0% found this document useful (0 votes)
65 views279 pages

Airport Access Road Engineering Specs

Engineering & Construction specifications.

Uploaded by

Ram Caceres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Construction Safety,
  • Construction Cost Management,
  • Material Handling,
  • Construction Best Practices,
  • Health and Safety,
  • Construction Quality Standards,
  • Site Preparation,
  • Bituminous Concrete,
  • Compaction Trials,
  • Construction Equipment
0% found this document useful (0 votes)
65 views279 pages

Airport Access Road Engineering Specs

Engineering & Construction specifications.

Uploaded by

Ram Caceres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Construction Safety,
  • Construction Cost Management,
  • Material Handling,
  • Construction Best Practices,
  • Health and Safety,
  • Construction Quality Standards,
  • Site Preparation,
  • Bituminous Concrete,
  • Compaction Trials,
  • Construction Equipment

Consulting Services for the

Detailed Engineering Design of the


Proposed Airport- CGC Access Road, MacArthur-CGC
Access Road, MacArthur-SCTEX Access Road and
Olympic Village Access Road

```

BIDDING DOCUMENTS
VOLUME III
TECHNICAL SPECIFICATIONS
AIRPORT TO NCC ROAD SECTIONS
(Sta. 1+500.00 to Sta. 16+000.00)

PACKAGE - 3 FINA L
MARCH 2018
TABLE OF CONTENTS

ITEM NO. DESCRIPTION PAGE NO.

PART A FACILITIES FOR THE ENGINEER A-1


A.1 Requirements A-1
A.1.1 Offices and Living Quarters for the Engineer A-1
A.1.1.2 Operation and Maintenance of Office and Living Quarters A-2
A.1.1.3 Staffing for Engineer’s Facility A-3
A.1.1.4 Furniture, Fixtures, Appliances and Equipment for the Office and A-3
Living Quarters of the Engineer
A.1.1.5 Quality Control and Testing Centers A-4
A.1.2 Vehicles for the Engineer A-4
A.1.2(5) Operation and Maintenance of the Vehicles for the Engineer A-5
A.1.3 Assistance for the Engineer A-6
A.1.4 Progress Photographs A-7
A.1.5 Communication Facility A-8
A.1.6 Schedule of Facilities for the Engineer A-8
A.1.1(11) Schedule for the Provision of Furniture/Fixtures, Equipment and A-9
Appliances for the Engineer’s Field Office
A.1.1(13) Schedule for the Provision of Furniture/Fixtures, Equipment and A-10
Appliances for the Living Quarters of the Engineer
A.2 Measurement and Payment A-14 to A-16

PART B OTHER GENERAL REQUIREMENTS B-1


B.1 Offices, Shops, Stores and Workmen’s Accommodation for the B-1
Contractor
B.2 Medical Room and First Aid Facilities B-1
B.3 Quality Control of Materials B-2
B.4 Construction Survey and Staking B-6
B.4.3 Centerline Reestablishment B-9
B.4.4 Culvert Survey and Staking B-10
B.4.5 Bridge Survey and Staking B-10
B.4.6 Retaining Walls and Other Types of Slope Protection Works B-11
Survey
B.4.7 Grade Finishing Stakes B-11
B.4.8 Permanent Monuments and Markers B-11
B.5 Project Sign Board B-13
B.6 Transportation and Handling B-13
B.6A Provisions For Passage of Traffic B-15
B.6B Disposal of Materials Outside the Project Boundaries B-16
B.6C Project Record Documents B-16
B.7 Construction Occupational Safety and Health Program B-19
B.8 Traffic Management During Construction B-21
B.9 Mobilization/Demobilization B-28
B.10 Method of Measurements B-29
B.11 Silence of Contract Documents B-32
B.12 Meetings/Conferences B-33
B.13 Measurement and Payment B-33

i
TABLE OF CONTENTS

ITEM NO. DESCRIPTION PAGE NO.

PART C EARTHWORK C-1


100 Clearing and Grubbing C-1
102 Excavation C-4
103 Structure Excavation C-10
104 Embankment C-15
105 Subgrade Preparation - C-24 to C-27

PART D SUBBASE AND BASE COURSE D-1


200 Aggregate Subbase Course D-1
201 Aggregate Base Course D-4
202 Crushed Aggregate Base Course D-6 to D-9

PART E SURFACE COURSES E-1


301 Bituminous Prime Coat E-1
310 Bituminous Concrete Surface Course, Hot-Laid E-3
311 Portland Cement Concrete Pavement E-9 to E-34

PART F BRIDGE CONSTRUCTION F-1


400 Piling F-1
400(27)a Pile Integrity Testing F-19
400(28) Pile Dynamic Testing F-20
401 Railings F-22
404 Reinforcing Steel F-25
405 Structural Concrete F-28
406 Prestressed Concrete Structures F-38
407 Concrete Structures F-47
412 Elastomeric Bearing Pads F-65
507 Rubble Concrete F-69
517 Drain Pipe F-71
508 Hand Laid Rock Embankment F-73
SPL-801 Pre-molded Expansion Joint Filler with Sealant F-73

PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES G-1


500 Pipe Culverts and Storm Drains G-1
502 Manholes, Inlets and Catch Basins G-2
505 Riprap and Grouted Riprap G-3
506 Stone Masonry G-5 to G-6

PART H MISCELLANEOUS STRUCTURES H-1


600 Curb and Gutter H-1
601 Sidewalk H-5
602 Monuments, markers and Guide Posts H-7

ii
TABLE OF CONTENTS

ITEM NO. DESCRIPTION PAGE NO.

PART H
603 Guardrail H-8
604 Fencing H-10
605 Road Signs H-12
612 Reflective Thermoplastic Stripping Material (Solid Form) H-14
613 Concrete Joint Sealant (Hot Poured Elastic Type) H-19
618 Reflectorized Thermoplastic Rumble Strips H-21
622 Bio-Engineering Solutions (Coconet) H-24
SPL-1200-1 Bikeway Paving (Reinforced Concrete with Exposed Glow H-26 to H-28
In the Dark Aggregates Finished)

PART J
103(1)a STREETLIGHTS AND LIGHTINGS J-1
104(7) Structure Excavation (Streetlight Concrete Pedestal) J-1 to J-12
SPL-1000(3) Structure Backfill (From Common Excavation)
Construction of Steel Pole Concrete Pedestal, including Rebars
SPL-1100-1 and Anchor Bolts w/ nut & Washer 25mm x 762mm
Supply & install, 12.0m. HIGH STEEL LIGHTING POLE, 3.0m –
SPL-1100-2 Single Arm , including Ground Rod w/ Clamp
Supply & install, 12.0m. HIGH STEEL LIGHTING POLE, 3.0m
SPL-1100-3 – Double Arm, including Ground Rod w/ Clamp
Supply & install, 120W LED Roadway Luminaire, Post
SPL-1100-4 Mounting with Copper Split bolt Connector
SPL-1100-5 Supply & Install, THW Copper Wire, 22mm²
SPL-1100-6 Supply & Install, THW Copper Wire, 8mm²
SPL-1100-7 Supply & Install, THW Copper Wire, 3.5mm²
SPL-1100-8 Supply & Install, 50mm Ø PVC Pipe with Coupling
Supply & Install, Enclosed Circuit Breaker, 2P40A 22KAIC,
SPL-1100-9 NEMA-4x with 50mm HUB
Supply and Install, Panel Board, MCB: 4P100AT; BRS:10-
SPL-1100-10 2P40AT; NEMA-4x
Supply and Install Synchronizing Panel, 3-45KVA, 3Ø, 400V,
SPL-1100-11 60HZ. PLC
Supply and Install Generator Set, Diesel, 45KVA, 3Ø, 400V,
SPL-1100-12 60HZ. Brushless
SPL-1100-13 Construction of Powerhouse Building, 4m x 6m Floor Area
SPL-1100-14 Standard Electrical Handhole, for Service Lateral Connection
Supply and Install Metered Electric Utility Services for 45KVA,
SPL-1100-15 3Ø, 400V
Contingency Miscellaneous

PART K STREET LANDSCAPE K-1


Scope of Works/Description and Materials K-1 to K- 27

iii
PART A

FACILITIES FOR THE


ENGINEER
FACILITIES FOR THE ENGINEER A

PART A. FACILITIES FOR THE ENGINEER

A.1 REQUIREMENTS

A.1.1 Offices and Living Quarters for the Engineer

A.1.1 .1 Offices and Living Quarters for the Engineer

The Contractor shall provide and maintain until final completion of the
project a one (1) unit field office building, and two (2) units of rented
living quarters for the exclusive use of the Engineer and his staff. The
office shall have at least 180 square meters in floor area, rectangular
and made of concrete finished walls and partitions, G.I. roofing, glass
windows and hard wooden doors, ply board ceilings, tiled floors, with
complete sanitary connections and sewage connection to a septic
tank, complete with electrical installation. This office building shall
contain the supplies, appliances, equipment and furnishings specified
in the Contract. The location and final plan of the office building shall
require the approval of the Engineer prior to the start of the
construction, while the rented living quarter shall also require the
approval of the Engineer prior to the selection of the unit for lease. It is
the intent of this Specification to locate the field office building in a
government owned lot so that the use by the government of this
facility can be maximized even after the completion of the project.
However, if no government lot is available, and this structure are to be
erected on private property, it is the responsibility of the Contractor to
make necessary arrangements with the landowner(s) regarding the
use of the lot for the Engineer’s office and to remove and transfer, if so
required under the Contract, the improvements thereon, including all
appurtenances upon completion of the Works.

The office building shall be constructed in accordance with the


approved Plans and Drawings which will be proposed and prepared
by the Contractor and approved by the Engineer. It shall be at
locations designated and oriented to the approval and satisfaction of
the Engineer. All cost of labor, materials, equipment and ground
rentals that maybe considered necessary for the construction of such
facility shall be at the expense of the Contractor.

The field office and living quarters shall be provided with all the
necessary electricity, telephone line, potable water supply, sewer and
drainage services for twenty-four (24) hours a day. This office and
living quarters must be ready for occupancy and use of the Engineer
within two (2) months of the commencement of the Works. This is
specified in Part A; Item A.1.1 (3), and Item A.1.1 (10).

However, if there will be delay in the provision of such facilities, the


Contractor shall provide temporary facilities in rented building(s)
conforming to all the requirements of the permanent facilities to the
satisfaction of the Engineer. The Contractor shall maintain such
temporary facilities for the Engineer over the same period.

All facilities provided by the Contractor shall conform to the best


standard of the required types. On the completion of the Contract,
these facilities (except those on rental basis) provided by the
Contractor including utilities and communication facilities shall be
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-1
FACILITIES FOR THE ENGINEER A
turned-over to the BCDA including office equipment, apparatus,
pieces of furniture and furnishing, etc., unless otherwise directed by
the Engineer.

The facilities provided by the Contractor shall be near the job site,
where necessary and shall conform to the best standard for the
required types. On the completion of the Contract, the facilities
provided by the Contractor including utilities and communication
facilities shall revert to the Government including office equipment,
pieces of furniture, apparatus, appliances unless otherwise specified
in the Contract documents.

The Contractor shall fence the office building with barbed wire (or
equivalent), 1.8 meter high with necessary gates as directed by the
Engineer. The Contractor shall raise the grade of the Engineer’s
facility (if necessary) and will provide drainage in the vicinity, with
suitable access walkways, seeding and sodding of the ground as
directed and approved by the Engineer. The facilities shall be provided
with a parking area for at least eight (8) vehicles and a satisfactory
access road to the parking area. Outside lighting around the facility
and parking areas shall be installed to the satisfaction of the Engineer
and be maintained at all times. Appropriate signs shall be erected to
inform the public of the purpose of the facility.

The Contractor shall be responsible for the maintenance and


protection of all facilities to be provided during the duration of the
Contract, including providing adequate stock of all expendable items,
such as light bulbs, light tubes and consumable stores at all times to
ensure proper and continuous functioning of all the Engineer’s
Facilities.

All windows and door openings of all buildings/facilities shall be wire


screened for insect protection.

The Contractor shall be responsible for all the materials quality control
and laboratory tests needed in the execution the Works. The
Contractor must submit for the approval of the Engineer the possible
accredited materials and laboratory testing centers that will conduct
the necessary tests needed. The Contractor shall also assign a
qualified and experienced laboratory staff and Material Engineer to
carry out, transport the specimen to the Accredited Laboratory
Centers and testify on all the materials quality control tests as
specified in the Contract and required by the Engineer. The person so
appointed by the Contractor to manage the laboratory works and to be
present during the actual testing shall be well experienced in the type
of work to be undertaken and shall be subject to the approval of the
Engineer. He shall work full time and shall be responsible to the
Engineer for all works carried out.

A.1.1.2 Operation and Maintenance of Office and Living Quarters

The Contractor is required to maintain and protect the Engineer's field


office, living quarters and all utilities therein in good condition
throughout the whole period for which the facility is required and to
repair and/or replace broken items that become defective in any way.
Should the Contractor fail to maintain, repair or replace any item when
such is required or fail to supply any material, article or thing
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-2
FACILITIES FOR THE ENGINEER A
necessary within the time to be specified by the Engineer, the
Engineer may deal with the matter himself in whatever manner he
considers most appropriate, and all costs thereby incurred by the
Engineer shall be recoverable from the Contractor and may be
deducted from any money which is due or which may become due to
the Contractor.

The Contractor shall provide and pay for all connection charges in
respect of electricity, water, telephones and communication facilities.
Electricity and water consumption costs and the cost of telephone
services and calls shall be paid for by the Contractor.

The Contractor shall provide emergency generators or power


generating units with enough capacity to supply the power needed in
case of local power failure. For potable water requirement, the
Contractor shall furnish drinking water dispenser with purifier,
including daily supply of loaded mineral water containers, to the
satisfaction of the Engineer.

In addition, the Contractor shall provide the following personnel for the
Engineer’s facilities:

One (1) - Messenger/ Utility man


Two (2) - Security Personnel

The Contractor shall provide protective clothing, waterproof clothing,


rubber boots, and safety helmets for the site staff.

All office and living quarters and its surroundings shall be proficiently
guarded at all times of the day and night, regularly and properly
cleaned, adequately supplied and maintained for the duration of the
Contract.

The above are specified in Part A, Item A.1.1 (16) and Item A.1.1 (18).

A.1.1.3 Staffing for Engineer’s Facilities

All staff for the Engineer's office and living quarters, such as janitors,
maintenance personnel, security staff, service drivers and support
staff shall be provided by the Contractor and approved by the
Engineer.

All staff assigned as assistance for the Engineer is defined in Part


A.1.3.- Assistance to the Engineer and in Item A.1.3 (3).

A.1.1.4 Furniture, Fixtures, Appliances and Equipment for the Office, and
Living Quarters of the Engineer

The Contractor shall, within thirty (30) calendar days after receipt of
Notice to Proceed, will furnish the field office and living quarters with
sufficient furnitures, fixtures, equipment, appliances and necessary
supplies and consumable stores as specified in Items A.1.1(16), and
Item A.1.1(18) hereunder to the satisfaction of the Engineer.

All furnitures, fixtures, appliances and equipment specified herein to


be provided as specified in Item A.1.1(11) and Item A.1.1(13)
hereunder and other items to be purchased for the use of the
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-3
FACILITIES FOR THE ENGINEER A
Engineer shall be brand new when initially furnished and shall conform
with those indicated in the Specifications as to kind, type and size or
as determined by the Engineer.

The Contractor shall ensure that the furnitures, fixtures, furnishings,


equipment and appliances therein are properly maintained and, if any
problem arises, shall rectify the matter himself and shall not wait for
the occupants of the property to take action if it is obvious that a delay
in dealing with the matter would otherwise occur. All costs in
connection with providing adequate maintenance shall be borne by
the Contractor.

It shall be understood that if the Contractor cannot provide the articles


as specified or intends to supply equivalent substitutes, the Contractor
should secure the approval of the Engineer and if such approval is
granted, it will be on the condition that adjustments in prices will be
effected based on the submitted receipt invoices of the Contractor.

A.1.1.5 Quality Control and Testing Centers

All material laboratory tests and quality control tests shall be


performed by the Contractor through an accredited material testing
centers duly approved by the Engineer. The payment and costs of all
the necessary tests shall be borne by the Contractor and understood
to have been incorporated in all his contract unit price analysis. No
extra payment for the said tests will be entertained.

A.1.2 Vehicles for the Engineer

A.1.2 (2) Provision of Vehicles for the Engineer (On Rental Basis)

Within fifteen (15) days after the Commencement Date, the Contractor
shall provide and deliver to the Site, the following brand new vehicles
on rental basis for the exclusive use of the Engineer, the Engineer's
assistants, staff and representatives working on the Site:

3 units 4WD Pick-Up Type, Double Crew Cab, Service Vehicle,


2200cc, Diesel Engine with factory installed air-conditioner

The Contractor shall submit catalogues in the English language of the


proposed rented vehicles to the Engineer for his approval within seven
(7) days after the Commencement Date, and the final consent for the
delivery of the rented vehicles on site shall be to the satisfaction of the
Engineer.

All vehicles shall carry or be fitted with all tools and accessories as
maybe prescribed by laws and with comprehensive insurances. They
shall also be complete with seat belts for all seats, and shall be
supplied with first aid kits, fire extinguishers, detachable magnetic
flashing orange warning lights, accident warning triangles and any
other safety kit requirements.

In case the Contractor fails to provide the aforesaid vehicles on the


date required, the Engineer shall take such action as he deemed
necessary, to acquire the usage of such vehicle and charge all
relevant expenses to the Contractor.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-4
FACILITIES FOR THE ENGINEER A
The vehicles may be used by the Engineer and/or the Employer both
on and off the site and outside the project area, both for business
purposes during working hours and in other official purposes.

The rented vehicles shall be duly registered in the name of owner with
all proper ownership documents kept by the Contractor together with a
copy of contract of lease executed by the Contractor and the owner of
the vehicle. These documents must be also furnished to the Engineer.
Accordingly, when the assignments of the Engineer's and Employer's
personnel in connection with the execution of the Works have been
completed, the vehicles shall be returned to the Contractor.

A.1.2 (5) Operation and Maintenance of the Vehicles for the Engineer

A.) Driver of Vehicles for the Engineer

Each vehicle shall be driven by a competent, qualified and


experienced driver recruited and paid for by the Contractor, including
overtime payments and the like. All such drivers shall be under the
direct full-time control of the Engineer.

All drivers shall be:


• properly licensed, with demonstrable previous experience in driving
in and under conditions prevailing on a major civil engineering
construction site;
• able to read, write and speak English
• available to work any hour on any day of the week
• have the requisite flexibility to meet demands for their services at
any time by the Engineer for any purpose under the Contract.

The Contractor shall manage and monitor the performance of drivers


to ensure the provision and maintenance of drivers with a high level of
skill and a demonstrated ability to drive efficiently and safely. Drivers
not meeting these criteria shall be promptly replaced by the Contractor
when so directed by the Engineer.

B.) Operation and Maintenance of Vehicles

The Contractor shall be solely responsible for all activities related to


the procurement of the vehicles and for the registration of the vehicles,
their annual road license/taxes and the provision of passes, access
stickers and the like, as well as for providing fully comprehensive
insurance until and including the date of issue of the Taking-Over
Certificate; all costs thereof being at the Contractor's expense which is
incorporated accordingly on his bare rental payments.

The Contractor shall maintain the vehicles in first class condition and
shall be supplied with appropriate fuel and lubricants at all times. He
shall also undertake entirely all servicing and maintenance
requirements for the vehicles, including regularly cleaning inside and
out and providing all such replacement parts as maybe from time to
time become necessary. This is provided as specified in Item A.1.2
(5) Operation and Maintenance of the Vehicles for the Engineer.

The Contractor shall provide equivalent substitute vehicles during the


period when specified vehicles are taken out of service due to

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-5
FACILITIES FOR THE ENGINEER A
breakdown, for servicing, for maintenance, repair or any other reason.

Should the Contractor fail to maintain, repair or replace any vehicle


when such is required, the Engineer may deal with the matter himself
in whatever manner he considers most appropriate, and all costs
thereby incurred by the Engineer shall be recoverable from the
Contractor and may be deducted from any money which is due or
which may become due to the Contractor.

The vehicles shall comply in all respect, with all relevant Philippine
national or local laws, statutes and regulations.

A.1.3 Assistance for the Engineer

A.1.3 (3) Provision of Survey Personnel for the Assistance to the Engineer

The Contractor shall provide and employ qualified survey personnel,


chainmen and laborers for the assistance to the Engineer as required
for in the execution of the Works. These personnel will keep and
maintain with confidentiality all information and records of the
measurements on site for the whole duration of the Contract. These
Contractor’s supplied personnel are subject for approval of the
Engineer. This is specified in Item A.1.3(1) Provision of Survey
Personnel for the Assistance to the Engineer.

Numbers of minimum required survey personnel are as follow;

One (1) - Survey Engineer


Two (2) - Instrument man (Junior Surveyor)
Four (4) - Chainmen
Eight (8) - Survey Aides

A.1.3 (2) Provision of Survey Equipment for the Assistance to the


Engineer (Contractor’s owned)

The Contractor shall at all times during the duration of the Contract
provide for the use of the Engineer all equipment, instruments and
apparatus, all information and records required by the Engineer for
inspecting and measuring the Works. This survey equipment,
instruments and apparatus are understood to be owned by the
Contractor from the start of the Contract and no separate payment
shall be made in respect of the provision and use of such survey
equipment, instruments and apparatus as this is deemed to be
included in the pay item for each work to be carried out.

Survey equipment, instruments and apparatus of approved type and


for the use of the Engineer shall be available within fifteen (15) days
from commencing the Works. The minimum requirements are as
follows;

1 - Total station with tripod including prism


2 - Automatic level complete with tripod
2 - Leveling rods
6 - 100 m. steel band tape
6 - 50 m. steel tape
6 - Range Poles (3 m long)
2 - Hand level
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-6
FACILITIES FOR THE ENGINEER A
6 - Claw Hammers
10 - Survey Umbrellas
1 Lot - Waterproof clothing (coat, rubber boots and hard hat)
10 - 3 meter steel tapes

The Contractor shall supply wooden pegs, stakes, concrete blocks,


survey monuments, steel pins, paints, hammers, saws, Engineer’s
field books, metal templates, straight edges, etc., to enable proper
setting out and checking of the works.

A.1.3 (3) Provision of Laboratory Personnel for the Assistance to the


Engineer

The Contractor shall provide qualified and experienced laboratory staff


to carry out all the materials quality control and all the tests specified
in the Contract and required by the Engineer. The personnel that will
be appointed by the Contractor to assist the Engineer and to manage
all material extractions, testing procedures and to bring field samples
to the Accredited Material Laboratory Testing Centers shall be well
experienced in the type of works and tests to be undertaken and shall
be all subject to the approval of the Engineer. They shall work full time
and shall be responsible to the Engineer for all works carried out. The
following personnel are;

One (1) - Materials Engineer


One (1 - Senior Laboratory Technician
Six (5) - Laboratory Aide
One (1) - Secretary/Encoder

These supplied laboratory personnel shall be totally Contractor’s crew


assigned for the above purpose and no separate payment shall be
made in respect of the time, days and works rendered by those
personnel as this is deemed to be included in the pay item for
maintenance of Engineer’s facility.

A.1.4 Progress Photographs

A.1.4 (1) Provision of Progress Photographs

The Contractor shall provide a photographic record of the construction


activities. Such photographs shall be taken when and where as
directed by the Engineer at intervals of not more than one month or as
required, taken selectively by the Engineer, which represents the
progress of the Works.

The photographs shall be sufficient in number and location to record


the exact progress of the Works. Such photograph shall be taken as
per instruction of the Engineer or under the following occasions or
events;

1) When a portion of the work is difficult or impossible to inspect at


the time of a particular operation, where a portion will be covered
by backfill, or filling materials after completion and acceptance of
the work by the Engineer.

2) When or where special or unusual features of the work or latent


conditions on the site are present.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-7
FACILITIES FOR THE ENGINEER A

When taking the photographs, the Contractor is required to observe


the following;

1) An indicator such as scale, pole or similar item shall be placed


thereon to signify or illustrate the relative dimensions of the
pictures.

2) Each picture shall be captioned and identified as to date, location,


description of the work in progress or completed operation or
activity or presence of unusual features.

3) Each picture shall be properly referenced.

4) The picture shall be clearly discernible in color having a dimension


of not less than 12.5cm x 9cm (DPWH DO No. 55, Series of 1994).

The photographs selected by the Engineer, which shall have his


signature with copies furnished by the Contractor, shall be compiled in
albums provided by the Contractor for the purpose and shall be so
arranged in consecutive order in accordance with the construction
program submitted to and approved by the Engineer. Each album
shall show the name of the Project on the cover and shall contain a
location map of the construction site.

All photographs retained by the Engineer shall become the property of


the BCDA. A set of photographs shall consist of ten (10) proof prints of
each photograph taken per month.

A.1.5 Communication Facility

A.1.5 (1) Communication Equipment

The Contractor shall provide within fifteen (15) calendar days upon
commencement of the Works and maintain for the duration of the
Contract, six (6) sets of new portable cellular phones for use of the
Engineer as communication facilities. Accessories shall include
protective carrying case, AC charger and pre-paid cards at a nominal
rate of PHP 1000 per month per cellular phone.

Failure on the part of the Contractor to provide such within the


stipulated time shall allow the Engineer to take such action as he may
be deemed necessary, and charge all relevant expenses to the
Contractor by deducting the amount from the Contractor’s monthly
billing. This is specified in Item A.1.5(1) Provision of Communication
Facility for the Engineer

A.1.6 Schedule of Facilities for the Engineer

A.1.1(11) Provision of Furniture/Fixtures, Equipment & Appliances for the


Engineer’s Field Office

A.1.1(13) Provision of Furniture/Fixtures, Equipment & Appliances for the


Living Quarters of the Engineer

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-8
FACILITIES FOR THE ENGINEER A

PART A FACILITIES FOR THE ENGINEER

Item No. A.1.1(11)

Provision of Furnitures/ Fixtures, Equipment and


Appliances for the Engineer’s Field Office

Description Unit Quantity

A Furnitures, Equipment, Fixtures and Appliances


1 Digital Camera each 2
2 Working/Conference Table, with 10 chairs set 2
Office Desk, 70 x 140 cm, (3 drawers on each side)
3 each 4
with lock and keys
Office Desk, 60 x 105 cm, (3 drawers on each side)
4 each 4
with lock and keys
Swivel Chair with padded seat and back arm rest, to
5 each 8
match desk
6 Plan Rack each 8
7 Steel Filling Cabinet, 4 Drawers with lock and keys,
fire resistant each 8
Scientific Calculator, Battery Operated, Casio Model or
8 equivalent each 8

9 Heavy Duty Combo Binder each 4


10 Magnetic Whiteboard, 4ft x 8 ft. each 2
11 Electric Stand Fan, 16” diameter each 4
12 Fire Extinguisher, 10 lbs. each 4
13 Hot and Cold Water Dispenser for drinking each 2
14 Raincoats set 20
15 Safety Shoes (Steel Toe) pair 12
16 Hard Hat each 20
17 Air conditioning Unit, Window Type, 2 Hp Remote unit 3
18 Wall Clock each 3
19 3 in 1 Inject Printer ( Print, Scan, Copy) unit 2
Desktop Computer, Intel Core TM2 Duo; Loaded
20 unit 4
complete with Microsoft Office

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-9
FACILITIES FOR THE ENGINEER A

PART A FACILITIES FOR ENGINEER

Item No. A.1.1(13)

Provision of Furnitures/Fixtures, Equipment &


Appliances for the Living Quarters of the Engineer

Description Unit Quantity

A Furniture, Equipment, Fixtures and Appliances


1 Dining Table with 6 Chairs set 2
2 Gas Stove Double Burner with Tank set 2
3 Plate Cabinet set 8
4 Single Bed with Foam set 8
5 Hot and Cold Water Dispenser for drinking each 2
6 Air conditioning Unit, Window Type, 1 Hp Remote unit 2
7 Washing Machine 6.5kg unit 2
8 Electric Stand Fan, 16” diameter each 2
9 32”’ Flat TV, LED each 2
10 Refrigerator, 6 [Link]. each 2
11 Electric Stand Fan, 16” diameter each 6
12 Wall Clock each 2

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-10
FACILITIES FOR THE ENGINEER A

PART A FACILITIES FOR ENGINEER


Minimum List of Contractor’s Owned Laboratory
Testing Equipment, Apparatus and Publications
for the use of the Engineer (Optional)

Description Unit Quantity


Mechanical Sieve Analysis of Soils and Analysis
I
of Fine and Course Aggregates
Sieve Analysis Set, 203 mm ø x 51 mm depth,
Brass, AASHTO M92
1. 3” 8” ø Brass Sieve each 1
2. 2 ½” 8” ø Brass Sieve each 1
3. 2” 8” ø Brass Sieve each 1
4. 1 ½” 8” ø Brass Sieve each 1
5. 1” 8” ø Brass Sieve each 1
6. ¾ ” 8” ø Brass Sieve each 1
7. ½ ” 8” ø Brass Sieve each 1
8. 3/8” 8” ø Brass Sieve each 1
9. #4 8” ø Brass Sieve each 1
10. #8 8” ø Brass Sieve each 1
11. #10 8” ø Brass Sieve each 1
12. #12 8” ø Brass Sieve each 1
13. #16 8” ø Brass Sieve each 1
14. #20 8” ø Brass Sieve each 1
15. #30 8” ø Brass Sieve each 1
16. #40 8” ø Brass Sieve each 1
17. #50 8” ø Brass Sieve each 1
18. #100 8” ø Brass Sieve each 1
19. #200 8” ø Brass Wash Sieve each 1
20. #200 8” ø Brass Wash Sieve, 4” deep for washing each 1
21. Brass Pan, 8”ø x 2” deep each 1
22. Brass Cover with ring each 1
23. Galvanized Steel Pan, 24” x 24” x 2” each 1
24. Galvanized Steel Pan, 24” x 24” x 4” each 1
25. Volumetric Flask, 500 ml with top each 1
26. Hand Operated Shaker for 8”ø Sieve each 1
27. Mechanical Shaker each 1
28. Balance, sensitive to 0.50 gram, 20 kg. capacity set of
unit 2
weight to accommodate capacity of balance
29. Triple Beam Balance, 2610 grams per 0.10 gram unit 2
30. Volumetric Flask, 250 ml with top each 1

II Atterberg Limits
31. Liquid Limit Test each 1
32. Plastic Limit Test each 1
33. Balance, sensitive to 0.001 gram, 1.0 kg. capacity
each 1
with set of weights
34. Moisture Cans, 150 mm ø each 1
35. Evaporating Disk each 1

III Shrinkage Factor Test


36. Shrinkage Limit Test each 1
37. Disk, for Mercury, 150 mm ø each 1
38. Spatula each 1

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-11
FACILITIES FOR THE ENGINEER A
39. Shrinkage Disk, 45 mm ø each 1
40. Straight Edge, 300 mm each 1
41. Glass Container, 50 mm ø each 1
42. Glass Plate, 2 mm x 80 mm x 80 mm each 1
43. Glass Plate with Prongs each 1
44. Graduated Cylinder, 25 ml. each 1
45. Mercury, 500 cc bottle 1

IV Moisture Density
Compaction Test
46. Compaction Mold, 4” ø each 1
47. Compaction Rammer, 5.5 lbs. each 1
48. Compaction Mold, 6” ø each 1
49. Compaction Rammer, 10 lbs. each 1
50. Sample Extruder each 1
51. Steel Straight Edge each 1
52. Mixing Pan, 24” x 24” x 3” pc. 1
53. Moisture Cans, 3 oz. dozen 2

V. Specific Gravity Test


Specific Gravity Test Set of Soil
54. Analytical Balance, 200 gms cap., sensitive to 0.0001
unit 1
gm.
55. Pycnometer Top and Jar pair 1
56. Volumetric Flask, 500 ml. each 1
57. Thermometer, Range 0 -100°C graduated 1°C each 1
Fine Aggregates Specific Gravity Test Set
58. Balance, sensitive to 0.1 gram, 1.0 kg. capacity with
unit 1
set of weights
59. Volumetric Flask, 500 ml. each 1
60. Conical Mold, Metal each 1
61. Tamping Rod each 1
Coarse Aggregates Specific Gravity Test Set
62. L.A. Abrasion Machine Model each 1
63. Balance, sensitive to 0.5 gram, 5.0 kg. capacity with
unit 1
set of weights
64. Basket, Mesh Opening 3.35 or 2.86 mm ø ht. =
each 1
20mm
65. Steel Container for Wire Basket each 1
66. Steel Stand with Rubber Plate covering upper
each 1
surface

VI Sand Equivalent Value


67. Sand Equivalent Base Set compose of: set 1
Sand Reading Indicator
Irrigator Tube
Measuring Graduated Cylinder
Siphon Assembly
Measuring Tin 90ml., 60 mm ø
Funnel
Bottle, 4-Liter Enamel Tray, 345 mm x 265 mm
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-12
FACILITIES FOR THE ENGINEER A
60 mm
68. Sieve 4.75 (No.4) set 1
69. Anhydrous, Calcium Chloride, 500 grams each 1
70. Glycerin each 1
71. Formaldehyde each 1

VII California Bearing Ratio (CBR)


Mechanical CBR Loading Apparatus with Strain
72. set 1
Gauge proving ring and penetration piston
CBR mold, 6” x 7” with perporated base plate and
73. each 6
collar
74. Spacer Disk each 1
75. Filter Screen each 12
76. Swell Plate each 6
77. Dial Gauge each 1
78. Tripod Attachment each 3
79. Slotted Surcharge Weights each 6
80. Circular Surcharge Weights each 6
81. Cutting Edge each 1

VIII Density of Soil in-Place by Sand Cone Method


82. Sand Density Apparatus each 1
83. Sand Cone and Jug each 2
84. Density Plate each 1
85. Replacement Jug each 2
86. Sampling Spoon each 1
87. One Gallon Field Cans each 2
88. Once Inch Steel Chisel each 1
89. Sand Scoop each 1
90. Ball Hammer each 1
91. Field Scale, 16 kg., 20 grams sensitivity unit 1
92. Spoon Sampling each 1

IX Specific Gravity and Absorption Test


93. Sand Absorption Cone and Tamper each 1
94. Trible Beam Balance, 2610 grams/0.10 gram unit 1
95. Micro Poise Balance, 100 grams/0.10 gram unit 1
96. Density Basket each 1
97. Bucket for immersing aggregates each 1
98. Pycnometer Top and Jar pair 1
99. Volumetric Flask, 250 ml each 1
100. Volumetric Flask, 500 ml each 1
101. Tin Pans, Rectangular, 4” x 4” x 16” each 1

Compression Strength of Molded Concrete


X
Cylinder
Compression Machine, Hydraulic Operated with set 1
102.
changeable head for flexural testing
103. Air Entrapment Meter each 1
104. Capping set for Capping of Specimen set 1
105. Capping Compound bag 8

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-13
FACILITIES FOR THE ENGINEER A

Making and Curing Concrete Compression and


XI
Flexural Test Specimen in the Field
106. Molds for Compression Test Specimen each 1
107. Molds for Flexural Test Specimen each 1
Tamping Rod, 5/8” ø, 24’ long having one end
108. each 1
hemispherical
109. Small Tools set 1
Two (2) each of shovels, pail trowel wood float,
blunted trowels, straight edge, feeler gauge,
scoops, rubber mallet and rulers

XII Concrete Coring and Saw Cutting


110. Core Drill Machine with 150 mm ø with two drill bits set 1
111. 4” ø, drill bit for concrete cored sample each 2
112. Concrete Saw Cutter set 1

XIII Slump of Portland Cement Concrete


113. Slump Test Apparatus: Slump Cone with Base and
set 1
Graduated Tamping Rod
114. Mixing Pan, 24” x 24” x 3” each 1
115. Cement Towel each 1
116. Armoured Thermometer each 1
117. Yield Bucket, 1/10 cu. ft. each 1
118. Yield Bucket, ½ cu. ft. each 1

XIV Miscellaneous Equipment


Laboratory Oven, Double Wall Gravity connection
119. set 1
220V/60 cy., A.C. Cap. 1 cu.m.
120. Hot Plate, 12” x 12”, 220 V each 1
121. Speedy Moisture Tester each 1
122. Organic Impurities Test Set set 1
123. Sand Equivalent Test Set each 1
124. Gas Range, 2 – Burners each 1

XIV Miscellaneous Equipment


125. Sodium Hydroxide Solution bottle 1
126. Capping Compound, 55 lbs. bag 1
127. Sodium Sulfate bottle 1
128. Calcium Carbide Reagent bottle 1
129. Sand Equipment Solution Standards bottle 1

A.2 MEASUREMENT AND PAYMENT

A.2.1 Measurement

1. Lump sum items shall be provided for the following:

a) Provision of one (1) Unit Field Office Building with all its land
development. Land development includes the raising of the
grades (as maybe required by the Engineer), the perimeter
fencing to a desired height as approved by the Engineer and the

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-14
FACILITIES FOR THE ENGINEER A
provision of access walkways, sodding or seeding of the ground
around the building and provision of access roads to parking
areas. Payment shall be made on a lump sum basis or on a pro-
rata basis of the contract unit price as reflected in the Bill of
Quantities or as directed by the Engineer.

b) Provision for furnishing and transporting of Furniture/Fixtures,


Equipment and Appliances for the Field Office and Living
Quarters of the Engineer.

c) Provisions for furnishing Communication Equipment for the


Engineer.

2. Provision of two (2) Units of Living Quarters for the Engineer will be
paid for from the time the Engineer occupies the facilities. Payment
shall be made on a monthly rental basis at the contract unit price
shown in the Bill of Quantities.

3. Operation and Maintenance of the Field Office and Living Quarters


for the Engineer will be paid for from the time the Engineer occupies
the facilities until the final completion of the Work. Payment shall be
made on a monthly basis at the contract unit price shown in the Bill
of Quantities.

4. Provision for furnishing supplies and consumables stores for the


Engineer’s field office and communication equipment shall be paid
upon the provision and supplied is accepted by the Engineer.
Payment shall be made on a monthly basis at the contract unit price
shown in the Bill of Quantities.

5. Provision of rented vehicles for the Engineer as specified will be


paid for during the time when the Engineer is supplied with each
type of vehicles until the completion of the project. The unit of
measurement to be paid shall be per vehicle per month.

6. Operation and Maintenance of Vehicles for the Engineer as specified


for shall be paid for during the time which the Engineer is supplied
with each type of vehicles which shall be supplied with appropriate
fuel and lubricants. Servicing and maintenance requirements
included and regular cleaning inside and out with the provision of
some necessary replacement parts from time to time. The salary of
the respective drivers shall be under this item. This operation and
maintenance will be from the start of the Engineer had accepted the
said vehicle until the completion of the project. The unit of
measurement to be paid for shall be per vehicle per month.

7. Provision of Survey Personnel as assistance to the Engineer shall


be paid for from the time the Engineer is supplied with the survey
personnel until the final completion of the Contract. Payment shall
be made on a monthly basis for the survey personnel, while the
supply and provision of survey instruments is deemed to be
Contractor’s owned and shall not be subject for payment.

8. The quantities for Progress Photographs shall be measured as per


monthly basis with the number of photographs taken, selected and
provided as progress photographs. The unit of measure is each at
the contract unit price shown in the Bill of Quantities.
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-15
FACILITIES FOR THE ENGINEER A

9. Provision of the communication facility for the Engineer shall be paid


from the time the unit had been received and approved by the
Engineer. Monthly pre-paid call cards for each unit are included in
this Item and payment shall be for each unit provided at the contract
unit price shown in the Bill of Quantities. The unit measure is “each”.

A.2.2 Payment

Payment will be made under:

Pay Item Unit of


Description
Number Measurement

A.1.1(3) Provision of Field Office Building for the Engineer Lump Sum

Provision of Living Quarter for the Engineer,


A.1.1(10) 2 Units- (Rental Basis) Month

Provision of Furnitures/Fixtures, Equipment and


A.1.1(11) Appliances for Field Office for the Engineer Lump Sum

Provision of Furnitures/Fixtures, Equipment and


A.1.1(13) Appliances for the Living Quarters for the Engineer Lump Sum

Operation and Maintainance of Field Office


A.1.1(16) Month
for the Engineer
Operation and Maintainance of Living Quarters
A.1.1(18) Month
for the Engineer
Provision of 3 Units, 4x4 Pick-Up Type, Service
A.1.2(2) Month
Vehicle for the Engineer (Rental Basis)
Operation and Maintenance of 3 Units, 4x4 Pick-Up
A.1.2(5) Month
Type, Service Vehicle for the Engineer

Provision of Survey Personnel for the Assistance to


A.1.3(3) Month
the Engineer

A.1.4(1) Provision of Progress Photographs Month


Provision of Communication Facility
A.1.5(1) for the Engineer Each

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page A-16
PART B

OTHER GENERAL
REQUIREMENTS
OTHER GENERAL REQUIREMENTS B

PART B- OTHER GENERAL REQUIREMENTS

B.1 OFFICES, SHOPS, STORES AND WORKMEN’S ACCOMMODATION FOR


CONTRACTOR

The Contractor shall provide and maintain their field offices, stores, workshops
latrines, housing and accommodations as are necessary. These shall be
located in the Contractor’s compound, distinct and separate from the Engineer’s
[Link] location, dimensions and layout of such buildings and places
shall be subject to the approval of the Engineer.

The selection of the site shall be the responsibility of the Contractor and shall
be approved by the Engineer. It is entirely up to the Contractor to make
whatever arrangements he deems necessary with the landowners regarding the
use of land for the purpose of erecting camps, workshops, garages, stockpiling
of materials, locations of plant, housing of laborers and staff, welfare facilities,
etc. All costs incurred in connection with the rental or lease of such land shall
be at the Contractor’s expense.

The Contractor shall be solely responsible for the erection, maintenance and
subsequent disposal of whatever facilities he deems necessary to execute the
Works. The Contractor shall not be permitted to erect temporary buildings or
structures within the road right-of-way without prior written approval from the
Engineer.

B.2 MEDICAL ROOM AND FIRST AID FACILITIES

The Contractor shall provide and maintain throughout the duration of the
project, a medical room together with all necessary supplies to be sited in the
Contractor’s main area. The medical room shall be waterproof; it could be a
building or a room designated and used exclusively for the purpose. It shall
have a floor area of at least 15 square meters and a glazed window area of at
least 2 square meters.

The Contractor shall employ permanently on the site a fully trained Medical
Aide, who shall be engaged solely on medical duties.

The location of such room and any other arrangements shall be made known to
all employees by posting a notice on prominent locations suitable in the Site.

The Contractor’s arrangement to comply with this Section shall be subject to


the approval of the Engineer and also the approval of any qualified Medical
Officer designated by the Governemnt to supervise medical arrangements on
the Site.

Payment and price is in Lump Sum basis and shall constitute full compensation
for the compliance and provision of all the necessary first aid room and facilities
with all the furniture and supplies as listed in the Schedule below. This item also
includes the salary of the medical staff assigned solely for the project.

Pay Item
Description Unit of Measurement
Number

B.2 Medical Room and First Aid Lump Sum


Facilities

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-1
OTHER GENERAL REQUIREMENTS B

B.2.1 Schedule of Other Requirements for Medical Room and First Aid
Facilities

PART B.2 MEDICAL ROOM AND FIRST AID FACILITIES


Description Unit Quantity
Requirements for Medical Room and First Aid
A
Facilities
1 Wash Basin (hand) with hot water and cold water each 1
2 Bed each 1
3 Chairs each 4

4 Office Table, each 1

5 Electric Kettle or Equivalent each 1

6 Complete First Aid outfit set 1


7 Bed Sheets, cotton, 150cm x 200cm each 2
8 Pairs of Polyester Pillow, 30cm x 60cm x 15 cm pair 1
9 Pillow Case, 40cm x 80cm. each 2
10 Blanket Cotton, 160cm x 200cm. each 2
11 Fire Extinguisher, 10 lbs. each 2
12 Fire Extinguisher, Refill each 2

B.3 QUALITY CONTROL OF MATERIALS

All Quality Control Procedures should be in accordance with the DPWH Bureau
of Research and Standard Requirements and the Contractor’s Approved
Quality Control/Quality Assurance Procedures. All Quality Control Tests will be
done with the Accredited Material Testing Laboratories or Material Testing
Centers approved by the Engineer.

B.3.1 Source of Supply and Quality of Materials

Promptly after receiving the contract award, the Contractor shall notify
the Engineer of all proposed material sources, including fabricators of
steel or other finished products. Prior to delivery of materials, sources
shall be approved first by the Engineer. If proposed material sources
are not acceptable by the Engineer, the Contractor shall locate other
sources and obtain approval from the Engineer.

All equipments, materials, and articles incorporated into the permanent


work shall:

1) Be new, unless the Specifications permit otherwise;


2) Meet the requirements of the Contract and be approved by the
Engineer;
3) Be inspected or tested at any time during their preparation and
use; and

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-2
OTHER GENERAL REQUIREMENTS B

4) Not be used in the work if they become unfit after being previously
approved.

B.3.2 Samples and Tests for Acceptance

The Contractor shall deliver material samples from the Manufacturer,


Producer, or Fabricator to the Engineer prior to execution of work. In
providing samples, the Contractor shall provide the Engineer with
sufficient time and quantities for approval before use. The Engineer may
require samples at any time. Samples not taken in the presence of the
Engineer will not be accepted for testing, unless the Engineer permits
otherwise.

The Contractor shall designate his experienced personnel as direct


contact person for material testing and acceptance. In his absence, the
Contractor shall designate other personnel of the same experience to
ensure that direct contact is maintained during the execution of work.

The Engineer will designate also an experienced representative as point


of contact for material testing and acceptance.

All field and laboratory material tests to be undertaken by the Contractor


shall be in accordance with the methods described in the contract
documents, or in the recognized standards of national organizations.
The following provisions will apply when the Contractor uses the
specifications or methods from the sources named hereunder:

ASTM – American Society for Testing and Materials: The ASTM


designation number refers to the society’s latest adopted or tentative
standard. The standard or tentative standard in effect on the bid
advertising date, will apply in each case.

Copies of any separate ASTM specifications or testing method may be


obtained from: the American Society for Testing and Materials, 1916
Race Street, Philadelphia, USA.

AASHTO – American Association of State Highway and


Transportation Officials: An AASHTO number refers to that
organization’s currently published (1) “Standard Specifications for
Transportation Materials and Methods of Sampling and Testing” or any
adopted revisions, or (2) “Interim Specifications and Methods of
Sampling and Testing adopted by the AASHTO Subcommittee on
Materials.”

Any standards, revisions, and interim standards in effect on the bid


advertising date will apply.

Copies of “Standard Specifications for Transportation Materials and


Methods of Sampling and Testing” may be obtained from the American
Association of State Highway and Transportation Officials, 917 National
Press Building, Washington, DC, USA.

JIS - Japan Industry Standard: The JIS designation number refers to


the latest adopted or tentative standard. The standard or tentative
standard in effect on the bid advertising date, will apply in each case.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-3
OTHER GENERAL REQUIREMENTS B

JRA - Japan Road Association: All references to JRA Specifications


refer to the latest adopted or tentative specification. The specification or
tentative specification in effect on the bid advertising date, will apply in
each case.

B.3.3 Removed and Rejected Materials

The Contractor may, prior to sampling, select to remove any defective


material(s) and replace it with new material(s) at no expense to the
Employer. Any such new material will be sampled, tested and
evaluated for acceptance as a sub-lot in accordance with the sampling
and testing procedure.

The Engineer may reject a sub-lot wherein tests show to be defective.


Such rejected material shall be removed from the site and the results or
test run on the rejected material will not be included in the original lot
acceptance tests.

B.3.4 Manufacturer’s Certificate of Compliance

The Engineer may accept certain materials on the basis of a


Manufacturer’s Certificate of Compliance as an alternative to material
inspection and testing. When a Manufacturer’s Certificate of Compliance
is authorized by these Specifications, the certificate shall be furnished to
the Engineer for approval prior to the use of material.

The Contractor may request, in writing, authority from the Engineer to


install such material prior to submitting the required certification;
however, no payment shall be made for the work in the absence of the
acceptable Manufacturer’s Certificate of Compliance. The Employer
reserves the right to deny the request for good cause.

If for any reason, the Contractor has no acceptable Manufacturer’s


Certificate of Compliance on the completion date of the work, the
Employer may process the final payment without paying for the work
performed on such basis.

The Manufacturer’s Certificate of Compliance must identify the


manufacturer, the type and quantity of material being certified, the
applicable specifications being affirmed, and the signature of a
responsible corporate official of the manufacturer and include supporting
mill tests or documents. A Manufacturer’s Certificate of Compliance
shall be furnished with each lot of material delivered to the site and the
lot so certified shall be clearly identified in the certificate.

All materials used and identified in the Manufacturer’s Certificate of


Compliance may be sampled and tested at any time. Any material not
conforming to the requirements will be subject to rejection whether in
place or not. The Employer reserves the right to refuse to accept
materials not on the basis of a Manufacturer’s Certificate of Compliance.

B.3.5 Handling and Storing Materials

In storing and handling materials, the Contractor shall protect any


materials against damage from careless handling, from exposure to
weather, from mixture with foreign matter, and from all other causes.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-4
OTHER GENERAL REQUIREMENTS B

The Engineer will reject and refuse to test materials improperly handled
or stored.

B.3.6 Sieves for Testing

Test sieves shall be made either: (1) of woven wire cloth conforming to
AASHTO Designation M 92 or ASTM Designation E 11, or (2) of square-
hole, perforated plates conforming to ASTM Designation E 323.

B.3.7 Compliance to Test Requirements

All tests and quality control works shall be done by the Contractor’s
Accredited Materials Testing Centers and Laboratory Staff under the
direct supervision of the Engineer.

All tests shall normally be carried out on the site, and that certain special
test may, subject to the approval of the Engineer, be carried out at an
approved and accredited independent testing laboratory. The Contractor
shall make all the necessary arrangements for the supply and delivery
of samples to, and collection of samples from such independent
laboratory. Unless otherwise directed by the Engineer, the Contractor
shall arrange for one copy of the independent testing laboratory test
certificates to be delivered to the Engineer not less than three (3) days
before the materials covered by the relevant test certificate are
incorporated into the works, and the test certificate shall be related to
the materials from which the samples were taken. These test and quality
control works shall be the responsibility of the Contractor.

The Contractor shall comply with the Minimum Materials Testing


Equipment Requirement given in, Appendix 4 to Bid, Volume 1 of the
Bidding Documents

When requested, the Contractor shall furnish a complete written


statement of the origin, composition and/or manufacture of any or all
materials (manufactured, produced or grown) that are to be used in the
works.

Unless otherwise provided, sampling and testing of materials shall be


made by the Contractor, under the direct supervision of the Engineer in
accordance with the methods given in the “Standard Specifications for
Highway Materials and Methods of Sampling and Testing” of the latest
edition of AASHTO.

1. Soils and Aggregates

T-11 Amount of Materials Finer than 0.75mm sieve in Aggregate


T-88 Particle Size Analysis of Soils
T-89 Determining the Liquid Limit of Soils
T-90 Determining the Plastic Limit and Plasticity Index of Soils
T-99 Moisture Density Relations of Soils Using a 2.5 kg Rammer
and 305 mm Drop
T-100 Specific Gravity of Soils
T-180 Moisture Density Relations of Soils Using a 4.54 kg
Rammer and a 457 mm Drop
T-191 Density of Soils In-Place by the Sand Cone Method

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-5
OTHER GENERAL REQUIREMENTS B

T-193 The California Bearing Ratio of Laboratory Compacted


Soils (CBR)
T-84 Specific Gravity and Absorption of Fine Aggregate
T-85 Specific Gravity and Absorption of Coarse Aggregate
T-19 Unit Weight of Aggregate
T-27 Sieve Analysis of Fine and Coarse Aggregates
T-96 Resistance to Abrasion by use of Los Angeles machine

2. Concrete
T-21 Organic Impurities of Sands for Concrete
T-22 Compressive Strength of Molded Concrete Cylinder
T-23 Making and Curing Concrete Compressive and Flexural
Strength Test Specimens in the Field
T-24 Obtaining and Testing Drilled Cores and Sawed Beams of
Concrete
T-97 Flexural Strength of Concrete
T-119 Slump of Portland Cement Concrete
T-126 Making and Curing of Concrete Test Specimens in the
Laboratory
T-141 Sampling of Fresh Concrete
T-148 Measuring Length of Drilled Concrete Cores
T-231 Capping Cylinder Concrete Specimen

3. Bituminous Materials
T- 40 Sampling Bituminous Materials
T- 49 Penetration of Bituminous Materials

4. Publications
The Contractor shall provide two (2) copies each of the latest edition
of the following publications:

• Part I, American Association of State Highway and


Transportation Officials – Specifications
• Part II, American Association of Stage Highway and
Transportation Officials – Tests
• Japan Road Association(JRA) Standard Specifications for
Highway Bridges, Parts 1,2,3, 4 and 5 (in English if available)
• JIS Standard for Paints, Screw Threads, Quality Control,
Welding, Ferrous Materials and Metallurgy, Piping and other JIS
standards as may be requested by the Engineer.

These publications maybe stored visibly in the office of the Engineer


for future reference.

B.4 CONSTRUCTION SURVEY AND STAKING

B.4.1 Description

The Contractor shall provide all necessary equipment, materials, skilled


and experienced engineering personnel to execute both survey, stake,
field works, calculate and record data for the control of work in
accordance with this Specification and conforming to the instruction
given to him by the Engineer. Quality performance of work and strict
conformity to the lines, grades and dimensions shown on the Plans or

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-6
OTHER GENERAL REQUIREMENTS B

as established or required by the Engineer shall be observed in the field.


Field survey work to be performed by the Contractor shall include but
not necessarily limited to the following:

1) Setting-out / Staking-out of the Works; and


2) Measurements of the Works for pay quantities.

In addition to the above routine field survey services, the Contractor


shall assign a geo-technical engineering specialist to monitor and
ensure compliance with additional soil borings, if ordered by the
Engineer.

B.4.2 Setting-Out/Staking-Out of the Work

The Contractor shall have sole responsibility of establishing and


maintaining all horizontal and vertical control points required or as may
be directed by the Engineer. Information for the existing control
monuments is shown on the Drawings and shall be used by the
Contractor for establishing the horizontal and vertical controls needed
for his work.

Staking activities shall be included in the construction schedule to be


submitted by the Contractor to the Engineer. Dates and sequence of
each staking activity shall be included.

Schedule and notification to survey shall be provided to the Engineer


and be subject for review and monitoring by the Engineer's
representative.

The Engineer shall set initial reference lines, horizontal and vertical
control points, and shall furnish the data for use in establishing control
for the completion of each element of the work. Data relating to
horizontal and vertical alignments, theoretical slope stake catch points,
and other design data shall be furnished.

The Contractor shall be responsible for the true setting of the works or
improvements and for correctness of positions, levels, dimensions and
alignment of all parts of the works. He shall provide all necessary
instruments, appliances, materials and supplies, and labor in connection
therewith. The Contractor shall provide a survey crew supervisor at the
project site whenever surveying/staking activity is in progress.

The Contractor shall make minor adjustments subject to the Engineer's


approval in the event that discrepancies are found between the
information shown on the Drawings and the actual field conditions.

From the control points provided by the Engineer, the Contractor shall
establish all additional and intermediate controls for accurately locating
all structures, centerlines, right-of-way limits, slopes, etc. as shown on
the Drawings and required by the Contract.

Prior to construction, the Engineer shall be notified of any missing initial


reference lines, control points, or stakes. The Engineer shall reestablish
missing initial reference lines, controls, points, or stakes.

The Contractor, for convenient use of Government-furnished data shall

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-7
OTHER GENERAL REQUIREMENTS B

perform additional calculations. Immediate notification of apparent errors


in the initial staking or in the furnished data shall be provided.

All initial reference and control points shall be preserved. At the start of
the construction, all destroyed or disturbed initial reference or control
points necessary to the work shall be replaced.

Before surveying and staking, the Contractor shall discuss and


coordinate the following with the Engineer:

1. Surveying and staking method


2. Stake marking/concrete monuments
3. Grade control for courses of material
4. Referencing
5. Structure control
6. Any other procedures and controls necessary for the work

The Contractor shall prepare field notes in an approved format. All field
notes and supporting documentation shall become the property of the
government upon completion of the work.

Work shall only be started after staking for the affected work as
accepted.

The Construction survey and staking work may be spot-checked by the


Engineer for accuracy, and unacceptable portions of work may be
rejected. Rejected work shall be resurveyed, and work that is not within
the tolerances shall be corrected. Acceptance of the construction
staking shall not relieve the Contractor of responsibility for correcting
errors discovered during the work and for bearing all additional costs
associated with the error, unless such error is based on incorrect data
supplied in writing by the Engineer, in which case, the expense in
rectifying the same shall be at the expense of the Government.

In the case of “change” or “changed conditions” which involve any


change in stakeout, the Contractor shall coordinate with the Engineer
and facilitate the prompt reestablishment of the field control for the
altered or adjusted work.

All flagging, lath, stakes, and other staking materials shall be removed
and disposed after the project is completed.

B.4.2.1 Equipment

Survey equipments and supporting equipment capable of achieving the


specified tolerances shall be furnished.

Acceptable tools, supplies, and stakes of the type and quality normally
used in the highway survey work and suitable for the intended use shall
be furnished. Stakes and hubs of sufficient length to provide a solid set
in the ground with surface area above ground for necessary legible
markings shall also be furnished.

B.4.2.2 Survey and Staking Requirements

All survey, staking, recording of data, and calculations necessary to

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-8
OTHER GENERAL REQUIREMENTS B

construct the project from the initial layout to the final completion shall
be performed. Stakes shall be reset as many times as necessary to
construct the work.

1. Control Points

Established initial horizontal and vertical control points in conflict


with the construction shall be relocated to areas that will not be
disturbed by construction operations. The coordinates and
elevations for the relocated points shall be furnished before the
initial points are disturbed
.
2. Roadway Cross-Sections

Roadway cross-sections shall be taken normal or perpendicular


to the centerline. When the centerline horizontal curve radius is
less than or equal to 150 meters and vertical parabolic curve
radius is less than or equal to 100 meters, cross-sections shall
be taken at a maximum centerline spacing of 10 meters.

When the centerline horizontal curve radius is greater than 150


meters and vertical parabolic curve radius is greater than 100
meters, cross-sections shall be taken at a maximum centerline
spacing of 20 meters.

Additional cross-sections shall be taken at significant breaks in


topography and at changes in the typical roadway sections
including transition change to superelevated sections. Points
shall be measured and recorded to at least the anticipated slope
stake and reference locations. All cross-section distances shall
be reduced to horizontal distances from centerline.

3. Slope Stakes and References

Slope stakes and references shall be set on both sides of


centerline at the cross-section locations. Slope stakes shall be
established in the field as the actual point of intersection of the
design roadway slope with the natural ground line. Slope stake
references shall be set outside the clearing limits.

All reference point and slope stake information shall be included


on the reference stakes. When initial references are provided,
slope stakes may be set from these points with verification of the
slope stake location with field measurements.

4. Clearing and Grubbing Limits

Clearing and grubbing limits shall be set on both sides of


centerline at roadway cross-section locations, extending one (1)
meter beyond the toe of the fill slopes or beyond the rounding of
cut slopes as the case maybe for the entire length of the project
unless otherwise shown on the plans or as directed by the
Engineer.

B.4.3 Centerline Reestablishment

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-9
OTHER GENERAL REQUIREMENTS B

The centerline shall be reestablished from instrument control


points. The maximum spacing between centerline points shall be
10 meters when the centerline horizontal curve radius is less
than or equal to 150meter and the vertical parabolic curve radius
is less than or equal to 100 meters. Then the centerline
horizontal curve radius is greater than 150meters and the
vertical parabolic curve radius is greater than 100meters, the
maximum distance between centerline points shall be 20 meters.

B.4.4 Culvert Survey and Staking

Culverts shall be staked to fit field conditions. The locations of


culverts may differ from the plans. The following shall be
performed:

a) Survey and record the ground profile along the culvert


centerline including inlet and outlet channel profile of at
least 10 meters and as additionally directed by the
Engineer so as to gather all necessary data for the
preparation of pipe projection plan.

b) Determine the slope catch points at the inlet and outlet.

c) Set the reference points and record information


necessary to determine culvert length and end
treatments.

d) Plot into scale the profile along the culvert centerline


reflecting the natural ground elevation, invert elevation,
the flow line, the roadway section, and the size, the
length of the degree of elbow of culvert, and treatments,
grade and other appurtenances.

e) Plot into scale the cross-section of the inlet and outlet


channel at not more than 5 meters interval.

f) Submit the plotted Pipe Projection Plan for the approval of


final culvert length, alignment and headwall.

g) When the Pipe Projection Plan has been approved, set


drainage culvert structure survey and reference stakes,
and stakes inlet and outlet to make the structure
functional.

B.4.5 Bridge Survey and Staking

Adequate horizontal and vertical control and reference points


shall be set for all bridge structure and superstructure
components. The bridge chord or the bridge tangent shall be
established and referenced. The centerline of each pier, bent,
and abutment shall also be established and referenced.

Set at least three (3) reference points each at downstream and


upstream portion. Conduct topographic survey and plot into
scale at least 100 meters upstream and downstream from the
centerline of bridge.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-10
OTHER GENERAL REQUIREMENTS B

B.4.6 Retaining Walls and Other Types of Slope Protection Works Survey
and Staking

Profile measurements along the face of the proposed wall and 2


meters in front of the wall face shall be surveyed and recorded.
Cross-sections shall be taken within the limits designated by the
Engineer at every 5 meters along the length of the wall and all
major breaks in terrain. For each cross-section, points shall be
measured and recorded every 5 meters and all major breaks in
terrain. Adequate references and horizontal and vertical control
points shall be set.

B.4.7 Grade Finishing Stakes

Grade finishing stakes shall be set for grade elevations and


horizontal alignment, at the centerline and at each shoulder of
the roadway cross-section locations. Stakes shall be set at the
top of subgrade and the top of each aggregate course.

Where turnouts are constructed, stakes shall be set at the


centerline, at each normal shoulder, and at the shoulder of the
turnout. In parking areas, hubs shall be set at the center and
along the edges of the parking area. Stakes shall be set at all
ditches to be paved.

The maximum longitudinal spacing between stakes shall be 10


meters when the centerline horizontal curve radius is less than
or equal to 150 meters and vertical parabolic curve radius is less
than or equal to 100 meters. When the centerline horizontal
curve radius is greater than 150 meters and vertical parabolic
curve radius is greater than 100 meters, the maximum
transverse spacing between stakes shall be 5 meters. Brushes
or guard stakes shall be used at each stake.

