KEYPLAN
PROPOSED TOWER A PROPOSED TOWER B
(RECREATIONAL FLR + (RECREATIONAL FLR +
RES.FLOORS1-12+SERVICE RES.FLOORS1-12+SERVICE
PROPOSED SHARED
FLOOR 1+TYP.RES.FLOORS FLOOR 1+TYP.RES.FLOORS
BUILDING
14-35+SERVICE FLOOR 2+ 14-35+SERVICE FLOOR 2+
(2B+G+6PODIUMS)
SERVICE FLOOR 3+ROOF) SERVICE FLOOR 3+ROOF)
PROJECT LOCATION
VACANT PLOT
Proposed Scope of Work Area.
Modification of Existing Footpath
PLOT NO-3820126 for Temporary construction
vehicle access for plot
no-3820126 LEGENDS:-
Proposed Tile 80mm
Proposed Flush Kerb
Existing Heel Kerb
Existing Kerb Stone
SIGNBOARD Existing Tile
safety cone's with plastic mesh TYPE-B
LOCATION - 2 E=482092.045 Existing Tram
N=2776800.994
Existing Asphalt
Proposed Sign Post
Stage-01Work Area
A
METHOD OF STATEMENT:-
Reduce Speed
1. MODIFICATION OF FOOTPATH IN ORDER TO
E=481999.961 CONSTRUCTION
Reduce Speed
N=2776676.213 2. EXCAVATION ONLY 30 CM IN ORDER TO PREPARE
A
SURFACE FOR TILES AND KERBSTONE.
Men at Work
TOTAL 3. LAYING OF ROAD BASE (20 CM) & BLACK SAND (5 CM) AND
Men at Work
26 NO
. CAR COMPACTING PRIOR TO FIX TILES.
PARKI
NG
4. FIXING KERBSTONE AND 6 & 8 CM INTERLOCK TILES
GENERAL NOTES:-
1. DO NOT SCALE FROM DRAWINGS.
2. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
3. ANY DISCREPANCIES ON THE DRAWINGS TO BE REPORTED
IMMEDIATELY TO THE ARCHITECT/ENGINEER.
EXISTING
Reduce Sp
ROUND ABOUT
Men at
Work
eed
REV. DRAWN BY DESCRIPTION DATE
PROJECT : PROJECT: EU-351
2B + G + 6PODIUMS+RECREATIONAL FLR + RES.FLOORS 1-12 +
SERVICE FLOOR 1+TYP.RES.FLOORS 14-35 +SERVICE FLOOR 2 +
SERVICE FLOOR 3 + ROOF ON PLOT NO.3820126
AT AL SAFOUH SECOND,DUBAI,UAE.
CLIENTS :
MR. ABDULLA AHMED ALMOOSA
Reduce Speed
CONSULTANT :
DUBAI MEDIA CITY
BLDG-5
Men at Work
MAIN CONTRACTOR :
DUBAI MEDIA CITY
BLDG-4
DUBAI MEDIA CITY
BLDG-4
1.81
Modification of Existing Footpath SUB CONTRACTOR :
for Temporary construction
vehicle access
Safety cone Safety cone
WORK UNDER
PROGRESS DRAWING TITLE :
Top of road Top of road SAFETY LAYOUT PLAN (CONSTRUCTION OF
TEMPORARY ENTRY AND EXIT - LAYOUT PLAN)
SCALE : N.T.S DRAWING SIZE : A3 DATE :17-08-2023
DRAWN BY : CHECKED BY : APPROVED BY:
Proposed Flush kerb Proposed Flush kerb SH MSM NQ
DRAWING NUMBER: REV REV.DATE
ESIC-18072023-351-SL 00 SHEET NO.
SECTION-AA 00