Framed

This document provides a detailed estimate of costs for an RCC framed structure. It includes 19 items with quantities, units, and rates for various construction works such as earthwork excavation, concrete work, brickwork, plastering, flooring, doors and windows, electrification, and other miscellaneous works. The quantities are based on the dimensions provided for each construction component. The document concludes with an abstract of the estimated costs calculated by multiplying the quantities with rates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
392 views8 pages

Framed

This document provides a detailed estimate of costs for an RCC framed structure. It includes 19 items with quantities, units, and rates for various construction works such as earthwork excavation, concrete work, brickwork, plastering, flooring, doors and windows, electrification, and other miscellaneous works. The quantities are based on the dimensions provided for each construction component. The document concludes with an abstract of the estimated costs calculated by multiplying the quantities with rates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

DETAILED ESTIMATE OF RCC FRAMED STR

S.NO ITEMS OF WORK NOS LENGTH BREADTH DEPTH


EARTHWORK EXCAVATION
1 IN HARD SOIL FOR
FOUNDATION
a)RCC COLUMNS 8 1.5 1.5 2
b) EARTH BEAM ALL ROUND 1 10.8 0.2 0.3
c)STEPS 1 2.8 0.8 0.1
TOTAL

PLAIN CEMENT CONCRETE


2 1:4:8 MIX USING 40mm
JELLY FOR BASE CONCRETE

a)RCC COLUMN FOOTINGS 8 1.5 1.5 0.15


b)FOR STEPS 1 2.8 0.8 0.1
TOTAL

RCC 1:2:4 MIX USING 20mm


3 JELLY FOR COLUMN,
FOOTINGS,BEAMS ETC.

a)RCC COLUMN BED 8 1.5 1.5 0.15


b)FOOTING TAPPER PORTION 8 0.85 0.85 0.3
c)RCC COLUMN BELOW
8 0.2 0.2 1.1
EARTH BEAM
d)RCC COLUMN UPTO
8 0.2 0.2 3.15
T-BEAM
e)EARTH BEAM 1 22.8 0.2 0.3
f)LINTEL ALL ROUND THE
1 22.8 0.2 0.15
WALL
g)SUNSHADE FOR W 5 1.3 0.6 0.08
h)FRONT SUNSHADE 1 6.1 0.6 0.08
i)FRONT SUNSHADE 1 2.6 0.6 0.08
j)T-BEAM 4 4.4 0.2 0.3
k)RCC SLAB 1 7.4 4.4 0.1
TOTAL

BRICK WORK IN CM 1:5


4
USING FIRST CLASS BRICKS

a)MAIN WALLS ALL ROUND


1 22.8 0.2 4.35
UPTO PARAPET
b)STEPS FIRST 1 2.4 0.6 0.15

1 1.8 0.3 0.15


SECOND
TOTAL
DEDUCTIONS FOR
i)RCC LINTEL ALL ROUND 1 22.8 0.2 0.15
ii)DOOR-D 1 1.2 0.2 2.2
iii)WINDOWS-W 7 0.9 0.2 1.5
iv)RCC COLUMN 8 0.2 0.2 4.35
v)RCC T-BEAM 4 4 0.2 0.3
TOTAL
NET QUANTITY
SAND FILLING IN
5 1 7 4 0.3
BASEMENT
TOTAL
PCC 1:5:10 USING 40mm
6 JELLY, 130mm THICK FOR 1 7 4 -
FLOORING
FLOOR FINISH WITH CM 1;4,
7
20 mm THICK FOR
FLOORING 1 7 4 -
DOOR SILL 1 1.2 0.2 -
TOTAL
PLASTERING WITH CM
8
1:4,12mm THICK
i)INSIDE OF WALL ALL
1 22 - 3
ROUND
ii)OUTSIDE OF WALL ALL
1 23.6 - 4.35
ROUND
iii)PARAPET WALL TOP 1 22.8 0.2 -
iv)PARAPET WALL INSIDE 1 22 - 0.8
v)TOP OF STEPS 1 2.4 0.6 -
vi)FRONT AND SIDES OF
1 2.4 - 0.15
1stSTEP
vii)FRONT AND SIDES OF 2nd
1 3.6 - 0.15
STEP
viii)FRONT SIDE OF TOP SIDE 1 1.8 - 0.15
TOTAL
DEDUCTIONS FOR
i)DOOR-D 1 1.2 - 2.2
ii)WINDOW-W 7 0.9 - 1.5
TOTAL
NET QUANTITY
PLASTERING WITH
9 CM1:3,10mm THICK FOR
CEILING
i)FOR CEILING 1 7 4 -
ii)FOR BEAM 3 SIDES 2 4 - 1
iii)SUNSHADES TOP AND
BOTTOM FOR BACK AND 10 1.3 0.6 -
SIDE SUNSHADE
iv)FRONT SUNSHADE 2 6.3 0.6 -
v)FRONT SUNSHADE 2 2.6 0.6 -
TOTAL
WHITE WASHING WITH
10
LIME IN 2 COATS
QUANTITY AS PER
PLASTERING AREA
(181.34-1.44)
EXCEDPT STEPS TREAD
PORTION
AS PER CEILING
PLASTERING AREA
TOTAL
COLOUR WASHING WITH
11
APPROVED QUALITY
QUANTITY AS PER ITEM
NO.10
SUPPLYING AND FIXING
12 FULLY PANELLED DOORS 1
OF SIZE 1.20*2.2m
SUPPLYING AND FIXING
13 FULLY PANELLED WIN DOW 7
FOR SIZE 0.9m*1.5m
PAINTING WITH ENAMEL
PAINT OVER PRIMING
14
COATS FOR DOORS AND
WINDOWS

a)PANELLED DOOR-D 2.6 1.2 - 2.5

b)PANELLED WINDOW-W 18.2 0.9 - 1.5


TOTAL

WEATHERING COURSE
WITH BRICK JELLY
CONCRETE IN LIME 75mm
15 1 7 4 -
THICK AND TWO COURSES
OF FLAT TILES IN CM 1;3
OVER THE SLAB