B.4.8 Permanent Monuments and Markers

All survey and staking necessary to establish permanent


monuments and markers shall be performed.

B.4.9 Miscellaneous Survey and Staking

All surveying, staking, and recording of data essential for


establishing the layout and control of the following shall be
performed, as applicable:

a. Approach roads and trails


b. Road Right of way and Construction limit in accordance
with the approved Parcellary Plan.
c. Curb and gutter
d. Guardrail
e. Parking Areas
f. Paved waterways and outfall structures
g. Lined canals and other ditches
h. Chutes and Spillways
i. Turf establishment
j. Utilities

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-11
OTHER GENERAL REQUIREMENTS B

k. Signs, delineators, and object markers


l. Pavement markings

B.4.10 Method of Measurement and Payment

The Contractor and Engineer shall jointly measure the Works for the
purpose of establishing progress and final pay quantities. Construction
survey and staking shall be measured by the kilometer.

Bridge survey and staking, and retaining wall survey and staking shall
be measured by the lump sum.

Slope, reference and clearing and grubbing stakes shall be measured


by the kilometer.

Culvert survey and staking shall be measured by the each.

Grade finishing stakes shall be measured by the kilometer. Subgrade


shall be measured one tie and each aggregate course shall also be
measured one time.

Permanent monuments and markers shall be measured by each unit


placed and installed at the proper locations.

The Contractor shall provide all necessary personnel and equipment to


perform the measurements for payment required by the Contract. Such
measurements and quantity calculations will not be accepted unless
conducted jointly with and monitored by the Engineer.

Whenever required for the purposes of measurement of quantities, the


Contractor shall take cross sections on the original ground at intervals of
20 meter or less, as directed by the Engineer. The profiles so
established shall be plotted on tracing paper to a scale, size and layout
as stipulated by the Engineer or encoded in a CAD system to the
approval on the Engineer. The drawn cross sections shall include the
proposed finished lines derived from the approved design details.

The original profile together with the three copies shall be submitted to
the Engineer who will endorse one copy with his approval, or his
revision thereof, and return it to the Contractor.

At any locations, measurement for pay quantities shall require material


volumes to determine the difference between the after-construction (or
design) profile and the existing before-construction profile. The
Contractor shall carry out as part of his routine survey works all the
necessary topographic surveys in sufficient detail to enable the work
volumes to be accurately calculated.

The Contractor in his routine survey work for quantity measurement is


required not only to make geometric measurement using precise levels,
theodolites, chains, etc. but also is required to take and measure
pavement cores as required by the Engineer. The Contractor is also
required to check the embankment thickness by auger boring or
settlement plates.

The Contractor shall also keep the haulage truck tallies and all other

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-12
OTHER GENERAL REQUIREMENTS B

methods of work volume measurement as the Engineer may direct. The


detailed requirements for the measurement of the Works are specified
for each Pay Item in the relevant sections of these Technical
Specifications.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

B.4 (1) Construction Survey and Staking Kilometer

Slope, Reference, with Clearing Kilometer


B.4 (2)
and Grubbing Stakes

B.4 (3) Centerline Reestablishment Kilometer

B.4 (4) Culvert Survey and Staking Each

B.4 (5) Bridge Survey and Staking Lump Sum

B.4 (7) Grade Finishing Stakes Kilometer

B.4 (8) Permanent Monuments and Markers Each

B.5 PROJECT SIGN BOARD

Unless otherwise specified in other pay items of the Contract, the Contractor
shall provide and erect project signboard at the exact location approved by the
Engineer. The design, layout and wordings are all to be approved by the
Engineer. All signboards shall display the title of the project, the name of the
Employer, the funding agency and the consulting engineering company, and
the funding Loan Agreement Reference Number. The signboard shall be
maintained in good condition throughout the duration of the Contract, and shall
be removed upon completion of the project to the satisfaction of the Engineer.

The quantities of Project Sign Board to be paid for shall be the number of
project sign boards of size installed in place and accepted and shall be paid at
the contract unit price indicated in the Bill of Quantities. Payment and price
shall constitute full compensation for furnishing and installing all materials, all
labor, equipment, tools and other incidental necessary to complete the Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

B.5 Project Sign Board Each

B.6 TRANSPORTATION AND HANDLING

B.6.1 Standards

Work processes shall be conducted in strict conformity with the


National, Provincial and Municipal regulations governing the work as

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-13
OTHER GENERAL REQUIREMENTS B

well as requirements for the preservation of natural resources and the


environment.

B.6.2 Coordination with Others

The Contractor's attention is directed to the fact that he will be required


to coordinate his transport operations with the work being performed or
to be performed on other Contracts, with work of the subcontractors,
utility companies and others as may be required.

In case of interference in operations from different Contractors, the


Engineer shall have the sole power to direct each Contractor and to
determine the sequence of work necessary to expedite the completion
of the entire project, and in all cases his decision shall be accepted as
final and shall not be caused for a claim.

B.6.3 Weight Limitations and Legal Requirements

If required, the Engineer may impose weight restrictions for the


protection of any existing road or structure within the vicinity of the
project. The Contractor is responsible in complying all legal weight
restrictions of existing roads and highways used for his work. The
Contractor shall provide portable scales as may be required to ensure
compliance. The Contractor shall be responsible for any damage to
roads or structures resulting from his construction operations.

B.6.4 Haul Roads

The Contractor shall, at his own expense, construct access and haul
roads necessary for proper execution of the work under this contract.
Haul roads shall be constructed with suitable grades and widths; sharp
curves, blind corners, and dangerous cross traffic shall be avoided.

The Contractor shall provide necessary lighting, signs, barricades, and


distinctive markings for the safe movement of traffic. The method of
dust control shall be in accordance with the special clause “Dust
Control”. Location, grade, width, and alignment of construction and
hauling roads shall be subject to the approval of the Engineer. Lighting
shall be adequate to assure full and clear visibility for full width of haul
road and work areas during any night work operations. Upon
completion of the work, haul roads designated by the Engineer shall be
removed.

B.6.5 Use of Existing Roads as Haul Routes

The Contractor shall be responsible for coordinating with the BCDA


Authorities for the use of any existing roads as haul routes.
Construction and routing of new haul roads, and/or upgrading of
existing roads to carry the anticipated construction traffic shall be
coordinated with the BCDA authorities and is the sole responsibility of
the Contractor.

In case the hauling operations of the Contractor will cause damage to


a public road or structure, or will cause flooding that will result to work
stoppage of the operation, the Engineer may direct the Contractor to
use an alternative route and the Contractor shall have no right to any

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-14
OTHER GENERAL REQUIREMENTS B

claims for any additional compensation to incurred damages during


hauling operations.

B.6A PROVISIONS FOR PASSAGE OF TRAFFIC

The Contractor shall construct and maintain detours wherever the work will
interfere with traffic on existing roads, footways or other ways over which there
is a public or private right-of-way, until such time as permanent diversions to
serve such traffic shall have been completed. No detours shall be constructed
and no traffic diverted until the Contractor's proposals therefore have been
approved by the Engineer and by the appropriate government authorities. Prior
to the commencement of the construction and of the use of detours, the
Contractor shall provide the Engineer with a full photographic record of the
existing roads, pathways, etc. as directed by the Engineer and shall have the
necessary temporary road signs ready for use.

No work which will inconvenience the traveling public shall be started until
adequate provision satisfactory to the Engineer, shall have been made to divert
the traffic in safety and in comfort. No road shall be closed to the public except
by permission in writing from the Engineer and from the appropriate
government authorities. Where traffic conditions permit, one-way-lane may be
permitted by the Engineer. Material stored upon the roadway shall be so well
placed and the work shall be so conducted as to cause as little obstruction as
possible to the traveling public.

All detours shall be maintained in good condition at all times and shall have a
total width of at least 6 meters and provided with graveled surface having a
minimum compacted thickness of 80 mm. Where existing public or private
roads are used as detours, the same shall be maintained in good riding
condition at all times and just before completion of the Contract, such roads
shall be restored to a condition not less satisfactory than that existing prior to
the commencement of the work.

Where part-width construction is adopted, the part-width not under construction


shall be made available to public traffic under alternate one-way control.

In such case, the Contractor shall furnish flagmen, pilot car and drivers to direct
traffic through the section of road under one-way control. The length of part-
width construction shall not exceed 500 meters for each section and the
distance between successive sections of part-width construction shall not be
less than 500 meters.

The Contractor shall so conduct his operations as to offer the least possible
obstruction, inconvenience and delay to traffic and shall be responsible for
adequate traffic control to achieve such an end.

Suitable warning signs, illuminated at night by electric bulbs, lanterns or flares


shall be provided to mark the places not yet available to traffic. In part-width
construction, the Contractor shall place acceptable barricades along the inside
edge of the available surface so that traffic will be confined therein while the
other part-width is under construction. One-way control shall continue until the
adjoining surface is completed and opened to traffic.

At sections where part-width traffic is in operation, and when so ordered by the


Engineer, the movements of the Contractor's equipment from one place of work
to another shall be subject to such part-width traffic control. Spillage resulting

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-15
OTHER GENERAL REQUIREMENTS B

from hauling operations along or across the roadway shall be removed


immediately at the Contractor’s expense. For further details in connection with
this Item see Item B.8 - Traffic Management during Construction provided
hereinafter.

B.6B DISPOSAL OF MATERIALS OUTSIDE THE PROJECT BOUNDARIES

Proper disposal of materials outside the project boundaries shall be the


responsibility of the Contractor. He shall make his own arrangements for the
disposal of materials outside of the project boundaries and all the costs
involved therein including the cost of hauling shall be considered as covered
under the pay items involved in the Contract.

When any materials including excess or unsuitable materials from excavations


are to be disposed of outside the project boundaries, the Contractor shall first
obtain written permission from the property owner of the proposed disposal site.
He shall submit to the Engineer the said written permission or a certified copy
thereof, together with a written release from the property owner absolving the
Government from any and all responsibilities in connection with the disposal of
materials into his property. No material shall be disposed prior to the receipt of
written approval and permission from the Engineer.

When materials are disposed of as provided above and if the site is visible from
the highway, the Contractor shall make the disposal in a neat and presentable
condition as to the satisfaction of the Engineer. The disposal site must not be
an eyesore.

B.6C PROJECT RECORD DOCUMENTS

B.6C.1 Description

Throughout the progress of the Works, the Contractor shall maintain


the accurate records of all changes in the Contract Documents on a
"Job Set" herein specified and shall transfer the final as built
information to the Final Record Documents before the completion of
the Works.

B.6C.2 Submittal Requirements

The Contractor shall submit or make available for review by the


Engineer the job set of Project Record Documents as currently
maintained on the 25th of each month. The Engineer's approval of
these documents will be a prerequisite for approval of the Monthly
Progress Payment Certificates.

The Contractor shall submit for the Engineer's approval the Final
Project Record Documents at the time of application for Taking-Over
Certificate. The Contractor shall accompany the submittal with a
transmittal letter, containing:

1) Date;
2) Project title and number;
3) Contractor's name and address;
4) Title and number of each record document;
5) Certification that each document as submitted is complete and
accurate; and

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-16
OTHER GENERAL REQUIREMENTS B

6) Signature of the Contractor, or his authorized representative.

B.6C.3 Project Record Documents

1) Job Set

Promptly following the Award of Contract, the Contractor shall obtain


from the Engineer at no cost to the Contractor, two complete sets of
all Documents comprising the Contract.

The Job Set will include (unless otherwise stated in the Contract) the
following:

- Conditions of Contract
- Contract Drawings
- Technical Specifications
- Addenda
- Other Modifications to the Contract (if any)

2) Storage of Job Set

The job set shall be stored in the field office in files and in the racks.
The Contractor shall maintain the job set protected from loss and
damage until the transfer of as-built data to the Final Project
Documents has been completed. The record documents shall not
be used for construction purposes and the documents shall be
available at all times for inspection by Engineer and Employer.

B.6C.4 Project Records for Materials & Equipment

All records concerning the testing and approval of materials and


equipment to be incorporated into the Permanent Works shall form a
part of the project records. The Contractor shall develop and maintain a
record system which clearly shows the current status of all material
sources, testing and approval. All approved samples shall be
maintained at the job site.

B.6C.5 Update and Maintenance of the Job Set Documents

1) Responsibility
The Contractor shall delegate the responsibility for the maintenance
of Record Documents to his authorized person with prior approval by
the Engineer.

2) Identification
Immediately upon receipt of the job set, identify each of the
documents with the title "PROJECT RECORD DOCUMENTS - JOB
SET", in 5 cm high printed letters.

2) Preservation
Considering the Contract completion time, the probable number of
occasions upon which the job set must be taken out for new entries
and for examination, and the conditions under which these activities
will be performed, the Contractor shall devise a suitable method for

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-17
OTHER GENERAL REQUIREMENTS B

protecting the job set with the approval of the Engineer.

4) Marking Entries on Drawings


Using an erasable colored pencil (not ink or indelible pencil); the
Contractor shall clearly describe the change by notes and by graphic
lines as required. The Contractor shall mark the date of all entries
and call attention to the entry by a "cloud" around the area or areas
affected. In the event of overlapping changes, different colors may
be used for each of the changes. Record documents shall be kept
current and works carried out must not be permanently concealed.

The Contractor shall legibly mark and record the actual construction
details of the following:
a) Depths of various foundation elements in relation to datum
shown.
b) Horizontal and vertical location of underground utilities shall be
referenced to permanent surface improvements.
c) Locations of internal utilities concealed in construction shall be
referenced to visible and accessible features of structures.
d) Field changes of dimension and detail.
e) Changes made by Change Order.
f) Details not on original Contract Drawings.

5) Timing

All entries shall be made within 24 hours after receipt of the


information.

6) Accuracy

Use all the necessary means including the proper tools for
measurement to determine the actual locations of the installed items
and the accuracy of entries.

The Contractor shall thoroughly coordinate all the changes within


the Record Documents and adequately and properly mark such
changes on each page of the Specifications, on each sheet of
Drawings and other Contract Documents. The accuracy of records
shall be such that any future search for items shown on the Contract
Documents may be obtained from the approved Record Documents.

B.6C.6 Final Record Documents

1) General

The purpose of the Final Record Documents is to provide factual


information regarding all aspects of the Works, both concealed and
visible, to enable future modification of design to proceed without
lengthy and expensive site measurement, investigation and
examination.

2) Transfer of Data to Drawings

Carefully transfer all changes of data shown on the job set of Record

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-18
OTHER GENERAL REQUIREMENTS B

Drawings to the corresponding original drawing of the Final Report


Drawings and clearly indicate the full description of all changes
made during construction and the actual location of all items. Call
attention to each entry by drawing a "cloud" around the area or
areas affected. Make all change entries on the originals neatly,
consistently, and in ink or crisp black pencil.

3) Transfer of Data to Other Documents

If documents other than Drawings have been kept clean and neat
during the progress of the Work, and if entries have been sufficiently
and orderly transferred with the approval of the Engineer, the job set
of those documents (other than Drawings) will be accepted by the
Engineer as Final Record Documents. If any such document is not
so approved by the Engineer, secure a new copy of that document
from the Engineer and carefully transfer the change data to the new
copy for the approval of the Engineer.

4) Review and Approval

Submit the completed set of Final Record Documents to the


Engineer at the time of application for the Taking-Over Certificate. If
requested by the Engineer, participate in a review meeting or
meetings, execute any required changes and promptly re-submit the
Final Record Documents to the Engineer for his acceptance.

5) Changes Subsequent to Acceptance

The Contractor shall have no responsibility of recording changes to


the Works subsequent to the issue by the Engineer of the Taking-
Over Certificate. He shall be responsible only for changes resulting
from replacements, repairs, and alternations made by him as part of
his guarantee or additional work that he has agreed to carry out
during the Defects Liability Period.

B.7 CONSTRUCTION OCCUPATIONAL SAFETY AND HEALTH PROGRAM

In compliance with the DPWH Department Order No.56, S 2005, that all
projects regardless of amount, funding source and mode of implementation
shall comply with the minimum safety and health requirements.

Occupational hazards are continually emerging. Construction workers often


encountered different types of hazards which may result to accidents, injuries
and the worst is the loss of life.

Requirements

The Contractor shall employ a full-time Certified Safety and Health Personnel
that is accredited by DOLE or the Department of Labor and Employment. This
is in compliance with government regulations (OSHS and DO13). This full-time
officer assigned as the general construction safety and health officer will
oversee full time the overall management of Construction Safety and Health
Program of the Contractor and its personnel working within the construction
site. A requirement of one (1) Construction Safety and Health Officer for every
ten (10) units of heavy equipment assigned to the project site, to oversee the

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-19
OTHER GENERAL REQUIREMENTS B

effective compliance with the Construction Safety and Health Program at the
construction site, in terms of heavy equipment utilization and maintenance.
Other requirements are medicines, supplies, equipment and facilities that
conform to the OSHS.

Safety and Warning Signs

Mandatory provision of safety and warning signs are reiterated not only for the
protection of workers, but also the public in general. The following signs should
conform to the standard requirements of the OSHS;

Usage of PPE
Falling/falling objects
Explosives and flammable substances
Tripping or slipping hazards
Toxic or irritant airborne contaminants/substances
Electrical facility
Dangerous moving parts of machines
Fire alarms/fire fighting
Instructional signs/Update of man-hours lost

Committee

Each site shall, at the start of the construction have a construction safety and
health committee which is composed of the following personnel;

• Project Manager or his representative as the chairperson


• General Construction Safety and health Officer;
• Safety representative/SO from each subcontractor;
• Doctors, Nurses and Health personnel;
• Workers’ representatives([Link] 3, not necessarily from one employer)

Monthly Summary Reports to DOLE

A monthly submission of Summary Reports to DOLE is required. The summary


reports shall include safety committee meeting agreements and hazardous
assessments with the corresponding remedial action/measured required.

The Contractor will send a notification of major accidents to DOLE within 24


hours.

Worker’s Welfare Facilities

The Contractor shall provide to his workers for adequate supply of safe drinking
water, adequate sanitary and washing facilities in order to ensure humane
conditions of work.
The total cost of Construction Safety and Health Program shall be mandatory
integral part of the construction project. It shall be treated as a separate pay
item and reflected in the Contractor’s bid.

The quantities of Construction Safety and Health Program shall be paid for in
monthly basis as per the contract unit price indicated in the Bill of Quantities
and upon recommendation and approval of the Engineer.
Payment and price shall constitute full compensation for the compliance and
provision of necessary health and safety requirements listed above which
conform to the standard requirements of the OSHS.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-20
OTHER GENERAL REQUIREMENTS B

Payment will be made under:


Pay Item Unit of
Description
Number Measurement
Construction Occupational Safety
B.7 Month
and Health Program

B.8 TRAFFIC MANAGEMENT DURING CONSTRUCTION

During construction, the Contractor shall provide access and temporary


relocated roads as necessary to maintain and protect traffic on all affected road
sections. Measures for the protection and diversion of traffic, including the
provision of watchmen and flagmen, erection of barricades, placing of lights
around and in front of equipment and the work, and the erection and
maintenance of adequate warning, danger, and direction signs, shall be as
required by the Engineer. The travelling public shall be protected from damage
to person and property. The Contractor’s traffic on the roads selected for
hauling material to and from the site shall interfere as little as possible with the
base traffic. The Contractor shall investigate the adequacy of the existing roads
and the allowable load limit on these roads. The Contractor shall be responsible
for the repair of any damage to roads caused by construction operations.

The Contractor shall employ a traffic management officer or Supervisor and


necessary staff under him for the overall control of traffic management including
the coordination with the national and local traffic authorities with jurisdiction
over the project area, so as to minimize traffic obstruction and facilitate the flow
of traffic through the construction area and through appropriate and approved
diversion roads.

The construction area shall be bounded by steel fence as shown on the


Drawings or as directed by the Engineer so that traffic can be more
manageable. Informatory, regulatory and warning signs with proper lightings
shall be installed wherever necessary. The Contractor shall coordinate his
traffic management with the concerned government agencies and concerned
private parties.

B.8.1 General

The Contractor shall furnish, install and maintain at all times for the
duration of the Contract, necessary traffic signs, barricades, lights,
signals and other traffic control devices and shall provide flagging and
other means for guidance of traffic through the work zone. Traffic
control shall be conducted in accordance with the prevailing
government rules and regulations and where applicable, in
accordance with the design details included in the Drawings.

All traffic signs and control devices furnished and installed by the
Contractor shall be reviewed by the Engineer as to location, position,
visibility, adequacy and manner of use under specific job conditions.

All traffic control devices necessary for the initial stage of construction
shall be properly placed and in operation before any construction shall
be allowed to start. When work of a progressive nature is involved,
the necessary signs shall be moved to adjust to advancing operation.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-21
OTHER GENERAL REQUIREMENTS B

If at any time, the Engineer determines that proper provisions for safe
traffic control are not being provided or maintained, he may restrict
construction operations affected by such defective signs or devices
until proper satisfactory adjustments shall have been made. The
Engineer may also suspend the entire work until the proper level of
compliance is achieved.

In cases of serious or willful disregard of the Contractor for safety of


the public or his employees, the Engineer may take appropriate
corrective measures and deduct the cost thereof from moneys due or
to become due to the Contractor.

The Contractor shall provide personnel to undertake continuous


surveillance over his traffic control operations. Such personnel shall
be available day and night to respond to calls involving damage to
barricades, lights, signs, etc., either through vandalism or traffic
accident. The Contractor shall identify such personnel to both the
Engineer and local traffic authorities at the work zone.

The Contractor shall provide on the site the towing equipment to move
stalled vehicles out of the traveled way to locations with no
interference to traffic and the possibility of an accident.

B.8.2 Flaggers

Flaggers while on duty and assigned to traffic control or to give


warning to the public that the highway is under construction and of any
dangerous conditions to be encountered as a result thereof, shall
perform their duties and shall be provided with the necessary
equipment subject to the approval of the Engineer. The equipment
shall be furnished and kept clean in good repair by the Contractor at
his own expense.

B.8.3 Traffic Handling Equipment and Devices

All devices used by the Contractor in the performance of the work


shall conform to the requirements of this Special Sub-item. Traffic
handling-equipment and devices damaged from any cause during the
progress of the work shall be repaired, including painting if necessary
or replaced by the Contractor at his own expense.

When traffic control devices furnished by the Contractor are no longer


needed for controlling traffic, they shall be removed from the site of
the work.

B.8.4 Barricades

Barricades shall be constructed of lightweight commercial quality


materials as approved by the Engineer. “A”-frame designs shall not
be rigid.

Markings for barricades rails shall be alternate orange and white


stripes. Reflective sheeting shall be replaced on rail surfaces in such a
manner that no air bubbles or voids are present between the rail
surface and reflective sheeting. The predominant color for barricade

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-22
OTHER GENERAL REQUIREMENTS B

components other than rails shall be white, except that unpainted


galvanized metal or aluminum may be used.

Ballasting shall be by means of sand filled bags placed on the lower


parts of the frame or stays, but shall not be placed on top of the
barricade or over any reflectorized barricade rail face facing the traffic.

If the barricades are displaced or are not in an upright position, from


any cause, said barricades shall immediately be replaced or restored
to their original location, in an upright position at the Contractor’s own
expense.

B.8.5 Flashing Arrow Signs

Flashing arrow signs shall be finished with commercial quality flat


black enamel and shall be equipped with yellow or amber lamps that
form arrows or arrowheads are required. Each lamp shall be provided
with a visor and the lamps shall be controlled by an electronic circuit
that will provide between 30 to 45 complete operating cycles per
minute in each of the displays and modes specified. The control shall
include provisions for dimming the lamps by reducing the voltage to 50
percent, ±5 percent, for night time use. Type I signs shall have both
manual and automatic photoelectric dimming controls. Dimming in
both modes shall be continuously variable over the entire dimming
range.

Flashing arrow signs shall conform to the following legibility


requirements. The minimum legibility distance is the distance at which
flashing arrow signs shall be legible at noon on a cloudless day and at
night by persons with vision of or corrected to 20/20.

Min. Number of Min. Legibility


Type Minimum Size
Panel Lamps Distance

I 1220 mm x 2440 mm 15 1600 m

II 610 mm x 1220 mm 13 1200 m

Flashing arrow signs shall be capable of being operated in 4 different


display modes as follows. The display to be used shall be as directed
by the Engineer.

1) Pass Left Display


2) Pass Right Display
3) Simultaneous Display
4) Caution Display

Flashing arrow signs shall also be capable of operating in one or both


of the following modes, at the option of the Contractor:

1) Flashing Arrow Mode


2) Sequential Mode

In the flashing arrow mode, all lamps forming both the arrowhead and
shaft shall flash on and off simultaneously.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-23
OTHER GENERAL REQUIREMENTS B

In the sequential mode, either arrowheads or arrows shall flash


sequentially in the direction indicated. In the caution display mode, a
combination of lamps not resembling any other display or mode shall
flash.

Each flashing arrow sign shall be mounted on a truck or on trailer and


shall be capable of operating while the vehicle is moving and shall
be capable of being placed and maintained in operation at locations
as shown on the Drawings, or as directed by the Engineer.

Flashing arrow signs shall be mounted to provide a minimum of 2.10


meters between the bottom of the sign and the roadway. Trailers on
which flashing arrow are mounted shall be equipped so that they can
be levelled and plumbed.

Electrical energy to operate the sign shall be obtained from the vehicle
on which the sign is mounted or from a generating plant mounted on
said vehicle. Regardless of the sources, the supply of electrical
energy shall be capable of operating the sign in the manner specified.

B.8.6 Portable Delineators

Portable delineators, including the base, shall be composed of a


material that has sufficient rigidity to remain upright when unattended
and shall be either flexible or collapsible upon impact by a vehicle.
The base shall be of such shape as to preclude roll after impact.

The base shall be sufficient weight or shall be anchored in a manner


such that said delineator shall remain in an upright position. Ballast if
used for the bases of portable delineators shall be sand or water.

If the portable delineators are displaced or are not in an upright


position, from any cause said delineators shall immediately be
replaced or restored to their original location, in an upright position, by
the Contractor.

The vertical portion of the portable delineators shall be of a fluorescent


orange or predominantly orange colour. The posts shall be not less
than 76 mm in width or diameter. The minimum height shall be 910
mm above the travelled way or as shown on the Drawings.

A minimum of 2 reflective bands each not less than 76 mm wide, shall


be mounted a minimum of 38 mm apart and at a height on the post so
that one reflective band will be between 0.76 mm and 0.91 m above
the roadway surface.

Reflective bands shall be white and shall be fabricated from flexible


reflective sheeting as specified in the special provisions. The reflective
bands shall be visible at 305 meters at night under illumination of legal
high beam headlights, by persons with vision of or corrected to 20/20.

Only one type of portable delineator shall be used on the project. The
type of portable delineator proposed for use on the project shall be
submitted to the Engineer for approval prior to replacement on the
project.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-24
OTHER GENERAL REQUIREMENTS B

B.8.7 Portable Flashing Beacons

Each portable flashing beacon unit shall consist of a lighting unit, a


flasher unit, a standard, a battery power source and a base. The units
shall be assembled to form a complete, self-contained, flashing
beacon which can be delivered to the site of use and placed in
immediate operation.

The lens for the beacon lighting unit shall have a visible diameter of
300 mm. The lens shall be glass or plastic conforming to the
provisions in ANSI Standard: D-10 for yellow traffic signal lens.

The beacon lighting unit shall be provided with a 200 mm minimum


length of visor and a back plate. Visors will not be required during the
hours of darkness.
The flasher unit shall provide 50 to 60 flashes per minute with 250 to
350 milliseconds dwell time.

The standard shall be adjustable to provide a variable mounting of the


lighting unit between 1.8 and 3 meters measured from the bottom of
the base to the center of lens, with provisions for securing the
standard at the desired height. The standard shall be securely
attached to the base and a sufficient length of multi-conductor,
neoprene jacketed cable as required for full vertical height shall be
provided.

The base shall be large enough to accommodate a minimum of two 12


volt, automotive type storage batteries and shall be of such shape and
weight that the beacon will not roll in the event it is struck by a vehicle
or pushed over.

The lamp shall be rated at 25 watts for operation on 12-volt battery


current.

The flashing beacon assembly shall be weatherproof and shall be


capable of operating a minimum of 150 hours between battery
recharging and other routine maintenance.

The standard and base shall be finished with 2 applications of


commercial quality orange enamel. The interior of the visor and the
front face of the back plate shall be finished with 2 applications of
commercial quality flat black enamel.

B.8.8 Construction Area Signs

The term "Construction Area Signs" shall include all temporary signs
required for the direction of public traffic through or around the work
during construction operation. Construction area signs shall be
installed at the locations shown on the Drawings or as directed by the
Engineer.

Construction area signs designated as stationary-mounted on the


drawings shall conform to the provisions in Sub-Section B.8.9,
“Stationary Mounted Signs” and construction signs designated as
portable signs on the Drawings shall conform to the provisions in Sub-
Section B.8.10, “Portable Signs”.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-25
OTHER GENERAL REQUIREMENTS B

Construction area signs not designated as stationary mounted nor as


portable on the plans shall be, at the Contractor's option, either
stationary mounted or portable signs conforming to the provisions in
said Sub-Sections B.8.9 or B.8.10.

All construction area signs shall conform to the dimensions, color and
legend requirements of the Drawings and these specifications. All
sign panels shall be the product of a commercial sign manufacturer,
and shall be as specified in these specifications.

Sign panels for all construction area signs shall be visible at 150
meters and legible at 90 meters at noon on a cloudless day and at
night under illumination of legal low beam headlights, by persons with
vision of or corrected to 20/20, except that the night time requirement
shall not apply to fabric sign panels for portable signs.

The Contractor may be required to cover certain signs during the


progress of the work. Covers for construction area signs shall be of
sufficient size and density to completely block out the message so that
it is not visible either during the day or at night. Covers shall be
fastened securely to prevent movement caused by wind action. The
Contractor shall clean all construction area sign panels at the time of
installation and as often thereafter as the Engineer determines to be
necessary, but at least once every 4 months.

Signs with the specified sheeting material will be considered


satisfactory if they conform to the requirements for visibility and
legibility and colors conform to the requirements as directed by the
Engineer. A significant difference between day and nighttimes
reflective colour will be grounds for rejecting signs.

To properly provide for changing traffic conditions and damage


caused by public traffic or otherwise, the Contractor shall be prepared
to furnish on short notice additional construction area sign panels,
posts and mounting hardware or portable sign mounts. The
Contractor shall maintain an inventory of the commonly required items
at the jobsite or shall make arrangements with a supplier who is able,
on daily basis, to furnish such items on short notice.

B.8.9 Stationary Mounted Signs

Stationary mounted signs shall be installed on wood posts in the same


manner shown on the Drawings or as directed by the Engineer.
Stationary mounted signs shall be installed in accordance with the
following guidelines:

1) Use of back braces and blocks for sign panels will not be required.

2) The height to the bottom of the sign panel above the edge of
travelled way shall be at least 1.50 meters, except when the sign
is located in the path of pedestrians or bicycles the height to the
bottom of the sign panel above the edge of the travelled way shall
be at least 2.10 meters.

3) Construction area sign posts may be installed on above ground


temporary platform sign supports as approved by the Engineer, or

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-26
OTHER GENERAL REQUIREMENTS B

the signs may be installed on existing lighting standards or other


supports as approved by the Engineer. When the construction
area signs are installed on existing lighting standards, holes shall
not be made in the standards to support the sign.

4) The post embedment shall be 0.76 meter. If post holes are


backfilled around the posts with portland cement concrete
produced from commercial quality aggregates and cement with
not less than 168 kilograms of cement per cubic meter.

Post size and number of posts shall be as shown on the plans,


except that when stationary mounted signs are installed and the type
of sign installation is not shown on the plans, post size and the
number of posts will be determined by the Engineer. Posts shall be
good sound wood post, suitable for the purpose intended.

Sign panels for stationary mounted signs shall consist of reflective


aluminium sheeting. Sign panels shall conform to the requirements
specified in Item 605. Legend and border may be applied by a
screening process or by use of pressure sensitive cut-out sheeting.
Size and spacing of letters and symbols shall be as depicted on the
sign specification sheets published by the Department.

All rectangular sheet aluminium signs over 140 centimetres measured


along the horizontal axis and all diamond-shaped sheet aluminium
signs 152 centimetres and larger shall be framed unless otherwise
specified. Frames shall be constructed in accordance with Item 605.
Sign panel fastening hardware shall be commercial quality.

B.8.10 Portable Signs

Each portable sign consist of a base, standard or framework and a


sign panel.

The units shall be capable of being delivered to the site of use and
placed in immediate operation.

Sign panels for portable signs shall conform to the requirements of


sign panels for stationary mounted signs in Section B.8.9,
"Stationary Mounted Signs" or shall be cotton drill fabric, flexible
industrial nylon fabric, or other approved fabric.

Fabric signs shall not be used during the hours of darkness. Size,
color and legend requirements for portable signs shall be as described
for stationary mounted sign panels in said Sub-Section B.8.9.

The sign standard or framework shall be capable of supporting a sign


panel of 120 centimetres by 120 centimetres maximum dimension, in
an upright position with the centre of the sign panel a minimum of 1.50
meters above the pavement.

All parts of the sign standard or framework shall be finished with 2


applications of orange enamel which will match the colour of the sign
panel background. Testing of paint will not be required.

If portable signs are displaced or overturned, from any cause, during

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-27
OTHER GENERAL REQUIREMENTS B

the progress of the work, the Contractor shall immediately replace the
signs in their original locations at his own expense.

B.8.11 Telescoping Flag Trees

Telescoping flag trees shall be of good commercial quality material,


suitable for the purpose intended and shall be capable of maintaining
an upright position at all times while in use.

B.8.12 Traffic Cones

Traffic cones shall be fluorescent and of good commercial quality,


flexible material suitable for the purpose intended. The outer section
of the portion above the base of the cone shall be translucent and be
of a highly pigmented fluorescent orange polyvinyl compound. The
overall height of the cone shall be at least 710 millimetre and the
bottom inside diameter shall be not less than 267 millimetre. The
base shall be of sufficient weight and size or shall be anchored in a
manner such that the traffic cone will remain in an upright position.
During the hours of darkness traffic cones shall be affixed or covered
with a minimum 330 millimetre flexible reflective cone sleeve, placed a
maximum of 76 millimetre form the top of the cone. The sleeves shall
be white and shall be fabricated from the reflective sheeting. The
reflective sheeting shall be visible at 305 meters at night under
illumination of legal high beam headlights, by persons with vision of or
corrected to 20/20.

Traffic cones to be in place during daylight hours shall not be affixed


or covered with reflectorized cone sleeves.

B.8.13 Measurement and Payment

Traffic management during construction shall be accounted and paid


for by the actual provision and furnishing of all traffic management
requirements and as per the necessity for the maintenance and safety
of the traveller and as well as the total safety of the project. The price
shall also include everything mentioned above and payment will be in
prorated form and as per actual accomplished provisions and duly
certified and approved by the Engineer.

Payment will be made under:


Unit of
Pay Item No. Description
Measurement

B.8 Traffic Management Lump Sum

B.9 MOBILIZATION/DEMOBILIZATION (CLEARING/FINISHING THE SITE)

Upon completion of all construction operations, the entire roadway or roadways


shall be finished/cleared as specified herein these Specifications.

Stockpiling of materials on the finished pavement and drifting of materials


across the pavement will not be permitted. The finished pavement shall be
cleaned of all dirt and foreign materials.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-28
OTHER GENERAL REQUIREMENTS B

The slopes in embankments; excavations; road approaches; road connections;


ditches; channel changes; and material sites within or adjacent to the project
boundaries shall be cleared and finished to the lines and grades called for on
the Drawings. Ditches and channels within or adjacent to the project
boundaries shall be cleared of debris and obstructions. Sewers, culverts and
other drainage facilities and their appurtenant structures constructed under the
contract shall be cleaned out. All stores and other waste materials exposed on
slopes, which are liable to become loosened, shall be removed and disposed
of. All materials and debris resulting from clearing and grubbing operations not
previously removed shall be disposed of.

All materials resulting from the above-specified clearing/finishing operations


shall become the property of the Contractor and shall be disposed of outside
the project boundaries unless otherwise permitted by the special provisions.

Disposal of materials outside the highway right of way shall be in accordance


with the provision in Item B.8, “Disposal of Materials outside the Project
Boundaries”. The entire roadway and right of way shall be left in a neat and
presentable condition.

Payment for this Item shall be in n Lump Sum basis and divided into two(2)
parts; Part A-Mobilization, once the Contractor had mobilized his
staff/manpower, equipment requirements and his facilities for the project and
Part B-Demobilization, once the Contractor had completed his works and
everything cleared on site including clean-up and removal of all his
installations/plants.

The basis of payment can be done on a staggered or percentage form based


upon his actual mobilization and demobilization status. The Contractor’s claim
for each shall be inventoried and upon recommendation and approval of the
Engineer.

Payment and price shall constitute the full compensation for the compliance of
the above specifications on mobilization and demobilization.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

B.9 Mobilization and Demobilization Lump Sum

B.10 METHOD OF MEASUREMENTS

B.10.1 Measurement of Quantities

In measuring all acceptable completed bid items of work, the Engineer


will:

1) Use SI metric standard measure;


2) Make all measurements as described in this Item, unless individual
specifications require otherwise;
3) Follow methods generally recognized as conforming to good
engineering practice;

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-29
OTHER GENERAL REQUIREMENTS B

4) Conform to the usual practice of the Employer by carrying


measurements and computations to the proper significant figure or
fraction of units for each item, but not exceeding one decimal place;
and
5) Measure horizontally or vertically (unless otherwise specified).

The items listed below shall be defined as follows in all measurements


under this item:

1) "Lump Sum" (when used as an item of payment): complete payment


for the work described for that item in the contract.
2) "Gage" (in measurement of plates): the U.S Standard Gage.
3) "Gage" (in measurement of galvanized sheets used to manufacture
corrugated metal pipe, metal plate, pipe culverts and arches, and
metal cribbing): that specified in AASHTO M 36, M 167, M 196, M
197, or M 219.
4) "Gage" (in measurement of wire): that specified in AASHTO M 32.
5) "Ton": The metric ton equal to 1,000 kilograms of weight.

For each basis of measurement listed below, the Engineer will use the
method of measurements as described herein.

1) Square Meter or Hectare - Measured on the neat dimensions shown


on the Drawings or dimensions altered by the Engineer.
2) Linear Meter (pipe culverts, guard rail, under drains, etc.) -
measured parallel to the structure's base or foundation or unless the
Drawings require otherwise.
3) Weight - weighed as required in Item B.10.2.

Volume (of excavation and embankment) - measured by the average-


end-area method. All or some computations may be based on ground
elevations and other data derived photogram metrically. The Engineer
may correct for curvature.

For each item listed below, the Engineer will use the method of
measurement described herein as:

Structure - measured on the neat lines shown on the Drawings or to


dimensions altered by the Engineer. When a complete structure or
structural unit is specified as the unit of measurement, the unit shall
include all fittings and accessories.

Standard Manufactured Items (fence, wire, plats, rolled shapes, pipe


conduit, etc., when specified) - measured by the manufacturer's
identification of gage, unit weight, section dimension, etc. The Engineer
will accept manufacturing tolerances set by each industry unless cited
specifications require more stringent tolerances.

• Cement - measured by bags


• Asphalt - measured by the ton.

No measurement will be made for:

(1) Work performed or materials placed outside lines shown on the


Drawings or set by the Engineer;

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-30
OTHER GENERAL REQUIREMENTS B

(2) Materials wasted, used or disposed of in manner contrary to the


contract;
(3) Rejected materials (including those rejected after placement if the
rejection resulted from the Contractor's failure to comply with the
contract);
(4) Hauling and disposing of rejected materials;
(5) Material remaining on hand after the work is completed, except as
provided in the contract; and
(6) Any other work or material contrary to any contract provision.

B.10.2 Weighing Equipment

B.10.2.1 General Requirements for Weighing Equipment

Any highway or bridge construction materials to be


proportioned or measured and paid for by weight shall be
weighed on scales. These materials include natural,
manufactured, or processed materials obtained from natural
deposits, stockpiles, or bunkers. The Contractor shall provide,
set up, and maintain certified scales to their good weighing
condition and use it permanently all throughout weighing work.

Scales shall:

1) Be accurate to within one-half of 1 percent throughout the


range of use;
2) Not include spring balances;
3) Include beams, dials, or other reliable readout equipment;
4) Be arranged so that operators and inspectors can safely
and easily see dials, beams, rods, and operating scale
mechanisms;
5) Be built to prevent scale parts from binding, vibrating, or
being displaced and to protect all working parts from falling
material, wind, and weather; and
6) Be carefully maintained, with (a) bunkers and platforms
kept clear of accumulated materials that could cause errors
and (b) knife edges given extra care and protection.

At each batching and platform scale location, the Contractor


shall keep standard weights for scale calibration and testing. If
the Engineer has approved other calibration and testing
equipment, the Contractor may substitute it for these weights.

B.10.2.2 Specific Requirements for Batching Scales

All materials proportioned by weight shall be weighed on an


accurate and approved scale by qualified operators employed
by the Contractor. The scales shall be positioned at locations
required and approved by the Engineer.

Each scale shall be designated to support a weighing hopper.


The arrangement shall make it convenient for the operator to
remove material from the hopper while watching read-out
devices. Any hopper mounted on a platform scale shall have
its center of gravity directly over the platform centerline.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-31
OTHER GENERAL REQUIREMENTS B

Marked intervals on the read-out device shall be spaced


evenly throughout and shall be based on scale's nominal rated
capacity. These intervals shall be at least 0.5 kilogram but
shall not exceed one-tenth of 1 percent of nominal rated
capacity.

An agent of the scale manufacturer shall test and service any


batch scale before its use at each new site and then at 6-
month intervals. The Contractor shall provide the Engineer a
copy of the final results after each test. Whenever the
Engineer requests, the Contractor's operator(s) shall test the
scale while the inspector observes.

Portland or asphalt cement shall be weighed on a scale not


used for other materials.

B.10.2.3 Measurement

If testing shows the scale has been under weighing, it shall be


adjusted immediately. The Contractor shall not be
compensated for any loss from under weighing. If the scale
has been overweighing, its operation will cease immediately
until adjusted. The Employer will calculate the combined
weight of all materials weighed after the last test showing
accurate results. This combined weight will then be reduced
by the percentage of scale error that exceeds one-half of 1
percent.

B.10.2.4 Payment

The Employer will pay for no materials received by weight


unless they have been weighed as required in this Item or as
required by another method the Engineer has approved in
writing. Payment will not be made for any material over the
maximum gross legal weight for the hauling vehicle.

Unit contract prices for the various pay items of the project
cover all costs related to weighing and proportioning materials
for payment. These costs include those for furnishing,
installing, certifying, and maintaining scales, those for
furnishing check weights and scale house, and those for any
other related item covered in this specification.

B.11 SILENCE OF CONTRACT DOCUMENTS

The apparent silence of the Drawings, Specifications, Supplemental


Specification, and Special Provisions, as to any detail or the apparent omission
of a detailed description concerning any point shall be regarded as meaning
that only the best general practice is to prevail and that only material and
workmanship of first class quality are to be used. All interpretation of the
Contract Documents shall be made by the Engineer on the basis stated above.

B.12 MEETINGS/CONFERENCES

As often as possible or as necessity arises, meetings/conferences shall be held


to discuss matters of detail i.e. construction sequences, progress, materials,

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-32
OTHER GENERAL REQUIREMENTS B

procedures, temporary works, quality control and similar subjects pertinent to


the satisfactory execution of the Works, or to discuss problems arising out of
the implementation of the Project.

Such meetings/conferences shall not be less frequent than twice a month and
shall be attended by the Project Manager of the Contractor and by the Engineer
or his representative.

Minutes of the Meetings/Conferences shall be officially documented, confirmed


or concurred to by the Contractor, copy thereof submitted to the Employer,
properly dated and numbered.

B.13 MEASUREMENT AND PAYMENT

Unless specifically included in the Bill of Quantities as pay item(s) of work,


under PART B – OTHER GENERAL REQUIREMENTS, the work(s) shall not
be measured for direct payments but shall be considered as subsidiary work for
other related pay Items.

Payment will be made under:

Pay Item Unit of


Description
Number Measurement

B.2 Medical Room and First Aid Facilities Lump Sum

B.4 (1) Construction Survey and Staking Kilometer

B.4 (2) Slope, Reference, Clearing and Grubbing Staking Kilometer

B.4 (3) Centerline Reestablishment Kilometer

B.4 (4) Culvert Survey and Staking Each

B.4 (5) Bridge Survey and Staking Lump Sum

B.4 (7) Grade Finishing Stakes Kilometer

B.4 (8) Permanent Monuments and Markers Each

B.5 Project Sign Board Each

B.7 Construction Occupational Safety and Health Program Month

B.8 Traffic Management Lump Sum

B.9 Mobilization and Demobilization Lump Sum

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page B-33
PART C

EARTHWORKS
EARTHWORK C

PART C EARTHWORK

ITEM 100 CLEARING AND GRUBBING

100.1 Description

This Item shall consist of the removal, hauling, and stockpiling of all materials
including trees, stumps, roots, vegetations, logs, wastes, debris and protruding
objects except those that are designated to remain in accordance with other
items of this Specification and where directed by the Engineer. The holes
resulting from clearing and grubbing operations, where directed by the
Engineer, shall be filled with approved materials, which shall be placed and
compacted to the maximum dry density. The work shall also include the
preservation from injury or defacement of all objects designated to remain.

100.2 Construction Requirements

100.2.1 General

The Engineer will establish the limits of work and designate all trees,
shrubs, plants and other things to remain. The Contractor shall
preserve all objects designated to remain. Paint required for cut or
scarred surface of trees or shrubs selected for retention shall be an
approved asphaltum base paint prepared especially for tree surgery.

Clearing shall be extended to one (1) meter beyond the toe of the fill
slopes, or beyond rounding of cut slopes or outside edge of drainage
facilities, unless otherwise shown on the Drawings or directed by the
Engineer, with the exception of trees under the jurisdiction of the
Forest Management Bureau and/or such tree and brush designated
for preservation. Trees, shrubs or bushes designated to remain in
place shall be carefully trimmed as directed by the Engineer and shall
be protected from scarring, debarking and other injuries during
construction operations.

Within the town or village areas, clearing and grubbing shall be strictly
limited to the extent of cut and fill as shown in the Drawings or as
designated by the Engineer. No private properties such as buildings,
crops, signs, fences, and others shall be removed, relocated or
altered without the written authorization from the Engineer.

Structures, properties and the likes which need to be removed but are
still under legal expropriation proceedings shall in the meantime be
preserved or excluded from the works, otherwise the Contractor shall
be solely liable for any complaints or litigation filed by the owner of
any damage to the structure and/or property as a result of his action.

Any unauthorized interference and damage to private property shall


be made good or restored by the Contractor to the satisfaction of the
Engineer and the Owner.

100.2.2 Clearing and Grubbing

All surface objects and all trees, stumps, roots and other protruding
obstructions, not designated to remain shall be cleared and/or

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-1
EARTHWORK C

grubbed, including mowed as required, except as provided below;

(1) Removal of undisturbed stumps and roots and nonperishable


solid objects with a minimum depth of one (1) meter below
subgrade or slope of embankment will not be required.

(2) In areas outside of the grading limits of cut and embankment


areas, stumps and nonperishable solid objects shall be cut off not
more than 150mm above the ground line or below water level.

(3) In areas to be rounded at the top of cut slopes, stumps shall be


cut off flush with or below the surface of the final slope line.

(4) Grubbing of pits, channel changes and ditches will be required


only to the depth necessitated by the proposed excavation within
such areas.

(5) In areas covered by cogon/talahib, wild grass and other


vegetations, top soil shall be cut to a maximum depth of 150mm
below the original ground surface or as designated by the
Engineer, and disposed outside the clearing and grubbing limits as
indicated in the typical roadway section.

Unless otherwise directed by the Engineer, materials from clearing


and grubbing and other unsuitable materials shall be delivered and
stockpiled at the approved designated areas.

100.2.3 Individual Removal of Trees or Stumps

The Contractor, prior to any tree cutting/removal operation shall


prepare inventory of the trees scheduled for cutting/removal for the
Engineer’s approval. List of trees to be cut shall be submitted in
tabulated form, showing as much information for easy identification as
follows:
• Station Limit
• Description/Name/Species of Trees
• Size/Diameter (in centimeter)
• Distance from the centerline of the road
• Location (Left/Right)

Upon Engineer’s approval of the list, the Contractor shall make a


request from the Local DENR (with the approved list attached) that
such number of trees will be cut/removed for the improvement of the
project road. No trees shall be cut/removed unless a “Permit to Cut
Trees” is issued by the DENR to the Contractor authorizing him to cut
only such approved number of trees.
Trees cut shall be disposed of in a manner conforming to the
requirements of Sub-Section 100.2.2 and with the requirements
contained in the DENR permit.
All fees relating to securing permit(s) shall be to expense of the
Contractor.

Individual trees or stumps intended to be removed and relocated as


indicated on the Drawings or as designated by the Engineer shall be
removed and relocated by the Contractor with care.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-2
EARTHWORK C

100.3 Method of Measurements

Measurement will be by one or more of the following alternate


methods;

(1) Area Basis. The work to be paid for shall be based on the total
number of hectares and fractions thereof acceptably cleared and
grubbed within the limits indicated on the Plans/Drawings or may
be adjusted in the field staking by the Engineer. Areas not within
the clearing and grubbing limits shown in the Plans/Drawings or
not staked for clearing and grubbing will not be measured for
payment.

(2) Lump-Sum Basis. When the Bill of Quantities contains a Clearing


and Grubbing lump-sum item, no measurement of area will be
made for such item.

(3) Individual Unit Basis (Selective Clearing). The diameter of trees


will be measured at a height of 1.4m (54 inches) above the ground.
Trees less than 150mm (6 inches) in diameter will not be
measured for payment.

When Bill of Quantities indicates measurement of trees by individual


unit basis, the units will be designated and measured in accordance
with the following schedule of sizes:

Pay Item
Diameter at height of 1.4 m
Designation

150mm to 900mm diameter Small

Over 900mm diameter Large

100.4 Basis of Payment

The accepted quantities, measured as prescribed in Section 100.3.


shall be paid for at the Contract unit price for each of the Pay Items
listed below that is included in the Bill of Quantities, with price and
payment shall be full compensation for furnishing of labor, equipment,
tools and incidentals necessary to complete the work prescribed in
this Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

100(1) Clearing and Grubbing Hectares

Individual Removal of Trees, Small


100(3)a2 Each
(301-500mm diameter)
Individual Removal of Trees, Small
100(3)a4 Each
(751-900mm diameter)

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-3
EARTHWORK C

ITEM 102 EXCAVATION

102.1 Description

This Item shall consist of roadway drainage and borrow excavation, and the
disposal of material in accordance with this Specification and in conformity with
the lines, grades and dimension shown on the plans or establishes by the
Engineer.

It shall be understood that the hauling of excavated fill material to stockpiles or


its hauling to areas of fill and the disposal of unsuitable materials to disposal
areas is at any distance and therefore no overhauling cost will be paid.

102.1.1 Roadway Excavation

Roadway excavation will include excavation and grading of roadways,


parking areas, intersections, approaches, slope rounding, benching,
waterways and ditches; removal of unsuitable material from the
roadbed and beneath the embankment areas; and excavating
selected materials found in the roadway as ordered by the Engineer
for specific use in the improvement. Roadway excavation will be
classified as “unclassified excavation”, “rock excavation”, “common
excavation”, or “muck excavation” as indicated in the Bill of Quantities
and hereinafter described.

1) Common Excavation. Common excavation shall consist of all


excavation including any pavement layer of the existing roadway
not covered by a separate item in the Bill of Quantities regardless
of the nature of the materials excavated, other than borrow
excavation, unsuitable excavation, soft rock and solid rock
excavation.

Common excavation shall include excavation for the reshaping of


side ditches in accordance with the lines, levels and details shown
on the drawings and as per instruction by the Engineer.

2) Rock Excavation. Rock excavation shall consist of excavation of


igneous, sedimentary and metamorphic rocks which cannot be
excavated without blasting or the use of rippers, and all boulders
or detached stones each having a volume of 1 cubic meter or
more as determined by physical measurements or visually by the
Engineer.

A.) Soft Rock Excavation shall consist of excavation of rock


which can be effectively removed by ripping with a tractor
of 150kw (200 Flywheel HP) equipped with a rear mounted
heavy-duty hydraulic ripper.

B.) Hard/Solid Rock Excavation shall consist of hard material


in masses (including individual rock boulders exceeding
1.0 m3 in volume) which in the opinion of the Engineer
cannot be excavated without blasting.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-4
EARTHWORK C

Hard/solid rock excavation shall include all materials that


cannot be ripped when worked with a tractor of at least 150
KW (200 Flywheel HP) fitted with a rear mounted heavy-
duty hydraulic single ripper and requires either of the
following:

a. Requires drilling and blasting for its removal or,


b. Requires the use of compressed air jack hammers for
its removal.

Individual boulders greater than 1 cubic meter in volume


shall be included in this class when the nature and size are
such that in the opinion of the Engineer it cannot be
removed without recourse to one of the above methods.

Where a portion of excavation contains 50% or more by volume of


boulders of this order, such portion shall be considered as
hard/solid rock excavation throughout

3) Muck Excavation. Muck excavation shall consist of removal and


disposal of deposits of saturated or unsaturated mixtures of soils
and organic matter such as muck, peat, organic silt, soil or sod,
which is not suitable for foundation materials regardless of
moisture content. This is sometimes considered as Unsuitable
Excavation and will be for the opinion and approval of the
Engineer.

4) Unclassified Excavation. Unclassified excavation shall consist of


the excavation and disposal of all materials regardless of the
nature, not classified and included in the Bill of Quantities under
other pay items.

102.1.2 Borrow Excavation

Borrow excavation shall consist of the excavation and utilization of


approved materials required for the construction of embankments or
for other portions of the work, and shall be obtained from approved
sources, in accordance with Clause 61, Standard Specifications for
Public Works and Highways, Volume 1 and the following;

(1) Borrow, Case 1


Borrow Case 1 will consist of material obtained from sources
designated on the plans or in the Special Provisions.

(2) Borrow, Case 2


Borrow Case 2 will consist of material obtained from sources
provided by the Contractor.

The material shall meet the quality requirements determined by the


Engineer unless otherwise provided in the Contract.

Irrespective of the source of borrow materials whether as indicated in


the Drawings, or as directed by the Engineer or from the Contractor’s
own source, it is understood that materials obtained from these

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-5
EARTHWORK C

sources are only of the desired quality passing the requirements of


the Specifications. All preparatory works, problems of access and
other related matters in connection with quarrying operations shall be
the sole responsibility of the Contractor.

102.2 Construction Requirements

102.2.1 General

When there is evidence of discrepancies on the actual elevations and


that shown on the Plans, a pre-construction survey referred to the
datum plane used in the approved Plan shall be undertaken by the
Contractor under the control of the Engineer to serve as the basis for
the computation of the actual volume of the excavated materials.

All excavations shall be finished to reasonably smooth and uniform


surfaces. No materials shall be wasted without the authority of the
Engineer. Excavation operations shall be conducted so that material
outside of the limits of slopes will not be disturbed. Prior to excavation,
all necessary clearing and grubbing in that area shall have been
performed in accordance with Item 100, Clearing and Grubbing.

102.2.2 Conservation of Topsoil


Suitable topsoil encountered in excavation and on areas where
embankment is to be placed shall be removed to such extent and to
such depth as directed by the Engineer. The removed topsoil shall be
transported and stockpiled at locations approved by the Engineer.
The topsoil shall be completely removed to the required depth from
any designated area prior to the beginning of regular excavation or
embankment work in the area and shall be kept separately from other
excavated materials for later use.

102.2.3 Utilization of Excavated Materials

All suitable materials removed from the excavation shall be used in


the formation of the embankment, subgrade, shoulders, slopes,
bedding, and backfill for structures, and for other purposes shown on
the Plans or as directed by the Engineer.

Only approved materials shall be used in the construction of


embankments and backfills.

All excess materials, including rock and boulders that cannot be used
in embankments shall be disposed off as directed by the Engineer.

Borrow Materials shall not be placed until after the readily accessible
materials from roadway excavation has been placed in the fill, unless
otherwise permitted or directed by the Engineer. If the Contractor
places more borrow than is required and thereby causes waste of
excavation, the amount of such waste will be deducted from the
borrow volume.

102.2.4 Prewatering

Excavation areas and borrow pits maybe prewatered before

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-6
EARTHWORK C

excavating the material. When prewatering is used, the areas to be


excavated shall be moistened to the full depth, from the surface to the
bottom of the excavation. The water shall be controlled so that the
excavated material will contain the proper moisture to permit
compaction to the specified density with the use of standard
compacting equipment.

The Contractor shall provide drilling equipment capable of suitably


checking the moisture penetration to the full depth of the excavation.

102.2.5 Presplitting

Unless otherwise provided in the Contract, rock excavation, which


requires drilling and shooting, shall be presplit.
Explosives maybe used only when authorized in writing by the
Engineer, in accordance with the provisions of all laws, orders and
regulations. The Engineer’s approval on the use of explosives shall,
in no case relieve the Contractor from any liability for claims caused
by blasting operations.

The Contractor at all times shall, with the Engineer’s permission, use
materials containing hazardous substances with strict compliance to
safety requirements and all manufacturer’s warning, application
instruction and specifications.

Regardless of the variance allowed in the formation of slope in rock


excavations, only the volume within the limits indicated in the drawings,
unless adjusted by the Engineer, shall be considered as pay quantity.

102.2.6 Excavation of Ditches, Gutters, etc.

All materials excavated from side ditches and gutters, channel


changes, irrigation ditches, inlet and outlet ditches, toe ditches, furrow
ditches, and such other ditches as may be designated on the Plans or
staked by the Engineer, shall be utilized as provided in Subsection
102.2.3.

Ditches and side ditches at cut sections, whether on rock or on


common soil, shall conform to the slope, grade and shape of the
required cross-section, with no projections of the roots, stumps, rock,
or similar matter. The Contractor shall maintain and keep open and
free from leaves, sticks and other debris all ditches dug by him until
final acceptance of the work.

At sections of fill where the original ground and toe of slope of the
designed road meet, and where the original ground slopes away from
the intersection such that run off water does not accumulate and flow
freely away from the roadbed, drainage ditch will not be necessary.
However, if the ground slopes down towards the roadbed, the
provisions of drainage ditches to convey run-off water away from the
road will be necessary whether or not indicated on the drawings.
Whenever the longitudinal gradient of drainage ditches constructed on
common soil exceeds the maximum allowed by the drawings or when
the conditions exist, which in the opinion of the Engineer, will result to
damage of the roadbed through the action of erosion, the Contractor

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-7
EARTHWORK C

may be required to provide the corresponding protection. Erosion


control protection whenever required shall be constructed in
accordance to the relevant provisions of Part G- Drainage and Slope
Protection Structures.

Structures to be constructed related to erosion control shall be


measured and paid for in accordance with the relevant items in the Bill
of Quantities under Part G: Drainage and Slope Protection Structures
and Part H: Miscellaneous Structures of the Specifications, whichever
is appropriate.

102.2.7 Excavation of Roadbed Level

Rock shall be excavated to a depth of 150 mm below the subgrade


within the limits of the roadbed, and the excavation be backfilled with
material designated on the Plans or approved by the Engineer and
compacted to the required density.

Materials below subgrade, other than rock shall be thoroughly


scarified to a depth of 150 mm and the moisture content increased or
reduced, as necessary, to bring the material throughout this 150mm
layer to the moisture content suitable for maximum compaction. This
layer shall then be compacted in accordance with Subsection 104.3.4
(Embankment-Compaction).

Tolerance for excavation shall be as follows:

• Cut Slopes in Soils shall be plus or minus one hundred


millimeters (+/- 100 mm)
• Cut Slopes in Soft Rock and Blasted Rock shall be plus or minus
three hundred millimeters (+/- 300 mm)

102.2.8 Borrow Areas

Material from borrow areas shall be used for the construction of


embankment or for backfill when there is no suitable materials
available from roadway excavation or structural excavation or
excavation of ditches or waterways. Permission to use material from
borrow areas shall first be obtained from the Engineer. Nevertheless,
the total volume of material from roadway excavation, ditch and
watercourse excavations, and structure excavation less the materials
declared unsuitable by the Engineer shall be considered available for
use in the work regardless of haul distance. Surplus materials
resulting from the Contractor’s use of borrow materials, without first
exhausting the available common excavation, shall not be measured
for payment.
No borrow material shall be taken nearer than 30 meters from the toe
of embankment or top of the cuts, unless called for in the widening
of cuts or authorized by the Engineer. The distance from the work
sites shall not be grounds for any claims for extra payment or revision
of the contract price.

In addition, no borrow material shall be obtained from any area within


two hundred (200) meters downstream of the drainage structure
without the approval of the Engineer.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-8
EARTHWORK C

The Contractor shall notify the Engineer sufficiently in advance of


opening any borrow area so that the cross-section elevations and
measurements on the ground surface after stripping maybe taken,
and the borrow material can be tested before being used. Sufficient
time for testing the borrow material shall be allowed.

102.2.9 Removal of Unsuitable Materials

In general, whenever materials of doubtful characteristics are


discovered during excavation and embankment construction, such
materials shall be subjected to laboratory test at the option of the
Contractor. If the test results show that the materials could be treated
or blended to produce materials of the required quality for
incorporation into the Works, the Contractor may perform such
treatment or blending operations to the complete satisfaction of the
Engineer. In all cases, the Contractor, in electing to undertake the
testing and treatment/blending operations, shall not be entitled to
extension of time or additional compensation.

Where excavation to the finished graded section results in a subgrade


or slopes of unsuitable soil, the Engineer may require the Contractor
to remove the unsuitable material and backfill to the finished graded
section with approved material. The Contractor shall conduct his
operations in such a way that the Engineer can take necessary cross-
sectional measurements before the backfill is placed.

When any material including surplus or unsuitable materials from


excavations are to be disposed off outside the right-of-way, the
Contractor shall first obtain a written permission from the property
owner of the proposed disposal site. The Contractor shall submit to
the Engineer a certified copy of the written permission together with a
written release of responsibility by the property owner absolving the
government from any responsibility in connection with the disposal of
material at the sites. The disposal of materials at the site as provided
shall be made in a neat and uniform manner and the disposal site
must be approved by the Engineer.

