Steam Service Test Procedure for Units 040-043

This document provides procedures for conducting a service test of steam systems for Units 040/041/042/043 at the Nghi Son Refinery and Petrochemical Complex in Vietnam. The test will check for leaks in equipment and piping systems prior to mechanical completion. Section A describes testing the common utility header for steam for Units 040/042/043, while Section B describes testing the common utility header for steam for Unit 041. The test must be performed safely according to the project's health, safety and environmental procedures.

Uploaded by

AnhTuấnPhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
177 views132 pages

Steam Service Test Procedure for Units 040-043

This document provides procedures for conducting a service test of steam systems for Units 040/041/042/043 at the Nghi Son Refinery and Petrochemical Complex in Vietnam. The test will check for leaks in equipment and piping systems prior to mechanical completion. Section A describes testing the common utility header for steam for Units 040/042/043, while Section B describes testing the common utility header for steam for Unit 041. The test must be performed safely according to the project's health, safety and environmental procedures.

Uploaded by

AnhTuấnPhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Employer Doc. No.

NSRP Contractor Doc. No.


Complex Project Nghi Son Refinery and Petrochemical S-000-1730-0814M
Limited Liability Company
Nghi Son, Vietnam Rev. 0 Page 1 of 10

Employer Contract No.: , Contractor JOB Code: 0-6495-20 Date: 08/SEP/15

Detail Commissioning Procedure for Service Test

of Steam for Unit 040/041/042/043

Unit No.: 040/041/042/043

Unit Abbreviation.: NHDS/PENEX/CCR/CCRR

Document Class: Z

Issue Purpose For Construction

Rev Date Page Description Prep'd Chk'd App'd

0 08/SEP/15 All For Construction NSR SG SM


A 13/JUL/15 All For Review NSR SG SM

Operation Centre JOB Code: Operation Centre Doc. No.:


Responsible Company Prepared by Checked by Approved by
TPM N.Wisatsiri S.Gibson S. Mariotti

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 2 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

CONTENTS

1 INTRODUCTION .................................................................................................................................. 3
2 REFERENCE DOCUMENTS ............................................................................................................... 3
3 DEFINITIONS ....................................................................................................................................... 3
4 ABBREVATIONS ................................................................................................................................. 3
5 SCOPE OF APPLICATION.................................................................................................................. 4
6 HSE....................................................................................................................................................... 4
7 TRAINING AND COMPETENCY OF PERSONNEL............................................................................ 4
8 ROLES AND RESPONSIBILITIES ...................................................................................................... 5
9 IMPLEMENTATION OF SERVICE TESTOF PIPELINES ................................................................... 6
10 ACCEPTANCE CRITERIA ................................................................................................................. 10
11 POST WORK ...................................................................................................................................... 10
12 ATTACHMENTS................................................................................................................................. 10

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 3 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

1 INTRODUCTION

This document provides a general method for the Service Test of Steam for Unit 040/041/042/043 by

separate to Section A is Service Test for common Utility header (Steam) of Unit 040/042/043 and

Section B is Service Test for common Utility header (Steam) of Unit 041. The Service test is a

method of test, used for checking of leaks at Equipment or of piping systems. Prior to the Mechanical

Completion activities, systems are subjected to a Service test such that it prevents any

uncontrollable leakage of process fluids. It is carried out after hydrostatic or pneumatic test (pressure

test) these tests may also be referred to as Tightness Test.

2 REFERENCE DOCUMENTS

S-000-1710-0001V Pre-commissioning and Commissioning Execution Plan

S-000-1710-0100V Pipe Cleaning Guide

S-000-1710-0120V General Pre-commissioning & Commissioning Procedure Tightness Test

S-000-1240-0001V Project Overall HSE Plan

X-XXX-XXXX-XXXX Flange Management Procedure

X-XXX-XXXX-XXXX Bolt Tensioning and Torqueing Procedure

X-XXX-XXXX-XXXX Mechanical Isolation Procedure

3 DEFINITIONS

The following terms are defined in Project Coordination Procedure (S-000-1140-0001V)

 Employer
Nghi Son Refinery and Petrochemical Limited Liability Company

 Contractor
A Joint Venture formed by JGC Corporation, Chiyoda Corporation, GS Engineering &
Construction Corporation, SK Engineering & Construction Co., Ltd., Technip France and
Technip Geoproduction (M) Sdn. Bhd.

 JVD
Contractor's Joint Venture Directorate

4 ABBREVATIONS

HSE - Health, Safety and Environment

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 4 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

JHA - Job Hazard Analysis


PPE - Personnel Protective Equipment
RA - Risk Assessment
PTW - Permit to work

5 SCOPE OF APPLICATION

The scope of this document is the Service test of Steam for Unit 040/041/042/043 by separate to

Section A is Service Test for Common Utility header (Steam) of Unit 040/042/043 and Section B is

Service Test for Common Utility header (Steam) of Unit 041. The Utility piping of this unit shall be

subjected to a Service Test on successful completion the system can be put into service.

6 HSE

The following HSE risks are inherent in Service Test. All personnel shall give top priority to the

management of health, safety and the environment (HSE). All work shall be undertaken in a

responsible manner giving full consideration to the impact of the activities may have on health, safety,

and the environment.

Specific Health and Safety requirements for this Pre-commissioning Procedure are:

1. Before executing activities stated in this Pre-commissioning Procedure, a Job Hazard

Analysis (JHA), Risk Assessment (RA), and Tool Box Talk shall be carried out.

2. Appropriate Personal Protective Equipment (PPE) as determined by the JHA and Risk

Assessment which shall be worn by all personnel assigned to execute these activities.

3. Ensure to follow recommended actions given in MSDS for chemicals as applicable.

4. If motorized equipment is used, refuelling shall not take place while equipment is running.

5. If electric tools are used, they shall be powered either by a 110-volt supply or by battery.

6. Additional safety precautions are provided in the specific Tightness Test for the system.

7 TRAINING AND COMPETENCY OF PERSONNEL

All activities covered in this Procedure shall be performed only by qualified and competent personnel.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 5 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

In addition, all personnel must have completed the HSE training. If sub-contractors or persons, other

than commissioning personnel, will assist in the execution of activities covered by this

Pre-commissioning procedure then those person(s) also shall attend HSE training and meet the

requirements for the HSE standard. Additionally, a qualified and competent commissioning

supervisor shall indoctrinate the sub-contractor or person(s) in the Tightness Test philosophy and

methodology.

8 ROLES AND RESPONSIBILITIES

The Roles and Responsibilities of various parties are provided below.

8.1 Employers Commissioning Team

Commissioning Engineer/Manager

1. Responsible for witnessing the test.

2. Responsible for accepting or rejecting the test.

Construction Representative

Employers representative will witness all Pre-commissioning testing.

8.2 Contractor’s Pre-Commissioning Team

Commissioning Manager

1. Overall control of Sub-contractor and Contractor commissioning team during execution of

commissioning operations.

2. Liaison with Employers commissioning representatives for executing the commissioning

operations.

3. Vendor mobilisation plan will be made and HSE induction will be coordinated upon their arrival

to site.

4. Commissioning Report/Dossier submission to the Employer.

5. Overall supervision of Pre-commissioning activities.

Pre-Commissioning Engineer

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 6 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

1. Responsible for the safety of all personnel assigned to him, ensuring that the JHA, applicable

permits and control measures are in place prior to applying the method statement.

2. Responsible for the final acceptance of test results.

3. Responsible for supporting the testing team & for setting all applicable test requirement and

conditions.

4. Responsible for ensuring all resources, tools, test equipment etc., are available at the test

site.

5. Responsible for coordinating the works with other parties that may be required and parties

affected by executing the method statement.

6. Coordinate construction Work Packs with Employers representatives.

Operators

1. Responsible for ensuring that the work as outlined in the method statement is performed

safely and all safeguards & controls are complied with.

2. Responsible for preparing the equipment, system for testing or activities as outlined in this

method statement.

3. Responsible for executing the tests/activities as outlined in the method statement and as

instructed by the Supervisor/Commissioning Vendor Engineers.

4. Vendor engineers will work in coordination with the Contractor Pre-Commissioning

(discipline) Engineer.

9 IMPLEMENTATION OF TIGHTNESS TEST OF PIPELINES

9.1 PRE-CLEANING / PRESERVATION

During site installation of the equipment, piping is pre-cleaned by flushing, blowing or hydro-jetting,

depending on contamination and required cleanliness level.

9.2 0.34DETAILED SCOPE

Service Test of Steam for Unit 040/041/042/043 by separate to Section A is Service Test for common
Utility header (Steam) of Unit 040/042/043 and Section B Service Test for common Utility header

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 7 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

(Steam) of Unit 041 refer to attached P&ID’s Mark-up. The Service test shall be carried out.

Section A Common header (Steam) of Unit 040/042/043

System No. System Description Test Pressure Service Test Attachment No.
MPa(g). Package No.
040-HPS-01 NHDS HP Steam
4.90 000-HPS-01-SV-1 S-000-1730-0814M_0020
042-HPS -01 CCR HP Steam
040-MPS-01 NHDS MP Steam
042-MPS -01 CCR MP Steam 2.06 000-MPS-01-SV-1 S-000-1730-0814M_0030
043-MPS -01 CCRR MP Steam
040-LPS-01 NHDS LP Steam
042-LPS -01 CCR LP Steam 0.34 000-LPS-01-SV-1 S-000-1730-0814M_0040
043-LPS -01 CCRR LP Steam

Section B Common header (Demineralised Water) of Unit 041

System No. System Description Test Pressure Service Test Attachment No.
MPa(g). Package No.
041-MPS-01 PENEX MP Steam 2.06 041-MPS-01-SV-1 S-000-1730-0814M_0050
041-LPS-01 PENEX LP Steam 0.34 041-LPS-01-SV-1 S-000-1730-0814M_0060

9.3 General Description & Classification

(1) Gross Air Tightness Test

This test is performed for all the hydrocarbon and utility piping systems using Air. This is done to

confirm the integrity of the Joints, Flange Gaskets, Glands and Packing of valves. Here the

system is pressurized with injection of Compressed air and then checked for leaks at all possible

points of leakage. This test is carried out at 0.70 MPa(g) or at the system operating pressure

whichever is less.

(2) Tightness Test with Nitrogen

This test is performed for smaller systems using Nitrogen in place of Air. This test is performed for

Refrigeration and other cold service lines.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 8 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

(3) Specialized Service Test Procedure

Nitrogen-Helium Service Testis one of the Specialized test procedure normally performed by a

Specialized contractor. This test is performed for hydrocarbon systems only. Helium Service Test

will use 99% Nitrogen and 1 % Helium as tracer gas. A calibrated Mass Spectrometer will be used

to detect the helium tracer gas. The Helium Service Test will be carried out at 90% of system

design pressure and will be performed after the normal Gross Air tightness test. After the Service

Testis performed, the system will be depressurized to 0.10 MPa(g) pressure to keep the system

inerted and preserved done during commissioning.

(4) In service test

This test is performed on low pressure systems generally utilities, where the actual operating fluid

is utilized as any leaks will not create an environmental or safety issue. On successful completion

of this test The system can remain in service dependent on site conditions.

9.4 Procedure

1. Method of Testing

System is pressurized with Steam and then checked for leaks at all possible points such as:
(a) Flanges
(b) Screw Connections
(c) Manholes and Handholes
(d) Valve Glands

Detection of leakage is by tape around joints and systematical going found and puncturing to

check for fluid build up.

2. Test Pressure

Shall Be the normal operating pressure of the fluid system .

3. Precaution

The following precautions must be observed during System Service tests:

 Barricade the area and install warning signs.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 9 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

 The over-pressure protection of the system must be put in service. PSV discharge

outlets shall be routed to a safe location with adequate bracing and barricading to

prevent equipment damage or personal injury.

 A local calibrated pressure gauge shall be installed in an easily accessible location.

4. Planning

1. Equipment and associated pipelines must be grouped according to their normal operating

pressure. Each grouped system is isolated using block valves.

2. Systems subjected to system leak tests must be clearly marked on P&ID including the following

items:

 Test Pressure

 Supply point and type of pressurization medium

 Location of boundary valves, sub-dividing system into groups

 Blinds and spades if applied

 Valve’s Open/Close position

 Pressure monitoring instruments to be used

 Depressurizing points to be used after the test completion or in case of emergency.

5. Preparation

 Availability of Steam must be confirmed prior to the test.

 All flanges are wrapped with masking tape to check for leakages.

 In accordance with the test plan, CONTRACTOR checks the tested portions and

confirms the readiness for the test.

6. Implementation

1. Gradually pressurize system to the test pressure with process fluid.

2. Maintain system under the test pressure until the test has been completed.

3. All points to be checked use tape and puncture method.

4. Any leakage points found during the test shall be re-tightened. If leak cannot be stopped,

system or part of system will be depressurized and the joint or connection shall be remade

after inspection for physical damage and then re-tested.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Commissioning Procedure for Service Test of Contractor Doc. No.
Page 10 of 10
Steam for Unit 040/041/042/043 S-000-1730-0814M

10 ACCEPTANCE CRITERIA

1. If no leak are detected using the above method the test is complete.

2. Check/inspection above shall be done by CONTRACTOR with EMPLOYER's witness.

Note: Depending on the service, small leakage from valve glands may be acceptable

11 POST WORK

1. After the system passes the Service test, the system shall be put into service unless site

conditions will not allow then preservation shall be considered dependent on duration.

2. Piping shall be reinstated as per P&ID.

3. Signing of the test document by CONTRACTOR 's supervisor and EMPLOYER 's witness shall be

done after the test completion.

4. Test Log sheets shall be signed by the Contractor and Employer and handed over to the

Company.

5. If site conditions require system to be depressured then dependent on duration preservation

needs to be consider.

12 ATTACHMENTS

- Attachment: S-000-1730-0814M_0020 Marked-up P&ID for Service Test Package 000-HPS-01-SV-1.


- Attachment: S-000-1730-0814M_0030 Marked-up P&ID for Service Test Package 000-MPS-01-SV-1.
- Attachment: S-000-1730-0814M_0040 Marked-up P&ID for Service Test Package 000-LPS-01-SV-1.
- Attachment: S-000-1730-0814M_0050 Marked-up P&ID for Service Test Package 041-MPS-01-SV-1.
- Attachment: S-000-1730-0814M_0060 Marked-up P&ID for Service Test Package 041-LPS-01-SV-1.
- Attachment: S-000-1730-0814M_0070: Inspection Record Sheet.

D R A
IN
10-SE
P - 2 0 15
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 1 of 10
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 4.90 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 2 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST
Control system pressure at operation - HPS supply from HPS Interconnecting Header.
pressure of HPS = 4.90 MPa(g) - LPCW return line to LPCW Interconnecting Header
- Permanent Supply required TEST POINT

040-HPS-01 141-HPS-01S
040-HPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 3 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-HPS-01 040-HPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 4 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-HPS-01 040-HPS-01

- LPCW return line to LPCW Interconnecting - LPCW return line to LPCW Interconnecting
Header Permanent Supply required Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 5 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-HPS-01 040-HPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A 040-HPS-01
N
I 0-SEP 5
1
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 6 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-HPS-01 040-HPS-01

042-HPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 7 of 10

042-HPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-HPS-01 042-HPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 8 of 10
042-HPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-HPS-01

042-HPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 9 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-HPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0020 System No. : 040-HPS-01,042-HPS-01 Package No. : 000-HPS-01-SV-1
Page 10 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
042-HPS-01

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-HPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 1 of 19
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 2.06 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 2 of 19

Control system pressure at operation -MPS supply from HPS Interconnecting Header.
pressure of MPS = 2.06 MPa(g) - LPCW return line to LPCW Interconnecting Header
- Permanent Supply required

040-MPS-01 040-MPS-01 141-MPS-01S PERMANENT LINE


SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 3 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-MPS-01 040-MPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 4 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-MPS-01 040-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

040-MPS-01 040-MPS-01

IN DR01A
5
P-2
10-SE
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 5 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-MPS-01 040-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 6 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-MPS-01 040-MPS-01

042-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 7 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-MPS-01 042-MPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 8 of 19

042-MPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

042-MPS-01

043-MPS-01 042-MPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 9 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 10 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

043-MPS-01 TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

043-MPS-01

043-MPS-01
043-MPS-01

Control system pressure at operation


043-MPS-01
pressure of MPS = 2.06 MPa(g)

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

043-MPS-01

IN DR01A
5
P-2
10-SE
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 11 of 19

040-MPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 12 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 13 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-MPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 14 of 19

042-MPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 15 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 16 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
043-MPS-01
- LPCW return line to LPCW
Interconnecting Header Permanent
Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 17 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required
043-MPS-01

043-MPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 18 of 19

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

043-MPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0030 System No. : 040-MPS-01,042-MPS-01, 043-MPS-01 Package No. : 000-MPS-01-SV-1
Page 19 of 19

Control system pressure at operation


pressure of MPS = 2.06 MPa(g)

PERMANENT LINE
SUBJECT TO
03-MPS-01 03-MPS-01 SERVICE TEST

TEST POINT

03-MPS-01
- LPCW return line to LPCW
Interconnecting Header Permanent
Supply required

D R A 03-MPS-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 1 of 45
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.34 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 2 of 45
Control system pressure at operation
pressure of LPS = 0.34 MPa(g)

040-LPS-01 040-LPS-01 141-LPS-01S

-LPS supply from LPS Interconnecting Header.


PERMANENT LINE
- LPCW return line to LPCW Interconnecting Header
SUBJECT TO
- Permanent Supply required
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 3 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-LPS-01 040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 4 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-LPS-01 040-LPS-01

D R A 040-LPS-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 5 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

040-LPS-01 TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required
040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 6 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

042-LPS-01 040-LPS-01

042-LPS-01

D R A 042-LPS-01 042-LPS-01 042-LPS-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 7 of 45

042-LPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01 042-LPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

042-LPS-01

IN DR01A
5
P-2
10-SE
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 8 of 45

042-LPS-01 042-LPS-01 042-LPS-01

PERMANENT LINE
- LPCW return line to LPCW SUBJECT TO
Interconnecting Header Permanent SERVICE TEST
Supply required

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required
042-LPS-01

042-LPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A 043-LPS-01

N
I P 5
-
10-SE
2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 9 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 10 of 45

043-LPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
043-LPS-01

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required
Control system pressure at operation
pressure of LPS = 0.34 MPa(g)

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

043-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 11 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 12 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 13 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 14 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 15 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 16 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 17 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 18 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 19 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 20 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 21 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 22 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

040-LPS-01 TEST POINT

- LPCW return line to LPCW


040-LPS-01 Interconnecting Header Permanent
Supply required

040-LPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 23 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 24 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 25 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

040-LPS-01 TEST POINT

040-LPS-01

040-LPS-01

040-LPS-01

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 26 of 45

040-LPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 27 of 45

040-LPS-01
PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT
040-LPS-01

040-LPS-01

040-LPS-01

040-LPS-01

040-LPS-01

040-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 28 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

040-LPS-01

- LPCW return line to LPCW Interconnecting


Header Permanent Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 29 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 30 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 31 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 32 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 33 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 34 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 35 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 36 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 37 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 38 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 39 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 40 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 41 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 42 of 45

042-LPS-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 43 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-LPS-01

042-LPS-01

042-LPS-01

042-LPS-01 042-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 44 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

043-LPS-01

- LPCW return line to LPCW


Interconnecting Header Permanent
Supply required

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0040 System No. : 040-LPS-01,042-LPS-01, 043-LPS-01 Package No. : 000-LPS-01-SV-1
Page 45 of 45

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

043-LPS-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01
127(6

SECTION B UNIT 041 Package No. : 041-MPS-01-SV-1 Page 1 of 10

3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 2.06 MPa (g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY OPEN
)8//<23(1

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 2 of 10


041-MPS-01-SV-1 Page

BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI Control system pressure at operation TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M
- MPS supply
1'' from ICPA-041-UI-015
MPS Interconnecting Header. 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M pressure of MPS = 2.06 MPa(g)
041
FI
041
NOTE 3 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT - LPCW return line to LPCW Interconnecting Header MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041 Permanent Supply required
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TI FI 041 PI 041-MPS-01 141-MPS-01
ICPA-041-UI-014
041-MPS-01 TT FT PG PT
C 0353 0353 0353 0353
FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 PERMANENT LINE C
MP STEAM MP STEAM
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS SUBJECT TO
041-3103M 141-3002S
SERVICE TEST
TO UNIT 041 MIN FROM INTERCONNECTING
1'' 1'' 1''
TEST POINT
041 MIN
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 0.75"-FLG-041-3005-A1GP-HC
H 041-3103M
A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M 141-3012S

TO UNIT 041 LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
0.75" PENEX
UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041 041 041 041 041 041 041
TI FI 041 PI
TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 3 of 10


041-MPS-01-SV-1 Page
NPIC-041-E-0160M
NPIC-041-E-0129M

LP CONDENSATE WATER
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

STEAM TRACE MANIFOLD

CONDENSATE MANIFOLD
CONDENSATE WATER

CONDENSATE WATER
0014V AND D-000-1225-0020V TO 0026V.
N

FROM STEAM TRAP

FROM STEAM TRAP


A900-DM-005

A900-DM-004

A900-CM-004
041-0018M

041-0027M

041-0027M
FROM 041-E-302
1. HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.

TO CBD HEADER

TO FLG HEADER
A A

TO 041-P-301A/B
041-3702M

041-0031M

041-0030M

041-0026M

041-3503M

041-1301M

041-1301M

041-1001M
EL. 106000
AT GRADE

EL. 108000

TO BL HEADER
US-013

US-023
US-014

TO 041-C-301
TO 041-V-301

TO BL AREA

TO BL AREA
LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM
1" EL.158300
1"-LPS-041-3038-A1AS-HS
LP HC US-021

LP
HC HC HC

EL.146300
1"-LPS-041-3040-A1AS-HS
HC US-020
0.75"-LPCW-041-0035-A2AS-PG

3"-LPS-041-0011-A1AS-HS

0.75"-LPS-041-3062-A1AS-HS

2"-LPS-041-3038-A1AS-HS
3"-LPS-041-0015-A1AS-HS

1.5"-LPS-041-3072-A1AS-HS
1"-LPS-041-3073-A1AS-HS

1"-LPS-041-3052-A1AS-HS
8"-LPCW-041-0012-A2AS-HS

0.75"-LPS-041-0033-A1AS-HS

1.5"-LPCW-041-3026-A2AS-PG
1"-LPS-041-3075-A1AS-HS

0.75"-LPS-041-3079-A1AS-HS

0.75"-LPS-041-3006-A1AS-HS

1.5"-LPS-041-3069-A1AS-HS
0.75"-LPCW-041-3037-A2AS-PG

0.75"-LPCW-041-0032-A2AS-PG
0.75"-LPS-041-3080-A1AS-HS

0.75"-LPS-041-3061-A1AS-HS

0.75"-LPS-041-0030-A1AS-HS
EL.137700
1"-LPS-041-3041-A1AS-HS
B HC US-019 B
NPIC-041-E-0102M

TWO PHASE FLOW


TWO PHASE FLOW

NPIC-041-E-0129M

TWO PHASE FLOW

TWO PHASE FLOW


EL.127750
1"-LPS-041-3042-A1AS-HS
HC US-018

1"-LPS-041-3043-A1AS-HS EL.116950
HC US-017
0.75"
MIN

C EL.107900 C

MIN
0.75" 1"-LPS-041-3044-A1AS-HS
HC US-016
ST

LP STEAM
2"-LPCW-041-3053-A2AS-PG

0.75"-LPCW-041-3041-A2AS-PG

0.75"-LPS-041-0029-A1AS-HS
041-0029M

2"-LPS-041-3084-A1AS-HS

NPIC-041-E-0129M
4"-LPS-041-3078-A1AS-HS
TO 041-P-303A/B
TWO PHASE FLOW

MIN LP STEAM
0.75"-LPS-041-0028-A1AS-HS
041-0028M
MIN

MIN
TO 041-P-302A/B
D MIN AT GRADE D
1"-LPS-041-3083-A1AS-HS
HC US-024

2"-LPS-041-3046-A1AS-HS
NPIC-041-E-0163M
NPIC-041-E-0153M
MIN

NPIC-041-E-0163M
MIN 0.75"

MIN
2"-LPS-041-3053-A1AS-HS
NPIC-041-E-0153M

NPIC-041-E-0153M
0.75" NPIC-041-E-0163M MIN

ST EL.118500

ST
MIN 1"-LPS-041-3039-A1AS-HS
E 0.75"-LPCW-041-3052-A1AS-PG
HC US-022 E
LP STEAM LP STEAM

MIN
TWO PHASE FLOW 10"-LPS-041-3001-A1AS-HS 10"-LPS-041-3001-A1AS-HS
041-3102M 041-1301M
6" 0.75"

0.75"-LPCW-041-3018-A2AS-PG
FROM / TO UNIT 41 0.75"-LPCW-041-3011-A2AS-PG FROM / TO BL
NPIC-041-E-0153M ST MIN
TWO PHASE FLOW
0.75"

TWO PHASE FLOW


0.75"-LPCW-041-3049-A2AS-PG
ST
0.75"-LPS-041-3059-A1AS-HS TWO PHASE FLOW
0.75" MIN MIN
MIN
F 2"-LPCW-041-3034-A2AS-PG F
TWO PHASE FLOW
LP
CONDENSATE WATER 0.75"

MIN

MIN

MIN
3"-LPCW-041-3001-A2AS-PG FREE DRAINING NOTE 1 FREE DRAINING
041-3102M
TWO PHASE FLOW
TO 041-V-614
0.75"-LPCW-041-3012-A2AS-PG
041-MPS-01
TWO PHASE FLOW NPIC-041-E-0163M
MP STEAM 041-MPS-01
44"-MPS-041-3001-B1AS-HS
MPS 041 3001 B1AS HS
041-3102M MP STEAM FEED DWG.No.
G G

NPIC-041-E-0119M
TO 041-EJ-611 0.75"-MPS-041-3003-B1AS-HS
0.75 MPS 041 3003 B1AS HS 0.75"
041-1301M
ST 3
3"
- LPCW return line to LPCW Interconnecting NPIC-041-E-0129M FROM BL
NPIC-041-E-0163M NPIC-041-E-0153M
Header Permanent Supply required MIN 14"-MPS-041-3001-B1AS-HS
LP MIN 2"-LPCW-041-3042-A2AS-NI DWG.No. Title
CONDENSATE WATER 0.75"
REFERENCE DRAWINGS
8"-LPCW-041-3002-A2AS-HS TWO PHASE FLOW
041-3102M 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
0.75" 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
TO 041-V-613

0.75"-LPCW-041-3017-A2AS-PG
NPIC-041-E-0142M 0.75" 0 11/APR/14 FOR CONSTRUCTION TTH RKM SMA
NPIC-041-E-0142M B - NOT ISSUED DMO RKM SMA
MIN

NPIC-041-E-0129M
NPIC-041-E-0153M
H NPIC-041-E-0153M A - NOT ISSUED DMO RKM SMA H

TWO PHASE FLOW


3"-LPS-041-3045-A1AS-HS Rev Date Description Prep'd Chk'd App'd
REVISIONS
MIN

MIN
MIN

MIN

MIN
Operation Centre JOB Code:
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0-6495-20 TPM
0.75"
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON
NPIC-041-E-0129M

ST

I I

0.75"-LPCW-041-0039-A2AS-PG

0.75"-LPCW-041-0045-A2AS-PG

0.75"-LPCW-041-0043-A2AS-PG

0.75"-LPCW-041-0044-A2AS-PG
1.5"-LPCW-041-3025-A2AS-PG

14"-MPS-041-0005-B1AS-HSB
MPS 041 0005 B1AS HSB
0.75"-LPS-041-0031-A1AS-HS
1"-LPS-041-3058-A1AS-HS

2"-LPS-041-0016-A1AS-HS

1"-LPS-041-0017-A1AS-HS

2"-LPS-041-3064-A1AS-HS

1"-LPS-041-0019-A1AS-HS

2"-LPS-041-0018-A1AS-HS

1"-LPS-041-3047-A1AS-HS
NSRP

TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW

Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J

14
PENEX
UNIT 041
STEAM AND CONDENSATE - 3
HC
CONDENSATE MANIFOLD

HC

CONDENSATE WATER

CONDENSATE WATER

CONDENSATE WATER

CONDENSATE WATER
041-MPS-01
AT GRADE
AT GRADE

FROM STEAM TRAP


US-038
US-037

041-0018M
041-0101M
041-0101M

041-0102M
041-0101M

041-3702M

041-0102M

FROM 041-EJ-612

FROM 041-EJ-614

FROM 041-EJ-613
A900-CM-003

Issue Purpose Document Class

041-0018M

041-0101M

041-3702M

041-0102M

TO 041-DS-611
TO 041-EJ-612

TO 041-EJ-614
TO 041-V-612

TO 041-V-615
TO 041-V-612

FOR CONSTRUCTION Z
(041-EJ-613)
(041-V-612)

MP STEAM
LP STEAM
LP STEAM

LP STEAM
LP STEAM

LP STEAM

LP STEAM

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE
LP

LP

LP

LP
DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3103M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 4 of 10


041-MPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

0.75"-LPCW-041-3035-A2AS-PG
CONDENSATE MANIFOLD

CONDENSATE MANIFOLD
STEAM TRACE MANIFOLD

STEAM TRACE MANIFOLD

STEAM TRACE MANIFOLD


0014V AND D-000-1225-0020V TO 0026V.

CONDENSATE WATER

CONDENSATE WATER
N

A900-DM-002

A900-DM-001

A900-DM-003

A900-CM-001

A900-CM-002
TWO PHASE FLOW

041-0018M
1. HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.
A A

041-0111M

041-0111M
041-0021M

MIN

STEAM TRAP
TO 041-V-613

TO 041-V-614
TO 041-C-202
0.75"

LP STEAM
0.75"-LPCW-041-3016-A2AS-PG

LP STEAM
ST
TWO PHASE FLOW

EL. 118500
EL.121050

EL.113900

EL.102550
US-008

US-007

US-006

US-015

LP

LP
NPIC-041-E-0157M
MIN AT GRADE
1"-LPS-041-3033-A1AS-HS
HC HC HC HC US-009 HC

NPIC-041-E-0158M
1" MIN
1.5"-LPS-041-3074-A1AS-HS

3"-LPS-041-0003-A1AS-HS

1.5"-LPS-041-3068-A1AS-HS
B 1"-LPS-041-3034-A1AS-HS
EL.110000 B

1.5"-LPCW-041-3028-A2AS-PG

0.75"-LPCW-041-0031-A2AS-PG
3"-LPCW-041-0013-A2AS-PG

1.5"-LPCW-041-3024-A2AS-PG
1.5"-LPS-041-3071-A1AS-HS

10"-LPCW-041-0005-A2AS-HS
0.75"-LPCW-041-3036-A2AS-PG
1"-LPS-041-3024-A1AS-HS

1"-LPS-041-3025-A1AS-HS
HC US-010

AT GRADE

1"-LPS-041-3070-A1AS-HS
US-012
NPIC-041-E-0160M

TWO PHASE FLOW


TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW


2"-LPS-041-3032-A1AS-HS

LP STEAM HC
NPIC-041-E-0129M

10"-LPS-041-0012-A1AS-HS
041-0111M
NO POCKET
MIN FROM 041-V-613

NPIC-041-E-0102M
NPIC-041-E-0153M
NPIC-041-E-0160M
MIN EL.105900
1"-LPS-041-3035-A1AS-HS
C HC US-011 C

1"-LPS-041-3037-A1AS-HS
MIN
LP STEAM
1"-LPS-041-0004-A1AS-HS

FREE DRAINING

FREE DRAINING
041-0025M

4" TO 041-V-211

MIN

MIN
2"-LPS-041-0004-A1AS-HS

MIN
0.75"
4"

MIN
D 0.75" D
10"-LPS-041-3003-A1AS-HS

ST
3"
0.75" 0.75"-LPCW-041-3050-A1AS-PG
ST
TWO PHASE FLOW
LP STEAM
0.75"-LPS-041-0027-A1AS-HS
0.75" 041-0025M

TO 041-P-213A/B
E E
MIN

LP STEAM LP STEAM

MIN

MIN

MIN
10"-LPS-041-3001-A1AS-HS A. DELETED.
6"
041-3101M 041-3103M
1. DELETED.

MIN

MIN

MIN
FROM / TO UNIT 41 6" FROM / TO BL

MIN
2"-LPCW-041-3048-A1AS-PG
2. DELETED.
0.75"-LPS-041-3057-A1AS-HS

NPIC-041-E-0153M
ST
3. DELETED.
NPIC-041-E-0153M 0.75"
NPIC-041-E-0160M 0.75"-LPCW-041-3051-A1AS-PG 0.75"-LPCW-041-3010-A2AS-PG 4. DELETED.
NPIC-041-E-0162M
TWO PHASE FLOW TWO PHASE FLOW

NPIC-041-E-0163M
0.75"
F MIN F
2"-LPCW-041-3033-A2AS-PG NPIC-041-E-0162M
TWO PHASE FLOW
LP 0.75" LP

MIN
CONDENSATE WATER FREE DRAINING FREE DRAINING CONDENSATE WATER
3"-LPCW-041-3001-A2AS-PG NOTE 1
041-3101M 041-3103M
TWO PHASE FLOW
FROM HEADER FROM HEADER
041-MPS-01 041-MPS-01
MP STEAM MP STEAM FEED DWG.No.
G 041-3101M
4"-MPS-041-3001-B1AS-HS 44"-MPS-041-3001-B1AS-HS
MPS 041 3001 B1AS HS
041-3103M
G
TO UNIT 041 NPIC-041-E-0163M FROM BL
3""
DWG.No. Title
0.75"-LPCW-041-3027-A2AS-PG REFERENCE DRAWINGS
ST 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TWO PHASE FLOW 0.75" 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
- LPCW return line to LPCW Interconnecting 0 11/APR/14 FOR CONSTRUCTION TTH RKM SMA
Header Permanent Supply required 0.75" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75"-MPS-041-3004-B1AS-HS A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LP LP Operation Centre JOB Code:
CONDENSATE WATER CONDENSATE WATER Operation Centre DWG.No.:
6"-LPCW-041-3002-A2AS-HS FREE DRAINING FREE DRAINING 8"-LPCW-041-3002-A2AS-HS
041-3101M 041-3103M Contractor JOB Code Responsible Company
TWO PHASE FLOW TWO PHASE FLOW 0-6495-20 TPM
TO 041-V-613 10" TO 041-V-613
Prepared by Checked by Approved by
MIN T. T. HUONG T. NGUYEN T. N. SON

1"-LPS-041-3028-A1AS-HS
1"-LPS-041-3026-A1AS-HS

NPIC-041-E-0146M

I I

NSRP
0.75"-LPS-041-3050-A1AS-HS

0.75"-LPS-041-3081-A1AS-HS
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J HC HC PIPING AND INSTRUMENT DIAGRAM J


PENEX
AT GRADE

AT GRADE
US-035

US-036

UNIT 041
STEAM AND CONDENSATE - 2
041-3502M

041-3502M
TO FLG HEADER

TO FLG HEADER
Issue Purpose Document Class
FOR CONSTRUCTION Z
LP STEAM

LP STEAM

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3102M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 5 of 10


041-MPS-01-SV-1 Page

041-MPS-01

LP CONDENSATE WATER

LP CONDENSATE WATER

LP CONDENSATE WATER

LP CONDENSATE WATER

LP CONDENSATE WATER

LP CONDENSATE WATER
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

CONDENSATE MANIFOLD
0014V AND D-000-1225-0020V TO 0026V.
N

FROM STEAM TRAP

FROM STEAM TRAP

FROM STEAM TRAP

FROM STEAM TRAP


A900-CM-007

041-0018M

041-0014M

041-0014M

041-0013M

041-0022M

041-0018M
FROM 041-E-103

FROM 041-E-204
1. RESTRICTION ORIFICE WITH 2.243 MM HOLE.

TO CCB HEADER

TO CBD HEADER

TO FLG HEADER
A A

TO 041-R-101A/B

TO 041-P-202A/B

TO 041-P-203A/B
041-3401M

041-0024M

041-3701M

041-3701M

041-3501M

041-0015M

041-0022M

041-0013M

041-0023M

041-0022M
TO FG HEADER

TO 041-EJ-611
TO 041-P-212

TO 041-E-204
2. HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.

