0% found this document useful (0 votes)
110 views1 page

Mechanical Work Planning: May 26-31

Uploaded by

SADMAN AOWAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views1 page

Mechanical Work Planning: May 26-31

Uploaded by

SADMAN AOWAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Mechanical Department Weekly Work Planning(26 May to 31 May)

Sl No. Work Details Responsible Engineer Remarks


1 Shut down supervision Keron, Sadman & Arabinda

1. Base Plate cutting 60/60


2. Top Plate cutting 60/60
3. Structural column 09/09
4. Gusset Plate 200/200
2 SWS plant structure & vessel-tower fabrication follow-up Arabinda & Sadman 5. Flat bar cutting for ladder
42 pcs
6. Beam cutting 5/5
(Praparing for installing
Gusset plate)

3 Shut-down follow-up & end report preparation Keron


4 BOQ & Pricing estimation for construction of C-7001 in-house Arabinda
5 New store design checking and supplier follow-up(CS updation)
6 Tank farm area pipeline fabrication supervision and planning
7 10000 BPD plant Open Drain-CD drawing confirmation Sadman
8 New Power-house electrical support work(fabrication drawing updating)
9 10000 BPD plant equipment(Vessel) modelling
10 10000 BPD plant procurement(local & foreign) follow-up and technical communication
11 Other foreign procurement follow-up
12 10000 BPD plant precurement master file updating Keron
13 10000 BPD plant 2D layout drawing
14 C-7001 technical communication follow-up
15 10000 BPD plant equipment(tower) modelling Arabinda
16 10000 BPD plant structure and OD-CD fabrication follow-up Keron & Sadman
17 Rotating items stock checking Kaisar
18 Contractors bill checking Arabinda & Sadman
19 Padma Meghna, Jamuna pipline survey and drawing preparation Surveyor Zelan
20 10000 BPD plant strainer BOQ preparation Arabindo
Rotating work list
1 Work Details Man power
2 H-301 blower fan maintenance work Aziz 70% complete
3 Cooling tower pump inter-change( spx to deepblue) Waiting for manpower Waiting for manpower.
4 Reformer-2 oil h-2 compressor dismental for scraping Jashim, Puloq Start on Sunday
5 Agitator motor installation work Jashim Waiting for approval.
6 Mechanical items house kepping work. Bela, Mijan 30%
7 Flare pump ready work. 4set completed, 2set running Aziz 80%
SL no Development work list Group Nos
1 SWS Vessel, Gusset Make, shell plate preparation, Saddle making
2 SWS Structure top bottom base plate cutting drilling, Gusset making
3 SWS Platform, railing making
4 SWS Ladder making 3
5 Old gate valve, fittings segregating for counting
6 Old Flare pipe line cutting and open
7 Old Flare Structure cutting and open 3
8 Flare fire water line making 1
9 Dyke-1 water flushing line, cooling line tie inn
10 Dyke -5 Fire, Foam line Fabrication & Fitting
11 Dyke -5 Beam Make for Tank Farm Pipe line Support fitting
4
12 Dyke-5 Tank 6" pipe line fabrication
13 Tank to tank Circulation line Fabrication as instructed
14 fire line around Dyke-5
15 New Exchanger Tube Bundle Make for RF-2 1
16 New Gate Make for Store and pocket gate, MCC Door Making 1
17 H-3001 to E-6015 Supply and return 6'' pipe line fabrication 2
18 RF-2 to CMX BT Tower 2" Line fabrication 1