102.3 Method of Measurement

The cost of excavation of material, which is incorporated in the Works or in


other areas utilized as fill, shall be deemed included in the Items of Works
where the material is used. The measurement of Unsuitable or Surplus material
shall be the net volume in its original position.

For measurement purposes, surplus suitable material shall be calculated as the


difference between the net volume of suitable material required to be used n
embankment, corrected by applying a shrinkage factor or a swell factor in case
of rock excavation, determined by the laboratory tests to get its original volume
measurement, and the net volume of suitable material from excavation in the
original position. Separate pay items shall be provided for surplus common,
unclassified and rock material.

The Contractor shall be deemed to have included in the contract unit prices all
costs of obtaining land for the disposal of unsuitable or surplus material.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-9
EARTHWORK C

102.4 Basis of Payment

The accepted quantities, measured as prescribed in Section 102.3 shall be


paid for in the contract unit price for each of the Pay Items listed below that is
included in the Bill of Quantities which price and payment shall be full
compensation for the removal and disposal of excavated materials including
all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.

Payment will be made under:

Pay Item Unit of


Description
Number Measurement

102(2) Roadway Surplus Common Excavation Cubic Meter

ITEM 103 STRUCTURE EXCAVATION

103.1 Description

This item shall consist of the necessary excavation for foundation of bridges,
culverts, underdrains, and other structures not otherwise provided for in the
Specifications. Except as otherwise provided for pipe culverts, the backfilling of
completed structures and the disposal of all excavated surplus materials, shall
be in accordance with these Specifications and in reasonably close conformity
with the Plans or as established by the Engineer.

This item shall include necessary diverting of live streams, bailing, pumping,
draining, sheeting, bracing, and the necessary construction of cribs and
cofferdams, and furnishing the materials therefore, and the subsequent
removal of cribs and cofferdams and the placing of all necessary backfill.

Structure excavation shall also include the furnishing and placing of approved
foundation fill material to replace unsuitable materials encountered below the
foundation elevations of the structures.

103.2 Construction Requirements

103.2.1 Clearing and Grubbing

Prior to starting excavation operations in any area, all necessary


clearing and grubbing in that’s area shall have been performed in
accordance with Item 100. Clearing and Grubbing.

103.2.2 Excavation

Generally, in all structures, the Contractor shall notify the Engineer


sufficiently in advance of the beginning of any excavation so that
cross-sectional elevations and measurements may be taken on the
undisturbed ground. The natural ground adjacent to the structure shall
not be disturbed without permission of the Engineer.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-10
EARTHWORK C

Any excavation carried beyond the limits and dimensions as shown or


described on the Drawings or Specifications shall be backfilled with
acceptable materials.

Trenches or foundation pits for structures or structure footings shall


be excavated to the lines and grades or elevation shown on the Plans
or as staked by the Engineer. They shall be of sufficient size to permit
the placing of structures or structure footings of the full width and
length as shown on the Plans. The elevations of the bottoms of
footings, as shown on the Plans, shall be considered as approximate
only and the Engineer may order, in writing, such changes in
dimensions or elevations of footings as maybe deemed necessary, to
secure a satisfactory foundation.

If excess excavation occur which resulted to a greater depth or width


than is necessary, then the Contractor shall at his own expense
backfill the excess excavation with approved materials, compacted to
the density of the adjacent ground, to the correct levels and
dimensions to the approval of the Engineer.
When instructed by the Engineer, the Contractor shall carefully set
aside the various materials encountered so that they may be replaced
in their original position

Trenches shall be kept clean and free from water during excavation,
concreting, laying of pipes and backfilling. In cases where presence of
water is unavoidable during excavation and prior the laying of pipes,
the Contractor shall dig diversion channels, erect cofferdams or
otherwise de-water the trench to ensure proper procedure and
compaction before concreting or laying of pipes.

Where, in the opinion of the Engineer, any invert has become soft or
unsuitable to receive the culvert or concrete bed due to the
Contractor’s method of working, the Contractor shall at his own
expense remove and replace the material with non-structural concrete
or other approved material as instructed by the Engineer. Where
concrete is specified, the mix shall consist of ordinary portland cement
and aggregate, both complying with the Specifications Item 405. The
3
weight of cement mixed with 0.3m of aggregate shall not be less than
50 kg. The quantity of water shall not exceed that required to produce
a smooth cement paste, which coat evenly the whole of the aggregate.

For pipe culverts, the width of the pipe trench shall be sufficient to
permit satisfactory jointing of the pipe and thorough tamping of the
bedding material under and around the pipe.

Where rock, hardpan, or other unyielding material is encountered, it


shall be removed below the foundation grade for a depth of at least
300mm or 4mm for each 100mm of fill over the top of pipe, whichever
is greater, but not to exceed three-quarters of the vertical inside
diameter of the pipe. The width of the excavation shall be at least
300mm greater than the horizontal outside diameter of the pipe. The
excavation below grade shall be backfilled with selected fine
compressible material, such as silty clay or loam, and lightly
compacted in layers not over 150mm in uncompacted depth to form a
uniform but yielding foundation.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-11
EARTHWORK C

For culverts which are to be constructed under a “trenched” or


“negative projection” conditions, where the pipes are laid in a trench
excavated below existing ground level or in a trench excavated in a
previously constructed embankment, the top 150mm in the trench
invert shall be compacted to a dry density of at least 95% MDD
(AASHTO T99) or at least the same density as the adjacent ground,
whichever is the greater, unless otherwise specified.

Where culverts are to be laid under the “embankment” or “positive


projection” conditions, the Contractor shall level the existing ground by
excavating and backfilling. The Contractor shall then compact the
ground for 150 mm below invert or underside of bedding material to a
dry density of 95% MDD (AASHTO T99) or to the density of the
adjacent ground, whichever is the greater, such that the foundation of
the culvert of bedding is true to grade and of uniform density over the
whole length of the culvert.

The Engineer’s approval is required before placing concrete in all


excavations for structures made through water bearing strata that
require dewatering.

103.2.3 Utilization of Excavated Materials

All suitable excavated materials shall be utilized as backfill or


embankment. The surplus materials shall be disposed off in such
manner as not to obstruct the stream or otherwise impair the
efficiency or appearance of the structure. No excavated materials
shall be deposited at any time so as not to endanger the partly
finished structure.

103.2.4 Cofferdams

Suitable and practically watertight cofferdams shall be used wherever


water-bearing strata are encountered above the elevation of the
bottom of the excavation. The Contractor shall submit the drawings
showing his proposed method of cofferdam construction, as directed
by the Engineer.

103.2.5 Preservation of Channel

Unless otherwise permitted, no excavation shall be made outside of


caissons, cribs, cofferdams, or sheet piling and the natural streambed
adjacent to structure shall not be disturbed without the permission
from the Engineer. If any excavation or dredging is made at the side
of the structure before the caissons, cribs, or cofferdams are sunk in
place, the Contractor shall, after the foundation base is in place,
backfill all such excavations to the original ground surface or stream
bed with material satisfactory to the Engineer.

103.2.6 Backfill and Embankment for Structures Other than Pipe Culvert

Excavated areas around structures shall be backfilled with free


draining granular materials approved by the Engineer and placed in
horizontal layers not over 150mm in thickness, to the level of the

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-12
EARTHWORK C

original ground surface. Each layer shall be moistened or dried as


required and thoroughly compacted with mechanical tampers.

Backfill and embankment for structures other than pipe culverts shall
be of suitable common materials excavated from required excavation
or from borrow source.

103.2.7 Bedding, Backfill, and Embankment for Pipe Culverts

Bedding, Backfill and Embankment for Pipe Culverts shall be done in


accordance with Item 500, Pipe Culverts and Storm Drains.

103.2.8 Choring, Cribbing, and Related Work

Shoring, cribbing, and related protective works if required in the


construction shall not be measured and paid for separately and shall
be considered subsidiary to the item for which they are constructed
and utilized.

103.3 Method of Measurement

103.3.1 Structure Excavation


The volume of excavation to be paid for will be the number of cubic
meters measured in original position of material acceptably excavated
in conformity with the Plans or as directed by the Engineer, except as
noted, will any of the following volumes be included in the
measurement for payment:

(1) The volume outside the vertical planes 450mm outside of the
parallel to the neat lines of footings and the inside walls of
the pipe and pipe-arch culverts at the widest horizontal
dimensions.

(2) The volume of excavation for culvert and section outside the
vertical plane for culverts stipulated in (1) above.

(3) The volume outside of the neat lines of underdrains as shown


on the Plans and outside the limits of foundation fill as
ordered by the Engineer.

(4) The volume included within the staked limits of the roadway
excavation, contiguous channel changes, ditches, etc., for
which payment is otherwise provided in the Specification.

(5) Volume of water or other liquid resulting from construction


operations and which can be pumped or drained away.

(6) The volume of any excavation performed prior to the taking of


elevations and measurements of the undisturbed ground.

(7) The volume of any material rehandled, except that where the
Plans indicate or the Engineer directs the excavation after
embankment has been placed and except that when
installation of pipe culverts by the imperfect trench method

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-13
EARTHWORK C

specified in Item 500 is required, the volume of material re-


excavated as directed will be included.

(8) The volume of excavation for footings ordered at a depth of


more than 1.5m below the lowest elevation for such footings
shown on the original Contract Plans for individual footings.

103.3.2 Bridge Excavation

The volume of excavation, designated on the Plans or in the Special


Provisions, as “Bridge Excavation” will be measured as described
below and will be kept separately from the excavation for all
structures for payment purposes.

The volume of bridge excavation to be paid shall be the vertical


450mm outside of and parallel to the neat lines of the footing. The
vertical planes shall constitute the vertical faces of the volume for pay
quantities regardless of excavation inside or outside of these planes.

103.3.3 Foundation Fill


The volume of foundation fill to be paid for will be the number of cubic
meters measured in final position of the special granular material
actually provided and placed below the foundation elevation of the
structures as specified, completed in place and accepted by the
Engineer.

103.3.4 Shoring, Cribbing, and Related Work


Shoring, cribbing and related work whenever included as a pay item in
the Bill of Quantities will be paid for at a lump sum bid price. This work
shall include furnishing, constructing, maintaining and removing any
and all shoring, cribbing, cofferdams, caissons, bracing, sheeting,
water control, and other operations necessary for the acceptable
completion of excavation included in the work of this Section, to a
depth of 1.5m below the lowest elevation shown on the Plans for each
separable foundation structure.

103.4 Basis of Payment

The accepted quantities, measured as prescribed in Section 103.3, shall be


paid for in the Contract unit price for each of the particular pay items listed
below that is included in the Bill of Quantities.

The payment for structure excavation and bridge excavation shall be deemed
to include the cost of backfilling, shoring, cribbing, protective works, removing
and disposing unsuitable materials off site and removal and hauling of excess
suitable materials to stockpiles as directed by the Engineer. The payment shall
be the full compensation for the work item including the cost of labor,
equipment, tools and incidentals necessary to complete the work prescribed in
this item.
No measurement for separate payment to the Contractor shall be made for
backfill being the relevant compensation included by the Contractor in his rates
in the Bill of Quantities in the pay items for excavation for structures and
bridges.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-14
EARTHWORK C

Payment will be made under:

Pay Item Unit of


Description
Number Measurement
Structure Excavation
103(1)a Cubic Meter
(Streetlight Concrete Pedestal)
Bridge Excavation
103(2)a Cubic Meter
(Common Soil )

103(3) Foundation Fill Cubic Meter

Structure Excavation
103(6)a Cubic Meter
(Pipe Culverts and Drain Excavation)

ITEM 104 EMBANKMENT

104.1 Description

This item shall consist of the construction of embankment in accordance with


this Specification and in conformity with the lines, grades and dimensions
shown on the Plans or established by the Engineer.

104.2 Material Requirements

Embankment shall be constructed of suitable materials in accordance with the


following definition:

1. Suitable Material
Material which is acceptable in accordance with the contract and which can
be compacted in the manner specified in this Item. It can be common
material or rock provided however, it shall have a CBR value of not less
than seven (7%) percent when tested according to AASHTO 193-81 after
four days soaking when compacted to 95% of the maximum dry density
according to AASHTO T-99-90.

Selected Borrow, for topping - shall be soil of such gradation that all
particles will pass a sieve with 75 mm (3 inches) square openings and not
more than 15 mass percent will pass the 0.075 mm (No. 200) sieve, as
determined by AASHTO T 11. The material shall have a plasticity index
ranging from 6% -11% as determined by AASHTO T 90, a liquid limit of not
more than 35 % as determined by AASHTO T 89.

2. Unsuitable Material - Material other than suitable materials such as:


(a) Materials containing detrimental quantities of organic materials, such as
grass, roots and sewerage.

(b) Organic soils such as peat and muck.

(c) Soils with liquid limit exceeding 80 and/or plasticity index exceeding 55.

(d) Soils with natural water content exceeding 100%.


3
(e) Soils with very low natural density, 800 kg/m or lower.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-15
EARTHWORK C

(f) Soils that cannot be properly compacted as determined by the Engineer.

3. Selected Granular Embankment


In situations where placing and/or compaction under saturated or flooded
conditions cannot be avoided, selected granular embankment shall be river
run gravelly sand or gravel or other clean granular materials as specified on
the drawing or as directed and approved by the Engineer.

104.3 Construction Requirements

104.3.1 General
Prior to the construction of embankment, all necessary clearing and
grubbing in that area shall have been performed in conformity with the
item 100, Clearing and Grubbing.

The Contractor shall submit to the Engineer for review and approval
the methodology he intends to apply for the formation of embankment
satisfying all requirements. The methodology shall show the
systematic procedure of constructing the embankment in conjunction
with the procedure proposed for the slope protection as shown in the
drawings.

The approval of the proposed methodology however does not relieve


the Contractor of the responsibilities for any unsatisfactory or
defective works as results of such methodology. The Engineer at his
discretion may reject or require remedial measures to the defective
works. The cost of replacing or remedying defective works shall be
borne by the Contractor.

Embankment construction shall consist of formation of roadway


embankments including preparation of the areas upon which they are
to be placed; the construction of dikes within or adjacent to the
roadway; the placing and compacting of approved material within the
roadway areas where unsuitable material has been removed; and the
placing and compacting of embankment material in holes, pits and
other depressions within the roadway area.

Before embankment construction is started, the Contractor shall


construct in accordance with his methodology, a section of trial
embankment in accordance with Sub-section 104.3.3 Compaction
Trials.

104.3.2 Method of Construction


In places where the road embankment will be constructed over the
existing gravel or dirt road, as shown in the plan or as directed by the
Engineer, the surface of the existing road shall be ripped to a depth of
150 mm. Then the existing road shall be reshaped and compacted to
the same or greater density as the materials to be placed thereon, to
provide a uniform foundation for the embankment materials to follow.

Thin bituminous layers less than 50 mm may be incorporated in the


layer of the embankment.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-16
EARTHWORK C

In places where the road embankment will be constructed over the


existing PCC pavement, the existing concrete pavement shall be
broken into pieces with greatest dimensions of not more than 500 mm
in accordance with the provisions of Sub-Section 105.3.6-Subgrade
Preparation on Existing Pavement.

• Thin bituminous layers less than 50 mm may be incorporated in


the layer of the embankment.
• In places where the road embankment will be constructed over the
existing PCC pavement, the existing concrete pavement shall be
broken into pieces with greatest dimensions of not more than 500
mm in accordance with the provisions of Sub-Section 105.3.6.
• 95% of maximum density as determined by AASHTO T 99, for all
the embankment, except the top 300 mm (subgrade).
• 98% of the maximum density as determined by AASHTO T 180
for the top 300 mm (subgrade) of the embankment.

The embankment shall be compacted with compaction equipment


over the full width and in a longitudinal direction until there is no visible
movement of the rock fill materials when under the compacting
equipment.

Placing of fill will be suspended if, in the opinion of the Engineer, there
is no adequate compaction and grading equipment available on site in
operating condition to shape and compact the fill immediately upon
placement.

104.3.3 Compaction
Compaction Trials
1) General
Before starting the formation of embankments, the Contractor
shall submit in writing to the Engineer for approval of his proposals
for the compaction of each type of fill material to be used in the
works. The proposals shall include the relationship between the
types of compaction equipment, the number of passes required
and the method of adjusting moisture content. The Contractor
shall carry out full scale compaction trials on areas not less than
10m wide and 50 m long as required by the Engineer and using
his proposed procedures or such amendments thereto as may be
found necessary to satisfy the Engineer that all requirements
regarding compaction can be consistently achieved. Compaction
trials with the main types of fill material to be used in the works
shall be completed before work with the corresponding materials
will be allowed to commence.

All findings obtained from the trial compaction and tests shall be
submitted to the Engineer for establishing desirable criteria for the
quality control of the embankment works. The Contractor shall
make joint efforts with the Engineer until acceptable criteria and
methodology are established.

This compaction trial on trial embankments shall also include the


Contractor’s plan and schedule for the construction of the trial

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-17
EARTHWORK C

embankment including location and area of embankment, type


and quality of equipment, manner of blending, placing, spreading
and compaction, items and quantity of test, and other information
for the trial embankment.

No separate payment shall be made of the trial embankment, all


the cost thereof are deemed to be included in the payment
specified in this work item.

Throughout the periods when compaction of earthwork is in


progress, the Contractor shall adhere to the compaction
procedures found from compaction trials for each type of material
being compacted, each type of compaction equipment employed
and each degree of compaction specified.

2) Execution of Trial Embankment


The trial embankment shall be carried out simulating normal
construction conditions by using all the equipment and methods
proposed for placing, spreading and compaction the embankment
materials.
The trial embankment shall be carried out at a minimum of four (4)
independent sites, and the section of each trial embankment shall
be constructed to the full width of the embankment over a 30m
length and to a height of 0.6 m at least after compaction. Each
trial embankment section shall be tested by various kind of
compaction equipment.

Spreading depth of the trial embankment shall be not more than


20 cm after compaction.

The number of passes shall be varied to provide at least four (4)


cases to establish a relation between number of passes and
degree of compaction.

Several kinds of material, which can cover representative soil


characteristics of the whole embankment materials, shall be
tested. Should clearly different materials be used for a section of
embankment, such materials shall also be tested in the same
manner.

3) Soil Test and Measurement

All materials of embankment shall be conditioned beforehand and


tested in accordance with Clause 104.2 of this Specification. The
Contractor shall carry out, as a minimum, the following tests
during the operation of the trial embankment:

a) Settlement measurement of layer.

Settlement of layer shall be measured after compaction at a


minimum of nine (9) points per each trial in each site using a
taut line horizontally strung between the batter boards at both
ends of embankment.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-18
EARTHWORK C

b) Measurement of in-place density and moisture content in


accordance with Sub-Section 104.3.12 of this Specification.
Measurement shall be made at a minimum of nine (9) points
per each trial in each site.

4) Establishment of Criteria

The Contractor shall investigate results of the trial embankment


and shall submit to the Engineer for approval his proposed method
and manner of embankment operation which shall include full
height construction of embankment, spreading depth, number of
passes, type of equipment, combination of equipment,
construction of slope protection, and other information necessary
for establishing the criteria of embankment operation.

If acceptable criteria are not established, the Contractor shall


repeat the trial embankment to the satisfaction of the Engineer.

104.3.4 Embankment Operation

a) General

This Sub-Section shall cover the manner of embankment


construction, no separate payment shall be made for the
requirements of this Sub-Section, and all the costs except surface
preparation are deemed included in the payment specified in this
work Item.

Costs of the surface preparation stated in the succeeding


paragraph are deemed included in the related items of payment
such as clearing and grubbing.

1) Operation of Borrow Pit


Borrow pits shall be cleared and grubbed as directed by the
Engineer to remove all unsuitable materials. The Contractor shall,
at his own expense secure the necessary right-of-way and access
thereto and shall bear all royalty fees imposed by the owner and
municipalities where these borrow areas are [Link]
Contractor shall construct and maintain the haul roads, together
with the necessary right-of-way for such roads .

Borrow pits where practicable shall be excavated to drain it to the


nearest natural outlet or to such outlet as directed by the Engineer.
The surface of the borrow pits shall be left in a reasonably smooth
and even condition and then stripped top soil, if any, shall be
returned and spread to the satisfaction of the Engineer before
abandoning such borrow pit areas. Planting trees and grass of
the leveled area may also be required from the Contractor before
abandoning the borrow pit as directed by the Engineer.

2) Surface Preparation
Ground surface to be covered with embankment materials shall be
prepared as follows:

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-19
EARTHWORK C

a) Clearing and grubbing shall be executed in accordance with


the requirements specified in Item 100 of these Specifications.

b) Stump holes or other small excavations in the limits of


embankment shall be filled with embankment materials and
thoroughly tamped by approved methods before commencing
any of the embankment operation.

c) The embankment operation shall be performed always in the


dry condition. Springs and seepage along the foundation, if
any, shall be treated by the method approved by the Engineer.

d) Prior to placing of any fill upon the area, all clearing and
grubbing operations and stripping of top soil, where required,
shall have been completed.
e) Where shown on the Drawings or ordered by the Engineer, the
surface of the existing ground shall be compacted to the depth
of 150 mm and in accordance with the requirements of Sub-
section 104.3.3.

3) Excavation, Transportation and Stockpile

The Contractor shall excavate embankment materials at approved


borrow pit, or at the stockpiles when the materials are stockpiled
under the scope of the excavation works specified in Item 102,
Excavation.

The material suitable for the embankment, which is, too wet for
immediate compaction shall be placed temporarily to the
stockyard and aerated until the moisture content is sufficiently
reduced to permit them for the embankment operation.

4) Placing, Spreading and Compaction

Placing spreading and compaction of embankment materials shall


be executed in the manner of the approved criteria of
embankment operation established through the trial embankment.
Materials shall be placed and spread so that no single layer
exceeds 200 mm in thickness after compaction. As far as
practicable, the material shall be dried or wetted to have proper
moisture content within the allowable range determined through
the regular compaction test.

Equipment for placing, spreading and compaction shall be as


specified in the approved criteria of embankment operation. No
other equipment shall be used without the approval of the
Engineer.

Degree of compaction shall be as specified in Sub-Section


104.3.3. When any layer fails to comply with the specified degree
of compaction, the Contractor shall immediately re-compact, wet
or dry, improve or replace the materials. All soft or yielding areas
that may develop in the embankment shall be corrected by re-
compaction, by removing the unsuitable materials and replacing
them immediately upon order of the Engineer.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-20
EARTHWORK C

When the results of embankment monitoring show the possibility


of slope or embankment failure, the Contractor shall take
immediate action such as tentative removal of a part of
embankment, tentative counterweight fill, or any other measures,
which the Contractor deems necessary. The Contractor shall in
this case, notify the Engineer of such possibility and the measures
being promptly taken by the Contractor to the extent possible.

5) Tolerance

The completed embankment section shall have elevation and


dimensions which fall within the following tolerances.

Elevation/Dimension Tolerance (mm)


Crest Elevation of Embankment + 50
Crest Width of Embankment + 100
Length of Embankment Slope + 200

104.3.5 Quality Control of Embankment Operation

1) General

Quality control of the embankment operation shall be carried out


through the regular compaction test and the daily control test as
specified hereinafter.

No separate payment shall be made for the requirements of this


Sub-Section and all the costs thereof are deemed included in the
payment specified in this work Item.

2) Regular Compaction Test

The regular compaction test shall be carried out once every


20,000 m3 of the materials before compaction in accordance with
JIS-A-1210 and before a new source of material is placed in the
works. Measurement of natural moisture content and specific
gravity of soils and determination of the optimum moisture content
and the maximum dry density shall be made and results shall be
submitted to the Engineer for approval.

3) Daily Quality Control Test

a) General

Daily quality control test shall be executed at embankment


sites by use of the radioisotope type soil density and
moisture gauge (RI gauge) which shall be procured by the
Contractor.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-21
EARTHWORK C

The Contractor shall measure in-place dry density and in-


place moisture content using the RI gauge on daily basis
when the embankment operation is executed.

b) Execution of Daily Quality Control Test

Measurement of in-place dry density and in-place moisture


content shall be made daily at the rate of one (1) point
measurement per 500 square meter area of each layer of
compacted fill.

All measurement data shall be recorded and filed with direct


output from the RI gauge. Record format shall contain, but not
limited to, the following items.

• Date and time of measurement


• Weather condition
• Rainfall
• Location of Embankment
• Location of Measurement
• Approximate work volume of embankment
• Type of embankment material.
• Moisture content at borrow pit or stockyard
• In-place moisture content at embankment site
• In-place density of embankment material
• Degree of compaction
• Presence of the Engineer

The Contractor shall plot the data in a form of daily control


graph and shall monitor its daily change.

The Contractor shall submit all the test results of daily quality
control test to the Engineer once every week for approval.

The Contractor, when requested by the Engineer, shall


measure in-place density of the soils by the sand replacement
method in a manner specified in JIS-A –1214 or ASTM
equivalent.

104.3.6 Protection of Roadbed during Construction


During the construction of the roadway, the roadbed shall be,
maintained in such condition that it will be well drained at all times.
Side ditches or gutters emptying from cuts to embankments or
otherwise shall be so constructed as to avoid damage to
embankments by erosion.

104.3.7 Protection of Structures


If embankment can be deposited on one-side only of abutments,
wing walls, piers or culvert headwalls, care shall be taken that the
area immediately adjacent to the structure is not compacted to the
extent that it will cause overturning of, or excessive pressure against
the structure. When noted on the Plans, the fill adjacent to the end
bent of the bridge shall not be placed higher than the bottom of the

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-22
EARTHWORK C

backfill of the bent until the superstructure is in place. When the


embankment is to be placed on both sides of a concrete wall or box
type structure, operations shall be so conducted that the embankment
is always at approximately the same elevation on both sides of the
structure.

104.3.8 Monitoring of Embankment


The settlement and stability of the major embankment formation shall
be periodically monitored by the Contractor in accordance.

104.4 Method of Measurement

Any material coming from roadway, structure, drainage or ditch excavations


which are suitable for use but are replaced by the Contractor with borrow
materials without prior approval by the Engineer, shall not be measured for
payment.
Measurement of quantities for embankment to be paid for shall be the volume
of embankment materials placed and compacted in place to the lines, grades,
and dimensions shown on the drawings or as directed by the Engineer and
shall be taken only in the presence of the Engineer. The Engineer shall be
notified at least 24 hours before taking such measurement. The volume of
embankment materials shall be computed by end area method and determined
from the execution section of the embankment established on the original
ground line after stripping. The original ground line shall be surveyed and
reported to the Engineer for checking and approval prior the execution of the
embankment operation.

The quantity of Embankment from Borrow shall be calculated as the balance


between the total embankment volume (as shown on the drawings plus volume
due to settlement) and the total volume of suitable material from roadway
excavation, from excess structure, bridge, pipe culvert and drainage excavation
and from excess dredging and realignment of river channel excavation,
employing the compaction factor 0.95 for common soil.

Materials from excavation per Item 102 and materials coming from dredging
operation and realignment of river channel and structure excavation that is
used in embankment formation and accepted by the Engineer will be paid
under Embankment. Moreover, such payment will be deemed to include the
cost of excavating, hauling, blending, drying and wetting if necessary, placing,
spreading and compaction, stockpiling and all other costs incidental to the work.

Material for Selected Borrow topping will be measured and paid for under the
same condition specified in the preceding paragraph.

104.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 104.4, shall be


paid for at the Contract unit price for each of the Pay Items listed below that is
included in the Bill of Quantities. The payment shall continue full compensation
for the furnishing, placing and compacting all materials, including all labor,
equipment, tools and incidentals necessary to complete the work prescribed in
this Item.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-23
EARTHWORK C

The unit price shall also include the costs for procurement and furnishing of
required materials if not coming from approved excavation. No separate
payment shall be made for the tentative removal of embankment,
counterweight fill, placing and removal of surcharge and preload and
secondary excavation and backfilling for structures to be constructed on the
embankment, cost of which shall be deemed included in the unit price of the
embankment.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

Embankment from Roadway


104 (1)a Cubic Meter
Excavation (Common Material)

ITEM 105 SUBGRADE PREPARATION

105.1 Description

This item shall consist of the preparation of the subgrade for the support of
overlying structural layers. It shall extend to full width of the roadway. Unless
authorized by the Engineer, subgrade preparation shall not be done unless the
Contractor is able to start immediately the construction of the pavement
structure.

105.2 Material Requirements

Unless otherwise stated in the Contract and except when the subgrade is in
rock cut, all materials below subgrade level to a depth of 150mm or to such
greater depth as may be specified shall meet the requirements of Section
104.2- Materials Requirement for Embankment

105.3 Construction Requirements

105.3.1 Prior Works

Prior to commencing preparation of the subgrade, all culverts, cross


drains, ducts and the like (including their fully compacted backfill),
ditches, drains and drainage outlets shall be completed. Any work on
the preparation of the subgrade shall not be started unless prior work
herein described shall have been approved by the Engineer.

105.3.2 Subgrade Level Tolerances

The finished compacted surface of the subgrade shall conform to the


allowable tolerances as specified hereunder:

Permitted variation from + 20 mm


design LEVEL OF SURFACE - 30 mm
Permitted SURFACE IRREGULARITY
MEASURED BY 3-m STRAIGHT EDGE 30 mm
Permitted variation from
design CROSSFALL OR CAMBER + 0.5 %

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-24
EARTHWORK C

Permitted variation from


design LONGITUDINAL GRADE ± 0.1 %
over 25 m length

105.3.3 Subgrade in Common Excavation


Unless otherwise specified, all materials below subgrade level in earth
cuts to a depth of 150 mm or other depth shown on the Plans or as
directed by the Engineer shall be excavated. The material, if suitable,
shall be set aside for future use or, if unsuitable, shall be disposed of
in accordance with the requirements of Sub-sections 102.2.9.

Where material has been removed from below subgrade level, the
resulting surface shall be compacted to a depth of 150 mm and in
accordance with the requirements of Sub-Section 104.3.3.
All materials immediately below subgrade level in earth cuts to a
depth of 150 mm, or to such greater depth as may be specified, shall
be compacted in accordance with the requirements of Subsection
104.3.3.

The roadbed material in cuts shall be moistened or dried to uniform


moisture content within + or - 2% of optimum moisture and shall be
thoroughly compacted.

• 95% of the maximum density as determined by AASHTO T 180 in


case the roadbed will constitute the subgrade of the new
pavement.
• 100% of the maximum dry density as determined by AASHTO T
180, in case the roadbed will constitute the subbase of the new
pavement

105.3.4 Subgrade in Rock Excavation


Surface irregularities under the subgrade level remaining after
trimming of the rock excavation shall be leveled by placing specified
material and compacted to the requirements of Subsection 104.3.3.

105.3.5 Subgrade on Embankment


After the embankment has been completed, the full width shall be
conditioned by removing any soft or other unstable material that will
not compacted properly. The resulting areas and all other low
sections, holes be or depressions shall be brought to grade with
suitable material. The entire roadbed shall be shaped and compacted
to the requirements of Subsection 104.3.3. Scarifying, blading,
dragging, rolling or other method of work shall be performed or used
as necessary to provide a thoroughly compacted roadbed shaped to
the cross-sections shown on the Plans.

105.3.5 Subgrade on Existing Pavement


Where the new pavement is to be constructed immediately over an
existing Portland Cement Pavement and if so specified in the Contract,
the slab shall be broken into pieces with greatest dimension of not
more than 500 mm and the existing pavement material compacted as
specified in Subsection 104.3.3, as directed by the Engineer. The
resulting subgrade level shall, as part of pavement construction be

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-25
EARTHWORK C

shaped to conform to the allowable tolerances of Subsection 105.3.2


by placing and compacting where necessary a leveling course
comprising the material of the pavement course to be placed
immediately above.

Where the new pavement is to be constructed immediately over an


existing Asphalt Concrete Pavement or gravel surface pavement and
if so specified in the Contract, the pavement shall be scarified,
thoroughly loosened, reshaped and recompacted in accordance with
Subsection [Link] resulting subgrade level shall conform to the
allowable tolerances if Subsection 105.3.2.

105.3.6 Protection of Completed Work


The Contractor shall be required to protect and maintain at his own
expense the entire work within the limits of his Contract in good
condition satisfactory to the Engineer from the time he first started
work until all work shall have been completed. Maintenance shall
include repairing and recompacting ruts, ridges, soft spots and
deteriorated sections of the subgrade caused by the traffic of the
Contractor’s vehicle/equipment or that of the public.

105.3.7 Templates and Straightedges


The Contractor shall provide for use of the Engineer, approved
templates and straightedges in sufficient number to check the
accuracy of the work, as provided in this Specification.

105.4 Method of Measurement

105.4.1 Measurement of Items for payment shall be provided only for:

1. The compaction of existing ground below subgrade level in cuts of


common material as specified in Subsection 105.3.3.

2. The breaking up or scarifying, loosening, reshaping and re-


compacting of existing pavement as specified in Subsection
105.3.6. The quantity to be paid for shall be the area of the work
specified to be carried out and accepted by the Engineer.

3. The preparation of the subgrade at locations where unsuitable


materials have been excavated and disposed shall be measured
in square meters, which shall be calculated based on surveys
carried out defining the limits as directed by the Engineer.

4. Should a leveling course be necessary to correct the irregularities


of the prepared subgrade or for non-compliance to the maximum
allowable tolerances prescribed in Section 105.3.5 such course
shall not be measured separately and shall be deemed to have
been included in the pay item for embankment.

105.5 Basis of Payment

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-26
EARTHWORK C

Pay Item Unit of


Description
Number Measurement
Subgrade Preparation
105 (1)a Square Meter
(Common Material)

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page C-27
PART D

SUBBASE AND BASE COURSE


SUBBASE AND BASE COURSE D

PART D SUBBASE AND BASE COURSE

ITEM 200 AGGREGATE SUBBASE COURSE

200.1 Description

This item shall consist of furnishing, placing and compacting an aggregate


subbase course on a prepared subgrade in accordance with this Specification
and the lines, grades and cross-sections shown on the plans, or as directed by
the Engineer.

200.2 Material Requirements

Aggregate for subbase shall consist of hard, durable particles or fragment


crushed stone, crushed slag, or crushed or natural gravel and filler of natural or
crushed sand or other finely divided mineral matter. The composite material
shall be free from vegetable matter and lumps or balls of clay, and shall be of
such nature that it can be compacted readily to form a firm, stable subbase.

The subbase material shall conform to Table 200.1, Grading Requirements

Table 200.1 – Grading Requirements


Sieve Designation
Standard, mm Alternate US Standard Mass Percent Passing

50 2” 100
25 1” 55 – 85
9.5 3/8” 40 – 75
0.075 No. 200 0 – 12

The fraction passing the 0.075 mm (No.200) sieve shall not be greater than
0.66 (two thirds) of the fraction passing the 0.425 mm (No. 40) sieve.

The fraction passing the 0.425 mm (No. 40) sieve shall have a liquid limit not
greater than 35 and plasticity index not greater than 12 as determined by
AASHTO T89 and T 90, respectively.

The coarse portion, retained on a 2.00 mm (No. 10) sieve, shall have a mass
percent of wear not exceeding 50 by the Los Angeles Abrasion Tests as
determined by AASHTO T 96.

The material shall have a soaked CBR value of not less than 30% as
determined by AASHTO T 193. The CBR value shall be obtained at the
maximum dry density and determined by AASHTO T 180, Method D.

200.3 Construction Requirements

200.3.1 Preparation of Existing Surface

The existing surface shall be graded and finished as provided under


Item 105, Subgrade Preparation, before placing the subbase material.

200.3.2 Placing

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-1
SUBBASE AND BASE COURSE D

The aggregate subbase material shall be placed at a uniform


mixture on a prepared subgrade in a quantity which will provide the
required compacted thickness. When more than one layer is
required, each layer shall be shaped and compacted before the
succeeding layer is placed.

The placing of material shall begin at the point designated by the


Engineer. Placing shall be from equipment especially equipped to
distribute the material in a continuous uniform layer or window. The
layer or window shall be of such size that when spread and
compacted the finished layer be in reasonably close comformity to
the nominal thickness shown on the plans.

When hauling is done over previously placed material, hauling


equipment shall be dispersed uniformly over the entire surface of the
previously constructed layer, to minimize rutting or uneven
compaction.

200.3.3 Spreading and Compacting

When uniformly mixed, the mixture shall be spread to the plan


thickness, for compaction.

Where the required thickness is 150 mm or less, the material may be


spread and compacted in one layer. Where the required thickness is
more than 150 mm. the aggregate subbase shall be spread and
compacted in two or more layers of approximately equal thickness,
and the maximum compacted thickness of any layer shall not exceed
150 mm. All subsequent layers shall be spread and compacted in a
similar manner.

The moisture content of subbase material shall, if necessary, be


adjusted prior to compaction by watering with approved sprinklers
mounted on trucks or by drying out, as required in order to attain the
required compaction.

Immediately following final spreading and smoothening, each layer


shall be compacted to the full width by means of approved
compaction equipment. Rolling shall progress gradually from the sides
to the center, parallel to the centerline of the road and shall continue
until the whole surface has been rolled. Any irregularities or
depressions that develop shall be corrected by loosening the material
at these places and adding or removing material until surface is
smooth and uniform. Along curbs, headers, and walls, and at all
places not accessible to the roller, the subbase material shall be
compacted thoroughly with approved tampers or compactors.

If the layer of subbase material, or part thereof, does not conform to


the required finish, the Contractor shall at his own expense, make the
necessary corrections.

Compaction of each layer shall continue until a field density of at least


100 percent of the maximum dry density determined in accordance
with AASHTO T 180, method D has been achieved. In-place density
determination shall be made in accordance with AASHTO T 191.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-2
SUBBASE AND BASE COURSE D

200.3.4 Trial Sections

Prior the subbase formation, the Contractor shall spread and compact
trial sections as directed by the Engineer. The purpose of the trial
sections is to check the suitability of the materials and the efficiency of
the equipment and construction method, which is proposed to be used
by the Contractor. Therefore, the Contractor must use the same
material, equipment and procedures that he proposes to use for the
2
main work. One trial section of about 500 m shall be made for every
type of material and/or construction equipment/procedure proposed
for use.

After final compaction of each trial section, the Contractor shall carry
out such field density tests and other tests required as directed by the
Engineer.

If a trial section shows that the proposed materials, equipment or


procedures in the Engineer’s opinion are not suitable for subbase, the
material shall be removed at the Contractor’s expense, and a new trial
section shall be constructed.

If the basic conditions regarding the type of material or procedure


change during the execution of the work, new trial sections shall be
constructed.

200.3.5 Tolerances

Aggregate subbase shall be spread with equipment that will provide a


uniform layer which when compacted will conform to the designed
level and transverse slope as shown on the plans. The allowable
tolerances shall be as specified hereunder:

Permitted variation from design + 20 mm


THICKNESS OF LAYER

Permitted variation from design + 10 mm


LEVEL OF SURFACE - 20 mm

Permitted SURFACE IRREGULARITY 20 mm


Measured by 3-m straight-edge

Permitted variation from design + 0.3%


CROSSFALL OR CAMBER

Permitted variation from design


LONGITUDINAL GRADE over + 0.1%
25 m in length

200.4 Method of Measurement

Aggregate Subbase Course will be measured by the cubic meter (m3). The
quantity to be paid for shall be the design volume compacted in-place as shown
on the plans, and accepted in the completed course. No allowance will be given
for materials placed outside the design limits shown on the cross-section. Trial

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-3
SUBBASE AND BASE COURSE D

section shall not be measured separately but shall be included in the quantity of
subbase herein measured.

200.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 200.4, shall be


paid for at the contract unit price for Aggregate Subbase Course which price
and payment shall be full compensation for furnishings and placing all materials,
including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement

200(1) Aggregate Subbase Course Cubic Meter

ITEM 201 AGGREGATE BASE COURSE

201.1 Description

This Item shall consist of furnishing, placing and compacting an aggregate


base course on a prepared subgrade/subbase in one or more layers in
accordance with this Specification, and the lines, grades, thickness and typical
cross – sections shown on the Plans or a as established by the Engineer.

201.2 Material Requirements

Aggregate for base course shall consist of hard, durable particles or fragments
of crushed stone, crushed slag, crushed or natural gravel, and filler of natural
or crushed sand, other finely divided mineral matter. The composite material
shall be free from vegetable matter and lumps or balls of clay, and shall be of
such nature that it can be compacted readily to form a firm, stable base.

In some areas where the conventional base course materials are scarce or
non-available, the use of 40% weathered limestone blended with 60% crushed
stones or gravel shall be allowed, provided that the blended materials meet the
requirements of this Item.

The base course material shall conform to Table 201.1, whichever is called for
in the Bill of Quantities.

Table 201.1 – Grading Requirements


Sieve Designation Mass percent Passing

Standard, mm Alternate US Standard Grading A Grading B


50 2” 100
37.5 1-1/2” - 100
25 1” 60 – 85 -
19 ¾” - 60 – 85
12.5 ½” 35 – 65 -
4.75 No. 4 20 – 50 30 – 55
0.425 No. 40 5 – 20 8 – 25
0.075 No. 200 0 – 12 2 –12

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-4
SUBBASE AND BASE COURSE D

The fraction of the material passing the 0.075 mm (No. 200) sieve shall not be
greater than 0.66 (two thirds) of the fraction passing the 0.425 mm (No. 40)
sieve.

The fraction of the material passing the 0.425 mm (No. 40) sieve shall have a
liquid limit of not more than 25 and a plasticity index of not more than 6 as
determined by AASHTO T 89 and T 90, respectively.

The coarse portion retained on a 2.00 mm (No. 10) sieve shall have a mass
percent of wear not exceeding 50 by the Los Angeles Abrasion Test as
determined by AASHTO T 96.

The material passing the 19mm sieve shall have a soaked CBR value of not
less than 80% as determined by AASHTO T193. The CBR value shall be
obtained at the maximum dry density (MDD) as determined by AASHTO 180.
Method D.

If filler, in addition to that naturally present, is necessary for meeting the


grading requirements or for satisfactory bonding, it shall be uniformly blended
with the crushed base course material on the road or in a pug mill unless
otherwise specified or approved by the Engineer. Filler shall be obtained from
sources approved by the Engineer, free from hard lumps and shall not contain
more than 15 percent of material retained on the 4.75 mm (No. 4) sieve.

201.3 Construction Requirements

201.3.1 Preparation of Existing Surface

The existing surface shall be graded and finished as provided


under Item 105, Subgrade Preparation, before placing the base
material.

201.3.2 Placing

It shall be in accordance with all the requirements of Subsection


200.3.2, Placing.

201.3.3 Spreading and Compacting

It shall be in accordance with all the requirements of Subsection


200.3.3, Spreading and Compacting.

201.3.4 Trial Sections

Trial sections shall conform in all respects to the requirements


specified in Subsection 200.3.4.

201.3.5 Tolerances

The aggregate base course shall be laid to the designed level


and transverse slopes shown on the Plans. The allowable
tolerances shall be in accordance with following:

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-5
SUBBASE AND BASE COURSE D

Permitted variation from design ± 10 mm


THICKNESS OF LAYER
Permitted variation from design + 5 mm
LEVEL OF SURFACE - 10 mm

Permitted SURFACE IRREGULARITY


Measured by 3-m straight-edge 5 mm

Permitted variation from design ± 0.2%


CROSSFALL OR CAMBER
Permitted variation from design ± 0.1%
LONGITUDINAL GRADE over
25 m in length

201.4 Method of Measurement

Aggregate Base Course will be measured by the cubic meter (m3). The
quantity to be paid for shall be the design volume compacted in-place as shown
on the Plans, and accepted in the completed base course. No allowance shall
be given for materials placed outside the design limits shown on the cross-
sections. Trial sections shall not be measured separately but shall be included
in the quantity of aggregate base course.

201.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 201.4, shall be


paid for at the contract unit price for Aggregate Base Course which price and
payment shall be full compensation for furnishing and placing all materials,
including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement

201 Aggregate Base Course Cubic Meter

ITEM 202 CRUSHED AGGREGATE BASE COURSE

202.1 Description

This Item shall consist of furnishing, placing and compacting crushed gravel,
crushed stone or crushed rock on a prepared subgrade/subbase in one or
more layers in accordance with this Specification, and the lines, grades,
thickness and typical cross – sections shown on the Plans or a as established
by the Engineer.

202.2 Material Requirements

202.2.1 Crushed Aggregate

It shall consist of hard, durable particles or fragments of stone or


gravel crushed to the size and of the quality requirements of this Item.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-6
SUBBASE AND BASE COURSE D

It shall be clean and free from vegetable matters, lumps or balls of


clay and other deleterious substances. The material shall be of such
nature that it can be compacted readily to form a firm, stable base.

The base material shall conform to the grading requirements of Table


202.1, whichever is called for in the Bill of Quantities.

Table 201.1 – Grading Requirements


Sieve Designation Mass percent Passing
Standard, mm Alternate US Standard Grading A Grading B

37.5 1-1/2” 100


25 1” - 100
19 ¾” 60 – 85 -
12.5 ½” - 60 – 90
4.75 No. 4 30 – 55 30 – 65
0.425 No. 40 5 – 20 10 – 30
0.075 No. 200 2 – 14 5 – 15

The portion of the material passing the 0.075 mm (No. 200) sieve shall
not be greater than 0.66 (two thirds) of the fraction passing the 0.425
mm (No. 40) sieve.

The portion of the material passing the 0.425 mm (No. 40) sieve shall
have a liquid limit of not more than 25 and a plasticity index of not more
than 6 as determined by AASHTO T 89 and T 90, respectively.

The coarse aggregate retained on a 2.00 mm (No. 10) sieve shall have
a mass percent of wear not exceeding 45 by the Los Angeles Abrasion
Test as determined by AASHTO T 96, and not less than 50 mass
percent shall have at least one (1) fractured face.

The material passing the 19 mm sieve shall have a minimum soaked


CBR value of 80% tested according to AASHTO T 193. The CBR value
shall be obtained at the maximum dry density (MDD) as determined by
AASHTO T 180, Method D.

If filler, in addition to that naturally present, is necessary for meeting the


grading requirements or for satisfactory bonding, it shall be uniformly
blended with the crushed base course material on the road or in a pug
mill unless otherwise specified or approved. Filler shall be obtained from
sources approved by the Engineer, free from hard lumps and shall not
contain more than 15 percent of material retained on the 4.75 mm (No.
4) sieve.

202.3 Construction Requirements

202.3.1 Preparation of Existing Surface

The existing surface shall be graded and finished as provided under


Item 105- Subgrade Preparation and Item 200- Aggregate Subbase
Course before placing the base material.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-7
SUBBASE AND BASE COURSE D

202.3.2 Placing

The aggregate base course material shall be placed at a uniform


mixture on a prepared subbase in a quantity, which will provide the
required compacted thickness. When more than one layer is required,
each layer shall be shape and compacted before the succeeding layer
is placed.

The placing of material shall begin at the point designated by the


Engineer. Placing shall be from vehicles especially equipped to
distribute the material in a continuous uniform layer or windrow. The
layer or windrow shall be of such size that when spread and
compacted, the finished layer shall be in reasonably close conformity
to the nominal thickness shown on the Plans.

When hauling is done over previously place material, hauling


equipment shall be dispersed uniformly over the entire surface of the
previously constructed layer, to minimize rutting or uneven
compaction.

202.3.3 Spreading and Compacting

When uniformly mixed, the mixture shall be spread to the plan


thickness, for compaction.

Where the required thickness is 150 mm or less, the material may be


spread and compacted in one layer. Where the required thickness is
more than 150 mm, the aggregate base course shall be spread and
compacted in two or more layers of approximately equal thickness,
and the maximum compacted thickness of any layer shall not exceed
150 mm. All subsequent layers shall be spread and compacted in a
similar manner.

Immediately following final spreading, each layer shall be compacted


to the full width by means of approved compaction equipment. Rolling
shall progress gradually from the side to the center, parallel to the
centerline of the road and shall continue until the whole surface has
been rolled. Any irregularities or depression that develop shall be
corrected by loosening the material at these places and adding or
removing material until surface is uniform.

If the layer of base course material, or part thereof, does not conform
to the required finish, the Contractor shall, at his own expense, make
the necessary corrections.

202.4 Method of Measurement

Crushed Aggregate Base Course will be measured by the cubic meter (m³).
The quantity to be paid for shall be the design volume compacted in-place as
shown on the Plans, and accepted in the completed course. No allowance shall
be given for materials placed outside the design limits shown on the cross-
sections. Trial sections shall not be measured separately but shall be included
in the quantity of crushed aggregate base course.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-8
SUBBASE AND BASE COURSE D

202.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 202.4, shall be


paid for at the contract unit price for Crushed Aggregate Base Course which
price and payment shall be full compensation for furnishing and placing all
materials, including all labor, equipment, tools and incidentals necessary to
complete the work prescribed in this Item.

Payment will be made under:

Pay Item Unit of


Description
Number Measurement

202 (1) Crushed Aggregate Base Course Cubic Meter

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page D-9
PART E

SURFACE COURSES
SURFACE COURSES E

PART E SURFACE COURSES

ITEM 301 BITUMINOUS PRIME COAT

301.1 Description

This Item shall consist of preparing and treating an aggregate base course with
material in accordance with the Plan and Specifications, preparatory to the
construction of a bituminous surface course.

301.2 Material Requirements

Bituminous material shall be either Rapid Curing (RC) or Medium Curing (MC)
Cut-back Asphalt, whichever is called for in the Bill of Quantities. It shall conform
to the requirements of Item 702, Bituminous Materials. The type and grade shall
be specified in the Special Provision.

301.3 Construction Requirements

301.3.1 Surface Condition

Prime coat shall be applied only to surfaces which are dry or slightly
moist. No prime coat shall be applied when the weather is foggy or rainy.

301.3.2 Equipment

The liquid bituminous material shall be sprayed by means of a pressure


distributor or not less than 1000 liters capacity, mounted on pneumatic
tires of such width and number that the load produced on the road
surface will not exceed 1 kN(100kgf) per cm width of tire.

The tank shall have a heating device able to heat a complete charge of
bituminous liquid to 180 ˚C. The heating device shall be such that
overheating will not occur. Consequently, the flames must not directly
touch the casing of the tank containing the bituminous liquid. The liquid
shall be insulated in such a way that the drop in temperature when the
tank is filled with bituminous liquid at 180 ˚C and not heated will be less
than 2 ˚C per hour. A thermometer shall be fixed to the tank in order to
be able to measure continuously the temperature of the liquid. The
thermometer shall be placed in such a way that the highest temperature
in tank is measured. The tank shall be furnished with a calibrated
dipstick to indicate the contents. The pipes for filling the tank shall be
furnished with an easily changeable filter.

The distributor shall be able to vary the spray width of the bituminous
liquid in maximum steps of 100 mm to a total width 0f 4 m. The spraying
bar shall have nozzles from which the liquid is sprayed fan-shaped on
the road surface equally distributed over the total spraying width.

For application of the liquid bituminous material, the distributor shall


have a pump either driven by a separate motor or with a device to
synchronize its speed with the speed of the distributor. The pump shall
be furnished with an indicator showing the rate of flow. The suction side
of the pump shall have an easily changeable filter. A thermometer shall

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-1
SURFACE COURSES E

be fixed, such that it indicates the temperature of the liquid immediately


before it leaves the spraying bar.

The distributor shall be furnished with a tachometer, indicating its


forward speed, which shall be visible from the driver’s seat. The
distributor shall be designed so that the deviation from the prescribed
rate of application does not exceed 10% and shall be equipped with a
device for hand spraying of the bituminous liquid.

301.3.3 Application of Bituminous Material

Immediately before applying the prime coat, the full width of surface to
be treated shall be ensured to be free from all dirt and other
objectionable materials. When required by the Engineer, immediately
prior to the application of the prime coat, the surface shall be slightly
sprayed with water but not saturated. Bituminous material shall be
applied by means of a pressure distributor at the temperature given in
Item 702, Bituminous Materials. The rate of application of the bituminous
material shall be within the range of 1 to 2 liters/m². The exact
application rate for the type of the bituminous material to be ordered by
the engineer shall be based on the quality of the materials and the field
condition.

The prime coat shall be left undisturbed for a period of at least 24 hours
or until such time that it has sufficiently cured as determined by the
Engineer, and shall not be opened to traffic so that it will not be picked
up by the wheels of passing vehicles. The Contractor shall maintain the
prime coat until the next course is applied. Care shall be taken that the
application of bituminous material is not in excess of the specified
amount. Any excess shall be blotted with sand or removed as directed
by the Engineer. All areas inaccessible to the distributor shall be sprayed
manually using the device for hand spraying. The surface of structures
and trees adjacent to the areas being treated shall be protected in such
a manner as to prevent their being spattered or marred.

301.4 Method of Measurement

Bituminous Prime Coat shall be measured by the area covered in square meter
(m²).

301.5 Basis of Payment

The accepted quantity, measured as prescribed in Section 301.4, shall be paid for
at the contract unit price for Bituminous Prime Coat which price and payment
shall be full compensation for furnishing and placing all materials, including all
labor, equipment, tools and incidentals necessary to complete this Item.
Payment will be made under:
Pay Item
Description Unit of Measurement
Number
Bituminous Prime Coat RC,
301 (2)a Square Meters
Cut-back Asphalt, Grade 70

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-2
SURFACE COURSES E

ITEM 310 BITUMINOUS CONCRETE SURFACE COURSE, HOT-LAID

310.1 Description

This Item shall consist of constructing a Bituminous Concrete Surface Course


composed of aggregates, mineral filler, and bituminous material mixed in a
central plant, constructed and laid hot on the prepared base in accordance with
this Specification and in conformity with lines, grades, thickness and typical cross-
section shown on the Plans.

310.2 Material Requirements

310.2.1 Composition and Quality of Bituminous Mixture


(Job-Mix Formula)

(Job-Mix Formula). The bituminous mixture shall be composed of


aggregate, mineral filler, hydrated lime, and bituminous material.

At least three weeks prior to production, the Contractor shall submit in


writing a job-mix formula for each mixture supported by laboratory test
data along with samples and sources of the components and viscosity-
temperature relationships information to the Engineer for testing and
approval.

Each job-mix formula submitted shall propose definite single values for:

1. The percentage of aggregate passing each specified sieve


size.
2. The percentage of bituminous material to be added.
3. The temperature of the mixture delivered on the road.
4. The kind and percentage of additive to be used.
5. The kind of mineral filler to be used.

After the job-mix is established, all mixture furnished for the project shall
conform thereto within the following ranges of tolerances:

Passing No. 4 and larger sieves ± 7 percent


Passing No. 8 to No. 100 sieves (inclusive) ± 4 percent
Passing No. 200 sieve ± 2 percent
Bituminous Material ± 0.4 percent
0
Temperature of Mixture ± 10 C

Should a change in source of material be proposed or should a job-mix


formula prove unsatisfactory, a new job-mix formula shall be submitted
by the Contractor in writing and be approved by the Engineer prior to
production.

Approval of a new job-mix formula may require laboratory testing and


verification.

The mixture shall have a minimum compressive strength of 1.4 MPa


(200 psi).

The mixture shall have a mass percent air voids with the range of 3 to 5.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-3
SURFACE COURSES E

The mixture shall also have an index of retained strength of not less
than 70 when tested by AASHTO T 165. For aggregates having
maximum sizes over 25 mm (1 inch), AASHTO T 165 will be modified to
use 150 mm x 150 mm ( 6 x 6 inches) cylindrical specimens. The 150
mm (6 inches cylinders will be compacted by the procedures outlined in
AASHTO T 167 modified to employ 10 repetitions of a molding load of
9.6 MPa (1400 psi), with no appreciable holding time after each
application of the full load.

310.2.2 Bituminous Material

The kind of bituminous material to be used shall be Penetration Grade


Asphalt Cement and shall it shall conform to the requirements of Item
702, Bituminous Materials. The grade of the bituminous material shall be
specified in the Special Provisions.

310.2.3 Aggregates

Aggregates shall conform to the requirements. Coarse and fine


aggregates shall be clean, hard, tough, sound particles free from
decomposed material, vegetable matter and other deleterious
substances.

Coarse aggregate shall consist of crushed rock or crushed river gravel.


At least 50 percent by weight of the coarse aggregate retained on the
4.75 m (No.4) sieve shall have at least one fractured face.

Fine aggregate, which is material passing a 4.75 (No.4) sieve, shall


consist of sand or stone screenings or a mixture thereof. At least 50
percent by weight of the fine aggregates shall be angular or fractured
particles.

The combined aggregate shall conform to Grading Class A as shown in


Table 310.1. When the combined grading of the coarse and fine
aggregate is deficient in material passing the No. 200 sieve, additional
filler material shall be added. However, the grading shall be adjusted to
take account of the results of the trials to allow the asphalt concrete mix
to conform in all respects to the requirements for the specified job-mix.

Table 310.1 Aggregate Grading for Asphalt Concrete


Mix Class Class A Class B Class C

Mix Use Wearing, Binder Wearing, Binder Wearing

Min. Compacted Thickness 50 mm 35 mm 25 mm

U.S. Standard Sieve Percent Passing by Weight

mm alternative
25 (1 in) 100
19 (3/4 in) 80 – 100 100
12.5 (1/2 in) - 80 – 100 100
9.5 (3/8 in) 60 – 80 70 – 90 80 – 100
4.75 (No. 4) 48 – 65 50 – 70 55 – 75
2.36 (No. 8) 35 – 50 35 – 50 35 – 50

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-4
SURFACE COURSES E

0.600 (No. 30) 19 – 30 18 – 29 18 – 29


0.300 (No. 50) 13 – 23 13 – 23 13 – 23
0.150 (No. 100) 7 – 15 8 – 16 8 – 16
0.075 (No. 200) 1–8 4 – 10 4 – 10

Table 310.2 Filler Grading for Asphalt Concrete


U. S. Standard Sieve
Percent Passing by Weight
mm Alternative
0.600 (No. 30) 100
0.300 (No. 50) 95 – 100
0.075 (No. 100) 70 – 100

The coarse and fine aggregates shall meet the following requirements:

a) The percentage of wear by the Los Angeles Abrasion Test


(AASHTO T96) shall not be more than 40.

b) The loss when subjected to five cycles of the Sodium Sulphate


Soundness Test (AASHTO T104) shall be less than 12%.

c) The Sand Equivalent (AASHTO T176) determined after all


processing except for addition of asphalt cement shall not be less
than 45.

d) All aggregates shall be non-plastic.

e) The flakiness index of the aggregate retained on the 9.5 mm (3/8 in)
sieve when tested in accordance with BS812 shall not exceed 35%.
(The flakiness index of an aggregate is the percentage by weight of
particles in it whose least dimension (thickness) is less than three-
fifths of their mean dimension. The test is not applicable to material
passing a 6.3 mm (1/4 in) sieve.

310.2.4 Mineral Filler

Filler material shall consist of finely divided rock dust, hydrated lime,
portland cement or other suitable mineral matter and shall conform to
the grading shown in Table 310.2.

310.2.5 Hydrated Lime

Material to be used shall conform to Item 701, Construction Lime


(Hydrated).

310.2.6 Proportioning of Mixtures

The proportion of bituminous material on the basis of total dry aggregate


shall be from 5.0 to 8.0 mass percent. The exact percentage to be used
shall be fixed by the Engineer in accordance with the job-mix formula
and the other quality control requirements.

During the mixing operation, one-half to one (0.5 to 1.0) mass percent of
hydrated lime, dry aggregate basis, shall be added to the mixture. The

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-5
SURFACE COURSES E

lower percentage limit is applicable to aggregates which are


predominantly calcareous.

The asphalt concrete mixture shall conform to requirements of Table


310.3. However, the exact composition of the mixture shall be adjusted
to take account of the results of the mix trials to allow the asphalt
concrete mix to conform in all respects to the requirements for asphalt
concrete.

Table 310.3 Asphalt Cement Content of Asphalt Concrete Mix

% Asphalt Cement of Total Mix by Weight

Binder Course Wearing Course

Minimum Maximum Minimum Maximum

4.0 5.5 5.0 7.0

Marshall Specimens are to be obtained from each of the binder and


wearing course materials supplied for trial laying purposes. The
Marshall specimens shall be formed and compacted in proper molds, in
accordance with the procedure described in ASTM D1599.

The Contractor shall demonstrate to the satisfaction of the Engineer, by


testing, carried out in the presence of the Engineer, in accordance with
the procedures set out in the Marshall Method of Mix Design in the
Asphalt Institute Manual, Mix Design Methods for Asphalt Concrete and
Other Hot Mix Types, Manual Series No. 2 (MS-2), that the requirements
given in Table 310.4 are achieved. The loss in Marshall Stability by
submerging specimens in water 600C for 24 hours shall not be more
than 25 percent of the stability of the job-mix. In addition, the Contractor
shall demonstrate by approved tests, to the satisfaction of the Engineer
that the proposed mix is not subject to stripping of the asphalt cement
from the aggregates.

Table 310.4 Marshall Test Requirement for Asphalt Concrete


Binder Course Wearing Course
Min. Max. Min. Max.
Stability (lbf) 1200 - 1200 -
Flow (0.01 in) 8 16 8 16
Air Voids (1%) 3 8 3 6
Aggregate Voids Filled with
60 75 70 80
Asphalt Cement (%)
Field Compacted Density
Marshall Specimen Density 97 - 97 -
(%)

To determine the Marshall Specimen Density, for each set of six


Marshall Specimens, the highest and lowest densities shall be ignored
and the Marshall Specimen Density shall then be the mean of the
densities of the remaining four specimens.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-6
SURFACE COURSES E

As compacted densities shall be determined of samples taken from the


materials laid and compacted for the mix trials as specified, at least four
samples shall be taken for each of the binder and wearing course
materials, under the direction of the Engineer and the required
percentage of the Marshall Specimen Density shall be achieved in each
case. Testing shall be in accordance with ASTM D1188 or ASTM D2726.

When the Engineer is satisfied that the materials and methods


demonstrated by the Contractor during the trial laying comply with the
requirements of the Contract, the Engineer shall determine the job-mix
and shall inform the Contractor in writing of its composition. On receipt
of such information, the Contractor may proceed with the work.

310.3 Construction Requirements

310.3.1 Spreading and Finishing

The mixture shall be spread and stuck off to the grade and elevation
established. Bituminous pavers shall be used to distribute the mixture
either over the entire width or over such partial width as may be
practicable and approved by the Engineer.