MP STEAM
LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM
AT GRADE

AT GRADE

AT GRADE
EL.118500

EL.117800
US-001

US-002

US-003

US-004

US-005
HC HC HC HC HC

B B

44"-MPS-041-0008-B1AS-HS
MPS 041 0008 B1AS HS
1.5"-LPCW-041-3021-A2AS-PG

0.75"-LPCW-041-0038-A2AS-PG

0.75"-LPCW-041-0030-A2AS-PG

0.75"-LPCW-041-0026-A2AS-PG
3"-LPS-041-0009-A1AS-HS
4"-LPCW-041-0002-A2AS-HS
0.75"-LPS-041-3007-A1AS-HS

0.75"-LPS-041-0026-A1AS-HS

0.75"-LPS-041-3008-A1AS-HS

0.75"-LPS-041-3055-A1AS-HS

0.75"-LPS-041-3049-A1AS-HS

0.75"-LPS-041-0022-A1AS-HS

0.75"-LPS-041-0025-A1AS-HS

0.75"-LPS-041-0024-A1AS-HS
0.75"-LPCW-041-0037-A2AS-PG

0.75"-LPCW-041-0040-A2AS-PG
1"-LPS-041-3012-A1AS-HS

1"-LPS-041-3013-A1AS-HS

1"-LPS-041-3015-A1AS-HS

1"-LPS-041-3016-A1AS-HS

1"-LPS-041-3036-A1AS-HS
TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW

NPIC-041-E-0119M
0.75"
C C

MIN
MIN

MIN

NPIC-041-E-0138M
MIN

MIN 0.75" 0.75"

2"-LPS-041-3014-A1AS-HS
NPIC-041-E-0129M

MIN
ST
2"
D D

ST
3"-LPS-041-3011-A1AS-HS

NPIC-041-E-0162M
0.75"-LPCW-041-3014-A2AS-PG

0.75"-LPCW-041-3015-A2AS-PG
MIN MIN
TWO PHASE FLOW

MIN

MIN
2"-LPS-041-0024-A1AS-HS

TWO PHASE FLOW

NPIC-041-E-0149M
MIN
NPIC-041-E-0129M

NPIC-041-E-0129M
NPIC-041-E-0153M
0.75"
0.75"-LPCW-041-3047-A2AS-PG
NPIC-041-E-0149M ST
E TWO PHASE FLOW
NPIC-041-E-0129M E
A. DELETED..
MIN

LP STEAM
3" 4" 6"-LPS-041-3001-A1AS-HS
041-3102M 1. DELETED.
MIN

MIN

MIN
0.75" 0.75"-LPS-041-3056-A1AS-HS 0.75"-LPCW-041-3008-A2AS-PG FROM / TO BL
0.75"-LPCW-041-3013-A2AS-PG 3" ST 2. DELETED.
MIN ST NPIC-041-E-0162M TWO PHASE FLOW
TWO PHASE FLOW 0.75"
3. DELETED.
MIN 2"-LPCW-041-3031-A2AS-PG

NPIC-041-E-0163M
MIN
0.75" 4. DELETED.
TWO PHASE FLOW
MIN 5. DELETED.
F 2"-LPCW-041-3030-A2AS-PG 6. DELETED.
F
LP
MIN 0.75"

MIN
CONDENSATE WATER
FREE DRAINING 3"-LPCW-041-3001-A2AS-PG NOTE 2
041-3102M
TWO PHASE FLOW
2"-LPS-041-3063-A1AS-HS

MIN

MIN
MIN TO 041-V-614
0.75" NPIC-041-E-0162M
2"

NPIC-041-E-0160M
MIN 041-MPS-01 MP STEAM
041-3102M
NPIC-041-E-0129M

2"
2" 33" FEED DWG.No.
0.75"-LPCW-041-3009-A2AS-PG FROM BL
G 0.75" 3" G
0.75"-LPCW-041-3032-A2AS-PG

ST
0.75" TWO PHASE FLOW 4"-MPS-041-3001-B1AS-HS
0.75"-LPCW-041-3019-A1AS-PG 0.75"-MPS-041-3002-B1AS-HS
MP
TWO PHASE FLOW

ST
TWO PHASE FLOW 0.75" - LPCW return line to LPCW Interconnecting LP
MIN MIN NPIC-041-E-0163M
0.75"-LPS-041-3067-A1AS-HS Header Permanent Supply required CONDENSATE WATER
FREE DRAINING 6"-LPCW-041-3002-A2AS-HS DWG.No. Title
041-3102M REFERENCE DRAWINGS
TWO PHASE FLOW
NPIC-041-E-0129M

0.75" MIN LP STEAM


TO 041-V-613 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
1"-LPS-041-0005-A1AS-HS 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0006M
MIN

NPIC-041-E-0138M
NPIC-041-E-0129M 0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
2" TO 041-E-011A/B B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LP STEAM
H 2"-LPS-041-0006-A1AS-HS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-0008M Rev Date Description Prep'd Chk'd App'd
MIN REVISIONS
MIN NPIC-041-E-0138M TO 041-DR-001A/B
MIN LP STEAM Operation Centre JOB Code:
0.75"-LPS-041-0020-A1AS-HS Operation Centre DWG.No.:
041-0004M
2"-LPN-041-3038-A2AS-NI

Contractor JOB Code Responsible Company


1"
ST

TO 041-DR-051A/B 0-6495-20 TPM


1.5"-LPS-041-3065-A1AS-HS

0.75"-LPCW-041-3020-A2AS-PG

0.75"-LPCW-041-3039-A2AS-PG
NPIC-041-E-0137M
NPIC-041-E-0162M

1.5"-LPCW-041-3022-A2AS-PG
EL.110000
1"-LPS-041-3017-A1AS-HS

1"-LPS-041-3018-A1AS-HS

1"-LPS-041-3021-A1AS-HS

1"-LPS-041-3020-A1AS-HS

2"-LPS-041-3019-A1AS-HS

1"-LPS-041-3022-A1AS-HS

0.75"-LPCW-041-3040-A2AS-PG

Prepared by Checked by Approved by


2" 1"-LPS-041-3030-A1AS-HS

1.5"-LPS-041-3066-A1AS-HS
041 HC US-033 T. T. HUONG T. NGUYEN T. N. SON
1"-LPS-041-3023-A1AS-HS

TWO PHASE FLOW

2"

MIN
FI 0.75"

TWO PHASE FLOW

TWO PHASE FLOW


0371
I 1" I
EL.103000
1"-LPS-041-3029-A1AS-HS
HC US-034
MIN

NPIC-041-E-0162M
NPIC-041-E-0163M

041
MIN
0.75"-LPS-041-3063-A1AS-HS
LP STEAM
041-3701M
NSRP

NPIC-041-E-0090M
PG Complex Project
0373 Nghi Son Refinery and Petrochemical
TO CBD HEADER
0.75"-LPCW-041-0021-A2AS-PG

MIN Nghi Son, Vietnam Limited Liability Company


0.75"-LPS-041-3048-A1AS-HS

LP STEAM
0.75"-LPS-041-0023-A1AS-HS

0.75"-LPS-041-3005-A1AS-HS

0.75"-LPS-041-0021-A1AS-HS

041
6"-LPCW-041-0004-A2AS-HS

3"-LPCW-041-0019-A2AS-HS
NOTE 1 0.75"-LPS-041-0034-A1AS-HS
2"-LPS-041-0014-A1AS-HS

3"-LPS-041-0008-A1AS-HS

2"-LPS-041-0001-A1AS-HS

RO 041-0008M
0371 Drawing Title

TWO PHASE FLOW


1"
TWO PHASE FLOW

TWO PHASE FLOW

0.75" NPIC-041-E-0149M
TO 041-DR-001A/B
NPIC-041-E-0162M

J 1"-LPS-041-3031
EL.105300 PIPING AND INSTRUMENT DIAGRAM J
0.75" HC US-032
HC HC HC HC HC HC HC -A1AS-HS PENEX UNIT
2"-LPN-041-3005-A1AA-NI

AT GRADE

AT GRADE

AT GRADE

4"-LPS-041-3077-A1AS-HS

NPIC-041-E-0160M
EL.104000

EL.108050

EL.122500

EL.133950

UNIT 041
US-025

US-026

US-028

US-029

US-030

US-027

US-031

NPIC-041-E-0102M
LP STEAM
3"-LPS-041-0007-A1AS-HS
041-0011M STEAM AND CONDENSATE - 1
LP CONDENSATE WATER TO 041-V-001 NPIC-041-E-0160M
STEAM TRACE MANIFOLD

STEAM TRACE MANIFOLD

CONDENSATE MANIFOLD
LP CONDENSATE WATER

LP CONDENSATE WATER
0.75"-LPCW-041-0029-A2AS-PG
041-0006M Issue Purpose Document Class
TWO PHASE FLOW
FROM STEAM TRAP
041-3501M

TO FLG HEADER

TO CBD HEADER
041-0020M

041-0019M

041-3701M

041-0017M

041-0011M

041-0010M

FOR CONSTRUCTION Z
TO 041-P-201A/B

TO 041-P-001A/B
A900-DM-007

A900-DM-006

A900-CM-005
LP CONDENSATE

FROM STEAM TRAP


041-0018M

041-0018M

FROM 041-E-203

041-0006M

FROM 041-E-012
K K
TO 041-C-201
TO 041-V-201

TO 041-V-112

Unit No. Unit Abbreviation PCWBS Size Scale


LP STEAM

ST
LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LPN 0.75" 041 PENX A900 A1 NONE


MIN

041-3601M NPIC-041-E-0102M
NPIC-041-E-0102M

DR01A
NPIC-041-E-0160M Contractor DWG.No. Sheet Rev.
A1

NPIC-041-E-0153M
NPIC-041-E-0162M D-041-1225-3101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
9
10 11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 6 of 10


041-MPS-01-SV-1 Page

041-E-012 NPIC-041-E-0099M
041-E-011A/B 041-H-011
NPIC-041-E-0159M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
REGENERANT VAPORIZER REGENERANT CONDENSERS
SIZE: 2H3 HEATER SHUTDOWN REGENERANT SUPERHEATER 0014V AND D-000-1225-0020V TO 0026V.
CODE ASME VIII DIV 1 / API 660 CODE ASME VIII DIV 1 / API 660
CIRCUIT FAULT RUN COMMAND 1. REGENERANT LOW FLOW / VAPORIZER HIGH LEVEL SHUTDOWN
PSET: 2.70 MPa(g) CODE ASME VIII DIV 1 / ASME B31.3
A DESIGN DUTY 781 kW
041
TYPE: BEU
041 041
BYPASS SWITCH WITH LIGHT DURING HOT H2 STRIPPING CASE. A
SIDE HOT COLD SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 560 mm/ 2500 mm/ 94 m² UA JZGL TYPE ELECTRICAL
PSV 2. DELETED.
2.20 MPa(g) + FV @ 144°C 0007 FREE DRAINING 6"-FLG-041-0007-A1AP-NI FLG DESIGN DUTY 2x1009 kW 0302 0301B DESIGN DUTY 779 kW
DESIGN PRESSURE 2.80 MPa(g) + FV @ 232 °C
NOTE 12 SIDE SHELL TUBE 2.00 MPa(g) + FV @ 316°C 3. EMPTYING LINE.
041-3501M DESIGN PRESSURE
DESIGN TEMPERATURE 350 °C 175°C 3.80 MPa(g) + FV @ 296°C 4. LOW FLOW ALARM INHIBITION SIGNAL PROVIDED BY DRCS.
DESIGN PRESSURE 2.95 MPa(g) DESIGN TEMPERATURE 485 °C NOTE 11
INSULATION TYPE HC NOTE 12
H POWER TRIM SPECIFICATION B2AH04 - HC 5. FACE PLATE ONLY.
TRIM SPECIFICATION P-041-0283-B1AP04-HC 041 041 DESIGN TEMPERATURE 200 °C NOTE 10 76 °C 041
TI TIK CONTROLLER FAULT
NOTE 5 NPIC-041-E-0130M INSULATION TYPE PP NI UZ 6. FOR SULFUR STRIPPING. UTILITY STATION TO BE LOCATED

FREE DRAINING
0319B 0319 NPIC-041-E-0158M 0302 RUNNING
NOTE 1
041 NEARBY.
0.75" TRIM SPECIFICATION B2AP04 - PP B2AW - NI UA 041
041 041

MIN
B 0301 UZ
1000
JZGL HZS
0306
7. FOR ON/OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M. B
0301A
2" 041 041 041 NOTE 8 8. LOCATED IN SWITCHGEAR.
US CRIT
TT TT 041 NOTE 8 RUN START
0003 (V) 041 (V) 9. HIGH LEVEL ALARM INHIBITION SIGNAL PROVIDED BY DRCS.
0319B 0319A
DRCS TZT 041 041 041 041 STATUS 041 041 H 041
UZ
041
HZL
6900 TE TE JI JC JY US JZHS
6" (V) 0323B 0323A 0302 0306A 10. ALTERNATE DESIGN CONDITIONS OF SHELL SIDE: DESIGN
4"-P-041-0136-B2AH04-HC SKIN SKIN 0301 0301 0301 0003 0301D
4"-P-041-0041-B2AH04-HC (V) (V) START/ DRCS TEMPERATURE 345 °C, DESIGN PRESSURE 2.0 MPa(g).
STOP STOP
NPIC-041-E-0099M NOTE 22 11. ALTERNATE DESIGN CONDITIONS: DESIGN TEMPERATURE 400 °C,
(V) 041
SIZE: 2H3 041 041 (V) 690V JZHS DESIGN PRESSURE 2.7 MPa(g).
PSET: 2.20 MPa(g) TE TE 3 PHASE 0301E L
NPIC-041-E-0093M 0318B 0318A 12. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITONS ARE 0.34MPa(g)
041 SKIN SKIN CRIT
C PSV
FREE DRAINING
NPIC-041-E-0099M 041
TZAHH @ 175 °C AND FV @ 175 °C. C
0008 8"-FLG-041-0052-A1AP-NI (V) HH
FLG 041 0322
(V)
041 041 (V) 041 041
UZ 13. BLANK-OFF DURING HOT HYDROGEN STRIPPING.
041-3501M TE TE TZE TZT
0322A 0322 0302 041 T ZAH
0316B 0316A SKIN (V) TZI 14. LOCATE AT END OPPOSITE TO SHELL INLET.
SKIN SKIN 041
TZE 0322 15. ACTIVATION OF 041-UZ-1000 FORCES 041-PIC-0208 TO MANUAL
0322B MODE AND 0% OUTPUT.
(V) SKIN
041 CRIT
TZAHH 16. VALVE AT STEAMTRAP INLET TO BE NORMALLY CLOSED.
0.75" (V) HH
041 041-H-011 041 041 041 041 0317

MIN
TI 041 041
TT TT TT TZE TZT UZ 17. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
0314 0316 0318 0323 0302 T ZAH
D NPIC-041-E-0130M 2"
(V) (V) (V) 0317A
041
SKIN
0317
(V)
041
TZI
PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
CONDENSER.
D
NPIC-041-E-0099M 0317
TZE
041 H 041 H 041 H
0317B 18. MULTI-TAP ORIFICE FLANGES (041-OR-0311, 041-ORJ-0311).
041 TI TI TI (V) SKIN
US
FREE DRAINING 4"-P-041-0042-B1AH04-HC CRIT ORIFICE FLANGES (041-ORJ-0311) SHALL BE LOCATED AT
0316 0318 0323 041
0003 TZAHH DOWNSTREAM OF ORIFICE PLATE.
DRCS (V) HH 0315
041 041 041
SIZE: 1.5F2 UZ 19. ORIFICE WITH 26 MM HOLE.
TZE TZT
0302 041 T ZAH
PSET: 3.80 MPa(g) 0315A 0315
FREE DRAINING

SKIN (V) TZI 20. STEAM-OUT CONDENSATE COLLECTION. NPIC-041-E-0108M


041 041
TT 041 TZE 0315
21. MAXIMUM CV : 9 IS CONSIDERED IN SAFETY DESIGN OF
0314 6" PSV 0315B
FREE DRAINING ISOMERATE TANKAGE.
E 0014 6"-FLG-041-0009-A1AP-NI FLG (V) SKIN
MIN E
041-3502M 041 22. MAKE CONNECTION AT DOWNSTREAM OF ELBOW.
TG NOTE 14
6"-P-041-0137-B1AP04-HC 0328 6" 1"-P-041-0139-B2AP04-PP 1"-FLG-041-0010-A1AP-NI FLG NPIC-041-E-0158M
NOTE 9 NO POCKET 041-3502M
041
FLG YZS 041 0.75"
0002 0.75" 4" TSV
041-3501M SIZE: 0.75D1 0015 A. DELETED.

MIN
FREE DRAINING
0.75" 1"-V-041-0013-A1AP-NI
PSET: 2.95 MPa(g)
1. DELETED.
2"
F 041-E-012 F

FREE DRAINING
MIN
NOTE 6 1"
4" 2" 041 041
1"-FLG-041-0008-A1AP-NI

1" 4"-P-041-0138-B2AP04-PP PG TG
MIN NP 0368 0324

FREE DRAINING
041-E-011A 0.75"
4"-P-041-0135-B1AP04-HC

NOTE 17
NPIC-041-E-0090M
041 L Z AH RS 6"-CWR-041-0002-A2AW-NI CWR
LZI
NOTE 13 6"-CWR-041-0015-B2AW-NI 041-3001M
0309A
FREE TYPE 1 TYPE 1 MIN
DRAINING RS HH HH L Z AH
041 H 041 H 041 041 FEED DWG.No.
UZ LZI 1"-FLG-041-0064-A1AP-NI
G 041
LZT
0309B
LZT
0309A 0302 0309B
LPS 1"-P-041-0296-B2AP04-PP FLG
G
LI GWR GWR 041-3101M
NO POCKET 041-3502M
0307 TYPE 1 1oo2 CRIT 0.75" NPIC-041-E-0158M AT GRADE
041 041
LZAHH RS 6"-CWS-041-0016-B2AW-NI 6"-CWS-041-0003-A2AW-NI CWS TO SAFE LOCATION

1"-LPS-041-0005-A1AS-HS
LT
NPIC-041-E-0090M

Control system0309pressure at operation


FREE DRAINING

NPIC-041-E-0090M TYPE 1 0307 REGENERANT VAPORIZER / SUPERHEATER


953053-120-09-A1
041-3001M
041 041 GWR
pressure of MPS = 2.06 MPa(g) 041-E-011B NOTE 17 DWG.No. Title
US LG 0.75" REFERENCE DRAWINGS
MIN 0308
2"
MIN 0003 CRIT 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
DRCS MAG 041

1"-P-041-0141-B2AP04-HC
TAH 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
MIN NPIC-041-E-0099M 2"-P-041-0043-B1AP04-PG 0.75" 0321 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041 NNF NOTE 3 041 041
LAH 2" NC US NPIC-041-E-0154M B 11/NOV/13 FOR APPROVAL DMO RKM SMA
CRIT FZ AH NOTE 5 TT
H 0.75" 0307
UC
CBD
041
FZALL
041
FZI 041
6" 0321 041 041
0003 DRCS
041
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
0
041 FZ A L FIK US PIK Rev Date Description Prep'd Chk'd App'd
0.75" CBD CBD 0311 0311 TT
NPIC-041-E-0090M PG 041
MIN

0309 0003 0306 REVISIONS


0211 PG NOTE 5 0321
DRCS Operation Centre JOB Code:
1.5"
5" NPIC-041-E-0090M 0307 041
NPIC-041-E-0099M

NPIC-041-E-0096M 0.75" PT 041 NPIC-041-E-0099M Operation Centre DWG.No.:


3" 041 PV
NPIC-041-E-0098M 2"-MPCW-041-0001-B2AS-HS 041 FAL 0306 Contractor JOB Code Responsible Company
4" NOTE 13 PT 0.75" 3"
0306
3"-P-041-0044-B1AP04-NI
REGENERANT
1.5" 0-6495-20 TPM
NPIC-041-E-0158M

0309
0208 FC 041-0032M
3"-LPCW-041-0022-A0JS-HS 1" FC Prepared by Checked by Approved by
041-MPS-01 041 0.75" 0.75"
2"-MPS-041-0013-B1AS-PP

NPIC-041-E-0099M UZ 1.5" TO BL T. T. HUONG T. NGUYEN T. N. SON


10D MIN 041 0.75"
1000 NP NOTE 20
LPCW 2"" NOTE 5 041 FV 041 FREE DRAINING
I 041-3101M
ST
PIK
041 041
US
NOTE 15 FC
UZ
0302
0309
1" US CBD I
041-MPS-01 1.5" 0003 1"-CBD-041-0003-A2AP-NI 041-3701M
0208 0003 DRCS
DRCS 041 2" MIN MIN 0.75"
PV 0.75" 041 NOTE 18 041 REGENERANT

2"
041
SP 041
PSL
0208 FZT
0311
FT
0309 LPT
4"-P-041-0045-B2AP04-PP
041-0008M NSRP
3"-P-041-0029-B2AP04-HC 1225
NNF

0208 LL 041 Complex Project


NPIC-041-E-0153M FROM 041-DR-001A/B Nghi Son Refinery and Petrochemical

MIN
FZE 0.75"
NC 0311
1" NOTE 21
REGENERANT 041 22"-LPCW-041-0028-A2AS-PG NPIC-041-E-0108M LC REGENERANT Nghi Son, Vietnam Limited Liability Company
ST 4"-P-041-0029-B2AP04-HC
041-0004M 3"-LPCW-041-0019-A2AS-HS NOTE 16 SP TWO PHASE FLOW 041-MPS-01 NOTE 19 041-0008M
1015 NC X NOTE 7 Drawing Title
- LPCW return
TWO lineFLOW
PHASE to LPCW Interconnecting 2"-LPCW-041-0046-A2AS-PG
PC
TO 041-DR-051A/B 041 041 TO 041-DR-001A/B
Header Permanent Supply required
J NPIC-041-E-0130M
NPIC-041-E-0138M NPIC-041-E-0143M
AT GRADE
YZS
0001
UV
0083
REGENERANT PIPING AND INSTRUMENT DIAGRAM J
2"-P-041-0046-B1AP04-NI
TO SAFE NOTE 4 041-0032M PENEX
REGENERANT LOCATION
3"-P-041-0030-B2AP04-PP FROM 041-E-301
041-0004M 041-MPS-01 FEED AND REGENERATION SECTION
DESUPERHEATED MP STEAM
FROM 041-DR-051A/B
041-MPS-01 3"-MPS-041-0001-B1AS-HS
S REGENERANT VAPORIZER / SUPERHEATER
041-0018M
LPCW 0.75"-LPCW-041-0029-A2AS-PG 0.75 MPS 041 0014 B1AS HS
0.75"-MPS-041-0014-B1AS-HS 2"" FROM 041-DS-611
FOR 041-LG-0307, 0308, 0309B ST
041-3101M TWO PHASE FLOW STRIPPING HYDROGEN Issue Purpose Document Class
4"-P-041-0047-B1AH04-HC
0.75" 0.75" 0.75" 041-0015M FOR CONSTRUCTION Z
K MIN 0.75"
NOTE 6
FROM 041-E-103 Unit No. Unit Abbreviation PCWBS Size Scale K
CBD
4"-P-041-0048-B1AH04-HC
STRIPPING HYDROGEN 041 PENX A900 A1 NONE

DR01A
041-3701M 041-0015M Contractor DWG.No. Sheet Rev.
2"-CBD-041-0040-A2AP-NI
A1

NOTE 6
TO 041-R-101A/B D-041-1225-0006M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
12 13 14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 7 of 10


041-MPS-01-SV-1 Page

041-E-101 041-EJ-611
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
COLD COMBINED FEED EXCHANGER STEAM JET EJECTOR 0014V AND D-000-1225-0020V TO 0026V.
CODE ASME VIII DIV 1 / API 660
CODE ASME VIII DIV 1 1. ORIFICE PLATE 041-FZE-0053A REPLACES 041-FZE-0053 DURING
TYPE: BEU
A SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA)
CAPACITY 173 kg/hr N2 @ 150 mm Hg NPIC-041-E-0100M HOT HYDROGEN STRIPPING. 041-FZE-0053A ORIFICE WITH 46.88MM A
810 mm/ 6100 mm/ 245 m² HOLE. 041-FZE-0053 ORIFICE WITH 26.15 MM HOLE.
NPIC-041-E-0158M DESIGN PRESSURE 2.80 MPa(g)
DESIGN DUTY 5100 kW
DESIGN TEMPERATURE 350 °C 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
SIDE SHELL TUBE
HS D-041-1225-2401M. NPIC-041-E-0098M
INSULATION TYPE
DESIGN PRESSURE 4.15 MPa(g) + FV @ 108°C 3.90 MPa(g) + FV @ 157°C
TRIM SPECIFICATION B1AS-HS 3. BOTH SIDES TO BE DISCONNECTED AND BLANK - OFF WHEN NOT IN
DESIGN TEMPERATURE 235°C 260°C COLD COMBINED FEED USE.
INSULATION TYPE HC HC 8"-P-041-0080-B1AH04-HC
041-0014M
TWO PHASE FLOW 4. LINE FOR SINGLE REACTOR OPERATION.
TRIM SPECIFICATION B1AH04-HC B1AH04-HC TO 041-E-102A/B
SIZE: 1.5F2
PSET: 3.90 MPa(g) 5. LINE FOR DRY - OUT. NPIC-041-E-0157M
B 041
TI
041 6"-FLG-041-0019-A1AP-NI B
0101 PSV 6. MINIMUM 7500 MM ABOVE GRADE.
0105 FREE DRAINING FLG 7. 10 MM WEEP HOLE TO BE PROVIDED AT LOW POINT.
041-3501M
041 8. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
TT
0101 SIGNAL 9. START - UP BY - PASS.

3"-P-041-0158-B1AH04-HC
041-0020M
10. HYDROGEN SETPOINT INPUT FROM OPERATOR.
TO 041-FY-0004
11. FOR START-UP ONLY.
SIGNAL
C C

FREE DRAINING
041-0019M 12. VALVE USED FOR LIQUID FILLING DURING START-UP. ACCESS TO
0.75" BE PROVIDED.

MIN
TO 041-XY-0201
HYDROGEN RATIO 13. DISCREPANCY ALARM BETWEEN 041-FT-0052 AND 41-FZT-0053A/B/C.
041 SIGNAL
XI 2"
041-0020M 14. DISCREPANCY ALARM BETWEEN 041-FT-0004 AND 041-FZT-0005A/B.
0082 L
TO 041-FY-0004 15. MULTI-TAP ORIFICE FLANGES (041-OR-0053, 041-ORJ-0053). ORIFICE
FLANGE WITH JACK SCREW (041-ORJ-0053) SHALL BE LOCATED AT
x HYDROGEN H
041 DOWNSTREAM OF ORIFICE PLATE.
041 041 PIC
XY AI 0.75"
D 0082 0051
0111 L 16. MULTI-TAP ORIFICE FLANGES (041-OR-0005, 041-ORJ-0005). ORIFICE D
FLANGE WITH JACK SCREW (041-ORJ-0005) SHALL BE LOCATED AT
NOTE 10 DOWNSTREAM OF ORIFICE PLATE.
041-E-101 041 041
PG PT
SIGNAL H 0112 0111 17. SILENCER SHALL BE IN VERTICAL POSITION.
041 0.75"
041-0001M FIC LAG REACTOR EFFLUENT
18. ORIFICE WITH 107.22 MM HOLE.
0052 RS 8"-P-041-0078-B1AH04-HC
L 041-0015M
TO 041-PY-0051
TWO PHASE FLOW
041 FROM 041-R-101A/B
HIC
x LEAD REACTOR EFFLUENT
0103
041 8"-P-041-0076-B1AH04-HC
FY 041-0014M
E TWO PHASE FLOW E

50-100%
0052

0-50%
RS x x 0-100% FROM 041-E-102A/B
NOTE 4 A. DELETED.
041 041
041 H 041 H HY HY FC
FDI FI 0103A 0103B 8"
0056 0052 041 SPLIT 1. DELETED.
L

100-0%
TG RANGE 041
NOTE 13 041 0126 HV
UZY 041 0103B 041
041 0105A/B 0.75" HV PV
TI 041 041 NPIC-041-E-0115M 041 0103A 0111
UZ UZ TG LAG REACTOR EFFLUENT
0059 S 8" 8"-P-041-0075-B1AH04-HC
1000 0101 0132
(X2) 041-0017M
HCL FC FL(O) TWO PHASE FLOW
F 041-0012M
0.75"-C-041-0008-D1AY04-NI 041
PI 0.75" 8" 0.75" 0.75" 4" 0.75"
TO 041-E-201A/B F
NOTE 11 0060
FROM HCL CYLINDER NOTE 3
0.75" 0.75"
041

MIN
NPIC-041-E-0158M 0.75"-C-041-0014-D1AY04-NI 0.75" 041 041 041 8"-P-041-0157-B1AH04-NI
FT 041
0052 TT PG PT
UZV TWO PHASE FLOW
0059 0071 0060
MAKE - UP GAS NOTE 15 0105 C 300 #
3" NOTE 8
3"-P-041-0036-B1AH04-NI NC
041-0005M
NPIC-041-E-0153M
LO 0.75"
6" 041 CRIT
FROM 041-DR-051A/B NPIC-041-E-0115M FC
0.75" FZALL 0.75" HYDROCARBON SAMPLE FEED DWG.No.
041 041 041 0.75" TSO
G 0.75"
041
FZE
FZT
0053A
FZT
0053B
FZT
0053C
0053
3"
0.75"-P-041-0077-B1AH04-PP
041-0015M G
FZ AL TWO PHASE FLOW
0053 LL LL LL 041 2"-P-041-0074-A1AP04-NI TO SAMPLE RECEIVER
FZI NOTE 5
NOTE 1 6"
NOTE 3 041 0053A 0.75"
0.75" UZ 953053-120-16-A1 COLD COMBINED FEED EXCHANGER
0101 041 FZ AL DWG.No. Title
041 2oo3 FZI
FIC REFERENCE DRAWINGS
0004 FLG 0053B
L 041 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-3501M

MIN
041 FZ AL UZV 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
TI 041
FZI 0106 C 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0004 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0053C FC
H 041 TYPE L3 TSO A 13/JUL/13 FOR REVIEW DMO RKM SMA H
SC 6" NOTE 8 Rev Date Description Prep'd Chk'd App'd
041 041 0003 NOTE 2 REVISIONS
FT TT 041
0004 0004 FV
041
4"-P-041-0073-B1AH04-HC Operation Centre JOB Code:
0004 Operation Centre DWG.No.:
REACTOR CHARGE NOTE 16 UZY S (X2) NOTE 9
6"-P-041-0071-D1AP04-NI 6" 0106A/B NC NC Contractor JOB Code Responsible Company
041-0011M 1" 0.75" 0-6495-20 TPM
041 FC 041 041
FROM 041-P-001A/B FZE Prepared by Checked by Approved by
041 041 0.75" 4" 0.75" UZ UZ NOTE 12
0005 1000 0101 MIN T. T. HUONG T. NGUYEN T. N. SON
FZT FZT
NOTE 18 0005A 0005B CRIT
LL LL 041 041
I UZ
0101
FZALL TO ATM I
START-UP PURGE 2oo2 0005 AT SAFE LOCATION
2"-P-041-0017-A1AP04-NI NOTE 6
041-0002M

FROM 041-V-051 041


FZI
FZ A L
NSRP
START-UP PURGE 0005A Complex Project
2"-P-041-0031-A1AP04-NI NPIC-041-E-0153M Nghi Son Refinery and Petrochemical
041-0004M Nghi Son, Vietnam Limited Liability Company
041 FZ A L START-UP PURGE
FROM 041-DR-051A/B FZI 2"-P-041-0083-A1AP04-NI
041-0015M Drawing Title
0005B
041 FROM 041-R-101A/B
J NOTE 17
PG PIPING AND INSTRUMENT DIAGRAM J
041 0072
SP PENEX
4101 NPIC-041-E-0097M 041-MPS-01
3"-V-041-0002-A1AP-PC REACTOR SECTION
NPIC-041-E-0158M
3" 041-MPS-01
DRAINING

MIN
0.75"-MPS-041-0023-B1AS-HS COLD COMBINED FEED EXCHANGER
H
FREE

041 FREE DRAINING MPS


FDI 44"-MPS-041-0008-B1AS-HS
MPS 041 0008 B1AS HS
0007 0041-3101M
1.5" NOTE
OT 8 3"" Issue Purpose Document Class
WEEP HOLE 0.75"-LPCW-041-0037-A2AS-PG
NOTE 14 041-EJ-611 0.75" 0.75" ST LPCW
FOR CONSTRUCTION Z
NOTE 7 TWO PHASE FLOW
K 041-3101M
Unit No. Unit Abbreviation PCWBS Size Scale K
0.75" HYDROGEN PURGE 041 PENX A900 A1 NONE
- LPCW return line to LPCW Interconnecting

DR01A
041-0015M Contractor DWG.No. Sheet Rev.
2"-P-041-0079-B1AH04-NI
Header Permanent Supply required
A1

TO 041-R-101A/B D-041-1225-0013M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 8 of 10


041-MPS-01-SV-1 Page

041-E-102A/B 041-E-103
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
HOT COMBINED FEED EXCHANGERS CHARGE HEATER 0014V AND D-000-1225-0020V TO 0026V.
CODE ASME VIII DIV 1 / API 660 CODE ASME VIII DIV 1 / API 660
1. LINE FOR SINGLE REACTOR OPERATION.
A TYPE: BEU TYPE: BEU A
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 2. FEED LOW FLOW SHUTDOWN OF CHARGE HEATER BYPASS
750 mm / 6100 mm / 396 m² 580 mm / 6100 mm / 110 m²
DESIGN DUTY 2 x 2823 kW DESIGN DUTY NPIC-041-E-0158M 3160 kW SWITCH WITH LIGHT FOR SULFUR STRIPPING.
SIDE SHELL TUBE SIDE SHELL TUBE
3. LOCATE ORIFICE FLANGES AND CONTROL VALVE ASSEMBLY
DESIGN PRESSURE 4.05 MPa(g) + FV @ 169 °C 3.90 MPa(g) + FV@ 196 °C DESIGN PRESSURE 4.00 MPa(g) + FV @ 193 °C 3.10 MPa(g) + FV @ 232 °C
SIZE: 4L6 IN HORIZONTAL RUN AT HEATER.
DESIGN TEMPERATURE 235 °C 260 °C DESIGN TEMPERATURE 235 °C 350 °C PSET: 3.90 MPa(g)
INSULATION TYPE HC HC INSULATION TYPE HC HS 041 FREE DRAINING 10"-FLG-041-0021-A1AP-NI FLG 4. HANDWHEEL PROVIDED WITH LIMIT STOP.
PSV
TRIM SPECIFICATION B1AH04-HC B1AH04-HC TRIM SPECIFICATION B1AH04-HC MPCW-041-0008-B2AS-HS 0102 041-3501M 5. EMERGENCY SHUTDOWN PUSH BUTTON.
B NPIC-041-E-0157M 6. ACTIVATION OF 041-UZ-1000 AND 041-UZ-0101 FORCES 041-FIC-0101
B
TO MANUAL MODE AND 0% OUTPUT.

7. ORIFICE WITH 35.04 MM HOLE.


CHLORIDE 0.75"

MIN
0.75"-C-041-0007-B1AY04-NI
041-0012M
041
FROM 041-A-111 HZS
2"
0107

FREE DRAINING
041 041 CRI T
C 0.75"
UZ
0101
HZL C
NOTE 2 0107A L
NP
6"-P-041-0163-B1AH04-HC
MIN
0.75" COMBINED FEED
8"-P-041-0085-B1AH04-HC
041-0015M
TWO PHASE FLOW
TO 041-R-101A/B

D 8"-P-041-0081-B1AH04-HC
D
TWO PHASE FLOW

SIZE: 1.5G3
PSET: 3.90 MPa(g)
041 FREE DRAINING 6"-FLG-041-0020-A1AP-NI FLG
PSV
0106 041-3501M

CRIT
E 041
TI
041
HZA E
0109
0102B L
A. DELETED.
0.75" NOTE 5
MIN

041 1. DELETED.
041 041 041
TG 041 H 041 041 6"-MPS-041-0009-B1AS-HS
UZ UZ HZS
0127 TIC 1000 0101 0109
TT TT
2" 0102A 0102A 0102B 041
FREE DRAINING

0.75" TI
0124 041 041
041-MPS-01 UZY UZY
0.75"
F 041
0107 0104
F
4"-P-041-0162-B1AH04-HC TT
S S
6"-MPS-041-0002-B1AS-HSB
0.75" 041 (x2) (x2) 041
041-E-103 0124
0.75" UZV UZV 041-MPS-01
041-E-102B LPT 0107 0104 DESUPERHEATED MP STEAM
RS C C
041-0018M
RS
1" FC FC
C 44" FROM 041-DS-611
0.75" 3" 0.75" TSO TSO 0.75"-MPS-041-0015-B1AS-HS
0.75 MPS 041 0015 B1AS HS LPCW
6" 0.75" 6" ST
041-3101
FEED DWG.No.
RS
G 0.75"
0.75"-LPCW-041-0030-A2AS-PG G
0.75" 041-LCPW-01
041 0.75" TWO PHASE FLOW
TG
0131 - LPCW return line to LPCW Interconnecting
953053-120-17-A1 HOT COMBINED FEED EXCH. & CHARGE HEATER
Header Permanent Supply required DWG.No. Title
041 REFERENCE DRAWINGS
041 TG 6" 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
TG 0133 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0129 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H RS A 13/JUL/13 FOR REVIEW DMO RKM SMA H

1500 MIN
Rev Date Description Prep'd Chk'd App'd
041-E-102A 041 041 041 REVISIONS
0.75" FIC UZ UZ Operation Centre JOB Code:
0101 1000 NPIC-041-E-0098M
0101 L Operation Centre DWG.No.:
8"
0.75" NOTE 6 4"-LPCW-041-0020-B0JS-HS Contractor JOB Code Responsible Company
0-6495-20 TPM
TWO PHASE FLOW
NOTE 7 Prepared by Checked by Approved by
041
NOTE 4 041 FT 041 T. T. HUONG T. NGUYEN T. N. SON
X
0.75" FE 0101 FV
TY 100-0% FO 0101 0101
I 0113AA 8" 4"-LPCW-041-0002-A2AS-HS LPCW I
041 NOTE 3 TWO PHASE FLOW 041-3101M
COLD FC
50-100%

TV
COMBINED FEED 0113AA X 3"-MPCW-041-0006-B2AS-HS 0.75" 1.5" 0.75" NPIC-041-E-0157M
8"-P-041-0080-B1AH04-HC NSRP
MIN

041-0013M 0-50% TY 0-100% 10D MIN


TWO PHASE FLOW 0113AB Complex Project
FROM 041-E-101 Nghi Son Refinery and Petrochemical
041 4"-LPCW-041-0036-A0JS-HS
SPLIT RANGE TIC 041 Nghi Son, Vietnam Limited Liability Company
TWO PHASE FLOW
0113A TV 2"
0113AB Drawing Title
6" 6" NPIC-041-E-0098M
J 041
PIPING AND INSTRUMENT DIAGRAM J
FC
50D MAX
30D MIN

TT
0113A 6" 0.75" PENEX
041 041
TI TT
REACTOR SECTION
0113B 0113B
HOT COMBINED FEED EXCHANGER & CHARGE HEATER
LEAD REACTOR EFFLUENT
8"-P-041-0076-B1AH04-HC
041-0013M
TWO PHASE FLOW NC LEAD REACTOR EFFLUENT
TO 041-E-101 Issue Purpose Document Class
NOTE 1 8"-P-041-0082-B1AH04-HC
041-0015M
TWO PHASE FLOW FOR CONSTRUCTION Z
K FROM 041-R-101A/B Unit No. Unit Abbreviation PCWBS Size Scale K
LEAD REACTOR EFFLUENT 041 PENX A900 A1 NONE
8"-P-041-0084-B1AH04-HC

DR01A
041-0015M Contractor DWG.No. Sheet Rev.
A1

TWO PHASE FLOW


TO 041-R-101A/B D-041-1225-0014M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. :15 16 9 of 10


041-MPS-01-SV-1 Page

041-DS-611
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-E-203 MP STEAM DESUPERHEATER 0014V AND D-000-1225-0020V TO 0026V.
STABILIZER REBOILER CODE ASME VIII DIV 1 1. ORIFICE FLANGE AND CONTROL VALVE ASSEMBLY TO BE LOCATED
A CODE ASME VIII DIV 1 / API 660 CAPACITY 57542 Kg/hr IN HORIZONTAL RUN AT REBOILER . ORIFICE WITH 47.47 MM HOLE. A
TYPE: BJ12U NPIC-041-E-0158M DESIGN PRESSURE 2.80 MPa(g) 2. ACTIVATION OF 041-UZ-1000 AND 041-UZ-0202 FORCES 041-FIC-0210
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 850 mm / 6100 mm / 209 m² DESIGN TEMPERATURE 350 °C AND 041-TIC-0211A TO MANUAL MODE AND 0% OUTPUT.
DESIGN DUTY 6333 kW ISULATION TYPE HS 3. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
SIDE SHELL TUBE TRIM SPECIFICATION B1AS-HS @ 175 °C AND FV @ 175 °C.
1.75 MPa(g) + FV @ 170 °C
DESIGN PRESSURE 2.80 MPa(g) + FV @ 232 °C 4. DELETED.
NOTE 3
DESIGN TEMPERATURE 200 °C 350 °C NPIC-041-E-0158M 5. HBFW CONTROL VALVE SHALL BE INSTALLED BELOW 041-DS-611
SIZE: 1E2 HBFW CONNECTION NOZZLE.
B INSULATION TYPE HC HS
PSET: 2.80 MPa(g) 6. 90° LONG RADIUS ELBOW.
NPIC-041-E-0136M B
TRIM SPECIFICATION B1AP04-HC MPCW-041-0007-B2AS-HS
041 NPIC-041-E-0106M
PSV NPIC-041-E-0153M 7. DESUPERHEATER TO BE IN VERTICAL POSITION.
0601
8. PARTIAL STROKE TEST FOR 041-UZV-0201 & 041-UZV-0202 SHALL BE
CARRIED OUT EVERY FOUR MONTHS.

