10 Other Evaluations and Analyses ............................................................... 19E-42
19E.5 Technical Specifications ........................................................................................... 19E-43
19E.5.1 Summary of Shutdown Technical Specifications...................................... 19E-43
19E.6 Shutdown Risk Evaluation ........................................................................................ 19E-43
19E.7 Compliance with NUREG-1449 ............................................................................... 19E-43
19E.8 Conclusion ................................................................................................................ 19E-44
19E.9 References ................................................................................................................. 19E-44

APPENDIX 19F MALEVOLENT AIRCRAFT IMPACT ..................................................................19F-1


19F.1 Introduction and Background .......................................................................................19F-1
19F.2 Scope ............................................................................................................................19F-1
19F.3 Assesment Methodology ..............................................................................................19F-1
19F.4 Results/Conclusions .....................................................................................................19F-2
19F.4.1 Shield Building and Spent Fuel Pool ........................................................... 19F-2
19F.4.2 Site Arrangement .........................................................................................19F-2
19F.4.3 Core Cooling and Containment Integrity ..................................................... 19F-3
19F.4.4 Reactor Trip .................................................................................................19F-4
19F.4.5 Supporting Power, Instrumentation, and Control Equipment ...................... 19F-5
19F.4.6 Fire Barriers .................................................................................................19F-5
19F.5 References ....................................................................................................................19F-5

Tier 2 Material xxxi Revision 19


Table of Contents AP1000 Design Control Document

[This page intentionally blank]

Tier 2 Material xxxii Revision 19

You might also like