Asphalt pavers (asphalt finisher) shall be equipped with automatic


systems of control and screed for both longitudinal grade and cross-
slope. The automatic system may be purchased in kit form and locally
installed or be a factory-installed item. The control system may be a
pneumatic-hydraulic or electric-hydraulic type actuated by slope sensors
and a 9-meter grade reference.

310.3.2 Surface Tolerances

The allowable tolerances for the flexible surfacing and cement concrete
pavement are given in Table 310.5.

Table 310.5 Tolerances for Flexible Surfacing and Cement Concrete Pavement
ASPHALT
CONCRETE CEMENT BITUMINOUS
GRAVEL
SURFACING CONCRETE SURFACE
SURFACING
(Binding & PAVEMENT TREATMENT
Wearing Courses)
Permitted variation
from design -
THICKNESS OF
LAYER mm +5 +5 -5 -5
Permitted variation
from design
LEVEL OF
SURFACE mm +5 +5 -5 -5
Permitted SURFACE
IRREGULARITY
Measured by 3m
Straight-edge mm 5 5 5 5
PERMITTED
Permitted variation
from design
CROSSFALL OR % +0.2 +0.2 +0.2 +0.2

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-7
SURFACE COURSES E

CAMBER

310.4 Method of Measurement


2
The area to be paid for under this Item shall be the number of square meters (m )
of asphalt pavement placed, compacted and accepted based on the thickness
and density of the cores taken in accordance with Subsection 307.3.10
(Acceptance, Sampling and Testing).

Item 307- Bituminous Plant-Mix Surface Course-General


Subsection 307.3.10 - Acceptance, Sampling and Testing

The contractor shall cut full depth samples as directed, from the finished
pavement, for testing. Samples shall be neatly cut by saw or core drill. Each
sample shall be at least 150 mm x 150 mm or 100 mm diameter full depth.
At least one, but not more than three samples shall be taken for each full
day’s operation. If no core samples were taken during the day’s operation,
core samples shall be taken from the completed pavement for every 100
L.M. per lane. The contractor shall supply and furnish new material to
backfill boreholes left by the samples taken.

No acceptance and final payment shall be made on completed asphalt


pavement unless core test for thickness determination is conducted, except
for Barangay Roads where the implementing office is allowed to waive such
test.

The samples obtained will be used to measure the thickness of the


pavement. The same samples will be used to test the density of the
compacted pavement by AASHTO T 166.

The compacted pavement shall have a density equal to, or greater than 97
mass percent of the density of a laboratory specimen. The asphalt
pavement represented by the cores shall not be accepted if the deficiency in
density is more than 2%.

The compacted pavement shall have a thickness tolerances of -5 mm.


Thickness in excess of the specified thickness shall not be considered in the
payment of asphalt pavement. The asphalt pavement represented by the
individual core shall not be accepted if the deficiency in the core thickness
as obtained in accordance with ASTM D 3549 is more than 5 mm.
Averaging of the density and thickness of asphalt cores is not permitted.

If the deficiency in the core thickness is more than 5 mm, additional layer
may be permitted in order to meet the designed thickness, however, the
minimum additional asphalt overlay thickness should be dependent on the
minimum thickness capacity of asphalt paver but it should not be less than
50 mm (2 inches) and that proper construction procedures are followed.

310.5 Basis of Payment

The accepted quantity, measured as prescribed in section 310.4, shall be paid for
at the contract unit price for Bituminous Concrete Surface Course, Hot-Laid,
which price and payment shall be full compensation for furnishing all materials,

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-8
SURFACE COURSES E

handling, mixing, hauling, placing, rolling, compacting, labor, equipment, tools and
incidentals necessary to complete this Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

Bituminous Concrete Surface Course


310 (1)a3 Square Meter
(Wearing), Hot-Laid, 30mm thick

ITEM 311 PORTLAND CEMENT CONCRETE PAVEMENT

311.1 Description

This Item shall consist of pavement of Portland Cement Concrete, with or without
reinforcement, constructed on the prepared base in accordance with this
Specification and in conformity with lines, grades, thickness and typical cross-
section shown on the Plans.

311.2 Material Requirements

311.2.1 Portland Cement

It shall conform to the applicable requirements of Item 700, Hydraulic


Cement. Only Type I Portland Cement shall be used unless otherwise
provided for in the Special Provisions. Different brands or the same
brands from different mills shall not be mixed nor be mixed nor shall they
be used alternately unless the mix is approved by the Engineer.
However, the use of Portland Pozzolan Cement Type IP meeting the
requirements of AASHTO M 240/ASTM C 595, Specifications for
Blended Hydraulic Cement shall be allowed, provided that trial mixes
shall be done and that the mixes meet the concrete strength
requirements, the AASHTO/ASTM provisions pertinent to the use of
Portland Pozzolan Cement Type IP shall be adopted.

Cement which for any reason, has become partially set or which
contains lumps of caked cement shall be rejected. Cement salvaged
from discarded or used bags shall not be used.

Sample of Cement shall be obtained in accordance with AASHTO T 127.

311.2.2 Fine Aggregate

It shall consist of natural sand, stone screenings or other inert materials


with similar characteristics, or combinations thereof, having hard, strong
and durable particles. Fine aggregate from different sources of supply
shall not be mixed or stored in the same pile nor used alternately in the
same class of concrete without the approval of the Engineer.

It shall not contain more than three (3) mass percent of material passing
the 0.075 mm (No. 200 sieve) by washing nor more than one (1) mass
percent each of clay lumps or shale. The use of beach sand will not be
allowed without the approval of the Engineer.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-9
SURFACE COURSES E

If the fine aggregate is subjected to five (5) cycles of the sodium sulfate
soundness test, the weighted loss shall not exceed 10 mass percent.

The fine aggregate shall be free from injurious amounts of organic


impurities. If subjected to the colorimatic test for organic impurities and a
color darker than the standard is produced, it shall be rejected. However,
when tested for the effect of organic impurities on strength of mortar by
AASHTO T 71, the fine aggregate may be used if the relative strength at
7 and 28 days is not less than 95 percent.

The fine aggregate shall be well-graded from coarse to fine and shall
conform to Table 311.1

Table 311.1 – Grading Requirement for Fine Aggregate


Sieve Designation Mass Percent Passing

9.5 mm (3/8 in) 100


4.75 mm (No. 4) 95 – 100
2.36 mm (No. 8) -
1.18 mm (No. 16) 45 – 80
0.600 mm (No. 30) -
0.300 mm (No. 50) 5 – 30
0.150 mm (No. 100) 0 – 10

311.2.3 Coarse Aggregate

It shall consist of crushed stone, gravel, blast furnace slag, or other


approved inert materials (coralline or dolomites) of similar characteristics,
or combinations thereof, having hard, strong, durable pieces and free
from any adherent coatings.

It shall consist of crushed stone, gravel, blast furnace slag, or other


approved inert materials of similar characteristics, or combinations
thereof, having hard, strong, durable pieces and free from any adherent
coatings.

It shall contain not more than one (1) mass percent of material passing
the 0.075 mm (No. 200) sieve, not more than 0.25 mass percent of clay
lumps, nor more than 3.5 mass percent of soft fragments.

If the coarse aggregate is subjected to five (5) cycles of the sodium


sulfate soundness test, the weighted loss shall not exceed 12 mass
percent.

It shall have a mass percent of wear not exceeding 40 when tested by


AASHTO T 96.

If the slag is used, its density shall not be less than 1120 kg/m³. The
gradation of the coarse aggregate shall conform to Table 311.2.

Only one grading specification shall be used from any one source.

Table 311.2 – Grading Requirement for Coarse Aggregate

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-10
SURFACE COURSES E

Sieve Designation Mass Percent Passing


Standard Alternate U.S.
Grading A Grading B Grading C
mm Standard
75.00 3 in. 100 - -
63.00 2-1/2 in. 90-100 100 100
50.00 2 in. - 90-100 95-100
37.5 1-1/2 in. 25 - 60 35-70 -
25.0 1 in. - 0-15 35-70
19.0 ¾ in. 0-10 - -
12.5 ½ in. 0-5 0-5 10-30
4.75 No. 4 - - 0- 5

311.2.4 Water

Water used in mixing, curing or other designated application shall be


reasonably clean and free of oil, salt, acid, alkali, grass or other
substances injurious to the finished product. Water will be tested in
accordance with and shall meet the requirements of Item 714, Water.
Water which is drinkable may be used without test. Where the source of
water is shallow, the intake shall be so enclosed as to exclude silt, mud,
grass or other foreign materials.

311.2.5 Reinforcing Steel

It shall conform to the requirements of Item 404 Reinforcing Steel.


Dowels and tie bars shall conform to the requirements of AASHTO M
31 or M 42, except that rail steel shall not be used for tie bars that are
to be bent and restraightened during construction. Tie bars shall be
deformed bars. Dowels shall be plain round bars. Before delivery to
the site of work, one-half of the length of each dowel shall be painted
with one coat of approval lead or tar paint.

The sleeves for dowel bars shall be metal of approved design to


cover 50 mm, plus or minus 5 mm of the dowel, with a closed end,
and with a suitable stop to hold the end of the sleeve at least 25 mm
from the end of the dowel. Sleeves shall be of such design that they
do not collapse during construction.

311.2.6 Wire Mesh

The diameter of wire for lateral and longitudinal directions shall not be
less than 6 mm in diameter. Tie wire shall be No. 16 gauged annealed
wire.

[Link] Fabrication of Wire Mesh

The spacing on the lateral direction is twice wider than that


of the longitudinal direction. The weight of wire mesh shall
not be less than 3 kg/m². It shall be fabricated by welding
or binding at each crossing point and shall meet the
requirements of ASTM A 185.

[Link] Installation of Wire Mesh

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-11
SURFACE COURSES E

After placement of slip bar placed at every 9.0 m maximum


interval for weakened plane joint, wire mesh shall be
placed at a depth of 5.0 cm to 7.5 cm below the surface of
the slab or at 2/3 of thickness from the bottom of the
pavement. It shall be supported by any approved support
assemblies or spacers against displacement and shall be
tied to it using tie wires. The sheets of the welded wire
mesh shall be flat, and proper care shall be observed in
handling and placing it to ensure its installation in the
proper position.

Welded wire meshes that have become bent or kinked shall


be rejected.

311.2.7 Joint Fillers

Poured joint fillers shall be mixed asphalt and mineral or rubber filler
conforming to the applicable requirements of Item 705, Joint Materials.
It shall also conform to the requirements of AASHTO M173.

As per Item 705.1 Joint Fillers;

Preformed fillers for joints shall conform to the requirements of


AASHTO M 33 (ASTM D 994), AASHTO M 153, AASHTO M 213,
AASHTO M 220, as specified, and shall be punched to admit the
dowels where called for on the Plans. The filler for each joint shall be
furnished in a single piece for the depth and width required for the joint
unless otherwise authorized by the Engineer. When the use of more
than one piece is authorized for a joint, the abutting ends shall be
fastened securely and held accurately to shape, by stapling or other
positive fastening satisfactory to the Engineer.

311.2.8 Admixtures

Air-entraining admixture shall conform to the requirements of AASHTO


M 154.

Chemical admixtures, if specified or permitted, shall conform to the


requirements of AASHTO M 194.

Fly Ash, if specified or permitted as a mineral admixture and not


exceeding 20% partial replacement of Portland Cement in concrete
mix shall conform to the requirements of ASTM C 618.

Admixture/s maybe added to the concrete mix to produce some


desired modifications to the properties of concrete if necessary, but

not as partial replacement of cement. If specified, monofilament


polypropylene synthetic fibrin fibers, which are used as admixture to
prevent the formation of temperature/shrinkage cracks and increase
impact resistance of concrete slabs shall be applied in the dosage rate
recommended by its manufacturer.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-12
SURFACE COURSES E

311.2.9 Curing Materials

Curing materials shall conform to the following requirements as


specified;

a) Burlap cloth - AASHTO M 182


b) Liquid membrane forming compounds - AASHTO M 148
c) Sheeting (film) Materials - AASHTO M 171

Cotton mats and water-proof paper can be used.

311.2.10 Calcium Chloride/Calcium Nitrate

It shall conform to AASHTO M 144, if specified or permitted by the


Engineer, as accelerator.

311.2.11 Storage of Cement and Aggregate

All cement shall be stored, immediately upon delivery at the Site, in


weatherproof building which will protect the cement from dampness.
The floor shall be raised from the ground. The building shall be placed
in locations approved by the Engineer. Provisions for storage shall be
ample, and the shipments of cement as received shall be separately
stored in such a manner as to allow the earliest deliveries to be used
first and to provide easy access for identification and inspection of
each shipment. Storage buildings shall have capacity for storage of a
sufficient quantity of cement to allow sampling at least twelve (12)
days before the cement is to be used. Bulk cement, if used, shall be
transferred to elevated air tight and weatherproof bins. Stored cement
shall meet the test requirements at any time after storage when retest
is ordered by the Engineer. At the time of use, all cement shall be free-
flowing and free of lumps.

The handling and storing of concrete aggregates shall be such as to


prevent segregation or the inclusion of foreign materials. The Engineer
may require that aggregates be stored on separate platforms at
satisfactory location.

In order to secure greater uniformity of concrete mix, the Engineer


may require that the coarse aggregate be separated into two or more
sizes. Different sizes of aggregate shall be stored in separate bins or
in separate stockpiles sufficiently removed from each other to prevent
the material at the edges of the piles from becoming intermixed.

311.2.12 Proportioning, Consistency and Strength of Concrete

The Contractor shall prepare the design mix based on the absolute
volume method as outlined in the American Concrete Institute (ACI)
Standard 211.1, “Recommended Practice for Selecting Proportions for
Normal and Heavyweight Concrete”.

It is the intent of this Specification to require at least 364 kg of cement


per cubic meter of concrete to meet the minimum strength
requirements. The Engineer shall determine from laboratory tests of
the materials to be used, the cement content and the proportions of

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-13
SURFACE COURSES E

aggregate and water that will produce workable concrete having a


slump of between 40 and 75 mm (1-1/2 and 3 inches) if not vibrated or
between 10 and 40 mm (1/2 and 1-1/2 inches) if vibrated, and a
flexural strength of not less than 3.8 MPa (550 psi) when tested by the
third-point method or 4.5 MPa (650 psi) when tested by the mid-point
method at fourteen (14) days in accordance with AASHTO T97 and
T177, respectively; or a compressive strength of 24.1 MPa (3500 psi)
for cores taken at fourteen (14) days and tested in accordance with
AASHTO T24.

Slump shall be determined using AASHTO T 119.

The designer shall consider the use of lean concrete (econocrete)


mixtures using local materials or specifically modified conventional
concrete mixes in base course and in the lower course composite,
monolithic concrete pavements using a minimum of 75 mm (3 inches)
of conventional concrete as the surface course.

The mix design shall be submitted to the Engineer for approval and
shall be accompanied with certified test data from an approved
laboratory demonstrating the adequacy of the mix design. A change
in the source of materials during the progress of work may necessitate
a new design mix.

Job mix adjustment of water content shall be allowed only on


permission of the Engineer, provided that cement is also added to
keep the original water-cement ratio of the design mix.

311.3 Construction Requirements

311.3.1 Quality Control of Concrete

The Contractor shall be responsible for the quality control of all


materials during the handling, blending, and mixing and placement
operations.

The Contractor shall furnish the Engineer a Quality Control Plan


detailing his production control procedures and the type and frequency
of sampling and testing to insure that the concrete produces complies
with the Specifications. The Engineer shall be provided free access to
recent plant production records, and if requested, informational copies
of mix design, materials certifications and sampling and testing reports.
Experienced and qualified personnel shall perform all batching or
mixing operation for the concrete mix, and shall be present at the plant
and job site to control the concrete productions whenever the plant is
in operation.

311.3.2 Equipment

Equipment and tools necessary for handling materials and performing


all parts of the works shall be approved by the Engineer as to design,
capacity and mechanical condition. The equipment shall be at the
jobsite sufficiently ahead of the start of construction operations to be
examined thoroughly and approved. In case of breakdown of such
equipment in the process of paving activity, a standby substitute of the

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-14
SURFACE COURSES E

same or equivalent must be available on site as not to hinder the


progress of the work and to minimize waste of concrete batches.

The following equipment must be at the jobsite;

1.) Batching Plant and Equipment

a) The batching shall include bins, weighing hoppers,


and scales for the fine aggregate and for each size of
coarse aggregate. If cement is used in bulk, a bin,
hopper and separate scale for cement shall be
included. The weighing hopper shall be properly
sealed and vented to preclude dusting operation. The
batch plant shall be equipped with a suitable non-
resettable batch counter which will correctly indicate
the number of batches proportioned.

b) Bins and Hoppers. Bins with adequate separate


compartments for fine aggregate and for each size of
course aggregate shall be provided in the batching
plant.

c) Scales. Scales for weighing aggregates and cement


shall be either the beam type or the springless-dial
type. They shall be accurate within one-half percent
(0.5%) throughout the range of use. Poises shall be
designed to be locked in any position and to prevent
unauthorized change. These scales shall be inspected
and sealed as often as the Engineer may deem
necessary to assure their continued accuracy.

d) Automatic Weighing Devices. Unless otherwise


allowed on the Contract, batching plants shall be
equipped with automatic weighing devices of an
approved type to proportion aggregates and bulk
cement.

2.) Mixers

a) General. Concrete may be mixed at the site of


construction or at the central plant, or wholly or in part
in truck mixers. Each mixers shall have a
manufacturer’s plate attached in a prominent place
showing the capacity of the drum in terms of volume
of mixed concrete and the speed of rotation of the
mixing drum or blades.

b) Mixers at Site of Construction. Mixing shall be done in


an approved mixer capable of combining the
aggregates, cement and water into thoroughly mixed
and uniform masses within the specified mixing period
and discharging and distributing the mixture without
segregation on the prepared grade. The mixer shall
be equipped with an approved timing device which will
automatically lock the discharge lever when the drum

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-15
SURFACE COURSES E

has been charged and released it at the end of the


mixing period. In case of failure of timing device, the
mixer may be used for the balance of the day while it
is being repaired, provided that each batch is mixed
90 seconds. The mixer shall b equipped with a
suitable non-resettable batch counter which shall
correctly indicate the number of the batches mixed.

c) Truck Mixers and Truck Agitators. Truck mixers used


for mixing and hauling concrete, and truck agitators
used for hauling central-mixed concrete, shall conform
to the requirements of AASHTO M157.

d) Non-Agitator Truck. Bodies of non-agitating hauling


equipment for concrete shall be smooth, mortar-tight
metal containers and shall be capable of discharging
the concrete at a satisfactory controlled rate without
segregation.

3.) Paving and Finishing Equipment

The concrete shall be placed with an approved paver


designed to spread, consolidate, screed and float finish
the freshly placed concrete in one complete pass of the
machine in such a manner that the minimum of hand
finishing will be necessary to provide a dense and
homogenous pavement in conformance with the Plans
and Specifications.

The finishing machine shall be equipped with at least two


(2) oscillating type transverse screed.
Vibrators shall operate at a frequency of 8,300 tom 9,000
impulses per minute under load at maximum spacing of
60 cm.

4.) Concrete Saw

The Contractor shall provide sawing equipment in


adequate number of units and power to complete the
sawing with a water-cooled diamond edge saw blade or
an abrasive wheel to the required dimensions and at the
required rate. The Contractor shall provide at least one
(1) standby saw in good working condition and with an
ample supply of saw blades.

5.) Forms

Forms shall be steel, of an approved section, and of


depth equal to the thickness of the pavement at the edge.
The base of the forms shall be of sufficient width to
provide necessary stability in all directions. The flange
braces must extend outward on the base to not less than
2/3 the height of the form.
All forms shall be rigidly supported on the bed of
thoroughly compacted material during the entire operation

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-16
SURFACE COURSES E

of placing and finishing the concrete. Forms shall be


provided with adequate devices for secure setting so that
when in place, they will withstand, without visible spring or
settlement, the impact and vibration of the consolidation
and finishing or paving equipment.

311.3.3 Preparation of Grade

After the subgrade or base has been placed and compacted to the
required density, the areas which will support the paving machine and
the grade on which the pavement is to be constructed shall be trimmed
to the proper elevation by means of a properly designed machine
extending the prepared work areas compacted at least 60 cm beyond
each edge of the proposed concrete pavement. If loss of density results
from the trimming operations, it shall be restored by additional
compaction before concrete is placed. If any traffic is allowed to use the
prepared subgrade or base, the surface shall be checked and corrected
immediately ahead of the placing of concrete.

The subgrade or base shall be uniformly moist when the concrete is


placed.

311.3.4 Setting Forms

The foundation under the forms shall be hard and true to grade so that
the form when set will be firmly in contract for its whole length and at the
specified grade. Any roadbed, which at the form line is found below
established grade, shall be filled with approved granular materials to
grade in lifts of three (3) cm variations above grade shall be corrected by
tamping or by cutting as necessary.

Forms shall be set sufficiently in advance of the point where concrete is


being placed. After the forms have been set to correct grade, the grade
shall be thoroughly tamped, mechanically or by hand, at both the inside
and outside edges of the base of the forms. The forms shall not deviate
from true line by more than one (1) cm at any point.

The alignment and grade elevations of the forms shall be checked and
corrections made by the Contractor immediately before placing the
concrete. Testing as to crown and elevation, prior to placing of concrete
can be made by means of holding an approved template in a vertical
position and moved backward and forward on the forms.

When any form has been disturbed or any grade has become unstable,
the form shall be reset and rechecked.

311.3.5 Conditioning of Subgrade or Base Course

When side forms have been securely set to grade, the subgrade or base
course shall be brought to proper cross-section. High areas shall be
trimmed to proper elevation. Low areas shall be filled and compacted to
a condition similar to that of surrounding grade. The finished grade shall
be maintained in a smooth and compacted condition until the pavement
is placed.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-17
SURFACE COURSES E

Unless waterproof subgrade or base course cover material is specified,


the subgrade or base course shall be uniformly moist when the concrete
is placed. If it subsequently becomes too dry, the subgrade or base
course shall be sprinkled, but the method of sprinkling shall not be such
as to form mud or pools of water.

311.3.6 Handling, Measuring and Batching Materials

The batch plant site, layout, equipment and provisions for transporting
material shall be such as to assure a continuous supply of material to
the work.

Stockpiles shall be built up in layers of not more than one (1) meter in
thickness. Each layer shall be completely in place before beginning the
next which shall not be allowed to “cone” down over the next lower layer.
Aggregates from different sources and of different grading shall not be
stockpiled together.

All washed aggregates and aggregates produced or handled by


hydraulic methods, shall be stockpiled or binned for draining at least
twelve (12) hours before being batched.

When mixing is done at the side of the work. aggregates shall be


transported from the batching plant to the mixer in batch boxes, vehicle
bodies, or other containers of adequate capacity and construction to
properly carry the volume required. Partitions separating batches shall
be adequate and effective to prevent spilling from one compartment to
another while in transit or being dumped. When bulk cement is used, the
Contractor shall use a suitable method of handling the cement from
weighing hopper to transporting container or into the batch itself for
transportation to the mixer, with chute, boot or other approved device, to
prevent loss of cement, and to provide positive assurance of the actual
presence in each batch of the entire cement content specified.

Bulk cement shall be transported to the mixer in tight compartments


carrying the full amount of cement required for the batch. However, if
allowed in the Special Provisions, it may be transported between the fine
and coarse aggregate. When cement is placed in contact with the
aggregates, batches may be rejected unless mixed within 1-1/2 hours of
such contact. Cement in original shipping packages may be transported
on top of the aggregates, each batch containing the number of sacks
required by the job mix.

The mixer shall be charged without loss of cement. Batching shall be so


conducted as to result in the weight to each material required within a
tolerance of one (1) percent for the cement and two (2) percent for
aggregates.

Water may be measured either by volume or by weight. The accuracy of


measuring the water shall be within a range of error of not over than one
(1) percent. Unless the water is to be weighed, the water-measuring
equipment shall include an auxiliary tank from which the measuring tank
shall be equipped with an outside tap and valve to provide checking the
setting, unless other means are provided for readily and accurately

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-18
SURFACE COURSES E

determining the amount of water in the tank. The volume of the auxiliary
tank shall be at least equal to that of the measuring tank.

311.3.7 Mixing Concrete

The concrete may be mixed at the site of the work in a central-mix plant,
or in truck mixers. The mixer shall be of an approved type and capacity.
Mixing time will be measured from the time all materials, except water,
are in the drum. Ready-mixed concrete shall be mixed and delivered in
accordance with requirements of AASHTO M 157, except that the
minimum required revolutions at the mixing speed for transit-mixed
concrete may be reduced to not less than that recommended by the
mixer manufacturer. The number of revolutions recommended by the
mixer manufacturer shall be indicated on the manufacturer’s serial plate
attached to the mixer.

The Contractor shall furnish test data acceptable to the Engineer


verifying that the make and model of the mixer will produce uniform
concrete conforming to the provision of AASHTO M 157 at the reduced
number of revolutions shown on the serial plate.

When mixed at the site or in a central mixing plant, the mixing time shall
not be less than fifty (50) seconds nor more than ninety (90) seconds,
unless mixer performance tests prove adequate mixing of the concrete
in a shorter time period.

Four (4) seconds shall be added to the specified mixing time if timing
starts at the instant the skip reaches its maximum raised positions.
Mixing time ends when the discharge chute opens. Transfer time in
multiple drum mixers is included in mixing time. The contents of an
individual mixer drum shall be removed before a succeeding batch is
emptied therein.

The mixer shall be operated at the drum speed as shown on the


manufacturer’s name plate attached on the mixer. Any concrete mixed
less than the specified time shall be discarded and disposed off by the
Contractor at his expense. The volume of concrete mixed per batch shall
not exceed the mixer’s nominal capacity in cubic meter, as shown on the
manufacturer’s standard rating plate on the mixer, except that an
overload up to ten (10) percent above the mixer’s nominal capacity may
be permitted provided concrete test data for strength, segregation, and
uniform consistency are satisfactory, and provided no spillage of
concrete takes place.

The batches shall be so charged into the drum that a portion of the
mixing water shall be entered in advance of the cement and aggregates.
The flow of water shall be uniform and all water shall be in the drum by
the end of the first fifteen (15) seconds of the mixing period. The throat
of the drum shall be kept free of such accumulations as may restrict the
free flow of materials into the drum.

Mixed concrete from the central mixing plant shall be transported in truck
mixers, truck agitators or non-agitating truck specified in Subsection
311.3.2, Equipment. The time elapsed from the time water is added to
the mix until the concrete is deposited in place at the Site shall not

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-19
SURFACE COURSES E

exceed forty five (45) minutes when the concrete is hauled in non-
agitating trucks, nor ninety (90) minutes when hauled in truck mixers or
truck agitators, except that in hot weather or under other conditions
contributing to quick hardening of the concrete, the maximum allowable
time may be reduced by the Engineer.

Re-tempering concrete by adding water or by other means shall not be


permitted, except that when concrete is delivered in truck mixers,
additional water may be added to the batch materials and additional
mixing performed to increase the slump to meet the specified
requirements, if permitted by the Engineer, provided all these operations
are performed within forty-five (45) minutes after the initial mixing
operation and the water-cement ratio is not exceeded. Concrete that is
not within the specified slump limits at the time of placement shall not be
used.

Admixtures for increasing the workability or for accelerating the setting


of the concrete will be permitted only when specifically approved by the
Engineer.

311.3.8 Limitation of Mixing

No concrete shall be mixed, placed or finished when natural light is


insufficient, unless an adequate and approved artificial lighting system is
operated.

During hot weather, the Engineer shall require that steps be taken to
prevent the temperature of mixed concrete from exceeding a maximum
temperature of 900F ( 320C)

Concrete not in place within ninety (90) minutes from the time the
ingredients were charged into the mixing drum or that has developed
initial set shall not be used. Re-tempering of concrete or mortar which
has partially hardened, that is remixing with or without additional cement,
aggregate, or water, shall not be permitted.

In order that the concrete may be properly protected against the effects
of rain before the concrete is sufficiently hardened, the Contractor will be
required to have available at all times materials for the protection of the
edges and surface of the unhardened concrete.

311.3.9 Placing Concrete

Concrete shall be deposited in such a manner to require minimal


rehandling. Unless truck mixers or non-agitating hauling equipment are
equipped with means to discharge concrete without segregation of the
materials, the concrete shall be unloaded into an approved spreading
device and mechanically spread on the grade in such a manner as to
prevent segregation. Placing shall be continuous between transverse
joints without the use of intermediate bulkheads. Necessary hand
spreading shall be done with shovels, not rakes. Workmen shall not be
allowed to walk in the freshly mixed concrete with boots or shoed coated
with earth or foreign substances.
When concrete is to be placed adjoining a previously constructed lane
and mechanical equipment will be operated upon the existing lane, that

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-20
SURFACE COURSES E

previously constructed lane shall have attained the strength for fourteen
(14) day concrete. If only finishing equipment is carried on the existing
lane, paving in adjoining lanes may be permitted after three (3) days.

Concrete shall be thoroughly consolidated against and along the faces


of all forms and along the full length and on both sides of all joint
assemblies, by means of vibrators inserted in the concrete. Vibrators
shall not be permitted to come in contact with a joint assembly, the
grade, or a side form. In no case shall the vibrator be operated longer
than fifteen (15) seconds in any one location.

Concrete shall be deposited as near as possible to the expansion and


contraction joints without disturbing them, but shall not be dumped from
the discharge bucket or hopper into a joint assembly unless the hopper
is well centered on the joint assembly. Should any concrete material fall
on or be worked into the surface of a complete slab, it shall be removed
immediately.

311.3.10 Test Specimens

As the work progresses, at least one (1) set consisting of three (3)
concrete beam test specimens, 150 mm x 150 mm x 525 mm or 900
mm shall be taken from each 330 m2 of pavement, 230 mm depth, or
fraction thereof placed each day.

Test specimens shall be made under the supervision of the Engineer,


and the Contractor shall provide all concrete and other facilities
necessary in making the test specimens and shall protect them from
damage by construction operations. Cylinder samples shall not be used
as substitute for determining the adequacy of the strength of concrete.

The beams shall be made, cured, and tested in accordance with


AASHTO T 23 and T 97.

311.3.11 Strike-off of Concrete and Placement of Reinforcement

Following the placing of the concrete, it shall be struck off to conform to


the cross-section shown on the Plans and to an elevation such that
when the concrete is properly consolidated and finished, the surface of
the pavement will be at the elevation shown on the Plans. When
reinforced concrete pavement is placed in two (2) layers, the bottom
layer shall be struck off and consolidated to such length and depth that
the sheet of fabric or bar mat may be laid full length on the concrete in
its final position without further manipulation. The reinforcement shall
then be placed directly upon the concrete, after which the top layer of
the concrete shall be placed, struck off and screeded. Any portion of the
bottom layer of concrete which has been placed more then 30 minutes
without being covered with the top layer shall be removed and replaced
with freshly mixed concrete at the Contractor’s expense. When
reinforced concrete is placed in one layer, the reinforcement may be
firmly positioned in advance of concrete placement or it may be placed
at the depth shown on the Plans in plastic concrete, after spreading by
mechanical or vibratory means.
Reinforcing steel shall be free from dirt, oil, paint, grease, mill scale and
loose or thick rust which could impair bond of

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-21
SURFACE COURSES E

311.3.12 Joints

Joints shall be constructed of the type and dimensions, and at the


locations required by the Plans or Special Provisions. All joints shall be
protected from the intrusion of injurious foreign material until sealed.

1. Longitudinal Joint

Deformed steel tie bars of specified length, size, spacing and


materials shall be placed perpendicular to the longitudinal joints,
they shall be placed by approved mechanical equipment or rigidly
secured by chair or other approved supports to prevent
displacement. Tie bars shall not be painted or coated with asphalt or
other materials or enclosed in tubes or sleeves. When shown on
the Plans and when adjacent lanes of pavement are constructed
separately, steel side forms shall be used which will form a keyway
along the construction joint. Tie bars, except those made of rail steel,
may be bent at right angles against the form of the first lane
constructed and straightened into final position before the concrete
of the adjacent lane is placed, or in lieu of bent tie bars, approved
two-piece connectors may be used.

Longitudinal formed joints shall consist of a groove or cleft,


extending downward from and normal to, the surface of the
pavement. These joints shall be effected or formed by an approved
mechanically or manually operated device to the dimensions and line
indicated on the Plans and while the concrete is in a plastic state.
The groove or cleft shall be filled with either a premolded strip or
poured material as required.

The longitudinal joints shall be continuous, there shall be no gaps in


either transverse or longitudinal joints at the intersection of the joints.

Longitudinal sawed joints shall be cut by means of approved


concrete saws to the depth, width and line shown on the Plans.
Suitable guide lines or devices shall be used to assure cutting the
longitudinal joint on the true line. The longitudinal joint shall be
sawed before the end of the curing period or shortly thereafter and
before any equipment or vehicles are allowed on the pavement. The
sawed area shall be thoroughly cleaned and, if required, the joint
shall immediately be filled with sealer.

Longitudinal pavement insert type joints shall be formed by placing a


continuous strip of plastic materials which will not react adversely
with the chemical constituent of the concrete.

2. Transverse Expansion Joint

The expansion joint filler shall be continuous from form to form,


shaped to subgrade and to the keyway along the form. Preformed
joint filler shall be furnished in lengths equal to the pavement width
or equal to the width of one lane. Damaged or repaired joint filler
shall not be used.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-22
SURFACE COURSES E

The expansion joint filler shall be held in a vertical position. An


approved installing bar, or other device, shall be used if required to
secure preformed expansion joint filler at the proper grade and
alignment during placing and finishing of the concrete. Finished
joint shall not deviate more than 6 mm from a straight line. If joint
filers are assembled in sections, there shall be no offsets between
adjacent units. No plugs of concrete shall be permitted anywhere
within the expansion space.

3. Transverse Contraction Joint/Weakened Joint

When shown on the Plans, it shall consist of planes of weakness


created by forming or cutting grooves in the surface of the pavement
and shall include load transfer assemblies. The depth of the
weakened plane joint should at all times not be less than 50 mm,
while the width should not be more than 6 mm.

a. Transverse Strip Contraction Joint. It shall be formed by


installing a parting strip to be left in place as shown on the
Plans.

b. Formed Groove. It shall be made by depressing an approved


tool or device into the plastic concrete. The tool or device
shall remain in place at least until the concrete has attained its
initial set and shall then be removed without disturbing the
adjacent concrete, unless the device is designed to remain in
the joint.

c. Sawed Contraction Joint. It shall be created by sawing


grooves in the surface of the pavement of the width not more
than 6 mm, depth should at all times not be less than 50 mm,
and at the spacing and lines shown on the Plans, with an
approved concrete saw. After each joint is sawed, it shall be
thoroughly cleaned including the adjacent concrete surface.

Sawing of the joint shall commence as soon as the concrete has


hardened sufficiently to permit sawing without excessive ravelling,
usually 4 to 24 hours. All joints shall be sawed before uncontrolled
shrinkage cracking takes place. If necessary, the sawing operations
shall be carried on during the day or night, regardless of weather
conditions.

The sawing of any joint shall be omitted if crack occurs at or near the
joint location prior to the time of sawing. Sawing shall be discounted
when a crack develops ahead of the saw. In general, all joints should
be sawed in sequence. If extreme condition exist which make it
impractical to prevent erratic cracking by early sawing, the
contraction joint groove shall be formed prior to initial set of concrete
as provided above.

4. Transverse Construction Joint

It shall be constructed when there is an interruption of more than 30


minutes in the concreting operations. No transverse joint shall be
constructed within 1.50 m of an expansion joint, contraction joint, or

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-23
SURFACE COURSES E

plane of weakness. If sufficient concrete has been mixed at the time


of interruption to form a slab of at least 1.5 m long, the excess
concrete from the last preceding joint shall be removed and disposed
off as directed.

5. Load Transfer Device

Dowel, when used, shall be held in position parallel to the surface


and center line of the slab by a metal device that is left in the
pavement.

The portion of each dowel painted with one coat of lead or tar, in
conformance with the requirements of Item 404, Reinforcing Steel,
shall be thoroughly coated with approved bituminous materials, e.g.,
MC-70, or an approved lubricant, to prevent the concrete from
binding to that portion of the dowel. The sleeves for dowels shall be
metal designed to cover 50 mm plus or minus 5 mm (1/4 inch), of the
dowel, with a watertight closed end and with a suitable stop to hold
the end of the sleeves at least 25 mm (1 inch) from the end of the
dowel.

In lieu of using dowel assemblies at contraction joints, dowel may be


placed in the full thickness of pavement by a mechanical device
approved by the Engineer.

311.3.13 Final Strike-off (Consolidation and Finishing)

1. Sequence

The sequence of operations shall be the strike-off and consolidation,


floating and removal of laitance, straight-edging and final surface
finish. Work bridges or other devices necessary to provide access to
the pavement surface for the purpose of finishing straight-edging,
and make corrections as hereinafter specified, shall be provided by
the Contractor.

In general, the addition of water to the surface of the concrete to


assist in finishing operations will not be permitted. If the application
of water to the surface is permitted, it shall be applied as fog spray
by means of an approved spray equipment.

2. Finishing Joints

The concrete adjacent to joints shall be compacted or firmly placed


without voids or segregation against the joint material assembly, also
under and around all load transfer devices, joint assembly units, and
other features designed to extend into the pavement. Concrete
adjacent to joints shall be mechanically vibrated as required in
Subsection 311.3.9, Placing Concrete.

After the concrete has been placed and vibrated adjacent to the
joints as required in Subsection 311.3.9, the finishing machine shall
be brought forward, operating in a manner to avoid damage or
misalignment of joints. If uninterrupted operation of the finishing
machine, to over and beyond the joints causes segregation of

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-24
SURFACE COURSES E

concrete, damage to, or misalignment of the joints, the finishing


machine shall be stopped when the front screed is approximately 20
cm (8 inches) from the joint. Segregated concrete shall be removed
from in front of and off the joint. The front screed shall be lifted and
set directly on top of the joint and the forward motion of the finishing
machine resumed. When the second screed is close enough to
permit the excess mortar in front of it to flow over the joint, it shall be
lifted and carried over the joint. Thereafter, the finishing machine
may be run over the joint without lifting the screeds, provided there is
no segregated concrete immediately between the joint and the
screed or on top of the joint.

3. Machine Finishing

a. Non-Vibratory Method. The concrete shall be distributed or spread


as soon as placed. As soon as the concrete has been placed, it shall
be struck off and screeded by an approved finishing machine. The
machine shall go over each area of pavement as many times and at
such intervals as necessary to give the proper compaction and leave
a surface of uniform texture. Excessive operation over a given area
shall be avoided. The tops of the forms shall be kept clean by an
effective device attached to the machine and the travel of the
machine on the forms shall be maintained true without wobbling or
other variation tending to affect the precision finish.

During the first pass of the finishing machine, a uniform ridge of


concrete shall be maintained ahead of the front screed in its entire
length.

b. Vibratory Method. When vibration is specified, vibrators for full width


vibration of concrete paving slabs, shall meet the requirements in
Subsection 311.3.2, Equipment. If uniform and satisfactory density of
the concrete is not obtained by the vibratory method at joints, along
forms, at structures, and throughout the pavement, the Contractor
will be required to furnish equipment and method which will produce
pavement conforming to the Specifications. All provisions in item (a)
above not in conflict with the provisions for the vibratory method shall
govern.

4. Hand Finishing

Hand finishing methods may only be used under the following


conditions:

a. In the event of breakdown of the mechanical equipment,


hand methods may be used to finish the concrete already
deposited on the grade.
b. In narrow widths or areas of irregular dimensions where
operations of the mechanical equipment is impractical, hand
methods may be used.

Concrete, as soon as placed, shall be struck off and screeded. An


approved portable screed shall be used. A second screed shall be
provided for striking off the bottom layer of concrete if reinforcement
is used.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-25
SURFACE COURSES E

The screed for the surface shall be at least 60 cm (2 feet) longer


than the maximum width of the slab to be struck off. It shall be of
approved design, sufficiently rigid to retain its shape, and
constructed either of metal or other suitable material shod with metal.

Consolidation shall be attained by the use of suitable vibrator or


other approved equipment.

In operation, the screed shall be moved forward on the forms with a


combined longitudinal and transverse shearing motion, moving
always in the direction in which the work is progressing and so
manipulated that neither end is raised from the side forms during the
striking off process. If necessary, this shall be repeated until the
surface is of uniform texture, true to grade and cross-section, and
free from porous areas.

5. Floating

After the concrete has been struck off and consolidated, it shall be
further smoothed, trued, and consolidated by means of a longitudinal
float, either by hand or mechanical method.

a. Hand Method. The hand-operated longitudinal float shall be


not less than 365 cm (12 feet) in length and 15 cm (6 inches)
in width, properly stiffened to prevent flexibility and warping.
The longitudinal float, operated from foot bridges resting on
the side forms and spanning but not touching the concrete,
shall be worked with a sawing motion while held in a floating
position parallel to the road center line, and moving gradually
from one side of the pavement to the other. Movement ahead
along the center line of the pavement shall be in successive
advances of not more than one-half the length of the float.
Any excess water or soupy material shall be wasted over the
side forms on each pass.

b. Mechanical Method. The mechanical longitudinal float shall


be of a design approved by the Engineer, and shall be in
good working condition. The tracks from which the float
operates shall be accurately adjusted to the required crown.
The float shall be accurately adjusted and coordinated with
the adjustment of the transverse finishing machine so that a
small amount of mortar is carried ahead of the float at all
times. The forward screed shall be adjusted so that the float
will lap the distance specified by the Engineer on each
transverse trip. The float shall pass over each areas of
pavement at least two times, but excessive operation over a
given area will not be permitted. Any excess water or soupy
material shall be wasted over the side forms on each pass.

c. Alternative Mechanical Method. As an alternative, the


Contractor may use a machine composed of a cutting and
smoothing float or floats suspended from and guided by a
rigid frame. The frame shall be carried by four or more visible
wheels riding on, and constantly in contact with the side

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-26
SURFACE COURSES E

forms. If necessary, following one of the preceding method of


floating, long handled floats having blades not less than 150
cm (5 feet) in length and 15 cm (6 inches) in width may be
used to smooth and fill in open-textured areas in the
pavement. Long-handled floats shall not be used to float the
entire surface of the pavement in lieu of, or supplementing,
one of the preceding methods of floating. When strike off
and consolidation are done by the hand method and the
crown of the pavement will not permit the use of the
longitudinal float, the surface shall be floated transversely by
means of the long-handled float. Care shall be taken not to
work the crown out of the pavement during the operation.
After floating, any excess water and laitance shall be
removed from the surface of the pavement by a 3-m straight-
edge or more in length. Successive drags shall be lapped
one-half the length of the blade.

6. Straight-edge Testing and Surface Correction

After the floating has been completed and the excess water
removed, but while the concrete is still plastic, the surface of
the concrete shall be tested for trueness with a 300 cm long
straight-edge.

For this purpose, the Contractor shall furnish and use an


accurate 300-cm straight-edge swung from handles 100 cm
(3 feet) longer than one-half the width of the slab. The
straight-edge shall be held in contact with the surface in
successive positions parallel to the road center line and the
whole area gone over from one side of the slab to the other
as necessary. Advances along the road shall be in
successive stages of not more than one-half the length of the
straight-edge.

Any depressions found shall be immediately filled with freshly


mixed concrete, struck off, consolidated and refinished. High
areas shall be cut down and refinished. Special attention
shall be given to assure that the surface across joints meets
the requirements for smoothness. Straight-edge testing and
surface corrections shall continue until the entire surface is
found to be free from observable departures from the
straight-edge and the slab conforms to the required grade
and cross-section.

7. Final Finish

If the surface texture is broom finished, it shall applied when


the water sheen has practically disappeared. The broom shall
be drawn from the center to the edge of the pavement with
adjacent strokes slightly overlapping. The brooming operation
should be so executed that the corrugations produced in the
surface shall be uniform in appearance and not more than 1.5
mm in depth.
Brooming shall be completed before the concrete is in such
condition that the surface will be unduly roughened by the

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-27
SURFACE COURSES E

operation. The surface thus finished shall be free from rough


and porous areas, irregularities, and depressions resulting
from improper handling of the broom. Brooms shall be of the
quality size and construction and be operated so as to
produce a surface finish meeting the approval of the Engineer.
Subject to satisfactory results being obtained and approval of
the Engineer, the Contractor will be permitted to substitute
mechanical brooming in lieu of the manual brooming herein
described.

If the surface texture is belt finished, when straight-edging is


complete and water sheen has practically disappeared and
just before the concrete becomes non-plastic, the surface
shall be belted with 2-ply canvass belt not less than 20 cm
wide and at least 100 cm longer than the pavement width.
Hand belts shall have suitable handles to permit controlled,
uniform manipulation. The belt shall be operated with short
strokes transverse to the center line and with a rapid
advances parallel to the center line.

If the surface texture is drag finished, a drag shall be used


which consists of a seamless strip of damp burlap or cotton
fabric, which shall produce a uniform of gritty texture after
dragging it longitudinally along the full width of pavement. For
pavement 5 m or more in width, the drag shall be mounted on
a bridge which travels on the forms. The dimensions of the
drag shall be such that a strip of burlap or fabric at least 100
cm wide is in contact with the full width of pavement surface
while the drag is used. The drag shall consist of not less than
2 layers of burlap with the bottom layer approximately 15 cm
wider than the layer. The drag shall be maintained in such
condition that the resultant surface is of uniform appearance
and reasonably free from grooves over 1.5 mm in depth.
Drag shall be maintained clean and free from encrusted
mortar. Drags that cannot be cleaned shall be discarded and
new drags be substituted.

Regardless of the method used for final finish, the hardened


surface of pavement shall have a coefficient of friction of 0.25
or more. Completed pavement that is found to have a
coefficient of friction less than 0.25 shall be grounded or
scored by the Contractor at his expense to provide the
required coefficient of friction.

8. Edging at Forms and Joints

After the final finish, but before the concrete has taken its
initial set, the edges of the pavement along each side of each
slab, and on each side of transverse expansion joints, formed
joints, transverse construction joints, and emergency
construction joints, shall be worked with an approved tool and
rounded to the radius required by the Plans. A well –
defined and continuous radius shall be produced and a
smooth, dense mortar finish obtained. The surface of the slab
shall not be unduly disturbed by tilting the tool during the use.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-28
SURFACE COURSES E

At all joints, any tool marks appearing on the slab adjacent to


the joints shall be eliminated by brooming the surface. In
doing this, the rounding of the corner of the slab shall not be
disturbed. All concrete on top of the joint filler shall be
completely removed.

All joints shall be tested with a straight-edge before the


concrete has set and correction made if one edge of the joint
is higher than the other.

311.3.14 Surface Test

As soon as the concrete has hardened sufficiently, the pavement


surface shall be tested with a 3-m straight-edge or other specified device.
Areas showing high spots of more than 3 mm but not exceeding 12 mm
in 3 m shall be marked and immediately ground down with an approved
grinding tool to an elevation where the area or spot will not show surface
deviations in excess of 3 mm when tested with 3 m straight-edge. Where
the departure from correct cross-section exceeds 12 mm, the pavement
shall be removed and replaced by and at the expense of the Contractor.

Any area or section so removed shall be not less than 1.5 m in length
and not less than the full width of the lane involved. When it is necessary
to remove and replace a section of pavement, any remaining portion of
the slab adjacent to the joints that is less than 1.5 m in length, shall also
be removed and replaced.

311.3.15 Curing

Immediately after the finishing operations have been completed and the
concrete has sufficiently set, the entire surface of the newly placed
concrete shall be cured in accordance with either one of the methods
described herein. Failure to provide sufficient cover material of whatever
kind the Contractor may elect to use, or the lack of water to adequately
take care of both curing and other requirements, shall be a cause for
immediate suspension of concreting operations. The concrete shall not
be left exposed for more than ½ hour between stages of curing or during
the curing period.

311.3.16 Removal of Forms

Forms for concrete shall remain in place undisturbed for not less than
twenty four (24) hours after concrete pouring. In the removal of forms,
crowbars should be used in pulling out nails and pins. Care should be
taken so as not to break the edges of the pavement. In case portions of
the concrete are spalled, they shall be immediately repaired with fresh
mortar mixed in the proportion of one part of Portland Cement and two
parts fine aggregates. Major honeycomb areas will be considered as
defective work, and shall be removed and replaced at the expense of the
Contractor. Any area or section so removed shall not be less than the
distance between weakened plane joint nor less than the full width of the
lane involved.
311.3.17 Sealing Joints

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-29
SURFACE COURSES E

Joint shall be sealed with asphalt sealant soon after completion of the
curing period and before the pavement is opened to traffic, including the
Contractor’s equipment. Just prior to sealing, each joint shall be
thoroughly cleaned of all foreign materials including membrane curing
compound and the joint faces shall be clean and surface dry when the
seal is applied.

The sealing material shall be applied to each joint opening to conform to


the details shown on the plans or as directed by the Engineer. Material
for seal applied hot shall be stirred during heating so that localized
overheating does not occur. The pouring shall be done in such a manner
that the material will not be spilled on the exposed surfaces of the
concrete. The use of sand or similar material as a cover for the seal will
not be permitted.

311.3.18 Protection of Pavement

The Contractor shall protect the pavement and its appurtenances


against both public traffic and traffic caused by his own employees and
agents. This shall include watchmen to direct traffic and the erection of
and maintenance of warning signs, lights, pavement bridges or cross-
overs, etc. The Plans or Special Provisions will indicate the location
and type of device or facility required to protect the work and provide
adequately for traffic.

All boreholes after thickness and/or strength determinations of newly


constructed asphalt and concrete pavements shall be immediately
filled/restored with the prescribed concrete/asphalt mix after completion
of the drilling works.

Any damage to the pavement, occurring prior to final acceptance, shall


be repaired or the pavement be replaced.

311.3.19 Concrete Pavement – Slip Form Method

If the Contract calls for the construction of pavement without the use of
fixed forms, the following provisions shall apply:

1. Grade

After the grade or base has been placed and compacted to the required
density, the areas which will support the paving machine shall be cut to
the proper elevation by means of a properly designed machine. The
grade on which the pavement is to be constructed shall then be brought
to the proper profile by means of properly designed machine. If the
density of the base is disturbed by the grading operation, it shall be
corrected by additional compaction before concrete is placed. The grade
should be constructed sufficiently in advance of the placing of the
concrete. If any traffic is allowed to use the prepared grade, the grade
shall be checked and corrected immediately before the placing of
concrete.

2. Placing Concrete
The concrete shall be placed with an approved slip-form paver designed
to spread, consolidate, screed and float-finish the freshly placed

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-30
SURFACE COURSES E

concrete in one complete pass of the machine in such a manner that a


minimum of hand finish will be necessary to provide a dense and
homogenous pavement in conformance with the Plans and
Specifications. The machine shall vibrate the concrete for the full width
and depth of the strip of pavement being placed. Such vibration shall
be accompanied with vibrating tubes or arms working in the concrete or
with a vibrating screed or pan operating on the surface of the concrete.
The sliding forms shall be rigidly held together laterally to prevent
spreading of the forms. The forms shall trail behind the paver for such a
distance that no appreciable slumping of the concrete will occur, and
that necessary final finishing can be accomplished while the concrete is
still within the forms. Any edge slump of the pavement, exclusive of edge
rounding, in excess of 6 mm shall be corrected before the concrete has
hardened.

The concrete shall be held at a uniform consistency, having a slump of


not more than 40 mm (1-12/ inches). The slip form paver shall be
operated with as nearly as possible a continuous forward movement and
that all operations of mixing, delivering and spreading concrete shall be
coordinated so as to provide uniform progress with stopping and starting
of the paver held to a minimum. If, for any reason, it is necessary to stop
the forward movement of the paver the vibratory and tamping elements
shall also be stopped immediately. No tractive force shall be applied to
the machine, except that which is controlled from the machine.

3. Finishing

The surface smoothness and texture shall meet the requirements of


Subsections 311.3.13 and 311.3.14.

4. Curing

Unless otherwise specified, curing shall be done in accordance with one


of the methods included in Subsection 311.3.15. The curing media shall
be applied at the appropriate time and shall be applied uniformly and
completely to all surfaces and edges of the pavement.

5. Joints

All joints shall be constructed in accordance with Subsection 311.3.12.

6. Protection Against Rain

In order that the concrete may be properly protected against rain before
the concrete is sufficiently hardened, the Contractor will be required to
have available at all times, materials for the protection of the edges and
surface of the unhardened concrete.

Such protective materials shall consist of standard metal forms or wood


planks having a nominal thickness of not less than 50 mm (2 inches)
and a nominal width of not less than the thickness of the pavement at its
edge for the protection of the pavement edges, and covering material
such as burlap or cotton mats, curing paper or plastic sheeting materials
for the protection of the surface of the pavement. When rain appears
imminent, all paving operations shall stop and all available personnel

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-31
SURFACE COURSES E

shall begin placing forms against the sides of the pavement and
covering the surface of the unhardened concrete with the protective
covering.

311.3.20 Acceptance of Concrete

The strength level of the concrete will be considered satisfactory if the


averages of all sets of three (3) consecutive strength test results equal
or exceed the specified strength, fc’ and no individual strength test result
is deficient by more than 15% of the specified strength, fc’. A set shall
consist of a minimum of three (3) concrete beam specimens.

Concrete deemed to be not acceptable using the above criteria may be


rejected unless the Contractor can provide evidence, by means of core
tests, that the quality of concrete represented by failed test results is
acceptable in place. At least three (3) representative cores shall be
taken from each member or area of concrete in place that is considered
deficient. The location of cores shall be determined by the Engineer so
that there will be at least impairment of strength of the structure. The
obtaining and testing of drilled cores shall be in accordance with
AASHTO T 24.

Concrete in the area represented by the cores will be considered


adequate if the average strength of the cores is equal to at least 85% of,
and if no single core is less than 75% of, the specified strength, fc’.

If the strength of control specimens does not meet the requirements of


this Subsection, and it is not feasible or not advisable to obtain cores
from the structure due to structural considerations, payment of the
concrete will be made at an adjusted price due to strength deficiency of
concrete specimens as specified hereunder:

Deficiency in Strength of
Concrete Specimens, Percent (%) of Contract
Percent (%) Price Allowed

Less than 5 100


5 to less than 10 80
10 to less than 15 70
15 to less than 20 60
20 to less than 25 50
25 or more 0

1.3.21 Opening to Traffic

The Engineer will decide when the pavement may be opened to traffic.
The road will not be opened to traffic until test specimens molded and
cured in accordance with AASHTO T 23 have attained the minimum
strength requirements in Subsection 311.2.12. If such tests are not
conducted prior to the specified age the pavement shall not be operated
to traffic until 14 days after the concrete was placed. Before opening to
traffic, the pavement shall be cleaned and joint sealing completed.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-32
SURFACE COURSES E

311.3.22 Tolerance and Pavement Thickness

1. General

The thickness of the pavement will be determined by measurement of


cores from the completed pavement in accordance with AASHTO T
148.

The completed pavement shall be accepted on a lot basis. A lot shall be


considered as 1000 linear meters of pavement when a single traffic lane
is poured or 500 linear meters when two lanes are poured concurrently.
The last unit in each slab constitutes a lot in itself when its length is at
least ½ of the normal lot length. If the length of the last unit is shorter
than ½ of the normal lot length, it shall be included in the previous lot.

Other areas such as intersections, entrances, crossovers, ramp, etc.,


will be grouped together to form a lot. Small irregular areas may be
included with other unit areas to form a lot. Each lot will be divided into
five (5) equal segments and one core will be obtained from each
segment in accordance with AASHTO T 24.

2. Pavement Thickness

It is the intent of this Specification that the pavement has a uniform


thickness as called for on the Plans for the average of each lot as
defined. After the pavement has met all surface smoothness
requirements, cores for thickness measurements will be taken.

In calculating the average thickness of the pavement, individual


measurements which are in excess of the specified thickness by more
than 5 mm will be considered as the specified thickness plus 5 mm and
measurement which are less than the specified thickness by more than
25 mm shall not be included in the average. When the average
thickness for the lot is deficient, the contract unit price will be adjusted
for thickness in accordance with paragraph (3 below).

Individual areas within a segment found deficient in thickness by more


than 25 mm shall be evaluated by the Engineer, and if in his judgment,
the deficient areas warrant removal, they shall be removed and replaced
by the Contractor with pavement of the specified thickness at his entire
expense. However, if the evaluation of the Engineer is that the deficient
area should not be removed and replaced, such area will not be paid.

When the measurement of any core is less than the specified thickness
by more than 25 mm, the actual thickness of the pavement in this area
will be determined by taking additional cores at no less than 5 m
intervals parallel to the center line in each direction from the affected
location until a core is found in each direction, which is not deficient in
thickness by more than 25 mm. The area of slab for which no payment
will be made shall be the product of the paving width multiplied by the
distance along the center line of the road between transverse sections
found not deficient in thickness by more than 25 mm. The thickness of
the remainder of the segment to be used to get the average thickness of

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-33
SURFACE COURSES E

each lot shall be determined by taking the average thickness of


additional cores which are not deficient by more than 25 mm.

3. Adjustment for Thickness

When the average thickness of the pavement per lot is deficient,


payment for the lot shall be adjusted as follows:

Deficiency in the Average Percent (%) of Contract


Thickness per lot (mm) Price Per Lot

0-5 100 % payment


6 - 10 80 % payment
11 - 15 70 % payment
16 - 20 60 % payment
21 - 25 50 % payment
More than 25 Remove and replace/No payment

No acceptance and final payment shall be made on completed


pavement unless core test for thickness determination is conducted,
except for Barangay Roads where the implementing office is allowed to
waive such test.

311.4 Method of Measurement

The area to be paid for under this Item shall be the number of square meters (m²)
of concrete placed and accepted in the completed pavement with or without rebar
or wire mesh reinforcement. The width for measurements will be the width from
outside edge to outside edge of completed pavement as placed in accordance
with the Plans or as otherwise required by the Engineer in writing. The length will
be measured horizontally along the center line of each roadway or ramp. Any curb
and gutter placed shall not be included in the area of concrete pavement
measured.

311.5 Basis of Payment

The accepted quantity, measured as prescribed in Section 311.4, shall be paid for
at the contract unit price for Portland Cement Concrete Pavement and Portland
Cement Concrete Pavement (Reinforced with Wire Mesh) which price and
payment shall be full compensation for preparation of roadbed and finishing of
shoulders, unless otherwise provided by the Special Provisions, furnishing and
placing all joint materials, for sawing weakened plane joints, for fitting the
prefabricated center metal joint, for facilitating and controlling traffic, and for
furnishing all labor, equipment, tools and incidentals necessary to complete the
Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement
Portland Cement Concrete
311(1)f1 Pavement (Unreinforced) Square Meter
0.30m thick

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page E-34
PART F

BRIDGE CONSTRUCTION
BRIDGE CONSTRUCTION F

PART F BRIDGE CONSTRUCTION

ITEM 400 PILING

400.1 Description

400.1.1 Scope

This Item shall consist of piling, furnished, driven or placed, cut and spliced in
accordance with this Specification and in reasonably close conformity with the
Plans. This also includes the construction of reinforced concrete piles, cast in
bored holes and drilled with the use of special equipment. It shall include the
excavation and drilling of holes, furnishing and placing of temporary steel casing
and other incidentals necessary for the execution of the work. Pile construction
shall be at locations, dimensions and lengths indicated in the Drawings.

The Contractor shall furnish the piles in accordance with an itemized list, which will
be provided by the Engineer, showing the number and lengths of all piles. When
the cast-in-place concrete piles are specified in the Plans, the Engineer will not
furnish the Contractor an itemized list showing the number and lengths of piles.
When test piles and load test are required in conformance with Subsection 400.1.2
and 400.1.3, respectively, the data obtained from driving test piles and making test
loads will be used in conjunction with other available subsoil information to
determine the number and lengths of piles to be furnished. The Engineer will not
prepare the itemized list of piles for any portion of the foundation area until all
specified loading tests in the Contract representative of the portion have been
completed.

[Link] Working Drawings

At least four (4) weeks prior to bored piling activities, the Contractor shall
submit to the Engineer for approval a construction methodology for such
construction of bored piles. The submittals shall include the following:

a) List of proposed equipment to be used including cranes, drills, augers,


bailing buckets, final cleaning equipment, desanding equipment,
slurry pumps, sampling equipment, tremies or concrete pumps,
casings, etc.
b) Details of overall construction operation sequence of bored pile
construction in bents or groups or singly.
c) Details of pile excavation method.
d) When slurry is required, details of the method, proposed mix,
circulation and design of slurry.
e) Details of methods to clean the pile excavation.
f) Details of reinforcement placement including support and
centralization methods.
g) Details of concrete placement, curing and protection.
h) Details of any required Load Tests (if called for in the Drawings) and;
i) Other information shown on the Drawings or requested by the
Engineer.

The Contractor shall not start construction of bored pile for which working
drawings are required until the Engineer has approved such drawings.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-1
BRIDGE CONSTRUCTION F

obtained by use of these drawings or any of this other responsibilities under


the Contract.

400.1.2 Test Piles

For his reference, the Contractor may drive the test piles at the location of the
regular piles indicated on the Plans such test piles as he may consider necessary
in addition to the test piles specified in the Contract and shall be considered as
regular piles. When called for in the Bill of Quantities, a pile if required to be
subjected to load test shall conform to the provision as provided in Subsection
400.1.3, Load Tests.

The Contractor shall furnish and drive the test piles of the dimensions and at the
locations designated by the Engineer. They shall be of the material shown in the
Bill of Quantities and shall be driven to refusal or to such tip elevation or
approximate bearing value as the Engineer may request. Test Piles shall be driven
with the same hammer that is used for driving foundation Piles.

400.1.3 Load Tests

Load tests for the piles shall be either Static or Pile Testing by Low-Strain Dynamic
Method, High-Strain Dynamic Method and Cross-Hole Sonic Logging of Bored
Holes.

When load tests are specified, the number and location of piles to be tested will be
designated by the Engineer. Load tests shall be done by methods approved by the
Engineer. The Contractor shall submit to the Engineer for approval a detailed
plans of the loading apparatus he intends to use. The apparatus shall be so
constructed as to allow various increments of the load to be placed gradually
without causing vibration to the test piles. If the approved method requires the use
of tension (anchor) piles, such tension piles shall be of the same type and
diameter as the permanent piles and shall be driven in the location of the
permanent piles when feasible. Piling not a part of the structure shall be removed
or cut off at least 300mm below the bottom of the footing or finished elevation of
the ground upon completion of the test load. Permanent piling used as anchor
piling which is raised during the test load shall be redriven to original grade and
bearing.

[Link] Static Testing

Suitable approved apparatus for determining accurately the load on the pile
and the settlement of the pile under increment of load shall be supplied by the
Contractor.