FREE DRAINING
2"-HBFW-041-0003-B2AS-HS 2"-HBFW-041-0004-A2AS-PG
9. CONTROL VALVE AND BYPASS VALVE CV : 1.9 EACH, ARE USED FOR
DESUPERHEATED 041-MPS-01
MP STEAM 041-PSV-0601 SIZING WITH CONSIDERATION THAT 041-TV-0211A NOT
3"-MPS-041-0001-B1AS-HS 041 TO FAIL OPEN AT THE SAME TIME WITH 041-HV-0211 FULLY OPEN.
041-0006M UZ
1000
C TO 041-E-012
041
NPIC-041-E-0107M
C
UZ
DESUPERHEATED 041-MPS-01 0202
HIPPS
MP STEAM
NOTE 2 AT GRADE
6"-MPS-041-0002-B1AS-HSB
041-0014M TO SAFE LOCATION
TO 041-E-103 041 H
TIC
0211A L
STABILIZER BOTTOMS
20"-P-041-0094-B1AP04-HC FREE DRAINING NOTE 2

FREE DRAINING
041-0017M
TWO PHASE FLOW
TO 041-C-201 NOTE 5
D 3"-HBFW-041-0001-M2AS-HS D
041
TV
0211A NPIC-041-E-0107M
NOTE 9

3"-HBFW-041-0002-B2AS-HS
HBFW
Control system pressure at operation FC 5D MIN 041-3201M

pressure of MPS = 2.06 MPa(g) 041 041


2" 1.5" 2"
UZY UZY
0201A/B 0202A/B

NPIC-041-E-0158M
041 NOTE 2 NOTE 2
TG STRAIGHT RUN
0215 041 041 041 041
UZ UZ UZ UZ
E 0.75" 1000 0202
S S
0202 1000 041
HV
NPIC-041-E-0107M
E
041 H (x2) (x2) NOTE 9
PIC HIPPS HIPPS 0211
A. DELETED.
041-C-201 TL SYMMETRICAL 041 041 041 5D MIN
041-0017M 0207 TI 3" 3"
UZV UZV
ARRANGEMENT 0201 0202 0211B L 1. DELETED.
6"-MPS-041-0004-B1AS-HSB 041 C C 041 1.5"
14" 14" 041 UZY UZY NPIC-041-E-0158M 2. DELETED.
PT STRAIGHT RUN 2"

MIN
041 041 0201
PST
0202 PST
0207 PV 3. DELETED.
5625

PG NPIC-041-E-0106M 041 041


0.75" 0207
041-E-203 0226
NPIC-041-E-0106M NOTE 8 NOTE 8 LPT
N
TT
0211B
TT
0211A
4. DELETED.
RS
S 1.5" 041-MPS-01
6000 MIN
F CL 1" 3"
041 FC 6"
FC FC 66" 10
10" 10"
10 14"-MPS-041-0005-B1AS-HSB
14 MPS 041 0005 B1AS HSB MPS
F
TG
0.75" 3" 0.75"
0216 TSO TSO
6" MIN 6" 1000 5D MIN 10D MIN 041-3103M
6" NOTE 6
0.75" 4"
VERTICAL HORIZONTAL 1" 1"
VERTICAL

12"-MPS-041-0012-B1AS-HSB

NPIC-041-E-0136M
RS
S LPCW 0.75"-MPS-041-0018-B1AS-HS
0.75 MPS 041 0018 B1AS HS STRAIGHT STRAIGHT
6" ST 6"" STRAIGHT 041-DS-611 RUN RUN NPIC-041-E-0101M
0.75"
041-MPCW-01 041-3101M RUN
NOTE 7 0.75"-LPCW-041-0039-A2AS-PG

NPIC-041-E-0101M
LPCW

0.75"
ST
3"-MPCW-041-0003-B2AS-HS

0.75"-LPCW-041-0021-A2AS-PG TWO PHASE FLOW 041-3103M


NPIC-041-E-0146M

0.75"-MPS-041-0016-B1AS-HS
MPS 041 0016 B1AS HS
1" -TWO PHASE
LPCW FLOW
return line to LPCW Interconnecting 0.75" 0.75"-MPS-041-0020-B1AS-HS
MP NPIC-041-E-0101M
- LPCW return line to LPCW Interconnecting FEED DWG.No.
G Header Permanent Supply required
6"" 0.75" Header Permanent Supply required G
1500 MIN

0.75"-MPS-041-0019-B1AS-HS
0.75 MPS 041 0019 B1AS HS 0.75"-LPCW-041-0035-A2AS-PG LPCW
LPCW 0.75"-LPCW-041-0038-A2AS-PG ST 953053-120-19-A1 STABILIZER
ST TWO PHASE FLOW 041-3103M
041-3101M TWO PHASE FLOW 041 041 DWG.No. Title
UZ UZ REFERENCE DRAWINGS
0202 1000

0.75
0.75"-MPS-041-0021-B1AS-HS 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
STABILIZER BOTTOMS 0.75" HIPPS NOTE 2 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
16"-P-041-0093-B1AP04-HC NPIC-041-E-0101M NPIC-041-E-0101M 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-0017M
041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H FROM 041-C-201 LPCW 0.75"-LPCW-041-0040-A2AS-PG
ST
0.75"-MPS-041-0022-B1AS-HS
0.75 MPS 041 0022 B1AS HS FIC
0210
6"-LPCW-041-0008-B0JS-HS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3101M TWO PHASE FLOW Rev Date Description Prep'd Chk'd App'd
NOTE 2 TWO PHASE FLOW
041 REVISIONS
FT 041
FE 041 Operation Centre JOB Code:
0.75" 0210 FV Operation Centre DWG.No.:
0210
0210 Contractor JOB Code Responsible Company
6"-LPCW-041-0004-A2AS-HS LPCW
0-6495-20 TPM
NOTE
OT 1 FC TWO PHASE FLOW 041-3101M
Prepared by Checked by Approved by
1.5" NPIC-041-E-0157M
550 MIN

0.75" 0.75" T. T. HUONG T. NGUYEN T. N. SON


NPIC-041-E-0138M

I 10D MIN 6"-LPCW-041-0024-A0JS-HS I


3" TWO PHASE FLOW
LPCW 0.75"-LPCW-041-0031-A2AS-PG
G
ST
041-3102M TWO PHASE FLOW
NSRP
- LPCW return line to LPCW Interconnecting Complex Project
041-MPS-01 Nghi Son Refinery and Petrochemical
Header Permanent Supply required Limited Liability Company
DESUPERHEATED Nghi Son, Vietnam
MP STEAM
10"-MPS-041-0003-B1AS-HSB Drawing Title
041-0027M

J TO 041-E-302 PIPING AND INSTRUMENT DIAGRAM J


PENEX
STABILIZER AND SCRUBBER SECTION
STABILIZER REBOILER

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0018M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
12 13 14 15 16
Attachment : S-000-1730-0814M_0_0050 System No. : 041-MPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Package No. : 041-MPS-01-SV-1 1610 of 10
Page

041-E-302 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
DEISOHEXANIZER REBOILER
CODE ASME VIII DIV 1 / API 660
A TYPE: BJ12U
1. ORIFICE FLANGE AND CONTROL VALVE ASSEMBLY TO BE LOCATED
IN HORIZONTAL RUN AT REBOILER. ORIFICE WITH 84.33 MM HOLE.
A
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 1150 mm / 6100 mm / 289 m² 2. ACTIVATION OF 041-UZ-1000 AND 041-UZ-0301 FORCES 041-FIC-0307
TO MANUAL MODE AND 0% OUTPUT.
DESIGN DUTY 22841 kW
SIDE SHELL TUBE 3. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
0.45 MPa(g) + FV @ 143°C
DESIGN PRESSURE 2.80 MPa(g) + FV @ 232°C
NOTE 3 4. DELETED.
DESIGN TEMPERATURE 175 °C 350 °C 5. PLUG VALVE TO BE PROVIDED WITH MAX. OPENING LIMIT STOP AT
INSULATION TYPE HC HS CV : 46. NPIC-041-E-0107M

B TRIM SPECIFICATION A1AP04-HC MPCW-041-0009-B2AS-HS 6. EMERGENCY SHUTDOWN PUSH BUTTON. NPIC-041-E-0158M B


041-MPS-01
DESUPERHEATED
MP STEAM
10"-MPS-041-0003-B1AS-HSB
10 MPS 041 0003 B1AS HSB
041-0018M

FROM 041-DS-611

C C

D REBOILER RETURN
D
30"-P-041-0112-A1AP04-HC FREE DRAINING
041-0026M 041 CRIT
TWO PHASE FLOW HZA
TO 041-C-301
0310
NPIC-041-E-0106M
SYMMETRICAL ARRANGEMENT
NPIC-041-E-0158M
041
HZS NOTE 6
0310
REBOILER RETURN
30"-P-041-0113-A1AP04-HC FREE DRAINING
041-0026M 041
TWO PHASE FLOW 041
E TO 041-C-301
UZY
0301A/B
UZY
0302A/B
E
041 041
TG TG 041 041 041 041 A. DELETED.
0329 0330 UZ UZ UZ UZ
S S
1000 0301 0301 1000 1. DELETED.
(X2) (X2)
041-C-301 TL NOTE 2 HIPPS HIPPS NOTE 2 2. DELETED.
041-0026M
041 041
UZY UZY 3. DELETED.
0301 0302
1"
PST 041 041 PST
12'' 0.75'' 041-MPS-01 UZV UZV
5025

0301
0 030
0302
F C C
F
CL
1" RS 041 LPT FC FC
TG NPIC-041-E-0130M TSO TSO
0331 0.75'' 0.75'' 66"
S
RS 10" 10"

041-E-302 0.75'' 0.75"-MPS-041-0017-B1AS-HS


0.75 MPS 041 0017 B1AS HS 0.75"-LPCW-041-0032-A2AS-PG LPCW
ST
TWO PHASE FLOW 041-3103M
0.75'' 041-MPS-01

0.75" - LPCW return line to LPCW Interconnecting


FEED DWG.No.
Header Permanent Supply required
G G
0.75''

953053-120-26-A1 DEISOHEXANIZER REBOILER

6"-MPCW-041-0005-B2AS-HS
DWG.No. Title
REFERENCE DRAWINGS
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
UZ
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
1000
1500 MIN

B 11/NOV/13 FOR APPROVAL DMO RKM SMA


041
H UZ
NPIC-041-E-0158M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
0301 Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
Operation Centre DWG.No.:
041
FIC Contractor JOB Code Responsible Company
0307 0-6495-20 TPM
REBOILER FEED
24"-P-041-0111-A1AP04-HC NOTE 2 Prepared by Checked by Approved by
041-0026M 8"-LPCW-041-0011-B0JS-HS T. T. HUONG T. NGUYEN T. N. SON
FROM 041-C-301 TWO PHASE FLOW
041
I 041
FE
FT
0307 041 I
FV
0307 0307

NOTE 1 FC 10D MIN


8"-LPCW-041-0012-A2AS-HS
TWO PHASE FLOW
LPCW
041-3103M
NSRP
Complex Project
4" NO POCKET Nghi Son Refinery and Petrochemical
0.75'' NOTE 5 Limited Liability Company
0.75'' Nghi Son, Vietnam
600 MIN

Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
DEISOHEXANIZER SECTION
DEISOHEXANIZER REBOILER

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0027M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01
127(6

SECTION B UNIT 041 Package No. : 041-LPS-01-SV-1 Page 1 of 37

3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.34 MPa (g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY OPEN
)8//<23(1

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 2 of 37
: 041-LPS-01-SV-1 Page

BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041
Control system pressure
041 H 041
at 9operation
NOTE FROM INTERCONNECTING
AI 1'' 3. ORIFICE WITH 182.1 MM HOLE.
pressure
0351
of MPS = 0.34
AT MPa(g) 041 041
0351 NPIC-041-E-0109M PG TG - LPS supply from LPS Interconnecting Header.
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN - LPCW return line to LPCW Interconnecting5.Header NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M Permanent Supply required 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT 041-LPS-01 MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041 141-LPS-01S
041-LPN-01 WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004
PERMANENT LINE C
MP STEAM MP STEAM SUBJECT TO
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS
041-3103M 141-3002S SERVICE TEST
TO UNIT 041 MIN FROM INTERCONNECTING
1'' 1'' 1'' TEST POINT
041 MIN
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
0361 ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
041-LPS-01 E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 00.75"-FLG-041-3005-A1GP-HC
5 G 0 3005 G C
H 041-LPS-01
041-3103M
A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M 141-3012S

TO UNIT 041 LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
0.75" PENEX
UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041 041 041 041 041 041 041
TI FI 041 PI
TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 3 of 37
: 041-LPS-01-SV-1 Page
041-LPS-01 041-LPS-01 041-LPS-01 041-LPS-01 NPIC-041-E-0160M
NPIC-041-E-0129M

LP CONDENSATE WATER
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

STEAM TRACE MANIFOLD

CONDENSATE MANIFOLD
CONDENSATE WATER

CONDENSATE WATER
0014V AND D-000-1225-0020V TO 0026V.
N

FROM STEAM TRAP

FROM STEAM TRAP


A900-DM-005

A900-DM-004

A900-CM-004
041-0018M

041-0027M

041-0027M
FROM 041-E-302
1. HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.

TO CBD HEADER

TO FLG HEADER
A A

TO 041-P-301A/B
041-3702M

041-0031M

041-0030M

041-0026M

041-3503M

041-1301M

041-1301M

041-1001M
EL. 106000
AT GRADE

EL. 108000

TO BL HEADER
US-013

US-023
US-014

TO 041-C-301
TO 041-V-301

TO BL AREA

TO BL AREA
LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM

LP STEAM
1" EL.158300 PERMANENT LINE
11"-LPS-041-3038-A1AS-HS
LPS 041 3038 A1AS HS
LP HC US-021

LP
HC HC HC SUBJECT TO
SERVICE TEST
EL.146300
11"-LPS-041-3040-A1AS-HS
LPS 041 3040 A1AS HS
HC US-020 TEST POINT
0.75"-LPCW-041-0035-A2AS-PG

33"-LPS-041-0011-A1AS-HS
LPS 041 0011 A1AS HS

0.75"-LPS-041-3062-A1AS-HS
LPS 041 3062 A1AS HS

2"-LPS-041-3038-A1AS-HS
3"-LPS-041-0015-A1AS-HS

1.5"-LPS-041-3072-A1AS-HS
LPS 041 3072 A1AS HS
11"-LPS-041-3073-A1AS-HS
LPS 041 3073 A1AS HS

11"-LPS-041-3052-A1AS-HS
LPS 041 3052 A1AS HS
8"-LPCW-041-0012-A2AS-HS

0.75"-LPS-041-0033-A1AS-HS
LPS 041 0033 A1AS HS

1.5"-LPCW-041-3026-A2AS-PG
11"-LPS-041-3075-A1AS-HS
LPS 041 3075 A1AS HS

0.75"-LPS-041-3079-A1AS-HS
LPS 041 3079 A1AS HS

0.75"-LPS-041-3006-A1AS-HS
LPS 041 3006 A1AS HS

1.5"-LPS-041-3069-A1AS-HS
0.75"-LPCW-041-3037-A2AS-PG

0.75"-LPCW-041-0032-A2AS-PG
0.75"-LPS-041-3080-A1AS-HS

0.75"-LPS-041-3061-A1AS-HS
LPS 041 3061 A1AS HS

0.75"-LPS-041-0030-A1AS-HS
LPS 041 0030 A1AS HS
EL.137700
11"-LPS-041-3041-A1AS-HS
LPS 041 3041 A1AS HS
B HC US-019 - LPCW return line to LPCW B
NPIC-041-E-0102M

TWO PHASE FLOW


TWO PHASE FLOW

NPIC-041-E-0129M

TWO PHASE FLOW

TWO PHASE FLOW


Interconnecting Header
EL.127750
11"-LPS-041-3042-A1AS-HS
LPS 041 3042 A1AS HS
HC US-018
Permanent Supply required

EL.116950

0.75
11"-LPS-041-3043-A1AS-HS
LPS 041 3043 A1AS HS

1.5

0.75
0.75

0.75
0.75

0.75
HC US-017
0.75"
MIN

C EL.107900 C

MIN
0.75" 1"-LPS-041-3044-A1AS-HS
S0
HC US-016
ST

LP STEAM
2"-LPCW-041-3053-A2AS-PG

0.75"-LPCW-041-3041-A2AS-PG

0.75"-LPS-041-0029-A1AS-HS
0.75 LPS 041 0029 A1AS HS
041-0029M

2"-LPS-041-3084-A1AS-HS

NPIC-041-E-0129M
4"-LPS-041-3078-A1AS-HS
TO 041-P-303A/B
TWO PHASE FLOW

MIN
M LP STEAM
0.75"-LPS-041-0028-A1AS-HS
0.75 LPS 041 0028 A1AS HS
041-0028M
MIN

MIN
TO 041-P-302A/B
D MIN
M AT GRADE D
1"-LPS-041-3083-A1AS-HS
HC US-024

2"-LPS-041-3046-A1AS-HS
S
NPIC-041-E-0163M
NPIC-041-E-0153M
MIN

NPIC-041-E-0163M
MIN 0.75"

MIN
22"-LPS-041-3053-A1AS-HS
LPS 041 3053 A1AS HS
NPIC-041-E-0153M

NPIC-041-E-0153M
0.75" NPIC-041-E-0163M MIN

ST EL.118500

ST
MIN 11"-LPS-041-3039-A1AS-HS
LPS 041 3039 A1AS HS 041-LPS-01
E 041-LPS-01 0.75"-LPCW-041-3052-A1AS-PG
LPCW
W
W-
HC US-022 E
LP STEAM LP STEAM

MIN
TWO PHASE FLOW 10"-LPS-041-3001-A1AS-HS 10"-LPS-041-3001-A1AS-HS
0 S 0 300 S S
041-3102M 041-1301M
6"" 0.75"

0.75"-LPCW-041-3018-A2AS-PG
FROM / TO UNIT 41 00.75"-LPCW-041-3011-A2AS-PG FROM / TO BL
NPIC-041-E-0153M ST MIN
TWO PHASE FLOW
0.75"

TWO PHASE FLOW


0.75"-LPCW-041-3049-A2AS-PG
ST
0.75"-LPS-041-3059-A1AS-HS TWO PHASE FLOW
0.75" MIN MIN
MIN
F 2"-LPCW-041-3034-A2AS-PG F
TWO PHASE FLOW
LP
CONDENSATE WATER 0.75"

MIN

MIN

MIN
3"-LPCW-041-3001-A2AS-PG FREE DRAINING NOTE 1 FREE DRAINING
041-3102M
TWO PHASE FLOW
TO 041-V-614
0.75"-LPCW-041-3012-A2AS-PG
- LPCW return line to LPCW Interconnecting
TWO PHASE FLOW NPIC-041-E-0163M
Header Permanent Supply required
MP STEAM
4"-MPS-041-3001-B1AS-HS
041-3102M MP STEAM FEED DWG.No.
G G

NPIC-041-E-0119M
TO 041-EJ-611 0.75"-MPS-041-3003-B1AS-HS 0.75"
041-1301M
ST 3"
NPIC-041-E-0129M FROM BL
NPIC-041-E-0163M NPIC-041-E-0153M
MIN 14"-MPS-041-3001-B1AS-HS
LP MIN 2"-LPCW-041-3042-A2AS-NI DWG.No. Title
CONDENSATE WATER 0.75"
REFERENCE DRAWINGS
8"-LPCW-041-3002-A2AS-HS TWO PHASE FLOW
041-3102M 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
0.75" 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
TO 041-V-613

0.75"-LPCW-041-3017-A2AS-PG
NPIC-041-E-0142M 0.75" 0 11/APR/14 FOR CONSTRUCTION TTH RKM SMA
NPIC-041-E-0142M B - NOT ISSUED DMO RKM SMA
MIN

NPIC-041-E-0129M
NPIC-041-E-0153M
H NPIC-041-E-0153M A - NOT ISSUED DMO RKM SMA H

TWO PHASE FLOW


33"-LPS-041-3045-A1AS-HS
LPS 041 3045 A1AS HS Rev Date Description Prep'd Chk'd App'd
REVISIONS
MIN

MIN
MIN

MIN

MIN
Operation Centre JOB Code:
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0-6495-20 TPM
0.75"
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON
NPIC-041-E-0129M

ST

I I

0.75"-LPCW-041-0039-A2AS-PG

0.75"-LPCW-041-0045-A2AS-PG

0.75"-LPCW-041-0043-A2AS-PG

0.75"-LPCW-041-0044-A2AS-PG
1.5"-LPCW-041-3025-A2AS-PG

14"-MPS-041-0005-B1AS-HSB
0.75"-LPS-041-0031-A1AS-HS
LPS 041 0031 A1AS HS
1"-LPS-041-3058-A1AS-HS

22"-LPS-041-0016-A1AS-HS
LPS 041 0016 A1AS HS

11"-LPS-041-0017-A1AS-HS
LPS 041 0017 A1AS HS

22"-LPS-041-3064-A1AS-HS
LPS 041 3064 A1AS HS

11"-LPS-041-0019-A1AS-HS
LPS 041 0019 A1AS HS

22"-LPS-041-0018-A1AS-HS
LPS 041 0018 A1AS HS

11"-LPS-041-3047-A1AS-HS
LPS 041 3047 A1AS HS
NSRP

TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW

Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title
0.75

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
UNIT 041
STEAM AND CONDENSATE - 3
HC
CONDENSATE MANIFOLD

HC

CONDENSATE WATER

CONDENSATE WATER

CONDENSATE WATER

CONDENSATE WATER
AT GRADE
AT GRADE

FROM STEAM TRAP


US-038
US-037

041-0018M
041-0101M
041-0101M

041-0102M
041-0101M

041-3702M

041-0102M

FROM 041-EJ-612

FROM 041-EJ-614

FROM 041-EJ-613
A900-CM-003

Issue Purpose Document Class

041-0018M

041-0101M

041-3702M

041-0102M

TO 041-DS-611
TO 041-EJ-612

TO 041-EJ-614
TO 041-V-612

TO 041-V-615
TO 041-V-612

FOR CONSTRUCTION Z
(041-EJ-613)
(041-V-612)

MP STEAM
LP STEAM
LP STEAM

LP STEAM
LP STEAM

LP STEAM

LP STEAM

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE
LP

LP

LP

LP
DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3103M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 4 of 37
: 041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

0.75"-LPCW-041-3035-A2AS-PG
CONDENSATE MANIFOLD

CONDENSATE MANIFOLD
STEAM TRACE MANIFOLD

STEAM TRACE MANIFOLD

STEAM TRACE MANIFOLD


0014V AND D-000-1225-0020V TO 0026V.

CONDENSATE WATER

CONDENSATE WATER
N

A900-DM-002

A900-DM-001

A900-DM-003

A900-CM-001

A900-CM-002
TWO PHASE FLOW

041-0018M
1. HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.
A A

041-0111M

041-0111M
041-0021M

MIN

STEAM TRAP
TO 041-V-613

TO 041-V-614
TO 041-C-202
0.75"

LP STEAM
0.75"-LPCW-041-3016-A2AS-PG

LP STEAM
ST
TWO PHASE FLOW

EL. 118500
EL.121050

EL.113900

EL.102550
US-008

US-007

US-006

US-015

LP

LP
PERMANENT LINE

NPIC-041-E-0157M
MIN AT GRADE SUBJECT TO
11"-LPS-041-3033-A1AS-HS
LPS 041 3033 A1AS HS
HC HC HC HC US-009 HC SERVICE TEST

NPIC-041-E-0158M
1" MIN
TEST POINT
1.5"-LPS-041-3074-A1AS-HS

3"-LPS-041-0003-A1AS-HS

1.5"-LPS-041-3068-A1AS-HS
LPS 041 3068 A1AS HS
B 1"-LPS-041-3034-A1AS-HS
EL.110000 B

1.5"-LPCW-041-3028-A2AS-PG

0.75"-LPCW-041-0031-A2AS-PG
3"-LPCW-041-0013-A2AS-PG

1.5"-LPCW-041-3024-A2AS-PG
1.5"-LPS-041-3071-A1AS-HS
LPS 041 3071 A1AS HS

10"-LPCW-041-0005-A2AS-HS
0.75"-LPCW-041-3036-A2AS-PG
11"-LPS-041-3024-A1AS-HS
LPS 041 3024 A1AS HS

1"-LPS-041-3025-A1AS-HS
HC US-010

AT GRADE

11"-LPS-041-3070-A1AS-HS
LPS 041 3070 A1AS HS
US-012
NPIC-041-E-0160M

TWO PHASE FLOW


TWO PHASE FLOW

TWO PHASE FLOW


TWO PHASE FLOW
- LPCW return line to LPCW

TWO PHASE FLOW

TWO PHASE FLOW


041-LPS-01
22"-LPS-041-3032-A1AS-HS
LPS 041 3032 A1AS HS
Interconnecting Header
LP STEAM HC
NPIC-041-E-0129M

10"-LPS-041-0012-A1AS-HS
10 LPS 041 0012 A1AS HS Permanent Supply required
041-0111M
NO POCKET
MIN FROM 041-V-613
1.5

NPIC-041-E-0102M
NPIC-041-E-0153M
NPIC-041-E-0160M
1.5
MIN EL.105900
1"-LPS-041-3035-A1AS-HS
C HC US-011 C

11"-LPS-041-3037-A1AS-HS
LPS 041 3037 A1AS HS
MIN 041-LPS-01
LP STEAM
11"-LPS-041-0004-A1AS-HS
LPS 041 0004 A1AS HS

FREE DRAINING

FREE DRAINING
041-0025M

4" TO 041-V-211

MIN

MIN
22"-LPS-041-0004-A1AS-HS
LPS 041 0004 A1AS HS

MIN
0.75"

M
4"

N
MIN
D 0.75" D
10"-LPS-041-3003-A1AS-HS

ST
3""
0.75" 0.75"-LPCW-041-3050-A1AS-PG
ST 041-LPS-01
TWO PHASE FLOW
LP STEAM
0.75"-LPS-041-0027-A1AS-HS
0.75" 041-0025M

TO 041-P-213A/B 041-LPS-01
E 041-LPS-01 E
MIN

LP STEAM LP STEAM

MIN

MIN

MIN
10"-LPS-041-3001-A1AS-HS A. DELETED.
6"
041-3101M 041-3103M
1. DELETED.

MIN

MIN

MIN
FROM / TO UNIT 41 6" FROM / TO BL

MIN
2"-LPCW-041-3048-A1AS-PG
2. DELETED.
0.75"-LPS-041-3057-A1AS-HS
0.75 LPS 041 3057 A1AS HS

NPIC-041-E-0153M
ST
3. DELETED.
NPIC-041-E-0153M 0.75"
NPIC-041-E-0160M 0.75"-LPCW-041-3051-A1AS-PG 0.75"-LPCW-041-3010-A2AS-PG 4. DELETED.
NPIC-041-E-0162M
TWO PHASE FLOW TWO PHASE FLOW

NPIC-041-E-0163M
0.75"
F MIN F
2"-LPCW-041-3033-A2AS-PG NPIC-041-E-0162M
TWO PHASE FLOW
LP 0.75" LP

MIN
CONDENSATE WATER FREE DRAINING FREE DRAINING CONDENSATE WATER
3"-LPCW-041-3001-A2AS-PG NOTE 1
041-3101M 041-3103M
TWO PHASE FLOW
FROM HEADER FROM HEADER

MP STEAM MP STEAM FEED DWG.No.


G 041-3101M
4"-MPS-041-3001-B1AS-HS 4"-MPS-041-3001-B1AS-HS
041-3103M
G
TO UNIT 041 NPIC-041-E-0163M FROM BL
3"
DWG.No. Title
0.75"-LPCW-041-3027-A2AS-PG REFERENCE DRAWINGS
ST 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
TWO PHASE FLOW 0.75" 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 11/APR/14 FOR CONSTRUCTION TTH RKM SMA
0.75" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75"-MPS-041-3004-B1AS-HS A - NOT ISSUED DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LP LP Operation Centre JOB Code:
CONDENSATE WATER CONDENSATE WATER Operation Centre DWG.No.:
6"-LPCW-041-3002-A2AS-HS FREE DRAINING FREE DRAINING 8"-LPCW-041-3002-A2AS-HS
041-3101M 041-3103M Contractor JOB Code Responsible Company
TWO PHASE FLOW TWO PHASE FLOW 0-6495-20 TPM
TO 041-V-613 10" TO 041-V-613
Prepared by Checked by Approved by
MIN T. T. HUONG T. NGUYEN T. N. SON

11"-LPS-041-3028-A1AS-HS
LPS 041 3028 A1AS HS
11"-LPS-041-3026-A1AS-HS
LPS 041 3026 A1AS HS

NPIC-041-E-0146M

I I

NSRP
0.75"-LPS-041-3050-A1AS-HS
LPS 041 3050 A1AS HS

0.75"-LPS-041-3081-A1AS-HS
LPS 041 3081 A1AS HS
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J HC HC PIPING AND INSTRUMENT DIAGRAM J


PENEX
AT GRADE

AT GRADE
US-035

US-036
0.75

0.75
UNIT 041
STEAM AND CONDENSATE - 2
041-3502M

041-3502M
TO FLG HEADER

TO FLG HEADER
Issue Purpose Document Class
FOR CONSTRUCTION Z
LP STEAM

LP STEAM

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
041-LPS-01
A1

041-LPS-01
D-041-1225-3102M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
J

K
A1

I
F
E
B
A

H
D
C

IN
10-SE
MIN
2"-LPN-041-3005-A1AA-NI

NOTE 1
2"-LPN-041-3038-A2AS-NI
NPIC-041-E-0162M

P-2 1
1

PG
041

RO
041
NPIC-041-E-0137M

041-LPS-01

0373
0.75"

0371
0.75"
NPIC-041-E-0162M

5
DR01A
MIN

FI
ST

041

LPN
0371

041-3601M
1"
1"

0.75"
0.75"
2"
LP STEAM LP STEAM

NPIC-041-E-0162M
NPIC-041-E-0129M 0.75"-LPS-041-3007-A1AS-HS
0.75 LPS 041 3007 A1AS HS
0.75"-LPS-041-0023-A1AS-HS

2
2

041-0020M 041-3401M

TO 041-P-201A/B EL.104000 TO FG HEADER


1"-LPS-041-3017-A1AS-HS
US-025

HC
MIN
AT GRADE 33"-LPS-041-3011-A1AS-HS
LPS 041 3011 A1AS HS
1"-LPS-041-3018-A1AS-HS MIN LP STEAM
041-LPS-01

US-026

HC
0.75"-LPS-041-0026-A1AS-HS
0.75 LPS 041 0026 A1AS HS

TWO PHASE FLOW


LP STEAM 041-0024M
22"-LPS-041-0014-A1AS-HS
LPS 041 0014 A1AS HS

0.75"-LPCW-041-3013-A2AS-PG
041-0019M TO 041-P-212
TO 041-V-201 AT GRADE

MIN
N
MIN

MIN
N
2"-LPS-041-3063-A1AS-HS
11"-LPS-041-3012-A1AS-HS
LPS 041 3012 A1AS HS

41
US-001
HC

NPIC-041-E-0129M

3
3

NPIC-041-E-0129M
0.75"-LPCW-041-3032-A2AS-PG
NPIC-041-E-0163M ST LP STEAM

2"
TWO PHASE FLOW 0.75"-LPS-041-3008-A1AS-HS
0.75 LPS 041 3008 A1AS HS
041-3701M

0.75"
2"-LPCW-041-3030-A2AS-PG
LP STEAM MIN TO CCB HEADER
0.75"-LPS-041-3048-A1AS-HS
0.75 LPS 041 3048 A1AS HS LP STEAM
041-3501M
0.75"-LPS-041-3055-A1AS-HS
0.75 LPS 041 3055 A1AS HS
041-3701M
041-LPS-01

TO FLG HEADER 0.75"-LPCW-041-3014-A2AS-PG


ST
LP STEAM TO CBD HEADER
MIN

0.75"-LPS-041-3005-A1AS-HS
0.75 LPS 041 3005 A1AS HS TWO PHASE FLOW
041-3701M
0.75"

4
4

MIN EL.118500
TO CBD HEADER 11"-LPS-041-3013-A1AS-HS
LPS 041 3013 A1AS HS
US-002
HC

041-LPS-01
LP STEAM
33"-LPS-041-0008-A1AS-HS
LPS 041 0008 A1AS HS
041-0017M

MIN
TO 041-C-201

22"

MIN
MIN
1.5"-LPCW-041-3021-A2AS-PG
A900-CM-007
TWO PHASE FLOW CONDENSATE MANIFOLD

2"
EL.108050 NPIC-041-E-0129M
11"-LPS-041-3021-A1AS-HS
LPS 041 3021 A1AS HS NPIC-041-E-0153M

0.75"
US-028

HC

5
5

0.75"
MIN

ST
EL.122500
11"-LPS-041-3020-A1AS-HS
LPS 041 3020 A1AS HS
MIN

US-029

HC
0.75"-LPCW-041-3015-A2AS-PG
G MIN LP STEAM
ST 0.75"-LPS-041-3049-A1AS-HS
0.75 LPS 041 3049 A1AS HS
EL.133950 041-3501M
TWO PHASE FLOW

1"
22"-LPS-041-3019-A1AS-HS
LPS 041 3019 A1AS HS
0.75"

US-030

HC
TO FLG HEADER

NPIC-041-E-0153M
NPIC-041-E-0102M
EL.117800

NPIC-041-E-0129M
AT GRADE 1"-LPS-041-3015-A1AS-HS
US-003
HC

1 LPS 041 3022 A1AS HS


1"-LPS-041-3022-A1AS-HS
US-027

HC
0.75"-LPS-041-3067-A1AS-HS
TWO PHASE FLOW
MIN

6
6

1.5"-LPS-041-3065-A1AS-HS
5 S 0 3065 AT GRADE
1"-LPS-041-3016-A1AS-HS
S 041 3016 A1AS HS

AS
A900-DM-007 US-004
HC

STEAM TRACE MANIFOLD NPIC-041-E-0162M

00.75"-LPCW-041-3019-A1AS-PG
LP STEAM
33"

LP CONDENSATE

3"
0.75"-LPCW-041-0021-A2AS-PG 0.75"-LPS-041-0022-A1AS-HS
0.75 LPS 041 0022 A1AS HS
2"-LPS-041-3014-A1AS-HS 041-0015M
041-0018M

2"
TWO PHASE FLOW TO 041-R-101A/B
FROM STEAM TRAP NPIC-041-E-0129M
LP STEAM MIN
0.75"-LPS-041-0021-A1AS-HS
0.75 LPS 041 0021 A1AS HS
041-0011M

TO 041-P-001A/B
0.75"
3""

7
7

LP STEAM
22"-LPS-041-0001-A1AS-HS
LPS 041 0001 A1AS HS
041-0010M
LP CONDENSATE WATER
NPIC-041-E-0149M

MIN
TO 041-V-112 MIN
NPIC-041-E-0162M 0.75"-LPCW-041-0038-A2AS-PG
041-0018M
AT GRADE TWO PHASE FLOW
11"-LPS-041-3023-A1AS-HS
LPS 041 3023 A1AS HS NPIC-041-E-0160M FROM STEAM TRAP
US-031

HC
44"

MIN
0.75"

0.75"-LPCW-041-3040-A2AS-PG LP CONDENSATE WATER


0.75"-LPCW-041-0030-A2AS-PG
041-0014M

8
8

TWO PHASE FLOW


TWO PHASE FLOW
0.75"

NPIC-041-E-0163M NPIC-041-E-0149M FROM STEAM TRAP


MIN

LP CONDENSATE WATER
0.75

6"-LPCW-041-0004-A2AS-HS LP CONDENSATE WATER


041-0018M 4"-LPCW-041-0002-A2AS-HS
TWO PHASE FLOW 041-0014M
FROM 041-E-203 TWO PHASE FLOW
FROM 041-E-103

NPIC-041-E-0138M AT GRADE
NPIC-041-E-0162M

11"-LPS-041-3036-A1AS-HS
LPS 041 3036 A1AS HS
US-005
HC

NPIC-041-E-0138M

1.5"-LPS-041-3066-A1AS-HS
1.5 LPS 041 3066 A1AS HS
A900-DM-006

9
9

LPS 041 3056 A1AS HS


0.75"-LPS-041-3056-A1AS-HS

STEAM TRACE MANIFOLD


MIN

LP STEAM
MIN

44"-LPS-041-3077-A1AS-HS
LPS 041 3077 A1AS HS 33"-LPS-041-0009-A1AS-HS
LPS 041 0009 A1AS HS
041-0022M
MIN TO 041-E-204
041-LPS-01

MIN
MIN
MIN
MIN
0.75"
MIN

MP STEAM
3"

MIN
4"-MPS-041-0008-B1AS-HS
041-0013M

0.75"
22"

TO 041-EJ-611

041-0006M
0.75"

A
FROM STEAM TRAP
AP
22"

ST
MIN
10

10
LP CONDENSATE WATER
3"-LPS-041-0007-A1AS-HS

ST
0.75
0.75
0.75"

ST
FREE DRAINING

NPIC-041-E-0163M
ST

06

-A1AS-HS
LPS 041 3029 A1AS HS
11"-LPS-041-3029-A1AS-HS
LPS 041 3030 A1AS HS
11"-LPS-041-3030-A1AS-HS
S S
2"-LPS-041-0006-A1AS-HS
LPS 041 0005 A1AS HS
11"-LPS-041-0005-A1AS-HS
22"-LPS-041-0024-A1AS-HS

TWO PHASE FLOW


NPIC-041-E-0149M
LPS 041 3063 A1AS HS
0.75"-LPS-041-3063-A1AS-HS
LPS 041 0020 A1AS HS
0.75"-LPS-041-0020-A1AS-HS

0.75"-LPS-041-0034-A1AS-HS

LPS 041 3031


11"-LPS-041-3031

11
11

0.75"-MPS-041-3002-B1AS-HS

MIN LP STEAM
FREE DRAINING

0.75"-LPCW-041-0029-A2AS-PG

0.75"-LPS-041-0025-A1AS-HS
0.75 LPS 041 0025 A1AS HS
NPIC-041-E-0160M

041-0023M
TWO PHASE FLOW

TWO PHASE FLOW

TO 041-P-202A/B
041-LPS-01

0.75"-LPCW-041-3008-A2AS-PG

LP STEAM
LP STEAM
LP STEAM
LP STEAM
LP STEAM
LP STEAM

LP CONDENSATE WATER
HC
HC

TO 041-V-001

0.75"-LPCW-041-0037-A2AS-PG
TWO PHASE FLOW

0.75"-LPCW-041-3009-A2AS-PG

041-0013M
NPIC-041-E-0162M

041-0011M
041-0008M
041-3701M
041-0004M
041-0008M
041-0006M

TO 041-E-011A/B

TO CBD HEADER

TWO PHASE FLOW


TO 041-DR-001A/B
TO 041-DR-051A/B
TO 041-DR-001A/B

FROM STEAM TRAP


0.75"-LPCW-041-3047-A2AS-PG

TWO PHASE FLOW


6"-LPS-041-3001-A1AS-HS

US-032
US-034
HC US-033

EL.105300
EL.103000
EL.110000
3"-LPCW-041-3001-A2AS-PG

MIN
12
12

NPIC-041-E-0090M
TWO PHASE FLOW

041-LPS-01

NPIC-041-E-0160M

MIN
041-LPS-01
0.75"

6"-LPCW-041-3002-A2AS-HS

0.75"-LPCW-041-3020-A2AS-PG LP CONDENSATE WATER


NPIC-041-E-0160M
NPIC-041-E-0102M
041-LPS-01

TWO PHASE FLOW 0.75"-LPCW-041-0026-A2AS-PG 041-0022M


TWO PHASE FLOW
0.75"-LPCW-041-3039-A2AS-PG FROM 041-E-204
TWO PHASE FLOW MIN LP STEAM
CONDENSATE MANIFOLD 0.75"-LPS-041-0024-A1AS-HS
0.75 LPS 041 0024 A1AS HS
TWO PHASE FLOW

1.5"-LPCW-041-3022-A2AS-PG 041-0022M
A900-CM-005
NPIC-041-E-0129M

13
13

NPIC-041-E-0102M NPIC-041-E-0119M TO 041-P-203A/B


MIN

2"-LPCW-041-3031-A2AS-PG
041-LPS-01

LP CONDENSATE WATER LP CONDENSATE WATER


3"-LPCW-041-0019-A2AS-HS 0.75"-LPCW-041-0040-A2AS-PG
041-0006M 041-0018M
TWO PHASE FLOW TWO PHASE FLOW
NOTE 2

FROM 041-E-012 FROM STEAM TRAP

NPIC-041-E-0138M
LP
LP

FROM BL
Header Permanent Supply required
LP STEAM

MP STEAM

TO 041-V-613
TO 041-V-614
FROM / TO BL

041-3102M
041-3102M
041-3102M

041-3102M

14
14

041-LPS-01
N

CONDENSATE WATER
CONDENSATE WATER
- LPCW return line to LPCW Interconnecting

4"-MPS-041-3001-B1AS-HS

0
1
2

A
B

Rev
1.