ELECTRIFICATION WITH
16
ALL FITTINGS
WATER SUPPLY AND
17
SANITARY
CONTINGENCIES AND
18
UNFORSEEN
PETTY SUPERVISION
19
CHARGES
AMED STRUCTURE
QUANTITY UNITS REMARKS

36 (7.2+4.2)2=22.80
0.648 22.80-(8*1.5)=10.80
1.2+2(2*0.3+0.2)=2.8
0.224
(2*0.3)+0.2=0.8
36.872 cu m

2.7 Size of footing=1.5x1.5


1.2+2(2*0.3+0.2)=2.8
0.224
(2*0.3)+0.2=0.8
2.924 cu m

2.7 (1.5+0.2)/2=0.85
1.734 (7.2+4.2)=22.80
(2.00-0.15-0.15-
0.352
0.3-0.3=1.10)
1.008 0.45+2.7=3.15
1.368 (7.2+4.2)2=22.80
0.684 (7.2+4.2)2=22.80
0.312
0.2928
0.1248 2.6+(2.175)=6.10
1.056 2.2+(0.2*2)=2.6
3.256 4.00+0.2+0.2=4.40
12.8876 cu m

(0.45+2.7+0.4+0.8)
19.836
=4.35
0.216 1.2+(0.3*4)=2.4

0.081 1.2+(0.3*2)=1.8
20.133 cu m

0.684 (7.2+4.2)2=22.80
0.528 size=1.2x2.2
1.89 size=0.9x1.5
1.392 size=1.2x1.2
0.96
5.454 cu m
14.679 cu m

8.4
8.4 cu m

28 sq m

28
0.24
28.24 sq m

66 (7.0+4.0)2=22.00

102.66 (7.4+4.4)2=23.60
4.56
17.6
1.44
0.36 (0.3+1.8+0.3)=2.4

0.54 (0.6+2.4+0.6)=3.6

0.27
193.43 sq m

2.64
9.45
12.09 sq m
181.34 sq m

28
8

7.8

7.56
3.12
54.48 cu m
179.9

55
234.9 sq m

247 sq m

1 No

7 NOS

PAINTING
COEFFICIENT
7.8 FOR PANELLED
DOORS AND
WINDOWS=2.6
24.57
32.37 sq m

28 sq m

LS

LS

LS

LS
ABSTRACT OF ESTIMATED COST
ITEM NO PARTICULARS OF ITEM QUANTITY UNIT RATE PER AMOUNT
Rs. P. Rs. P.

EARTHWORK
EXCAVATION
IN HARD SOIL FOR
1 FOUNDATION 36.872 cu m

PLAIN CEMENT
CONCRETE
1:4:8 MIX USING 40mm
JELLY FOR BASE
2 CONCRETE 2.924 cu m

RCC 1:2:4 MIX USING


20mm
JELLY FOR COLUMN,
3 FOOTINGS,BEAMS ETC. 12.8 cu m
BRICK WORK IN CM 1:5
USING FIRST CLASS
4 BRICKS 14.679 cu m
SAND FILLING IN
5 BASEMENT 8.4 cu m
PCC 1:5:10 USING 40mm
JELLY, 130mm THICK
6 FOR FLOORING 28 sq m

FLOOR FINISH WITH CM


7 1;4, 20 mm THICK FOR 28.24 sq m
PLASTERING WITH CM
8 1:4,12mm THICK 181.34 sq m
PLASTERING WITH
CM1:3,10mm THICK FOR
9 CEILING 54.58 sq m
WHITE WASHING WITH
10 LIME IN 2 COATS 234.9 sq m
COLOUR WASHING
WITH APPROVED
11 QUALITY 247 sq m

SUPPLYING AND FIXING


FULLY PANELLED DOORS
12 OF SIZE 1.20*2.2m 1 NO

SUPPLYING AND FIXING


FULLY PANELLED WIN
DOW FOR SIZE
13 0.9m*1.5m 7 NOS

PAINTING WITH
ENAMEL PAINT OVER
PRIMING COATS FOR
14 DOORS AND WINDOWS 32.37 sq m
WEATHERING COURSE
WITH BRICK JELLY
CONCRETE IN LIME
75mm THICK AND TWO
COURSES OF FLAT TILES
IN CM 1;3 OVER THE
15 SLAB 28 sq m
ELECTRIFICATION WITH
16 ALL FITTINGS LS
WATER SUPPLY AND
17 SANITARY LS
CONTINGENCIES AND
18 UNFORSEEN LS
PETTY SUPERVISION
19 CHARGES LS
TOTAL
GRAND TOTAL