Test loading shall consist of the application of incremental static loads to a


pile and measuring the resultant settlement. The load static shall be applied
by a hydraulic jack acting against suitable anchorage, transmitting the load
directly to the pile, or other methods designated by the Plans or approved by
the Engineer.

[Link] Pile Testing

Pile testing shall be done by Low-Strain Dynamic Method, High-Strain


Dynamic Method or Cross-Hole Sonic Logging Method as required in

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-2
BRIDGE CONSTRUCTION F

Dynamic Method or Cross-Hole Sonic Logging Method as required in the


Plans or as directed by the Engineer.

[Link].1 Low-Strain Dynamic Method

Pile integrity testing by Low-Strain Dynamic method shall conform to


ASTM D-5882. It is a so called Low Strain method, since it requires the
impact of only a small hand-held hammer, and also referred to as a Non-
Destructive Method.

[Link].2 High-Strain Dynamic Method

Pile integrity testing by High-Strain Dynamic Method shall conform to


ASTM D4945. High-Strain Dynamic Method shall be applied to confirm
the design parameters and capacities assumed for the piles as well as
to confirm the normal integrity of testing of the piles. It is considered
supplemental to the low-strain and the sonic-type integrity testing of the
cast-in-place piles. It is non-destructive relatively quick test and it is
intended that the test shaft be left in a condition suitable for the use in
production. The shaft used for the test will be instrumented and tested
by the testing specialist, as approved by the Engineer, meeting
requirements in accordance to ASTM D 4945.

[Link].3 Cross-Hole Logging of Bored Holes Method

This is done by sending ultrasonic pulses through the concrete from one
probe to another (probes located in parallel tubes), the Cross-Hole Sonic
Logging (CSL) procedure inspects the drilled shafts structural integrity,
and extent and location of defects, if any. At the receiver probe, pulse
arrival time and signal the concrete affects strength. For equidistant
tubes, uniform concrete yields consistent arrival times with reasonable
pulse wave speed and signal strengths. Non- uniformities such as
contamination, soft concrete, honeycombing, voids, or intrusions of
foreign objects exhibit delayed arrival time with reduced signal strength.

400.1.4 Concrete and Steel Pile Bearing Values

The bearing values for concrete and steel pile will be determined by the Engineer
using the following formulas:

a. Modified Hiley’s Formula or any formula from brochures of the


equipment used shall be used when the ratio of weight of ram or
hammer to weight of pile is greater than one fourth (1/4).

2WH (W)
Ru = ----------------------------
(S+K) (W+Wp)

Ru
Ra = -------------
FS

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-3
BRIDGE CONSTRUCTION F
where:

Ru = ultimate capacity of piles (KN)


Ra = capacity of pile (KN)–shall be greater than the required weight of ram or
hammer
W = (KN)
H = height of fall of ram (mm)
Wp weight of pile (KN)
S = average penetration for the last ten blows (mm)
K = 10 mm (unless otherwise observed/computed during
driving)
FS = factor of safety (min. = 3)

b. Hiley’s Formula shall be used when the ratio of the weight of ram or
hammer to weight of pile is less than one fourth (1/4).

efWH (W) (W + n2 Wp)


Ru = ------------------------------ x ---------------------------
S+1/2 (C1+C2+C3) (W + Wp)

Ru
Ra = --------------
FS
where:
Ru = ultimate capacity of pile (KN)
Ra = capacity of pile (KN)
ef = efficiency of hammer (refer to table)
W = weight of ram (KN)
Wp = weight of pile (KN)
H = height of fall of ram (mm)
S = average penetration for last ten blows (mm)
C1 = temporary compression allowance for pile head and cap (refer to table)
C2 = RuL/AEp
C3 = range from 2.54mm to 5.08mm (0.1” to 0.2”) for resilient soil to 0 for
hard pan (rock, very dense sand and gravel)
L = length of pile
A = cross-sectional area of pile
Ep = modulus of elasticity of pile
n = coefficient of restitution (refer to table)
FS = factor of safety (min. = 3)

Required minimum penetration of all piles shall be six (6) meters. However,
for exposed piles, the embedded length shall be equal or greater than the
exposed length but not less than 6.0m.

Note: Formula for other pile hammers with suggested factor of safety should be as
provided/recommended by their respective manufacturer. In all cases when the bearing power
of concrete and steel piles is determined by formula, the piles shall be driven until the safe
bearing power of each is computed to be not less than 27 tons..

400.1.5 Safe Loads

When the safe bearing power of any pile is found by test or computation to be less
than the design load, longer piles or additional piles shall be driven as ordered in
writing by the Engineer.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-4
BRIDGE CONSTRUCTION F

400.1.6 Jetted Piles

The safe bearing power of jetted piles shall be determined by actual tests or by the
appropriate methods and formulas given in the preceding Subsections. No jet
shall be used during the test blows.

400.2 Material Requirements

The kind and type of piles shall be as specified on the Plans and Bill of Quantities.
No alternative type or kind of piling shall be used.

400.2.1 Concrete Piles

Cast in place concrete materials for bored piles shall conform to the
requirements of Item 405, Structural Concrete. Concrete shall be Class “AA1”
with strength requirement of 28 Mpa (4,000psi), unless otherwise specified in
the Plans.

Concrete shall be proportioned to achieved a range of 6” to 8” (150mm to


200mm) slump, self-compacting mix, or as directed by the Engineer.

The use of appropriate plasticizer/additives to assure mix fluidity and


consistency shall be allowed and with the Engineer’s approval. A retardant of
proven adequacy and approved by the Engineer may be used to ensure that
early hardening of concrete during operation will not occur.

Reinforcing steel shall conform to the requirements of Item 404, Reinforcing


Steel. Prestressing reinforcing steel shall be high-tensile steel wire conforming
to AASHTO M 204 or other high-tensile metals conforming to AASHTO
Standards.

Casings which are required to be incorporated as part of permanent work


shall conform to AASHTO M183 (ASTM A-36) or JIS G3114 (SMA 400W).

400.2.2 Steel Shells

1. Shells Driven Without a Mandrel

Unless otherwise called for on the Plans or Special Provisions, shells for cast-
in-place concrete piles shall have a minimum 305mm diameter at cut off and a
minimum 203mm diameter at tip: made from not less than 4.55mm in
thickness plate stock conforming to AASHTO M 183. Shells may either be
spirally welded or longitudinally welded and may either be tapered or constant
in section. Tips shall be sealed as shown on the Plans.

2. Shells Driven With a Mandrel


The shell shall be of sufficient strength and thickness to withstand driving
without injury and to resist harmful distortion and/or buckling due to soil
pressure after driven and the mandrel removed. Butt and tip dimension shall
be as called for on the Plans or Special Provisions.

400.2.3 Steel Pipes

Filled Steel Pipes (filled with concrete) shall conform to the requirements of
ASTM A 252, Grade 2, Welded and Seamless Pipe Piles. Closure

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-5
BRIDGE CONSTRUCTION F

Plates for closed piles shall conform to the requirements of AASHTO M 183.

Unfilled Tubular Steel Piles shall conform to the requirements of ASTM A 252,
Grade 2, with chemical requirements meeting ASTM Designation A 53,
Grade B. The wall thickness shall not be less than 4.76mm.

400.2.4 Steel H-Piles

Steel H-Piles shall be rolled steel sections of the weight and shape called for
on the Plans. They shall be structural steel meeting the requirements of
AASHTO M 183 provided that, where the Special Provisions called for
copper-bearing structural steel, the steel shall not contain less than one-fifth
percent nor more than zero point thirty five percent (0.35%) of copper, except
that steel manufactured by the acid-Bessemer process shall not be used.

400.2.5 Sheet Piles

Steel sheet piles shall meet the requirements of AASHTO M 202 (ASTM A
328), or AASHTO M 223. All other sheet piles shall meet the requirements
prescribed above the particular material specified. The joints shall be
practically watertight when the piles are in place.

400.2.6 Pile Shoes

Pile shoes shall be as called for on the Plans.

400.2.7 Splices

Material for pile splices, when splicing is allowed, shall be of the same quality
as the material used for the pile itself and shall follow the requirements given
on the Plans.

400.2.8 Paint

It shall conform to Item 411, Paint.

400.3 Construction Requirements

400.3.1 Location and Site Preparation

Piles shall be driven where indicated on the Plans or as directed by the


Engineer.

All excavations for the foundation on which the piles are to be driven shall be
completed before the pile driving, unless otherwise specified or approved by
the Engineer. After driving is completed, all loose and displaced materials
shall be removed from around the piles by hand excavation, leaving clean
solid surface to receive the concrete of the foundation. Any requirement for
granular fill and lean concrete shall be indicated on the Plans or as directed by
the Engineer.

400.3.2 Determination of Pile Length

Pile length and bearing capacity shall be determined by the Engineer from the
results of the test piling and load tests.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-6
BRIDGE CONSTRUCTION F

The criterion for pile length may be one of the following:

1. Piles in sand and gravel shall be driven to a bearing power determined


by the use of the pile driving formula or as decided by the Engineer.

2. Piles in clay shall be driven to the depth ordered by the Engineer.


However, the bearing power shall be controlled by the pile driving
formula if called for by the Engineer.

3. Piles shall be driven to refusal on rock or hard layer when so ordered by


the Engineer.

The Contractor shall be responsible for obtaining the correct pile length and
bearing capacity according to the criteria given by the Engineer.

400.3.3 Pile Driving

All piles shall be driven as shown on the Plans or as ordered in writing by the
Engineer. They shall be driven within an allowed variation of 20mm per meter
of pile length from the vertical or batter as shown on the Plans. The maximum
allowable variation at the butt end of the pile shall be 75mm in any direction
from the location shown on the Plans or as directed by the Engineer. Each
pile shall, after driving, be within 150mm from the theoretical location
underneath the pile cap or underneath the superstructure in case of pile bents.
All piles pushed up by the driving of adjacent piles or any other cause shall be
redriven.

Piles shall be used only in places where the minimum penetration of 3m n firm
materials, or 5m in soft materials can be obtained. Whereas soft upper
stratum overlies a hard stratum, the piles shall penetrate the hard materials at
sufficient depths to fix the ends rigidly.

All pile driving equipment is subject to the Engineer’s approval. The


Contractor is responsible for sufficient weight and efficiency of the hammers
to drive the piles down to the required depth and bearing capacity. Hammers
shall be gravity hammers, single and double acting steam or pneumatic
hammers or diesel hammers. Gravity hammers shall not weigh less than 60
percent of the combined weight of the pile and driving head but not less than
2,000 kg. The fall shall be regulated so as to avoid injury to the pile and shall
in no case exceed 4.50m for timber and steel piles and 2.50m for concrete
piles unless otherwise specified or approved by the Engineer.

The plant and equipment furnished for steam hammers shall have sufficient
capacity to maintain, under working condition, the pressure at the hammer
specified by the manufacturer. The boiler or pressure tank shall be equipped
with an accurate pressure gauge and another gauge shall be supplied at the
hammer intake to determine the drop in pressure between the gauges. When
diesel hammers or any other types requiring calibration are used, they shall
be calibrated with test piling and/or test loads in accordance with Subsection
400.1.2, Test Piles.
Water jets shall be used only when permitted in writing by the Engineer.
When water jets are used, the number of jets and the nozzle volume and
pressure shall be sufficient to erode freely the material adjacent to the pile.
The plant shall have sufficient capacity to deliver at all time a pressure
equivalent to at least 690 KPa at two 19 mm (3/4 inch) jet nozzles. The jets

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-7
BRIDGE CONSTRUCTION F

shall be shut off before the required penetration is reached and the piles shall
be driven solely by hammers to final penetration as required by the Engineer.

Piles shall be supported in line and position with leads while being driven. Pile
driving leads shall be constructed in such a manner as to afford freedom of
movement of the hammer, and shall be held in position by guys or steel
braces to insure rigid lateral support to the pile during driving. The leads shall
be of sufficient length to make the use of a follower unnecessary and shall be
so designed as to permit proper placing of batter piles. The driving of the piles
with followers shall be avoided if practicable and shall be done only under
written permission from the Engineer.

The method used in driving piles shall not subject them to excessive and
undue abuse producing crushing and spalling of the concrete, injurious
splitting, splintering and brooming of the wood or deformation of the steel.
Manipulation of piles to force them into proper position if considered by the
Engineer too excessive will not be permitted.

The pile tops shall be protected by driving heads, caps or cushions in


accordance with the recommendation of the manufacturer of the pile hammer
and to the satisfaction of the Engineer. The driving head shall be provided to
maintain the axis of the pile with the axis of the hammer and provide a driving
surface normal to the pile.

Full-length piles shall be used where practicable. Splicing of piles when


permitted, shall be in accordance with the provisions of Subsection 400.3.7
and 400.3.8. All piles shall be continuously driven unless otherwise allowed
by the Engineer.

Piles shall not be driven within 7 m of concrete less than 7 days old.

400.3.4 Precast Concrete Piles

Precast concrete piles shall be of the design shown on the Plans. Pre-
stressed concrete piles shall be prestressed as prescribed in Item 406,
Prestressed Concrete Structures.

The piles shall be cast separately and concrete in each pile shall be placed
continuously. The completed piles shall be free from stone pockets,
honeycombs, or other defects, and shall be straight and true to the form
specified. The forms shall be true to line and built of metal, plywood or
dressed lumber. A 25mm chamfer strip shall be used in all corners. Form
shall be watertight and shall not be removed until at least twenty-four (24)
hours after the concrete is placed.

Piles shall be cured and finished in accordance with Items 405, Structural
Concrete and 406, Prestressed Concrete Structures.

Cylinder specimens shall be made and tested in accordance with Item 405.
Piles shall not be moved until the tests indicate that the concrete has attained
a compressive strength of at least 80 percent (80%) of the design 28-day
compressive strength and they shall not be transported or driven until the
design 28-day compressive strength has been attained.

If testing equipment is not available, as in isolated areas, piles shall not be


moved until after fourteen (14) days after casting and shall not be transported

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-8
BRIDGE CONSTRUCTION F

or driven prior to 28 days after casting. If high early strength cement is used,
piles shall not be moved, transported or driven prior to 7 days after casting.

When concrete piles are lifted or moved, they shall be supported at the points
shown on the Plans; if not shown, they shall be supported at the quarter
points.

400.3.5 Cast-in-place Concrete Piles

1. Drilled Holes

All holes for concrete piles cast in drilled holes shall be drilled dry to tip
elevation shown on the Plans. All holes will be examined for straightness and
any hole, which on visual inspection from the top shows less than one-half the
diameter of the hole at the bottom of the hole will be rejected. Suitable
casings shall be furnished and placed when required to prevent caving of the
hole before concrete is placed.

All loose material existing at the bottom of the hole after drilling operations
have been completed shall be removed before placing concrete.

The use of water for drilling operations or for any other purpose where it may
enter the hole will not be permitted. All necessary action shall be taken to
prevent surface water from entering the hole and all water which may have
infiltrated into the hole shall be removed before placing concrete.

Concrete shall be placed by means of suitable tubes. Prior to the initial


concrete set, the top 3m of the concrete filled pile or the depth of any
reinforcing cage, whichever is greater, shall be consolidated by acceptable
vibratory equipment,

Casing, if used in drilling operations, may be left in place or removed from the
hole as concrete is placed. The bottom of the casing shall be maintained not
more than 1.5m nor less than 0.3m below the top of the concrete during
withdrawal and placing operations unless otherwise permitted by the Engineer.
Separation of the concrete during withdrawal operations shall be avoided by
vibrating the casing.

2. Steel Shells and Pipes

The inside of shells and pipes shall be cleaned and all loose materials
removed before concrete is placed. The concrete shall be placed in one
continuous operation from tip to cut-off elevation and shall be carried on in
such a manner as to avoid segregation.

The top 3 meters of concrete filled shells, or to the depth of any reinforcing
cage, whichever is greater, shall be consolidated by acceptable vibratory
equipment.

Pipes shall be of the diameter shown on the Plans. The pipe wall thickness
shall not be less than that shown on the Plans but in no case less than 5mm.
The pipe, including end closures, shall be of sufficient strength to be driven by
the specified methods without distortion.

Closure plates and connecting welds shall not project more than 12.5 mm
beyond the perimeter of the pile tips.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-9
BRIDGE CONSTRUCTION F

No shell or pipe shall be filled with concrete until all adjacent shells, pipes, or
piles within a radius of 1.5m or 4 ½ times the average pile diameter,
whichever is greater, have been driven to the required resistance.

After a shell or pipe has been filled with concrete, no shell, pipe or pile shall
be driven within 6m thereof until at least 7 days have elapsed.

3. Drilled Shafts

Drilled shafts are deep foundations formed by boring a cylindrical hole into soil
and/or rock and filling the hole with concrete. Drilled shafts are also commonly
referred to as caissons, bored piles or drilled piers.

Drilled shafts, like driven piles, transfer structural loads to bearing stratum well
below the base of the structure by passing soils having insufficient strength to
carry the design loads.

Drilled shafts are classified according to their primary mechanism for deriving
load resistance either as floating shafts (i.e., shafts transferring load primarily
by side resistance), or end-bearing shafts (i.e., shafts transferring load
primarily by tip resistance). Occasionally, the bases of shafts are enlarged
(i.e., belled or under reamed) to improve the load capacity of end bearing
shafts on less than desirable soils, or to increase the uplift resistance of
floating shafts.

Effects of ground and ground water conditions on shaft construction


operations should be considered and delineated, when necessary, the general
method of construction to be followed to ensure the expected performance.
Because shafts derive their capacity from side and tip resistance, which are a
function of the condition of the materials in direct contact with the shaft, it is
important that the construction procedures be consistent with the material
conditions assumed in the design. Softening, loosening or other changes in
soil and rock conditions caused by the construction method could result in a
reduction in shaft capacity and an increase in shaft displacement. Therefore,
evaluation of the effects of shaft construction procedure on load capacity must
be considered an inherent aspect of the design.

Drilled shafts are normally sized in 15.24 cm (6-inch diameter increments with
a minimum diameter of 45.72 cm (18”). The diameter of a shaft socketed into
rock should be a minimum of 15.24 cm (6”) larger than the socket diameter. If
a shaft must be inspected by the entry of a person, the shaft diameter shall
not be less than 76.20 cm (30”).

Drilled shafts constructed in dry noncaving soils can usually be excavated


without lateral support of the hole. Other ground conditions where caving,
squeezing or sloughing soils are present require installation of a steel casing
or use of a slurry for support of the hole Such conditions and techniques may
result in loosening of soil around the shaft, or altering of frictional resistance
between the concrete shaft and surrounding soil.

The center-to-center spacing between shafts is normally restricted to a


minimum of 3B to minimize the effects of interaction between adjacent shafts
during construction or in service. However, larger spacing may be required
where drilling operations are difficult or where construction must be completed
in very short time frames.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-10
BRIDGE CONSTRUCTION F

Particular attention should be given to the potential for deposition of loose or


wet material in the bottom of the hole, or the buildup of a cake of soft material
around the shaft perimeter prior to concrete placement. Adequate cleaning
and inspection of rock sockets should always be performed to assure good
contact between the rock and shaft concrete. If good contact along the shaft
cannot be confirmed, it may be necessary to assume that all load is
transferred to the tip. If the deposition of soft or loose material in the bottom
of the hole is expected, the shaft may have to be designed to carry the entire
design load through side resistance.

A number of methods can be used to prevent caving during the drilling of


holes and the placement of concrete. It is preferred that drilled shafts be
constructed in stable non-sloughing soil without excessive ground water. If
impossible, consider the following three different construction methods:

a) construction of the pile or shaft in a wet condition while the walls of


the excavation are stabilized by hydrostatic pressure of water or
mineral slurry until the concrete is placed by tremie methods for the
full length of the pile.

Mineral slurry used in the drilling process shall have both a mineral grain size
that will remain in suspension and sufficient viscosity and gel characteristics to
transport excavated material to a suitable screening system. The percentage
and specific gravity of the material used to make the suspension shall be
sufficient to maintain the stability of the excavation and to allow proper
concrete placement. The level of the slurry shall be maintained at a height
sufficient to prevent caving of the hole.
The mineral slurry shall be premixed thoroughly with clean fresh water and
adequate time allotted for hydration prior to introduction into the shaft
excavation. Adequate slurry tanks will be required when specified. No
excavated slurry pits will be allowed when slurry tanks are required on the
project without written permission of the Engineer. Adequate desanding
equipment will be required when specified. Steps shall be taken as necessary
to prevent the slurry from “setting up” in the shaft excavation, such as
agitation, circulation, and adjusting the properties of the slurry.

Control tests using suitable apparatus shall be carried out by the Contractor
on the mineral slurry to determine density, viscosity, and pH. An acceptable
range of values for those physical properties is shown in the following table.
o o
Range of Values (At 20 or [68 F])

Property Time of Slurry Time of Concreting Test


(Units) Introduction (In Hole) Method

Density 10.10 to 10.86 10.10 to 11.79 Density


(KN/m3) 64.3 to 69.1 64.3 to 75.0 Balance
(pcf)

Viscosity 28 to 45 28 to 45 Marsh
(sec. per quart) Cone

pH 8 to 11 8 to 11 pH Paper
or Meter

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-11
BRIDGE CONSTRUCTION F

Note:
3
1) Increase density values by 0.314 KN/m (2 pcf) in salt water.

2) If desanding is required; sand content shall not exceed 4 percent (by


volume) at any point in the shaft excavation as determined by the
American Petroleum Institute sand content test.

Tests to determine density, viscosity and pH values shall be done during the
shaft excavation to establish a consistent working pattern.

Prior to placing shaft concrete, slurry samples shall be taken from the bottom
and at intervals not exceeding 3.05m (10 feet) for the full height of slurry. Any
heavily contaminated slurry that has accumulated at the bottom of the shaft
shall be eliminated. The mineral slurry shall be within specification
requirements immediately before shaft concrete placement.

Excavation Inspection

The Contractor shall provide equipment for checking the dimensions and
alignment of each shaft excavation. The Contractor under the direction of the
Engineer shall determine the dimensions and alignment of the drilled shaft.
Final shaft depth shall be measured after final cleaning.

The base of the shaft excavation may be cleaned using a cleaning bucket
followed by airlifting. Reverse circulation techniques may also be used to
clean the base of the shaft.

The shaft excavation shall be cleaned so that a minimum of 50 percent of the


base will have less than 12.5 mm of sediment and at no place on the base
more than 37.5 mm of sediment. The Engineer will determine shaft
cleanliness.

b) The use of steel casing, which is installed during drilling


operations to hold the hole open and usually withdrawn during
concrete placement.

Casing, if used in operation, shall be metal, smooth, clean, watertight, and of


ample strength to withstand both handling and driving stresses and the
pressure of both concrete and the surrounding earth materials. The outside
diameter of casing shall not be less than the specified size of the shaft. It
shall conform to AASHTO M 270 (ASTM A 709) Grade 36 unless otherwise
specified.

Temporary casings shall be removed while the concrete remains workable.


Generally the removal of temporary casing shall not be started until concrete
placement in the shaft is at or above ground surface. Movement of casing by
rotating, exerting downward pressure and tapping to facilitate extraction or
extraction with a vibratory hammer will be permitted. Casing extraction shall
be at a slow, uniform rate with the pull in line with the shaft axis.

A sufficient head of concrete shall be maintained above the bottom of the


casing to overcome the hydrostatic pressure of water or drilling fluid outside of
the casing.

c) The use of a permanent casing, which is left in place within


the portion of the pile, which is in unstable material.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-12
BRIDGE CONSTRUCTION F

A permanent casing is applied as protection from the presence of surface


water during drilling and as support later for the installation of the rebar cage
and as a concrete form in drilling under water.

Reinforcing Steel Cage Construction and Placement

The reinforcing steel cage consisting of the steel shown on the Plans plus
cage stiffener bars, spacers, centralizers and any other necessary
appurtenances shall be completely assembled and placed as a unit
immediately after the shaft excavation is inspected and accepted and prior to
shaft concrete placement.

Where the reinforcing cage length is too long for placement as a single unit
the cage may be placed in separate units such that appropriate means of
splicing the longitudinal steel is provided for. The Contractor shall submit his
plans for such splices to the Engineer for approval.

The reinforcing steel in the hole shall be tied and supported so that the
reinforcing steel will remain within allowable tolerances until the concrete will
support the reinforcing steel. When concrete is placed by suitable tubes,
temporary hold-down devices shall be used to prevent uplifting of the steel
cage during concrete placement. Concrete spacers or other approved non-
corrosive spacing devices shall be used at sufficient intervals not exceeding
1.50 meters along the shaft to insure concentric location of the cage within the
shaft excavation. When the size of the longitudinal reinforcing steel exceeds
25mm, such spacing shall not exceed 3.0 meters.

Concrete Placement, Curing and Protection

Concrete shall be placed as soon as possible after reinforcing steel cage


placement. Concrete placement shall be continuous in the shaft to the top
elevation of the shaft. Placement shall continue after the shaft is full until
good quality concrete is evident at the top of the shaft. Concrete shall be
placed through a suitable tube.

For piles less than 2.5 meters in diameter, the elapsed time from the
beginning of concrete placement in the shaft to the completion of placement
shall not exceed 2 hours. For piles 2.50 meters and greater in diameter, the
concrete placing rate shall not be less than 9.0 meters of pile height per each
2-hour period. The concrete mix shall be of such design that the concrete
remains in a workable plastic state throughout the 2-hour placement limit.

When the top of pile elevation is above ground, the portion of the pile above
ground shall be formed with a removable form or permanent casing when
specified.

The upper 1.5 meters of concrete shall be vibrated or rodded to a depth of 1.5
meter below the ground surface except where soft uncased soil or slurry
remaining in the excavation will possibly mix with the concrete.

After placement, the temporarily exposed surfaces of the shaft concrete shall
be cured in accordance with the provision in Sub-section 407.3.8 – Curing
Concrete.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-13
BRIDGE CONSTRUCTION F

For at least 48 hours after pile concrete has been placed, no construction
operations that would cause soil movement adjacent to the shaft, other than
mild vibration, shall be conducted.

Construction Tolerances:

The following tolerances shall be maintained in constructing drilled shaft;

a. The drilled shaft shall be within 15.24 cm of the plan position in


the horizontal plane at the plan elevation for the top of the shaft.

b. The vertical alignment of the shaft excavation shall not vary from
the plan alignment by more than 20.83 mm/m (1/4 inch per foot)
of depth.

c. After the shaft concrete is placed, the top of the reinforcing steel
cage shall be no more than 15.24 cm above and no more
than 15.24 cm above and no more than 7.62 cm below plan
position.

d. When casing is used, its outside diameter shall not be less than
the shaft diameter shown on the plans. When casing is not used,
the minimum diameter of the drilled shaft shall be the diameter
shown on the plans for diameters 60.96 cm (24”) or less, and not
more than 2.54 cm (1 inch) less than the diameter shown on the
plans for diameters greater than 60.96 cm (24”).

e. The bearing area of bells shall be excavated to the plan bearing


area as a minimum. All other plan dimensions shown for the bells
may be varied, when approved, to accommodate the equipment
used.

f. The top elevation of the shaft shall be within 2.54 cm (1 inch) of


the plan top of shaft elevation.

g. The bottom of the shaft excavation shall be normal to the axis of


the shaft within 62.5 mm/m (3/4 inch per foot) of shaft

diameter.

Drilled shaft excavations constructed in such a manner that the concrete shaft
cannot be completed within the required tolerances are unacceptable.

400.3.6 Steel H-Pile

Steel H-Pile shall consist of structural steel shapes of the sections indicated
on the Plans.

When placed in the leads, the pile shall not exceed the camber and sweep
permitted by allowable mill tolerance. Piles bent or otherwise damaged will be
rejected.

The loading, transporting, unloading, storing and handling of steel H-pile


shall be conducted so that the metal will be kept clean and free from damage.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-14
BRIDGE CONSTRUCTION F

400.3.7 Unfilled Tubular Steel Piles

The tubular steel piles should be or as specified by the Engineer.

The minimum wall thickness shall be as indicated in the following table

Outside Diameter Less than 355 mm 355 mm and over

Minimum wall thickness 6.5mm 9.5mm

6.5.1 Splicing

Splicing when permitted shall be made as shown on the Plans and in


accordance with this Subsection.

1. Precast Concrete Piles

a. By using prefabricated joints mounted in the forms and cast


together with the piles sections and joined together as specified
by the manufacturer and approved by the Engineer. The joints
shall be of the design and type as specified or shown on the
Plans.

b. By cutting away the concrete at the end of the pile, leaving the
reinforcing steel exposed for a length of 40 bar diameters for
corrugated or deformed bars and 60 bar diameters for plain bars.
The final cut of the concrete shall be perpendicular to the axis of
the pile. Reinforcement of the same size as that used in the pile
shall be spliced to the projecting steel in accordance with Item
404, Reinforcing Steel, and the necessary formwork shall be
placed, care being taken to prevent leakage along the pile. The
concrete shall be of the same quality as that used in the pile.
Just prior to placing concrete, the top of the pile shall be wetted
thoroughly and covered with a thin coating of neat cement,
retempered mortar, or other suitable bonding material to the
satisfaction of the Engineer. The forms shall remain in place not
less than seven (7) days. The pile shall not be driven until the
safe design has been reached.

c. By any other method shown on the Plans or approved by the


Engineer. Curing and finishing of extensions shall be the same
as in the original pile.

2. Pre-stressed Piles

Splicing of pre-
stressed precast piles will generally not be permitted, but when
permitted, it shall be made in accordance with (1) above, but only after
driving has been completed. Reinforcement bars shall be included in
the pile head for splicing to the extension bars. No additional driving
will be permitted. The Contractor, at his option, may submit alternative
plans of splicing for consideration by the Engineer.

3. Steel Piles, Shells or Pipes

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-15
BRIDGE CONSTRUCTION F

If the length of the steel pile, shell or pipe driven is insufficient to obtain
the specified bearing power, an extension of the same cross-section
shall be spliced to it. Unless otherwise shown on the Plans, splices
shall be made by butt-welding the entire cross-sections to form an
integral pile using the electric arc method. The sections connected
shall be properly aligned so that the axis of the pile shall be straight.
Bent and/or damaged piles shall be rejected.

400.3.9 Cutting Off and Capping Piles

The top of foundation piles shall be embedded in the concrete footing as


shown on the Plans.

Concrete piles shall, when approved by the Engineer, be cut off at such a
level that at least 300mm of undamaged pile can be embedded in the
structure above. If a pile is damaged below this level, the Contractor shall
repair the pile to the satisfaction of the Engineer. The longitudinal
reinforcement of the piles shall be embedded in the structure above to a
length equal to at least 40 times the diameter of the main reinforcing
corrugated bars (60 diameters for plain bars). The distance from the side of
any pile to the nearest edge of the cap shall not be less than 200mm.

When the cut off elevation for a precast pile or for the steel shell or pile for a
cast in place concrete pile is below the elevation of the bottom of the pile cap,
the pile may be built-up from the butt of the pile to the elevation of the bottom
of the cap by means of reinforced concrete extension constructed in
accordance with Subsection 400.3.8 or as approved by the Engineer.
Cut-offs of structural steel piles shall be made at right angles to the axis of
the pile. cuts shall be made in clear, straight lines and any irregularity due to
cutting or burning shall be leveled-off with deposits of weld metal prior to
placing bearing caps.

400.3.10 Defective Piles

Any pile delivered with defects, or damaged in driving due to internal


defects or by improper driving, or driven out of its proper location, or driven
below the elevation fixed by the Plans or by the Engineer, shall be corrected
at the Contractor’s expense by one of the following methods approved by the
Engineer for the pile in question:

1. Any pile delivered with defects shall be replaced by a new pile.

2. Additional pile shall be driven/casted at the location as directed by the


Engineer.

3. The pile shall be spliced or built-up as otherwise provided herein on the


underside of the footing lowered to properly embed the pile.

A precast concrete pile shall be considered defective if it has a visible crack,


extending around the four sides of the pile, or any defect which, in the
opinion of the Engineer, affects the strength or life of the pile.

When a new pile is driven or cast to replace a rejected one, the Contractor at
his own expense, shall enlarge the footing as deemed necessary by the
Engineer.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-16
BRIDGE CONSTRUCTION F

400.3.11 Painting Steel Piles

Unless otherwise provided, when required steel piles extend above the
ground surface or water surface, they shall be protected by paint as specified
for cleaning and painting metal surfaces in accordance with Item 403, Metal
Structures. This protection shall extend from the elevation shown on the
Plans to the top of the exposed steel.

400.3.12 Pile Records

The Contractor shall keep records of all piles driven or installed. A copy of
the record shall be given to the Engineer within two (2) days after each pile is
driven. The record form to be used shall be approved by the Engineer. The
pile records shall give full information on the following :

Driven Piles Cast-in-Place Piles

1. Pile type and dimension 1. Date of boring or driving (For steel


shell) & casting
2. Date of casting and concrete 2. Pile type and nominal dimension
quality (for concrete piles)

3. Date of driving 3. Length of finished pile and tip elevation

4. Driving equipment: type, 4. Details of penetration during boring or


weight & efficiency of hammer, driving of steel shell(driving records as
etc. for driven piles)

5. Description of cushion on pile head 5. Concrete quality and consistency

6. Depth driven and tip elevation 6. Time interval between boring or driving
and concreting
7. Final set for the last 20 blows (for every 10 7. Volume of concrete placed in concrete
piles and when the Engineer so requires
the penetration along the whole depth
driven shall be recorded)

8. For gravity and single-acting


hammers: the height of drop

9. For double acting-hammers ---


the frequency of blows

10. Details of any interruption in


driving

11. Level of pile top immediately


after driving and the level
when all piles in the group are
driven

12. Details of re-driving

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-17
BRIDGE CONSTRUCTION F

400.4 Method of Measurement

400.4.1 Timber, Steel and Precast Concrete Piles

1. Piles Furnished
The quantity to be paid for will be the sum of the lengths in meters of
the piles of several types and lengths ordered in writing by the Engineer,
furnished in compliance with these Specifications and stockpiled in
good condition at the project site by the Contractor and accepted by the
Engineer. The length to be paid for will include test and tension piles
ordered by the Engineer, but not those furnished by the Contractor at
his option. No allowance will be made for piles, including test piles,
furnished by the Contractor to replace piles previously accepted by the
Engineer that are subsequently lost or damaged while in stockpile, or
during handling or driving, and are ordered by the Engineer to be
removed from the site work.

In case extensions of piles are necessary, the extension length will be


included in the length of pile furnished, except for cut of length used for
extensions and measured for payment.

2. Piles Driven
The quantity to be paid for will be the sum of the lengths in meters of
the piles driven in the completed work measured from the pile tip
elevation to the bottom of the pile caps, footings or bottom of concrete
superstructure in the case of pile bents. Measurement will not include
additional piles or test piles driven that maybe necessary to suit the
Contractor’s method of construction and were driven at his option.
Unless otherwise provided for, preboring, jetting or other methods used
for facilitating pile driving operations will not be measured directly but
will be considered subsidiary to Pay Items.

400.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 400.4 shall be paid for
at the contract unit price for each of the particular item listed below that is included in
the Bill of Quantities. Price and payment shall be full compensation for furnishing
and placing of the all materials, including all labor, equipment tools and incidentals
as well as temporary works, staging areas or crane-way necessary to complete the
work prescribed in this Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement
Concrete Bored Piles Cast in Place,
400 (23)a7 (1.40m diameter ) Meter

Concrete Bored Piles Cast in Place,


400 (23)a9 (1.60m diameter ) Meter
Concrete Bored Piles Cast in Place,
400 (23)a13 (2.00m diameter ) Meter
Concrete Bored Piles Cast in Place,
400 (23)a19 (2.60m diameter ) Meter
Concrete Bored Piles Cast in Place,
400 (23)a21 (2.80m diameter ) Meter

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-18
BRIDGE CONSTRUCTION F
Permanent Casing,
400 (24)g1 (1.40m dia x 10mm thick) Meter
Permanent Casing,
400 (24)i1 (1.60m dia x 12mm thick) Meter
Permanent Casing,
400 (24)m1 Meter
(2.0m dia. x 12mm thick)
Permanent Casing,
400 (24)s1 Meter
(2.60m dia. x 16mm thick)
Permanent Casing,
400 (24)u1 Meter
(2.80m dia. x 16mm thick)

ITEM 400(27)a PILE INTEGRITY TESTING

400(27)a.1 Integrity Testing

The completed bored pile shall be subjected to non-destructive testing to determine


the extent of any defects that may be present in the pile. Integrity-testing method to
be adopted shall be low-strain, by either the Pulse Echo Method (PEM) or Transient
Response Method (TRM) in accordance with ASTM D 5882, subject to the approval
of the Engineer.

The testing shall be carried out by the material engineer of the Contractor with
specialized experience in this field and shall be approved by the Engineer. Prior to
integrity testing, all apparatus shall be calibrated to ensure that precise and reliable
data will be obtained. Certificate of calibration shall be submitted by the Contractor
unless otherwise waived by the Engineer.

400(27)a.2 Report

The Contractor shall submit a report on the integrity testing containing vital
information necessary for the pile evaluation, prescribed in ASTM D5882. Such
report shall be submitted within seven days after the completion of each test.

400(27)a.3 Final Integrity Evaluation

If and when necessary as determined after evaluation of the integrity of the pile
subjected to the test, the Engineer may require further test or dictate pile repair or
replacement, depending on the seriousness of the defect that may be established

For piles that need to be repaired, the Contractor shall submit for approval of the
Engineer, remedial measures he intends to implement.

For rejected piles, the Contractor shall make a proposal for review and approval of
the Engineer. Such proposal shall include the necessary design calculations, the
methodology he intends to implement, equipment and other items as may be
necessary. Approval of these proposals however does not relieve the Contractor of
his contractual responsibilities for any defects as a result of the proposals. The cost
of further tests required, remedial measures and replacement of rejected piles shall
be borne by the Contractor.

400(27)a.4 Method of Payment

The quantity of the load tests to be paid for will be the number tests completed and
accepted except that load tests made to calibrate different types of hammers, if not
included in the Bill of Quantities, will not be measured for payments. Any incidentals

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-19
BRIDGE CONSTRUCTION F

not otherwise described hereto are considered subsidiary to the work item and shall
not be paid for separately.

Anchor and test piling, which are not part of the completed structure, will be included
in the unit bid price for each “Load Test”. Anchor and test piling or anchor and test
shafts, which are a part of the permanent structure, will be paid for under the
appropriate Item.

400(27a.5 Basis of Payment

The accepted quantity as provided in Section 400(27)a.4 shall be paid at the


contract unit price in the Bill of Quantities. The price and payment shall constitute
full compensation of the cost of Integrity Pile Testing, including tools, apparatus,
testing and reporting and all labor and incidentals necessary to complete the work
prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement

Load Test
400 (27)a Each
(Low Strain Dynamic Method, PIT)

ITEM 400(28) PILE DYNAMIC TESTING

400(28).1 Description

High-Strain Dynamic Testing is performed by obtaining and analyzing record of shaft


force and velocity under weights impact for evaluation of shaft load carrying capacity,
structural integrity, and load-movement and shaft-soil load transfer relationships

Testing of drilled and cast-in-place shafts closely resembles testing of driven piles
during re-strike. The following are specifications and instructions for high-strain
dynamic testing of drilled and cast-in-place foundation shafts.

The work shall consist of furnishing all materials, equipment, and labor necessary
for conducting high-strain dynamic tests on drilled and cast-in-placed shafts
(hereinafter noted as test shaft). The Contractor shall not conduct the test himself
but shall appoint an Independent Specialist to conduct all testing. The Contractor
will be required to supply materials, equipment and labor, hereinafter as specified
including prior to, during, and after the load test. High-strain Dynamic Testing is a
non-destructive quick test and it is intended that the test shaft be left in a condition
suitable for use in production. Testing procedures shall conform to the ASTM
D4945-89 specification unless as otherwise noted below. The shaft used for the
test will be instrumented and tested by the Independent Specialist, as approved by
the Engineer, meeting requirements outlined in the ASTM D4945-89 specification
as well as those outlined below.

400(28).2 Equipment and Material Requirements

The Contractor shall supply all labor, materials and equipment required to prepare
the test shaft, dynamically load the shaft, and return the shaft to a condition suitable
for use in the finished structure. Equipment to be supplied by the Contractor
required to perform the test includes but is not limited to:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-20
BRIDGE CONSTRUCTION F

1) If a permanent casing is not used to construct the shaft, then a shaft


top extension consisting of a thin walled casing or equivalent shall be
used to extend the shaft by length at least equal to two and a half (2
½) pile diameters such that the extended pile head is readily
accessible by the testing engineer at the time of the test. If the shaft
top is below grade, then the Contractor must have equipment
available to remove surrounding soil (creating a safe working
environment) so as to expose the concrete.

2) Means to ensure flat, level (axial to shaft) and sound concrete shaft
top. Concrete should be on level with, or above the casing. Prior to
the test, four “windows” approximately sized 6 by 6 inches (150 by
150mm) shall be provided at each quadrant of the casing

3) A drop weight in the range of one and half to two percent (1.5% to
2%) of the anticipated pile capacity, or as determined by the Engineer.

4) A guide allowing variable drop heights typically between 2 to 3m, or


as determined by the Engineer.

5) A shaft top cushion consisting of new sheets of plywood with total


thickness between 2 to 6 inches (50 to 150 mm), or as determined by
the Engineer.

6) A steel striker plate with a thickness of at least 2 inches (50 mm) and
an area between 70 to 90% of shaft top area but not less than
the area of the impacting surface of the drop weight shall be
placed on top of the plywood cushion.

7) If protruding reinforcing bars are present, the Contractor has the


option to incorporate the reinforcing steel in the test area. Upon
successful completion of the dynamic test, the surrounding concrete
can then be removed as to make the pile suitable for use in the
structure. If the Contractor selects not to incorporate the steel in such
a manner as described above, 20% of the shaft cross sectional area
shall be supplied with sufficient length, such that the ram impact will
not interface with the reinforcing bars. Steel striker plates and
plywood cushion must also be sized so that they cover as much as
the impact area as possible.

8) One (1) k of 200 Volt AC Power.

9) Surveyor’s transit, laser light or equivalent for measurement of pile


set under each impact.

400(28).3 Dynamic Testing Firm

Testing is to be performed by an accredited Independent Specialist from a firm with


a minimum of four (4) year experience in dynamic load testing. The actual test
shall be conducted and/or supervised by a practicing Geotechnical Engineer with at
least five (5) years of dynamic testing experience or who has achieved basic or
better level experience on the foundation QA examination as Provider of PDA
Testing services. The firm selected by the Contractor must be approved by the
Engineer.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-21
BRIDGE CONSTRUCTION F

The Independent Specialist must supply the following testing instrumentation in


addition to instrumentation outlined in ASTM specification D4945-89 Section 5:

a) Pile Driving Analyzer (PDA)


b) Calibrated Strain Transducers
c) Calibrated Accelerometer

400(28).4 Reporting Results

The Independent Specialist appointed by the Contractor shall submit a timely report
of the testing results to the Engineer for approval. The field results from at least
one (CAPWAP) analysis (case Pile Wave Analysis Program) shall be submitted.
The CAPWAP analysis shall be performed by an engineer that has achieved an
advanced or better level on the foundation QA examination as providers of PDA
Testing Services. The report must also provide the following:

a) Wave Equation analysis results obtained prior to testing


b) CAPWAP analysis result.
c) For each impact the maximum measured force, maximum
calculated tension force, transferred energy to the gage
location, corresponding stresses, and the Case Method
bearing capacity.
d) Assessment of the test result with respect to both pile
capacity and integrity.

400(28).5 Method of Payment

The quantity of the load tests to be paid for shall be the number of bored piles
tested and accepted. Any item indicated and not otherwise described hereto shall
be considered subsidiary to the work item and shall not be paid for separately.

400(28).6 Basis of Payment

The accepted quality as provided in Section 400(28).5 shall be paid at the contract
unit price shown below. The payment shall constitute full compensation for the cost
of Pile Dynamic Testing, the cost of appointing an Independent Specialist, all
instrumentation, testing and testing equipment, analysis and reporting, tools, labor
and all other incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement

Load Test
400(28) (Pile Dynamic Method, PDA) Each

ITEM 401 RAILINGS

401.1 Description

This Item shall consist of furnishing or fabricating and/or placing railings, for
bridges and other structures of the material or combination of materials shown on
the plans, constructed in reasonably close conformity with this Specification and to
the lines, grades and dimensions shown in the Plans. Railing shall be classified as

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-22
BRIDGE CONSTRUCTION F

concrete, steel, aluminum or timber in accordance with the predominating material


contained in each.

401.2 Material Requirements

401.2.1 Concrete

It shall conform to the applicable requirements prescribed in Item 405,


Structural Concrete.

401.2.2 Reinforcing Steel

It shall conform to the requirements of Item 404, Reinforcing Steel and


Wire Rope.

401.2.3 Steel

Structural steel consisting of steel and iron plates, shapes, pipes, fittings
and castings shall conform to the requirements of Item 403, Metal
Structures.

401.2.4 Aluminum

It shall conform to the requirements of AASHTO M 193, ASTM B 221 or


ASTM B 308 or as called for on the Plans.
401.2.5 Paint

It shall conform to the requirements of Item 411, Paints.

401.3 Construction Requirement

401.3.1 General

Railings shall be constructed to the lines and grades shown on the plans
and shall not reflect any unevenness in the structure. All railing post shall
be set plumb in hand or mechanically dug holes, unless driving is
permitted. In the latter case, the manner of driving shall be in such as to
avoid battering or distorting of post. Postholes shall be backfilled with
acceptable material placed in layers and thoroughly compacted. When it
is necessary to cut post holes in existing pavement, all loose materials
shall be removed and the paving replaced in kind. Bridge railings shall
not be constructed on a span until centering or falsework has been
removed, rendering the span self-supporting.

Rail elements shall be erected according to plans and in a manner


resulting in smooth, continuous installation with laps in the direction of
traffic flow. All bolts except adjustment bolts shall be drawn tight. Bolts
shall be sufficient length to extend beyond the nuts by more than 25mm.

Where painting of the railing component is specified, any damaged to the


shop coat of paint shall be corrected by an application of an approved
rust-inhibitive primer prior to painting. Ungalvanized surfaces inaccessible
to painting after erection shall be field painted before erection. The railing
components shall be given specified number of coats of paint uniformly
applied by thorough brushing or by approved pressure spray.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-23
BRIDGE CONSTRUCTION F

Galvanized surfaces which have been abraded so that the base metal is
exposed, threaded portions of all fittings and fasteners and cut ends of
bolts shall be painted with two (2) coats of zinc-dust and zinc oxide paint.

401.3.2 Concrete Railing

1. Railing Cast-In-Place

The portion of the railing or parapet which is to be cast-in-place shall be


constructed in accordance with the requirements of Item 405, Structural
Concrete. Special care shall be exercised to secure smooth and tight
fitting forms which can be rigidly held in line and grade and removed
without injury to the concrete. Forms shall either be of single width boards
or shall be lined with suitable material to have a smooth surface, which
shall meet the approval of the Engineer or as shown on the Plans.

All moldings, panel work and bevel strips shall be constructed according
to the detailed Plans with metered joints, and all corners in the finished
work shall be true, sharp and clean-cut and shall be free from cracks,
spalls and other defects.

2. Precast Railings

Moist tamped mortar precast members shall be removed from the molds
as soon as practicable and shall be kept damp for a period of least ten
(10) days. Any member that shows checking of soft corners of surfaces
shall be rejected.

Expansion joint shall be constructed as to permit freedom of movement.


After all work is completed, all loose or thin shells of mortar likely to spall
under movement shall be carefully removed from all expansion joints by
means of sharp chisel.

401.3 Method of Measurement

The quantity to be paid for shall be the number linear meters of specified railing
actually completed and accepted measured from center to center of end posts.

401.4 Basis of Payment:

The accepted quantity measured as prescribed in Section 401.4, shall be paid for
at the contract unit price for Railing, which price and payment shall be full
compensation for furnishing and placing all materials including all labor, equipment,
tools and incidentals necessary to complete this Item.

Payments will be made under:


Unit of
Pay Item Number Description
Measurement

401(2) a Reinforced Concrete Railing (Standard) Linear Meter

401(2) b Reinforced Concrete Railing (Baluster), Linear Meter


Painted

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-24
BRIDGE CONSTRUCTION F

ITEM 404 REINFORCING STEEL

404.1 Description

This item shall consist of furnishing, bending, fabricating and placing of steel
reinforcement of the type, size, shape and grade required in accordance with the
Specification and in conformity with the requirements shown on the Plans or as
directed by the Engineer.

404.2 Material Requirements

Reinforcing steel shall meet the requirements of Item 710, Reinforcing Steel and
Wire Rope.

404.3 Construction Requirements

Should the Contractor propose to use reinforcing bar complying with JIS
Standards, the Contractor shall, before materials are ordered, furnish the Engineer
for approval Drawings annotated in English of the reinforcement arrangement of
each affected structure, showing clearly any revised spacing or diameters of bars
required to ensure that the design strength of the structure is maintained. The
design strength shall be defined as the product of yield strength of reinforcing bar
and the area of reinforcing bar provided in the section. Any expense incidental to
the revisions of materials furnished in accordance with such Drawings shall be
borne by the Contractor.

404.3.1 Order Lists

Before materials are ordered, the Contractor shall furnish all order lists
and bending diagrams to the Engineer for approval. The approval of the
order lists and bending diagrams by the Engineer shall in no way relieve
the Contractor off responsibility for the correctness of such lists and
diagrams.

Any expense incident to the revisions of materials furnished in


accordance with such lists and diagrams to make them comply with the
Plans shall be borne by the Contractor.

404.3.2 Rebar Fabrication and Installation

Fabrication and installation of rebar shall be done by a competent steel


man to ensure good workmanship. There shall be proper supervision by
the Contractor for the “cutting and bending” of reinforcing bars and
frequent checking of bar schedule and clearances, from the beginning
until the rebars are installed.

404.3.3 Protection of Materials

Steel reinforcement shall be stored above the surface of the ground upon
platforms, skids, or other supports and shall be protected as far as
practicable from mechanical injury and surface deterioration caused by
exposure to conditions producing rust. When placed in the work,
reinforcement shall be free from dirt, detrimental rust, loose scale, paint,
grease, oil, or other foreign materials. Reinforcement shall be free from

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-25
BRIDGE CONSTRUCTION F

injurious defects such as cracks and laminations. Rust, surface seams,


surface irregularities or mill scale will not be cause for rejection, provided
the minimum dimensions, cross sectional area and tensile properties of a
hand wire brushed specimen meets the physical requirements for the
size and grade of steel specified

404.3.4 Bar Bending, Splicing, Placing and Fastening

The Contractor shall submit to the Engineer for approval, the shop
drawings indicating the bending, cutting, splicing and installation of all
reinforcing bars.

All reinforcing bars requiring bending shall be cold-bent to the shapes


shown on the Plans or required by the Engineer. Bars shall be bent
around a circular pin having the following diameters (D) in relation to the
diameter of the bar (d):

Nominal diameter, d,mm Pin diameter (D)


10 to 20 6d
25 to 28 8d
32 and greater 10d

All steel reinforcement shall be accurately placed in the position shown


on the Plans or required by the Engineer and firmly held there during the
placing and setting of the concrete. Bars shall be tied at all intersections
except where spacing is less than 300mm in each directions, in which
case, alternate intersections shall be tied. Ties shall be fastened on the
inside.

Distance from the forms shall be maintained by means of stays, blocks,


ties, hangers, or other approved supports, so that it does not vary from
the position indicated on the Plans by more than 6mm. Blocks for holding
reinforcement from contact with the forms shall be precast mortar blocks
of approved shapes and dimensions. Layers of bars shall be separated
by precast mortar blocks or by other equally suitable devices. The use of
pebbles, pieces of broken stone or brick, metal pipe and wooden blocks
shall not be permitted. Unless otherwise shown on the Plans or required
by the Engineer, the minimum distance between bars shall be 40mm.
Reinforcement in any member shall be placed and then inspected and
approved by the Engineer before the placing of concrete begins.
Concrete placed in violation of this provision may be rejected and
removal may be required. If fabric reinforcement is shipped in rolls, it
shall be straightened before being placed. Bundled bars shall be tied
together at not more than 1.8m intervals.

All reinforcement shall be furnished in the full lengths indicated on the


Plans. Splicing of bars, except where shown on the Plans, will not be
permitted without the written approval of the Engineer. Splices shall be
staggered as far as possible and with a minimum separation of not less
than 40 bar diameters. Not more than one-third of the bars may be
spliced in the same cross-section, except where shown on the Plans.
Unless otherwise shown on the Plans, bars shall be lapped a minimum
distance of:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-26
BRIDGE CONSTRUCTION F

But not less


Splice Type Grade 40 Grade 60
than
300 mm
Tension 24 bar dia 36 bar dia
Compression 20 bar dia 24 bar dia 300 mm

In lapped splices, the bars shall be placed in contact and wired together.
Lapped splices will not be permitted at locations where the concrete
section is insufficient to provide minimum clear distance of one and one-
third the maximum size of coarse aggregate between the splice and the
nearest adjacent bar. Welding of reinforcing steel shall be done only if
detailed on the Plans or if authorized by the Engineer in writing. Spiral
reinforcement shall be spliced by lapping at least one and a half turns or
by butt welding unless otherwise shown on the Plans.

404.4 Method of Measurement

The quantity of reinforcing steel to be paid for will be the final quantity placed and
accepted in a completed structure.

No allowance will be made for tie-wires, separators, wire chairs and other material
used in fastening the reinforcing steel in place. If bars are substituted upon the
Contractor’s request and approved by the Engineer and as result thereof more
steel is used than specified, only the mass specified shall be measured for
payment.

No measurement or payment will be made for splices added by the Contractor


unless directed or approved by the Engineer.

Quantities to be paid for shall be the calculated theoretical number of kilograms of


reinforcing steel bars, mesh or mats as determined from the net length of the steel
as shown on the drawings, incorporated in concrete and accepted.

Reinforcing steel bars shall not be measured and paid separately where structures
are paid in unit, as they are deemed included in the unit pay items of
the structures.

The weight of plain or deformed bars or bar-mat information to AASHTO


Specifications will be computed from the theoretical weight of plain round bars of
the same nominal size as shown on the following table:

Bar Designation Size (mm) Unit Weight (kg/m)

#2 6 0.222
#3 10 0.616
#4 12 0.888
#5 16 1.579
#6 20 2.466
#8 25 3.854
#9 28 4.833
#10 32 6.313
#11 36 7.991

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-27
BRIDGE CONSTRUCTION F

The weight of reinforcing steel conforming to JIS Standards will be computed from
an equivalent table appropriate to JIS Standards and approved by the Engineer.

404.5 Basis of Payment

The accepted quantity, measured as prescribed in Section 404.4, shall be paid for
at the contract price for Reinforcing Steel which price and payment shall be full
compensation for furnishing and placing all materials, including all labor,
equipment, tools and incidentals necessary to complete the work prescribed in this
Item.

Payments will be made under:


Pay Item Unit of
Description
Number Measurement

404(1)a Reinforcing Steel Bar, (Grade 40) Kilogram

404(1)b Reinforcing Steel Bar, (Grade 60) Kilogram

ITEM 405 STRUCTURAL CONCRETE

405.1 Description

405.1.1 Scope

This Item shall consist of furnishing, bending, placing and finishing


concrete in all structures except pavements in accordance with this
Specification and conforming to the lines, grades, and dimensions shown
on the Plans. Concrete shall consist of a mixture of Portland Cement, fine
aggregate, coarse aggregate, admixture when specified, and water
mixed in the proportions specified or approved by the Engineer.

405.1.2 Classes and Uses of Concrete

Five classes of concrete are provided for in this Item, namely: A, B, C, P


and Seal. Each class shall be used in that part of the structure as called
for on the Plans.

The classes of concrete will generally be used as follows:

Class A – All superstructures and heavily reinforced substructures.


The important parts of the structure included are slabs, beams,
girders, columns, arch ribs, box culverts, reinforced abutments,
retaining walls, and reinforced footings.

Class B – Footings, pedestals, massive pier shafts, pipe bedding, and


gravity walls, unreinforced or with only a small amount of
reinforcement.

Class C – Thin reinforced sections, railings, precast R.C. piles and


cribbing and for filler in steel grid floors.

Class P – Prestressed concrete structures and members.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-28
BRIDGE CONSTRUCTION F

Seal – Concrete deposited in water.

405.2 Material Requirements

405.2.1 Portland Cement

It shall conform to all the requirements of Subsection 311.2.1.

405.2.2 Fine Aggregate

It shall conform to all the requirements of Subsection 311.2.2.

405.2.3 Coarse Aggregate

It shall conform all the requirements of Subsection 311.2.3 except that


gradation shall conform to Table 405.1.

Table 405.1 – Grading Requirements for Coarse Aggregate


Standard Alternate Class Class Class Class Class
Mm US A B C P Seal
Standard

63 2-1/2”
50 2” 100 100
100
37.5 1-1/2” 95 – 100 -
95-100
25 1” - 35 – 70 100
-
19.0 ¾” 35 – 70 - 100 -
25-60
12.5 ½” - 10 – 30 90 – 100 -
-
9.5 3/8” 10 – 30 - 40 – 70 20 – 55
0-10
4.75 No.4 0-5 0-5 0 – 15* 0 – 10*

*The measured cement content shall be within plus (+) or minus (-) 2 mass
percent of the design cement content.

405.2.4 Water

It shall conform to the requirements of Subsection 311.2.4

405.2.5 Reinforcing Steel

It shall conform to the requirements of Item 710, Reinforcing Steel and


Wire Rope.

405.2.6 Admixtures

Admixtures shall conform to the requirements of Subsection 311.2.7

405.2.7 Curing Materials

Curing materials shall conform to the requirements of Subsection 311.2.8.

405.2.8 Expansion Joint

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-29
BRIDGE CONSTRUCTION F

Expansion joint materials shall be:

1. Preformed Sponge Rubber and Cork, conforming to AASHTO M


153.

2. Hot-Poured Elastic Type, conforming to AASHTO M 173.

3. Preformed Fillers, conforming to AASHTO M 213.

405.2.9 Elastomeric Compression Joint Seals

These shall conform to AASHTO M 220.

405.2.10 Elastomeric Bearing Pads

These shall conform to AASHTO M 251 or Item 412 – Elastomeric


Bearing Pads.

405.2.11 Storage of Cement and Aggregates

Storage of cement and aggregates shall conform to all the requirements


of Subsection 311.2.10.

405.3 Sampling and Testing of Structural Concrete

As work progresses, at least one (1) sample consisting of three (3) concrete cylinder
test specimens, 150 x 300mm (6 x 12 inches), shall be taken from each seventy five
(75) cubic meters of each class of concrete or fraction thereof placed each day.

Compliance with the requirements of this Section shall be determined in accordance


with the following standard methods of AASHTO:

Sampling of fresh concrete T 141


Weight per cubic meter and air content (gravi- Metric) of concrete T 121
Sieve analysis of fine and coarse aggregates T 27
Slump of Portland Cement Concrete T 119
Specific gravity and absorption of fine aggregate T 84

Tests for strength shall be made in accordance with the following:

Making and curing concrete compressive and


flexural tests specimens in the field
T 23
Compressive strength of molded concrete
T 22
Cylinders

405.4 Production Requirements

405.4.1 Proportioning and Strength of Structural Concrete

The concrete materials shall be proportioned in accordance with the


requirements for each class of concrete as specified in Table 405.2,
using the absolute volume method as outlined in the American Concrete
Institute (ACI) Standard 211.1. “Recommended Practice for Selecting

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-30
BRIDGE CONSTRUCTION F

Proportions for Normal and Heavyweight Concrete”. Other methods of


proportioning may be employed in the mix design with prior approval of
the Engineer. The mix shall either be designed or approved by the
Engineer. A change in the source of materials during the progress of
work may necessitate a new mix design.

The strength requirements for each class of concrete shall be as


specified in Table 405.2.

Table 405.2 Composition and Strength of Concrete for Use in Structures


Class Minimum Maximum Consistency Designated Minimum
Of Cement Water/ Range in Size of Coarse Compressive
Concrete Content Cement Slump Aggregate Strength of
Per m3 Ratio 150x300mm
Square Opening Concrete
kg kg/kg mm (inch) Std. mm Cylinder
(bag**) Specimen at
28 days,
MN/m2 (psi)
A
364 0.53 50 – 100 37.5 – 4.75 20.7
(9.1 bags) (2 – 4) (1-1/2” – No. 4) (3000)
B
320 0.58 50 – 100 50 – 4.75 16.5
(8 bags) (2 – 4) (2” – No. 4) (2400)
C
380 0.55 50 – 100 12.5 – 4.75 20.7
(9.5 bags) (2 – 4) (1/2” – No. 4) (3000)
P
440 0.49 100 max. 19.0 – 4.75 37.7
(11 bags) (4 max.) (3/4” – No. 4) (5000)
Seal
380 0.58 100 – 200 25 – 4.75 20.7
(9.5 bags) (4 - 8) (1” – No. 4) (3000)

*The measured cement content shall be within plus or minus 2 mass percent of the
design cement content.
**Based on 40 kg/bag

405.4.2 Consistency

Concrete shall have a consistency such that it will be workable in the


required position. It shall be of such a consistency that it will flow around
reinforcing steel but individual particles of the coarse aggregate when
isolated shall show a coating of mortar containing its proportionate
amount of sand. The consistency of concrete shall be gauged by the
ability of the equipment to properly place it and not by the difficulty in
mixing and transporting. The quantity of mixing water shall be determined
by the Engineer and shall not be varied without his consent. Concrete as
dry as it is practical to place with the equipment specified shall be used.

405.4.3 Batching

Measuring and batching of materials shall be done at a batching plant.

1. Portland Cement

Either sacked or bulk cement may be used. No fraction of a sack of


cement shall be used in a batch of concrete unless the cement is
weighed. All bulk cement shall be weighed on an approved weighing
device. The bulk cement weighing hopper shall be properly sealed and

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-31
BRIDGE CONSTRUCTION F

vented to preclude dusting operation. The discharge chute shall not be


suspended from the weighing hopper and shall be so arranged that
cement will neither be lodged in it nor leak from it.

Accuracy of batching shall be within plus (+) or minus (-) 1 mass percent.

2. Water

Water may be measured either by volume or by weight. The accuracy of


measuring the water shall be within a range of error of not more than 1
percent.

3. Aggregates

Stockpiling of aggregates shall be in accordance with Subsection


311.2.10. All aggregates whether produced or handled by hydraulic
methods or washed, shall be stockpiled or binned for draining for at least
12 hours prior to batching. Rail shipment requiring more than12 hours will
be accepted as adequate binning only if the car bodies permit free
drainage. If the aggregates contain high or non-uniform moisture content,
storage or stockpile period in excess of 12 hours may be required by the
Engineer.