1.
2.

6.
5.
3.
2.

4.
A.

A.

041
Prepared by

Drawing Title
Date

Issue Purpose
13/JUL/13
08/JUN/15

11/APR/14
11/NOV/13
28/NOV/14
DWG.No.
DELETED.

DELETED.
DELETED.

DELETED.
DELETED..

DELETED.
DELETED.

Complex Project

Contractor DWG.No.
Contractor JOB Code

Nghi Son, Vietnam


FEED DWG.No.

T. T. HUONG

NSRP

Unit No. Unit Abbreviation


Operation Centre DWG.No.:

PENX
Operation Centre JOB Code:
Package No. 15

15
FOR REVIEW
FOR APPROVAL

D-041-1225-3101M
FOR CONSTRUCTION
Checked by
FOR CONSTRUCTION
FOR CONSTRUCTION
FOR CONSTRUCTION

0-6495-20

PCWBS
A900
Description
REVISIONS

UNIT 041
T. NGUYEN
0014V AND D-000-1225-0020V TO 0026V.

TEST POINT

PENEX UNIT

Size
SUBJECT TO

Sheet
REFERENCE DRAWINGS
RESTRICTION ORIFICE WITH 2.243 MM HOLE.

SERVICE TEST

A1
Title
Interconnecting Header
PERMANENT LINE

Document Class

001 OF 001
STEAM AND CONDENSATE - 1
TTH
TTH
TTH

Z
: 041-LPS-01-SV-1 Page

16
Permanent Supply required

Approved by

PIPING AND INSTRUMENT DIAGRAM


Limited Liability Company

Rev.
HEADER COLLECTING CONDENSATE FROM STEAM TRAPS.

Scale

NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
- LPCW return line to LPCW

TPM
TN
DM

2
Nghi Son Refinery and Petrochemical
T. N. SON
Responsible Company

NONE
FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

16 5 of 37

TNS
TNS

RKM JMD

DMO RKM SMA


DMO RKM SMA

Prep'd Chk'd App'd

J
F

K
E
B
A

H
D
C

G
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 6 of 37
: 041-LPS-01-SV-1 Page

041-DR-051A
1"-V-041-0023-A1AP-NI NPIC-041-E-0158M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
MAKE-UP GAS DRIER
TO ATM 041 0014V AND D-000-1225-0020V TO 0026V.
SIZE: 1.5F2 CODE ASME VIII DIV 1 FI
AT SAFE 0054 SIGNAL 1. RESTRICTION ORIFICE WITH 5 MM HOLE.
PSET: 4.30 MPa(g) SIZE:I.D x TT
A 6"-FLG-041-0005-A1AP-NI 041
600 mm x 6900 mm LOCATION L
041-0008M
A
MODE NORMAL REGEN. 2. SIGHT GLASS TO BE LOCATED ABOVE DRIER.

PIP.
PSV
0005 4.30 MPa(g) + FV @ 40 °C 2.00 MPa(g) TO 041-AY-0001
DESIGN PRESSURE 3. RESTRICTION ORIFICE WITH 3 MM HOLE.

INST.
FLG FREE DRAINING DESIGN TEMPERATURE 200 °C 345 °C 3"-P-041-0036-B1AH04-NI 4. START-UP PRESSURING.
INSULATION TYPE HC 041 041 MAKE-UP GAS
041-3501M 5. RESTRICTION ORIFICE WITH 8 MM HOLE.
FT AT 041-0005M
TRIM SPECIFICATION P-041-0281-B2AH04-HC 0054 0001A
MOIS NPIC-041-E-0141M 6. LIQUID FILLING AND REGENERANT CIRCULATION.
FLG 1.5"-FLG-041-0065-A1AP-NI MIN NPIC-041-E-0141M MIN TO 041-E-101
041-3501M FREE DRAINING FREE DRAINING 1"-P-041-0037-B1AH04-NI 7. VACUUM PURGE CONNECTION TO BE DISCONNECTED AND
VALVE MODE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E INDICATION VALVE COMMAND BLANK-OFF WHEN NOT IN USE.
B B

E
NOTE 8 NOTE 8 (LOCAL/SEQUENCE) INDICATION

MIN
041
UV Z LOCAL 8. ELECTRICAL TRACING.

E
041 041
041 0.75" 0081 XA XI MODE MAINTAINING TEMPERATURE: 43°C.
PDI 0.75"-LPN-041-0012-A1AA-NI

E
E
041 Y 2" 0079 L 0080 041
0054 HS 9. 041-DR-051A/B TO BE LOCATED AS CLOSE AS POSSIBLE TO 041-E-012

E
E
UV
0071A LPN 1" 0053B AND 041-H-011 (DWG. D-041-1225-0006M).

E
NPIC-041-E-0151M

E
041 041-3601M 10. VALVE SWITCHING MANIFOLD TO BE ACCESSIBLE FROM PLATFORM.

E
041 UV
041 041 0.75" 0.75"

NPIC-041-E-0141M
US PDT RO 0072A NPIC-041-E-0151M 11. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.

E
3"-P-041-0133-B2AH04-HC
0003 0054 0051 041-LPS-01 0.75"
DRCS X 0.75"-LPS-041-0020-A1AS-HS 0.75"-P-041-0257-B1AH04-HC X

E
12. DELETED.
NOTE 1 041
C 041 C

E
UV 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO DRIERS.
NOTE 2 LPS US

E
0072B

MIN.
E
041-3101M 0003 14. HIGH LEVEL AT 041-LI-0056 SHALL STOP FILLING UP STEP IN DRCS
1" DRCS

E
041
1.5"-P-041-0294-B2AH04-HC
SG 041 041

E
SG 0.75" 0.75" 1" FC SEQUENCE DURING REGENERATION.
NOTE 14 UV UV

E
1009 041

E
041 041 0064A 0064B UV 041 041 15. VALVE TO BE PROVIDED WITH SPRING LOADED STUFFING BOX WITH

3"-P-041-0033-B2AP04-HC
E
041 UV UV 041 0.75"
LI 0063 HIC HS

E
0070A 0065A X X OPTION CODE "4604".
UV

NPIC-041-E
NPIC-041-E-0105M

E
0053 0053A

-0141M
0056 Y 0065B

E
VALVE COMMAND 16. ORIFICE WITH 7.7 MM HOLE. NPIC-041-E-0158M
SEQUENCE
FREE DRAINING

3" 3"

E
(LOCAL MODE) MODE
041 041 17. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.

E
041 TYPE 1 Y UV UV Y
041 18. CENTER OF RANGE.
US
D D

E
0056B 0056A NPIC-041-E-0151M

E
LT NPIC-041-E-0090M
DRCS
0003 NOTE 18 0056 X
1" X 1"

E
GWR
NPIC-041-E-0105M Y 1" Y 1" NPIC-041-E-0105M 041
PERMANENT LINE
FREE DRAINING 041 041

E
041
NPIC-041-E-0151M

NPIC-041-E-0158M

UV IFO US FAL SUBJECT TO


041 041 0066B FT

E
041 0051 0003 0051 SERVICE TEST

FREE DRAINING

FREE DRAINING
PI UV UV NOTE 16 DRCS

NPIC-041-E-0105M
0061A 0061B

NPIC-041-E-0105M
CBD

E
0055 X X 041
1000

041 041
041 041 041 FE FI
041 041 UV

INST.

INST.
UV UV UV

MIN.
MIN.
0051 0051 TEST POINT
PG PT 0.75" 0062A 0059A 0059B 0062B 0.75"
NPIC-041-E-0090M 0067 0055 041
MIN.

MIN.
2" UV X X X X

PIP.
PIP.
NOTE 17 NOTE 17 MAKE - UP GAS
0066A 3" 3" 3"-P-041-0035-B2AH04-HC
E 041-0005M E
TOP CONNECTION TOP CONNECTION FROM / TO 041-DR-051B A. DELETED.
NOTE 15 NOTE 15
Y 1" Y 1"
3"-P-041-0131-B2AH04-HC

041 041
FREE DRAINING

FREE DRAINING
UV UV
MW 0060A 0060B

FREE DRAINING

FREE DRAINING
INERT CERAMIC BALLS FREE DRAINING
F WIRE MESH SCREEN F
REGENERATION DRAIN
FREE DRAINING 1.5"-P-041-0034-A1AH04-PG
041-0010M

TO 041-V-112
041-DR-051A 3"-P-041 C
2AH04-P
-0132-B2A NPIC-041-E-0097M
H04-PC -0032-B
MOLECULAR SIEVES NOTE 9,10,11,13 3"-P-041 NPIC-041-E-0097M
041 041
UV UV 300 #
0058A NPIC-041-E-0151M 0058B FEED DWG.No.
NOTE 7
G Y
041 041
Y G
HH US PDI 041
300 # UV NC
0003 0058 1"
12" NOTE 7 1" X DRCS 0057B
X START-UP PURGE
INERT CERAMIC BALLS NC 041 2"-P-041-0031-A1AP04-NI 953053-120-07-A1 MAKE-UP GAS DRIER A
041 041-0013M DWG.No. Title

FREE DRAINING
UV
FREE DRAINING

PDT
TL 0057A 0058 REFERENCE DRAWINGS
TO 041-EJ-611
041 041 041 041 041 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
UV UV UV UV
MIN

MIN
PG 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0068 0054A 0053A 0053B 0054B
SCREEN 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
8" MIN X X X X MIN B 11/NOV/13 FOR APPROVAL DMO RKM SMA
MAKE - UP GAS
3000 MIN

H 3" 3" 3"-P-041-0028-B2AH04-HC


041-0005M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
041 NOTE 15
NPIC-041-E-0141M

NPIC-041-E-0158M 041 NOTE 15 041 041


FROM / TO 041-DR-051B REVISIONS
UV UV UV UV
2" 0069A LPT LPT Operation Centre JOB Code:
0055A 0055B 0069B
X 3" Y NC 0.75" NC 0.75" X 3" Operation Centre DWG.No.:

FREE DRAINING
Y 1" Y 1" Y
0.75" 0.75" Contractor JOB Code Responsible Company
3"-P-041-0022-B2AH04-HC 041 041
NPIC-041-E-0153M

041
UV 041 041 0-6495-20 TPM
FREE DRAINING

UV
FREE DRAINING
FREE DRAINING

1" RO UV
FREE DRAINING

0067A 0073A UV 0067B Prepared by Checked by Approved by

FREE DRAINING
0055 0073B
1"
X 2" NOTE 3 X 2" T. T . HUONG T. NGUYEN T. N. SON
0.75" 041
UV NPIC-041-E-0153M
I 0068B
X
I
NC REGENERATION DRAIN
X 1"-P-041-0333-A1AH04-PG
041-0010M

041
UV
NOTE 4 TO 041-V-112 NSRP
REGENERATION DRAIN Complex Project
0068A FREE DRAINING Nghi Son Refinery and Petrochemical
041-0010M Limited Liability Company
Nghi Son, Vietnam
041 041 1.5"-P-041-0025-A1AH04-PG
DRAINING

041 TO 041-V-112
UV 041 UV X TI
0075A UV Drawing Title
0075B Y
FOR 041-LT-0056
FREE

Y 0058
0074A 041
J X UV NPIC-041-E-0151M
041
UV NOTE 6
REGENERANT PIPING AND INSTRUMENT DIAGRAM J

MIN
0.75" 1" 0074B 6"
0.75" 1" NOTE 5 0078 041-0006M
041 041 PENEX
MIN 041 US TT 3"-P-041-0029-B2AP04-HC FROM 041-H-011
FREE DRAINING CBD X
041 041 041 041 RO 0003
DRCS 0058 MAKE-UP GAS SECTION

MIN
US PDT UV UV 0056
041-3701M X REGENERANT
0003 0059 0076 0077 NPIC-041-E-0141M MAKE - UP GAS DRIERS - 1
CLOSED BLOWDOWN DRCS Y 1.5"
2"-CBD-041-0041-A2AP-NI 041-0006M
041-0005M 041 041 3"-P-041-0030-B2AP04-PP
FREE DRAINING
NPIC-041-E-0154M

US PDT CBD TO 041-E-011A/B


FROM 041-LT-0057 0003 DRCS 0099 2"-P-041-0038-B2AH04-PG 041-3701M Issue Purpose Document Class
041 NPIC-041-E-0090M
PDI 0.75"
FOR CONSTRUCTION Z
2"-CBD-041-0004-A2AP-NI
K MAKE-UP GAS
NPIC-041-E-0153M 0059 DRIER PURGE NPIC-041-E-0153M Unit No. Unit Abbreviation PCWBS Size Scale K
3"-P-041-0021-B1AH04-NI TO UNIT 042 REGENERANTION DRAIN 041 PENX A900 A1 NONE
041-0003M 041
1"-P-041-0059-A1AP04-PG

DR01A
PDI 042-AC-101 041-0008M Contractor DWG.No. Sheet Rev.
FROM 041-V-052
A1

0099
041-1001M FROM 041-DR-001A/B D-041-1225-0004M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 7 of 37
: 041-LPS-01-SV-1 Page

041-E-012 NPIC-041-E-0099M
041-E-011A/B 041-H-011
NPIC-041-E-0159M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
REGENERANT VAPORIZER REGENERANT CONDENSERS
SIZE: 2H3 HEATER SHUTDOWN REGENERANT SUPERHEATER 0014V AND D-000-1225-0020V TO 0026V.
CODE ASME VIII DIV 1 / API 660 CODE ASME VIII DIV 1 / API 660
CIRCUIT FAULT RUN COMMAND 1. REGENERANT LOW FLOW / VAPORIZER HIGH LEVEL SHUTDOWN
PSET: 2.70 MPa(g) CODE ASME VIII DIV 1 / ASME B31.3
A DESIGN DUTY 781 kW
041
TYPE: BEU
041 041
BYPASS SWITCH WITH LIGHT DURING HOT H2 STRIPPING CASE. A
SIDE HOT COLD SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 560 mm/ 2500 mm/ 94 m² UA JZGL TYPE ELECTRICAL
PSV 2. DELETED.
2.20 MPa(g) + FV @ 144°C 0007 FREE DRAINING 6"-FLG-041-0007-A1AP-NI FLG DESIGN DUTY 2x1009 kW 0302 0301B DESIGN DUTY 779 kW
DESIGN PRESSURE 2.80 MPa(g) + FV @ 232 °C
NOTE 12 SIDE SHELL TUBE 2.00 MPa(g) + FV @ 316°C 3. EMPTYING LINE.
041-3501M DESIGN PRESSURE
DESIGN TEMPERATURE 350 °C 175°C 3.80 MPa(g) + FV @ 296°C 4. LOW FLOW ALARM INHIBITION SIGNAL PROVIDED BY DRCS.
DESIGN PRESSURE 2.95 MPa(g) DESIGN TEMPERATURE 485 °C NOTE 11
INSULATION TYPE HC NOTE 12
H POWER TRIM SPECIFICATION B2AH04 - HC 5. FACE PLATE ONLY.
TRIM SPECIFICATION P-041-0283-B1AP04-HC 041 041 DESIGN TEMPERATURE 200 °C NOTE 10 76 °C 041
TI TIK CONTROLLER FAULT
NOTE 5 NPIC-041-E-0130M INSULATION TYPE PP NI UZ 6. FOR SULFUR STRIPPING. UTILITY STATION TO BE LOCATED

FREE DRAINING
0319B 0319 NPIC-041-E-0158M 0302 RUNNING
NOTE 1
041 NEARBY.
0.75" TRIM SPECIFICATION B2AP04 - PP B2AW - NI UA 041
041 041

MIN
B 0301 UZ
1000
JZGL HZS
0306
7. FOR ON/OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M. B
0301A
2" 041 041 041 NOTE 8 8. LOCATED IN SWITCHGEAR.
US CRIT
TT TT 041 NOTE 8 RUN START
0003 (V) 041 (V) 9. HIGH LEVEL ALARM INHIBITION SIGNAL PROVIDED BY DRCS.
0319B 0319A
DRCS TZT 041 041 041 041 STATUS 041 041 H 041
UZ
041
HZL
6900 TE TE JI JC JY US JZHS
6" (V) 0323B 0323A 0302 0306A 10. ALTERNATE DESIGN CONDITIONS OF SHELL SIDE: DESIGN
4"-P-041-0136-B2AH04-HC SKIN SKIN 0301 0301 0301 0003 0301D
4"-P-041-0041-B2AH04-HC (V) (V) START/ DRCS TEMPERATURE 345 °C, DESIGN PRESSURE 2.0 MPa(g).
STOP STOP
NPIC-041-E-0099M NOTE 22 11. ALTERNATE DESIGN CONDITIONS: DESIGN TEMPERATURE 400 °C,
(V) 041
SIZE: 2H3 041 041 (V) 690V JZHS DESIGN PRESSURE 2.7 MPa(g).
PSET: 2.20 MPa(g) TE TE 3 PHASE 0301E L
NPIC-041-E-0093M 0318B 0318A 12. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITONS ARE 0.34MPa(g)
041 SKIN SKIN CRIT
C PSV
FREE DRAINING
NPIC-041-E-0099M 041
TZAHH @ 175 °C AND FV @ 175 °C. C
0008 8"-FLG-041-0052-A1AP-NI (V) HH
FLG 041 0322
(V)
041 041 (V) 041 041
UZ 13. BLANK-OFF DURING HOT HYDROGEN STRIPPING.
041-3501M TE TE TZE TZT
0322A 0322 0302 041 T ZAH
0316B 0316A SKIN (V) TZI 14. LOCATE AT END OPPOSITE TO SHELL INLET.
SKIN SKIN 041
TZE 0322 15. ACTIVATION OF 041-UZ-1000 FORCES 041-PIC-0208 TO MANUAL
0322B MODE AND 0% OUTPUT.
(V) SKIN
041 CRIT
TZAHH 16. VALVE AT STEAMTRAP INLET TO BE NORMALLY CLOSED.
0.75" (V) HH
041 041-H-011 041 041 041 041 0317

MIN
TI 041 041
TT TT TT TZE TZT UZ 17. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
0314 0316 0318 0323 0302 T ZAH
D NPIC-041-E-0130M 2"
(V) (V) (V) 0317A
041
SKIN
0317
(V)
041
TZI
PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
CONDENSER.
D
NPIC-041-E-0099M 0317
TZE
041 H 041 H 041 H
0317B 18. MULTI-TAP ORIFICE FLANGES (041-OR-0311, 041-ORJ-0311).
041 TI TI TI (V) SKIN
US
FREE DRAINING 4"-P-041-0042-B1AH04-HC CRIT ORIFICE FLANGES (041-ORJ-0311) SHALL BE LOCATED AT
0316 0318 0323 041
0003 TZAHH DOWNSTREAM OF ORIFICE PLATE.
DRCS (V) HH 0315
041 041 041
SIZE: 1.5F2 UZ 19. ORIFICE WITH 26 MM HOLE.
TZE TZT
0302 041 T ZAH
PSET: 3.80 MPa(g) 0315A 0315
FREE DRAINING

SKIN (V) TZI 20. STEAM-OUT CONDENSATE COLLECTION. NPIC-041-E-0108M


041 041
TT 041 TZE 0315
21. MAXIMUM CV : 9 IS CONSIDERED IN SAFETY DESIGN OF
0314 6" PSV 0315B
FREE DRAINING ISOMERATE TANKAGE.
E 0014 6"-FLG-041-0009-A1AP-NI FLG (V) SKIN
MIN E
041-3502M 041 22. MAKE CONNECTION AT DOWNSTREAM OF ELBOW.
TG NOTE 14
6"-P-041-0137-B1AP04-HC 0328 6" 1"-P-041-0139-B2AP04-PP 1"-FLG-041-0010-A1AP-NI FLG NPIC-041-E-0158M
NOTE 9 NO POCKET 041-3502M
041
FLG YZS 041 0.75"
0002 0.75" 4" TSV
041-3501M SIZE: 0.75D1 0015 A. DELETED.

MIN
FREE DRAINING
0.75" 1"-V-041-0013-A1AP-NI
PSET: 2.95 MPa(g)
1. DELETED.
2"
F 041-E-012 F

FREE DRAINING
MIN PERMANENT LINE
NOTE 6 1" SUBJECT TO
4" 2" 041 041
1"-FLG-041-0008-A1AP-NI

1" 4"-P-041-0138-B2AP04-PP PG TG SERVICE TEST


MIN NP 0368 0324

FREE DRAINING
041-E-011A 0.75"
4"-P-041-0135-B1AP04-HC

NOTE 17
NPIC-041-E-0090M
041 L Z AH RS 6"-CWR-041-0002-A2AW-NI CWR TEST POINT
LZI
NOTE 13 6"-CWR-041-0015-B2AW-NI 041-3001M
0309A
FREE TYPE 1 TYPE 1 041-LPS-01 MIN
DRAINING RS HH HH L Z AH
041 H 041 H 041 041 FEED DWG.No.
UZ LZI 1"-FLG-041-0064-A1AP-NI
G 041
LZT
0309B
LZT
0309A 0302 0309B
LPS 1"-P-041-0296-B2AP04-PP FLG
G
LI GWR GWR 0
041-3101M
NO POCKET 041-3502M
0307 TYPE 1 1oo2 CRIT 0.75" NPIC-041-E-0158M AT GRADE
041 041
LZAHH RS 6"-CWS-041-0016-B2AW-NI 6"-CWS-041-0003-A2AW-NI CWS TO SAFE LOCATION

11"-LPS-041-0005-A1AS-HS
LPS 041 0005 A1AS HS
LT
NPIC-041-E-0090M
FREE DRAINING

NPIC-041-E-0090M TYPE 1 0307 0309 REGENERANT VAPORIZER / SUPERHEATER


953053-120-09-A1
041-3001M
041 041 GWR 041-E-011B NOTE 17 DWG.No. Title
US LG 0.75" REFERENCE DRAWINGS
MIN 0308
2"
MIN 0003 CRIT 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
DRCS MAG 041

1"-P-041-0141-B2AP04-HC
TAH 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
MIN NPIC-041-E-0099M 2"-P-041-0043-B1AP04-PG 0.75" 0321 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041 NNF NOTE 3 041 041
LAH 2" NC US NPIC-041-E-0154M B 11/NOV/13 FOR APPROVAL DMO RKM SMA
CRIT FZ AH NOTE 5 TT
H 0.75" 0307
UC
CBD
041
FZALL
041
FZI 041
6" 0321 041 041
0003 DRCS
041
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041 FZ A L FIK US PIK Rev Date Description Prep'd Chk'd App'd
0.75" CBD CBD 0311 0311 TT
NPIC-041-E-0090M PG 041
MIN

0309 0003 0306 REVISIONS


0211 PG NOTE 5 0321
DRCS Operation Centre JOB Code:
1.5" NPIC-041-E-0090M 0307 041
NPIC-041-E-0099M

NPIC-041-E-0096M 0.75" PT 041 NPIC-041-E-0099M Operation Centre DWG.No.:


3" 041 PV
NPIC-041-E-0098M 2"-MPCW-041-0001-B2AS-HS 041 FAL 0306 Contractor JOB Code Responsible Company
4" NOTE 13 PT 0.75" 3"
0306
3"-P-041-0044-B1AP04-NI
REGENERANT
1.5" 0-6495-20 TPM
NPIC-041-E-0158M

0309
0208 FC 041-0032M
3"-LPCW-041-0022-A0JS-HS 1" FC Prepared by Checked by Approved by
041 0.75" 0.75"
0
2"-MPS-041-0013-B1AS-PP

NPIC-041-E-0099M UZ 1.5" TO BL T. T. HUONG T. NGUYEN T. N. SON


10D MIN 041 0.75"
1000 NP NOTE 20
LPCW 2" NOTE 5 041 FV 041 FREE DRAINING
I 041-3101M
ST 041
PIK
041
US
NOTE 15 FC
UZ
0302
0309
1" US CBD I
0003 1"-CBD-041-0003-A2AP-NI 041-3701M
0208 0003 1.5" DRCS
DRCS 041 2" MIN MIN 0.75"
PV 0.75" 041 NOTE 18 041 REGENERANT

2"
041
SP 041
PSL
0208 FZT
0311
FT
0309 LPT
4"-P-041-0045-B2AP04-PP
041-0008M NSRP
3"-P-041-0029-B2AP04-HC 1225
NNF

0208 LL 041 Complex Project


NPIC-041-E-0153M FROM 041-DR-001A/B Nghi Son Refinery and Petrochemical

MIN
FZE 0.75"
NC 0311
1" NOTE 21
REGENERANT 041 2"-LPCW-041-0028-A2AS-PG NPIC-041-E-0108M LC REGENERANT Nghi Son, Vietnam Limited Liability Company
ST 4"-P-041-0029-B2AP04-HC
041-0004M 3"-LPCW-041-0019-A2AS-HS SP NOTE 16 TWO PHASE FLOW NOTE 19 041-0008M
1015 NC X NOTE 7 Drawing Title
TWO PHASE FLOW 2"-LPCW-041-0046-A2AS-PG
TO 041-DR-051A/B 041 041 TO 041-DR-001A/B
J NPIC-041-E-0130M
NPIC-041-E-0138M NPIC-041-E-0143M
AT GRADE
YZS
0001
UV
0083
REGENERANT PIPING AND INSTRUMENT DIAGRAM J
2"-P-041-0046-B1AP04-NI
TO SAFE NOTE 4 041-0032M PENEX
REGENERANT LOCATION
3"-P-041-0030-B2AP04-PP FROM 041-E-301
041-0004M FEED AND REGENERATION SECTION
DESUPERHEATED MP STEAM
FROM 041-DR-051A/B 3"-MPS-041-0001-B1AS-HS REGENERANT VAPORIZER / SUPERHEATER
041-0018M
LPCW 0.75"-LPCW-041-0029-A2AS-PG 0.75"-MPS-041-0014-B1AS-HS 2" FROM 041-DS-611
FOR 041-LG-0307, 0308, 0309B ST
041-3101M TWO PHASE FLOW STRIPPING HYDROGEN Issue Purpose Document Class
4"-P-041-0047-B1AH04-HC
0.75" 0.75" 0.75" 041-0015M FOR CONSTRUCTION Z
K MIN 0.75"
NOTE 6
FROM 041-E-103 Unit No. Unit Abbreviation PCWBS Size Scale K
CBD
4"-P-041-0048-B1AH04-HC
STRIPPING HYDROGEN 041 PENX A900 A1 NONE

DR01A
041-3701M 041-0015M Contractor DWG.No. Sheet Rev.
2"-CBD-041-0040-A2AP-NI
A1

NOTE 6
TO 041-R-101A/B D-041-1225-0006M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
12 13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 8 of 37
: 041-LPS-01-SV-1 Page

SIGNAL
041-0015M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
041 FROM 041-AT-0001D
FI 0.75"
NPTF 1. DELETED.
NPIC-041-E-0105M
A SIGNAL
MAKE-UP GAS DRIERS 0002 L LIGHT NAPHTHA 2. ELECTRICAL TRACING. MAINTAINING TEMPERATURE: 43°C
A
NPIC-041-E-0109M 0.25" 041 1"-P-041-0149-B1AP04-NI
041-0004M 041 H FT 041-0032M
AI NPIC-041-E-0155M 0002 0.75" SAMPLE RETURN 3. START-UP BY-PASS AND EMERGENCY CIRCULATION.
FROM 041-AT-0001A NOTE 15 0001A TO BL
MAKE-UP GAS DRIERS INST. PIP. 4. LINE FOR COOLING.
FEED DRIERS 041 041
FAL US
CRI T 0001 0003 5. 041-DR-001A/B TO BE LOCATED AS CLOSE AS POSSIBLE TO 041-E-012
041 041 041 H DRCS AND 041-H-011 (DWG. D-041-1225-0006M).
TAH AI
041-DR-001A AY
NOTE 13 NOTE 9 6. VALVE SWITCHING MANIFOLD TO BE ACCESSIBLE FROM PLATFORM.
0008A 0001 0001B
FEED DRIERS
041 041 041 041
FEED DRIER DRYOUT
FI FT FE RO 7. FACE PLATE ONLY.
CRI T 0001 0001 0001 0006
041 041 8. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M.
B CODE ASME VIII DIV 1 TAH AI 2"-P-041-0058-B1AP04-NI B
SIZE:I.D x TT 2300 mm x 4300 mm 0008B 0001D 9. RESTRICTION ORIFICE WITH 19.3 MM HOLE.

DESIGN PRESSURE 2.00 MPa(g) + FV @ 40 °C 10. FILLING LINE.


041
DESIGN TEMPERATURE 345 °C 041 NPIC-041-E-0141M AT NPIC-041-E-0141M 041
UV UV 11. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO DRIERS.
0001B MOIS
INSULATION TYPE HC 0016 0031 12. PLUG VALVE.
MIN MIN

E
TRIM SPECIFICATION P-041-0284-B2AP04-HC X E X
NPIC-041-E-0105M
13. ORIFICE WITH 27.9 MM HOLE.

E
SIZE: 3K4 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E LIGHT NAPHTHA
6"-P-041-0057-B1AP04-NI 14. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.

E
NOTE 2

E
PSET: 2.00 MPa(g) INST. PIP. 041-0011M
NPIC-041-E-0105M NPIC-041-E-0109M
15. LOCATED IN ANALYZER SHELTER 041-AS-001.

E
NC

E
C 041
PSV 0.75"-LPN-041-0025-A1AA-NI E E E NOTE 14 TO 041-V-001
C

E
0.75" 16. BLANK OFF WHEN NOT IN USE. NPIC-041-E-0158M
FLG FREE DRAINING 0009 MIN NPIC-041-E-0105M
8"-FLG-041-0013-A1AP-NI

E
PERMANENT LINE

6"-P-041-0148-B2AP04-HC
041-3501M LPN

E
041-3601M SUBJECT TO

E
0.75" 0.75" SERVICE TEST

E
0.75"-LPS-041-0034-A1AS-HS
041-LPS-01 0.75"-P-041-0273-B1AP04-HC

E
0.75"
TEST POINT
MIN

E
LPS

MIN.
E

E
D 2" 0
041-3101M
D

E
0.75" 0.75"

E
E

E
041
H X 4" NPIC-041-E-0105M NPIC-041-E-0155M UV
041
E

E
PI 041
UV 0028
041 NOTE 7
E

E
0005
FREE DRAINING

Y 0012 041
6"-P-041-0145-B2AP04-HC
UV Y 2" 041 Y 2" NPIC-041-E-0105M X 4"
041 FO NOTE 12 UV
E

E
0010 PDIK US PDT 6'' Y 0030
041
0.75"

041 041 0001 0003 0001 INST.


1" INST. UV DRCS UV 0.75" 041
VENDOR CONTRACTOR 041 UV 041 0.75" 041 UV
041 UV 0026 0024 UV PIP.
MIN

E PIP. X 0020 PDV X FREE 0029 1" E


DRAINING

PT

MIN
0011 0001 0004 DRAINING
0005 041 041 041 041
LPT 6"
FREE

2" X UV UV UV UV X A. DELETED.
X 0007 0008 X X 0023 X 0025 LIGHT NAPHTHA
NOTE 14 6"-P-041-0056-B2AP04-HC
041-0009M
NOTE 14 041

MIN
TOP CONNECTION
MIN

24" TOP CONNECTION UV 041 FROM / TO 041-DR-001B


041-DR-001A NPIC-041-E-0105M 0009
UV NPIC-041-E-0105M
NPIC-041-E-0130M 041 0027
NOTE 5, 6, 8, 11 UV Y 1" Y 1" 041 041
0022 UV UV 2"
2" 0005 0006
Y 1" NOTE 16
2" NOTE 16 041 FREE DRAINING X Y 1"
F INERT CERAMIC BALLS 0.75"
UV
X
FREE DRAINING NPIC-041-E-0158M F
NPIC-041-E-0158M 0021 REGENERATION DRAIN
FREE DRAINING 1.5"-P-041-0055-A1AP04-PG
041-0010M
WIRE MESH SCREEN
FREE DRAINING

TO 041-V-112
WO NPIC-041-E-0153M
C
NPIC-041-E-0153M 6"-P-04 NPIC-041-E-0097M P04-P
1-0146 4-B2A NPIC-041-E-0097M 041-LPS-01
-B2AP0
4-PC 4 1-005 2"-P-041-0147-B2AP04-HC
MOLECULAR SIEVES 2"-CBD-041-0024-A2AP-NI 6"-P-0
LPS
FEED DWG.No.
G CBD NPIC-041-E-0097M
041-3101M
G
0.75" 0.75"
041-3701M NPIC-041-E-0097M 2"-LPS-041-0006-A1AS-HS
NPIC-041-E-0097M
MH 1.5"-P-041-0053-B2AP04-PC
24" 953053-120-11-A1 FEED DRIER A
2"-FLG-041-0012-A1AP-NI FLG DWG.No. Title
INERT CERAMIC BALLS NPIC-041-E-0158M NPIC-041-E-0158M
NO POCKET 041-3501M REFERENCE DRAWINGS
TL NPIC-041-E-0153M 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041
NOTE 16 NOTE 16 0.75" 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
PG 041 041 041 041 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
LPT 0006 1.5" UV UV UV UV 1.5" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0002 X 0001 X X 0017 X 0018 LIGHT NAPHTHA
H 6"-P-041-0051-B2AP04-HC 6"-P-041-0052-B2AP04-HC
041-0009M
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Description Prep'd Chk'd App'd
3000 MIN

SCREEN Rev Date


041 041
UV 041 041 UV REVISIONS
FROM / TO 041-DR-001B
0013 UV 0.75" UV 2" 041 0032 NPIC-041-E-0153M Operation Centre JOB Code:
2" 041 NOTE 10
UV 0003 0019 UV Operation Centre DWG.No.:
4"
3"-CBD-041-0023-A2AP-NI

X 0034 X 4"
0014 Y 1" Y 1" Contractor JOB Code Responsible Company
3" X 0.75" 0.75" X 0-6495-20 TPM
0.75" 041 Prepared by Checked by Approved by
UV T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING

0015
Y 1"
Y 1"
I 2" 041 I
WO UV
FREE DRAINING

NPIC-041-E-0153M
0033
NPIC-041-E-0158M
FREE DRAINING
REGERATION DRAIN
1"-P-041-0059-A1AP04-PG FREE DRAINING
NSRP
041-0004M Complex Project
Nghi Son Refinery and Petrochemical
041
TO 041-DR-051A/B
UV Nghi Son, Vietnam Limited Liability Company
041 X
NPIC-041-E-0155M UV 0038 4"-P-041-0060-B2AP04-HC NPIC-041-E-0153M
CBD H Drawing Title
041 041 0037
041-3701M TI TT NOTE 4
J 041
TI
041
US
041
0002 0002 X 4" 041
UV PIPING AND INSTRUMENT DIAGRAM J
TT X 0036
0003
DRCS 0003 0003 4"-P-041-0061-B2AP04-HC PENEX
NOTE 4 FEED AND REGENERATION SECTION
REGENERANT MIN
4"-P-041-0045-B2AP04-PP HC
041-0006M 041 FEED DRIERS - 1
MIN UV
TO 041-E-011A/B 6" 0035
REGENERANT X
Issue Purpose Document Class
4"-P-041-0029-B2AP04-HC
041-0006M FOR CONSTRUCTION Z
K FROM 041-H-011 ISOMERATE Unit No. Unit Abbreviation PCWBS Size Scale K
4"-P-041-0062-B1AP04-NI
LIGHT NAPHTHA 041-0032M 041 PENX A900 A1 NONE
6"-P-041-0143-B1AP04-NI NOTE 3

DR01A
041-0007M Contractor DWG.No. Sheet Rev.
FROM 041-E-301
A1

FROM 041-E-001 D-041-1225-0008M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 9 of 37
: 041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-V-112 0014V AND D-000-1225-0020V TO 0026V.

1. DELETED.
BLEEDER KNOCKOUT DRUM
A 2. FOR ON / OFF VALVE DETAILS, REFER TO DWG. D-041-1225-0221M. A
CODE ASME VIII DIV 1
3. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
SIZE:I.D x TT 800 mm x 2000 mm @ 175°C AND FV @ 175°C.
DESIGN PRESSURE 0.35 MPa(g) + FV @ 120 °C NPIC-041-E-0090M
4. MIN 600 MM ABOVE FLARE HEADER.
DESIGN TEMPERATURE 120 °C
5. NOZZLE HEIGHT SHALL BE 150MM FOR INSERTION TYPE THERMAL
INSULATION TYPE NI MASS FLOW SWITCH.
TRIM SPECIFICATION P-041-0286-A1AP04-NI NPIC-041-E-0106M
NOTE 3
PERMANENT LINE
B SUBJECT TO
B
SERVICE TEST
REGENERATION DRAIN
1.5"-P-041-0055-A1AP04-PG FREE DRAINING
041-0008M NPIC-041-E-0153M TEST POINT
041
FAH
FROM 041-DR-001A/B 0006
REGENERATION DRAIN
1.5"-P-041-0034-A1AH04-PG FREE DRAINING
041-0004M

C FROM 041-DR-051A/B 041


FSH C
0006 NPIC-041-E-0106M
REGENERATION DRAIN
1"-P-041-0333-A1AH04-PG FREE DRAINING HPT
041-0004M 2" NOTE 5
FREE DRAINING FREE DRAINING NPIC-041-E-0090M
FROM 041-DR-001A/B 2"-FLG-041-0015-A1AP-NI
TM
LO MIN
2"-P-041-0066-A1AP04-NI

NOTE 4
600 MM
0.75"

D REGENERATION DRAIN
1.5"-P-041-0025-A1AH04-PG FREE DRAINING FLG D
041-0004M H
041-V-112 MW 041-3501M
041
FROM 041-DR-051A/B TI
0005

041
TT NPIC-041-E-0157M
0005

E 1.5"-P-041-0055-A1AP04-PG 2" E
LO A. DELETED.
6"
1. DELETED.
NPIC-041-E-0090M

041 H TYPE 1
LI 041
LG
0003 L 0004
MAG
NPIC-041-E-0158M
F NPIC-041-E-0090M
F
041
US
0003
DRCS

TYPE 1
041
LT
0003
DP

FEED DWG.No.
041-LPS-01
G G
2"-LPS-041-0001-A1AS-HS 2"-P-041-0151-A1AP04-HC

LPS 953053-120-13-A1 BLEEDER KNOCKOUT DRUM


0
041-3101M DWG.No. Title
REFERENCE DRAWINGS
0.75" 0.75" 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
TL 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
CBD B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H NPIC-041-E-0090M NOTE 2
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
041 IN VIEW
MIN

REVISIONS
UV
1.5"-300# 0040 1.5"-300# Operation Centre JOB Code:
Y Operation Centre DWG.No.:
2" FREE DRAINING
1.5"-P-041-0010-A1AP04-NI CBD
Contractor JOB Code Responsible Company
FC 041-3701M 0-6495-20 TPM
0.75" TSO 0.75" 1.5"-CBD-041-0006-A2AP-NI Prepared by Checked by Approved by
0.75"
T. T. HUONG T. NGUYEN T. N. SON
1.5"
I NPIC-041-E-0122M 1.5" I

WO
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
FEED AND REGENERATION SECTION
BLEEDER KO DRUM

Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0010M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1610 of 37


041-LPS-01-SV-1 Page

041-V-001 041-P-001A/B
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V
TO 0014V AND D-000-1225-0020V TO 0026V.
FEED SURGE DRUM CHARGE PUMPS
1. START-UP / EMERGENCY SPILLBACK.
A 041
PIC
041
PIC
CODE ASME VIII DIV 1 CODE API 610 A
0002A L NPIC-041-E-0107M 0002B
SIZE:I.D x TT 3200 mm x 9600 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 5 2. DELETED.

041 041 DESIGN PRESSURE 2.00 MPa(g) + FV @ 40 °C RATED CAPACITY/NPSHr 176 m 3/hr/8.5m 3. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2201M.
PV PV
0002A 0002B DESIGN TEMPERATURE 120 °C DIFF.HEAD/SHUT-OFF PRESSURE 515.3 m / 5.89 MPa(g)
MAKE-UP GAS 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
1.5"-P-041-0040-B1AH04-NI FREE DRAINING 1.5" FREE DRAINING FREE DRAINING 1.5"-FG-041-0001-A1AD-NI FG INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 0.63 @ 175°C AND FV @ 175°C.
041-0005M
FC FC NNF 041-3401M TRIM SPECIFICATION P-041-0304-B1AH04-NI MOTOR SIZE 315 kW
5. VALVE USED FOR LIQUID FILLING DURING START-UP. ACCESS TO
FROM 041-DR-051A/B INSULATION TYPE NI
0.75" 1" 0.75" 0.75" 1" 0.75" BE PROVIDED.
NOTE 4
TRIM SPECIFICATION D1AP04-NI NPIC-041-E-0158M
SIZE: 4L6 6. ORIFICE WITH 107.2 MM HOLE.
1.5" 041 1.5" PSET: 2.00 MPa(g)
B PT
041 FREE DRAINING 10"-FLG-041-0016- A1AP-NI FLG
7. DO NOT CLOSE UNTIL DISCHARGE VALVE IS CLOSED B
0002
PSV
IN VIEW 0011 041-3501M
IN VIEW
041 PERMANENT LINE
PG SUBJECT TO
0009 NOTE 5

FREE DRAINING
SERVICE TEST

MIN
FREE DRAINING
1.5"-P-041-0247-B1AH04-NI
0.75"
TEST POINT
C 2"
C

6"-P-041-0156-B1AH04-NI

2"
2"
8" VH
041
D FIC D
0003
041-V-001 041 L
FV
0003
6"-P-041-0067-B1AP04-NI
NOTE 1 FO
3" 0.75"

041 H
E LI E

NPIC-041-E-0090M
0001 L
A. DELETED.

0.75"-LPS-041-0021-A1AS-HS 6"-P-041-0152-D1AP04-NI 1. DELETED.


041-LPS-01
041 CRIT NPIC-041-E-0090M NOTE 6
LZAHH NPIC-041-E-0158M LPS 041
041
0005 041-3101M
0 FT
HH 041 TYPE 1 TYPE 1 FE
0003
041 041 041 0003
LZT UZ 0.75" 0.75"
0004 LT LG 0.75"-P-041-0258-D1AP04-HC
0005 L Z AH 0001 0002A REACTOR CHARGE
DP
F 041
LZI DP
MAG
6"-P-041-0071-D1AP04-NI
041-0013M F
0005
LIGHT NAPHTHA TO 041-E-101
6"-P-041-0057-B1AP04-NI LPN
041-0008M
041-3601M
FROM 041-DR-001A/B 0.75" 0.75"
TYPE 1
041

MIN
MH
24" LG 0.75"-LPN-041-0013-A1AA-NI
0002B

041-LPS-01 MAG
FEED DWG.No.
G LPS 3"-LPS-041-0007- A1AS-HS
G

MIN
0.75"
041-3101M 0.75"

MIN
0.75" 0.75" TL
953053-120-14-A1 FEED SURGE DRUM
3"-P-041-0159-B1AP04-HC 0.75" DWG.No. Title

MIN
REFERENCE DRAWINGS
CBD
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPT NPIC-041-E-0090M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
5200 MIN

0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD


10"-P-041-0068-B1AP04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75" NP REVISIONS
NPIC-041-E-0158M Operation Centre JOB Code:
0.75"

MIN
NPIC-041-E-0158M Operation Centre DWG.No.:
H NPIC-041-E-0123M Contractor JOB Code Responsible Company
041 NOTE 7 NPIC-041-E-0158M
PDI NOTE 7 0-6495-20 TPM
0003 6"-P-041-0153-D1AP04-NI Prepared by Checked by Approved by
NPIC-041-E-0100M 0.75"
3" 10"-P-041-0070-D1AP04-NI T. T. HUONG T. NGUYEN T. N. SON
0.75"
041 0.75" 4" - 600# NPIC-041-E-0100M
I 041
PDT
STR RF
041
PG 041
041
STR
041
PG I
1035 0010 PDT 0011
0003
6" - 600# (V) 0004 1036 4" - 600#
0.75" (V) 0.75"
FREE DRAINING

RF RF
WO
041 041
NSRP
PG H PG Complex Project

NPIC-041-E-0158M
041 041 041
0012 UZ 0013 UZ Nghi Son Refinery and Petrochemical
3"-CBD-041-0007-A2AP-NI M 1000
PDI M 1000 Limited Liability Company
A,B,C,E 0004 A,B,C,E Nghi Son, Vietnam
10"-P-041-0069-D1AP04-NI M-2 6" - 600# M-2
RF Drawing Title
041-P-001A 041-P-001B
0.75" CBD NOTE 3 NPIC-041-E-0100M NOTE 3
J 0.75"
041-3701M
041
MGL
041
MGL
PIPING AND INSTRUMENT DIAGRAM J
MIN
NPIC-041-E-0158M (V) 0001A 0.75"-CBD-041-0008-A2AP-NI 0002A PENEX
(V) RUN
RUN FEED AND REGENERATION SECTION
0.75" - 600#
FREE DRAINING CBD 0.75"-P-041-0155-D1AP04-NI FREE DRAINING CBD
RF FEED SURGE DRUM
0.75" 0.75" 041-3701M 041-3701M
0.75"-P-041-0154-D1AP04-NI 0.75" - 600#
MIN 2" 0.75" 0.75" 0.75"-CBD-041-0009-A2AP-NI
FREE DRAINING CBD RF Issue Purpose Document Class
041-3701M
2"-CBD-041-0039-A2AP-NI NPIC-041-E-0158M
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
WO WO 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0011M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1611 of 37


041-LPS-01-SV-1 Page
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE

NPIC-041-E-0153M
041-3601M
PG

MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V) 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.

MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC

FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B

MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B

NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"

MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 0055
1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5

VENDOR CONTRACTOR LO FL(O) 2" LO 041 UZ


FROM 041-DR-051A/B 041 NOTE 6 041 HZS 0101
PG PG 0.75" 1" 0.75"
NOTE 17 2" MIN 0108

NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A

FREE DRAINING
MIN

1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D

MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M
041 H TWO PHASE FLOW PERMANENT LINE
041
1.5"-P-041-0306-B1AH04-PC TT TI SUBJECT TO
0107 0107
SERVICE TEST
H
2"-WW-041-0001-A2AW-NI

041 041
NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104 TEST POINT
H
FREE DRAINING

F 0.75"-FLG-041-0024-A1AP-NI FLG 041


TT
041
TI
041
PDY
041
PDI F
NO POCKET 041-3501M 0108 0108 0105 0105 L
041 H
041
TT TI
FREE DRAINING

0.75" 0109 0109


1" NC
041 UC H
041 041 041
SP PG TI
1221 0.75"-P-041-0169-B1AH04-NI TT
0115 0110 0110

041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G

041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150

0207 GL(R) 041-3501M


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041 041 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 9 NOTE 2
0.75" TT PG 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
6" 6"
H SIGNAL 0112 0116
H
2300 MIN

NPIC-041-E-0115M PT A 13/JUL/13 FOR REVIEW DMO RKM SMA


041-0008M NOTE 2 LPT 0104 Rev Date Description Prep'd Chk'd App'd
PIP. LAG REACTOR EFFLUENT
8"-P-041-0166-B1AH04-HC REVISIONS
TO 041-AY-0001 0.75" INST. INST. 041-0016M
NOTE 8 Operation Centre JOB Code:
041 NOTE 12 PIP. NC CIRCUIT Operation Centre DWG.No.:
FLG 041 NOTE 1 TROUBLE FROM 041-R-101B
SC AT 8"-P-041-0161-B1AH04-HC 0.75"
0.75" 0.75" 8" 8" CRIT Contractor JOB Code Responsible Company
041-3501M 0004 0001D 0.75" NPT 041 041 041 041
NPT MOIS UZ UZ HZA UA 0-6495-20 TPM
TYPE L2
NOTE 1 0103 0101 0110 0102 Prepared by Checked by Approved by
NPIC-041-E-0105M
0.75" 0.75" 300 # 300 # SAMPLE RETURN T. T. HUONG T. NGUYEN T. N. SON
NOTE 15
NOTE 1 NOTE 1 041 0.75"-P-041-0089-B1AH04-NI
041 041-0017M
PSV
I 3"
0.75"-IA-041-0002-S0RA-NI
0152 UZ 041
HZS
NNF
TO 041-E-201A/B
I
3"-CBD-041-0026-A2AP-NI

(V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING

PIP. INST. CIRCUIT UZY


0.75"-P-041-0077-B1AH04-PG 0103
041-0013M LPN TROUBLE S Complex Project
IA Nghi Son Refinery and Petrochemical
TWO PHASE FLOW NC WO 041-3601M
MIN

FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
(V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 00.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN

ULL ULH ULH ULL REACTOR SECTION


LEAD REACTOR EFFLUENT 041-LPS-01 0102 0102 0103 0103
8"-P-041-0082-B1AH04-HC L L
041-0014M 041 REACTORS - 1
TWO PHASE FLOW PI
TO 041-E-102A/B 0110 L 041 041 041 041 041 041
START-UP PURGE USL USH UZV UZV USH USL 3"-FLG-041-0023-A1AP-NI
2"-P-041-0083-A1AP04-NI 0102 0103 Issue Purpose Document Class
0102 0102 0103 0103
041-0013M
FOR CONSTRUCTION Z
K TO 041-EJ-611
3"-P-041-0168-B1AH04-HC FREE DRAINING FLG
Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT
8"-P-041-0078-B1AH04-HC TWO PHASE FLOW 041-3501M
041 PENX A900 A1 NONE
LO LO

DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.

0.75"
TWO PHASE FLOW TSO TSO
A1

TO 041-E-101 3" 3" D-041-1225-0015M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1612 of 37


041-LPS-01-SV-1 Page

041-E-201A/B 041-C-201
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
STABILIZER FEED BOTTOMS EXCHANGERS 0014V AND D-000-1225-0020V TO 0026V.
STABILIZER
CODE ASME VIII DIV 1 / API 660 1. DELETED.
A TYPE: BEU CODE ASME VIII DIV 1
SIZE: 6Q8 A
PSET: 1.70 MPa(g) 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 760 mm / 6100 mm / 410 m² SIZE:I.D x TT 2000 mm / 2800 mm x 24800 mm 041 FREE DRAINING D-041-1225-2401M.
14"-FLG-041-0029- A1GP-NI FLG
DESIGN DUTY NPIC-041-E-0158M 2 x 2050 kW PSV
DESIGN PRESSURE 1.70 MPa(g) + FV @ 120 °C 041-3501M 3. BLANK-OFF WHEN NOT IN USE.
0201
SIDE SHELL TUBE DESIGN TEMPERATURE 200 °C 4. TRANSMITTER TO BE LOCATED ON PLATFORM AS CLOSE TO INLET
1.90 MPa(g) + FV @ 120 °C INSULATION TYPE HC NOZZLE AS POSSIBLE.
DESIGN PRESSURE 1.80 MPa(g) + FV @ 120 °C
NOTE 5
P-041-0290-B1AP04-HC / 2"-P-041-0311-B1GH04-NI 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34
DESIGN TEMPERATURE 170 °C 200 °C TRIM SPECIFICATION

1000 MIN
P-041-0307-B1AH04-HC MPa(g) @ 175 °C AND FV @ 175 °C.
INSULATION TYPE HC HC NOTE 5 041 H 6. DELETED.
PI 2oo3 0.75"
TRIM SPECIFICATION B1AH04-HC B1AP04-HC
B 0201 041
041
UZ 7. PLUG VALVE. B
TI

FREE DRAINING
0202 8. NOZZLE ORIENT PARALLEL TO TRAY DOWNCOMERS.
0202 HIPPS
9. ORIFICE WITH 117.5 MM HOLE.

HH HH HH
041 041 041 041 041 10"-P-041-0175-B1AH04-NI PERMANENT LINE
TT PT PZT PZT PZT 8"-P-041-0095-B1AH04-NI SUBJECT TO
0202 0201 0209A 0209B 0209C
8" STABILIZER OVERHEAD SERVICE TEST
10" FREE DRAINING
041-0019M

C 3"
TO 041-AC-201 TEST POINT C
041 041
PDI PDY
0203 0203
041-C-201
MAKE-UP GAS REFLUX
1.5"-P-041-0039-B1AH04-NI 4"-P-041-0096-B1AP04-NI
041-0005M MH 041-0020M
NNF 24"
FROM 041-DR-051A/B NOTE 3 1 FROM 041-P-201A/B
0.75" 0.75"

D D

041 H
TI
FREE DRAINING

0201

14
NOTE 4
E 041
TT
E
0201
MH A. DELETED.
24"
1. DELETED.
MIN
15
041 30
PG
0224

F 041
PI
041
PT
F
0202 0202
STABILIZER BOTTOMS
NOTE 8 FREE DRAINING 20"-P-041-0094-B1AP04-HC
041-0018M
TWO PHASE FLOW
FROM 041-E-203
NPIC-041-E-0090M
TYPE 1
041
LG
8"-P-041-0090-B1AH04-HC H
NPIC-041-E-0090M 0202
041 041 MAG
TWO PHASE FLOW LI FEED DWG.No.
LT
G 0214 L 0214 041
TYPE 1
041 H G
DP LT LIC
MH 0201
24" 0201 L
DP
953053-120-19-A1 STABILIZER
041-LPS-01 DWG.No. Title
REFERENCE DRAWINGS
LPS 3"-LPS-041-0008-A1AS-HS 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-3101M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75" TL TL 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0.75" 0.75" 041-0018M
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
041
H 3"-P-041-0178-B1AP04-HC
041
TI A 13/JUL/13 FOR REVIEW DMO RKM SMA H
8100 MIN

TT CBD
0205 0205 Rev Date Description Prep'd Chk'd App'd
041-E-201B L LPT NPIC-041-E-0090M REVISIONS
16" STABILIZER BOTTOMS Operation Centre JOB Code:
16"-P-041-0093-B1AP04-HC
041-0018M Operation Centre DWG.No.:
0.75" TO 041-E-203
Contractor JOB Code Responsible Company
3" 0-6495-20 TPM
RS 6"-P-041-0091-B1AP04-HC
FLG Prepared by Checked by Approved by
0.75" T. T. HUONG T. NGUYEN T. N. SON
041-3503M
3"
I NOTE 2 TYPE M2
I
041 041 041
FIC UZ SC
0202 1000 0005
NSRP
FREE DRAINING WO Complex Project
Nghi Son Refinery and Petrochemical
CWS Nghi Son, Vietnam Limited Liability Company
041-E-201A NOTE 9
041 041 041 041-3002M Drawing Title
FT TI TT 10"-P-041-0174-A1AP04-HC
041 0202 0206 1.5"-CBD-041-0010-A2AP-NI 041
FE 0206 CBD FV
J 0202
041-3701M
0202
STABILIZER BOTTOMS
PIPING AND INSTRUMENT DIAGRAM J
RS 6"
041-0026M PENEX
SAMPLE RETURN FC TWO PHASE FLOW
0.75"-P-041-0089-B1AH04-NI 0.75" 8" 0.75" 6" 0.75" NO POCKET TO 041-C-301 STABILIZER AND SCRUBBER SECTION
041-0015M
NNF 0.75" NOTE 7 STABILIZER
FROM SAMPLE 6"-P-041-0092-B1AP04-HC
RECEIVER FOR 041-LG-0202

Issue Purpose Document Class


0.75" 0.75" 0.75"
041 FOR CONSTRUCTION Z
MIN
K TG
0212 FREE DRAINING CBD Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT 041-3701M 041 PENX A900 A1 NONE
8"-P-041-0075-B1AH04-HC

DR01A
041-0013M 2"-CBD-041-0038-A2AP Contractor DWG.No. Sheet Rev.
A1

TWO PHASE FLOW


FROM 041-E-101 D-041-1225-0017M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1613 of 37


041-LPS-01-SV-1 Page

041-AC-201 041-E-202 041-V-201 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.
STABILIZER TRIM CONDENSER STABILIZER RECEIVER
STABILIZER CONDENSER CODE ASME VIII DIV 1 / API 660 1. FOR AIR COOLER DETAILS, REFER TO DWG. D-041-1225-2301M.
A CODE ASME VIII DIV 1 / API 661 TYPE: BEU
CODE ASME VIII DIV 1
2. DELETED.
A
SIZE: I.D x TT 1700 mm x 5100 mm
SIZE: H.T. AREA 5764 m2 (FINNED) NPIC-041-E-0158M SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 650 mm / 6100 mm / 149 m²
DESIGN PRESSURE 1.75 MPa(g) + FV @ 120 °C 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
DESIGN DUTY 4069 kW DESIGN DUTY 573 kW D-041-1225-2401M.
DESIGN TEMPERATURE 120 °C
DESIGN PRESSURE 1.75 MPa(g) + FV @ 120 °C SIDE SHELL TUBE
INSULATION TYPE NI 4. FOR PRESSURE TEST. TEMPORARY PRESSURE PROTECTION
DESIGN TEMPERATURE 130 °C 1.75 MPa(g) + FV @ 120°C
DESIGN PRESSURE 1.35 MPa(g) P-041-0291-B1AH04-NI (PSV) TO BE INSTALLED BEFORE CONNECTING SWING ELBOW TO
NO OF FANS 2 NOTE 5 TRIM SPECIFICATION HPN.
P-041-0308-B1AP04-NI NPIC-041-E-0098M
TRIM SPECIFICATION B1AH04-NI DESIGN TEMPERATURE 120 °C 76 °C
NOTE 5 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34
INSULATION TYPE NI NI
MPa(g) @ 175 °C AND FV @ 175 °C.
NOTE 5
B TRIM SPECIFICATION B1AH04 - NI A2AW - NI
6. 50% OF THE FANS SHALL BE PROVIDED WITH VARIABLE SPEED
B
SIGNAL
DRIVE.
041-0013M NPIC-041-E-0158M
H 7. DELETED.
FROM 041-FIC-0004 041
TI
041-AC-201 8. ORIFICE WITH 47.9 MM HOLE. NPIC-041-E-0098M
0204
NOTE 1, 6 9. CONNECTION FOR TEMPORARY PSV. SET PRESSURE TO BE 1.75
MPa(g).
SIGNAL
041 10. MAXIMUM ALLOWED CV : 45 WHICH IS THE GOVERNING FOR
TT 041-0021M 041-PSV-0202 SIZING CASE.
C STABILIZER OVERHEAD
0204
2"-P-041-0310-B1GH04-NI FROM 041-PIC-0205
C
FREE DRAINING 11. METAL SEATED BUTTERFLY VALVE WITH OPTION CODE "4617".
041-0017M
NPIC-041-E-0121M NPIC-041-E-0108M
FROM 041-C-201 8"-P-041-0095-B1AH04-NI

PERMANENT LINE
6"-P-041-0126-B1AH04-NI 0.75" SUBJECT TO
M M TWO PHASE FLOW SERVICE TEST
2"-FLG-041-0030-A1GP-NI FLG
NO POCKET 041-3501M
041
1000 MIN
TEST POINT
D SIZE: 0.75D1 HIC
0201
HYDROGEN RATIO D
PSET: 1.35 MPa(g)

NPIC-041-E-0151M
FLG

FREE DRAINING

FREE DRAINING
041 H
TSV 041 041 041
FI 041-3502M XY XI
0205
FREE DRAINING
0201 0201 0201
1"-V-041-0015-A1AP-NI L L

NOTE 3
041 SIGNAL
NOTE 8 SC
041-0021M
041 0006
041 FT TYPE L3
0.75" FE 0201 041 FROM 041-AI-0201
PV
E E
FREE DRAINING

0201 0204
1" AT GRADE STABILIZER GAS
6"-CWR-041-0014-A2AW-NI 041 FREE DRAINING 4"-P-041-0098-B1AH04-NI A. DELETED.
TO SAFE LOCATION TG 041-0021M
0213 FC
0.75" 2" 0.75" TO 041-C-202
0.75"
CWR 6"-CWR-041-0006-A2AW-NI RS
041-3001M
NOTE 11 041
NPIC-041-E-0121M 041-E-202 PG 1.5" LC
NOTE 11 RS 0210 NOTE 10 NPIC-041-E-0108M
CWS 6"-CWS-041-0007-A2AW-NI INVIEW
F 041-3001M
041 041 H
041
041
PG
F
0.75" PDY PIC PT 0235
0206 0204 0204
6"-CWS-041-0015-A2AW-NI NOTE 9
041 1.5"
TG 1.5"-HPN-041-0004-D1AA-NI HPN
0217 041 NOTE 4 041-3601M
PDI
0206 0.75" 0.75"
L
1.5"-P-041-0274-D1AH04-NI
6" NPIC-041-E-0098M FEED DWG.No.
4"
G G

FREE DRAINING
6"-P-041-0097-B1AH04-NI
FREE DRAINING

NPIC-041-E-0153M
TWO PHASE FLOW

953053-120-20-A1 STABILIZER RECEIVER


DWG.No. Title
REFERENCE DRAWINGS
8"
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
2" SIGNAL
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0020M 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-V-201 6" VH B 11/NOV/13 FOR APPROVAL DMO RKM SMA
TO 041-FIC-0203A
H A 13/JUL/13 FOR REVIEW DMO RKM SMA H
NPIC-041-E-0090M Rev Date Description Prep'd Chk'd App'd
NPIC-041-E-0090M
REVISIONS
Operation Centre JOB Code:
Operation Centre DWG.No.:
041 TYPE 1 TYPE 1 TYPE 1 NPIC-041-E-0090M
041 041 H Contractor JOB Code Responsible Company
LI 041 041
LT MH LT LIC LG 0-6495-20 TPM
0215 L 0215 24" 0203 0203 0204
DP L Prepared by Checked by Approved by
041-LPS-01 DP MAG
2"-P-041-0248-B1AP04-HC T. T. HUONG T. NGUYEN T. N. SON

LPS 2"-LPS-041-0014-A1AS-HS
I 041-3101M FREE DRAINING MIN. I
0.75" 0.75"
CBD
NPIC-041-E-0090M
NSRP
2" Complex Project
Nghi Son Refinery and Petrochemical
4500 MIN

2"-P-041-0179-B1AP04-NI NC Nghi Son, Vietnam Limited Liability Company

0.75" 2" Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


PENEX
FREE DRAINING

REFLUX
FOR 041-LG-0204 FREE DRAINING 8"-P-041-0101-B1AP04-NI
041-0020M STABILIZER AND SCRUBBER SECTION
WO
0.75" 0.75" TO 041-P-201A/B STABILIZER RECEIVER
MIN
FREE DRAINING 2"-CBD-041-0011-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
2"-CBD-041-0044-A2AP-NI CBD
K 041-3701M MINI FLOW Unit No. Unit Abbreviation PCWBS Size Scale K
3"-P-041-0180-B1AP04-NI 041 PENX A900 A1 NONE
041-0020M
MINI FLOW

DR01A
Contractor DWG.No. Sheet Rev.
FROM 041-P-201A/B
A1

D-041-1225-0019M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1614 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-P-201A/B 0014V AND D-000-1225-0020V TO 0026V.
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2201M.
STABILIZER REFLUX PUMPS
A 2. DELETED. A
CODE API 610
PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1 3. CONNECTION FOR START-UP FILLING. VALVE TO BE ACCESSIBLE AT
SIGNAL GRADE.
041 041 RATED CAPACITY / NPSHR 79.6 m³/hr / 1.6 m
041-0013M FY FFY
0004 0212 DIFF. HEAD / SHUT-OFF PRESSURE 84.7 m / 2.29 MPa(g) 4. WASH WATER CONNECTION TO PREVENT FeS FIRE DURING
FROM 041-FIC-0004 0.55 TURNAROUND
SPECIFIC GRAVITY @ PUMPING TEMP
SIGNAL
MOTOR SIZE 30 kW 5. LOCATION TO BE ABLE FOR FLEXIBLE HOSE CONNECTION WITH
041-0013M NI NEARBY FIRE WATER. NPIC-041-E-0101M
041 INSULATION TYPE
FFI
FROM 041-FI-0052 TRIM SPECIFICATION B1AP04-NI 6. RESTRICTION ORIFICE WITH 6.108 MM HOLE.
0212
B NPIC-041-E-0158M
B
REFLUX / FEED RATIO 7. PLUG VALVE.

8. DELETED. NPIC-041-E-0155M
9. EMERGENCY SHUTDOWN PUSH BUTTON TO BE LOCATED AT SAFE
FLG
DISTANCE (MINIMUM 15 METERS) FROM PUMPS.
041-3501M FLG
041 NPIC-041-E-0158M
FIC 041-3501M 10. UPON ACTIVATION OF THE INTERLOCKS THE PUMPS WILL BE
0313 STOPPED AND CLOSED THE EIV'S WITHOUT TIME DELAY.
L

0.75"-FLG-041-0060-A1AP-NI
11. ORIFICE WITH 74.03 MM HOLE

0.75"-FLG-041-0061-A1AP-NI
041
C FV
12. ORIFICE WITH 71.12 MM HOLE C

NO POCKET
0313
MINI FLOW 3"
3"-P-041-0180-B1AP04-NI

NO POCKET
13. DELETED. NPIC-041-E-0107M
041-0019M
MINI FLOW FO
TO 041-V-201 PERMANENT LINE
0.75" 2" 0.75"
SIGNAL NOTE 7 SUBJECT TO
041-0019M SERVICE TEST
FROM 041-LIC-0203
NOTE 4, 5 TEST POINT
BY VENDOR 0.75"
D HC 0.75"
D
2.5" 041
FIC
NPIC-041-E-0098M 0203 0.75"
L
NPIC-041-E-0101M
0.75"
3"-P-041-0322-A0RA-NI NOTE 11 NOTE 12
NOTE 9
041 041 041 041 041
041 FT FE FT FE HZS
FV
3" 0203
0203 0203 0313 0313 0208A
REFLUX
4"-P-041-0096-B1AP04-NI 4"
E 041-0017M
FO NOTE 9 0.75" E
TO 041-C-201 A. DELETED.
0.75" 4" 0.75" 041
0.75" 041 041
4"
HZS UZ UZ
NOTE 7 1000 0203 FC
0207A
041
O TSO 1. DELETED.

041 041
NOTE 10 UZV
2. DELETED.
4" 0206 C NPIC-041-E-0155M
UZ UZ
1000 0203 FC, TSO LPN 0.75"-LPN-041-0015-A1AA-NI 3. DELETED.
O
041 0.75" 0.75"
NOTE 10 UZV 041-3601M
0204

MIN
041 C 0.75" 0.75" MIN
F HZS 041
HZS F
0207B 041-LPS-01 0208B
NPIC-041-E-0155M 0.75" NPIC-041-E-0107M 0.75"

MIN

MIN
NPIC-041-E-0107M LPS 0.75"-LPS-041-0023-A1AS-HS
041-3101M
041 H
041 0.75" 0.75"
TI
NOTE 6

NOTE 6
TT 041 041
0208 0208 RO RO
0204
0.75"-P-041-0261-B1AP04-HC 0205
REFLUX FREE DRAINING
8"-P-041-0101-B1AP04-NI 0.75"
041-0019M 0.75" 0.75" FEED DWG.No.
1"
G FROM 041-V-201 G
NOTE 3 0.75"
8" 8"
041 FC, TSO FC, TSO
UZV 041 953053-120-20-A1 STABILIZER RECEIVER
0203 UZV
C 0205 DWG.No. Title
NPIC-041-E-0155M 0.75" C 0.75"

MIN
NPIC-041-E-0155M REFERENCE DRAWINGS
MIN

2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LPN 0.75"-LPN-041-0026-A1AA-NI
0.75" A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75"
041-3601M 0.75" 0.75" NPIC-041-E-0152M
REVISIONS
Operation Centre JOB Code:
0.75"-LPN-041-0027-A1AA-NI
0.75" 0.75"
041 Operation Centre DWG.No.:
PG 041 Contractor JOB Code Responsible Company
0225
8"-P-041-0099-B1AP04-NI

STR 0-6495-20 TPM


4"-P-041-0181-B1AP04-NI

NPIC-041-E-0152M 1061
NPIC-041-E-0100M Prepared by Checked by Approved by
041
041 PG T. T. HUONG T. NGUYEN T. N. SON
041 PG 041-P-201B 0212
0228 4" - 300#
STR NOTE 1
I 1060 RF I
NPIC-041-E-0100M
041 8"-P-041-0100-B1AP04-NI
PG 041-P-201A M-2
M
0227 NOTE 1
4" - 300#
RF LPN 6" - 300# A, B, C, E
NSRP
Complex Project
041-3601M RF Nghi Son Refinery and Petrochemical
M-2 Nghi Son, Vietnam Limited Liability Company
NPIC-041-E-0100M 041
M (V) MGL
6" - 300# A, B, C, E 0202A Drawing Title
NPIC-041-E-0158M
RF 0.75" - 300# RUN
J NPIC-041-E-0100M 041 RF PIPING AND INSTRUMENT DIAGRAM J
(V) MGL
0201A 0.75"-P-041-0024-B1AP04-NI PENEX
0.75" - 300# RUN STABILIZER AND SCRUBBER SECTION
RF FREE DRAINING FREE DRAINING
0.75"-P-041-0023-B1AP04-NI CBD CBD STABILIZER REFLUX PUMPS
NPIC-041-E-0158M 041-3701M 041-3701M
0.75" 0.75" 0.75"-CBD-041-0021-A2AP-NI 0.75" 0.75" 0.75"-CBD-041-0022-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
WO WO Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0020M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1615 of 37


041-LPS-01-SV-1 Page
SIGNAL
041-0019M 0.75"-FLG-041-0068-A1AP-NI FLG
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0.75"-150# 041-3502M
TO 041-PDY-0206 1"-150# 0014V AND D-000-1225-0020V TO 0026V.
041 H RF (V)
PIC RF
A 0205 L 0.75"
1. TO BE LOCATED ABOVE CAUSTIC DISTRIBUTOR TRAY AND IN THE
HORIZONTAL DIRECTION.
A
SIGNAL
1"-V-041-0021-A1AP-NI
041-0019M TP TP FREE DRAINING FREE DRAINING 4"-FLG-041-0058-A1AP-NI FLG 2. DELETED.
M3 M18
TO 041-XY-0201 NPIC-041-E-0109M 041-3502M 3. DELETED.
E H NOTE 14 NPIC-041-E-0126M
NPIC-041-E-0126M 041
AI
041 0.75"
041 041

E
4. WATER DRAIN.

E
AT 041 041
PG PT 0201 0201 TI

E
041 TT

E
0213 0205 H2 PV 0218 5. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
0218
E E

NPIC-041-E-0105M 0205 D-041-1225-2401M.


4"

E
4"-P-041-0104-A1AH04-STL NOTE 12

E
6. SPRAY NOZZLE.
B SIZE: 2J3 TOP CONNECTION FC 3" 6" 7. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
B
PSET: 0.90 MPa(g) 0.75" 0.75"
4" 0.34 MPa(g) @ 175°C AND FV @ 175°C.
041
PSV FREE DRAINING 8. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
0202 4"-FLG-041-0033-A1AP-NI FLG FLG
WITH WATER PRIOR TO STEAM-OUT.
041-3502M 041-3502M
4"-P-041-0098-B1AH04-NI NOTE 5 9. DELETED.
STABILIZER GAS 041
2" SC
041-0019M 0011 10. NET GAS SCRUBBER SHALL NOT BE DRAINED BELOW 1 FOOT
0.75" TYPE L3 ABOVE THE INLET GAS DISTRIBUTOR.
041-C-202

FREE DRAINING
FREE DRAINING

MIN
FROM 041-V-201 NPIC-041-E-0105M
NOTE 8 11. ORIFICE WITH 47.85 MM HOLE. NPIC-041-E-0158M
C 0.75"
2"
C
12. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200 MM
041
NPIC-041-E-0107M NPIC-041-E-0109M
SP 13. VALVE WITH MONEL TRIM.
1144 NPIC-041-E-0107M
3"-P-041-0184-A1AH04-NI
14. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-046.