Batching shall be conducted as to result in a 2 mass percent maximum
tolerance for the required materials.

4. Bins and Scales

The batching plant shall include separate bins for bulk cement, fine
aggregate and for each size of coarse aggregate, a weighing hopper,
and scales capable of determining accurately the mass of each
component of the batch.

Scales shall be accurate to one-half (0.5) percent throughout the range


used.

5. Batching

When batches are hauled to the mixer, bulk cement shall be transported
either in waterproof compartments or between the fine and coarse
aggregate. When cement is placed in contact with moist aggregates,
batches will be rejected unless mixed within 1-1/2 hours of such contact.
Sacked cement may be transported on top of the aggregates.

Batches shall be delivered to the mixer separate and intact. Each batch
shall be dumped cleanly into the mixer without loss, and, when more than
one batch is carried on the truck, without spilling of material from one
batch compartment into another.

6. Admixtures

The Contractor shall follow an approved procedure for adding the


specified amount of admixture to each batch and will be responsible for
its uniform operation during the progress of the work. He shall provide
separate scales for the admixtures which are to be proportioned by
weight, and accurate measures for those to be proportioned by volume.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-32
BRIDGE CONSTRUCTION F

Admixtures shall be measured into the mixer with an accuracy of plus or


minus three (3) percent.

The use of Calcium Chloride as an admixture will not be permitted.

405.4.4 Mixing and Delivery

Concrete may be mixed at the site of construction, at a central point or by


a combination of central point and truck mixing or by a combination of
central point mixing and truck agitating. Mixing and delivery of concrete
shall be in accordance with the appropriate requirements of AASHTO M
157 except as modified in the following paragraphs of this section, for
truck mixing or a combination of central point and truck mixing or truck
agitating. Delivery of concrete shall be regulated so that placing is at a
continuous rate unless delayed by the placing operations. The intervals
between delivery of batches shall not be so great as to allow the concrete
in-place to harden partially, and in no case shall such an interval exceed
30 minutes.

In exceptional cases and when volumetric measurements are authorized,


for small project requiring less than 75 cu.m. per day of pouring, the
weight proportions shall be converted to equivalent volumetric proportions.
In such cases, suitable allowance shall be made for variations in the
moisture condition of the aggregates, including the bulking effect in the
fine aggregate. Batching and mixing shall be in accordance with ASTM
C 685, Section 6 through 9.

Concrete mixing, by chute is allowed provided that a weighing scales for


determining the batch weight will be used.

For batch mixing at the site of construction or at a central point, a


batch mixer of an approved type shall be used. Mixer having a rated
capacity of less than a one-bag batch shall not be used. The volume of
concrete mixed per batch shall not exceed the mixer’s nominal capacity
as shown on the manufacturer’s standard rating plate on the mixer except
that an overload up to 10 percent above the mixer’s nominal capacity
may be permitted, provided concrete test data for strength, segregation,
and uniform consistency are satisfactory and provided no spillage of
concrete takes place. The batch shall be so charge into the drum that a
portion of the water shall enter in advance of the cement and aggregates.
The flow of water shall be uniform and all water shall be in the drum by
the end of the first 15 seconds of the mixing period. Mixing time shall be
measured from the time all materials, except water, are in the drum.
Mixing time shall not be less than 60 seconds for mixers having a
3
capacity of 1.5m or less. For mixers having a capacity greater than
3
1.5m , the mixing time shall not be less than 90 seconds. If timing starts,
the instant the skip reaches its maximum raised position, 4 seconds shall
be added to the specified mixing time. Mixing time ends when the
discharge chute opens.

The mixer shall be operated at the drum speed as shown on the


manufacturer’s name plate on the mixer. Any concrete mixed less than
the specified time shall be discarded and disposed off by the Contractor
at his own expenses.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-33
BRIDGE CONSTRUCTION F

The timing device on stationary mixers shall be equipped with a bell or


other suitable warning device adjusted to give a clearly audible signal
each time the lock is released. In case of failure of the timing device, the
Contractor will be permitted to continue operations while it is being
repaired, provided he furnishes an approved timepiece equipped with
minute and second hands. If the timing device is not placed in good
working order within 24 hours, further use of the mixer will be prohibited
until repairs are made.

Retempering concrete will not be permitted. Admixtures for increasing


the workability, for retarding the set, or for accelerating the set or
improving the pumping characteristics of the concrete will be permitted
only when specifically provided for in the Contract, or authorized in writing
by the Engineer.

1. Mixing Concrete: General

Concrete shall be thoroughly mixed in a mixer of an approved size


and type that will insure a uniform distribution of the materials
throughout the mass.

All concrete shall be mixed in mechanically operated mixers.


Mixing plant and equipment for transporting and placing concrete
shall be arranged with an ample auxiliary installation to provide a
minimum supply of concrete in case of breakdown of machinery
or in case the normal supply of concrete is disrupted. The
auxiliary supply of concrete shall be sufficient to complete the
casting of a section up to a construction joint that will meet the
approval of the Engineer.

Equipment having components made of aluminum or magnesium


alloys, which would have contact with plastic concrete during
mixing, transporting or pumping of Portland Cement concrete,
shall not be used.

Concrete mixers shall be equipped with adequate water storage


and a device of accurately measuring and automatically
controlling the amount of water used.

Materials shall be measured by weighing. The apparatus provided


for weighing the aggregates and cement shall be suitably
designed and constructed for this purpose. The accuracy of all
weighing devices except that for water shall be such that
successive quantities can be measured to within one percent of
the desired amounts. The water measuring device shall be
accurate to plus or minus 0.5 mass percent. All measuring
devices shall be subject to the approval of the Engineer. Scales
and measuring devices shall be tested at the expense of the
Contractor as frequently as the Engineer may deem necessary to
insure their accuracy.

Weighing equipment shall be insulated against vibration or


movement of other operating equipment in the plant. When the
entire plant is running, the scale reading at cut-off shall not vary
from the weight designated by the Engineer more than one mass

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-34
BRIDGE CONSTRUCTION F

percent for cement, 1-1/2 mass percent for any size of aggregate,
or one (1) mass percent for the total aggregate in any batch.

2. Mixing Concrete at Site

Concrete mixers may be of the revolving drum or the revolving


blade type and the mixing drum or blades shall be operated
uniformly at the mixing speed recommended by the manufacturer.
The pick-up and throw-over blades of mixers shall be restored or
replaced when any part or section is worn 20mm or more below
the original height of the manufacturer’s design. Mixers and
agitators which have an accumulation of hard concrete or mortar
shall not be used.

When bulk cement is used and volume of the batch is 0.5m3 or


more, the scale and weigh hopper for Portland Cement shall be
separate and distinct from the aggregate hopper or hoppers. The
discharge mechanism of the bulk cement weigh hopper shall be
interlocked against opening before the full amount of cement is in
the hopper. The discharging mechanism shall also be interlocked
against opening when the amount of cement in the hopper is
underweight by more than one (1) mass percent or overweight by
more than 3 mass percent of the amount specified.

When the aggregate contains more water than the quantity


necessary to produce a saturated surface dry condition,
representative samples shall be taken and the moisture content
determined for each kind of aggregate.
The batch shall be so charged into the mixer that some water will
enter in advance of cement and aggregate. All water shall be in
the drum by the end of the first quarter of the specified mixing
time.

Cement shall be batched and charged into the mixer so that it will
not result in loss of cement due to the effect of wind, or in
accumulation of cement on surface of conveyors or hoppers, or in
other conditions which reduce or vary the required quantity of
cement in the concrete mixture.

The entire content of a batch mixer shall be removed from the


drum before materials for a succeeding batch are placed therein.
The materials composing a batch except water shall be deposited
simultaneously into the mixer.

All concrete shall be mixed for a period of not less than 1-1/2
minutes after all materials, including water, are in the mixer.
During the period of mixing, the mixer shall operate at the speed
for which it has been designed.

Mixers shall be operated with an automatic timing device that can


be locked by the Engineer. The time device and discharge
mechanics shall be so interlocked that during normal operation no
part of the batch will be charged until the specified mixing time
has elapsed.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-35
BRIDGE CONSTRUCTION F

The first batch of concrete materials placed in the mixer shall


contain a sufficient excess of cement, sand, and water to coat
inside of the drum without reducing the required mortar content of
the mix. When mixing is to cease for a period of one hour or
more, the mixer shall be thoroughly cleaned.

3. Mixing Concrete at Central Plant

Mixing at central plant shall conform to the requirements for


mixing at the site.

4. Mixing Concrete in Truck

Truck mixers, unless otherwise authorized by the Engineer, shall


be of the revolving drum type, water-tight, and so constructed that
the concrete can be mixed to insure a uniform distribution of
materials throughout the mass. All solid materials for the concrete
shall be accurately measured and charged into the drum at the
proportioning plant. Except as subsequently provided, the truck
mixer shall be equipped with a device by which the quantity of
water added can be readily verified. The mixing water may be
added directly to the batch, in which case a tank is not required.
Truck mixers may be required to be provided with a means of
which the mixing time can be readily verified by the Engineer.

The maximum size of batch in truck mixers shall not exceed the
minimum rated capacity of the mixer as stated by the
manufacturer and stamped in metal on the mixer. Truck mixing,
shall, unless other-wise directed be continued for not less than
100 revolutions after all ingredients, including water, are in the
drum. The mixing speed shall not be less than 4 rpm, nor more
than 6 rpm.

Mixing shall begin within 30 minutes after the cement has been
added either to the water or aggregate, but when cement is
charged into a mixer drum containing water or surface wet
o
aggregate and when the temperature is above 32 C, this limit
shall be reduced to 15 minutes. The limitation in time between the
introduction of the cement to the aggregate and the beginning of
the mixing may be waived when, in the judgement of the Engineer,
the aggregate is sufficiently free from moisture, so that there will
be no harmful effects on the cement.

When a truck mixer is used for transportation, the mixing time


specified in Subsection 405.4.4 (3) at a stationary mixer may be
reduced to 30 seconds and the mixing completed in a truck mixer.
The mixing time in the truck mixer shall be as specified for truck
mixing.

5. Transporting Mixed Concrete

Mixed concrete may only be transported to the delivery point in


truck agitators or truck mixers operating at the speed designated
by the manufacturers of the equipment as agitating speed, or in
non-agitating hauling equipment, provided the consistency and
workability of the mixed concrete upon discharge at the delivery

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-36
BRIDGE CONSTRUCTION F

point is suitable point for adequate placement and consolidation


in place.

Truck agitators shall be loaded not to exceed the manufacturer


guaranteed capacity. They shall maintain the mixed concrete in a
thoroughly mixed and uniform mass during hauling.

No additional mixing water shall be incorporated into the concrete


during hauling or after arrival at the delivery point.

The rate of discharge of mixed concrete from truck mixers or


agitators shall be controlled by the speed of rotation of the drum in
the discharge direction with the discharge gate fully open.

When a truck mixer or agitator is used for transporting concrete to


the delivery point, discharge shall be completed within one hour,
or before 250 revolutions of the drum or blades, whichever comes
first, after the introduction of the cement to the aggregates.
Under conditions contributing to quick stiffening of the concrete or
when the temperature of the concrete is 30oC, or above, a time
less than one hour will be required.

6. Delivery of Mixed Concrete

The Contractor shall have sufficient plant capacity and


transportation apparatus to insure continuous delivery at the rate
required. The rate of delivery of concrete during concreting
operations shall be such as to provide for the proper handling,
placing and finishing of the concrete. The rate shall be such that
the interval between batches shall not exceed 20 minutes. The
methods of delivering and handling the concrete shall be such as
will facilitate placing of the minimum handling.

405.5 Method of Measurement

The quantity of structural concrete to be paid for will be the final quantity placed and
accepted in the completed structure. No deduction will be made for the volume
occupied by pipe less than 100mm in diameter or by reinforcing steel, anchors,
conduits, weep holes or expansion joint materials.

405.6 Basis of Payment

The accepted quantities, measured as prescribed in Section 405.4 shall be paid for
in the contract unit price for each of the Pay item listed below that is included in the
Bill of Quantities.

Payment shall constitute full compensation for furnishing, placing and finishing
concrete including all labor, equipment, tools and incidentals necessary to complete
the work prescribed in the Item.

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-37
BRIDGE CONSTRUCTION F

Pay Item Number Description Unit of Measurement

405(1)b2 Structural Concrete Class “A”, Cubic Meter


(fc’=27.58Mpa) 14 days
Structural Concrete Class “A”,
405(1)b3 (fc’=27.58Mpa) 28 days Cubic Meter

ITEM 406 PRESTRESSED CONCRETE STRUCTURES

406.1 Description

This Item shall consist of prestressed concrete structures and the prestressed
concrete portions of composite structures, constructed in reasonably close
conformity with the lines, grades and dimensions shown on the Plans or established
by the Engineer and in accordance with this Specification. It shall also include the
furnishing and installing of any appurtenant items necessary for the particular
prestressing system to be used, including but not limited to ducts, anchorage
assemblies and grouts used for pressure grouting ducts.

406.2 Material Requirements

406.2.1 Concrete and Grout

The materials for concrete and grout shall conform to Item 405, Structural
Concrete. The concrete shall be Class P as shown in Table 405.2, unless
otherwise shown on the Plans or specified in the Special Provisions. The
proportions of the grout will be as set out in Subsection 406.3.11, Bonding
Steel.

406.2.2 Prestressing Reinforcing Steel

It shall conform to Item 710, Reinforcing Steel and Wire Rope.

406.2.3 Prestressing Steel

It shall conform to the requirements of Item 710, Reinforcing Steel and Wire
Rope.

All prestressing steel shall be protected against physical damage and rust or
other results of corrosion at all times from manufacture to grouting.
Prestressing steel that has sustained physical damage at any time shall be
rejected.

406.2.4 Packaging, Storing and Shipping

Prestressing steel shall be packed in containers or other shipping forms for


the protection of the steel against physical damage and corrosion during
shipping and storage. A corrosion inhibitor which prevents rust or other
results of corrosion shall be placed in the package or form, or when
permitted by the Engineer, may be applied directly to the steel. The corrosion
inhibitor shall have no deleterious effect on the steel or concrete or bond

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-38
BRIDGE CONSTRUCTION F

strength of concrete to steel. Packaging or forms damaged from any cause


shall be immediately replaced or restored to original condition.

This shipping package or form shall be clearly marked with a statement that
the package contains high-strength prestressing steel and the care to be
used in handling, and the type, kind and amount of corrosion inhibitor used,
including the date when placed, safety orders and instructions for use.

406.2.5 Elastomeric Bearing Pads

This shall conform to Item 412(1), Elastomeric Bearing Pads.

406.2.6 Water

It shall conform to the requirements of Subsection 311.2.4, Water.

406.2.7 Enclosures

Duct enclosures for pre-stressing steel shall be galvanized ferrous metal or


of a type approved by the Engineer, mortar tight and accurately placed at the
locations shown on the Plans or approved by the Engineer. Transition
couplings connecting said ducts to anchoring devices need not be galvanized.

406.2.8 Sampling and Testing

All wire, strand, anchorage assemblies or bars to be shipped to the site shall
be assigned a lot number and tagged for identification purposes.

All samples submitted shall be representative of the lot to be furnished and in


the case of wire or strand, shall be taken from the same master roll.

All of the materials specified for testing shall be furnished free of cost and
shall be delivered in time for tests to be made well in advance of anticipated
time of use.

The Contractor shall furnish for testing the following samples selected from
each lot, if ordered by the Engineer. The selection of samples will be made
at the manufacturer’s plant by the Engineer or his representative.

1. For pre-tensioning work-samples at least 2 m long shall be furnished


of each size of wire or strand proposed.

2. For post-tensioning work-samples of the following lengths shall be


furnished of each size of wire proposed.

a. For wire requiring heading, 2 m.

b. For strand to be furnished with fittings, 1.50 m between near


ends of fittings.
c. For bars to be furnished with thread ends and nuts, 1.5 m
between threads at ends.

3. Anchorage assemblies – If anchorage assemblies are not attached to


reinforcement samples, two (2) anchorage assemblies shall be

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-39
BRIDGE CONSTRUCTION F

furnished, completed with distribution plates of each size and type to


be used.

When prestressing system has been previously tested and approved for
similar projects by an agency acceptable to the Engineer, complete tendon
samples need not be furnished, provided there is no change whatsoever in
the materials, design or details previously approved.

406.3 Construction Requirements

406.3.1 General

Prestressed concrete structural members shall be constructed in accordance


with the requirements of Item 405, Structural Concrete and Reinforcing Steel
shall be placed in accordance with the requirements of Item 404, Reinforcing
Steel, subject to the modifications and amendments contained herein.

406.3.2 Prestressing Method

The method of prestressing to be used shall be optional with the Contractor


subject to all requirements hereinafter specified.

The Contractor, prior to casting any members to be prestressed, shall submit


to the Engineer for approval complete details of the methods, materials and
equipment he proposes to use in the prestressing operations. Such details
shall outline the method and sequence of stressing, complete specifications
and details of the prestressing, steel and anchoring devices proposed for use,
anchoring stresses, type of enclosures and all other data pertaining to the
prestressing operations, including the proposed arrangement of the
prestressing units in the members, pressure grouting materials and
equipment.

406.3.3 Prestressing Equipment

Hydraulic jacks used to stress tendons shall be equipped with either a


pressure gauge or a load cell for determining the jacking stress. The
pressure gauge, if used, shall have an accurate reading dial at least 154 mm
(6 inches) in diameter and each jack and its gauge shall be calibrated as a
unit with the cylinder extension in the approximate position that it will be at
final jacking force, and shall be accompanied by a certified calibration chart.
The load cell, if used, shall be calibrated and shall be provided with an
indicator by means of which the prestressing force in the tendon may be
determined. The range of the load cell shall be such that the lower ten (10)
percent of the manufacturer’s rated capacity will not be used in determining
the jacking stress.

Safety measures shall be taken by the Contractor to prevent accidents


due to possible breaking of the prestressing steel or the slipping of the grips
during the prestressing process.

406.3.4 Casting Yard

The precasting of prestressed concrete structural members may be done at


a location selected by the Contractor, subject to the approval of the Engineer.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-40
BRIDGE CONSTRUCTION F

406.3.5 Placing Enclosures

Enclosures for prestressed reinforcement shall be accurately placed at


locations shown on the Plans or approved by the Engineer.

406.3.6 Placing Steel

Steel units shall be accurately placed at the position shown on the Plans and
firmly held during the placing and setting of the concrete.

Ducts may be fabricated with either welded or interlocked seams.


Galvanizing of the welded steel will not be required. Ducts shall have
sufficient strength to maintain their correct alignment and shape during
placing of concrete. Joints between sections of ducts shall be positive
metallic connections which do not result in angle changes at the joints.
Waterproof tape shall be used at the connections.

All ducts or anchorage assemblies shall be provided with pipes or other


suitable connections for the injection of grout after prestressing.

Ducts for pre-stressing steel shall be securely fastened in place to prevent


movement.

After installation in the forms, the end of ducts shall at all times be covered
as necessary to prevent the entry of water of debris.

All ducts for continuous structures shall be vented over each intermediate
support, and at additional locations as shown on the Plans. Vents shall be
12.7 mm (1/2 inch) minimum diameter standard pipe. Connections to ducts
shall be made with metallic structural fasteners. The vents shall be mortar
tight, taped as necessary, and shall provide means for injection of grout
through the vents and for sealing the vents. Ends of vents shall be removed
25.4 mm (1 inch) below the roadway surface after grouting has been
completed.

Distances from the forms shall be maintained by stays, blocks, ties, hangers
or other approved supports. Blocks for holding units from contact with the
forms shall be precast mortar blocks of approved shape and dimensions.
Layers of units shall be separated by mortar blocks or other equally suitable
devices. Wooden blocks shall not be left in the concrete.

When acceptable prestressing steel for post-tensioning is installed in ducts


after completion of concrete curing, and if stressing and grouting are
completed within ten (10) calendar days after the installation of the
prestressing steel, rust which may form during said ten (10) days will not be
caused for rejection of the steel. Prestressing steel, installed, tensioned and
grouted in this manner, all within ten (10) calendar days, shall be subject to
all the requirements in this Item pertaining to corrosion protection and
rejection because of rust.

No welds or grounds for welding equipment shall be made on the forms or on


the steel in the manner after the prestressing steel has been installed.

Wires, wire groups, parallel-lay cables and any other prestressing elements
shall be straightened to insure proper positioning in the enclosures.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-41
BRIDGE CONSTRUCTION F

Suitable horizontal and vertical spacers shall be provided, if required, to hold


the wires in place in true position in the enclosures.

406.3.7 Pretensioning

The prestressing elements shall be accurately held in position and stressed


by jacks. A record shall be kept of the jacking force and the elongations
produced thereby. Several units may be cast in one continuous line and
stressed at one time. Sufficient space shall be left between ends of units to
permit access for cutting after the concrete has attained the required
strength. No bond stress shall be transferred to the concrete, nor end
anchorages released until the concrete has attained a compressive strength,
as shown by cylinder tests, of at least 28 MPa unless otherwise specified.
The elements shall be cut or released in such an order that lateral
eccentricity or prestress will be a minimum.

406.3.8 Placing Concrete

Concrete shall not be deposited in the forms until the Engineer has inspected
the placing of the reinforcement, enclosures, anchorages and prestressing
steel and given his approval thereof. The concrete shall be vibrated with care
and in such a manner as to avoid displacement of reinforcement, conduits, or
wires.

Prior to placing concrete, the Contractor shall demonstrate to the Engineer


that all ducts are unobstructed.

406.3.9 Curing

Steam curing process may be used as an alternative to water curing. The


casting bed for any unit cured with steam shall be completely enclosed by a
suitable type of housing, tightly constructed so as to prevent the escape of
steam and simultaneously exclude outside atmosphere. Two to four hours
after placing concrete and after the concrete has undergone initial set, the
first application of steam or radiant heat shall be made unless retarders are
used, in which case the waiting period before application of the steam or
radiant heat shall be increased to from four to six hours.

During the waiting period, the temperature within the curing chamber shall
o o
not be less than 10.0 C (50 F) and live steam or radiant heat may be used to
maintain the curing chamber at the proper minimum temperature. The steam
shall be at 100 percent relative humidity to prevent loss of moisture and to
provide moisture for proper hydration of the cement. Application of the steam
shall not be directly on the concrete. During application of the steam, or of
radiant heat, the ambient air temperature shall increase at a rate not to
exceed 4.41oC per hour until the curing temperature is reached. The
maximum curing temperature within the enclosure shall not exceed 71.1oC.
The maximum temperature shall be held until the concrete has reached the
desired strength. Detensioning shall be accomplished immediately after the
steam curing or the heat curing has been discontinued and additional curing
is not required after detensioning.

1. Curing with Low Pressure Steam

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-42
BRIDGE CONSTRUCTION F

Application of live steam shall not be directed on the concrete forms as


to cause localized high temperatures.

2. Curing with Radiant Heat

Radiant heat may be applied by means of pipes circulating steam, hot


oil or hot water, or by electric heating elements. Radiant heat curing
shall be done under a suitable enclosure to contain the heat and
moisture loss shall be minimized by covering all exposed concrete
surfaces with plastic sheeting or by applying an approved liquid
membrane curing compound to all exposed concrete surfaces. Top
surface of concrete members to be used in composite construction
shall be clear of residue of the membrane-curing compound so as not
to reduce bond below design limits.

If the Contractor proposes to cure by any other special method, the


method and its details shall be subject to the approval of the Engineer.

406.3.10 Post-tensioning

Tensioning of the prestressing reinforcement shall not be commenced until


tests on concrete cylinders, manufactured of the same concrete and cured
under the same conditions, indicate that the concrete of the particular
member to be prestressed has attained compressive strength of at least 28
MPa unless otherwise specified.
After all concrete has attained the required strength, the prestressing
reinforcement shall be stressed by means of jacks to the desired tension and
the stress transferred to the end anchorage.

Cast-in-place concrete shall not be post-tensioned until at least ten (10) days
after the last concrete has been placed in the member to be the post-
tensioned and until the compressive strength of said placed concrete has
reached the strength specified for the concrete at the time of stressing.

All side forms for girders shall be removed before post-tensioning. The
falsework under the bottom slab supporting the superstructure shall not be
released until a minimum of 48 hours have elapsed after grouting of the post-
tension tendons nor until all other conditions of the Specifications have been
met. The supporting falsework shall be constructed in such a manner that
the super restructure will be free to lift off the falsework and shorten during
post-tensioning. Formwork left inside box girders to support the roadway
slab shall be detailed in such a manner so as to offer minimum resistance to
girder shortening due to shrinkage and post-tensioning.

The tensioning process shall be so conducted that the tension being applied
and the elongation of the prestressing elements may be measured at all
times. The friction loss in the element, i.e., the difference between the
tension of the jack and the minimum tension, shall be determined in
accordance with Article 1.6.7 of AASHTO Standard Specifications for
Highway Bridges.

Suitable shims or other approved devices shall be used to insure that the
specified anchor set loss is attained.

Prestressing tendons in continuous post-tensioned members shall be


tensioned by jacking at each end of the tendon. Such jacking of both ends

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-43
BRIDGE CONSTRUCTION F

need not be done simultaneously.

A record shall be kept of gage pressure and elongation at all times and
submitted to the Engineer for his approval.

406.3.11 Bonding Steel

Prestressing steel shall be bonded to the concrete by filling the void space
between the duct and the tendon with grout

Grout shall consist of Portland Cement, water and an expansive admixture


approved by the Engineer.

Water shall be potable.


No admixture containing chlorides or nitrates shall be used.

Water shall first be added to the mixer followed by cement and admixture.

The grout shall be mixed in mechanical mixing equipment of a type that will
produce uniform and thoroughly mixed grout. The water content shall be not
more than 19 litres (5 gallons) per sack of cement. Retempering of grout will
not be permitted. Grout shall be continuously agitated until it is pumped.

Grouting equipment shall be capable of grouting at a pressure of at least


0.6894 MPa (100 psi).

Grouting equipment shall be furnished with a pressure gauge having a full-


scale reading of not more than 2.07 MPa (300 psi).

Standby flushing equipment capable of developing a pumping pressure of


1.72 MPa (250 psi) and of sufficient capacity to flush out any partially grouted
ducts shall be provided.

All ducts shall be clean and free of deleterious materials that would impair
bonding of the grout or interfere with grouting procedures. All grout shall
pass through a screen with a 2 mm (0.0787 inch) maximum clear openings
prior to being introduced into the grout pump.

Grout injection pipes shall be fitted with positive mechanical shutoff valves.
Vents and ejection pipes shall be fitted with valves, caps or other devices
capable of withstanding the pumping pressures. Valves and caps shall not
be removed or opened until the grout has set.

Post-tensioned steel shall be bonded to the concrete. All prestressing steel to


be bonded to the concrete shall be free of dirt, loose rust, grease or other
deleterious substances.

Immediately after completion of the concrete pour, the metal conduit shall be
blown out with compressed oil free air to the extent necessary to break up
and remove any mortar in the conduit before it hardens. Approximately 24
hours after the concrete pour, the metal conduits shall be flushed out with
water and then blown out with compressed oil free air.

Prior to placing forms for roadway slabs of box girder structures, the
Contractor shall demonstrate to the satisfaction of the Engineer that all ducts

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-44
BRIDGE CONSTRUCTION F

are unobstructed and if the prestressing reinforcement has been placed, that
the steel is free and unbonded in the duct.

After the tendons have been stressed to the required tension, each conduit
encasing the prestressing steel shall be blown out with compressed oil free
air. The conduit shall then be completely filled from the low end with grout
under pressure. Grout shall be pumped through the duct and continuously
wasted at the outlet until no visible slugs of water or air are ejected and the
efflux time of ejected grout is not less than 11 seconds. All vents and
openings shall then be closed and the grouting pressure at the injection end
shall be raised to a minimum of 0.6894 MPa (100 psi) and held for a
minimum of 10 seconds.

If aluminum powder is used to expand the grout, it shall be added as


follows:

From 2 to 4 grams of the unpolished variety (about 1 to 2 teaspoons)


shall be added for each sack of cement used in the grout. The exact
amount of aluminum powder will be designated by the Engineer. The
dosage per batch of grout shall be carefully weighed. A number of
weighings may be made in the laboratory and doses placed in glass
vials for convenient use in the mix. The aluminum powder shall be
blended with pumicite or other inert powder in the proportion of one (1)
part powder to fifty (50) parts pumicite (or other inert powder) by weight.
The blend shall be thoroughly mixed with the cement. The amount of
the blend used should vary from 120 g (4-1/2 ounces) per sack of
o
cement for concrete having a temperature of 21.1 C to 190 g (7
ounces) for a temperature of 4.44oC after all ingredients are added, the
batch shall be mixed for 3 minutes. Batches of grout shall be placed
within 45 minutes after mixing.

406.3.12 Unbonded Steel

Where the steel is not to be bonded to the concrete, it shall be carefully


protected against corrosion by a coating of tar of other waterproofing material,
in addition to any galvanizing, which may be specified in addition to the
requirements of ASTM A 416 (AASHTO M 203) and ASTM A 421 (AASHTO
M 204.)

406.3.13 Handling

Extreme care shall be exercised in handling and moving precast


prestressed concrete mortar members. Precast girders and slabs shall be
transported in an upright position and the points of support and directions of
the reactions with respect to the member shall be approximately the same
during transportation and storage as when the members are in their final
position. If the Contractor deems it expedient to transport or store precast
units in other than this position, it shall be done at his own risk after notifying
the Engineer of his intention to do so.

Prestressed concrete girders shall not be shipped until tests on concrete


cylinders, manufactured of the same concrete and cured under the same
conditions as the girders, indicate that the concrete of the particular girder
has attained a compressive strength equal to the specified design

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-45
BRIDGE CONSTRUCTION F

compressive strength of the concrete in the girder and has attained a


minimum age of 14 days.

406.3.14 Composite Slab Construction

The manufacturing tolerances for pre-cast members shall not exceed those
given for length, cross-section and straightness on the Plans, as specified in
the Contract or as approved by the Engineer. In addition, where beams are
laid side by side in a deck:

1. The difference on soffit level between adjacent units before the in-situ
concrete is placed shall not exceed 5 mm for units up to 10 mm for longer
units.

2. The width of the deck soffit shall be within ±25 mm.

3. In adjacent span, the continuity of the outside beams shall be maintained.

4. The width of gap between individual beams shall not exceed twice the
nominal gap.

5. The alignment of transverse holes shall permit the reinforcement or


prestressing cables to be placed without distortion.

406.4 Method of Measurement

406.4.1 Structural Members

The quantity to be measured for payment will be the actual number of precast
pre-stressed concrete structural members, except piling, of the several types
and sizes, installed in place, completed and accepted. Each member will
include the concrete, reinforcement and pre-stressing steel, anchorages,
plates, nuts, elastomeric bearing pads, and other such material contained
within or attached to the unit.

Piling will be measured as provided in Item 400.

406.4.2 Other Items

The quantities of other Contract items which enter into the completed and
accepted structure will be measured for payment in the manner prescribed for
the several items involved.

406.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 406.4 shall be


paid for at the contract unit price for each of the particular item listed below that
is included in the Bill of Quantities, which price and payment shall be full
compensation for furnishing and placing all materials, including all labor,
equipment, tools and incidentals necessary to complete the work prescribed in
this Item.

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-46
BRIDGE CONSTRUCTION F

Pay Item Unit of


Description
Number Measurement
Prestressed Structural Concrete Members
406(1)g6 (AASHTO Girder Type VI, L= 31.30m) Each
Prestressed Structural Concrete Members
406(1)g7 (AASHTO Girder Type V, L= 32.00m) Each
Prestressed Structural Concrete Members
406(1)g8 (AASHTO Girder Type V, L= 32.75m) Each
Prestressed Structural Concrete Members
406(1)h2 (AASHTO Girder Type VI, L= 34.20m) Each
Prestressed Structural Concrete Members
406(1)h3 (AASHTO Girder Type VI, L= 35.00m) Each
Prestressed Structural Concrete Members
406(1)h4 (AASHTO Girder Type VI, L= 35.80m) Each

ITEM 407 CONCRETE STRUCTURES

407.1 Description

This item shall consist of general description of the materials, equipment,


workmanship and construction requirements of concrete structures and concrete
portions of composite structures conforming to the alignment , grades, design,
dimensions and details shown on the Plans and in accordance with the
Specifications for piles reinforcing steel, structural steel, structural concrete and
other items which constitute the completed structure. The class of concrete to be
used in the structure or part of the structure shall be as specified in Item 405,
Structural Concrete.

407.2 Material Requirements

1. Concrete and Concrete Ingredients

Concrete and concrete materials shall conform to the requirements in Item


405, Structural Concrete. Unless otherwise shown on the Plans or specified
in the Special Provisions, concrete shall be Class A.

2. Reinforcing Steel

Reinforcing steel shall conform to the requirements in Item 404, Reinforcing


Steel.

3. Structural Steel

Structural steel shall conform to the requirements of corresponding materials


in Item 403, Metal Structures.

4. Bridge Bearing (Elastomeric Bearing Pad)

Elastomeric bearing pads shall conform to Item 412, Elastomeric Bearing


Pads.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-47
BRIDGE CONSTRUCTION F

5. Paints

Paints shall conform to the requirements in Item 411, Paint.

6. Waterproofing and Damp-proofing.

Unless otherwise shown on the Plans and indicated in Special Provisions,


materials for waterproofing and damp-proofing shall conform to the
requirements of the following specifications;

a. AASHTO M 115 Asphalt for damp-proofing and waterproofing.

b. AASHTO M 116 Primer for the use with Asphalt in damp-proofing


and waterproofing.

c. AASHTO M 117 Woven cotton fabrics saturated with bituminous


substances for use in waterproofing.

d. AASHTO M 118 Coal-Tar pitch for roofing, damp-proofing and


waterproofing.

e. AASHTO M 121 Creosote for priming coat with coal-tar pitch


damp-proofing and waterproofing.

f. AASHTO M 159 Woven burlap fabric saturated with bituminous


substances for use in waterproofing.

g. AASHTO M 166 Numbered cotton duck and array duck.

h. AASHTO M 239 Asphalt for use in waterproofing membrane


construction.

7. Concrete Curing Compound


Curing compound shall conform to the requirements of AASHTO M 148
Liquid membrane-forming compounds for curing concrete.

8. Joint Filler
Unless otherwise shown in the Plans or in Special Provisions, materials for
expansion joint filler shall conform to the requirements of AASHTO M 33,
AASHTO M 153, AASHTO M 173, ASHTO M 213 and ASHTO M 220.

407.2.1 Proportioning and Strength of Structural Concrete

This shall be in accordance with Item 405 Structural Concrete.

407.2.2 Sampling and Testing

This shall be in accordance with Item 405, Structural Concrete.

407.3 Construction and Requirements

407.3.1 Handling and Placing Concrete: General

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-48
BRIDGE CONSTRUCTION F

Concrete shall not be placed until forms and reinforcing steel have been
checked and approved by the Engineer.

If lean concrete is required in the Plan or as directed by the Engineer prior to


placing of reinforcing steel bar, the lean concrete should have a minimum
compressive strength of 13.8 MPa (2,000 psi)..

In preparation for the placing of concrete, all sawdust, chips and other
construction debris and extraneous matter shall be removed from inside the
formwork, struts, stays and braces, serving temporarily to hold the forms in
correct shape and alignment, pending the placing of concrete at their
locations, shall be removed when the concrete placing has reached an
elevation rendering their service unnecessary. These temporary members
shall be entirely removed from the forms and not buried in the concrete.

No concrete shall be used which does not reach its final position in the forms
within the time stipulated under “Time of Hauling and Placing Mixed
Concrete”.

Concrete shall be placed so as to avoid segregation of the materials and the


displacement of the reinforcement. The use of long troughs, chutes, and
pipes for conveying concrete to the forms shall be permitted only on written
authorization of the Engineer. The Engineer shall reject the use of the
equipment for concrete transportation that will allow segregation, loss of fine
materials, or in any other way will have a deteriorating effect on the concrete
quality.

Open troughs and chutes shall be of metal lined; where steep slopes are
required, the chutes shall be equipped with baffles or be in short lengths that
reverse the direction of movement to avoid segregation.

All chutes, troughs and pipes shall be kept clean and free from coatings of
hardened concrete by thoroughly flushing with water after each run. Water
used for flushing shall be discharged clear of the structure.

When placing operations would involve dropping the concrete more than 1.5
m, concrete shall be conveyed through sheet metal or approved pipes. As
far as practicable, the pipes shall be kept full of concrete during placing and
their lower end shall be kept buried in the newly placed concrete. After initial
set of the concrete, the forms shall not be jarred and no strain shall be
placed on the ends of projecting reinforcement bars.

The concrete shall be placed as nearly as possible to its final position and the
use of vibrators for moving of the mass of fresh concrete shall not be
permitted.

[Link] Placing Concrete by Pneumatic Means

Pneumatic placing of concrete will be permitted only if specified in the


Special Provisions or authorized by the Engineer. The equipment shall be so
arranged that vibration will not damage freshly placed concrete.

Where concrete is conveyed and placed by pneumatic means, the equipment


shall be suitable in kind and adequate in capacity for the work. The machine
shall be located as close as practicable to the work. The discharge lines shall

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-49
BRIDGE CONSTRUCTION F

be horizontal or inclined upwards from the machine. The discharge end of


the line shall not be more than 3 m from the point of deposit.

At the conclusion of placing the concrete, the entire equipment shall be


thoroughly cleaned.

[Link] Placing of Concrete by Pumping

The placing of concrete by pumping will be permitted only if specified or if


authorized by the Engineer. The equipment shall be so arranged that
vibration will not damage freshly placed concrete.

Where concrete is conveyed and placed by mechanically applied pressure


the equipment shall be suitable in kind and adequate in capacity for the work.
The operation of the pump shall be such that a continuous stream of
concrete without air pockets is produced. When pumping is completed, the
concrete remaining in the pipeline, if it is to be used, shall be ejected in such
a manner that there will be no contamination of the concrete or separation of
the ingredients. After this operation, the entire equipments shall be
thoroughly cleaned.

[Link] Placing Concrete in Water

Concrete shall not be placed in water except with approval of the Engineer
and under his immediate supervision. In this case the method of placing
shall be hereinafter specified.

Concrete deposited in water shall be Class A concrete with a minimum


3
cement content of 400 kg/m of concrete. The slump of the concrete shall be
maintained between 10 and 20 cm. To prevent segregation, concrete shall
be carefully placed in a compact mass, in its final position, by means of a
tremie, a bottom-dump bucket, or other approved means, and shall not be
disturbed after being placed.

A tremie shall consist of a tube having a diameter of not less than 250 mm
constructed in sections having flanged couplings fitted with gaskets with a
hopper at the top. The tremie shall be supported so as to permit free
movement of the discharge and over the entire top surface of the work and
so as to permit rapid lowering when necessary to retard or stop the flow of
concrete. The discharge end shall be closed at the start of work so as to
prevent water entering the tube and shall be completely submerged in
concrete at all times; the tremie tube shall be kept full to the bottom of the
hopper. When a batch is dumped into the hopper, the flow of concrete shall
be induced by lightly raising the discharge end, but always keeping it in the
placed concrete. The flow shall be continuous until the work is completed.

When the concrete is placed with a bottom-dump bucket, the top of the
bucket shall be open. The bottom doors shall open freely downward and
outward when tripped. The buckets shall be completely filled and slowly
lowered to avoid backwash. It shall not be dumped until it rests on the
surface upon which the concrete is to be deposited and when discharged
shall be withdrawn slowly until well above the concrete.

407.3.2 Compaction of Concrete

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-50
BRIDGE CONSTRUCTION F

Concrete during and immediately after placing shall be thoroughly


compacted. The concrete in walls, beams, columns and the like shall be
placed in horizontal layers not more than 30 cm thick except as hereinafter
provided. When less than a complete layer is placed in one operation, it
shall be terminated in a vertical bulkhead. Each layer shall be placed and
compacted before the preceding layer has taken initial set to prevent injury to
the green concrete and avoid surfaces of separation between the layers.
Each layer shall be compacted so as to avoid the formation of a construction
joint with a preceding layer.

The compaction shall be done by mechanical vibration. The concrete shall be


vibrated internally unless special authorization of other methods is given by
the Engineer or is provided herein. Vibrators shall be of a type, design, and
frequency approved by the Engineer. The intensity of vibration shall be such
as to visibly affect a mass of concrete with a 3 cm slump over a radius of at
least 50 cm. A sufficient number of vibrator shall be provided to properly
compact each batch immediately after it is placed in the forms. Vibrators
shall be manipulated so as to thoroughly work the concrete around the
reinforcement and embedded fixtures and into the corners and angles of the
forms and shall be applied at the point of placing and in the area of freably
placed concrete. The vibrators shall be inserted into and withdrawn from the
concrete slowly. The vibration shall be of sufficient duration and intensity to
compact the concrete thoroughly but shall not be continued so as to cause
segregation and at any one point to the extent that localized areas of grout
are formed. Application of vibrators shall be at points uniformly spaced, and
not farther apart than twice the radius over which the vibration is visibly
effective. Vibration shall not be applied directly or thru the reinforcement to
sections or layers of concrete that have hardened to the degree that the
concrete ceases to be plastic under vibration. It shall not be used to make
concrete flow in the forms over distances so great as to cause segregation,
and vibrators shall not be used to transport concrete in the forms of troughs
or chutes.

407.3.3 Casting Sections and Construction Joints

The concrete in each form shall be placed continuously. Placing of concrete


in any such form shall not be allowed to commence unless sufficiently
inspected and approved materials for the concrete is at hand, and labor and
equipment are sufficient to complete the pour without interruption.

Joints in the concrete due to stopping work shall be avoided as much as


possible. Such joints, when necessary, shall be constructed to meet the
approval of the Engineer.

When the placing of concrete is temporarily discontinued, the concrete, after


becoming firm enough to retain its shape, shall be cleaned of laitance and
other objectionable material to a sufficient depth to expose sound concrete.
Where a “faster edge” might be produced at a construction joint, as in the
sloped top surface of a wingwall, an inset formwork shall be used to produce
an edge thickness of not less than 15 cm in the succeeding layer. Work shall
not be discontinued within 50 cm of the top of any face, unless provision has
been made for a coping less than 50 cm thick, in which case if permitted by
the Engineer, the construction joint may be made at the underside of coping.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-51
BRIDGE CONSTRUCTION F

Immediately following the discontinuance of placing concrete, all


accumulations of mortar splashed upon the reinforcing steel and the surfaces

of forms shall be removed. Dried mortar chips and dust shall not be puddled
into the unset concrete. Care shall be exercised, during the cleaning of the
reinforcing steel, not to injure or break the concrete-steel bond at and near
the surface of the concrete.

407.3.4 Casting Box Culverts

In general, the base slab of box culverts shall be placed and allowed to set
before the remainder of the culvert is constructed. In the construction of box
culverts the side walls and top slab may be constructed as a monolith.

If the concrete in the walls and top slab is placed in two separate operations,
special care shall be exercised in order to secure bonding in the construction
joint and appropriate keys shall be left in the sidewalls for anchoring the top
slab. Each wingwall shall be constructed, if possible, as a monolith.
Construction joints where unavoidable, shall be horizontal and so located that
no joints will be visible in the exposed face of the wingwall above the ground
line.

Vertical construction joints shall be at right angles to the axis of the culverts.

407.3.5 Casting Columns, Slabs and Girders

Concrete in columns shall be placed in one continuous operation, unless


otherwise directed. The concrete shall be allowed to set for at least 20 hours
before the caps are placed.

Unless otherwise permitted by the Engineer, no concrete shall be placed in


the superstructure until the column forms have been stripped sufficiently to
determine the condition of the concrete in the column. The load of the super-
structure shall not be allowed to come upon the bents until they have been in
place at least 14 days, unless otherwise permitted by the Engineer.

Concrete in slab spans shall be placed in one continuous operation for each
span unless otherwise provided.

Concrete in T-Beam or deck girder spans shall be placed in one continuous


operation unless otherwise directed. If it is permitted to place the concrete in
two separate operations, each of the operations, shall be continuous: first, to
the top of the girder stems, and second, to completion. In the latter case, the
bond between stem and slab shall be secured by means of suitable shear
keys which may be formed by the use of timber blocks approximately 50 mm
x 100 mm in cross-section having a length of 100 mm less than the width of
the girder stem. These key blocks shall be placed along the girder stems as
required, but the spacing shall not be greater than 300 mm center to center.
The blocks shall be beveled and oiled in such a manner as to insure their
ready removal, and they shall be removed as soon as the concrete has set
sufficiently to retain its shape. If the contractor wishes to place the concrete
in two separate operations, he shall, with his request for permission to do so,
submit plans and proposals of the required changes to the reinforcement,
which plans and proposals shall be subject to the approval of the Engineer.
In box girders, the concrete in the bottom slab be poured first, as a separate
operation.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-52
BRIDGE CONSTRUCTION F

The concrete in the webs and the top slab shall be placed in one continuous
operation unless otherwise specified. If it is permitted to place the concrete
in more than one operation, the requirements for T-beam shall apply.

407.3.6 Construction Joints

Construction joints shall be made only where shown on the Plans or called
for in the pouring schedule, unless otherwise approved by the Engineer.
Shear keys or reinforcement shall be used, unless otherwise specified, to
transmit shear or to bond the two sections together.

Before depositing new concrete on or against concrete which has hardened,


the forms shall be retightened. The surface of the hardened concrete shall be
roughened as required by the Engineer, in a manner that will not leave loose
particles of aggregate or damage concrete at the surface. It shall be
thoroughly cleaned of foreign matter and laitance. When directed by the
Engineer, the surface of the hardened concrete which will be in contact with
new concrete shall be washed with water to this satisfaction, and to insure an
excess of mortar at the juncture of the hardened and the newly deposited
concrete, the cleaned and saturated surfaces, including vertical and inclined
surfaces shall first be thoroughly covered with a coating of mortar of the
same proportion of sand and cement as the class of concrete used against
which the new concrete shall be placed before the grout or mortar has
attained its initial set.

The placing of concrete shall be carried continuously from joint to joint. The
face edges of all joints which are exposed to view shall be carefully finished
true to line and elevation.

407.3.7 Concrete Surface Finishing

Surface finishing shall be classified as follows:

Class 1, Ordinary Finish


Class 2, Rubbed Finish
Class 3, Floated Finish

All concrete shall be given Class 1, Ordinary Finish and additionally any
further finish as specified.

Unless otherwise specified, the following surfaces shall be given a Class 2,


Rubbed Finish.

1. The exposed faces of piers, abutments, wingwalls, and retaining walls.

2. The outside faces of girders, T-beams, slabs, columns, brackets, curbs,


headwalls, railings, arch rings, spandrel walls and parapets.

Excluded, however, are the tops and bottoms of floor slabs and sidewalks,
bottoms of beams and girders, sides of interior beams and girders, backwalls
above bridge seats or the underside of copings. The surface finish on piers
and abutments shall include all exposed surfaces below the bridge seats to
20 cm below low water elevation or 50 cm below finished ground level when
such ground level is above the water surface. Wingwalls shall be finished
from the top to 50 cm below the finished slope lines on the outside face and

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-53
BRIDGE CONSTRUCTION F

shall be finished on top and for a depth of 20 cm below the top on the back
sides.

Unless otherwise specified, the surface of the traveled way shall be Class 3,
Floated Finish.

Class 1, Concrete Ordinary Finish

Immediately following the removal of forms, all fins and irregular


protection shall be removed from all surface except from those which
are not to be exposed or are not to be waterproofed. On all surfaces
the cavities produced by form ties and all other holes, honeycomb
spots, broken corners or edges and other defects shall be thoroughly
cleaned, and after having been kept saturated with water for a period
of not less than three hours shall be carefully pointed and made true
with a mortar of cement and fine aggregate mixed in the proportions
used in the grade of the concrete being finished. Mortar used in
pointing shall not be more than one hour old. The mortar patches
shall be cured as specified under Subsection 407.3.8. All construction
and expansion joints in the completed work shall be left carefully
tooled and free of all mortar and concrete. The joint filler shall be left
exposed for its full length with a clean and true edges.

The resulting surface shall be true and uniform. All repaired surfaces,
the appearance of which is not satisfactory to the Engineer, shall be
“rubbed” as specified below.

Class 2, Concrete Rubbed Finish

After removal of forms, the rubbing of concrete shall be started as


soon as its condition will permit. Immediately before starting this work,
the concrete shall be kept thoroughly saturated with water for a
minimum period of three hours. Sufficient time shall have elapsed
before the wetting down to allow the mortar used in the pointing of
road holes and defects to thoroughly set. Surfaces to be finished
shall be rubbed with a minimum coarse carborundum stone using a
small amount of mortar on each face. The mortar shall be composed
of cement and fine sand mixed in the proportions used in the concrete
being finished. Rubbing shall be continued until all form marks,
protections and irregularities have been removed, all voids have been
filled, and a uniform surface has been obtained. The face produced
by this rubbing shall be left in place at this time.

After all concrete above the surface being created has been cast, the
final finish shall be obtained by rubbing with a fine carborundum stone
and water. This rubbing shall be continued until the entire surface is
of smooth texture and uniform color.

After the final rubbing is completed and the surface has dried, it
should be rubbed with burlap to remove loose powder and shall be
left free from all unsound patches, paste, powder and objectionable
marks.

Class 3, Concrete Floated Finish

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-54
BRIDGE CONSTRUCTION F

After the concrete is compacted as specified in Subsection 407.3.2,


Compaction of Concrete, the surface shall be carefully struck off with
a strike board to conform to the cross-section and grade shown on
the Plans. Proper allowance shall be made for camber if required.
The strike board may be operated longitudinally or transversely and
shall be moved forward with a combined longitudinal and transverse
motion, the manipulation being such that neither is raised from the
side forms during the process. A slight excess of concrete shall be
kept in front of the cutting edge at all times.

After striking off and consolidating as specified above, the surface


shall be made uniform by longitudinal or transverse floating or both.
Longitudinal floating will be required except in places where this
method is not feasible.

The longitudinal float, operated from foot bridges, shall be worked


with a sawing motion while held in a floating position parallel to the
road centerline and passing gradually from one side of the pavement
to the other. The float shall then be moved forward one-half of each
length and the above operation repeated. Machine floating which
produces an equivalent result may be substituted for the above
manual method.

The transverse float shall be operated across the pavement by


starting at the edge and slowly moving to the center and back again
to the edge. The float shall then be moved forward one-half of each
length and the above operation repeated. Care shall be taken to
preserve the crown and cross-section of the pavement.

After the longitudinal floating has been completed and the excess
water removed, but while the concrete is still plastic, the slab surface
shall be tested for trueness with a straight-edge. For the purpose, the
Contractor shall furnish and use an accurate 3 m straight-edge swing
handless 1 m longer than one half the width of the slab.

The straight-edge shall be held in successive positions parallel to the


road centerline and in contact with the surface and the whole area
gone over from one side of the slab to the other as necessary
advancement along the deck shall be in successive stages of not
more than one-half the length of the straight-edge. Any depression
found shall be immediately filled with freshly mixed concrete, struck
off, consolidated and refinished. The straight-edge testing and
refloating shall continue until the entire surface is found to be free
from observable departure from the straight-edge and the slabs has
the required grade and contour, until there are no deviations of more
than 3 mm under the 3 m straight-edge.

When the concrete has hardened sufficiently, the surface shall be


given a broom finish. The broom shall be an approved type. The
strokes shall be square across the slabs from edge to edge, with
adjacent strokes slightly overlapped, and shall be made by drawing
the broom without tearing the concrete, but so as to produce regular
corrugations not over 3 mm in depth. The surface as thus finished
shall be free from porous spots, irregularities, depressions and small
pockets or rough spots such as may be caused by accidental

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-55
BRIDGE CONSTRUCTION F

disturbing, during the final brooming of particles of coarse aggregate


embedded near the surface.

Concrete Surface Finish for Sidewalk.

After the concrete has been deposited in place, it shall be compacted


and the surface shall be struck off by means of strike board and
floated with a wooden or cork float. An edging tool shall be used on
all edges and at all expansion joints. The surface shall not vary more
than 3 mm under a 3 m straight-edge. The surface shall have a
granular or matted texture which will not slick when wet.

407.3.8 Curing Concrete

All newly placed concrete shall be cured in accordance with this Specification,
unless otherwise directed by the Engineer. The curing method shall be one or
more of the following:

1. Water Method

The concrete shall be kept continuously wet by the application of water for a
minimum period of 7 days after the concrete has been placed.

The entire surface of the concrete shall be kept dump by applying water with
an atomizing nozzle. Cotton mats, rugs, carpets, or earth or sand blankets
may be used to retain the moisture. At the expiration of the curing period the
concrete surface shall be cleared of the curing medium.

2. Curing Compound

Surfaces exposed to the air may be cured by the application of an impervious


membrane if approved by the Engineer.

The membrane-forming compound used shall be practically colorless liquid.


The use of any membrane-forming compound that will alter the natural color
of the concrete or impart a slippery surface to any wearing surface shall be
prohibited. The compound shall be applied with a pressure spray in such a
manner as to cover the entire concrete surface with a uniform film and shall
be of such character that it will harden within 30 minutes after application.
The amount of compound applied shall be ample to seal the surface of the
concrete thoroughly. Power-operated spraying equipment shall be equipped
with an operational pressure gauge and means of controlling the pressure.

The curing compound shall be applied to the concrete following the surface
finishing operation immediately after the moisture sheen begins to disappear
from the surface, but before any drying shrinkage or craze cracks begin to
appear. In the event of any delay, in the application of the curing compound,
which results in any drying or cracking of the surface, application of water
with an atomizing nozzle as specified under “Water Method”, shall be started
immediately and shall be continued until the application of the compound is
resumed or started, however, the compound shall not be applied over any
resulting free standing water. Should the film of compound be damaged
from any cause before the expiration of 7 days after the concrete is placed in
the case of structures, the damaged portion shall be repaired immediately
with additional compound.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-56
BRIDGE CONSTRUCTION F

Curing compound shall not be diluted or altered in any manner after


manufacture. At the time of use, the compound shall be in a thoroughly
mixed condition. If the compound has not been used within 120 days after
the date of manufacture, the Engineer may require additional testing before
the use to determine compliance to requirements.
An anti-setting agent or a combination of anti-setting agents shall be
incorporated in the curing compound to prevent caking.

The curing compound shall be packaged in clean barrels or steel containers


or shall be supplied from a suitable storage tank located on the Site. Storage
tank shall have a permanent system designed to completely redisperse any
settled material without introducing air or any other foreign substance.
Containers shall be well-sealed with ring seals and lug type crimp lids. The
linings of the containers shall be of a character that will resist the solvent of
the curing compound. Each container shall be labeled with a manufacturer’s
name, specification number, batch number, capacity and date of
manufacture, and shall have label warning concerning flammability. The
label shall also warn that the curing compound shall be well-stirred before
use. When the curing compound is shipped in tanks or tank trunks, a
shipping invoice shall accompany each load. The invoice shall contain the
same information as that required herein for container labels.

Curing compound may be sampled by the Engineer at the source of


supply and on the Site.

3. Waterproof Membrane Method

The exposed finished surfaces of concrete shall be sprayed with water, using
a nozzle that so atomizes the flow that a mist and not a spray is formed until
the concrete has set, after which a curing membrane of waterproof paper or
plastic sheeting shall be placed. The curing membrane shall remain in place
for a period of not less than 72 hours.

Waterproof paper and plastic sheeting shall conform to the specification of


AASHTO M 171.

The waterproof paper or plastic sheeting shall be formed into sheets of such
width as to cover completely the entire concrete surface.

All joints in the sheets shall be securely cemented together in such a manner
as to provide a waterproof joint. The joint seams shall have a minimum lap
of 100 mm.

The sheets shall be securely weighed down by placing a bank of earth on the
edges of the sheets or by other means satisfactory to the Engineer.

Should any portion of the sheets be broken or damaged within 72 hours after
being placed, the broken or damaged portions shall be immediately repaired
with new sheets properly cemented into place.

Sections of membrane which have lost their waterproof qualities or have


been damaged to such an extent as to render them unfit for curing, the
concrete shall not be used.

4. Forms-In-Place Method

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-57
BRIDGE CONSTRUCTION F

Formed surfaces of concrete may be cured by retaining the form-in-place.


The forms shall remain in place for a minimum period of 7 days after the
concrete has been placed, except that for members over 50 cm in least
dimensions, the forms shall remain in place for a minimum period of 5 days.
Wooden forms shall be kept wet by watering during the curing period.

5. Curing Cast-In-Situ Concrete

All newly placed concrete for cast-in-situ structures, other than highway bridge
deck, shall be cured by the water method, the forms-in-place method, or as
permitted herein, by the curing compound method, all in accordance with the
requirements of Subsection, 407.3.8 Curing Concrete.

The curing compound method may be used on concrete surfaces which are to
be buried under ground and surfaces where only Ordinary Surface Finish is to
be applied and on which a uniform color is not required and which will not be
visible from public view.

The top surface of highway bridge decks shall be cured by either the curing
compound method or the water method. The curing compound shall be
applied progressively during the deck finishing operations. The water cure
shall be applied not later than 4 hours after completion of the deck finishing.

When deemed necessary by the Engineer during periods of hot weather,


water shall be applied to concrete surface being cured by the curing
compound method or by the forms-in-place method until the Engineer
determine that a cooling effect is no longer required.

6. Curing Pre-Cast Concrete (except piles)

Pre-cast concrete members shall be cured for not less than 7 days by the
water method or by steam curing. Steam curing for pre-cast members shall
conform to the following provisions:

a. After placement of the concrete, members shall be held for a


minimum 4-hour pre-steaming period.

b. To prevent moisture loss on exposed surfaces during the pre-


steaming period, members shall be covered immediately after casting
or the exposed surface shall be kept wet by fog spray or wet blankets.

c. Enclosures for steam curing shall allow free circulation of steam


about the member and shall be constructed to contain the live steam
with a minimum moisture loss. The use of tarpaulins or similar
flexible covers will be permitted, provided they are kept in good
condition and secured in such a manner to prevent the loss of steam
and moisture.

d. Steam at jets shall be low pressure and in a saturated condition.


Steam jets shall not impinge directly on the concrete, test cylinders,
or forms. During application of the steam, the temperature rise within
o
the enclosure shall not exceed 20 C per hour. The curing
o
temperature throughout the enclosure shall not exceed 65 C and shall
be maintained at a constant level for a sufficient time necessary to
develop the required compressive strength. Control cylinders shall be

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-58
BRIDGE CONSTRUCTION F

covered to prevent moisture loss and shall be placed in a location


where temperature of the enclosure will be the same as that of the
concrete.

e. Temperature recording devices that will provide an accurate


continuous permanent record of the curing temperature shall be
provided. A minimum of one temperature recording device per 50 m
of continuous bed length will be required for checking temperature.

f. Curing of pre-cast concrete will be considered completed after the


termination of the steam curing cycle.

7. Curing Pre-cast Concrete Piles

All newly placed concrete for pre-cast concrete piles, conventionally


reinforced or prestressed shall be cured by the “Water Method” as described
in Subsection 407.3.8, Curing Concrete, except that the concrete shall be
kept under moisture for at least 14 days. At the option of the Contractor,
stream curing may be used in which case the steam curing provisions of
Subsection 407.3.8 (6), Curing Pre-Cast Concrete (except piles) shall apply
except that the concrete shall be kept wet for at least 7 days including the
holding and steaming period.

407.3.9 Falsework Design and Drawings

Detailed working drawings and supporting calculations of the false work shall
be furnished by the Contractor to the Engineer. No falsework construction
shall start until the Engineer has reviewed and approved the design. The
Contractor shall provide sufficient time for the Engineer to complete this
review. Such time shall be proportionate to the complexity of the falsework
design and in no case be less than two weeks.

The Contractor may review the falsework drawings at any time provided
sufficient time is allowed for the Engineer’s review before construction is
started on the revised portion.

Assumptions used in design of the falsework shall include but not be limited
to the following:

1. The entire superstructure cross-section, except for the railing,


shall be considered to be placed at one time, except when in
the opinion of the Engineer, a portion of the load is carried by
members previously cast and having attained a specified
strength.

2. The loading used on timber piles shall not exceed the bearing
value for the pile and shall in no case exceed 20 tonne per pile.

3. Soil bearing values and soil condition (wet and dry) shall be
designated by the Contractor on the falsework drawings.
Falsework footings shall be designed to carry the loads
imposed upon them without exceeding estimated soil bearing
values or allowable settlements.

4. The maximum loadings and deflections used on jacks,


brackets, columns and other manufactured devices shall not

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-59
BRIDGE CONSTRUCTION F

exceed the manufacture’s recommendations. If requested by


the Engineer, the Contractor shall furnish catalogue or other
data verifying these recommendations.

5. If the concrete is to be prestressed, the falsework shall be


designed to support any increased or readjusted loads caused
by the prestressing forces.

6. Joints supporting slabs and overhangs shall be considered as


falsework and designed as such.

For the construction of falsework over and adjacent to roadways where


falsework openings are required for maintaining traffic, the Contractor shall
provide any additional features for the work needed to insure that the
falsework will be stable if subjected to impact by vehicles.

The falsework design at the locations where said openings are required shall
include but not be limited to the following minimum provisions:

a. Each exterior stringer in a span shall be securely anchored to the


following cap or framing.

b. Adequate bracing shall be used during all stages of falsework


construction and removal over or adjacent to public traffic.

c. Falsework members shall be at least 300 mm clear of temporary


protective railing members.

The falsework drawings shall include a superstructure placing diagram


showing proposed concrete placing sequence and construction joint locations,
except that where a schedule for placing concrete is shown on the Contract
Plans, no deviation will be permitted there from unless approved in writing by
the Engineer.

The falsework drawings shall show pedestrian openings which are required
through the falsework.

Anticipated total settlements of falsework and forms shall be indicated by the


Contractor on the falsework drawings. These should include falsework
footing settlements over 20 mm will not be allowed unless otherwise
permitted by the Engineer. Deck slab forms between girders shall be
constructed with no allowance for settlement relative to the girders.

Detailed calculations by the Contractor showing the stresses deflections, and


camber necessary to compensate for said deflections in all load supporting
members shall be supplied.

After approving the Contractor’s falsework deflection camber, the Engineer


will furnish to the Contractor the amounts of camber necessary to
compensate for vertical alignment or anticipated structure deflection, if these
are not shown on the drawings. The total camber used in constructing
falsework shall be the sum of the aforementioned cambers.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-60
BRIDGE CONSTRUCTION F

407.3.10 Falsework Construction

The falsework shall be constructed to conform to the falsework drawings.