NOTE 13 MH PERMANENT LINE


24" WASH WATER
6" 3"-P-041-0185-A2AN04-NI SUBJECT TO
041-0023M
SERVICE TEST
4"-P-041-0102-A1AH04-NI

FROM 041-P-202A/B
D 041 D
LI TEST POINT
HH
8" 0207
NPIC-041-E-0090M
NPIC-041-E-0090M

TYPE 1 TYPE 1
041 041
LT LG
0207 0208
DP MAG

E CCB
NPIC-041-E-0090M
RECIRCULATING
CAUSTIC
E
NPIC-041-E-0107M 6" 3"-P-041-0186-A2AN04-NI A. DELETED.
041-0022M
MH
NOTE 1, 13 24" FROM 041-E-204

041
SP
1145 041 CRIT
LZALL
0205

F 041
LZI
L Z AH F
HH
8" 0205
2" L Z AL
4"-P-041-0103-A1YV04-NI

RECIRCULATING
NOTE 6 CAUSTIC
6" 2"-P-041-0187-A2AN04-NI
041-0022M

041 FROM 041-E-204 FEED DWG.No.


G UZ
0201
TYPE 1 G
041 NPIC-041-E-0145M
LG
TYPE 1 NPIC-041-E-0090M 0206A
041 MAG
LZT 963053-120-21-A1 NET GAS SCRUBBER
0205 DWG.No. Title
DP 041
LL TYPE 1 FI REFERENCE DRAWINGS
041 0208
MIN MH LG NOTE 11
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
24" 0206B 041 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
FREE DRAINING MAG 041
FT 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
6" FE
0208 0208 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H NOTE 10
3"-FCAU-041-0004-A2AN04-NI
CAUSTIC A 13/JUL/13 FOR REVIEW DMO RKM SMA H
3" 041-0024M Rev Date Description Prep'd Chk'd App'd
NPIC-041-E-0115M REVISIONS
041-LPS-01 2" FROM 041-P-212
NPIC-041-E-0158M Operation Centre JOB Code:
LPS 0.75" Operation Centre DWG.No.:
TL
041-3102M 041
IN VIEW Contractor JOB Code Responsible Company
041 0-6495-20 TPM
1700 MIN

041 SG FI
0.75" 0.75" LI 1226 Prepared by Checked by Approved by
0208L
0205L
NPIC-041-E-0115M T. T. HUONG T. NGUYEN T. N. SON
3"-P-041-0190-A2AN04-HC SG NPIC-041-E-0158M

I 3"-LPS-041-0003-A1AS-HS RECIRCULATING
CAUSTIC
I
IN VIEW 041-0022M
0.75"
IN VIEW
4"-P-041-0188-A2AN04-NI TO 041-P-203A/B
WASH WATER
NSRP
Complex Project
3"-P-041-0189-A2AN04-NI Nghi Son Refinery and Petrochemical
041-0023M
3" Nghi Son, Vietnam Limited Liability Company
NNF TO 041-P-202A/B
LPT SPENT CAUSTIC
NOTE 4 NC 3"-SCAU-041-0001-A2AN04-NI Drawing Title
041-0025M
FOR 041-LG-0208
J 041-C-202 TO 041-V-211 PIPING AND INSTRUMENT DIAGRAM J
0.75"
0.75" 0.75" PENEX
NET GAS SCRUBBER
FREE DRAINING MIN
CODE ASME VIII DIV 1 3"-CBD-041-0029-A2AP-NI CBD
4"-P-041-0104-A1AH04-STL STABILIZER AND SCRUBBER SECTION
SIZE:I.D x TT 1000 / 3000 mm x 19500 mm 041-3701M FOR 041-LG-0206A/B
NPIC-041-E-0090M
NET GAS SCRUBBER
0.75" 2"-CBD-041-0042-A2AP-NI
DESIGN PRESSURE 0.90 MPa(g) + FV @ 100°C 3" 0.75" 0.75"
NPIC-041-E-0115M
DESIGN TEMPERATURE 100°C MIN Issue Purpose Document Class
FREE DRAINING FREE DRAINING CBD
INSULATION TYPE NI 3"-CCB-041-0019-A2AN04-NI CCB SWEET-OFF GAS FOR CONSTRUCTION Z
041-3701M
K TRIM SPECIFICATION
P-041-0292-B2AN04-NI 041-3701M NPIC-041-E-0151M NPIC-041-E-0101M TO UNIT 124 Unit No. Unit Abbreviation PCWBS Size Scale K
P-041-0309-A1AH04-NI NPIC-041-E-0119M
NPIC-041-E-0115M 124-V-001 041 PENX A900 A1 NONE
WO 2"-CCB-041-0021-A2AN04-NI FREE DRAINING

DR01A
NOTE 7, 8 NPIC-041-E-0158M
CCB
041-1001M Contractor DWG.No. Sheet Rev.
A1

041-3701M D-041-1225-0021M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1616 of 37


041-LPS-01-SV-1 Page

SIZE: 1E2
PSET: 1.45 MPa(g) 041-P-203A/B 041-E-204 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041 CAUSTIC CIRCULATION PUMPS CAUSTIC HEATER 0014V AND D-000-1225-0020V TO 0026V.
PSV
0203 CODE ASME VIII DIV 1 / API 660
A CODE API 610
TYPE: MULTITUBE
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2202M. A
PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
041 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 203 mm/ 2745 mm/ 8.98 m²
3"-P-041-0196-A2AN04-NI FI RATED CAPACITY / NPSHR 17 m 3/hr/ 2 m D-041-1225-2401M.
0205 31.6 m / 1.40 MPa(g) DESIGN DUTY 495 kW
L DIFF. HEAD / SHUT-OFF PRESSURE 3. RESTRICTION ORIFICE WITH 27 MM HOLE.
1.13 SIDE SHELL TUBE
041 SPECIFIC GRAVITY @ PUMPING TEMP
FI DESIGN PRESSURE 0.81 MPa(g) + FV @ 120°C 1.45 MPa(g) + FV @ 100°C 4. WASH WATER CONNECTION TO PREVENT FeS FIRE DURING
0205L MOTOR SIZE 7.5 kW
TURNAROUND.

FREE DRAINING
NI DESIGN TEMPERATURE 265°C 100°C
INSULATION TYPE
INSULATION TYPE HS NI 5. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED

2"-P-041-0195-A2AN04-NI
TRIM SPECIFICATION B2AN04-NI
TRIM SPECIFICATION A2AS-HS A2AN04-NI WITH WATER PRIOR TO STEAM-OUT.

B NOTE 6 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE B


IN VIEW 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.

FREE DRAINING
7. HOT CONDENSATE TO BE COOLED USING SERVICE WATER
NOTE 3 BEFORE DISCHARGE TO COC.
NOTE 12 041
RO 8. LOCATION TO BE ABLE FOR FLEXIBLE HOSE CONNECTION WITH
041 041-LPS-01
0202 NEARBY UTILITY STATION.
FT
RECIRCULATING 041 0205
FE 66" 3"-LPS-041-0009-A1AS-HS LPS 9. INLET AND OUTLET PIPING TO BE SYMMETRICAL.
CAUSTIC 0205
3"-P-041-0186-A2AN04-NI 041-3101M
0
041-0021M 0.75" 10. FULL OPENING OF GLOBE VALVE MAY FLOOD THE FLOOR. GLOBE
C TO 041-C-202
VALVE TO BE ADJUSTED TO ACHIEVE SUFFICIENTLY COOL C
NPIC-041-E-0153M TEMPERATURE AT 041-TG-0219 (40°C RECOMMENDED).
NPIC-041-E-0153M NPIC-041-E-0153M 041-LPS-01
3" 0.75" 041 11. ORIFICE WITH 18.23 MM HOLE.
FI
2"
041 H 0.75"-LPCW-041-0026-A2AS-PG LPCW
12. ORIFICE WITH 40.45 MM HOLE.
0204 TI NPIC-041-E-0158M ST
L TWO PHASE FLOW
041 0209 041-E-204 NOTE 9
041-3101M
2.5" L 13. SELF-VENTING PUMP CASING. NPIC-041-E-0158M
FI NOTE 5 0.75"-LPS-041-0035-A1AS-HS
HC
0204L 0.75'' 041 - LPCW return line to LPCW Interconnecting
IN VIEW 041 NPIC-041-E-0158M 041 8"" 8" TG
BY VENDOR NOTE 11 Header Permanent Supply required
FT TT 0214
RECIRCULATING NOTE 4, 8 0204 041 0209 3"-300#
0.75"
D CAUSTIC
2"-P-041-0187-A2AN04-NI
FE
0204 3" RS RS
D
041-0021M

TO 041-C-202 6" 6" PERMANENT LINE


3"-300# 0.75"
SUBJECT TO
6" 6" SERVICE TEST
NOTE 9
FLG 6"-LPCW-041-0010-A2AS-PG TEST POINT
SVW 2"-SVW-041-0005-A2AW-NI
041-3502M
041-3301M
E 041 E

MIN
0.75" 0.75" TG
0219 - LPCW
A. DELETED. return line to LPCW
IN VIEW Interconnecting
1. DELETED. Header
NOTE 2 NOTE 10
041 2. DELETED.
SC
Permanent Supply required
0012
WO 3. DELETED.
TYPE L3
TO COC
(BY CIVIL)
NOTE 7
F 3"-P-041-0194-A2AN04-NI F

RECIRCULATING
CAUSTIC
4"-P-041-0188-A2AN04-NI
041-0021M
3"-P-041-0193-A2AN04-NI
FROM 041-C-202
DMW
041-3301M
NPIC-041-E-0123M
0.75" 0.75" 1"-DMW-041-0003-A0JP-NI FEED DWG.No.
G G
MIN

0.75"-LPN-041- 0.75" 0.75"


0016-A1AA-NI
MIN

MIN
LPN
953053-120-22-A1 CAUSTIC CIRCULATION AND WATER INJECTION
041-3601M DWG.No. Title
MIN

0.75" 0.75"
4"-P-041-0191-A2AN04-NI

REFERENCE DRAWINGS

4"-P-041-0192-A2AN04-NI
0.75"-LPS-041-
041-LPS-01
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
0024-A1AS-HS
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS

MIN
MIN

LPS 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD


0.75"
MIN

DMW 041-3101M B 11/NOV/13 FOR APPROVAL DMO RKM SMA


MIN

H 041-3301M 0.75" HC 0.75" DMW 0.75"-CCB-041-0023-A2AN04-NI FREE DRAINING CCB


A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" 0.75" 041-3301M 041-3701M REVISIONS
0.75" 041
041 PG
PG 0.75" 0.75" 0.75" 0.75" Operation Centre JOB Code:
0.75"-DMW-041-0004-A0JP-NI 0215

NPIC-041-E-0158M
0214 Operation Centre DWG.No.:
NPIC-041-E-0158M

041-P-203A 0.75"-DMW-041-0005-A0JP-NI
041-P-203B Contractor JOB Code Responsible Company
041 NOTE 1, 13 NOTE 1, 13 0-6495-20 TPM
NPIC-041-E-0158M

NPIC-041-E-0158M

STR 041
STR Prepared by Checked by Approved by
1071 2"-300# 2"-300# 0.75"-CBD-041-0032-A2AP-NI FREE DRAINING CBD
1072 T. T. HUONG T. NGUYEN T. N. SON
041 RF RF 041-3701M
PG 041
PG
I 0229
0230 I
M M-2 M M-2
3"-300# A, B, C, E 3"-300# A, B, C, E
RF RF NSRP
041 041 041 041 Complex Project
(V) MGL (V) MGL Nghi Son Refinery and Petrochemical
UZ UZ
NPIC-041-E-0158M NPIC-041-E-0158M
0203A 1000 0204A 1000 Nghi Son, Vietnam Limited Liability Company
0.75"-300# RUN 0.75"-300# RUN
RF 0.75" RF 0.75" WO Drawing Title

0.75"-P-041-0197-A2AN04-NI 0.75"-P-041-0198-A2AN04-NI
J PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0122M
NPIC-041-E-0098M
PENEX
STABILIZER AND SCRUBBER SECTION
WO WO
CAUSTIC CIRCULATION
FREE DRAINING

FREE DRAINING

0.75"-CCB-041-0001-A2AN04-NI 0.75"-CCB-041-0002-A2AN04-NI Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
CCB CCB

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-3701M 041-3701M
D-041-1225-0022M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1617 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
041 041 1. DELETED.
PIC PIC
A 0216A 0216B
2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2202M.
A
041 041 3. 041-P-211B IS A WAREHOUSE SPARE.
NPIC-041-E-0098M PV NPIC-041-E-0098M PV
NPIC-041-E-0098M 0216A 0216B 4. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.

FREE DRAINING
D-041-1225-2401M.
LPN 1"-P-041-0324-A1AP04-NI FREE DRAINING FREE DRAINING 1" FREE DRAINING FLG
5. 10 MM WEEP HOLE TO BE PROVIDED AT LOW POINT.
041-3602M 041-3502M 3"-V-041-0011-A1AP-NI
FC SIZE: 1.5G3 FC
1" 1" 6. SAMPLE CONNECTION DRAIN TO BE COLLECTED IN PORTABLE
0.75" 0.75" 0.75" 0.75" 041 PSET: 0.35 MPa(g) 0.75" 0.75"
PT DEVICE.
041 NPIC-041-E-0152M
0216 1" 2"-FLG-041-0038-A1AP-NI
B 1"-LPN-041-0005-A1AA-NI NPIC-041-E-0098M 2"
PSV
0206 FREE DRAINING 7. ORIFICE WITH 35.88 MM HOLE. B

FREE DRAINING
8. FOR DETAILS, REFER TO VENDOR DWG. VM2158-111-A-003.
1"
NPIC-041-E-0134M
WEEP HOLE 9. MAXIMUM ALLOWED CV : 7.6 WHICH IS THE GOVERNING CASE FOR
NOTE 9 NPIC-041-E-0158M NOTE 5 041-PSV-0206. NPIC-041-E-0098M
2"
NPIC-041-E-0098M 10. MAXIMUM ALLOWED CV : 3.5 TO NOT EXCEED THE 041-PSV-0206's
3"-P-041-0204-A1AP04-NI RELIEVING CAPACITY. NPIC-041-E-0108M
FREE DRAINING 11. SELF-VENTING PUMP CASING. NPIC-041-E-0158M

C 3" RS 1.5" 3"-P-041-0205-A1AP04-NI PERMANENT LINE C


MW SUBJECT TO
041-V-212
SERVICE TEST
041
UZ
1000
(v) NPIC-041-E-0090M
TEST POINT
SIZE: 1D2
PSET: 1.35 MPa(g) TYPE 1
NPIC-041-E-0090M 041 H
041 041
LT LIC
PSV
D 7500 0.5" 041
TYPE 1 0212
DP
0212 L
041
NPIC-041-E-0098M D
LG NPIC-041-E-0098M LV
0213 0212
GL(R)
NPIC-041-E-0107M

NPIC-041-E-0152M
NPIC-041-E-0158M
2"-P-041-0265-A2AP04-NI 2"-CLBFW-041-0001-B2AS-NI

FREE DRAINING
CLBFW
1"-P-041-0203-A2AN04-NI NPIC-041-E-0158M 041-3201M
0.5" 1" FC

FREE DRAINING
0.75" 0.75"
NPIC-041-E-0107M 041-P-211A TL
041 NOTE 3, 8 NPIC-041-E-0098M
PG
7500 0.5"
E E

750 MIN
0.5" LC
0.5" NOTE 10 NPIC-041-E-0108M
A. DELETED.
041 H
FI 0.75" 0.75" 1. DELETED.
1.5"
0206 L M
041
FI NPIC-041-E-0115M
M-2 1.5"-P-041-0202-A2AP04-NI NPIC-041-E-0122M
0206L NOTE 7 A, B, C, E
IN VIEW 041 041
FT 041 SC
3"-P-041-0185-A2AN04-NI 0206
FE
0013
TYPE J1
0206 NOTE 4, 6 WO
F WASH WATER
041 041
F
041-0021M UZ MGL
1000 0205A
TO 041-C-202 0.75" RUN

3"-P-041-0201-A2AN04-NI
WASH WATER
3"-P-041-0189-A2AN04-NI
041-0021M

FROM 041-C-202 FEED DWG.No.


G 0.75"-LPN-041-0017-A1AA-NI G
NPIC-041-E-0098M 0.75" LPN 0.75" 0.75"
041-V-212
041-3601M 953053-120-22-A1 CAUSTIC CIRCULATION AND WATER INJECTION
MIN

MIN

MIN
0.75" WATER BREAK TANK
MIN

DWG.No. Title
0.75" 0.75"
0.75"-LPS-041-0025-A1AS-HS REFERENCE DRAWINGS
CODE ASME VIII DIV 1 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPS SIZE: I.D x TT 750 mm x 1500 mm 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75" 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3101M DESIGN PRESSURE 0.35 MPa(g) + FV @ 40 °C
MIN

MIN
3"-P-041-0200-A2AN04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" HC 0.75" 0.75"
041-LPS-01 0.75" DESIGN TEMPERATURE 70 °C A 13/JUL/13 FOR REVIEW DMO RKM SMA H
NI Rev Date Description Prep'd Chk'd App'd
INSULATION TYPE
FREE DRAINING 0.75"-CCB-041-0024-A2AN04-NI

3"-P-041-0199-A2AN04-NI FREE DRAINING REVISIONS


FREE DRAINING 0.75"-CBD-041-0033-A2AP-NI

CCB P-041-0312-A1AP04-NI
TRIM SPECIFICATION Operation Centre JOB Code:
041 041
041 041 041-3701M P-041-0313-B2AP04-NI Operation Centre DWG.No.:
STR 041-P-202A PG
STR
041-P-202B PG
1080 NOTE 2, 11 0218
NOTE 2, 11 0219 0.75" 0.75"-CCB-041-0025-A2AN04-NI Contractor JOB Code Responsible Company
WO 1081 0-6495-20 TPM
NPIC-041-E-0158M NPIC-041-E-0158M
041-P-211A/B Prepared by Checked by Approved by
2"-300# 2"-300# T. T. HUONG T. NGUYEN T. N. SON
FREE DRAINING CBD
RF 041 RF WATER INJECTION PUMPS
PG 041-3701M
I 041
PG
0232
0.75"-CBD-041-0034-A2AP-NI
CODE API 675 I
0231 M M-2 M M-2 PUMP TYPE / NO. OF STAGE PROPORTIONING / 1
3" - 300# A, B, C, E 3" - 300# A, B, C, E NPIC-041-E-0122M RATED CAPACITY / NPSHR 0.053 m 3/hr/0.56 m
RF RF
NPIC-041-E-0098M
DIFF. HEAD / SHUT-OFF PRESSURE 108.7 m NPIC-041-E-0158M NSRP
SPECIFIC GRAVITY @ PUMPING TEMP 0.99 Complex Project
NPIC-041-E-0158M (V) 041 041 NPIC-041-E-0158M (V) 041
Nghi Son Refinery and Petrochemical
MGL UZ 041 0.37 kW
MGL UZ MOTOR SIZE Nghi Son, Vietnam Limited Liability Company
0206A 1000
0.75"-300# 0.75"-300# 0207A 1000 INSULATION TYPE NI
RF 0.75" RUN RF 0.75" RUN Drawing Title
TRIM SPECIFICATION A2AP04-NI
CCB CBD WO
J 041-3701M 041-3701M 0.75"-P-041-0207-A2AN04-NI PIPING AND INSTRUMENT DIAGRAM J
0.75"-P-041-0206-A2AN04-NI 041-P-202A/B
PENEX
WATER CIRCULATION PUMPS STABILIZER AND SCRUBBER SECTION
WO WO CODE API 610 WATER INJECTION
FREE DRAINING

FREE DRAINING

PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1


RATED CAPACITY / NPSHR 14.0 m 3/hr/2.1 m
0.75"-CCB-041-0003-A2AN04-NI 0.75"-CCB-041-0004-A2AN04-NI Issue Purpose Document Class
DIFF. HEAD / SHUT-OFF PRESSURE 24.2 m / 1.33 MPa(g)
SPECIFIC GRAVITY @ PUMPING TEMP 0.99 FOR CONSTRUCTION Z
K MOTOR SIZE 5.5 kW
Unit No. Unit Abbreviation PCWBS Size Scale K
INSULATION TYPE NI 041 PENX A900 A1 NONE
CCB CCB

DR01A
Contractor DWG.No. Sheet Rev.
TRIM SPECIFICATION B2AN04-NI
A1

041-3701M 041-3701M
D-041-1225-0023M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1618 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-TK-211 041-P-212
0014V AND D-000-1225-0020V TO 0026V.

CAUSTIC DILUTION TANK CAUSTIC TRANSFER PUMP


A CODE API 650 CODE ISO 5199
1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
OPERATION TO BE PROVIDED AT GRADE LEVEL. VALVE
A
TYPE CONED ROOF PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1 MATERIAL AS PER S0CW PIPING CLASS SPEC.

SIZE:I.D x HEIGHT 5000 mm x 5000 mm RATED CAPACITY/NPSHr 24 m3/hr/2.3 m 2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG.
WORKING CAPACITY 65.4 m³ DIFF.HEAD/SHUT-OFF PRESSURE 83.8 m/ 1.18 MPa(g) D-041-1225-2203M

DESIGN PRESSURE 1.448 / 0.7584 KPa(g) (INTERNAL / EXTERNAL) SPECIFIC GRAVITY @ PUMPING TEMP. 1.13 3. SIPHON BREAKER TO BE PROVIDED.
DESIGN TEMPERATURE 70°C MOTOR SIZE 22 kW 4. RESTRICTION ORIFICE WITH 16 MM HOLE.
INSULATION TYPE NI INSULATION TYPE NI
5. PLANT AIR IS FOR TANK MIXING.
TRIM SPECIFICATION P-041-0314-A2AN04-NI TRIM SPECIFICATION A2AN04-NI
B 6. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG. B
NPIC-041-E-0107M D-041-1225-2401M.
CAUSTIC
3"-FCAU-041-0004-A2AN04-NI 7. DELETED.
041-0021M
8. GAUGING HATCH.
TO 041-P-203A/B TO ATM NPIC-041-E-0107M
9. DELETED.
041
LI 10. PIPING IN CAUSTIC SERVICE FROM 041-P-212 SHALL BE
(V) 0209L FLUSHED WITH WATER PRIOR TO STEAM-OUT. STEAM-OUT
CONDITIONS ARE 0.34MPa(g) @ 175 ºC AND FV@175 ºC.
C (V) 11. SAMPLE CONNECTION DRAIN TO BE COLLECTED IN A
C
041 H
041 PORTABLE DEVICE.
6" LT LI
0209 0209 L 12. BLOCK / GLOBE VALVE SHOULD BE LOCATED OUTSIDE THE
FLT
NOTE 8 TANK BLINDWALL.
041 041
FQI
FI
8"
13. ORIFICE WITH 22.04 MM HOLE.
0207 0207L 24" MH
14. ORIFICE WITH 24.93 MM HOLE. NPIC-041-E-0098M
NOTE 13 041 IN
041 FT 15. STEAM OUT CONDENSATE SHALL BE ROUTED TO CBD.
VIEW

MIN
FE 0207
D 0207 NOTE 3 16. SELF-VENTING PUMP CASING. NPIC-041-E-0158M D
CLBFW 2"-CLBFW-041-0002-B2AS-NI
PERMANENT LINE
041-3201M NOTE 4 NOTE 12
041 SUBJECT TO
RO
0.75"
0203
SERVICE TEST
NOTE 10

305
NPIC-041-E-0107M
PA 1"-PA-041-0001-A2AA-NI
TEST POINT
041-3601M NOTE 5 600 MIN

(V)
E E
A. DELETED.
NPIC-041-E-0098M
1"-DMW-041-0002-A0JP-NI
1"-PA-041-0002-A2AN04-NI

NOTE 6, 11 TOP CONNECTION


1. DELETED.
041
SC DMW 2. DELETED.
0014
041-3301M
TYPE J1 MIN
0.75" 0.75"
4" 0.75"-LPN-041-0018-A1AA-NI

MIN
F NPIC-041-E-0098M TOP CONNECTION F
NC MIN
041

1000
041 LPN NPIC-041-E-0158M
TT TI
0210 0210 041-3601M
NOTE 15

MIN
3" MH 0.75" 0.75"
UC 24" 4"

MIN
FREE DRAINING

0.75"
1:120 1:120 HC

4"-FCAU-041-0010-A2AN04-NI
LPS 0.75"

MIN
FEED DWG.No.

FREE DRAINING
G 041-3101M G
4" 041-TK-211 0.75" 0.75"
041-LPS-01

FREE DRAINING 0.75"-CCB-041-0022-A2AN04-NI


NPIC-041-E-0107M NPIC-041-E-0098M
0.75"-LPS-041-0026-A1AS-HS

FREE DRAINING 0.75"-CBD-041-0046-A2AP-NI


041 953053-120-23-A1 CAUSTIC DILUTION TANK
PG DWG.No. Title
0221 REFERENCE DRAWINGS
FREE DRAINING
WO 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0140M
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
0.75" B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H IN VIEW 12" UG
A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
NOTE 12 AOC
UG REVISIONS
NPIC-041-E-0140M
(BY CIVIL ) NOTE 1 Operation Centre JOB Code:
0.75"-DMW-041-0001-A0JP-NI Operation Centre DWG.No.:
NOTE 14 TOP CONNECTION
041 Contractor JOB Code Responsible Company

MIN
FI 041 0-6495-20 TPM
0211L FE DMW Prepared by Checked by Approved by
0211
041-3301M T. T. HUONG T. NGUYEN T. N. SON
041 MIN
FT NPIC-041-E-0098M 0.75" 0.75" NPIC-041-E-0158M
I 0211 041
STR NPIC-041-E-0100M
CBD I
1083
0.75" 041-3701M
041
FQI
041-P-212 1" - 150#
0211
041 NOTE 2, 16 RF NSRP
3"-FCAU-041-0006-A2AN04-NI

PG Complex Project
0220 Nghi Son Refinery and Petrochemical
A, B, C, E 041 Nghi Son, Vietnam Limited Liability Company
4"-FCAU-041-0007-A2AN04-NI MGL
M
1.5" - 150# M-2 0208A Drawing Title
RF RUN
J NPIC-041-E-0100M PIPING AND INSTRUMENT DIAGRAM J
0.75" - 300# (V) PENEX
RF
STABILIZER AND SCRUBBER SECTION
NPIC-041-E-0146M 0.75"-FCAU-041-0011-A2AN04-NI FREE DRAINING CCB
CAUSTIC CAUSTIC DILUTION TANK
041-3701M
FROM UNIT 130 0.75" 0.75"-CCB-041-0005-A2AN04-NI
0.75"
130-P-003A/B Issue Purpose Document Class
041-1001M FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0024M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1619 of 37


041-LPS-01-SV-1 Page

041-V-211 041-P-213A/B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
CAUSTIC DEGASSING DRUM SPENT CAUSTIC PUMPS 1. DELETED.
A CODE ASME VIII DIV 1 CODE ISO 5199
A
2. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2203M.
SIZE:I.D x TT 900 mm x 3000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1
3. MIN 600 MM ABOVE FLARE HEADER.
0.35 MPa(g) + FV @ 100 °C RATED CAPACITY/NPSHr 23 m3/hr/2.2 m
DESIGN PRESSURE 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
DIFF.HEAD/SHUT-OFF PRESSURE 60.2 m / 1.20 MPa(g)
DESIGN TEMPERATURE 100 °C 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
SPECIFIC GRAVITY @ PUMPING TEMP. 1.16
INSULATION TYPE NI MOTOR SIZE 11 kW 5. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
P-041-0293-A1AP04-NI WITH WATER PRIOR STEAM-OUT.
TRIM SPECIFICATION INSULATION TYPE NI
SCAU-041-0013-B2AN04-NI 6. SPENT CAUSTIC PUMPS 041-P-213A/B ARE INTERMITTENT SERVICE.
TRIM SPECIFICATION A2AN04-NI
B NOTE 4 NPIC-041-E-0158M
LOW FLOW ALARM SHALL BE ACTIVATED ONLY WHEN THE PUMPS
ARE IN SERVICE.
B
MIN
FREE DRAINING 7. ORIFICE WITH 49.27 MM HOLE.
3"-FLG-041-0040-A1AP-NI
LO 8. MAXIMUM ALLOWED CV : 45 WHICH IS THE GOVERNING FOR

NOTE 3
600 MIN
041-V-211 SIZING CASE.
0.75"
NPIC-041-E-0108M
9. SELF-VENTING PUMP CASING.

FREE DRAINING
NPIC-041-E-0158M
3"-P-041-0105-A1AP04-NI
FLG PERMANENT LINE
C 041-V-211 041-3502M SUBJECT TO C
NOTE 5 SERVICE TEST
041
LZY
0210 2"
041 041 TEST POINT
UZ UZ MW
S
1000 0201 041
LZV
0210 RS NPIC-041-E-0158M
SPENT CAUSTIC C
3"-SCAU-041-0001-A2AN04-NI 3"
041-0021M
FC 1
FROM 041-C-202 TSO
D 0.75" 1.5" 0.75" D
2
2''

LC NOTE 8 NPIC-041-E-0090M
NPIC-041-E-0108M
NPIC-041-E-0090M

TYPE 1 TYPE 1 TYPE 1


041 H 041 H 041
041 041 041
LI LT LT LIC LG LY
0216 0216 0210 0210 0211 0210B
NPIC-041-E-0090M

L L
DP MAG
E DP 041
FI
E
041
1"-SCAU-041-0003-A2AN04-HC LY 0209 NOTE 6 A. DELETED.
L
HH 0210A 041
LOW
8" FI
LEVEL STOP 0209L
NOTE 7
041
041 FT
LPS 1"-LPS-041-0004-A1AS-HS FE 0209
IN VIEW
041-3102M 0209
TL
041-LPS-01 4"-SCAU-041-0011-A2AN04-NI
0.75" 0.75"
F LPT NPIC-041-E-0090M CCB
F
FREE DRAINING
900 MIN

3"-SCAU-041-0006-A2AN04-NI

0.75"-LPN-041- 0.75" 0.75"


0019-A1AA-NI

MIN
LPN

MIN
041-3602M FEED DWG.No.
G G

MIN
0.75" 0.75"

4"-SCAU-041-0005-A2AN04-NI
4"-SCAU-041-0004-A2AN04-NI

0.75" 0.75"-LPS-041- 0.75" NPIC-041-E-0122M


0027-A1AS-HS

MIN
NPIC-041-E-0100M
NPIC-041-E-0158M
LPS
953053-120-24-A1 CAUSTIC DEGASSING DRUM
NPIC-041-E-0123M 0.75"
041 MIN HC 041-3102M 041 DWG.No. Title
STR 0.75" 0.75" 0.75" STR REFERENCE DRAWINGS
1089 041-LPS-01 1090 FREE DRAINING CCB 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0100M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0158M 041-3701M
041 041 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-P-213A PG 041-P-213B PG 0.75" 0.75"-CCB-041-0026-A2AN04-NI B 11/NOV/13 FOR APPROVAL DMO RKM SMA
NOTE 2, 9 0222 0223
H NOTE 2, 9 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
1" - 150# 1" - 150# Rev Date Description Prep'd Chk'd App'd
041 041
PG RF PG RF REVISIONS
1.5" - 150# FREE DRAINING CBD
0233 0234 Operation Centre JOB Code:
RF 041-3701M Operation Centre DWG.No.:
0.75"-CBD-041-0036-A2AP-NI Contractor JOB Code Responsible Company
M M 0-6495-20 TPM
1.5" - 150#
Prepared by Checked by Approved by
M-2 RF M-2
0.75" NPIC-041-E-0100M T. T. HUONG T. NGUYEN T. N. SON
1.5" A, B, C, E A, B, C, E
(V) (V)
041
I UZ
041
MGL
041
UZ
041
MGL I
0.5" - 150# 1000 0209A 0.5" - 150# 1000 0210A
WNRF WNRF
NPIC-041-E-0158M RUN NPIC-041-E-0158M RUN
WO
0.75"-SCAU-041-0008-A2AN04-NI 0.75"-SCAU-041-0009-A2AN04-NI
WO NSRP
1.5"-CCB-041-0011-A2AN04-NI

0.75" Complex Project


1.5"-CBD-041-0030-A2AP-NI

Nghi Son Refinery and Petrochemical


0.75" 0.75"
Nghi Son, Vietnam Limited Liability Company

3"-SCAU-041-0007-A2AN04-NI
0.75"
Drawing Title

J PIPING AND INSTRUMENT DIAGRAM J


WO PENEX
WO STABILIZER AND SCRUBBER SECTION
CAUSTIC DEGASSING DRUM
FREE DRAINING

FREE DRAINING

FREE DRAINING

FREE DRAINING
Issue Purpose Document Class
0.75"-CCB-041-0006-A2AN04-NI 0.75"-CCB-041-0007-A2AN04-NI
FOR CONTRUCTION Z
SPENT CAUSTIC
K Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 190
CCB CBD CCB CCB
041 PENX A900 A1 NONE
190-TK-101

DR01A
Contractor DWG.No. Sheet Rev.
041-3702M 041-3702M 041-3702M 041-3702M
A1

041-1001M
D-041-1225-0025M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1620 of 37


041-LPS-01-SV-1 Page

FREE DRAINING 24''-FLG-041-0041-A1AP-NI FLG


A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-C-301 SIZE: 8T10 SIZE: 8T10 SIZE: 8T10 SIZE: 8T10 041-3503M
0014V AND D-000-1225-0020V TO 0026V.
PSET: 0.35MPa(g) PSET: 0.3675MPa(g) PSET: 0.3675MPa(g) PSET: 0.3675MPa(g)
041 1. DELETED.
DEISOHEXANIZER
A PSV
0301A NOTE 4
041
PSV
041
PSV
041
PSV 2. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
A
CODE ASME VIII DIV 1 12" 0301B NOTE 4 0301C NOTE 4 0301D NOTE 4 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
P
12" 12" 12"
SIZE: I.D x TT 4700 mm x 48200 mm NPIC-041-E-0158M
0.75'' P P P 3. DELETED.

DRAINING
NPIC-041-E-0151M 0.75'' NPIC-041-E-0158M
0.75'' 0.75''

DRAINING

DRAINING

DRAINING
DESIGN PRESSURE 0.35 MPa(g) + FV @ 143 °C NPIC-041-E-0130M 0.5'' 4. PSV'S ARE OF 4x25%.
0.5'' 0.5'' 0.5''

FREE
NPT

FREE

FREE

FREE
DESIGN TEMPERATURE 175 °C 0.75'' NPT NPT NPT REQUIRED ORIFICE AREA:
NPIC-041-E-0092M NPIC-041-E-0092M
INS. 0.75'' - 041-PSV-0301A: 15984MM ² NPIC-041-E-0107M
INSULATION TYPE HC / PG 1.5''-P-041-0327-A1AP04-PG INS. INS. INS.
FREE DRAINING

MIN
PIP. DIH OVERHEAD
P-041-0302-A1AP04-PG 041 PIP. PIP. PIP. - 041-PSV-0301B/C/D: 16040MM ².
TRIM SPECIFICATION TI 2oo3
P-041-0315-B1AP04-HC 041 0.75'' 0.5'' 0.75'' 0.5'' 0.75'' 041-0030M
0301 UZ 2"
B LO LO LO LO TO-041-V-301 B

FREE DRAINING
0301 PERMANENT LINE
NOTE 2 HIPPS 10"-P-041-0220-A1AP04-NI
HH HH HH
H
SUBJECT TO
041 041 041 041 041 041
TT PZT PZT PZT PT PI 1.5''-P-041-0328-A1AP04-PG 1.5''-P-041-0330-A1AP04-PG SERVICE TEST
0301 0315A 0315B 0315C 0304 0304 L 1.5''-P-041-0329-A1AP04-PG
3" 30''-P-041-0266-A1AP04-PG
FREE DRAINING DIH OVERHEAD
TEST POINT
041-0030M

TOP CONNECTION TO-041-AC-301


041-C-301
30"-P-041-0106-A1AP04-PG
C C
DIH REFLUX
MH 8"-P-041-0110-A1AP04-NI
24" 041-0031M

FROM 041-P-301A/B
1
5

H SIGNAL
041 041 041 041
TI TIC
D 0333
TT
0333
6 TT
0302 0302
041-0031M
D
20 TO 041-HY-0302

MH
24"

21
STABILIZER BOTTOMS 40
10"-P-041-0174-A1AP04-HC MH
041-0017M
TWO PHASE FLOW 24"
41
E FROM 041-E-201A/B
NO POCKET 12" 66
041 041 E
PDY PDI
0303 0303 A. DELETED.
MH SIGNAL
24" 041-0030M 1. DELETED.
041 H
LI 2. DELETED.
67 FROM 041-PIC-0302
0301 L 3. DELETED.
NPIC-041-E-0090M 93
DIH SIDE DRAW
NPIC-041-E-0090M
3"-P-041-0301-A1AP04-PG
041-0029M
F 041
TYPE 1
041 TYPE 1
MH MINI FLOW F
24" 041 FROM 041-P-303A/B
LG LT
TI
0302 0301 DP
MAG 0309

041
CBD MIN
3000 MIN

94 TT
0309
NPIC-041-E-0090M 96 DIH SIDE DRAW
041 041
8"-P-041-0107-A1AP04-PG FEED DWG.No.
TI 041 041-0029M
G FOR 041-LG-0302 0304
TT
0304
97 PG
TO 041-P-303A/B
G
0308
105 041
041
PI
0.75" 0.75" PT
0301 0301 953053-120-25-A1 DEISOHEXANIZER
MIN FREE DRAINING 30"-P-041-0112-A1AP04-HC
REBOILER RETURN
041-0027M DWG.No. Title
SYMMETRICAL TWO PHASE FLOW FROM 041-E-302 REFERENCE DRAWINGS
FREE DRAINING 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
ARRANGEMENT 30"-P-041-0113-A1AP04-HC
REBOILER RETURN
041-0027M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
TWO PHASE FLOW FROM 041-E-302 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
FOR 041-LG-0304 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 2"-P-041-0108-A1AP04-PG
DIH BOTTOMS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
041-0028M
0.75" 0.75" NPIC-041-E-0090M MINI FLOW REVISIONS
NPIC-041-E-0090M NPIC-041-E-0090M FROM 041-P-302A/B
MIN Operation Centre JOB Code:
Operation Centre DWG.No.:
TYPE 1 TYPE 1 TYPE 1 SIGNAL
041 041 H 041 H Contractor JOB Code Responsible Company
041 041
LG LI LT LIC 0-6495-20 TPM
LT 041-0029M
0304 0310 0310 DP 0303 DP 0303
MAG L L Prepared by Checked by Approved by
TO 041-FIC-0306
T. T. HUONG T. NGUYEN T. N. SON

NPIC-041-E-0127M
I CLOSED BLOWDOWN I
2"-CBD-041-0045-A2AP-NI
NPIC-041-E-0098M 041-0030M
MH
CBD 24" 041
TI
FROM 041-LG-0306
MANIFOLD
NSRP
NPIC-041-E-0090M 0312 L Complex Project
Nghi Son Refinery and Petrochemical
LPS 3"-LPS-041-0011-A1AS-HS TL
041-0027M Nghi Son, Vietnam Limited Liability Company
041-3103M
041
0.75'' 0.75'' TT Drawing Title
041-LPS-01 0312
DIH BOTTOMS
24'' 3"-P-041-0109-A1AP04-PG
J 3"-P-041-0208-A1AP04-HC 041-0028M PIPING AND INSTRUMENT DIAGRAM J
LPT TO 041-P-302A/B PENEX
REBOILER FEED
7700 MIN

24"-P-041-0111-A1AP04-HC DEISOHEXANIZER SECTION


041-0027M

TO 041-E-302 DEISOHEXANIZER
FREE DRAINING 3''-CBD-041-0012-A2AP-NI CBD
041-3702M
3'' 0.75'' Issue Purpose Document Class
2"-CBD-041-0043-A2AP-NI FREE DRAINING CBD
FOR CONSTRUCTION Z
K 041-3702M
Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
WO Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0026M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1621 of 37


041-LPS-01-SV-1 Page

041-P-302A/B 041-E-303 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO

DEISOHEXANIZER BOTTOMS COOLER SIZE: 1.5F2 0014V AND D-000-1225-0020V TO 0026V.


PSET: 1.75 MPa(g)
DEISOHEXANIZER BOTTOMS PUMPS CODE ASME VII DIV 1 / API 660 FREE DRAINING
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2204M.
A CODE NPIC-041-E-0158M API 660 TYPE: MULTITUBE
041
PSV
4''-FLG-041-0044-A1AP-NI FLG
2. RESTRICTION ORIFICE WITH 9.1 MM HOLE.
A
0304 041-3503M
PUMP TYPE/NO. OF STAGES HIGH SPEED CENTRIFUGAL / 1 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 154.1 mm / 5795 mm / 11.03 m² 3. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
3 D-041-1225-2401M.
RATED CAPACITY/NPSHr 6.1 m /hr/ 1.4m (WATER) DESIGN DUTY 69x2 kW
DIFF.HEAD/SHUT-OFF PRESSURE 158.9 m/ 1.65 MPa(g) SIDE SHELL TUBE 4. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
SPECIFIC GRAVITY @ PUMPING TEMP. 0.65 1.75 MPa(g) + FV @ 140 °C 1.35 MPa(g)
DESIGN PRESSURE
MOTOR SIZE 15 kW NOTE 4 0.75" 5. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO

MIN
PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
INSULATION TYPE PG DESIGN TEMPERATURE 170 °C 76 °C
COOLER. NPIC-041-E-0151M
TRIM SPECIFICATION B1AP04-PG / D1AP04-PG INSULATION TYPE PP NI

FREE DRAINING
6. GLOBE VALVE TO BE FULLY OPEN IN NORMAL OPERATION.
B TRIM SPECIFICATION B1AP04-PG A2AW-NI 2"
7. ORIFICE WITH 16.43 MM HOLE.
B
NPIC-041-E-0158M
8. METAL SEATED BUTTERFLY VALVE WITH OPTION CODE "4617".
SIZE: 0.75D1
PSET: 1.35 MPa(g) NPIC-041-E-0121M
3''-P-041-0212-B1AP04-PG
NPIC-041-E-0151M 041 PERMANENT LINE
TSV
0305
1''-V-041-0016-A1AP-NI
SUBJECT TO

FREE DRAINING
SERVICE TEST
2"-P-041-0114-B1AP04-PG

C NOTE 2 TEST POINT C


041
RO
NPIC-041-E-0090M 0301 0.75"

FREE DRAINING
NPIC-041-E-0130M 3"-CWR-041-0013-A2AW-NI AT GRADE
DIH BOTTOMS
2"-P-041-0108-A1AP04-PG 1" 1" TO SAFE LOCATION
041-0026M 041
MINI FLOW TG
TO 041-C-301 NOTE 6 0.75" 0327
NPIC-041-E-0121M
041-E-303 0.75" NPIC-041-E-0158M
2"-P-041-0211-B1AP04-PG
D RS NOTE 5, 8
3"-CWR-041-0004-A2AW-NI CWR D
0.75"-LPN-041-0020-A1AA-NI 041-3002M
3" - 300# 6" LPT
NPIC-041-E-0158M
LPN 0.75''
RS NPIC-041-E-0130M NOTE 5
041-3603M 3"-CWS-041-0005-A2AW-NI CWS

0.75" 0.75" 041-3002M

0.75"-LPS-041-0028-A1AS-HS 3" - 300# 0.75" 3"-CWS-041-0014-A2AW-NI


MIN

LPS NPIC-041-E-0158M
041-3103M 0.75"
E 0.75" E

MIN
0.75" 0.75"
0.75"-P-041-0267-B1AP04-HC
041-LPS-01 A. DELETED.
2"
0.75" 1. DELETED.
MIN

MIN
041
FIC
0.75" 0305

041 041 041


PG PG FT
DIH BOTTOMS 0309 0310 0305
F 041-0026M
3"-P-041-0109-A1AP04-PG F
0.75" 041
FROM 041-C-301 NOTE 7 FE
0305
MIN

0.75" 6" 1.5"


MIN

041 H
041
TI TT
0313 0313
041
3"-P-041-0209-B1AP04-PG

3"-P-041-0210-B1AP04-PG

0.75" 0.75" FV
0305
DEISOHEXANIZER BOTTOMS
2" 2"-P-041-0116-B1AP04-NI FEED DWG.No.
G FC
041-0032M G
0.75" 1" 0.75" TO BL

041 041
STR 953053-120-27-A1 DEISOHEXANIZER BOTTOMS AND SIDE DRAW
STR
1098 1099 041 DWG.No. Title
SC REFERENCE DRAWINGS
0007 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041 NOTE 3 TYPE L3 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
PG 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041 0.75" (V) 0317 0.75" (V)
PG
3" - 600# 2" - 600# 3" - 600# 2" - 600# B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0316 RF RF RF RF
FLG A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3503M Rev Date Description Prep'd Chk'd App'd
041 041
UZ UZ REVISIONS
NPIC-041-E-0152M M 1000 NPIC-041-E-0152M M 1000
NPIC-041-E-0158M Operation Centre JOB Code:
M-2 NPIC-041-E-0158M
041-P-302A A, B, C, E
041-P-302B M-2 A, B, C, E Operation Centre DWG.No.:
PG PG Contractor JOB Code Responsible Company
NOTE 1 NOTE 1 0-6495-20 TPM
041 0.75" - 300# 041 Prepared by Checked by Approved by
(V) MGL (V) MGL
WNRF T. T. HUONG T. NGUYEN T. N. SON
0303A 0304A

0.75" - 300# RUN NPIC-041-E-0158M RUN


I NPIC-041-E-0158M WNRF
0.75"-P-041-0214-B1AP04-NI I
0.75" 0.75"
0.75"-P-041-0213-B1AP04-NI NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title
WO WO
J PIPING AND INSTRUMENT DIAGRAM J
FREE DRAINING

FREE DRAINING

0.75"-CBD-041-0013-A2AP-NI 0.75"-CBD-041-0014-A2AP-NI PENEX


DEISOHEXANIZER SECTION
DEISOHEXANIZER BOTTOMS

Issue Purpose Document Class


FOR CONSTRUCTION Z
K CBD CBD Unit No. Unit Abbreviation PCWBS Size Scale K
041-3702M 041-3702M 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0028M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1622 of 37


041-LPS-01-SV-1 Page

041-P-303A/B 041-AC-302 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
DEISOHEXANIZER SIDE DRAW PUMPS DEISOHEXANIZER SIDE DRAW COOLER
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2205M.
A CODE API 610 CODE ASME VIII DIV 1 / API 661 A
PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 1 SIZE: H.T. AREA 2643 m 2 (FINNED) 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
NPIC-041-E-0158M D-041-1225-2401M.
RATED CAPACITY/NPSHr 79 m3/hr/4.2 m DESIGN DUTY 1609 kW
DIFF.HEAD/SHUT-OFF PRESSURE 158.7 m/ 1.57 MPa(g) DESIGN PRESSURE 1.65 MPa(g) + FV @ 101 °C 3. FOR AIR COOLER DETAILS, REFER TO DWG. D-041-1225-2321M.

SPECIFIC GRAVITY @ PUMPING TEMP. 0.59 DESIGN TEMPERATURE 130 °C 4. CONNECTION FOR START-UP (FILLING THE DEISOHEXANIZER
SIGNAL
MOTOR SIZE 55 kW NO. OF FANS 2 OVERHEAD SYSTEM). VALVE TO BE ACCESSIBLE AT GRADE.
041-0026M
INSULATION TYPE PG TRIM SPECIFICATION A1AP04-PG 5. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE 0.34 MPa(g)
FROM 041-LIC-0303 @ 175°C AND FV @ 175°C.
TRIM SPECIFICATION B1AP04-PG
NOTE 5
B 041 041 H 041-AC-302 6. PLUG VALVE. B
FIC TI NOTE 3 7. ORIFICE WITH 69.76 MM HOLE.
0306 L 0311
8. ORIFICE WITH 70.95 MM HOLE. NPIC-041-E-0105M

NOTE 7 9. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.


041
041 FT 041 041 10. LOCATED IN ANALYSER SHELTER 041-AS-001.
041 FE 0306 TT TG NPIC-041-E-0109M
FV 0311 0326
0306 0306 11. SELF-VENTING PUMP CASING. NPIC-041-E-0158M
DIH SIDE DRAW
4"-P-041-0050-A1AP04-NI 4"
041-0007M
C TO 041-E-001
FC
6" 6"
PERMANENT LINE C
4" SUBJECT TO
NOTE 6 0.75"
SERVICE TEST

M
TEST POINT
FLG 2.2-DIMETHYLBUTANE 2.3-DIMETHYLBUTANE

NOTE 2 041-3502M SIGNAL


041 041
041 AI AIC 041-0031M
SC 0302 0302
D 0008 TO 041-AY-0302B D
TYPE L3 NPIC-041-E-0105M 041 041
NPIC-041-E-0106M FIC
041 FV
AY 0312 0312 L
DIH SIDE DRAW 0302A 300# 300#
3"-P-041-0301-A1AP04-PG CHROMATOGRAPH 3"
041-0026M
MINI FLOW FO
TO 041-C-301 041
AT 1.5"
0302 0.75" 0.75"
NPIC-041-E-0105M
NOTE 10 NPIC-041-E-0109M 2"
E 4"-P-041-0115-A1AP04-PG E
NOTE 8
041 A. DELETED.
041 FT
NPIC-041-E-0105M 0.75" INST. 0312
FE
PIP. 0312
NOTE 9
NPIC-041-E-0105M

LPN 0.75"-LPN-041-0021-A1AA-NI
041-3603M
F 0.75" 0.75"
MIN 4"-P-041-0217-A1AP04-PG F

LPS 0.75"-LPS-041-0029-A1AS-HS
S 0 00 9 S S

MIN
0.75"
041-3103M
0.75" 0.75"
041-LPS-01 0.75"-P-041-0268-A1AP04-HC

MIN
0.75" FEED DWG.No.
0.75"
MIN

G G
NPIC-041-E-0105M 0.75"
NPT NPIC-041-E-0105M
041
INST. PG
041 0312 953053-120-27-A1 DEISOHEXANIZER BOTTOMS AND SIDE DRAW
PIP. 0.75" PG DWG.No. Title
0311 REFERENCE DRAWINGS
DIH SIDE DRAW
8"-P-041-0107-A1AP04-PG 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-0026M 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
2"
FROM 041-C-301 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 4 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0.75"
H H
MIN
MIN

A 13/JUL/13 FOR REVIEW DMO RKM SMA


Rev Date Description Prep'd Chk'd App'd
REVISIONS
Operation Centre JOB Code:
0.75" 0.75"
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
NPIC-041-E-0158M

NPIC-041-E-0158M
0-6495-20 TPM
041 041 Prepared by Checked by Approved by
STR 041-P-303A STR
041-P-303B T. T. HUONG T. NGUYEN T. N. SON
1102 1103
NOTE 1, 11 NOTE 1, 11
I 8"-P-041-0215-A1AP04-PG 8"-P-041-0216-A1AP04-PG I
041 2"-300# 041 2"-300#
PG PG
0318 4"-300# 0319 4"-300#

M-2
NSRP
041 041 Complex Project
UZ UZ Nghi Son Refinery and Petrochemical
M A, B, C, E 1000 M A, B, C, E 1000 Nghi Son, Vietnam Limited Liability Company
M-2 Drawing Title
PG PG

J 041
MGL
041
MGL PIPING AND INSTRUMENT DIAGRAM J
0305A 0306A
(V) (V) PENEX
NPIC-041-E-0158M RUN NPIC-041-E-0158M RUN
DEISOHEXANIZER SECTION
0.75" - 300# FREE DRAINING 0.75" - 300# FREE DRAINING
0.75"-P-041-0218-A1AP04-NI CBD 0.75"-P-041-0219-A1AP04-NI 0.75"-CBD-041-0016-A2AP-NI CBD
DEISOHEXANIZER SIDE DRAW
RF RF
041-3702M 041-3702M
0.75" 0.75" 0.75" 0.75"
0.75"-CBD-041-0015-A2AP-NI
Issue Purpose Document Class
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0029M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1623 of 37


041-LPS-01-SV-1 Page

SIZE: 6Q8 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-AC-301 041-V-301 PSET: 0.40 MPa(g)
0014V AND D-000-1225-0020V TO 0026V.
041
PSV
DEISOHEXANIZER CONDENSER DEISOHEXANIZER RECEIVER 1. FOR START - UP.
A 0302 FREE DRAINING 8''-FLG-041-0047-A1AP-NI FLG A
CODE ASME VIII DIV 1 / API 661 CODE ASME VIII DIV 1 NPIC-041-E-0093M 2. DELETED.
NPIC-041-E-0158M 041-3503M
SIZE: H.T. AREA 64533 m 2 (FINNED) SIZE: I.D x TT 3000 mm x 10200 mm 3. FOR AIRCOOLER DETAILS, REFER TO DWG. D-041-1225-2311M /
DESIGN DUTY 25986 kW 2312M.
DESIGN PRESSURE 0.40 MPa(g) + FV @ 120°C
0.40 MPa(g) + FV @ 120°C 4. TO BE USED FOR DEGASSING DURING START-UP AND TO VENT
DESIGN PRESSURE DESIGN TEMPERATURE 120°C NOTE 4 NON-CONDENSIBLES. ACCESS TO BE PROVIDED.
DESIGN TEMPERATURE 120°C INSULATION TYPE NI
5. EQUALIZING LINE. REFER TO DWG D-041-1225-2311M/2312M FOR

MIN
NO OF FANS 16 P-041-0303-A1AP04-NI IN VIEW
TRIM SPECIFICATION LAYOUT REQUIREMENT. NPIC-041-E-0158M
TRIM SPECIFICATION A1AP04 - PG P-041-0316-B1AP04-NI 0.75''
B NOTE 6 NOTE 6
2" 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
B

FREE DRAINING
7. 50% OF THE FANS SHALL BE PROVIDED WITH VARIABLE SPEED
DRIVE.

8. FOR PRESSURE TEST.


NPIC-041-E-0153M
9. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
12''-P-041-0224-A1AP04-PG CONNECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
SWING ELBOW TO HPN.
NPIC-041-E-0115M
10. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
C C
11. PLUG VALVE

12. LOW LEVEL OF 041-LI-0311 SHALL CLOSE THE VALVES 041-UV-0304


041 AND 041-UV-0309. NPIC-041-E-0115M
PDT
0305 13. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 0.4 MPa(g).
2"-P-041-0249-D1AP04-NI 2"-HPN-041-0005-D1AA-NI HPN
NOTE 8 041-3602M 14. NON-CONDENSIBLE VENT. NPIC-041-E-0158M
041 H
PDIC 0.75'' 0.75''
0305 NPIC-041-E-0153M NPIC-041-E-0115M PERMANENT LINE
041
D 041 PG IN VIEW 041
SUBJECT TO D
PDV 0320 PG SERVICE TEST
DIH OVERHEAD
0305
0076 NOTE 13
10"-P-041-0220-A1AP04-PG FREE DRAINING 12" 2"
041-0026M NOTE 9 TEST POINT
FC 2"-LPN-041-0010-A1AA-NI LPN
FROM 041-C-301
0.75'' 6'' NOTE 1 041-3603M
NPIC-041-E-0158M NOTE 11
SIGNAL
041 H 1"-P-041-0221-A1AP04-NI NOTE 14 0.75'' 0.75''
041-0026M PIC
041 H NOTE 10
0302
TI
TO 041-PDY-0303
0305B
12"-P-041-0122-A1AP04-NI
E E
041
041 041
PT 041 A. DELETED.
0302 PV
TT TT MIN
0302 0305A 0305B
DIH OVERHEAD
FREE DRAINING 1. DELETED.
041-0026M NPIC-041-E-0093M
FO MINIMUM RUN OF 2. DELETED.
TOP CONNECTION

3"-P-041-0222-A1AP04-NI
FROM 041-C-301
0.75'' 24" HORIZONTAL PIPE

FREE DRAINING
30"-P-041-0106-A1AP04-PG NPIC-041-E-0091M

NOTE 5
F F

FREE DRAINING
M M

MIN
041 H
TIC
041-AC-301 0305A SIGNAL
041 H
NOTE 3, 7
3" 041-V-301 LIC

10"
041-0031M
0305 L
TO 041-FIC-0303
8" VH
FEED DWG.No.
G G
NPIC-041-E-0090M
NPIC-041-E-0158M
NPIC-041-E-0090M
953053-120-29-A1 DEISOHEXANIZER RECEIVER
TYPE 1
041 H 041 041 041 TYPE 1 DWG.No. Title
LI LT TYPE 1 MH LT LG REFERENCE DRAWINGS
NPIC-041-E-0098M NOTE 12 0311 NPIC-041-E-0098M NPIC-041-E-0090M 24" 0305 0306
L 0311 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
DP MAG
3''-LPS-041-0015-A1AS-HS DP 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H LPS A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3103M Rev Date Description Prep'd Chk'd App'd
CBD REVISIONS
0.75''' 0.75'' NPIC-041-E-0090M
041-LPS-01 Operation Centre JOB Code:
3''-P-041-0250-A1AP04-HC FREE DRAINING
ISOMERATE
Operation Centre DWG.No.:
14"-P-041-0120-A1AP04-NI
041-0031M
7800 MIN

Contractor JOB Code Responsible Company


TO 041-P-301A/B 0-6495-20 TPM
Prepared by Checked by Approved by
CLOSED BLOWDOWN
2"-P-041-0121-A1AP04-NI T. T. HUONG T. NGUYEN T. N. SON
041-0031M

I FROM 041-P-301B
I
0.75" SIGNAL
041-0032M
3"
TO DRCS CONTROL NSRP
OF 041-UV-0304 Complex Project
Nghi Son Refinery and Petrochemical
SIGNAL Nghi Son, Vietnam Limited Liability Company
041-0032M
FREE DRAINING

WO Drawing Title
TO 041-US-0309
J PIPING AND INSTRUMENT DIAGRAM J
3"-CBD-041-0017-A2AP-NI NPIC-041-E-0098M PENEX

FOR 041-LG-0306
DEISOHEXANIZER SECTION
CBD DEISOHEXANIZER RECEIVER
041-3702M
0.75" 0.75"
CLOSED BLOWDOWN MIN Issue Purpose Document Class
2"-CBD-041-0045-A2AP-NI FREE DRAINING
041-0026M FOR CONSTRUCTION Z
K FROM 041-LG-302, 304
Unit No. Unit Abbreviation PCWBS Size Scale K
MANIFOLD NPIC-041-E-0127M 041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0030M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1624 of 37


041-LPS-01-SV-1 Page

041-P-301A/B A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
DEISOHEXANIZER OVERHEAD PUMPS
A 1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2204M.
A
CODE API 610 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
PUMP TYPE/NO. OF STAGES CENTRIFUGAL / 2 D-041-1225-2401M.
RATED CAPACITY/NPSHr 497 m3/hr/2.8 m 3. CONNECTION FOR START-UP FILLING. VALVE TO BE ACCESSIBLE.
DIFF.HEAD/SHUT-OFF PRESSURE 205.8 m/ 1.82 MPa(g)
4. ORIFICE WITH 162.1 MM HOLE.
SPECIFIC GRAVITY @ PUMPING TEMP. 0.60
5. ORIFICE WITH 84.52 MM HOLE. NPIC-041-E-0105M
MOTOR SIZE 315 kW
INSULATION TYPE NI 6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
TRIM SPECIFICATION B1AP04-NI
B 7. LOCATED IN ANALYSER SHELTER 041-AS-001. NPIC-041-E-0109M
B

SIGNAL
PERMANENT LINE
041 041 SUBJECT TO
041-0030M FIC FY
0303 0303 SERVICE TEST
FROM 041-LIC-0305

FLG TEST POINT


041-3503M 041
FI
0302
C C
NOTE 2 TYPE L3
041
SC NOTE 4
0009 041
041 FT
041 FE 0302
FV NPIC-041-E-0092M
0303 0302
DIH REFLUX
8"-P-041-0110-A1AP04-NI 8" 10"-P-041-0228-B1AP04-NI
041-0026M
FO
TO 041-C-301 10"
6"
0.75" 0.75"
D D
SIGNAL
041-0026M

FROM 041-TIC-0302
SWITCH SWITCH

SIGNAL SIGNAL
041 041 041
041-0029M AY HY FIC 041-0032M
E FROM 041-AIC-0302
0302B 0302 0301 L
TO 041-FV-0301
E
3- METHYLPENTANE 2- METHYLPENTANE
A. DELETED.
H 041 041 1. DELETED.
AI AIC
0301 0301

NPIC-041-E-0105M
041
AY
0301
F CHROMATOGRAPH NPIC-041-E-0105M F
0.75" 041
NPT AT
0301
NPIC-041-E-0109M
INST. NOTE 7 NOTE 5 041
NPIC-041-E-0105M PIP. NPIC-041-E-0105M FT
0.75" 0.75" 041
INST. FE 0301
PIP. 0301
ISOMERATE
10" NOTE 6 6"-P-041-0118-B1AP04-NI
041-0032M FEED DWG.No.
G 14"-P-041-0120-A1AP04-NI TO 041-E-301 G
ISOMERATE
FREE DRAINING
041-0030M
LPT 10"-P-041-0227-B1AP04-NI 953053-120-29-A1 DEISOHEXANIZER RECEIVER
FROM 041-V-301 DWG.No. Title
0.75"-LPN-041- REFERENCE DRAWINGS
2" 0022-A1AA-NI 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
LPN 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NOTE 3 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
041-3603M
0.75"

MIN
MIN

B 11/NOV/13 FOR APPROVAL DMO RKM SMA


0.75" 0.75" 0.75"
H H
MIN

MIN
0.75"-LPS-041- A 13/JUL/13 FOR REVIEW DMO RKM SMA
Rev Date Description Prep'd Chk'd App'd
0030-A1AS-HS
REVISIONS
LPS
Operation Centre JOB Code:
041-3103M
MIN

MIN
Operation Centre DWG.No.:
0.75" 0.75" 0.75" Contractor JOB Code Responsible Company
041-LPS-01 0.75"
0.75" 0.75" 0-6495-20 TPM
0.75"-P-041-0269-B1AP04-HC Prepared by Checked by Approved by
041 041
041 041 T. T. HUONG T. NGUYEN T. N. SON
STR STR PG
PG
1109 0313 14"-P-041-0226-B1AP04-NI 1110 0314
I 14"-P-041-0225-B1AP04-NI I
041-P-301A 041-P-301B
NOTE 1 NOTE 1
041
PG
0.75" (V) 8" 041
PG
0.75" (V) 8" NSRP
0333 0334 Complex Project
Nghi Son Refinery and Petrochemical
12" 12" Nghi Son, Vietnam Limited Liability Company
A, B, C, E 041 A, B, C, E 041
MGL MGL
NPIC-041-E-0132M M NPIC-041-E-0132M M Drawing Title
0307A 0308A
M-2 M-2
RUN RUN
J PIPING AND INSTRUMENT DIAGRAM J
CLOSED BLOWDOWN NPIC-041-E-0158M
041 041
041-0030M (V) UZ 2"-P-041-0121-A1AP04-NI 0.75" - 300# (V) UZ PENEX
1000 RF 1000
TO 041-V-301 DRAIN DEISOHEXANIZER SECTION
0.75" - 300# FREE DRAINING FREE DRAINING
NPIC-041-E-0158M 0.75"-P-041-0229-B1AP04-NI CBD 0.75"-P-041-0230-B1AP04-NI CBD DEISOHEXANIZER OVERHEAD PUMPS
RF
041-3702M 041-3702M
0.75" 0.75" 0.75" 0.75"
Issue Purpose Document Class
0.75"-CBD-041-0018-A2AP-NI 0.75"-CBD-041-0019-A2AP-NI
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
WO WO

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0031M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1625 of 37


041-LPS-01-SV-1 Page

SIZE: 2J3
PSET: 1.34 MPa(g) 6"-FLG-041-0067-A1AP-NI FREE DRAINING FLG
041-V-612 NOTE 12 041-P-612 041
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-3503M
PSV 0014V AND D-000-1225-0020V TO 0026V.
CLOSED BLOWDOWN DRUM CLOSED BLOWDOWN DRUM PUMP 0624 SIZE: 0.75D1
A CODE ASME VIII DIV 1 CODE API 610
PSET: 1.00MPa(g) 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE A

4"-P-041-0321-A2AP-PG
FREE DRAINING
041 OPERATION TO BE PROVIDED AT GRADE LEVEL.
SIZE: I.D x TT 2000 mm x 6000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1 0.75" TSV

MIN
0623 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS

1"-V-041-0018-A1AP-NI
DESIGN PRESSURE 0.34 MPa(g)+FV@175°C RATED CAPACITY/NPSHr 33 m3/hr/ 2.9m

FREE DRAINING
85.6 m/ 1.32 MPa(g) 3. DELETED.
DESIGN TEMPERATURE 175 °C DIFF.HEAD/SHUT-OFF PRESSURE
2"
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 0.6 - 1.0 NPIC-041-E-0158M 4. RESTRICTION ORIFICE WITH 2.2 MM HOLE.
TRIM SPECIFICATION P-041-0318-A2AP-NI MOTOR SIZE 37 kW 5. RESTRICTION ORIFICE WITH 14.81 MM HOLE.

FREE DRAINING
INSULATION TYPE PG 1"
6. LINE REQUIRED TO ENSURE ADEQUATE COOLING OF DRUM LIQUID.
041-EJ-612 TRIM SPECIFICATION A2AP - PG
B EJECTOR
7. 000P-612A IS PROVIDED AS A WAREHOUSE COMMON SPARE FOR B
041-LPS-01 040-P-612 AND 041-P-612.
AT GRADE
CODE ASME VIII DIV 1 TO SAFE LOCATION 8. PIT COVERED BY GALVANIZED METAL GRATING.
041
CAPACITY 4.1 m3/hr LPS 0.75"-LPS-041-0031-A1AS-HS 0.75"-P-041-0270-A2AP-HC 8"-300# TG
9. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C 041-3103M 041-E-613 0624 0.75"
AIR PURGE.
0.75" 0.75" RS NOTE 14 CWR
DESIGN TEMPERATURE 265°C 6"-CWR-041-0010-A2AW-NI
LPT 10. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2203M.
INSULATION TYPE PG 041-3002M
RS NOTE 14 0.75"
TRIM SPECIFICATION A2AP - PG 6"-CWS-041-0011-A2AW-NI CWS 11. DELETED.
041-3002M 12. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
C 041-E-612
4" 8"-300# 0.75" 0.34 MPa(g) @ 175 °C AND FV @ 175 °C. C
6" 13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR
041 041 H 041
CBD FLASH GAS COOLER RO NOTE 5
TI TT DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.
0622 0623 0623
CODE ASME VIII DIV 1 / API 660 0.75" 14. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
TYPE: BEU 2" PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 1250 mm / 3658 mm / 180 m² 4"-P-041-0319-A2AP-NI COOLER.

DESIGN DUTY NPIC-041-E-0158M 14610 kW 15. ORIFICE WITH 57 MM HOLE.


0.75" 041
SIDE SHELL TUBE TO ATM FA 16. NOZZLE LENGTH SHALL BE 150MM.

4"-P-041-0246-A2AP-PG
AT SAFE LOCATION 1173
D 0.77 MPa(g) NPIC-041-E-0146M
D

MIN
DESIGN PRESSURE 1.00 MPa(g)
NOTE 12 SIZE : 0.75D1
DESIGN TEMPERATURE 175°C 76°C 041 PSET: 1.00 MPa(g) NPIC-041-E-0158M
TSV 0.75" 4''-V-041-0008-A1AP-NI
INSULATION TYPE PG NI 0622 PERMANENT LINE
1"-V-041-0019-A1AP-NI
TRIM SPECIFICATION A2AP-PG A2AW - NI SUBJECT TO

FREE DRAINING
2"-P-041-0243-A2AP-NI
SERVICE TEST
0.75" HPT
041-E-613

FREE DRAINING
FREE DRAINING

NOTE 6
FREE DRAINING 4"-P-041-0245-A2AP-PG FLG TEST POINT
CBD SLOP COOLER 041-3503M
E CODE ASME VIII DIV 1 / API 660 1"
LO
0.75"
LO E
4"-FLG-041-0057-A1AP-PG
NPIC-041-E-0129M - LPCW
DELETED. return line to LPCW

NPIC-041-E-0120M
TYPE: MULTITUBE NPIC-041-E-0158M AT GRADE A.
TO SAFE LOCATION 041 18"
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 388 mm / 4880 mm / 101 m² Interconnecting Header
TG B. DELETED.
DESIGN DUTY 2245 kW 8" 0.75" 0622 041
SIDE SHELL TUBE CWR RS
US Permanent Supply required
0621
1.34 MPa(g) 041-3002M LPT 041 O
DESIGN PRESSURE 1.00 MPa(g) NOTE 14

2''-P-041-0255-A2AP-PG
NOTE 12 NOTE 14 UV
0.75" CWS RS 0621
1. DELETED.
DESIGN TEMPERATURE 175°C 76°C 041-LPS-01 C

MIN
041-3002M 2. DELETED.
041-E-612 041-EJ-612
F INSULATION TYPE PP NI F

16"-P-041-0240-A2AP-PG
14"-CWR-041-0009-A2AW-NI 0.75" 0.75" LPS 1.5"
TRIM SPECIFICATION A2AP-PP A2AW-NI
SIZE: 3L4 041-3103M
14"-CWS-041-0010-A2AW-NI
PSET: 0.34 MPa(g) 0.75" 0.75"" FC
TSO

NPIC-041-E-0151M
1''-LPS-041-0017-A1AS-HS
1"-P-041-0251-A2AP-NI NOTE 4 041 1''-P-041-0253-A2AP-HC NPIC-041-E-0129M
PSV 6"-FLG-041-0056-A1AP-NI
041

4"-P-041-0241-A2AP-PG
041
RO PG 0621 041
NPIC-041-E-0137M NPIC-041-E-0129M

NPIC-041-E-0158M
0621 0621 FREE DRAINING PG
FLG 0623
041-3503M
8"-P-041-0238-A2AP-NI

LPN 1"-LPN-041-0008-A1AA-NI 041


FEED DWG.No.

FREE DRAINING
FI
NPIC-041-E-0158M ST
G 041-3603M 0622
WO G

0.75''-LPCW-041-0045-A2AS-PG
0.75" 0.75" 0.75" RUN
1" 041 START/STOP 041
US MGL

TWO PHASE FLOW


0.75"
MIN

041-LPS-01 0622 0621A - LPCW return line to LPCW Interconnecting

NPIC-041-E-0120M
0.75" Header Permanent Supply required

NPIC-041-E-0141M
DWG.No. Title
NOTE 15
LPS 22"-LPS-041-0016-A1AS-HS
LPS 041 0016 A1AS HS 2" REFERENCE DRAWINGS
041 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-3103M FE
FREE DRAINING

041 H 041 H 0621 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS


0.75" 0.75" 041 H
LI LI
2"-P-041-0252-A2AP-HC PI 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
2"-P-041-0244-A2AP-HC

0622 041 H 0622 L 0621 L


M-2 041 H 041 041 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
TI FI FT

4"-P-041-0325-A2AP-NI
H 0621
A, B, C, D, E
RS 041
LI
0623
US
0621 0621 0621 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
PG L Rev Date Description Prep'd Chk'd App'd

FREE DRAINING
M 0624 LPCW REVISIONS

NPIC-041-E-0120M

NPIC-041-E-0120M
PA 1"-PA-041-0004-A2AA-NI

FREE DRAINING
3" -300# 041-3103M 041 Operation Centre JOB Code:
041-3603M FI
041 041 041 041 041 0621L Operation Centre DWG.No.:
0.75" 041
PT TT LI LT LT LT 2''-P-041-0254-A2AP-NI Contractor JOB Code Responsible Company
0622 0621 0622L 0622 GWR 0621 GWR 0623
GWR 0-6495-20 TPM
SVW 2"-CBD-041-0028-A2AP-NI NOTE 13 IN VIEW
2" 6" NOTE 2 0.75" Prepared by Checked by Approved by
041-3301M
2" T. T. HUONG T. NGUYEN T. N. SON
NPIC-041-E-0120M

0.75" 0.75" 8" VH NOTE 8 NOTE 16


4" 4"
I 2"-SVW-041-0006-A2AW-NI I

NPIC-041-E-0146M
NPIC-041-E-0120M

NSRP
CLOSED BLOWDOWN 1:500 041-V-612 Complex Project
LO Nghi Son Refinery and Petrochemical
10''-CBD-041-0020-A2AP-NI MH
041-3702M
24" Nghi Son, Vietnam Limited Liability Company
FROM HEADER NOTE 1 0.75"
Drawing Title

4"-WO-041-0001-A2AP-NI
J PIPING AND INSTRUMENT DIAGRAM J

4"-P-041-0242-A2AP-NI
PENEX
UNIT 041

NPIC-041-E-0158M
NOTE 9
041-P-612
NOTE 7, 10 CLOSED BLOWDOWN DRAIN DRUM

Issue Purpose Document Class


FOR CONTRUCTION Z
K LIGHT SLOP WASTE WATER Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 156 TO UNIT 190
041 PENX A900 A1 NONE
156-TK-001 190-TK-201A/B

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-1001M 041-1001M D-041-1225-0101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
11 12 13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1626 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-EJ-613 041-V-615 041-Y-620 041-P-615A/B
0014V AND D-000-1225-0020V TO 0026V.

EJECTOR CANISTER FILTER 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
A CAUSTIC CLOSED BLOWDOWN DRUM CAUSTIC CLOSED BLOWDOWN DRUM PUMPS OPERATION TO BE PROVIDED AT GRADE LEVEL. A
CODE ASME VIII DIV 1 CODE ASME VIII DIV 1
CODE ASME VIII DIV 1 CODE API 610
CAPACITY 4.1 m 3/hr CAPACITY 19 Nm³/hr 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS.
SIZE: I.D x TT 2000 mm x 4000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C DESIGN PRESSURE 0.34 MPa(g) 3. CANISTER FILTER MEDIUM TO BE PERIODICALLY REPLACED.
DESIGN PRESSURE 0.34 MPa(g) RATED CAPACITY/NPSHr 11.9 m3/hr/1.4m
DESIGN TEMPERATURE 265°C DESIGN TEMPERATURE 100°C 4. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN TEMPERATURE 100 °C DIFF.HEAD/SHUT-OFF PRESSURE 68.3 m/ 1.43 MPa(g)
INSULATION TYPE PG INSULATION TYPE NI AIR PURGE.
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 1.16 NPIC-041-E-0158M
TRIM SPECIFICATION A2AN04-PG TRIM SPECIFICATION A2AN04 5. 041-P-615B IS A WAREHOUSE SPARE.
TRIM SPECIFICATION CCB-041-0020-A2AN04-NI MOTOR SIZE 18.5 kW
NPIC-041-E-0158M
NOTE 10 INSULATION TYPE NI 6. DELETED.
B TRIM SPECIFICATION A2AN04-NI 7. PIT COVERED BY GALVANIZED METAL GRATING. B
8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
TO ATM
AT SAFE LOCATION D-041-1225-2401M.

9. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2206M.

10. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE


0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
TO ATM 11. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
2"-V-041-0004-A1AP-NI AT SAFE LOCATION
C WITH WATER PRIOR TO STEAM-OUT.
C
12. RESTRICTION ORIFICE WITH 2.21 MM HOLE .

13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR


DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.