The materials used in the falsework construction shall be of the quantity and
quality necessary to withstand the stresses imposed. The workmanship used
in falsework shall be of such quality that the falsework will support the loads
imposed on it without excessive settlement or take-up beyond that shown on
the falsework drawings.

When falsework is supported on piles, the piles shall be driven to a bearing


value equal to the total calculated pile loading as shown on the falsework
drawings.

Suitable jacks or wedges shall be used in connection with falsework to set


the forms to their required grade and to take up any excessive settlement in
the falsework either before or during the placing of concrete.

The Contractor shall provide tell-tales attached to the soffit forms easily
readable and in enough systematically-placed locations to determine the total
settlement of the entire portion of the structure where concrete is being
placed.

Should unanticipated events occur, including settlements that deviate more


than ±20 mm from those indicated on the falsework drawings, which in the
opinion of the Engineer would prevent obtaining a structure conforming to the
requirement of the Specification, the placing of concrete shall be
discontinued until corrective measures satisfactory to the Engineer are
provided. In the event satisfactory measures are not provided prior to initial
set of the concrete in the affected area, the placing of concrete shall be
discontinued at a location determined by the Engineer. All unacceptable
concrete shall be removed.

407.3.11 Removing Falsework

Unless otherwise shown on the drawings, or permitted by the Engineer,


falsework supporting any span of a supported bridge shall not be released
before 14 days after the last concrete, excluding concrete above the bridge
deck, has been placed. Falsework supporting any span of a continuous or
rigid frame bridge shall not be released before 14 days after the last concrete
excluding concrete above the bridge deck, has been placed in that span and
in the adjacent portions of each adjoining span for a length equal to at least
half the length of the span where falsework is to be released.

Falsework supporting deck overhangs and deck slabs between girders shall
not be released until 7 days after the deck concrete has been placed.

In addition to the above requirements, no falsework for bridges shall be


released until the supported concrete has attained a compressive strength of
at least 80% of the required 28-day strength. Falsework for cast-in place
prestressed portion of structure shall not be released until after the
prestressing steel has been tensioned.

All falsework materials shall be completely removed. Falsework piling shall


be removed at least 50 cm below the surface of the original ground or stream
bed. When falsework piling is driven within the limits of ditch or channel

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-61
BRIDGE CONSTRUCTION F

excavation areas, the falsework piling within such areas shall be removed to
at least 50 cm below the bottom and side slopes of said excavated areas.

All debris and refuse resulting from work shall be removed and the site left in
a neat and presentable condition.

407.3.12 Formwork Design and Drawings

The Contractor shall prepare drawings and materials data for the formwork
and shutters to be submitted to the Engineer for approval unless otherwise
directed.
The requirements for design of formwork are the same as described under
Section 407.3.9.

407.3.13 Formwork Construction

Concrete forms shall be mortar-tight, true to the dimensions, lines and


grades of the structure and with the sufficient strength, rigidity, shape and
surface smoothness as to leave the finished works true to the dimensions
shown on the Plans or required by the Engineer and with the surface finish
as specified.

Formwork and shutters are to be constructed in accordance with the


approved Plans.

The inside surfaces of forms shall be cleaned of all dirt, mortar and foreign
material. Forms which will later be removed shall be thoroughly coated with
form oil prior to use. The form oil shall be of commercial quality form oil or
other approved coating which will permit the ready release of the forms and
will not discolor the concrete.

Concrete shall not be deposited in the forms until all work in connection with
constructing the forms has been completed, all materials required for the unit
to be poured, and the Engineer has inspected and approved said forms and
materials. Such work shall include the removal of all dirt, chips, sawdust and
other foreign material from the forms.

The rate of depositing concrete in forms shall be such to prevent bulging of


the forms or form panels in excess of the deflections permitted by the
Specification.

Forms for all concrete surfaces which will not be completely enclosed or
hidden below the permanent ground surface shall conform to the
requirements herein for forms for exposed surfaces. Interior surfaces of
underground drainage structures shall be completely enclosed surfaces.

Formwork for concrete place under water shall be watertight. When lumber
is used, this shall be planed, tongued and grooved.

Forms for exposed concrete surface shall be designed and constructed so


that the formed surface of the concrete does not undulate excessively in any
direction between studs, joists, form stiffeners, form fasteners, or wales.
Undulations exceeding either 2 mm or 1/270 of the center to center distance
between studs, joists, form stiffeners, form fasteners, or wales will be
considered to be excessive. Should any form of forming system, even

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-62
BRIDGE CONSTRUCTION F

though previously approved for use, produce a concrete surface with


excessive undulations, its use shall be discontinued until modifications
satisfactory to the Engineer have been made. Portions of concrete
structures with surface undulations in excess of the limits herein specified
may be rejected by the Engineer.

All exposed surfaces of similar portions of a concrete structure shall be


formed with the same forming material or with materials which produce
similar concrete surface textures, color and appearance.

Forms for exposed surfaces shall be made of form materials of even


thickness and width and with uniform texture. The materials shall have sharp
edges and be mortar-tight.

Forms for exposed surfaces shall be constructed with triangular fillets at least
20 mm wide attached so as to prevent mortar runs and to produce smooth
straight chamfers at all sharp edges of the concrete.

Form fasteners consisting of form bolts, clamps or other devices shall be


used as necessary to prevent spreading of the forms during concrete
placement. The use of ties consisting of twisted wire loops to hold forms in
position will not be permitted.
Anchor devices may be cast into the concrete for later use in supporting
forms or for lifting precast members. The use of driven types of anchorage
for fastening forms of form supports to concrete will not be permitted.

407.3.14 Removal of Forms and Falseworks

Forms and falsework shall not be removed without the consent of the
Engineer. The Engineer’s consent shall not relieve the Contractor of
responsibility for the safety of the work. Blocks and bracing shall be removed
at the time the forms are removed and in no case shall any portion of the
wood forms be left in the concrete.

Falsework removal for continuous or cantilevered structures shall be as


directed by the Engineer or shall be such that the structure is gradually
subjected to its working stress.

When concrete strength tests are used for removal of forms and supports,
such removal should not begin until the concrete has attained the percentage
of the specified design strength shown in the table below.

Minimum Percentage
Minimum Time
Design Strength
Centering under girders,
beams frames or arches 14 days 80%
Floor slabs 14 days 70%
Walls 1 day 70%
Columns 2 days 70%
Sides of beams and all other vertical
surfaces 1 day 70%

In continuous structures, falsework shall not be released in any span until the
first and second adjoining spans on each side have reached the strength
specified herein, or in the Special Specifications. When cast-in-place post

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-63
BRIDGE CONSTRUCTION F

tensioned bridges are constructed, falsework shall remain in place until all
post tensioning has been accomplished.

Falsework under all spans of continuous structures shall be completely


released before concrete is placed in railings and parapets. In order to
determine the condition of column concrete, forms shall be removed from
columns before releasing supports from beneath beams and girders.

Forms and falsework shall not be released from under concrete without
first determining if the concrete has gained adequate strength without regard
to the time element. In the absence of strength determination, the forms and
falsework are to remain in place until removal is permitted by the Engineer.

The forms for footings constructed within cofferdams or cribs may be left in
place when, in the opinion of the Engineer, their removal would endanger the
safety of the cofferdam or crib, and when the forms so left intact will not
be exposed to view in the finished structure. All other forms shall be removed
whether above or below the ground line or water level.

All forms shall be removed from the cells of concrete box girders in which
utilities are present and all formwork except that necessary to support the
deck slab shall be removed from the remaining cells of the box girder.

To facilitate finishing, forms used on ornamental work, railing, parapets and


exposed vertical surfaces shall be removed in not less than 12 nor more than
48 hours, depending upon weather conditions. In order to determine the
condition of concrete in columns, forms shall always be removed from them
before the removal of shoring from beneath beams and girders.

Falsework and centering for spandrel-filled arches not be struck until filling at
the back of abutments has been placed up to the spring line. Falsework
supporting the deck of rigid frame structure shall not be removed until fills
have been placed back to the vertical legs.

407.4 Method of Measurement

The quantity of structural steel, structural concrete, reinforcing steel, or other


Contract Pay Items shall constitute the completed and accepted structure
which shall be measured for payment in the manner prescribed in the several
items involved..

407.5 Basis of Payment

The accepted quantities measured as prescribed in Section 407.4 Method of


Measurement, shall be paid for at the contract unit price for each of the
several pay items listed below that are included in the Bill of Quantities. The
price and payment shall be full compensation for furnishing, preparing,
fabricating, placing, and curing and for all labor, equipment, tools and
incidentals necessary to complete the Item. Such payment shall constitute
full payment for the completed concrete structure ready for use.

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-64
BRIDGE CONSTRUCTION F

Pay Item Unit of


Description
Number Measurement

407(8) Lean Concrete (Class B, f’c=16.50 Mpa) Cubic Meter

ITEM 412 ELASTOMERIC BEARING PADS

412.1 Description

412.1.1 Scope

This Item shall consist of the requirement for elastomeric bearing pads
whose main ffunction is to transfer loads or accommodate relative
movement between a bridge superstructure and its supporting structure, or
both while avoiding damaging strain and additional tension. Elastomeric
bearings shall include unreinforced pads (consisting of elastomer only) and
reinforced bearings with steel laminates.

412.1.2 General Requirements

All bearings shall be designed in accordance with specifications contained


in the latest edition of the AASHTO Standard Specification for Highway
Bridges, 15th Edition, 1992.

412.1.3 Classification and Use

The following are the types of elastomeric bearings:

a. Plain Elastomeric Bearing Pad


b. Plain Elastomeric Sandwich Bearing

c. Steel-Laminated Elastomeric Bearing without External Load Plates


d. Steel-Laminated Elastomeric Bearing with External Load Plate(s)

A laminated bearing pad is required when the thickness of the plain pad is
more than 31.75 mm and the compressive strain is more than 15%.

412.2 Material Requirements

The elastomer for the manufacture of the bearing is furnished in two types as
follows:
1) Type CR-Chloroprene Rubber

2) Type NR-Natural Rubber

The elastomer compound used in the construction of a bearing shall contain


only either natural rubber or a chloroprene rubber as the raw polymer. No
reclaimed rubber shall be used.

Steel laminates used for reinforcement shall be made from rolled mild steel
conforming to ASTM A 36, A 570 or equivalent, unless otherwise specified by
the Engineer. The laminates shall have a minimum nominal thickness of 20
gages.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-65
BRIDGE CONSTRUCTION F

412.2.1 Physical Requirements

A. The elastomer compound shall meet the minimum requirement of Table


1.

B. Dimensions and Permissible Variations

All elastomeric layers, for example, plain bearing pads, laminates, and covers,
shall be of uniform thickness unless otherwise specified in the contract or
purchase order.

All internal steel laminates shall be of uniform thickness. When specified in


the contract or purchase order, the thickness of the outer steel laminates
may differ if not adjacent to an external load plate.

The minimum thickness of internal steel laminates shall be 1.5 mm or 0.060


in (16 gage) when the greater of the length or width of a rectangular bearing
or diameter of a circular bearing is less than 450 mm or 18 in. In all other
cases, the minimum thickness shall be 2 mm or 0.075 inch (14 gage).

Bearing dimensions and elastomer layer thicknesses shall satisfy the


tolerances in Table 2, in which D is the length, width or diameter as
appropriate, and T is the total elastomer thickness.

Variation from a plane parallel to a design surface shall not exceed an


average slope of 0.005 for the upper surface and 0.006 for a side surface.

Table 1 – Quality Control Properties of Elastomer


Natural Rubber (NR) Chloroprene Rubber (CR)

Grade (Durometer) 60 70 60 70

Physical Properties:
A. Before Aging
Tensile Strength, MPa (D412) 15.5 (min.) 15.5 (min.) 15.5 (min.) 15.5 (min.)

Elongation, % (D412) 400 (min.) 300 (min.) 350 (min.) 300 (min.)

Durometer Hardness, Shore Pts. (D2240) 60±5 70±5 60±5 70±5


Tear Resistance, N/mm (D624) 31.5 (min.) 31.5 (min.) 31.5 (min.) 31.5 (min.)

Compression Set , % (D395) 25 (max.) 25 (max.) 35 (max.) 35 (max.)

Method B, Temperature, oC 70 70 100 100

B. After Aging
Temperature of the Test, oC 70 70 100 100
Aging Time, Hours 168 168 70 70
Tensile Strength, % (D573) -25 (max.) -25 (max.) -15 (max.) -15 (max.)
Elongation, % -25 (max.) -25 (max.) -40 (max.) -40 (max.)
Durometer Hardness, Shore Pts. +10 (max.) +10 (max.) +15 (max.) +15 (max.)
Other Properties:
Ozone Resistance (D1149)
Partial Pressure, MPa 25 25 100 100
Duration, Hours 48 48 100 100

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-66
BRIDGE CONSTRUCTION F
Tested at 20% strain 37.7 oC ±1 No cracks No cracks
oC - -
Mounting procedure D518
Procedure A
Brittleness D2137, low temp.
Brittleness at -40 oC Pass Pass Pass Pass
Shear Modulus
Nominal Hardness Shear
Modulus at 23 oC, MPa 0.85-1.1 1.13-1.84 0.85-1.1 1.13-1.84

Plain pads and laminated bearings shall be manufactured to the design dimensions and
these specifications with the tolerances listed in Table 2, unless other tolerances are
shown on the design drawings.

Table 2 – Tolerances
Design Dimensions /Parts Mm

Overall vertical dimensions


Design thickness 32 mm (1 ¼ in) or less -0, +3
Design thickness over 32 mm (1 ¼) -0, +6

Overall horizontal dimensions


-0, +6
914 mm (36 in) and less
-0, +12
Over 914 mm (36 in)

Thickness of individual layers of


±20 percent of design value but no more than ±3
elastomer (laminated bearing only) at
mm (1/8 in)
any point within the bearing

Variation from a plane parallel to the


theoretical surface: (as determined by
measurements at the edge of the
bearings)
Top Slope relative to the bottom of no more than 0.005
radian

Sides 6
3
Position of exposed connection members

Edge cover of embedded laminated connection -0, +3


members
±3
Size of holes, slots or inserts
±3
Position of holes, slots, or inserts

412.3 Construction Requirements

412.3.1 Handling, Transport, Storage and Installation

During handling, transport, storage, and installation, bearings shall be kept


clean and protected from mechanical damage, heat, contaminants and other
deleterious effects.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-67
BRIDGE CONSTRUCTION F

Bearings shall be placed on surfaces that are plane to within 1.6 mm and
unless the bearings are placed in opposing pairs, horizontal to within 0.01
radians.
Any lack of parallelism between the top of bearing and the underside of the
girder that exceeds 0.01 radians shall be corrected either grinding of the
surface, grout pack bearing seats or modification of the bearing such that the
intended bearing placement is as originally designed with the least amount of
bearing modification, or as otherwise directed by the Engineer.

Exterior plates of the bearing shall not be welded unless at least 38.1 mm of
steel exists between the weld and the elastomer.

Each completed bearing shall have its components clearly identified, be


securely bolted, straffed or otherwise fastened to prevent any relative
movement and marked on its top as to location and orientation in each
structure in the projects conformity with the plans.

Dismantling at the site shall not be done unless absolutely necessary for
inspecting or installation.

412.3.2 Sampling

Sampling, testing and acceptance consideration will be made on a lot basis.


A lot shall be further defined as the smallest number of bearings as
determined by the following criteria:

a. A lot shall not exceed a single contract or project quantity.


b. A lot shall not exceed 50 bearings.
c. A lot shall consist of those bearings of the same type regardless of load
capacity.

For acceptance purposes, bearing from within the lot shall be selected at
random as samples for inspection and testing.

A minimum of three bearings shall be taken from the lot for testing. If the
number of bearings in the lot exceeds 50 then for each additional 50 or part
thereof, one additional bearing shall be taken for testing.

412.3.3 Acceptance Requirements

1. If lack of elastomer to steel bond is indicated, the


bearing shall be rejected.

2. If laminate placement faults are observed which results


in elastomer layer thickness that exceed the tolerances
in Table 2, the bearing shall be rejected.

3. If there are at least three separate surface cracks


which are each at least 2 mm wide and 2 mm deep.
The bearing shall be rejected.

4. Record the median compressive stiffness (K) of the


bearing of median [Link] compressive stiffness
of each bearing tested shall not differ form (K) by more
than 10%.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-68
BRIDGE CONSTRUCTION F

5. For each bearing that fails to meet the


requirements in (1), two additional bearings maybe
sampled and shall meet the requirements in (1) or the
lot shall be rejected.
6. If the lot is not rejected, the bearing of median stiffness
(K) shall be subjected to the elastomeric material tests
in (2).

412.4 Method of Measurement

The quantity of elastomeric bearing pad to be paid for will be the final quantity
placed and accepted in the completed structure. The dimensions of elastomeric
bearing pads will be the quantity placed in accordance with the Plans or as
otherwise directed by the Engineer.

412.5 Basis of Payment

The accepted quantity, measured as prescribed in Section 412.4, shall be paid for at
the contract unit price for Elastomeric Bearing Pads which price and payment shall
be full compensation for furnishing and placing all materials, including all labor,
equipment, tools and incidentals necessary to complete the work prescribed in this
Item.

Payment will be made under:


Unit of
Pay Item Number Description
Measurement

412 (1) Elastomeric Bearing Pads, DURO 60 Each

ITEM 507 – RUBBLE CONCRETE

507.1 Description

This item shall consist of the construction of rubble concrete in accordance with this
specification and in conformity with the lines, grades, slopes and dimensions shown in
the Plans or established by the Engineer.

507.2 Material Requirements

507.2.1 Stone

The stone shall be cleaned, hard, and durable and shall be subject to the
Engineer’s approval. Adobe stone shall not be used unless otherwise
specified. Stones to be used shall be more than 0.015 cubic metre in volume
and not less than 75 percent of the total volume of rock embankment and
shall consist of stones 0.03 cubic metre in volume as described in Item 506.2.
Stones obtained from excavation performed under this contract may be used.

507.2.2 Concrete Class “B”

Concrete shall be Class “B” in accordance with Item 405, Structural Concrete.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-69
BRIDGE CONSTRUCTION F

507.3 Construction Requirements

507.3.1 Preparation of Foundation Bed

The foundation bed shall be excavated to the lines and grades as shown in
the plans as directed by the Engineer, and shall be thoroughly compacted in
accordance with Item 104.3.3.

507.3.2 Falsework and Formwork Construction

Falsework/formwork shall be constructed so as to withstand the stresses


imposed.

Formwork used shall be constructed with sufficient strength, rigidity and


shape as to leave the finished works true to the dimensions shown on the
Plans and with the surface finished as specified.

The inside surface of the forms shall be cleaned of all dirt, water and foreign
materials. Forms shall be thoroughly coated with form oil prior to use. The
form oil shall be commercial quality form oil or other approved coating which
will permit the ready release of forms and will not discolor the concrete.

507.3.3 Placing

One layer of concrete Class “B” shall be placed at the prepared bed prior to
placing of stones. Clearance between stones shall not be less than 2-1/2
inches or the maximum size of concrete aggregate for Class “B”.

Concrete Class “B” shall be placed after each layer of stone and shall be
thoroughly consolidated by means of a vibrator inserted in each layer of
concrete. In no case shall the vibrator be operated longer than 10 seconds in
any location.

After removal of forms, any cavities, voids and honeycomb spots shall be
filled up with mortar composed of one part cement and two parts sand.

All debris and refuse resulting from work shall be removed and the site left in
a neat and presentable condition.

507.3.4 Weepholes

It shall conform to the requirements of Item 504, Riprap and Grouted Riprap
under Subsection 504.3.4, Weepholes.

507.4 Method of Measurement

The quantity to be paid for shall be the number of cubic meters of rubble concrete
complete in place and accepted. In computing the quantity of payment the dimension
used shall be those shown on the plans or ordered in writing by the Engineer. No
reduction shall be made for weepholes.

507.5 Basis of Payment

The quantity of rubble concrete determined as provided in the preceding section


507.4, Method of Measurement, shall be paid for at the contract unit price per cubic

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-70
BRIDGE CONSTRUCTION F

meter for rubble concrete, which price and payment shall be full compensation for the
preparation of the bed, furnishing, necessary excavations, falsework, and for all labor,
equipment, tools and incidentals necessary to complete the Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement

507 (1) Rubble Concrete Cubic Meter

ITEM 517 DRAIN PIPE

517.1 Description

This Item shall consist of furnishing and installing drain pipes, fastened with steel
straps that are either bolted to pier copings, welded or fastened to girders in
various locations of the bridge, or as indicated in accordance with this Specification
and in conformity with the lines, and grades and dimensions shown in the Plans or
as established by the Engineer.

Longitudinal drainage for bridges shall be provided by scuppers (catch basin) or


drainpipe, which is of sufficient size and number to drain the storm water in the
gutter adequately. Downspouts, where required, shall be made of rigid corrosion-
resistant material not less than 150 mm in least dimension and should be provided
with cleanouts. The details of drains shall such as to prevent the discharge of
drainage water against any portion of the structure or on moving traffic below and
to prevent erosion at the outlet of the downspout. Downspout shall be provided
with pipe supports, where required on the Drawings.

The Contractor shall submit working drawings to the Engineer for his review. All
working drawings shall show full detailed dimensions, sizes for all component parts
of the structure. The required grade of steel for each individual steel fabrication
shall be clearly indicated.

517.2 Material Requirements

Polyvinyl Chloride (PVC) pipe shall meet the requirements specified in one of the
following specification: ASTM 3034, D 2241, D 1785, D 2665, D 2680, F 789, F
679 or AASHTO M 304M (D 2729).

Galvanized iron pipe shall meet the requirements specified in one of the following
specifications: ASTM A53, AASHTO M 36 or M 218.

Steel strap shall meet the requirements of Item 712, Structural Metal; Item 409,
Welded Structural Steel and Item 411, Paint, DPWH Standard Specifications,
Volume II, Highways, Bridges and Airports.

Anchor bolts and bolts fasteners shall meet the requirement of Item 712, Structural
Metal, DPWH Standard Specifications, Volume II, Highways, Bridges and
Airports. 2013 edition.
Drain pipes for all bridges other than steel girder bridges shall be of standard
galvanized iron pipe conforming to ASTM A501 with the diameter of 150 mm or as
shown on the Drawing.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-71
BRIDGE CONSTRUCTION F

517.3 Construction Requirements

Drain pipes shall be constructed in accordance with the lines, dimensions and
details shown on the Drawings or as directed by the Engineer. Drain pipe
extension, if needed shall be attached to the ends of existing drain pipes either
using pipe sleeves or pipe with bell sockets. The length of the extension shall
depend on the existing drain pipe condition and the location as shown in the Plans
and shall be lower than the required vertical clearance or as directed by the
Engineer.

Pipes and fittings shall be homogenous throughout and free from visible cracks,
holes, foreign inclusions or other injurious defects. Pipes installed shall be as
uniform as commercially practical in color, opacity, density and other physical
properties.

Fabrication of steel straps shall conform to the dimensions shown in the Plans and
must be galvanized. Steel strap, unless otherwise specified, shall be coated with
two shop coats of red lead paint nd two field coats of paint as specified under Item
411, paint, DPWH Standard Specifications, Volume II, highways, bridges and
Airports.

Anchor bolts shall be placed as provided under Item 403, metal Structures.

Welded connections shall conform to the requirements of Item 409, Welded


Structural Steel, DPWH Standard specification, Volume II. Highways, bridges and
Airports.

517.4 Measurement and Payment

Drain pipes shall be measured and paid on a linear meter basis, completed and
accepted.

The quantities measured shall be paid for at the contract price for the Pay Items
which price and payment shall be full compensation for furnishing and placing all
materials and for all labor, equipment, tools, testing, supervision, transportation,
shipping and storage costs, test assembly and all incidentals and appurtenances
necessary to complete the work.

The payment shall be deemed to include full compensation for all additional
materials and work not shown on the Drawings or specified, which are necessary
to complete the installation.

Payment will be made under:


Unit of
Pay Item Number Description
Measurement

Drain Pipe 100 mm Diameter,


517(1)a Linear Meter
(G.I Pipe including Pipe Fittings)

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-72
BRIDGE CONSTRUCTION F

ITEM 508 HAND-LAID ROCK EMBANKMENT

508.1 Description

This Item shall consist of hand-laid rock embankment, as designated in the Bid
Schedule, constructed in accordance with this Specification and in conformity with
the lines and grades shown on the plans or established by the Engineer.

508.2 Material Requirements

Stones to be furnished and used shall be sound, clean, hard, and durable and in a
well balanced range of sizes that would meet the requirements herein. Stones
shall be approved by the Engineer. Unless otherwise specified on the Drawings,
all stones shall be more than 0.015 cubic meter in volume and not less than 75
percent of the total volume of rock embankment shall consist of stone 0.03 cubic
meter in volume. Stones obtained from excavation performed under this Contract
may be used and shall be approved by the Engineer. Adobe stone shall not be
used for the construction of rock embankment, unless otherwise specified. Broken
concrete pieces 300 mm maximum size may be used with the approval of the
Engineer.

508.3 Method of Measurement

The quantities to be measured and paid for shall be the number of cubic metre of
hand laid rock embankment as indicated in the Bill of Quantities including stones
furnished, place laid in position, completed and accepted by the Engineer.

508.4 Basis of Payment

The quantities determined in Section 508.3 Method of Measurement, will be paid


for at the contract unit per cubic meter which price and payment shall constitute
full compensation for excavation and preparation of bed, furnishing, selecting and
transporting of stones, for placing stones by hand, backfilling or filling and for all
labor, equipment, tools and incidentals necessary to complete the Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

508(1) Hand-Laid Rock Embankment Cubic Meter

ITEM SPL-801 PREMOLDED EXPANSION JOINT FILLER WITH SEALANT

Premolded expansion joint filler with sealant for concrete paving and structural
construction shall conform to the applicable requirements of AASHTO M153.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections – Package 3 Volume III, Part IIA
Page F-73
PART G

DRAINAGE AND SLOPE


PROTECTION STRUCTURES
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

ITEM 500 PIPE CULVERTS AND STORM DRAINS

500.1 Description

This Item shall consist of the construction or reconstruction of pipe culvert


and storm drains, hereinafter referred to as “conduit” in accordance with this
Specification and in conformity with the lines and grades shown on the plans
or as established by the Engineer.

500.2 Material Requirements

Material shall meet the requirement specified in the following specifications:


Reinforced concrete culvert, storm drain and sewer pipe – AASHTO M 170

Joint Mortar – Joint mortar for concrete pipe shall consist of 1 part, by
volume of Portland Cement and two (2) parts of approved sand with water
as necessary to obtain consistency.

500.3 Construction Requirements

500.3.1 Excavation

Trenches shall be excavated in accordance with the requirement of


Item 103, Structure Excavation, to a width sufficient to allow for
proper jointing of the conduit and thorough compaction of the
bedding and backfill materials under and around the conduit.

500.3.2 Bedding

The minimum thickness of bedding material beneath the pipe shall


be 100 mm. The bedding material shall be sand or selected sandy
soil all of which a 9.5 mm sieve and not more than 10 percent of
which passes a 0.075 mm sieve.

500.3.3 Backfilling

Materials for backfilling on each side of the conduit for the full
trench width and to an elevation of 300 mm above the top of the
conduit shall be fine, readily compactible soil or granular material
selected from excavation or from an approved source, and shall
not contain stones that would be retained on a 50 mm sieve,
chunks of highly plastic clay, or other objectionable material.
Granular backfill material shall have not less than 95 % passing a
12.5 mm sieve and not less than 95 % retained on a 4.75 mm
sieve. Over size material, shall be removed from the backfill,
except as directed by the Engineer.

500.4 Method of Measurement

The quantities to be paid for, for each class and diameter of new pipe
culverts, shall be the lengths of pipes between the outside faces of the
headwalls, measured along the axis of the pipes as, installed in place,
completed and accepted.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-1
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

500.5 Basis of Payment

The accepted quantities of conduit, determined as provided for in Section


500.4, Method of Measurement shall be paid for at the Contract unit price
per linear meter for the conduit of the types and sizes specified and
completed in place. The price and payment shall be full compensation for
furnishing and placing all materials, including granular bedding and backfill
and all labor, equipment, tools and incidentals necessary to complete the
item.

Excavation for culverts, including excavation below flow line grade and for
imperfect trench, shall be measured and paid for as provided in Item 103,
Structure Excavation.

Payment will be made under:

Pay Item Description Unit of


Number Measurement

500(1)a RC Pipe Culvert, 460mm diameter Linear Meter


Class II, Type B

500(1)a3 RC Pipe Culvert, 910mm diameter Linear Meter


Class II, Type B

ITEM 502 MANHOLES, INLETS AND CATCH BASINS

502.1 Description

This Item shall consist of the construction of manholes, inlets and catch
basins in accordance with this Specification and to the lines, grades,
dimensions and locations shown on the Drawings or as established by the
Engineer.

502.2 Material Requirement

Unless otherwise indicated on the Drawings, concrete for these structures


shall be concrete Class “A” and shall be in accordance with item 405,
Structural Concrete, and reinforcing steel AASSHTO M 31.

502.3 Method of Measurement

Excavation for manholes, inlets and catch basins will be measured and paid
for as provided in item 103 Structure Excavation. No payment shall be made
on areas over cut or excavated outside the specified section as shown in the
Plan [Link] be paid

502.4 Basis of Payment

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-2
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

Pay Item Number Description Unit of


Measurement
Manhole (1.0m x 1.0m)
502 (1)a Each
for 460mm diameter RCPC
Manhole (1.50m x 1.50m )
502 (1)a7
for Lateral Drains Each
502 (3)a3 Catch Basin , 910mm diameter Each
Concrete Cover for Manhole
502 (4)a (1.0m x 1.0m Manhole) Each

Concrete Cover for Manhole


502 (4)a7 Each
(1.5m x 1.5m Manhole)

ITEM 505 RIPRAP AND GROUTED RIPRAP

505.1 Description

This Item shall consist of furnishing and placing of riprap with grout in
accordance with this Specification and to the lines, grades and dimensions
shown on the Drawings. This work also includes construction of weep holes.

505.2 Material Requirements

505.2.1 Stones

Cobbles and boulders for Class A riprap shall consist of rock as


nearly rectangular in section as is practicable or round natural
stones ranging from 200mm to 250mm in diameter. Boulders shall
be sound, tough, durable, dense, resistant to the action of air and
water, and suitable in all aspects for the purpose intended.

505.2.2 Filter Materials

For weep-hole, non-woven geotextiles sewed like a bag and filled


with gravel, 20 mm diameter, in accordance with DPWH standards
shall be used as filter as shown in the Drawings.

The PVC pipe shall be durable and of accepted quality and shall
be subject to the approval of the Engineer. Unless otherwise
shown on the drawing the pipe shall be schedule 40 and minimum
50mm diameter.

505.2.3 Mortar

Mortar for grouted riprap shall be one (1) part cement to three (3)
parts sand by volume and enough water to obtain the required
consistency and shall conform to the requirements of Item 405,
Structural Concrete.

505.3 Construction Requirements

505.3.1 Excavation

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-3
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

The bed for grouted riprap shall be excavated to the required


depths and to the design slope properly compacted, trimmed and
shaped as shown on the Drawings.
The grouted riprap shall be founded in a toe trench dug below the
depth of scour as shown on the Drawings or as ordered by the
Engineer. The toe trench shall be filled with stones of the same
class as that specified for the grouted riprap, unless otherwise
specified.

505.3.2 Placing

The stones shall be laid by hand or individually by machines. They


shall be laid with close, broken joints and shall be firmly bedded
into the slope and against the adjoining stones. Each stone shall
be laid in close contact with each adjacent stones. The riprap shall
thoroughly be rammed into place as construction progresses and
the finished surface shall present an even, tight surface.
Interstices between stones shall be filled with small broken
fragments firmly rammed into place. The surface of the riprap
shall not vary from the theoretical surface by more than 100mm at
any point.

505.3.3 Grouting

Sufficient mortar shall be used to completely fill all spaces between


stones throughout the thickness of the riprap except that the face
surface of the stones shall be left exposed. Grout shall be placed
from bottom to top of the surface and swept with a stiff broom.
After grouting is completed, the surface shall be cured as specified
in Item 405, Structural Concrete for a period of at least three days.
Hardened grout left during the previous days’ operation shall be
cleaned thoroughly from earth or dust and other unnecessary
materials with water and broom before another layer of stone and
grout is added.

505.4 Method of Measurement

Riprap and grouted riprap shall be measured by the number of cubic metre
in place, completed and accepted by the Engineer in accordance with the
Drawings. Only accepted work will be measured for payment and the
computation of the quantity thereof will be based on the volume within the
limiting dimensions designated on the Drawings or as determined by the
Engineer. No separate measurement shall be made for filter materials.

505.5 Basis of Payment

The quantities measured as provided under Sub-Section 505.4, Method of


Measurement shall be paid for at the Contract unit price as listed in the Bill
of Quantities, which price and payment shall be full compensation for
excavation and preparation of the bed, for furnishing and placing all
materials including weep holes, filter materials, backfill, and additional fill to
bring the riprap bed to the line, grades and dimension as shown on the
Drawings and for all labor, equipment, tools and incidentals necessary to
complete the work Item.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-4
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

Payment will be made under:

Pay Item Number Description Unit of


Measurement
505(2)a Grouted Riprap, Class A Cubic Meter

ITEM 506 STONE MASONRY

506.1 Description

This Item shall consist of stone masonry in minor structures, in headwall for
culverts, in retaining walls at the toes of slope, and at other places called for
on the plans, constructed on the prepared foundation bed, in accordance
with this Specification and to the lines, grades and dimensions shown on the
Drawings. This work also includes construction of weep holes.

506.2 Material Requirements

506.2.1 Stone

Stones shall be clean, hard and durable and shall be subject to the
approval of the Engineer. Unless otherwise specified on the
Drawings or as directed by the Engineer, stones for masonry shall
be Class A as described in Item 504, Riprap and Grouted Riprap.
Stones shall have roughly similar blunted ends.

506.2.2 Mortar

The mortar for stone masonry shall be composed of one (1) part
Portland cement to two (2) parts of sand by volume and sufficient
water to obtain the required consistency and shall conform to the
requirements of materials under Item 405, Structural Concrete.

506.3 Construction Requirement

506.3.1 Selection and Placing

Care shall be taken to prevent the bunching of small stone or


stones of the same size. Large stones shall be used in the corners.

All stones shall be cleaned thoroughly and wetted immediately


before being set, and the bed shall be cleaned and moistened
before the mortar is spread. They shall be laid with there longest
faces horizontal in full beds of mortar, and the joint shall be flushed
with mortar.

506.3.2 Weepholes

It shall conform to the requirement of item 504, Riprap and


Grouted Riprap.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-5
DRAINAGE AND SLOPE PROTECTION STRUCTURES G

506.3.3 Cleaning Exposed Faces

Immediately after being laid, all outside face stone shall be


thoroughly cleaned of mortar stains and shall be kept clean until
the work is completed.

506.4 Method of Measurement

Stone Masonry shall be measured by the number of cubic meter in place,


completed and accepted by the Engineer in accordance with the Drawings.
Only accepted work will be measured for payment and the computation of
the quantity thereof will be based on the volume within the limiting
dimensions designated on the Drawings or as determined by the Engineer.
No separate measurement shall be made for filter materials.

506.5 Basis of Payment

The quantities measured as provided under Sub-Section 506.4, Method of


Measurement shall be paid for at the Contract unit price as listed in the Bill
of Quantities, which price and payment shall be full compensation for
excavation and preparation of the bed, for furnishing and placing all
materials including weep holes, filter materials, backfill, and additional fill to
bring the riprap bed to the line, grades and dimension as shown on the
Drawings and for all labor, equipment, tools and incidentals necessary to
complete the work Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement

506(1) Stone Masonry Cubic Meter

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page G-6
PART H

MISCELLANOUS
STRUCTURES
MISCELLANEOUS STRUCTURES H

PART H MISCELLANEOUS STRUCTURES

ITEM 600 CURB AND GUTTER

600.1 Description

This Item shall consist of the construction of curb and gutter either Precast or Cast
in place, made of concrete in accordance with this Specification at the location, and
in conformity with the lines, grades, dimensions and design, shown on the Plans or
as required by the Engineer.

600.2 Material Requirements

600.2.1 Material for Bed Course

Bed course materials as shown on the plans shall consist of cinder, sand,
slag, gravel, crushed stone, or other approved porous material of such
grading that all the particles will pass through 12.5 mm sieve.

600.2.2 Concrete

Concrete shall be of the class indicated on the Plans and shall conform to
the requirements of Item 405, Structural Concrete.

600.2.3 Expansion Joint Filler

Expansion joint shall be conform to the requirements of AASHTO M


153/Item 705.

600.2.4 Cement Mortar

Cement mortar shall consist of one part of Portland cement and two parts
of fine aggregates with water added as necessary to obtain the required
consistency. The mortar shall be used within 30 minutes of preparation.

600.2.5 Bonding Compound

Where bonding compound is used, it shall conform to AASHTO M 200.

600.3 Construction Requirements

600.3.1 Bedding

Excavation shall be made to the required depth and the base upon which
the curb and/or gutter is to be set shall be compacted to a firm and even
surface. All soft and unsuitable material shall be removed and replaced
with suitable material.

Bed course material shall be placed and compacted to form a bed of the
required thickness as shown on the Plans.

600.3.2 Cast in Place Curb and Gutter

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-1
MISCELLANEOUS STRUCTURES H

[Link] Placing

Forms shall conform to the requirements of Item 407, Concrete


Structures. Metal forms shall be of an approved section.

Forms to hold the concrete shall be built and set-in-place as


described in Item 407, Concrete Structures. Forms for at least 50 m
of curb and gutter shall be in-place and checked for alignment and
grade before concrete is placed. Curbs and gutters constructed on
curves shall have forms of either wood or metal and they shall be
accurately shaped to the curvature shown on the Plans.

Mixing, Placing, Finishing and curing of concrete shall conform to


the requirements of Item 405, Structural Concrete, as modified by
the requirements below.

The concrete shall be placed in the forms in layers of 100 or 125


mm each, and to the depth required. It shall be tamped and spaded
until mortar entirely covers the top and surfaces of the f orms. The
top of the concrete shall be finished to a smooth and even surface
and the edges rounded to the radii shown on the Plans. Before the
concrete is given the final finishing, surface of the gutter shall be
tested with a 3-m straight-edge and any irregularities of more than
10 mm in 3 m shall be corrected.

The curb and gutter shall be constructed in uniform section of not


more than 50 m in length except where shorter sections are
required to coincide with the location of weakened planes or
contraction joints of 2 m long. The sections shall be separated by
sheet templates set perpendicular to the face and top of the curb
and gutter. The templates shall be approximately 5 mm in thickness
and of the same width as that of the curb and/or gutter and not less
than 50 mm deeper than the depth of the curb and/or gutter.
Templates shall be set carefully and held firmly during the placing of
the concrete and shall remain in place until the concrete has set
sufficiently to hold its shape but shall b removed while the forms are
still in place. A preformed joint filler approved by the Engineer may
be used in lieu of the sheet template mentioned above. In this event
the fiber board shall be pre-cut to the shape of the curb so that its
outer edge will be flushed with the abutting curb and/or gutter.

Expansion joint shall be formed at intervals shown on the Plans.


Where a curb is placed next to a concrete pavement, expansion
joints in the curb shall be located opposite expansion joints in the
pavement.

The form shall be removed within 24 hours after the concrete has
been placed. Minor defects shall be repaired with mortal containing
one part of Portland cement and two parts of fine aggregate.
Plastering shall not be permitted and all rejected portions shall be
removed and replaced at the Contractor’s expense. The exposed
surface shall be wetted soft brick or wood until they are smooth.
The surfaces shall be wetted thoroughly, either by dipping the brick
or wood in water, or by throwing water on the surfaces with a brush.
After the concrete has been rubbed smooth using water, it shall

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-2
MISCELLANEOUS STRUCTURES H

then be rubbed with a thin grout containing one part of Portland


cement and one part of fine aggregates. Rubbing with grout shall
continue until uniform color is produced. When completed, the
concrete shall be covered with suitable material may be applied as
provided in Item 405, Structural Concrete. The concrete shall be
suitably protected from the weather until thoroughly hardened.

After the concrete has set sufficiently, the spaces on the back of the
curb which were excavated for placing the curb shall be refilled to
the required elevation with suitable material which shall be tamped
in layers of not more than 150 mm until consolidated.

600.3.3 Precast Curb and Gutter

[Link] Placing

The precast concrete curb and gutter shall be set in 20 mm of


cement mortal as specified in Subsection 600.2.4 to the line level
and grade as shown on the approved Plans.

The precast curb shall not be more than 20 cm in width at the top
portion and not be more than 25 cm at the base. The precast curb
and gutter shall be 1.0 m in length and shall be put side
consecutively with joint in between.

Joints between consecutive curb and gutter shall be filled with


cement mortar to the full section of the curb and gutter. Expansion
joints shall be formed at intervals shown on the Plans. Where a
curb and gutter is placed next to a concrete pavement, expansion
joints in the curb and gutter shall be located opposite expansion
joints in the pavement.

Minor defects shall be repaired with mortar containing one part of


portland cement and two parts of fine aggregates. Plastering shall
not be permitted and all rejected portions shall be removed and
replaced at the contractor’s expense. The exposed surface shall be
finished by rubbing the surfaces with a wetted soft brick or wood
until they are smooth. The surfaces shall be wetted thoroughly,
either by dipping the brick or wood in water, or by throwing water on
the surfaces with a brush. After the concrete has been rubbed
smooth using water, it shall then be rubbed with a thin grout
containing one part of Portland cement and one part of fine
aggregate. Rubbing with grout shall continue until uniform color is
produced.

[Link] Handling Precast Curb and Gutter

1. In preparation for the handling of precast curb and gutter, all


fabricated curb and gutter of one (1) meter in length shall be
provided or inserted with 2(25 mm) Ø PVC pipes for fitting at
their required locations. The PVC pipes shall be placed 25 mm
from both edge during the plastic state of fresh concrete.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-3
MISCELLANEOUS STRUCTURES H

2. Precast curb and gutter shall be lifted on upright position and


not at the points of support and shall be the same during
transporting and storage.

3. Extreme care shall be exercised in handling and moving precast


curb and gutter to avoid cracking.

4. No precast curb and gutter shall be used that does not reach its
final position in the forms with the required time stipulated prior
to installation.

5. Precast curb and gutter shall be transferred to the construction


site. Fresh curb and gutter shall not be placed against in-situ
concrete which has been in a position for more than 30 minutes.

6. Precast curb and gutter may only be transported to the delivery


point in truck agitators truck mixer operating at the speed
designated by the manufacturer of the equipment, provided that
the consistency and workability of the mix concrete upon
discharge at the delivery point is suitable for adequate
placement.

600.4 Method of Measurement

The length of curb and gutter to be paid shall be the number of linear meters of curb
and gutter (cast in place) or the number of pieces of precast curb and gutter of the
required dimension shown on the Plans measured along its front face in-place,
completed and accepted. No deductions shall be made for flattening of curbs at
entrances and no additional allowances shall be made for curbs and gutters
constructed on curves.

600.5 Basis of Payment

The length of curb and gutter determined in Subsection 600.4, Method of


Measurement, shall be paid for at the contract unit price per linear meter for curb
and gutter which price and payment shall constitute full compensation for furnishing
and placing all materials for concrete, forms for drainage openings, excavation for
curb and gutter, backfilling, dumping and disposal of surplus materials, and for all
labor, equipment, tools and incidentals necessary to complete the Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement

600(1) Concrete Curb (Cast in Place) Linear Meter

600(4) Combination Curb and Gutter Linear Meter


(Cast in Place)

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-4
MISCELLANEOUS STRUCTURES H

ITEM 601 SIDEWALK

601.1 Description

This Item shall consist of the construction of asphalt or portland cement concrete
sidewalk in accordance with this Specification and to the lines, grades, levels and
dimensions shown on the Plans, or as required by the Engineer.

601.2 Material Requirements

601.2.1 Portland Cement Concrete

The cement concrete shall be Class A as specified in Item 405, Structural


Concrete.

601.2.2 Asphalt

Asphaltic material shall be specified in Item 308, Bituminous Plant-Mix


Surface Course, Cold-Laid, or Item 310, Bituminous Concrete Surface
Course, Hot-Laid.

601.2.3 Expansion Joint Filler

Unless otherwise ordered, the preformed joint filler shall have a thickness
of 5 mm and shall conform to the conform to the requirements of Item 311,
Portland Cement Concrete Pavement.

601.2.4 Forms

Forms shall be of wood or metal as approved by the Engineer and shall


extend to the full depth of the concrete. All forms shall be straight, free from
warps and of adequate strength to resist distortion.

601.2.5 Bed Course Material

Bed course material consists of cinders, sand, slag, gravel, crushed stone
or other approved permeable granular material of such grading that all
particles shall pass a 12.5 mm (1/2 inch) sieve.

601.2.6 Asphaltic Prime Coat

Prime coat shall be cut-back asphalt conforming to the requirements of


Item 301, Bituminous Prime Coat.

601.3 Construction Requirements

601.3.1 Asphalt Sidewalk

Excavation shall be made to the depth and width required that will permit
the installation and bracing of the forms. The foundation shall be shaped
and compacted to a firm and even surface conforming to the section shown
on the Plans. All materials from soft areas shall be removed and replaced
with suitable materials.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-5
MISCELLANEOUS STRUCTURES H

The bed course shall be compacted in layers not exceeding 100 mm to the
depths, lines and levels shown on the Plans.

The prepared bed course material shall receive an application of prime coat
in accordance with the requirements of Item 301, Bituminous Prime Coat.

The asphalt mixture shall be placed on the previously primed and prepared
bed only when, in the opinion of the Engineer, the bed is sufficiently dry
and weather conditions are suitable. The mixture shall be placed in one or
more layers of uniform thickness to the total depth shown on the Plans.
Each layer shall be smoothed by raking or screeding and shall be
thoroughly compacted by rolling with a hand operated roller of a type
satisfactory to the Engineer. After compaction, the surfacing shall be of the
thickness and section shown on the Plans and shall be smooth, even and
of a dense uniform texture. Forms, if used, shall be removed and the
shoulders shaped and compacted to the required section.

601.3.2 Cement Concrete Sidewalk

Excavation shall be as specified above. The bed course material shall be


placed in accordance with the Item 200, Aggregate Subbase Course.

All forms shall be staked securely in position at the correct line and level.
Performed joint filler shall be set in position shown on the Plans before
placing of the concrete is started. The top of the joint filler shall be placed 5
mm below the top surface of the finished sidewalk.

The mixing, placing, finishing and curing of concrete shall be as specified in


Item 405, Structural Concrete. The Portland cement concrete shall be
placed to the total depth shown on the Plans.
The surface shall be cut through to a depth of 10 mm with a trowel at
intervals of 1 m or, were required, in straight lines perpendicular to the
edge of sidewalk. The surface shall then be brushed. The edges of the
sidewalk and the transverse cuts shall be shaped with a suitable tool so
formed as to round the edges to a radius of 15 mm.

601.4 Method of Measurement

The area to be paid for shall be the number of square meters of sidewalk measured,
completed in-place and accepted.

601.5 Basis of Payment

The quantity as determined in Subsection 601.4, Method of Measurement, shall be


paid for all the contract unit price per square meter for Sidewalk which price and
payment shall constitute full compensation for furnishing and placing all materials for
asphalt sidewalk, concrete sidewalk, expansion joint material, for excavating and
compacting the foundation bed, for furnishing and placing cinders, gravel or other
permeable bed course material, for prime coat material, for forms and for all labor,
equipment, tools and incidentals necessary to complete the Item.

Payment will be made under:

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-6
MISCELLANEOUS STRUCTURES H

Pay Item Description Unit of


Number Measurement
601(1)a Reinforced Concrete Sidewalk 0.10m thk. With Square Meter
Homogeneous Granite Tile Finished
601(1)b Reinforced Concrete Sidewalk 0.10m thk. With Square Meter
Colored Cement Finished
601(1)c Sidewalk Concrete Plank Paver Finished Square Meter
(0.125m x 0.368m, Dark Gray)

ITEM 602 MONUMENTS, MARKERS AND GUIDE POSTS

602.1 Description

This item shall consist right-of-way monuments, maintenace marker posts,


kilometer posts, drainage marker post and/or guide posts, furnished and installed in
accordance with this Specification at the locations, and in conformity with the sizes,
dimensions and design, shown on the plans, or as required by the Engineer.

602.2 Materials Requirement

Unless otherwise indicated on the Drawings, concrete shall be Class “A” and shall
be composed of materials conforming to the requirements of Item 405, Structural
Concrete

Reinforcing steel shall conform to the requirements of item 404, Reinforcing Steel.

The metal material shall conform to the requirements shown on the Plans, or as
stipulated in the Special Provisions.

Paints, if required, shall conform to the requirements shown on the Plans, or as


stipulated in the Special Provisions.

Warning reflectors, if required, shall conform to the requirements shown on the


Plans, or as stipulated in the Special Provisions.

602.3 Construction Requirements

Construction or fabrication and installation of monuments and posts shall be as


shown on the plans and shall include the attaching of warning reflectors and the
painting of posts, if required. Each monument and post shall be set accurately at
the required location and elevation and in such manner as to insure its being held
firmly in place. In constructing pre-cast monuments, the forms shall not be removed
until after the concrette has hardened. Monuments that are warped shall be rejected.
The exposed surface of the finished monuments shall be uniform or even texture,
and shall be free from holes, cracks and chipped edges. The precast monuments
shall not be transported to the work until the concrete has been cured.

602.4 Method of Measurement

The quantities to be paid for shall be the actual number of kilometer post and
drainage marker furnished, placed and accepted.
602.5 Basis of Payment

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-7
MISCELLANEOUS STRUCTURES H

The quantities determined as provided in Subsection 602.4 Method of


Measurement, shall be paid for the contract price per unit of measurement
respectively, for each of the particular Pay itme listed below and as shown in the
Bid Schedule, which price and payment shall constitute full compensation for
furnishing and placing all materials including all labor, equipment, tools and
incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:


Description Unit of
Pay Item Number
Measurement
602 (3)b Kilometer Post (Precast) Each

ITEM 603 GUARDRAIL

603.1 Description

This item shall consist of furnishing and constructing post and flex beam guardrail
and in accordance with this Specification, at the locations, and in conformity with the
lines and grades shown on the plans, or as required by the Engineer.

603.2 Materials Requirement

Materials for the desired type of guardrail shall meet the requirements specified in
the following specifications:

1. Wire rope or wire cable AASHTO M 30


2. Chain link fabric AASHTO M 181
3. Metal beam rail AASHTO M 180
4. Timber rail, unless otherwise indicated in the Plans or Special Provisions, any
of the following first group Philippine Timber shall be used: Ipil, Molave, Tindalo
or Yacal. Only one specie of timber shall be used in the construction of any
one continuous length of guardrail.

Timber guardrail shall be well-seasoned, straight and free of injurious defects.


They shall be dressed and of sufficient length so that joints shall be on the rail
posts.

Guardrail Hardware. Offset brackets of the resilient and non-resilient types


shall be of the type specified, or as shown on the Plans, and shall meet the
strength requirements specified.

Splices and end connections shall be of the type and design specified or as
shown on the Plans, and shall be of such strength as to develop the full
design strength of the rail elements.

Unless otherwise specified, all fittings, bolts, washers and other accessories
shall be galvanized in accordance with the requirements of AASHTO M 111 or
ASTM A 153, whichever may apply. All galvanizing shall be done after
fabrication.
Guardrail Post. Posts shall be of either wood, steel, or concrete, as may be
specified. Only one kind of post shall be used for any one continuous guardrail.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-8
MISCELLANEOUS STRUCTURES H

Wood post shall be fabricated from an approved or specified timber specie and
shall be of the quality, diameter or section and length as specified, or as shown
on the Plans.

Steel post shall be of the section and length as specified, or as shown on the
Plans. They shall be of a copper bearing steel when so specified. Steel shall
conform to the requirements of AASHTO M 183 for the grade specified. The
posts shall be galvanized or shop painted as may be specified.

Pre-cast reinforced concrete posts shall be of a section and length as specified


or as shown on the Plans. Concrete shall conform with the requirements of
Item 405, Structural Concrete, for class specified. Reinforcement shall
conform with the requirements of AASHTO M 31 Grade 60. All bars shall be of
the deformed type.

Concrete deadmen for end anchorages shall be as specified, or as shown on


the Plans. Concrete and reinforcement shall conform to the requirements as
stated above the precast reinforced concrete posts.

Paints for steel and wood shall be specified and conform to the requirements
specified in Item 411, Paint.

603.3 Construction Requirements

603.3.1 Posts

Post shall be set vertically in the position shown on the Plans and, where
embedded in a concrete foundation block, shall remain undisturbed for a
minimum of 48 hours. The space around the post shall be backfilled to the
ground line with approved materials in layers of exceeding 100mm and each
layer shall be moistened and thoroughly compacted

603.3.2 Rail Elements

Rail elements shall be errected in a manner resulting in a smooth continous


installation. All bolts, except adjustment bolts, shall be drawn ttight. Bolts shall
be of sufficient length to extend beyond the nuts at least 5mm but not more
than 10mm.

Where painting of railing components is specified, any damage to the shop


coat of paint shall be corrected by an application of an approved rust- inhibitive
primer prior to further painting. Any surface inaccessible to painting after
erection shall be given the specified number of coats of paint uniformly applied
by thorough brushing using an approved pressure spray.

Galvanized surfaces which have been abraded so that the base material is
exposed, threaded portions of all fittings and fasteners and cut ends of bolts
shall be protected in a manner as may be specified or directed by the Engineer.

The surfaces and sawed edges of untreated or salt-treated guardrail shall be


painted with three coats of white paint to within 200 mm of the ground line.
The first 200 mm of posts above the ground shall be painted with two coats of
black paint. Painting shall be done only when the timber is dry and clean. Each
coat of paint shall be thoroughly dry before the next coat is applied. Paint shall
be applied in heavy coats, completely covering every part of the surface and

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-9
MISCELLANEOUS STRUCTURES H

shall be worked well into the joints and open spaces. It shall be thoroughly and
evenly spread that no excess paint collects at any point.

Guardrail and posts, after erection has been completed, shall be stained with
two applications of approved creosote stain, covering the rails and the exposed
portions of the posts. The wood shall be dry before being stained. The first
coat shall be thoroughly dry before the second is applied. Stain shall not be
applied in damp weather.

For beam type guardrails, metal works not galvanized shall be given one shop
coat of red lead, zinc chromate paint or an approved fast-drying rust-inhibitive
primer and two field coats of white or aluminum paint. Untreated wood posts
shall be given three coats of paints of the color indicated on the Plans, or as
specified. Painting shall conform to the requirements of Item 411, Paint.

603.4 Method of Measurement

Guardrail shall be measured by linear meter from center to center of end post except
where end connections are made on masonry or steel structures, in which case
measuremetn will be to the face of such structures.
Terminal sections or end pieces will be measured as units of each kind as shown on
the Bill of Quantities. If no pay item for anchorages or terminal sections appear in
the Bid Schedule, measurement threfore shall be included in the linear meter
measurement of completed guardrail.

603.5 Basis of Payment

The accepted quantities of guardrail, determined in Subsection 603.4 Method of


Measurement, shall be paid for at the contract unit price per linear meter for the type
specified, completed in place.

Payment will be made under:


Pay Item Number Description Unit of Measurement
603 (3)a1 Metal Guardrail (Metal Beam), with Post Linear Meter
603 (4)a Metal Beam, End Piece Each

ITEM 604 FENCING

604.1 Description

This Item shall consist of furnishing and constructing posts and barbed wire or chain
link fences in accordance with the details, and at the locations, shown on the Plans,
or as required by the Engineer.

604.2 Material Requirements

604.2.1 Barbed Wire

Barbed wire shall conform to the requirements of ASTM A 121, Class I.


The barbed wire shall consist of 2 strands of 12.5 gauge wire, twisted with
2 points, 14 gauge barbs spaced 100 mm apart.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-10
MISCELLANEOUS STRUCTURES H

604.2.2 Chain Link Fence Fabric

Chain link fence fabric shall be fabricated from 10 gauge galvanized wire
conforming to AASHTO M 181 and shall be of the type shown on the Plans.
Before ordering the chain link fence fabric, the Contractor shall submit a
sample of the material to the Engineer for testing and for approval.

604.2.3 Concrete Post

Concrete posts shall be made of Class A concrete in accordance with Item


405, Structural Concrete. The posts shall be cast to a tapered section 3 m
long, or to the length shown on the detailed Plans, and shall have a smooth
surface finish.

604.2.4 Steel Post

Steel posts shall be of the sections and length as specified or as shown on


the Plans. The posts shall be copper bearing steel and shall conform to the
requirements of AASHTO M 183 for the grade specified.

604.2.5 Hardware

Nuts, bolts, washer and other associated hardware shall be galvanized


after fabrication as specified in ASTM A 153.

604.3 Construction Requirements

The Contractor shall perform such clearing and grubbing as may be necessary to
construct the fence to the required grade and alignment.

Fence shall generally follow the contour of the ground. Grading shall be performed
where necessary to provide a neat appearance.

604.3.1 Erection Post

The post shall be erected vertically in position inside the formwork of the
foundation block prior to the placing of concrete and shall be adequately
support by bracing to prevent movement of the post during the placing and
setting of the concrete. The posts shall be erected to the height and
location shown on the Plans. or as ordered by the Engineer.

604.3.2 Installation of Chain Link Fence Fabric

The chain link fence fabric shall be set to line and elevation, and pulled taut
between each post before spot welding or other method of fixing, is carried
out. Where splicing of the fence fabric is necessary, or at joints, the lapping
of the chain link fabric shall be for a minimum of 100 mm and shall occur
only at the post. No horizontal splicing will be permitted. The fence fabric
shall be fixed to the posts as shown on the Plans. Any surface protective
layer damaged during welding and/or construction shall be restored
properly.

604.4 Method of Measurement

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-11
MISCELLANEOUS STRUCTURES H

The quantity to be paid for shall be the number of linear meters measured center to
center of posts of fencing erected in place and accepted.

604.5 Basis of Payment

The quantity, as determined in Section 604.4, Method of Measurement, shall be paid


for at the contract price per unit of measurement respectively for each of the
particular items listed below and as shown in the Bid Schedule, which price and
payment shall be full compensation for furnishing and placing all materials and for all
labor, equipment, tools and incidentals necessary to complete the Item.

Payment will be made under:


Description Unit of
Pay Item Number
Measurement
604 (2) Fencing (Chain Link Fence Fabric) Linear Meter
Including Pedestal

ITEM 605 ROAD SIGNS

605.1 Description

This item shall consist of furnishing and installing road signs in accordance with this
Specification, at the locations, and in conformity with the lines and grades shown on
the Plans, or as required by the Engineer.

Road sign shall be classified as standard or non-standard. Standard signs consist of


all warning sings, regulatory sings and informative signs with the exception of
direction signs, place identification signs and the line. Non-standard signs consists of
all informatory signs which as not classified as standard signs.

605.2 Materials Requirement

605.2.1 Sign Panels

Sign panels for warning, regulatory, and informatory signs shall be


manufactured from aluminum sheeting at least 3 mm thick.

605.2.2 Reflective Sheeting

Table 605.1 – Reflective Brightness of Traffic Signs Surfaces


Minimum Reflective
Color Angle of Angle of Brightness Value
Incidence Divergence Compared with MgO
Red -40 0.50 15
200 0.50 10
500 0.50 3
White -40 0.50 75
200 0.50 70
500 0.50 70
Yellow -40 0.50 35
200 0.50 35
500 0.50 10
Blue -40 0.50 6
200 0.50 4.5

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-12
MISCELLANEOUS STRUCTURES H

500 0.50 0.5


Green -40 0.50 6
200 0.50 4.5
500 0.50 0.5

605.2.3 Post and Frames

Posts for road signs shall be either G.I. pipe conforming to ASTM A 283
Grade D. In lieu of wide flange steel posts, the Contractor may use tubular
steel posts conforming to ASTM A 501. All posts shall be thoroughly
cleaned, free from grease, scale and rust and shall be given one coat of
rust inhibiting priming paint and two coats of gray paint in accordance with
Item 411, Paint.

Other structural steel members shall conform to ASTM A 283 Grade D.

605.2.4 Nuts and Bolts

Nuts, bolts, washers and other metal parts shall be hot-dip galvanized after
fabrication in accordance with the requirements of AASHTO M 111.

605.2.5 Concrete Foundation Blocks

The concrete for the foundation blocks shall be class A in accordance with
item 405, Structural Concrete and shall be of the size shown on the plans.

The exposed portions of the fastening hardware on the face of the signs
shall be painted with enamel matching the background color.

605.3 Construction Requirements

605.3.1 Excavation and Backfilling

Hole shall be excavated to the required depth to the bottom of the concrete
foundation as shown on the Plans.

Backfilling shall be carried out by using suitable material approved by the


Engineer and shall be compacted in layers not exceeding 150mm in depth.
Surplus excavated material shall be disposed of by the Contractor as
directed by the Engineer.

605.3.2 Erection of Posts

The post shall be erected vertically in position inside the formwork of the
foundation block prior to the placing of the concrete and shall be
adequately supported by bracing to prevent movement of the post during
the placing and setting of concrete. The post shall be located at the
positiions hsown on the Plans.

605.3.3 Sign Panel Installation

Sign panels shall be installed in accordance with the details shown on the
Plans. Any chipping or bending of the sign panels shall be considered as
sufficient cause to require placement of the panels at the Contractor’s
expense.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-13
MISCELLANEOUS STRUCTURES H

The exposed portion of the fastening hardware on the face of the signs
shall be painted with enamels matching the background color.

All newly erected traffic road sings shall be covered until ordered
removed by the Engineer.

605.4 Method of Measurement

The quantities of standard reflective warning and regulatory signs shall be the
number of such signs of the size specified, including the necessary posts and
supports erected and accepted.

605.5 Basis of Payment

The accepted quantities of road signs, determined in Subsection 605.4 Method of


Measurement, shall be paid for at the contract unit price per unit for the type
specified, completed in place.