14. SAMPLE CONNECTION DRAIN SHALL BE COLLECTED IN A POTABLE


DEVICE.
2"-V-041-0010-A1AP-NI 15. NOZZLE LENGTH SHALL BE 150MM. NPIC-041-E-0146M
1"
16. FILTER TO BE REMOVED PRIOR TO STEAM OUT.
D NPIC-041-E-0152M NOTE 3 17. MEDIUM WITHDRAWAL.
NPIC-041-E-0158M D
NPIC-041-E-0158M RS

4" 041-Y-620 PERMANENT LINE


NOTE 17 NOTE 16
SUBJECT TO
SIZE: 2J3
SERVICE TEST
PSET: 0.34 MPa(g)
0.75" 0.75"
FLG 4"-FLG-041-0059-A1AP-NI FREE DRAINING 041
PSV TEST POINT
041-3503M 0631
TYPE J1
E LO NOTE 8, 14 E
041 041 A. DELETED.
PG SC - LPCW return line to LPCW
0632 0631 B. DELETED.
Interconnecting Header
MIN

1. DELETED.
0.75" 041 Permanent Supply required
PG
2" 0631 0.75" 041
2. DELETED.
US
0631

O
F F

2"-CCB-041-0008-A2AN04-NI
041
UV
6"-CCB-041-0018-A2AN04-NI 1''-LPS-041-0019-A1AS-HS 0631 NPIC-041-E-0151M
C
041-LPS-01
LPS
LPS 22"-LPS-041-0018-A1AS-HS
LPS 041 0018 A1AS HS 2"-CCB-041-0013-A2AN04-HC
041-3103M
041-3103M 1.5"
NPIC-041-E-0158M FC 041-EJ-613
FREE DRAINING

0.75" 0.75" NPIC-041-E-0158M NPIC-041-E-0158M 041-LPS-01 0.75" 0.75" TSO


NPIC-041-E-0129M
NOTE 12 041
041 PG RUN
RO 0633 041 START/STOP 041 FEED DWG.No.
0.75''-LPCW-041-0044-A2AS-PG LPCW
G 0631 1"-CCB-041-0017-A2AN04-HC US
0632
MGL
0631A
ST
TWO PHASE FLOW 041-3103M
G

2"-CCB-041-0016-A2AN04-PG
LPN 1"-LPN-041-0011-A1AA-NI 041

NPIC-041-E-0141M

NPIC-041-E-0120M
FI
041-3603M 0631 0.75" - LPCW return line to LPCW Interconnecting
NOTE 2 Header Permanent Supply required
0.75" 0.75" 1" DWG.No. Title
041 H 041 041 H WO
LI LI REFERENCE DRAWINGS

FREE DRAINING
LI
0631
L 0631L 0632
L
M-2 H
2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0137M 041 041

4"-P-041-0326-A2AN04-NI
A, B, C, D, E LI US 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0158M
0633 0631 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
041 H L
PI M RS B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H PA 1"-PA-041-0003-A2AA-NI 0634 300# A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3603M Rev Date Description Prep'd Chk'd App'd
041 041 041 2''-CCB-041-0015-A2AN04-NI
LT LT REVISIONS
0.75" 0631 0632
041-V-615 LT
0633 Operation Centre JOB Code:
041 GWR GWR GWR
PT 4" NOTE 13 NOTE 11 Operation Centre DWG.No.:
2" 0634 MH
SVW Contractor JOB Code Responsible Company
2"-SVW-041-0007-A2AW-NI 2"-CCB-041-0012-A2AN04-NI 24" 2"
NPIC-041-E-0120M

VH NOTE 7 NOTE 15 0-6495-20 TPM


041-3301M 4" 4"
8" Prepared by Checked by Approved by
0.75" 0.75"
T. T. HUONG T. NGUYEN T. N. SON

2"-SCAU-041-0002-A2AN04-NI
NPIC-041-E-0146M
NPIC-041-E-0120M
I I
CAUSTIC CLOSED BLOWDOWN 1:500 LO
041-3702M
3"-CCB-041-0009-A2AN04-NI
NSRP
FROM HEADER NOTE 1 Complex Project
0.75" Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J NPIC-041-E-0158M
PIPING AND INSTRUMENT DIAGRAM J
NOTE 4 041-P-615A PENEX
NOTE 5, 9
UNIT 041
CAUSTIC CLOSED BLOWDOWN DRAIN DRUM

CAUSTIC BLOWDOWN Issue Purpose Document Class

TO UNIT 190 FOR CONSTRUCTION Z


K 190-TK-101 Unit No. Unit Abbreviation PCWBS Size Scale K
041-1001M
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0102M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1627 of 37


041-LPS-01-SV-1 Page

041 H
TO ATM AI
AT SAFE LOCATION 0641 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.

NPIC-041-E-0158M 0.75" - 150# 1. CONTROL VALVE TO BE LOCATED AT GRADE.


A NPIC-041-E-0109M
NPIC-041-E-0118M TP RF 0.75"-CWR-041-0019-A2AW-NI CWR NPIC-041-E-0118M
A
2. DELETED.
M9 041-3001M
3. LOOP SEAL REQUIRED ON OVERHEAD CONDENSER OUTLET LINE TO
041
AT PREVENT BACKFLOW FROM DRUM DIRECTLY TO ATMOSPHERE.
LPT
0641

4"-V-041-0009-A1AP-PG
0.75" - 150# HC 0.75" - 150#

NPIC-041-E-0109M
4. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2201.
RF TP TP RF 0.75"-CWS-041-0020-A2AW-NI CWS
5. ORIFICE WITH 71.63 MM HOLE. NPIC-041-E-0105M
M5 NOTE 7 M8 041-3001M
041 H 6. PROBE NOZZLE SIZE SHALL BE 2". HEIGHT SHALL BE 200MM.
TI 041 H
0641 AI 7. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-047.
B L
TO ATM 0642
0.75" - 150# 8. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-048.
B
AT SAFE LOCATION
TP RF 0.75"-CWR-041-0020-A2AW-NI CWR
041 9. MAXIMUM ALLOWED CV:185 WHICH IS THE GOVERNING FOR ATM
041-LPS-01 NC 8"-V-041-0005-A1AP-PG M9 041-3001M SIZE: 0.75D1
TT VENT LINE SIZING CASE.
0641 NOTE 6 041-AT-0642 PSET: 1.0 MPa(g)
LP STEAM SIZE: 3K4 NPIC-041-E-0108M
10"-LPS-041-0039-A1AS-HS SAMPLE PRE-CONDITIONING SYSTEM

DRAINING
041-3102M PSET: 0.81 MPa(g) 041 TUBING BY INST 041
AT NOTE 8 0.75" - 150# TSV
PERMANENT LINE

FREE
TO HEADER 10"-LPS-041-0012 -A1AS-HS 041 0642
TP TP TP RF 0.75"-CWS-041-0021-A2AW-NI CWS 0642 SUBJECT TO
HC
NO POCKET PSV FREE M5B M5A M8 041-3001M 1''-V-041-0020-A1AP-NI
041 0641 NOTE 8 SERVICE TEST
PG DRAINING
0.75" - 150#
C 0641
LPT 0.75" - 150# TO ATM C
FREE RF RF TEST POINT
AT SAFE LOCATION
DRAINING

FREE DRAINING
2" 1"
1"-WO-041-0006-A2AW-NI
6"-LPS-041-0013-A1AS-HS

VH

FREE DRAINING
0.75" NPIC-041-E-0105M 6"-V-041-0006-A1AP-PG
4" 041 041
PG TG
WO 0642 0642
12" NOTE 6

FREE DRAINING
LP CONDENSATE WATER FREE DRAINING NPIC-041-E-0158M
10"-LPS-041-0038-A1AS-PG AT GRADE
10"-LPCW-041-0005-A2AS-HS TO GRADE
D 041-3102M
TWO PHASE FLOW 041-V-613 NO POCKET TO SAFE LOCATION D
FROM HEADER
AT SAFE LOCATION 041
TG
4"

MIN
NPIC-041-E-0158M 0644
NPIC-041-E-0158M NPIC-041-E-0090M
8"-CWR-041-0008-A2AW-NI
NPIC-041-E-0090M 0.75"
TYPE 1 041 RS CWR
LG TYPE 1 TYPE 1 041-3001M
0641 041 041 041 H RS
LIC 8"-CWS-041-0009-A2AW-NI CWS
MAG LT LT
0645 DP MH 0642 0642 L 041-3001M
041 H 24" DP
LI 041-E-614 0.75"
2"
E 0645 L
041
LI
E
0642L 041-V-614
TL VH A. DELETED.
NPIC-041-E-0158M 4"
B. DELETED.
3"
1. DELETED.
TO OPEN DRAIN 16"-LPCW-041-0016-A2AS-PG

1000 MIN
MIN

LP MANIFOLD TWO PHASE FLOW 2. DELETED.


CONDENSATE WATER FREE DRAINING NOTE 1 041
3. DELETED.
3"-LPCW-041-0013-A2AS-PG 041 TG
041-3102M 0643 6"
TWO PHASE FLOW LV

1000 MIN
IN VIEW

NOTE 3
F FROM HEADER 0642
NPIC-041-E-0145M
F
10D MIN
3"-LPCW-041-0018-A2AS-PG
8"-LPCW-041-0014-A2AS-PG
FC
0.75" 4" 0.75" 0.75"

TYPE 1 NPIC-041-E-0090M 3"-SCW-041-0006-A2AS-PG


NPIC-041-E-0090M 041
4"
NPIC-041-E-0108M LG 3"-SCW-041-0007-A2AS-PG
NOTE 9 0643 TYPE 1
MAG 041 041 H FEED DWG.No.
G 10"-LPCW-041-0015-A0JS-PG
LT
0644
LIC
0644 L 041 041 G
MH DP LL FIC
TWO PHASE FLOW FV 041
24" 0641 0641 FI
TL 300# 300# 0642 L
NPIC-041-E-0106M
DWG.No. Title
FOR 041-LG-0643 PUMP MINI FLOW FO NOTE 5 NOTE 5 REFERENCE DRAWINGS
1.5" 0.75" 041 041 041 041 041 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
2"-SCW-041-0008-A2AS-PG TO OPEN DRAIN 2" FE FT FT FE 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
6000 MIN

LV
0.75" MANIFOLD 0641 0641 0642 0642 0644 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
LPT NPIC-041-E-0106M
300# 300# B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H NPIC-041-E-0158M 0.75" NPIC-041-E-0158M 4" 4" A 13/JUL/13 FOR REVIEW DMO RKM SMA H
8"-SCW-041-0001-A2AS-PG

Rev Date Description Prep'd Chk'd App'd


FC REVISIONS
3" 4"-SCW-041-0004-A2AS-PG 0.75" 3" 0.75" Operation Centre JOB Code:
NPIC-041-E-0122M 0.75" 0.75" Operation Centre DWG.No.:
4"
041-V-614 041-V-613 Contractor JOB Code Responsible Company
0-6495-20 TPM

MIN
MIN
AT GRADE
ATM. CONDENSATE FLASH DRUM MP CONDENSATE FLASH DRUM Prepared by Checked by Approved by
WO T. T. HUONG T. NGUYEN T. N. SON
CODE ASME VIII DIV 1 CODE ASME VIII DIV 1
SIZE: I.D X TT 1600 mm x 4900 mm SIZE: I.D X TT 1400 mm x 5600 mm
I 0.81 MPa(g) + FV @ 265 oC
0.75" 0.75" I

MIN
0.34 MPa(g) + FV @ 265 °C
MIN
DESIGN PRESSURE DESIGN PRESSURE
DESIGN TEMPARATURE 265 oC DESIGN TEMPARATURE 265 oC
0.75" 0.75"
MIN

NSRP

MIN
INSULATION TYPE PG INSULATION TYPE HS 041 041
8"-SCW-041-0002-A2AS-PG

8"-SCW-041-0003-A2AS-PG
TI TT
LPS-041-0037-A1AS-PG LPS-041-0036-A1AS-HS 0645 6"
TRIM SPECIFICATION TRIM SPECIFICATION 0645 Complex Project
LPCW-041-0034-B2AS-PG LPCW-041-0033-B2AS-PG Nghi Son Refinery and Petrochemical
0.75" 041 0.75" 041 Nghi Son, Vietnam Limited Liability Company
041 041
PG PG
STR STR

4"-SCW-041-0005-A2AS-PG
0644 0646 Drawing Title
041-E-614 1121 1122
NPIC-041-E-0152M NPIC-041-E-0152M
041-P-613A/B
J ATM. CONDENSATE FLASH DRUM COOLER 041 041
PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0090M
CODE ASME VIII DIV 1 / API 660 STEAM CONDENSATE PUMPS PG PG PENEX
0643 0645
TYPE: BEU CODE ISO 5199 1.5" 1.5" UNIT 041
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 650 mm / 2438 mm / 54 m² PUMP TYPE/ NO. OF STAGE CENTRIFUGAL / 1 3" 3" CONDENSATE RECOVERY DRUM
DESIGN DUTY 3350 x 1.1 kW RATED CAPACITY/ NPSHr 63 m3/hr/2.6m
SIDE SHELL TUBE DIFF. HEAD/ SHUT-OFF PRESSURE 93.6 m/ 1.42 MPa(g) M M-2 M M-2
DESIGN PRESSURE 0.77 MPa(g) + FV @ 265°C 1.00 MPa(g) SPECIFIC GRAVITY @ PUMPING TEMP. 0.96 NPIC-041-E-0158M A, B, C, E A, B, C, E Issue Purpose Document Class
DESIGN TEMPERATURE 265 °C 76 °C MOTOR SIZE 45 kW 041-P-613A 041-P-613B OIL SUSPECT COND. FOR CONSTRUCTION Z
K INSULATION TYPE PG NI INSULATION TYPE PG
NOTE 4
0.5" (V) 041
MGL
NOTE 4
0.5" (V) 041
MGL
NPIC-041-E-0151M TO UNIT 102 Unit No. Unit Abbreviation PCWBS Size Scale K
TRIM SPECIFICATION A2AS - PG A2AW - NI TRIM SPECIFICATION A2AS - PG 0641A 0642A
102-TK-002 041 PENX A900 A1 NONE

DR01A
041-1302M Contractor DWG.No. Sheet Rev.
RUN RUN
A1

D-041-1225-0111M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
12 13 14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1628 of 37


041-LPS-01-SV-1 Page

0.75"-LPN-041-0023-A1AA-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


LPN 0014V AND D-000-1225-0020V TO 0026V.

041-3603M 1. CONNECTION TO BE USED FOR WATER FLUSHING DURING


A SHUT-DOWN. A
0.75" 0.75"
BL 2. LIGHT ISOMERATE TO RFCC UNIT.

041 041 TPM SK 3. OFF-SPEC. ISOMERATE TO FRN TANK.


FI FT
0321 0321 041 4. OFF-SPEC. ISOMERATE TO SLOP TANK.
PG MIN MIN
5D MIN 15D MIN 0321 MIN. ICPA-041-PI-001
MAKE-UP GAS MAKE-UP GAS PERMANENT LINE
3"-P-041-0001-B1AH04-NI 3"-P-140-3020-B1AH-NI SUBJECT TO
041-0001M 140-3021S
SERVICE TEST
B TO 041-V-051 2"
0.75" 0.75" 0.75" 0.75"
FROM UNIT 042
B
NPIC-041-E-0158M
041
PG TEST POINT
0322 MIN MIN MIN. ICPA-041-PO-001
DRIER PURGE DRIER PURGE
2"-P-041-0038-B2AH04-PG 2"-P-140-3025-B2AH04-PG
041-0004M 140-3001S
FROM 041-DR-051A/B
TO UNIT 042
0.75" 0.75" 0.75" 0.75"
0.75"-LPN-041-0024-A1AA-NI
LPN
C C
041-3603M

0.75" 0.75"
0.75"-LPS-041-0033-A1AS-HS

041-LPS-01 LPS
041
041-3103M PG
0323
MIN MIN MIN.
0.75"-P-041-0272-B1AP04-HC 0.75" 0.75" ICPA-041-PI-002
LIGHT NAPHTHA LIGHT NAPHTHA
6"-P-041-0049-B1AP04-NI 6"-P-140-3034-B1AP-NI
D 041-0007M 140-3001S
D
TO 041-E-001 FROM UNIT 040
0.75" 0.75" 0.75" 0.75"
041
PG 4"-P-041-0276-B1AP-STL
0324
MIN MIN MIN.
NPIC-041-E-0126M ICPA-041-PO-007
SWEET-OFF GAS SWEET-OFF GAS
4"-P-041-0104-A1AH04-STL 4"-P-140-3026-B1AP-STL
041-0021M 140-3001S
FROM 041-C-202
TO UNIT 124
0.75" 0.75" 0.75" 0.75"
E 041 NPIC-041-E-0151M E
PG
0325 MIN MIN MIN. ICPA-041-PI-003 A. DELETED.
CAUSTIC CAUSTIC
3"-FCAU-041-0006-A2AN04-NI 3"-FCAU-140-3002-A2AN-NI
041-0024M 140-3021S

TO 041-TK-211 FROM UNIT 130


0.75" 0.75" 0.75" 0.75"
CAUSTIC BLOWDOWN
2"-SCAU-041-0002-A2AN04-NI NPIC-041-E-0151M
041-0102M NPIC-041-E-0151M

FROM 041-V-615
F 041 F
PG
0326
MIN MIN MIN. ICPA-041-PO-008
SPENT CAUSTIC SPENT CAUSTIC
3"-SCAU-041-0007-A2AN04-NI 3"-SCAU-140-3001-A2AN-NI
041-0025M 140-3021S
FROM 041-P-213A/B
TO UNIT 190
1" NOTE 1 0.75" 0.75" 0.75"
041
PG NPIC-041-E-0151M
0327 MIN MIN MIN. ICPA-041-PO-002 FEED DWG.No.
G ISOMERATE PRODUCT
6"-P-041-0117-B1AP04-NI 6"-P-140-3104-B1AP-NI
ISOMERATE PRODUCT
G
041-0032M 140-3011S
FROM 041-E-301
TO UNIT 153
0.75" 0.75" 0.75" 0.75"
041 DWG.No. Title
PG
0328
MIN MIN MIN. REFERENCE DRAWINGS
ICPA-041-PO-005 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
OFF-SPEC OFF-SPEC
6"-P-041-0125-B1AP04-NI 6"-P-140-3080-B4AR-NI 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0032M 140-3011S 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
FROM 041-E-301 TO UNIT 156 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" 1" 1" 1" NOTE 4 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LIGHT SLOP 6"-P-041-0275-B4AR-NI Operation Centre JOB Code:
4"-P-041-0242-A2AP-NI Operation Centre DWG.No.:
041-0101M
Contractor JOB Code Responsible Company
FROM 041-V-612
0-6495-20 TPM
041 4"-WO-041-0002-B2AP-NI
PG Prepared by Checked by Approved by
NPIC-041-E-0090M MIN MIN MIN.
0329 ICPA-041-PO-009 T. T. HUONG T. NGUYEN T. N. SON
WASTE WATER WASTE WATER
4"-WO-041-0001-A2AP-NI 4"-WO-140-3016-B2AP-NI
I 041-0101M
FROM 041-V-612
140-3021S
I
TO UNIT 190
0.75" 0.75" 0.75" 0.75"

041
PG
NSRP
0330
MIN MIN MIN. Complex Project
ICPA-041-PO-006 Nghi Son Refinery and Petrochemical
ISOMERATE ISOMERATE
6"-P-041-0123-B1AP04-NI 6"-P-140-3097-B1AP-NI Nghi Son, Vietnam Limited Liability Company
041-0032M 140-3011S
FROM 041-E-301 Drawing Title
TO UNIT 152
0.75" 0.75" 0.75" 0.75" NOTE 3
J PIPING AND INSTRUMENT DIAGRAM J
6"-P-041-0317-B1AP-NI
PENEX
041
PG UNIT 041
0331
MIN MIN MIN. ICPA-041-PO-003 PROCESS BATTERY LIMIT
LIGHT ISOMERATE LIGHT ISOMERATE
3"-P-041-0119-B1AP04-NI 3"-P-140-3095-B1AP-NI
041-0032M 140-3011S
FROM 041-E-301 Issue Purpose Document Class
TO UNIT 023
0.75" 0.75" 0.75" 0.75" NOTE 2 FOR CONSTRUCTION Z
K NPIC-041-E-0151M Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1001M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1629 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
N
1. DELETED.

REFINERY FUEL GAS

REFINERY FUEL GAS

REFINERY FUEL GAS


A A

TO FLG HEADER

TO FLG HEADER

TO FLG HEADER
041-3501M

041-3501M

041-3503M
PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

1"-FG-041-3002-A1AD-NI

1"-FG-041-3005-A1AD-NI

2"-FG-041-3006-A1AD-NI
NPIC-041-E-0129M
B B

C C

D D

0.75"-LPN-041-3008-A1AA-NI 0.75"-FG-041-3011-A1AD-NI

NPIC-041-E-0162M

E LPN E
041-3601M NPIC-041-E-0129M A. DELETED.

NPIC-041-E-0129M
0.75" 0.75"
041-LPS-01
LPS
041-3101M

0.75"-LPS-041-3007-A1AS-HS 0.75" 0.75"


MIN
MIN

MIN

REFINERY FUEL GAS


F 0.75"-FG-041-3004-A1AD-HC 2"-FG-041-3001-A1AD-STL
041-1301M
F

MIN

MIN
FROM BL
0.75"

NPIC-041-E-0146M
FEED DWG.No.
G G

DWG.No. Title
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A 15/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
FREE DRAINING

Operation Centre JOB Code:


Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0-6495-20 TPM
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON

I I

NSRP
Complex Project
Nghi Son Refinery and Petrochemical
1.5"-FG-041-0001-A1AD-NI

1"-FG-041-3007-A1AD-NI

1"-FG-041-3008-A1AD-NI
Nghi Son, Vietnam Limited Liability Company

Drawing Title
NNF

J PIPING AND INSTRUMENT DIAGRAM J


PENEX UNIT
UNIT 041
FUEL GAS
REFINERY FUEL GAS

REFINERY FUEL GAS

Issue Purpose Document Class


REFINERY FUEL GAS

041-3502M

041-3502M
TO FLG HEADER

TO FLG HEADER FOR CONSTRUCTION Z


041-0011M

FROM 041-V-001

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3401M 001 OF 001 2

IN
10-SE
5
1
P-2 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1630 of 37


041-LPS-01-SV-1 Page

0.75"-LPN-041-0023-A1AA-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


LPN 0014V AND D-000-1225-0020V TO 0026V.

041-3603M 1. CONNECTION TO BE USED FOR WATER FLUSHING DURING


A SHUT-DOWN. A
0.75" 0.75"
BL 2. LIGHT ISOMERATE TO RFCC UNIT.

041 041 TPM SK 3. OFF-SPEC. ISOMERATE TO FRN TANK.


FI FT
0321 0321 041 4. OFF-SPEC. ISOMERATE TO SLOP TANK.
PG MIN MIN
5D MIN 15D MIN 0321 MIN. ICPA-041-PI-001
MAKE-UP GAS MAKE-UP GAS PERMANENT LINE
3"-P-041-0001-B1AH04-NI 3"-P-140-3020-B1AH-NI SUBJECT TO
041-0001M 140-3021S
SERVICE TEST
B TO 041-V-051 2"
0.75" 0.75" 0.75" 0.75"
FROM UNIT 042
B
NPIC-041-E-0158M
041 TEST POINT
PG
0322 MIN MIN MIN. ICPA-041-PO-001
DRIER PURGE DRIER PURGE
2"-P-041-0038-B2AH04-PG 2"-P-140-3025-B2AH04-PG
041-0004M 140-3001S
FROM 041-DR-051A/B
TO UNIT 042
0.75" 0.75" 0.75" 0.75"
0.75"-LPN-041-0024-A1AA-NI
LPN
C C
041-3603M

0.75" 0.75"
0.75"-LPS-041-0033-A1AS-HS

041-LPS-01 LPS
041
041-3103M PG
0323
MIN MIN MIN.
0.75"-P-041-0272-B1AP04-HC 0.75" 0.75" ICPA-041-PI-002
LIGHT NAPHTHA LIGHT NAPHTHA
6"-P-041-0049-B1AP04-NI 6"-P-140-3034-B1AP-NI
D 041-0007M 140-3001S
D
TO 041-E-001 FROM UNIT 040
0.75" 0.75" 0.75" 0.75"
041
PG 4"-P-041-0276-B1AP-STL
0324
MIN MIN MIN.
NPIC-041-E-0126M ICPA-041-PO-007
SWEET-OFF GAS SWEET-OFF GAS
4"-P-041-0104-A1AH04-STL 4"-P-140-3026-B1AP-STL
041-0021M 140-3001S
FROM 041-C-202
TO UNIT 124
0.75" 0.75" 0.75" 0.75"
E 041 NPIC-041-E-0151M E
PG
0325 MIN MIN MIN. ICPA-041-PI-003 A. DELETED.
CAUSTIC CAUSTIC
3"-FCAU-041-0006-A2AN04-NI 3"-FCAU-140-3002-A2AN-NI
041-0024M 140-3021S

TO 041-TK-211 FROM UNIT 130


0.75" 0.75" 0.75" 0.75"
CAUSTIC BLOWDOWN
2"-SCAU-041-0002-A2AN04-NI NPIC-041-E-0151M
041-0102M NPIC-041-E-0151M

FROM 041-V-615
F 041 F
PG
0326
MIN MIN MIN. ICPA-041-PO-008
SPENT CAUSTIC SPENT CAUSTIC
3"-SCAU-041-0007-A2AN04-NI 3"-SCAU-140-3001-A2AN-NI
041-0025M 140-3021S
FROM 041-P-213A/B
TO UNIT 190
1" NOTE 1 0.75" 0.75" 0.75"
041
PG NPIC-041-E-0151M
0327 MIN MIN MIN. ICPA-041-PO-002 FEED DWG.No.
G ISOMERATE PRODUCT
6"-P-041-0117-B1AP04-NI 6"-P-140-3104-B1AP-NI
ISOMERATE PRODUCT
G
041-0032M 140-3011S
FROM 041-E-301
TO UNIT 153
0.75" 0.75" 0.75" 0.75"
041 DWG.No. Title
PG
0328
MIN MIN MIN. REFERENCE DRAWINGS
ICPA-041-PO-005 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
OFF-SPEC OFF-SPEC
6"-P-041-0125-B1AP04-NI 6"-P-140-3080-B4AR-NI 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0032M 140-3011S 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
FROM 041-E-301 TO UNIT 156 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" 1" 1" 1" NOTE 4 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LIGHT SLOP 6"-P-041-0275-B4AR-NI Operation Centre JOB Code:
4"-P-041-0242-A2AP-NI Operation Centre DWG.No.:
041-0101M
Contractor JOB Code Responsible Company
FROM 041-V-612
0-6495-20 TPM
041 4"-WO-041-0002-B2AP-NI
PG Prepared by Checked by Approved by
NPIC-041-E-0090M MIN MIN MIN.
0329 ICPA-041-PO-009 T. T. HUONG T. NGUYEN T. N. SON
WASTE WATER WASTE WATER
4"-WO-041-0001-A2AP-NI 4"-WO-140-3016-B2AP-NI
I 041-0101M
FROM 041-V-612
140-3021S
I
TO UNIT 190
0.75" 0.75" 0.75" 0.75"

041
PG
NSRP
0330
MIN MIN MIN. Complex Project
ICPA-041-PO-006 Nghi Son Refinery and Petrochemical
ISOMERATE ISOMERATE
6"-P-041-0123-B1AP04-NI 6"-P-140-3097-B1AP-NI Nghi Son, Vietnam Limited Liability Company
041-0032M 140-3011S
FROM 041-E-301 Drawing Title
TO UNIT 152
0.75" 0.75" 0.75" 0.75" NOTE 3
J PIPING AND INSTRUMENT DIAGRAM J
6"-P-041-0317-B1AP-NI
PENEX
041
PG UNIT 041
0331
MIN MIN MIN. ICPA-041-PO-003 PROCESS BATTERY LIMIT
LIGHT ISOMERATE LIGHT ISOMERATE
3"-P-041-0119-B1AP04-NI 3"-P-140-3095-B1AP-NI
041-0032M 140-3011S
FROM 041-E-301 Issue Purpose Document Class
TO UNIT 023
0.75" 0.75" 0.75" 0.75" NOTE 2 FOR CONSTRUCTION Z
K NPIC-041-E-0151M Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1001M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1631 of 37


041-LPS-01-SV-1 Page

0.75"-LPN-041-0023-A1AA-NI A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


LPN 0014V AND D-000-1225-0020V TO 0026V.

041-3603M 1. CONNECTION TO BE USED FOR WATER FLUSHING DURING


A SHUT-DOWN. A
0.75" 0.75"
BL 2. LIGHT ISOMERATE TO RFCC UNIT.

041 041 TPM SK 3. OFF-SPEC. ISOMERATE TO FRN TANK.


FI FT
0321 0321 041 4. OFF-SPEC. ISOMERATE TO SLOP TANK.
PG MIN MIN
5D MIN 15D MIN 0321 MIN. ICPA-041-PI-001
MAKE-UP GAS MAKE-UP GAS
PERMANENT LINE
3"-P-041-0001-B1AH04-NI 3"-P-140-3020-B1AH-NI SUBJECT TO
041-0001M 140-3021S
SERVICE TEST
B TO 041-V-051 2"
0.75" 0.75" 0.75" 0.75"
FROM UNIT 042
B
NPIC-041-E-0158M
041 TEST POINT
PG
0322 MIN MIN MIN. ICPA-041-PO-001
DRIER PURGE DRIER PURGE
2"-P-041-0038-B2AH04-PG 2"-P-140-3025-B2AH04-PG
041-0004M 140-3001S
FROM 041-DR-051A/B
TO UNIT 042
0.75" 0.75" 0.75" 0.75"
0.75"-LPN-041-0024-A1AA-NI
LPN
C C
041-3603M

0.75" 0.75"
0.75"-LPS-041-0033-A1AS-HS

041-LPS-01 LPS
041
041-3103M PG
0323
MIN MIN MIN.
0.75"-P-041-0272-B1AP04-HC 0.75" 0.75" ICPA-041-PI-002
LIGHT NAPHTHA LIGHT NAPHTHA
6"-P-041-0049-B1AP04-NI 6"-P-140-3034-B1AP-NI
D 041-0007M 140-3001S
D
TO 041-E-001 FROM UNIT 040
0.75" 0.75" 0.75" 0.75"
041
PG 4"-P-041-0276-B1AP-STL
0324
MIN MIN MIN.
NPIC-041-E-0126M ICPA-041-PO-007
SWEET-OFF GAS SWEET-OFF GAS
4"-P-041-0104-A1AH04-STL 4"-P-140-3026-B1AP-STL
041-0021M 140-3001S
FROM 041-C-202
TO UNIT 124
0.75" 0.75" 0.75" 0.75"
E 041 NPIC-041-E-0151M E
PG
0325 MIN MIN MIN. ICPA-041-PI-003 A. DELETED.
CAUSTIC CAUSTIC
3"-FCAU-041-0006-A2AN04-NI 3"-FCAU-140-3002-A2AN-NI
041-0024M 140-3021S

TO 041-TK-211 FROM UNIT 130


0.75" 0.75" 0.75" 0.75"
CAUSTIC BLOWDOWN
2"-SCAU-041-0002-A2AN04-NI NPIC-041-E-0151M
041-0102M NPIC-041-E-0151M

FROM 041-V-615
F 041 F
PG
0326
MIN MIN MIN. ICPA-041-PO-008
SPENT CAUSTIC SPENT CAUSTIC
3"-SCAU-041-0007-A2AN04-NI 3"-SCAU-140-3001-A2AN-NI
041-0025M 140-3021S
FROM 041-P-213A/B
TO UNIT 190
1" NOTE 1 0.75" 0.75" 0.75"
041
PG NPIC-041-E-0151M
0327 MIN MIN MIN. ICPA-041-PO-002 FEED DWG.No.
G ISOMERATE PRODUCT
6"-P-041-0117-B1AP04-NI 6"-P-140-3104-B1AP-NI
ISOMERATE PRODUCT
G
041-0032M 140-3011S
FROM 041-E-301
TO UNIT 153
0.75" 0.75" 0.75" 0.75"
041 DWG.No. Title
PG
0328
MIN MIN MIN. REFERENCE DRAWINGS
ICPA-041-PO-005 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
OFF-SPEC OFF-SPEC
6"-P-041-0125-B1AP04-NI 6"-P-140-3080-B4AR-NI 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041-0032M 140-3011S 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
FROM 041-E-301 TO UNIT 156 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H 0.75" 1" 1" 1" NOTE 4 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
LIGHT SLOP 6"-P-041-0275-B4AR-NI Operation Centre JOB Code:
4"-P-041-0242-A2AP-NI Operation Centre DWG.No.:
041-0101M
Contractor JOB Code Responsible Company
FROM 041-V-612
0-6495-20 TPM
041 4"-WO-041-0002-B2AP-NI
PG Prepared by Checked by Approved by
NPIC-041-E-0090M MIN MIN MIN.
0329 ICPA-041-PO-009 T. T. HUONG T. NGUYEN T. N. SON
WASTE WATER WASTE WATER
4"-WO-041-0001-A2AP-NI 4"-WO-140-3016-B2AP-NI
I 041-0101M
FROM 041-V-612
140-3021S
I
TO UNIT 190
0.75" 0.75" 0.75" 0.75"

041
PG
NSRP
0330
MIN MIN MIN. Complex Project
ICPA-041-PO-006 Nghi Son Refinery and Petrochemical
ISOMERATE ISOMERATE
6"-P-041-0123-B1AP04-NI 6"-P-140-3097-B1AP-NI Nghi Son, Vietnam Limited Liability Company
041-0032M 140-3011S
FROM 041-E-301 Drawing Title
TO UNIT 152
0.75" 0.75" 0.75" 0.75" NOTE 3
J PIPING AND INSTRUMENT DIAGRAM J
6"-P-041-0317-B1AP-NI
PENEX
041
PG UNIT 041
0331
MIN MIN MIN. ICPA-041-PO-003 PROCESS BATTERY LIMIT
LIGHT ISOMERATE LIGHT ISOMERATE
3"-P-041-0119-B1AP04-NI 3"-P-140-3095-B1AP-NI
041-0032M 140-3011S
FROM 041-E-301 Issue Purpose Document Class
TO UNIT 023
0.75" 0.75" 0.75" 0.75" NOTE 2 FOR CONSTRUCTION Z
K NPIC-041-E-0151M Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1001M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14 15
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
16
Attachment : S-000-1730-0814M_0_0060 System No. : 041-LPS-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. : 15 1632 of 37


041-LPS-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


0014V AND D-000-1225-0020V TO 0026V.
N
1. DELETED.

REFINERY FUEL GAS

REFINERY FUEL GAS

REFINERY FUEL GAS


A A

TO FLG HEADER

TO FLG HEADER

TO FLG HEADER
041-3501M

041-3501M

041-3503M
PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

1"-FG-041-3002-A1AD-NI

1"-FG-041-3005-A1AD-NI

2"-FG-041-3006-A1AD-NI
NPIC-041-E-0129M
B B

C C

D D

0.75"-LPN-041-3008-A1AA-NI 0.75"-FG-041-3011-A1AD-NI

NPIC-041-E-0162M

E LPN E
041-3601M NPIC-041-E-0129M A. DELETED.

NPIC-041-E-0129M
0.75" 0.75"
041-LPS-01
LPS
041-3101M

0.75"-LPS-041-3007-A1AS-HS 0.75" 0.75"


MIN
MIN

MIN

REFINERY FUEL GAS


F 0.75"-FG-041-3004-A1AD-HC 2"-FG-041-3001-A1AD-STL
041-1301M
F

MIN

MIN
FROM BL
0.75"

NPIC-041-E-0146M
FEED DWG.No.
G G

DWG.No. Title
REFERENCE DRAWINGS
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H A 15/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
REVISIONS
FREE DRAINING

Operation Centre JOB Code:


Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
0-6495-20 TPM
Prepared by Checked by Approved by
T. T. HUONG T. NGUYEN T. N. SON

I I

NSRP
Complex Project
Nghi Son Refinery and Petrochemical
1.5"-FG-041-0001-A1AD-NI

1"-FG-041-3007-A1AD-NI

1"-FG-041-3008-A1AD-NI
Nghi Son, Vietnam Limited Liability Company

Drawing Title
NNF

J PIPING AND INSTRUMENT DIAGRAM J


PENEX UNIT
UNIT 041
FUEL GAS
REFINERY FUEL GAS

REFINERY FUEL GAS

Issue Purpose Document Class


REFINERY FUEL GAS

041-3502M

041-3502M
TO FLG HEADER

TO FLG HEADER FOR CONSTRUCTION Z


041-0011M

FROM 041-V-001

K Unit No. Unit Abbreviation PCWBS Size Scale K


041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3401M 001 OF 001 2

IN
10-SE
5
1
P-2 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
J

K
A1

I
F
E
B
A

H
D
C

IN
NPIC-041-E-0162M

10-SE
RO
041

0381

1"
NPIC-041-E-0162M

MIN

P-2 1
1

1"-FG-041-3002-A1AD-NI FG

NPIC-041-E-0162M
041-3401M
FLARE GAS

5
041
STR
2"-FLG-041-0030-A1GP-NI

0.75"

0.75"
041-0019M

1:500

DR01A
NO POCKET NPIC-041-E-0162M
FROM 041-V-201

1179
1"-LPN-041-3009-A1AA-NI LPN
041-3601M

0.75"
0.75"
NPIC-041-E-0162M

2
2

PG
0.75"-LPS-041-3048-A1AS-HS
0.75 LPS 041 3048 A1AS HS LPS
041-3101M
041-LPS-01

0.75"
0.75"
NPIC-041-E-0162M

PG
0.75"-LPS-041-3049-A1AS-HS LPS

24"-FLG-041-3001-A1GP-NI
041-3101M

3
3

041-LPS-01

0.75"
0.75"
NPIC-041-E-0162M
RO
041

0382

NPIC-041-E-0162M

1"
MIN
1"-FG-041-3005-A1AD-NI FG
041-3401M
041
STR

0.75"

0.75"

FLARE GAS

1:500
0.75"-FLG-041-2021-A1AP-NI NPIC-041-E-0162M
041-2201M
1180

NO POCKET 1"-LPN-041-3010-A1AA-NI LPN


FROM 041-P-201A/B
041-3601M

4
4

FLARE GAS NPIC-041-E-0162M

NPIC-041-E-0162M
0.75"-FLG-041-0060-A1AP-NI
0.75"
0.75"

041-0020M FLARE GAS


NO POCKET 1"-FLG-041-0018-A1AP-NI
FROM 041-P-201A 041-0012M
NO POCKET
FLARE GAS FROM 041-A-111
0.75"-FLG-041-2022-A1AP-NI
041-2201M FLARE GAS
NO POCKET 2"-FLG-041-0026-A1AP-NI
FROM 041-P-201B 041-0015M
NO POCKET

2"-FLG-041-2021-A1AP-NI
FLARE GAS FROM 041-R-101A
0.75"-FLG-041-0061-A1AP-NI
041-0020M FREE DRAINING FLARE GAS
NO POCKET 8"-FLG-041-0017-A1AP-NI
041-0012M

5
5

FROM 041-P-201B

NPIC-041-E-0098M FROM 041-A-111


NPIC-041-E-0162M
FREE DRAINING FLARE GAS
8"-FLG-041-0025-A1AP-NI
041-0015M
FLARE GAS FREE DRAINING
14"-FLG-041-0029-A1GP-NI FROM 041-PSV-0103
041-0017M
(041-R-101A)
FROM 041-PSV-0201 FREE DRAINING FLARE GAS
(041-C-201) 8"-FLG-041-0027-A1AP-NI
041-0016M

FROM 041-PSV-0104

6
6

14"-FLG-041-3002-A1AP-NI

(041-R-101B)
FLARE GAS
2"-FLG-041-0028-A1AP-NI
041-0016M
NPIC-041-E-0129M NO POCKET
FROM 041-R-101B
NPIC-041-E-0162