Payment will be made under:


Pay Item Description Unit of
Number Measurement
605 (1)c2 Warning Signs, 750mm Triangle Each
(W1- 3B) (Curve Sign)
605 (1)g3 Warning Signs, 750mm Triangle Each
(W2- 1C) (T-Junction)
605 (1)j3 Warning Signs, 750mm Triangle Each
(W2- 4C) (Cross Road)
605 (2)r2 Regulatory Signs, 600mm Circle Each
(R4 -1B) (Speed Limit Sign)
Guide or Informative Signs,
605 (3) 800mm x 1200mm Rectangle Each
(Load Limit Sign)
Guide or Informative Signs,
605 (3)a2 960mm x 2100mm Rectangle Each
(G1-2, Advance Direction Sign)

ITEM 612 REFLECTIVE THERMOPLASTIC STRIPPING MATERIAL (SOLID FORM)

612.1 Description

This standard specifies the requirement for reflectorized thermoplastic pavement


stripping material conforming to AASHTO M249 that is applied to the road surface in
a molten state by mechanical means with surface application of glass beads at a
rate of not less than 350 g/L of glass beads having a size range of drop-in type and
will produce an adherent reflectorized stripe of specified thickness and width capable
of resisting deformation by traffic.

612.2 Material Requirements

1. Reflectorized Thermoplastic Pavement Material shall be homogeneously


composed of pigment, filler, resins and glass reflectorizing spheres.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-14
MISCELLANEOUS STRUCTURES H

2. Glass Beads (Pre-Mix) shall be uncoated and shall comply with the following
requirements:
Refractive Index, min. - 1.50
Spheres, Percent, min. - 90

Gradation:
Sieve, mm Mass Percent Passing

0.850 100
0.600 75-95
0.425 -
0.300 15-35
0.180 -
0.150 0-5

612.3 General Requirements

612.3.1 Composition

The pigment, beads and filler shall be uniformly dispersed in the resin. The
material shall be free from all skins, dirt and foreign objects and shall
comply with the requirements as specified in Table 612.1

Table 612.1 Composition Requirements


Components White Yellow
Binder, min 18.0 18.0
Glass Beads:
Min. 30.0 30.0
Max. 40.0 40.0
Titanium
Dioxide, min. 10.0
Chrome Yellow,
Medium. Min. 10.0
Calcium Carbonate
And Inert Fillers,
Max. 42.0 42.0

612.3.2 Qualitative

The material shall conform to the qualitative requirements as specified in


Table 612.2

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-15
MISCELLANEOUS STRUCTURES H

Table 612.2- Qualitative Requirements


Requirements
Property
White Yellow

Specific Gravity, max 2.15


Drying Time, minutes, max 10.00
Bond Strength to Portland
Cement Concrete after heating for four (4) hours 1.24
± min. @ 218 ºC, Mpa, max
Cracking Resistance@ low
temp. after heating for four (4) hours No Cracks
±5min. @218±2ºC
Impact Resistance after heating for four (4) hour
±5 min. @ 218 ±2ºC and forming test specim 115.00
mm/Kg, min.
Softening Point after heating for four (4) hours 102.5 ± 9.5 ºC
±5 min. @ 218 ±2ºC.
Daylight reflectant @ 45 Degrees – 0 degree, & min. 75.00 45.00

612.4 Application Properties

The material shall readily extrude at a temperature of 211 ± 7oC, from approved
equipment to produce a line 3.2 to 4.8 mm thick, which shall be continuous and
uniform in shape having clear and sharp dimensions.

The material shall not exude fumes which, are toxic, obnoxious or injurious to
persons or property when heated during applications.

The applicationof additional glass beads by drop-in method shall be at a rate of not
less than 350g/L of glass beads having a size range for drop-in type. The
Typical size range of spheres of drop-in type paints is as follows;

Passing 850 um (#20) sieve and


retained on 250 um (#60) sieve, % 80 – 100

a) Preparation of Road Surface

The materials should be applied only on the surface which is clean and dry. It
shall not be laid into loose detritus, mud or similar extraneous matter, or over an
old paint marking, or over an old thermoplastic marking which is faulty. In the
case of smooth, polished surface stones such as smooth concrete, old asphalt
surfacing with smooth polished surface stones and/or where the method of
application of the manufacturer of the thermoplastic materials shall be
recommended the application of materials shall be with the approval of the
Engineer.

b) Preparation of Thermoplastic Materials

The materials shall be melted in accordance with the manufacturer’s instruction


in a heater fitted with a mechanical stirrer to give a smooth consistency to the
thermoplastic and such that the local overheating shall be avoided. The
temperature of the mass shall be within the range specified by the manufacturer
and shall on no account be allowed to exceed the maximum temperature stated
by the manufacturer. The molten material shall be used as expeditiously as

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-16
MISCELLANEOUS STRUCTURES H

possible and for thermoplastics which have natural resin binders or otherwise
sensitive to prolong heating the materials shall not be maintained in a molten
condition for more than 4 hours.

c) Laying

Center lines, lane lines and edges shall be applied by approved mechanical
means and shall be laid to regular alignment. Other markings may be applied by
hand-screed, hand propelled machine or by self-propelled machine approved or
directed by the Engineer. After transfer to the laying apparatus the materials
shall be maintained within the temperature range specified by the manufacturer
and stirred to maintain the right consistency for laying.

In the case of screen application the material shall be laid to a thickness of not
less than 3mm (approx. 1/8 inch) or more than 6mm (1/4 inch) unless specifically
authorized by the Engineer when laid over an existing marking. In the case of
sprayed application the material shall be laid to the thickness of not less than 1.5
mm unless specifically authorized by the Engineer. In all cases the surface
produced shall be uniform and appreciably free from bubbles and streaks.
Where the Contract Documents require or the Engineer directs that balloting
shall be applied to the surface of the markings, these shall be applied uniformly
to the surface of hot thermoplastic immediately after laying such that the quality
of ballotini firmly embedded and retained in the surface after completion
complies with the requirements of Subsection 606.2.2 Materials Requirements.

Road markings of a repetitive nature, other center lines, lane lines, etc. shall
unless otherwise directed by the Engineer be set out with stencils which comply
with the size and spacing requirements shown on the Drawings.

d) Re-use of Thermoplastic Materials

At the end of the day as much as possible, the remaining material in the heater
and/or laying apparatus shall be removed. This may be broken and used again
provided that the maximum heating temperature has not been exceeded and
such re-using of material shall be approved by the Engineer.

612.4.1 Defective Materials or Workmanship

Materials which are defective shall be replaced by a new one, to the


satisfaction and approval of the Engineer. If in case pavement marking has
been applied in an unsatisfactory manner or in incorrect dimensions or in a
wrong location, it shall be removed immediately and shall be corrected by
the Contractor at his own expense. The road pavement shall be made
good to the satisfaction and approval of the Engineer.

612.4.2 Protection of the Traffic

The Contractor shall protect pedestrians, vehicles and other traffic adjacent
to the working area against damage or disfigurement by construction
equipment, tools and materials or by spatters, splashes and smirches or
paint or other construction materials and during the course of the work,
provide and maintain adequate signs and signals for the warning and
guidance of traffic.

612.5 Sampling

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-17
MISCELLANEOUS STRUCTURES H

A minimum weight of 10 kg. of Reflectorized Thermoplastic paint shall be taken for


every 100 bags or fraction thereof.

612.6 Testing

The material shall be tested in accordance with AASHTO T 250 or with the
appropriate method in ASTM designation.

612.7 Packing and Marking

The material shall be packaged in a suitable containers to which it will not adhere
during shipment and storage. The blocks of cast thermoplastic material shall be
approximately 300 x 915 by 51 mm and shall weigh approximately 23 kg. Each
container label shall designate the color, manufacturer’s name, batch number and
date of manufacture. Each batch manufactured shall have its own separate number.
The label shall warn the user that the material shall be heated to 211 ± 7oC during
application.

612.8 Method of Measurement

The quantity of pavement markings to be paid for shall be the area in square meter
as shown on the Drawings of symbols, lettering, hatching and the like, as completed
and accepted.

The quantity shown in the Bill of Quantities represents the approximate quantity
in square meter of pavement markings, with width as shown and applied at the
centerline of the road pavements to which may be increased or decreased
depending on the Engineer’s decision whether to require additional markings or
delete parts of it. Other markings representing symbols, lettering, hatching and
others in locations where they maybe required by the Engineer shall, likewise, be
implemented by the Contractor using reflectorized thermoplastic pavement markings
as approved and directed.

612.9 Basis of Payment

The quantities measured as determined in section 612.8, Method of Measurement,


shall be paid for at the appropriate contract unit price for the Pay Items shown in the
Bill of Quantities which price and payment shall constitute full compensation for
furnishing and placing all materials, sampling and packing, for the preparation of the
surface, and for all labor, equipment, tools and incidentals necessary to complete
the Item.

Payment will be made under:

Description Unit of
Pay Item Number
Measurement
Reflectorized Thermoplastic Pavement
612(1) Square Meter
Markings (White) 3.20mm thick

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-18
MISCELLANEOUS STRUCTURES H

ITEM 613 CONCRETE JOINT SEALANT (HOT-POURED ELASTIC TYPE)

613.1 Description

This item shall consist of furnishing and placing joint sealant, composed of a mixture
of materials that will form a resilient and adhesive compound capable of effectively
sealing joints and cracks applied either hot or cold in concrete pavements, bridges
and other structures, in accordance with the Specification and to the details shown
on the Plans, or as directed by the Engineer.

This specification applies to the following types of concrete joint sealant:

a. Concrete Joint Sealant Hot-Poured Elastic Type


b. Concrete Joint Sealant Cold-applied Type

613.2 Materials Requirements

613.2.1 Sealing Compound

Concrete joint sealant materials shall be homogeneously composed of one


substance, or of two or more substances that are to be mixed prior to
application. The substance shall be of such a character that a homogeneous
preparation can readily be obtained by mechanical or manual stirring without
heating the blended material above a temperature of 38˚C. The sealing
compound, after curing, shall be a resilient and adhesive material that is
capable of sealing joints in concrete.

613.2.2 General Requirements

The concrete joint sealant shall be capable of sealing joints and/or cracks
against the infiltration of moisture and foreign materials throughout repeated
cycles of expansion and contraction with temperature changes, and that will
not flow from the joint/crack or be picked-up by vehicle tires on pavement at
summer temperature.

The concrete joint sealant shall be capable at being brought to a uniform


application consistency suitable for completely filling the joints without
inclusion of large air holes or discontinuities and without damage to the
material.

The sealing compound, after curing, shall be of such nature that it will adhere
to dry but dust-free concrete or to damp concrete free from surface moisture.

613.2.3 Backer Material

Backer material when used shall conform to ASTM D 5249.


Backer material or bond breaker in the bottom of the joint to be filled with
concrete joint sealer shall be used to control the depth of sealant and
achieve the desired shape factor, and to support the sealant against
indentation and sag. Backer materials shall be compatible with the concrete
joint sealer. It shall be compressible without extruding the concrete, and shall
recover to maintain contact with the joint faces when the joint is open.

613.3 Construction Requirements

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-19
MISCELLANEOUS STRUCTURES H

613.3.1 Equipment

For installation of the joint sealer, hot-poured elastic type, all equipment
necessary for the satisfactory performance of this construction shall be on
the project site and approved by the Engineer before work will be permitted
to begin.

613.3.2 Joints Preparation

Pavement joints in new construction for application of concrete joint sealer


shall be dry, clean of all scale, dirt, dust, curing compound, and other
foreign matter. The sidewalls of the joint space to be sealed shall be
thoroughly cleaned, blown free of loose sand by high-pressure air.

For maintenance or resealing of joint that have previously contained either


similar or dissimilar sealing material, the joint shall be dry, cleaned
thoroughly with a plow, router, wire brush, concrete saw, or other suitable
tools designed for the purpose of neatly cleaning pavement joints. Loose
material shall be blown free of loose sand with high-pressure air.

613.3.3 Heating

The concrete joint sealer shall be heated within the manufacturer’s


specified application temperature range, in a kettle or melter, constructed
as a double boiler, with the space between the inner and outer shells filled
with oil or other heat transfer medium. Positive temperature control,
mechanical agitation, and recirculating pumps shall be provided. The
Engineer shall approve other methods of indirect heating. Direct heating
shall not be used.

The manufacturer shall certify that the material is capable of being


reheated satisfactorily at least once ad specifically designate any limits to
the number of reheating times for the material.

613.3.4 Application

Concrete joint sealer shall be applied to joint using a melter-applicator.


Joints shall be filled in a neat workmanlike manner from flush to 5mm
below the adjacent pavement surface.
The joint sealer shall be protected from traffic until it is fully cured.
Restriction on joint width and pavement temperature at the time of joint
sealer application shall be shown on the Plans. In the absence of
temperature range, applications above 32˚C shall not be permitted.

613.4 Delivery and Storage

Joint sealer shall be delivered in manufacturer’s original unopened containers and


packaging, with labels clearly indentifying product name and manufacturer. The joint
sealer shall be stored in dry and shaded area in accordance with manufacturer’s
instructions. Containers shall be sealed until it is ready for use. Expired joint sealer
shall be removed from the site.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-20
MISCELLANEOUS STRUCTURES H

613.5 Sampling and Testing

Sampling shall be taken at the plant or warehouse prior to delivery or at the time of
delivery. If sampling is done prior to shipment, the Engineer shall have the access to
the materials to be sampled. The Engineer shall be provided all reasonable facilities
for inspection and sampling shall be conducted so as not to interfere unnecessarily
with the operation of the works.

Sample shall consist of one of the manufacturer’s original sealed containers selected
at random from the lot or batch of finished material that was manufactured
simultaneously or continuously, as a unit between the time of compounding and the
time of packaging or placing in shipping containers.

Obtain the hot-poured type sealant portion for testing from the selected
manufacturer’s original sealed container in accordance with ASTM D 5167. The
sample portion added to and heated in the melter shall weigh 800 ± 50 g.

Heat the material in accordance with ASTM D 5167

Testing for hot-poured type sealant shall be in accordance with ASTM D 5329.

613.6 Method of Measurement

The quantity to be measured and paid for will be the number of kilogram of any joint
sealant applied in the accepted pavement or structure.

613.7 Basis of Payment

The accepted quantity measured as prescribed in Section 613.6, Method of


Measurement shall be paid for at the contract unit price of the joint sealant, which
price and payment shall be full compensation for furnishing and placing all materials,
including all labor, equipment, tools and incidentals necessary to complete this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


Concrete Joint Sealant
613 (1) (Hot Poured Elastic Type) Kilogram

ITEM 618 REFLECTORIZED THERMOPLASTIC RUMBLE STRIPS

618.1 Description

This Item shall consist of furnishing and applying reflectorized thermoplastic rumble
strips on the surface of the pavement in accordance with this Specification and at
the locations shown on the Plans, or required by the Engineer.

618.2 Material Requirements

618.2.1 Reflectorized Thermoplastic Pavement Material


and Glass Beads (Pre-Mix)

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-21
MISCELLANEOUS STRUCTURES H

Both materials shall conform to their respective requirements of Section


612.2, Materials Requirements, Item 612 – Reflective Thermoplastic
Pavement Marking.

618.3 General Requirements

618.3.1 Design

[Link] General

Reflectorized thermoplastic rumble strips shall have the following


dimension:

Height : 4.0 mm to 13 mm
Width : 50 mm to 100 mm
Spacing : 200 mm to 500 mm

As much as possible, placement of reflectorized thermoplastic


rumble strips shall be limited to rural locations and shall not be
installed near residential areas because of the noise it can
generate. It should not be placed through pedestrian crossings or
on bicycle routes.
The recommended length of road section where reflectorized
thermoplastic rumble strips are to be installed shall be form 20 m to
30 m depending on the advisory speed limit of the road section.

The color of reflectorized thermoplastic rumble strips shall be either


white or yellow.

Reflectorized thermoplastic rumble strips places in the travelled way


should not be overused. If used at too many locations, reflectorized
thermoplastic rumble strips may lose their ability to gain the motorist’s
attention.

[Link] Pattern

The Contractor shall lay out a reflectorized thermoplastic rumble


strips test pattern prior to the start of construction for approval by the
Engineer. Pattern shall be balanced to provide adequate warning to
drivers without being so severe that they state drives or upset
motorcycles.

The pattern of reflectorized thermoplastic rumble strips shall finish


within 50 m of any hazard it is associated with.

[Link] Composition

It shall conform to the requirements of Sebsection 612.3.2,


Composition, Item 612 – Reflective Thermoplastic Stripping Materials
(Solid Form).

[Link] Qualitative

It shall conform to the requirements of Subsection 618.3.3, Qualitative,

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-22
MISCELLANEOUS STRUCTURES H

Item 612 – Reflective Thermoplastic Stripping Materials (Solid Form).

618.4 Application Properties

It shall conform to the requirements of Subsection 618.4, Application Properties,


Item 612 – Reflective Thermoplastic Stripping Materials (Solid Form).

Reflectorized thermoplastic rumble strips shall be placed transverse to motor vehicle


traffic movement. It shall not adversely affect overall pavement skid resistance under
wet or dry conditions and shall not be placed on sharp horizontal or vertical curves. It
shall be applied over deteriorating existing reflectorized thermoplastic rumple strips
or pavement surface.

A sign warning the drivers of the onset of reflectorized thermoplastic rumble strips
may be placed in advanced of rumble strips installation.

618.5 Sampling

It shall conform to the requirements of Section 618.5, Sampling Item 612 –


Reflective Thermoplastic Stripping Materials (Solid Form).

618.6 Testing

It shall conform to the requirements of Section 618.6, Testing, Item 612 – Reflective
Thermoplastic Stripping Materials (Solid Form).

618.7 Packing and Marking

It shall conform to the requirements of Section 618.7, Packing and Marking, Item
612 – Reflective Thermoplastic Stripping Materials (Solid Form).

618.8 Method of Measurement

The area to be paid for under this Item shall be the number of square meter (m²) of
reflectorized thermoplastic rumble strips applied and accepted.

618.9 Basis Payment

Payment shall constitute full compensation for furnishing and application of


reflectorized thermoplastic rumble strips including all labor, equipment, tools and
incidentals necessary to complete the Item.

Payment will be made under:


Description Unit of
Pay Item Number
Measurement

Reflectorized Thermoplastic Rumble


618(1) Square meter
Strips (White) 6.0mm thick

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-23
MISCELLANEOUS STRUCTURES H

ITEM 622 BIO-ENGINEERING SOLUTIONS (COCONET)

622.1 Description

This Item cover installation of cocnut coir fiber made into geonets such as coconets,
coco-logs, coco twines and coco peat as bioengineering materials for controlling soil
erosion and slope stabilization in accordance with the cross section shown on the
Plans or as directed by the Engineer.

622.2 Material Requirements

622.2.1 Coconut Coir

Coconut coir fiber materials for use in the fabrication of cocnut geonets
shall be a multi-cellular fiber with 12 to 24 microns in diameter and the
ratio of the length to diameter shall be 35. The fiber shall also be
hygroscopic, with moisture content of 10% to 12% at 65% humidity
and 22% to 55% at 95%relative humidity.

622.2.2 Coco-net and Coco-log/Fascine

Coco-net and Coco-log shall conform to the Table 1 and Table 2


respectively.

Table 1- Physical Properties of Coco-net


Coconet Coconet Coconet
Property
400 700 900
Thicknes,mm 10.0 Min
Width.m 1.0Min.
Length,m 25.0Min.
Unit Weight 1g.m2 400±20 700±35 900±45

Diameter of Twine,mm
5.0 mm ± 0.50 mm
Hand and Machine Spuns
No of Twines/m Crosswise
(Hand&Machine) Direction 40 Min 40 Min 70 Min
Spuns

Lenghtwise 40 Min 70 Min 70 Min


Direction
Table 2 Physical Properties of Coco- log
Weight (min.)
Type of Coco-log/Fascine Diameter (mm)
(Kg/m)

Cocolog 100 100 2.0


Cocolog 200 200 4.5
Cocolog 300 300 10
Cocolog 400 400 20
Cocolog 500 500 30

622.2.3 Backfill

Backfill shall be in accordance with the approved Plan and shall


conform to the requirements of Item 104-Embankment.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-24
MISCELLANEOUS STRUCTURES H

622.2.4 Bamboo Stakes

Bamboo stakes shall be mature and shall be 30 to 40mm in width and


300 mm long.

622.3 Construction Requirements


622.3.1 Quality Control

The coconut geonets manufacturer shall be responsible for


establishing and maintaining a quality control program to assure
compliance with the requirements.

622.3.2 Equipment

Equipment and tools necessary for handling materials and performing


all parts of the works shall be approved by the Engineer as to design,
capacity and mechanical condition. The equipment shall be at the
jobsite sufficiently ahead of the start of construction operations.

622.3.3 Site Measurement

Site measurement shall be done to prepare specific lengths of the


coco-nets to conform the necessary area requirements and the
necessary length for coco-logs to be installed/placed.

622.3.4 Preparation of Beds

Site for net installation shall be graded and sloped to the approved
shall be design and any runoff control such as diversions, dikes and
berms shall be completed prior to installation. All depression/gullies
and eroded portions shall be backfilled for the coco-nets to snugly
come in contact with the soil surface. The face of the slope shall be
smoothened. Rocks, clods, vegetation (deemed detrimental to the
erosion control system to be installed), and other obstructions shall be
removed from the tip to the toe of the slope to ensure complete
contact to the coco-nets with the soil.

622.4 Method of Measurement

The area to be paid for under this Item shall be the number of square meter (m²) of
coco-net, linear meter for coco-log, square meter of live vetiver grass hedgerow and
square meter of effective vegetative growth of grass cover, installed/placed and
accepted into the completed project.

622.5 Basis Payment

Payment shall constitute full compensation for the accepted quantities prescribed in
Subsection 622.4 Method of Measurement and shall be paid for at the contract unit
price for the coconut geonets, which price and payment shall be for the preapration
of bed and furnishing of all materials for placing/installation of coconut geonets and
furnishing of all labor, maintenance of plants, equipment, tools and incidentals
necessary to complete the Item.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-25
MISCELLANEOUS STRUCTURES H

Payment will be made under:


Pay Item Number Description Unit of Measurement

Bio-Engineering Solutions
622 (1)a Square meter
(Coco-net 700CGN)

Bio-Engineering Solutions
622 (3)a Square meter
(Vegetation Grass-Cover)

ITEM SPL 1200-1 BIKEWAY PAVING (Reinforced Concrete with Exposed Glow in the
Dark Aggregates Finished)

1.0 Description

This Item shall consist of the construction of portland cement concrete bikeway
in accordance with this Specification and to the lines, grades, levels and
dimensions shown on the Plans, or as required by the Engineer.

2.0 Material Requirements

2.1 Portland Cement Concrete

The cement concrete shall be Class A as specified in Item 405,


Structural Concrete.

2.2 Glow In the Dark Aggregates

Glow in the Dark Aggregate material shall be use for this bikeway lane.

2.3 Reinforcing Bars

All reinforcing bars must conform to the requirement of Item 404-


Reinforcing Steel.

2.4 Expansion Joint Filler

Unless otherwise ordered, the preformed joint filler shall have a


thickness of 5 mm and shall conform to the conform to the
requirements of Item 311, Portland Cement Concrete Pavement.

2.5 Forms

Forms shall be of wood or metal as approved by the Engineer and shall


extend to the full depth of the concrete. All forms shall be straight, free
from warps and of adequate strength to resist distortion.

2.6 Bed Course Material

Bed course material consists of cinders, sand, slag, gravel, crushed


stone or other approved permeable granular material of such grading
that all particles shall pass a 12.5 mm (1/2 inch) sieve.

3.0 Construction Requirements

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-26
MISCELLANEOUS STRUCTURES H

Installation

a) Forms must be made of wood, metal or plastic, and are attached to stakes
to contain the concrete in the area desired. It is important that forms are in
good condition, be set to provide the proper slope or grade for drainage,
and should be constructed to create clean corners where they abut each
other or on bridge sidewalks.

All forms shall be staked securely in position at the correct line and level.
Performed joint filler shall be set in position shown on the Plans before
placing of the concrete is started. The top of the joint filler shall be placed 5
mm below the top surface of the finished sidewalk.

The mixing, placing, finishing and curing of concrete shall be as specified in


Item 405, Structural Concrete. The Portland cement concrete shall be
placed to the total depth shown on the Plans.

The surface shall be cut through to a depth of 10 mm with a trowel at


intervals of 1 m or, were required, in straight lines perpendicular to the
edge of sidewalk. The surface shall then be brushed. The edges of the
sidewalk and the transverse cuts shall be shaped with a suitable tool so
formed as to round the edges to a radius of 15 mm.

b) Using steel reinforcing bars or welded wire mesh is critical in providing


structural function and support in the slab. The main reasons to include
reinforcement in the slab is to help control cracking, provide structural
capacity, increase impact resistance, and reduce joint maintenance. The
most common method for placing concrete is to have the ready-mix truck
pull up to the placement area and deposit the concrete from the chute. The
concrete should be placed as close to its final destination as possible
because moving it around too much (with shovels or other tools) can lead
to segregation. Also be sure plastic sheeting is used to protect adjacent
slab or other existing slabs from concrete splatter. The type of concrete
used is also crucial to successful placement. Make sure to discuss with the
Engineer and submit a construction methodology for approval to avoid
issues on the proper slump, or mix design.

c) Sidewalk/bikeway slabs should be monolithically poured with concrete with


a design mix as follows: portland cement, 1 part by weight, three-eighths
inch and smaller pea gravel, 3.2 parts by weight, and concrete sand, 2.3
parts by weight.

d) The work done immediately following concrete placement is critical, since


this is when you must create the perfect canvas for decorative stamping.

Factors to be considered are as follows;

1. The surface shall be leveled to prevent any low or high spots, and that
cement paste should be brought to the surface to permit a well-
defined imprint. Water should be carefully controlled to hold the slump
as low as practicable for workability. In placing the concrete, usual
procedures should be followed with respect to spreading and screed
leveling. Following the straightedge, the slab should be wood floated

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-27
MISCELLANEOUS STRUCTURES H

with darbles or bull floats until the surface is leveled and properly
sloped to drains.

2. Toss the ½ inch diameter glow-in-the-dark aggregates over the entire


concrete surface as it is setting up. Gently work the aggregates into
the curing concrete with a trowel, leaving them just under the surface
covered with a thin film of concrete. The spread of glow-in-the-dark
aggregates per square meter shall be 200 grams

3. To expose the aggregates, the curing concrete surface shall be lightly


sprayed by a concrete retarding agent. The concrete retarder
chemically slows down the curing process leaving 1/8 to 3/8 inch of the
surface uncured. The top is then pressure-washed off, which exposes
the glow-in-the-dark and the non-glow-in-the-dark aggregates on
the surface. After washing, normal curing practices should be
employed.

4.0 Method of Measurement

The area to be paid for shall be the number of square meters of sidewalk/bikeway
measured, completed in-place and accepted.

5.0 Basis of Payment

The quantity as determined in Subsection SPL 601()a 4.0, Method of


Measurement, shall be paid for all the contract unit price per square meter for
Bikeway which price and payment shall constitute full compensation for
furnishing and placing all materials for bridge concrete sidewalk, glow in the dark
aggregates, expansion joint material, for excavating and compacting the
foundation bed, for furnishing and placing cinders, gravel or other permeable bed
course material, for forms and for all labor, equipment, tools and incidentals
necessary to complete the Item.

Payment will be made under:


Pay Item Unit of
Description
Number Measurement
Bikeway Paving , (75mm thick Reinforced
SPL 1200-1 Concrete with Exposed Glow in the Dark Square Meter
Aggregates Finished)

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page H-28
PART K

STREET LANDSCAPE
STREET LANDSCAPE K_

PART K - LANDSCAPE

SPL 1200 – STREET LANDSCAPE

7.1 Scope of Work

This section includes the furnishing of all plant, tools, equipment, materials and other
in the installation of waterproofing and roofing, including miscellaneous sheet metal
works as required providing a waterproof installation.

7.2 Hardscape Components

7.2.1 Concrete Reinforcement

Product Delivery, Storage and Handling

All reinforcing bars delivered to the site shall be new and shall be carefully
stored and sheltered to prevent from rust, oil defects, grease per kinks.

Materials

a. Deformed Reinforcing bar: ASTM A G15 M-82


b. G.I Wire Ga. No.16 - shall be used for tying bar intersections
c. Reinforcing bars specified by structural engineer’s drawings for landscape
area

Preparatory Works

Bends for stirrups and ties shall be made around a pin having diameter not
less than two times the minimum thickness of the bar. Bends for other bars
shall be made around a pin having a diameter not less than six times the
minimum thickness of the bar, except for bar larger than 1- inch, the pin shall
not less than eight times the minimum thickness of bar. All bars shall be bent
cold. Heating of reinforcement will not be permitted and reinforcement shall
not be bent or straightened in any manner that will injure the material.

Installation

a) Metal reinforcement shall be accurately placed in accordance with the


plans and shall be secured in position by concrete or metal chairs or
spacers. Nails shall not be driven into forms to support reinforcement
nor shall tie wires come in contact with forms. All steel reinforcement
shall be accurately placed against displacement by tying them together
at each bar intersection with Ga. No. 16 G.I. wire

b) Design: Laps and splices shall be sufficient to transfer stress between


bars by bond and shares. Splices generally shall be avoided at points
of maximum shear in every member. Bar extension of cut-off
reinforcing bars shall be 12 times bar diameter of the effective depth,
whichever is greater.

Concrete Protection

Unless otherwise noted, the thickness of concrete over reinforcement shall be


as follows:

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-1
STREET LANDSCAPE K_
a. Where concrete is deposited against ground without use of
forms, not less than 75mm.
b. Where concrete maybe exposed to ground but placed on forms
not less than 50mm.
c. Where concrete maybe exposed to weather, not less than 50mm.
d. In all cases, the thickness of concrete over the reinforcement
shall be at least equal to the diameter of round bars or one and
one half times the side dimensions of square bars.

Do not allow pedestrian traffic on the newly installed reinforcement to prevent


misalignment of bars.

Cleaning

Upon installation of reinforcing bars is completed, surplus, materials,


apparatus, etc. shall be removed and shall be left in a clean and neat
condition ready for concreting.

7.2.2 Stone and Other Finishes

7.2.2.a Textured Homogenous Tiles on Concrete Slab

Preparation

a) Structural slabs with limited bending: Prepared in accordance with


ANSIA108.1. Before stones are applied with dry set mortar, the structural
concrete floor shall be tested for levelness or uniformity of slope by using a
straight edge. Areas where the floor does not meet the required tolerances
shall be filled and leveled in accordance with ANSI A108.5 and provide
expansion joints.

b) Slab on Grade construction where no bending stresses occur: Prepare in


accordance with ANSI A108.1.

c) The concrete surface shall be wet for at least four (4) hours before the
scratch coat is applied. The required scratch coat of cement mortar is the
proportion of one (1) part Portland cement to two (2) parts sand, by volume
shall be applied to not more than ¾ in thickness.

Installation

a) The buttering mortar for tiles shall be per manufacturer specifications and
shall be worked to true even plain, either leveled or sloped to drain as
required. For areas of more than 100 sq. ft. screed strip shall be set as
temporary guide to secure this result. As large a floor area as can be
covered with tiles before the mortar has reached its initial set, shall be
placed in one operation. When more setting mortar has been spread then
it can thus be covered, it shall be cut to a clean beveled edge close to the
tiles and be removed.

b) Tiles shall be firmly secured in place. Joints shall be well-filled, lines kept
straight and true, and finished surfaces brought to a true plane. The
complete work shall be free from loose, cracked or broken units.

Grouting

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-2
STREET LANDSCAPE K_
Grouting shall be done as soon as the mortar beds have sufficiently settled.
Cement grout shall be colored as called for by the color of the tiles.

Protection

Spaces in which tiles are being laid shall be closed to traffic or other work shall
be kept free until the floors are completed and the stones firmly set. Tile work
shall be adequately protected from damage until the completion of the
contract.

Cleaning

Upon completion of the work, wash the finished surface with clean water and
brush thoroughly to produce a clean and sparkling appearance.

7.2.2.b Exposed Aggregate Finish with Glow-in-the-Dark Aggregates

Installation

a) Forms, made from wood, metal or plastic, are attached to stakes to contain
the concrete in the area desired. It is important that forms are in good
condition, be set to provide the proper slope or grade for drainage, and are
erected to create clean corners where they abut each other or structures.

b) Using steel reinforcing bars or welded wire mesh is critical to providing


structural function and support in the slab. The main reasons to include
reinforcement in the slab is to help control cracking, provide structural
capacity, increase impact resistance, and reduce joint maintenance. The
most common method for placing concrete is to have the ready-mix truck
pull up to the placement area and deposit the concrete from the chute. The
concrete should be placed as close to its final destination as possible
because moving it around too much (with shovels or other tools) can lead to
segregation. Also be sure plastic sheeting is used to protect adjacent
buildings, landscaping, or other existing slabs from concrete splatter. The
type of concrete used is also crucial to successful placement. Make sure to
discuss with your contractor how he plans to avoid issues that can arise
without the proper slump, or mix design.

c) Slabs should be cast monolithically with a mix as follows: portland cement,


1 part by weight, three-eighths inch and smaller pea gravel, 3.2 parts by
weight, and concrete sand, 2.3 parts by weight.

d) The work done immediately following concrete placement is critical, since


this is when you must create the perfect canvas for decorative stamping.
The two most important factors are that the surface is leveled to prevent
any low or high spots, and that cement paste is brought to the surface to
permit a well-defined imprint. Water should be carefully controlled to hold
the slump as low as practicable for workability. In placing the concrete,
usual procedures should be followed with respect to spreading and screed
leveling. Following the straightedge, the slab should be wood floated with
darbles or bull floats until the surface is level and properly sloped to drains.

e) Toss the ½ inch diameter glow-in-the-dark aggregates over the entire


concrete surface as it is setting up. Gently work the aggregates into the
curing concrete with a trowel, leaving them just under the surface covered
with a thin film of concrete. The spread of glow-in-the-dark aggregates per
square meter shall be 200 grams
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-3
STREET LANDSCAPE K_

f) To expose the aggregates, the curing concrete surface shall be lightly


sprayed by a concrete retarding agent. The concrete retarder chemically
slows down the curing process leaving 1/8 to 3/8 inch of the surface
uncured. The top is then pressure-washed off, which exposes the glow-in-
the-dark and the non-glow-in-the-dark aggregates on the surface. After
washing, normal curing practices should be employed.

7.2.2.c Groove Line Finish

The concrete shall be screed and floated to the required finish level with no
coarse aggregate visible while concrete is still green, steel or wood trowel to
an even, smooth finish and then a fiber bristle brush in a direction transverse
to that of the main traffic. This should be used on sidewalks in plain cement
finish.

7.2.2.d Concrete Pavers on Sand Setting

Paving Material

0.125m x 0.368m x 0.05m Plank Paver, Dark Gray, 3000 psi minimum by
Quality-Star Concrete Products, Inc. or approved equivalent

Sand Setting Bed Material

Sand shall generally referred to as sand setting and shall free of organic
materials and any other contaminates that could potentially stain or otherwise
damage the unit pavers.

Edge Restraint

Paving banding materials as indicated in landscape architectural drawings.

Execution

Examine all surfaces to receive the parts of the work specified. Contractor
shall verify all dimensions of in-place and subsequent construction.
Contractor shall not proceed with the work until unsatisfactory conditions have
been corrected. Installation of concrete pavers and associated construction
constitutes acceptance of the adjacent and underlying construction.

Installation of Sand Setting Bed

a) (Optional) Place a layer of the specified geotextile filter fabric uniformly on


the surface of the properly prepared grade that is ready to receive the
sand setting bed. Cover the designated area in its entirety.

b) Place solid steel ¾ or 1 inch thick control bars directly on the sand or
geotextile filter fabric. Install shims under bars for minor adjustment of
depth and finish paver elevations and slopes. Space bars approximately 7
feet apart and parallel to each other to serve as guides for strike-off
boards. Spacing can very as determined by the size of the area and
layout.

c) Place sand setting bed between control bars on the sand or geotextile
filter fabric to not less than thickness of the designated control bars.
Spread material and strike off by pulling the material with a 8 foot long x 2
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-4
STREET LANDSCAPE K_
inch x 6 inch wood board several times to produce a smooth firm and even
setting bed. Add fresh material in low areas after each pass of the strike-
off board. After each panel is complete remove and advance the first
control bar to the next panel position in readiness for placing and striking
adjacent panels. Fill in depressions left by the control bar and any shims.

Paver Installation

a) Install concrete pavers, slabs and curbs in locations, patterns and at


elevations and with slopes for surface drainage as shown on the Drawings.
Install concrete pavers, slabs and curbs in accordance with the
manufacturer's printed installation instructions and the final reviewed shop
drawings.

b) Lay out pavement in working area modules according to concrete paver


mainfield as specified in landscape architectural drawings. Set concrete
pavers, slabs and curbs by hand, on sand setting bed in patterns shown
on the drawings with hand tight joints 1/8 to 3/16 inch wide joints and
uniform top surfaces.

c) Field cut concrete pavers in accordance with manufacturer's


recommendations for methods, equipment and precautions.

d) Maintain accurate alignment and check for creep and shrinkage. Make
adjustments to creep and shrinkage within the concrete paver working
area or mainfield.

e) Install edge restraints where required and as shown on landscape


architectural drawings and details.

f) Spread sand to fill joints immediately after installing concrete pavers on


setting bed. Brush in sand until joints are completely filled, remove surplus
sand. Do not allow traffic on installed pavers, slabs or curbing until the
joints have been filled.

g) Protect newly laid pavers with plywood panels on which workers stand.
Advance protective panels as work progresses but maintain protection in
areas subject to continued movement of materials and equipment to avoid
creating depressions or disrupting alignment of installed pavers.

h) Contractor to replace cracked or chipped concrete pavers until final


acceptance period by Owner.

Cleaning and Protection (Responsibility of end user)

a) Remove and replace pavers, which are loose, chipped, broken, stained or
otherwise damaged or if units do not match adjoining units as intended.
Provide new units to match adjoining units and install in same manner as
original units with same joint treatment to eliminate evidence of
replacement

b) Cleaning: Remove soiling from exposed paver surfaces and brush of


particles aside from sand.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-5
STREET LANDSCAPE K_
c) Provide final protection and maintain conditions in a manner acceptable to
installer, which ensures paver work being without damage or deterioration
at time of substantial completion.

d) Spread sand to backfill the spaces along the edges of the concrete paver
mainfield and level concrete pavers to specified finish floor elevation as
per landscape architecture drawings.

7.2.3 Metal Works

Materials

a) All metals shall be free from defects impairing strength, durability or


appearance and shall be of best commercial quality for each intended
purpose.

b) Fastening: Which are exposed shall be of the same material, color and
finish as the metal to which they are applied, unless otherwise
shown on the drawings or as specified. All items employed with galvanized
iron and steel shall be galvanized ferrous metal.

c) Steel Shapes: Shall conform to the requirements of ASTM A36 for the
Structural Steel. Steel Pipes shall conform to ASTM A53 or A120.

d) Cast Iron: Shall conform to the requirements of ASTM A36 for the
structural Steel. Steel pipes shall conform to ASTM A53 or A120.

e) Gauges: Of sheet iron and steel are U.S. Standard for sheet and plate
where needed. Gauges of non-ferrous metals are Brown and Matte.

. Installation

a) Take all measurements required at the building. Check and compare


dimensions and other data with various trades, installing adjoining work to
assure proper coordination.

b) Do all drilling and fitting, cutting, welding, bolting and riveting required to
erect, install and fit metal work to adjoining work. Conform to AISC Code.
Furnish all screws, bolts, anchors, etc., required to attach metal work
securely to adjoining work.

c) Do not cut or alter members in the field without Landscape Architect’s


approval or Engineer’s approval. Do not enlarge unfair holes by burning or
forcing, but correct by reaming.

d) Be responsible for the correct location of miscellaneous metal work,


including anchor bolts and base plates, lintels and others. Take particular
care to details.

e) All work should be accurately set to established lines and elevations and
rigidly fastened in place with suitable attachments to the construction of
the building.

f) Furnish, fabricate, install and anchor all lights steel, miscellaneous and
ornamental metal/grille work as indicated in the drawings as specified

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-6
STREET LANDSCAPE K_
herein. Install all supports and anchors for miscellaneous metal work,
except those to be cast into concrete or built into masonry.

g) Furnish all metal inserts, dovetail anchor slots, anchors, anchor bolts,
fastenings, etc. for a attachment of work of all trades to concrete and
masonry, except where otherwise specified or obviously included under
other Section of the Specifications.

7.3 Softscape Components

7.3.1 Scope of Works

The scope of work in this section shall include but not be limited to the
following:

a. Installation of plants
b. Removal and transfer of existing trees
c. Maintenance of landscape area

7.3.2 Quality of Workmanship and Materials

a. All materials and workmanship shall be of the highest standards and


quality demanded by this specification. Substandard work and materials
identified by the Installer’s cost.

b. All plant materials shall be of the genus, species and variety specified and
substitutions shall not be permitted unless authorized in writing by the
Landscape Architect.

c. All trees and shrubs installed by the Plant Installer shall be free of pest,
disease, discoloration and damage. Plants shall be well branched with
vigorous shoots. The root systems of each plant shall contain a good
proportion of fibrous roots.

d. All materials are to be approved by the Landscape Architect or by the


Engineer prior to use on [Link] shall be obtained from approved
sources, manufacturers and/or suppliers.

e. Where particular products are specified and the Plant Installer wishes the
use of similar products from other suppliers, prior confirmation in writing
shall be obtained from the Landscape Architect or the Engineer.

7.3.3 Supply of Softscape Materials

a) The Landscape Architect reserves the right to make field adjustments and
reasonable substitutions to ensure implementation of the landscape
concept in relation to field conditions.

b) The Plant Installer (from the Contractor side) shall submit his proposed
construction program based on the criteria of the Master Program showing
the intended sequences, stages, and order of proceeding with the works
together with the period of time he has estimated for each and every stage
of progress.

c) The Plant Installer shall liaise with other Contractors at each phase to
program and execute the works.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-7
STREET LANDSCAPE K_
d) The Plant Installer shall complete the works on or before the date of
completion as set forth in the Contract.

e) All work carried out must be done in accordance with the relevant Code of
Practice as stipulated by the relevant Government and Statutory bodies.

f) The Plant Installer shall undertake all responsibility for defects and
maintenance to the landscape for a period of twelve (12) months from the
date of practical completion.

g) This specification is a set of directions for the installation of Softscape


Works. The Plant Installer must read these specifications at the time of
tender in order to be aware of his obligations under the Contract should he
be the successful bidder.

h) It is essential therefore that the Plant Installer is fully conversant with the
techniques set out in this specification and is adequately prepared with the
trained management, supervisors, foreman and labor force as well as
tools, equipment and materials to complete the works to the specifications.

i) The Plant Installer shall not use different techniques or quality criteria or
materials unless the alternative system has been approved in writing by
the Landscape Architect or the Engineer. No cost increased for alternative
specifications will be entertained unless formally submitted in writing as an
improvement in the quality of a product and accepted in writing following
the Client’s/Owner’s approval, through the Landscape Architect.

j) The Plant Installer is to study the drawings at the time of tender and notify
the Landscape Architect of any discrepancy at the time of tender
submission.

k) On completion of the works, the Plant Installer will prepare a set of as-built
drawings covering the areas installed. These drawings shall be at the
same scale as the original planting plans and shall contain the accurate
positions of all planting with the actual number of plants installed. These
drawings and the quantities shall be approved by the Landscape Architect
before being signed and stamped by the Plant Installer.

l) The general description of the works mentioned above is only for the
guidance of the Plant Installer (Contractor’s side) and any error or
omission shall not constitute a ground for claim by the Plant Installer. The
onus for investigating and ensuring the actual extent and nature of the
works comprised in this Contract prior to the submission of the tender is
solely with the Plant Installer. Any doubts should be clarified with the
Landscape Architect before the tender is submitted. No claim arising out of
lack of clarity or availability of information will be entertained. Allowance for
any or all of these provisions shall be made in the tender.

7.3.4 Backfill and Growing Media

Materials for backfilling and planting holes and beds shall consist of approved
quality topsoil transplanted to the site and thoroughly mixed with sand, organic
compost and coco peat. The Plant Installer must submit samples for approval
of Landscape Architect.

The soilmix compositions are as follows or other growing mix as specified by


Landscape Architect:
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-8
STREET LANDSCAPE K_

Planting on Grade Planter Boxes on concrete slab decks

Loamy topsoil 50% Loamy topsoil 30%


White washed sand 10% White washed sand 10%
Soil Conditioner 10% Soil Conditioner 7.5%
Sugarcane waste soil 6% Vermiculite 7.5%
Rice hull 6% Perlite 16% Coconut
fiber 6% Charcoal 5% Begasse
6% Sugarcane waste soil 6% Chicken manure (composted) 6%
Rice hull 6% Coconut fiber
6% Begasse 6%

Chicken manure(composted) 6%

Soil Mix

For soil mix, submit a written statement to the Landscape Architect or


Engineer by delivery, stating location of soil source and chemical analysis of
soil samples including pH, percentage of soluble salts, and amount of
potassium, phosphorus and nitrogen.

Mechanical Analysis of topsoil will determine conformance percentage of


sand, silt, clay and organic matter.

Samples of Materials

2 soil aggregate types - 2 liters each


2 drainage aggregate types - 2 liters each
Soil conditioner - 2 liters each
Filter Fabric - 0.4 sq. m.

Mulch - 2 kg bag
Fertilizer - 1 liter plus manufacturer’s label
Anti-Transpirant Spray - 500 ml plus manufacturer’s label

Top Soil

Soil composition for turfed areas shall be 70% sandy loam, 20% sand
(washed), and 10 % organic compost (as outlined).

a. Shall be fertile natural red/brown topsoil transported to the site, free from
stones, clay, wood and sod, and obtained from naturally well-drained area.
Topsoil shall neither be excessively acidic nor have high alkalinity, and
shall be free from any toxic matter liable to be harmful to plant growth. The
pH for topsoil shall be in the range of 5.5-6.5.

b. Topsoil shall generally be reasonably loose in a form containing not more


than 10-15% of moisture content. Topsoil delivered in a wet and soggy
condition will be rejected by the Landscape Architect.

c. Topsoil depth in designated planting areas shall be as follows:

1. Lawns and Sodded Areas - 0.15cm


2. Ground Cover Areas - 0.30 cm
3. Shrubbery Areas - 0.60 cm
4. Palms and trees - Shall conform with the size of

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-9
STREET LANDSCAPE K_
the root ball. Allow 0.30 minimum
dimension from palm/tree root ball
edge to rim of prepared
excavation.

Depth of pit excavation shall have a minimum of 0.60 cm. Allow 0.30
cm soil pedestal to prevent balled tree from settling. Actual pit depth
shall be determined by the existing root ball dimensions. Refer to tree
planting details.

Soil Conditioner

Shall be peat moss, coco peat, ground bark, well composted chicken manure,
begasse, sugarcane (mud) waste/pulp or other approved fibrous organic
matter suitable for mixing with topsoil to make a friable growing medium for
plants , resistant to rapid decay, free of soluble salts below 900 ppm, pH 6-6.5,
free of large lumps or debris.

Lightweight Aggregate

Shall be an approved low-density, inert material such as charcoal, expanded


shale or porous volcanic stone free from dust and debris, pH 6-6.5, free of
soluble salts.

Organic Compost

Shall be an organic vegetable compost e.g. tree bark compost produced by a


thorough horticultural or industrial composting progress. Compost is to have a
clean, under composed smell free from any rotting substances, debris, refuse,
clay or visible fungus. A sample and test data is to be submitted before being
packed for transport and odorous materials used on site will be rejected. Any
vermin resulting in use of organic compost will have to be controlled by the
Plant Installer within 12 hours of any infestation.

Soil Analyst’s Test Reports on Mechanical Analysis of Soil Mix

Shall be clean, coarse-grained and angular material with a minimum 1mm


diameter section. It shall be well-graded, free from soluble salts ranging in size
so that 80- 100% passes the 3mm sieve and 0-50% passes the 2mm sieve,
with 0% passing through a 1mm sieve.

Fertilizer and Lime

a. Fertilizer used shall be complete food having an N:P:K formulation of


[Link] for foliage plants and trees, and [Link] for flowering plants.
The Plant

Installer shall also provide an approved basic fertilizer (slow release


fertilizer) for every plant that is being potted and reported. The nutrients in
the fertilizer must be freely available to the plants and all fertilizer must be
delivered in original, unopened containers, bearing the manufacturer’s
guaranteed analysis.

b. Triple Superphosphate 0-46-0 uniform in composition delivered to the site


in unopened containers, each fully labeled, conforming to the applicable
fertilizer laws, and bearing the name or mark of the manufacturer.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-10
STREET LANDSCAPE K_

c. Ground dolomitic limestone not less than 85% total carbonates, minimum
20% calcium and 10% magnesium. Ground so that 50% passes through
the 250 microns sieve materials will be acceptable and the specified rates
of application are increased proportionally on the basis of quantities
passing through the 250 microns sieve.

Mulches

Coarse, ground organic materials such as coco peat, or other approved


available organic matter free from soluble salts and with a pH between 5.0-
7.0.

7.3.5 Plant Material

Nomenclature

Names of plants required under this contract conform to those given in Exotic
Plant Manual, Alfred Byrd Graf, 3rd Edition, Roers Company, East Rutherford,
N.J., USA. Names of varieties not included therein conform to names
generally accepted in the nursery trade.

Quality and Size

a. Provide plants grown in approved nursery, acclimatized not fertilized for a


period of at least four months before delivery. Habit of growth that is
normal for the species, sound, healthy, vigorous and free from insects,
diseases, injuries, abrasions, sunscald, disfigurement. Equal to or
exceeding measurements specified in branches in normal position;
necessary pruning done at time of planting as recommended by the

Landscape Architect Sizes and methods of handling according to accepted


practice where it is not indicated.

b. Plants shall be grown or established in containers in which they will be


delivered for at least six months but not more than twenty-four months in
advance or final planting.

c. Trees shall be well-formed with uniform branching. There shall be no


abrasion of the bark, and no fresh cuts of limbs over 30 mm which have
not completely callused over.

d. Trees and palms larger in size than specified may be used but increase in
price is as limited by the contract documents. It is the responsibility of the
Plant Installer to ascertain that materials larger in size than that specified
can be accommodated in the proposed locations.

Plants Required

The species (scientific and common name) size, manner in which to be


furnished, and indication of the approximate number to complete the planting
plan are given in the plant list. Plant quantities on the list are indicated only for
the convenience of the Plant Installer. The Plant Installer shall furnish and
plant all plant materials required by the plans. Surpluses or shortages in the
list shall not be used for claims for additional compensation.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-11
STREET LANDSCAPE K_
Substitution

a. Plants of kinds other than those named in the plant list will not be accepted
unless specifically approved in writing by the Landscape Architect. Proposed
substitute, in each case, must possess the same essential characteristics as
the type of plant actually specified in regard to appearance, ultimate height,
shape, habit of growth and other requirements. Where a substitution is
approved for the Plant Installer’s convenience, plants of greater value may be
accepted without additional cost to the Employer.

b. The Plant Installer or his authorized representative shall be present during


inspection.

c. Make a written request to the Landscape Architect or to the Engineer, a


minimum of thirty working days in advance of all inspections at the nursery.
List the particular plants which are to be inspected as well as the size of the
plants.

Special Guarantee

All plant materials furnished under this Section shall be guaranteed for a
period of one year from Completion as to the species, hybrid, flower color
and/or variety specified herein or on the drawings. If after the issue of the
completion certificate for the Main Contract by the Landscape Architect, any
guaranteed plant material proves to be of different species, hybrid, flower color
and/or variety not initially determined, the Plant Installer shall replace that
plant with a new plant of the originally specified species, hybrid, flower color
and/or variety.

Minor Materials

Accessories or other materials not described but required for completed work
shall conform to commonly accepted industry standards and shall be of types
of sizes best suited for the intended purpose and related conditions such as
using a plastic plant separator for separating lawn from shrubs and planting
from grade and other purposes. The Plant Installer is required to submit
samples to the Landscape Architect for approval, before installation.

7.3.6 Installation

Acclimatization

Local practice will dictate the percent shade that should be provided during
this acclimatization period. Light levels listed in the schedule of plant materials
represent the approximate condition that the plant will be provided when it is
installed in the building and not the light level that should be produced during
the first stage of acclimatization when the plant is grown under shade before
installation.

Planting

a. Planting shall be performed in accordance with the recognized best


horticultural practice.

b. All plants must come with pots or plastic bags in which they were originally
grown and established in the nursery.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-12
STREET LANDSCAPE K_
c. All plants are to be removed from their original growing receptacles prior to
installation. They should be arranged in a manner such that the leaves
complement each other and are within touching distance of the other and
not overlapping one another unless specified to the contrary.

d. All planting works shall have the appearance of established growth. Plants
shall be arranged with their foliage showing off their best face so that the
intended design will be fully realized.

e. Plants shall be set plumb and at such a level or elevation to level


surrounding ground as they bore to ground from which they were dug. All
plants shall be planted on and in soil mix. The soil mix will be properly
compacted before the placement of trees with a heavy root ball.

f. Earth balled and hessian covered plants shall have all cloth, ropes, etc.
removed from the tops of the earth balls but no cloth shall be pulled out
from under the earth balls.

g. In planting beds designated, deposit planting mix to full required depth as


shown on the drawings. Deposit enough material to allow for settling and
compaction. Compact by hand tamping and rolling. Do not compact by
puddling. After soil is spread and compacted and just before planting,
moisten evenly to full depth with a fine water spray. Place additional
planting mix as necessary, to correct any settling occurring at this time.

h. Bare-rooted plants are not acceptable.

i. Disturbance to the root system or ball or earth shall be prevented in


removing plants from containers. Root bound plants shall not be planted.

j. After placing the plant, the plant pit shall be back filled with planting soil
mix placed in layers and tamped firmly to eliminate air-void, minimize
settlement and provide stability for the plant. A watering ring should be
made out of the soil around the plant to store water.

k. During and after planting, the plants shall be thoroughly watered to


eliminate air voids around the roots and watered regularly as required for
the planting to become established.

l. All saplings shall be securely staked and tied.

m. All semi-matured instant trees and palm shall be staked by guying or by


ground anchors as specified

n. Trees of the species and of the size specified on the plans shall be planted
in locations shown. Trees shown on plans at spacing shall be accurately
and evenly spaced in true lines.

o. Shrubs shall be positioned in the location and numbers shown on plan and
placed to achieve even spacing and proper matching of shapes related in
a random fashion of approximately equal centers to obtain a natural dense
cover.

p. Groundcover plants and all potted plants shall be planted with a hand
trowel to firm soil around roots.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-13
STREET LANDSCAPE K_

7.3.7 Staking

a. Provide all necessary support for plant material as required, such as posts
and line wires for tree and tall shrub planting, stakes or tripods for tall tree
sand palms, using durable materials which will remain in good condition for
the duration of the contract.

b. Stakes for supporting trees shall be sound wood, uniform in size, reasonably
free of knots and capable of standing in the ground for at least one (1) year.
Stakes for supporting trees, two meters tall and over shall be 50mm and not
less than 2.5 meters in length.

c. Wire for tree bracing and guying shall be pliable 12 to 14 gauge (2.0-2.8mm)
galvanized soft steel wire.

d. Ground anchors shall be 25mm diameter GI anchors or equivalent. Hose


shall be two-ply fiber bearing garden hose, not less than ½” (1cm) inside
diameter.

e. Wrapping material shall be first quality, heavy waterproof crepe paper


manufactured for this purpose, or first quality burlap not less than 15cm nor
more than 25cm wide of suitable strength and manufactured for this purpose.

7.3.8 Maintenance Operations

a. Watering of plants and turfed areas is the responsibility of the sub-contractor


to water and spray water to remove dust to all plants regularly.

All the external plants shall be watered twice daily in the absence of sufficient
natural rainfall.

b. Weeding - all weeds found growing in the landscaped area under


maintenance must be removed. All plant beds must be weeded weekly.

c. Forking - all plant beds must be forked fortnightly to loosen the soil and
provide sufficient aeration for the roots.

d. Pruning - plant shoots must be pruned when necessary. All trees, palms,
shrubs and groundcovers shall be pruned by thinning out and shortening
branches to the extent of 1/3 of the existing growth. Trees shall be pruned if
dead, rotten or crossed branches are present or to maintain a clear stem up
to the specified height using the methods described below. Allowances are to
be made for all shrubs and climbers to be pruned at least twice during the
Maintenance Period to promote bushy growth and good flowering
characteristics. The shrubs shall be checked and all dead wood, broken,
damaged or crossed branches shall be cut back, depending on species.
Allowances must be made for the regular pruning of dead and dying plant
parts. Pruning and removal of branches are to be carried out using sharp and
clean instruments to give a clean, sloping cut with one flat face. Ragged
edges of bark or wood are to be trimmed with a sharp knife. Dead wood and
broken or badly bruised branches shall be removed. Main leaders shall not
be cut. Pruning shall be done with clean and sharp tools to produce a clean-
cut face.

e. Topdressing/ Mulching - plant with exposed root planting beds and turfing
with low topsoil level and those affected by rainwater splashing and erosion
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-14
STREET LANDSCAPE K_
shall be topdressed a minimum of every three months or as instructed. A
mulch can reduce the amount of water loss through surface evaporation,
weed generation and soil erosion. All planting beds must be mulched with
coco peat with a minimum depth of 75mm every three months or as
instructed. Mulch should not touch the stem of a plant or cover the foliage in
any situation.

f. Spraying of plants - all foliage and flowering plants must be sprayed with a
fungicide, miticide and an insecticide once every two weeks or as directed by
the Landscape Architect. Trees are to be sprayed with the proper pesticide
when required.

g. Fertilizing of plants - slow release of NPK (nitrogen, phosphorus, potassium)


combined with fast release organic fertilizer shall be applied regularly to
ensure healthy growth, repeating the application once every four to six
weeks. All trees, foliage and flowering plants are to be given fertilizer
according to the following dosage, fertilizer type:

(A) Trees/Palms (NPK - [Link])

Age Group Application Rate


1-3 yrs. 2 kg/plant per year in two applications
• 1 kg each time
3-5 yrs. 4 kg/plant per year in three applications
• 1.3 kg each time
5 yrs. and above 6 kg/ plant per year in three applications
• 2 kg each time

The Plant Installer shall put manure on every tree each month with slow
releasing fertilizer, recommended and approved by the Landscape Architect.

(B) Shrubs/ Climbers/ Foliage/ Groundcovers

Height of Plants Application Date Remarks

1 m ht 35g/plant per month NPK:15:15:15


1-1.5 m ht 50g/plant per month and 1-[Link]
1.5 m ht 65g/plant per month as and when
Directed
Flower bed 70g/meter per month by the Landscape
Architect

h. Replacement of Plant - all poor conditioned, dying and dead plants and turf
not growing properly are to be replaced by healthy plants of the same species
as specified and size of those adjacent in the planting area during the
maintenance period at the Plant Installer’s expense.

i. Maintenance of Turf After Laying:

j. The Plant Installer shall remove and replace any portion of turfed area where
the turf fails to become established within thirty days of turfing.

k. The Plant Installer shall regularly maintain all turfed areas in a neat manner
by watering, moving, ranking and clipping during the whole of the
Maintenance Period. All turfed areas shall be moved after one month of
completion of turfing, and thereafter at maximum intervals of three weeks.

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-15
STREET LANDSCAPE K_

l. About one month after planting, the grass shall be applied with manure with a
complete chemical fertilizer which supplies Nitrogen, Phosphorus, Potassium
and Magnesium approximately in the following proportion [Link]. This
shall be applied at rate of 125 kg/ha of grass after all weeds have been
removed. The fertilizer shall be mixed with the topdressing and spread evenly
over the field. This application shall be repeated after three months.

7.3.9 Clean-up

a. The Plant Installer must ensure that all plant beds are tidied up and free from
any debris or unapproved plant materials immediately on completion of the
planting works.

b. All areas affected by horticulture activities must be thoroughly cleaned of soil


stains, etc. removed to the satisfaction of the Landscape Architect.

7.3.10 Final Planting Inspection and Acceptance of Works

a. Final inspection for acceptance shall be made at the conclusion of


maintenance period provided that all the projects improvements and corrective
work has been complete. If improvements are not complete, maintenance
shall be continued until completion of such work.

b. If the Plant Installer fails to complete the final planting after notification by
registered mail, the Landscape Architect reserves the right to take the work
out of the sub-contract and rectify the work. All charges for rectification shall
be at the Plant Installer’s expense.

c. Written notice requesting final inspection shall be submitted by the Plant


Installer to the Landscape Architect at least fifteen (15) days before the
anticipated date of completion.

d. Prior to handing over of the work at contract completion and at the end of the
Maintenance Period, all plants must be groomed and neatly trimmed to show
off their best for the purpose of inspections.

SUMMARY OF MATERIALS AND FINISHES

SPACE AREA OF
LANDSCAPE ARCHITECTURAL REMARKS
NOS. APPLICATION
ITEM
MATERIALS
NO.
I PAVING FINISHES
A. Texture Homogenous Tile (Granite Tile)

Urban Streetscape
0.20m x 0.40m, 0.20m x 0.20m Walkway Paving Non-skid; gray
Banding

Urban Streetscape
0.40m x 0.60m Walkway Typical Non-skid; dark gray
Paving Mainfield
Urban Streetscape
0.20m x 0.20m Walkway Typical Non-skid; dark gray
Paving Mainfield

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-16
STREET LANDSCAPE K_

B. Concrete Paver (Plank Paver by Quality-Star


Concrete Solutions or Approved Equivalent)

Urban Streetscape
0.1250m x 0.368m x 0.05m thick
Walkway Typical On sand setting
Paving Mainfield
C. Exposed Aggregate Concrete Finish with
Glow-in-the-dark Aggregates (Cypress
Bomanite Philippines or Approved
Equivalent)

Urban Streetscape
Gray
Bikeway

Il PLANT MATERIALS

A. Tree/Palm
“Acacia mangium”
(MANGIUM)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-17
STREET LANDSCAPE K_

“Alstonia scholaris”
(DITA)

See Planting Plan for


specifications

“Bucida sp.”
(PHILIPPINE TALISAY)

See Planting Plan for


specifications

“Cassia philipinensis”
(PALAWAN CHERRY)

See Planting Plan for


specifications

“Lagerstroemia speciosa”
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-18
STREET LANDSCAPE K_

(BANABA)

See Planting Plan for


specifications

“Livistonia philippinensis”
(ANAHAW)

See Planting Plan for


specifications

“Michelia champaca”
(GOLDEN CHAMPACA)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-19
STREET LANDSCAPE K_

See Planting Plan for


specifications

“Peltophorum pterocarpum”
(YELLOW PONCIANA)

See Planting Plan for


specifications

“Petersianthus quadrialatus”
(TOOG)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-20
STREET LANDSCAPE K_

“Plumeria rubra”
(RED KALACHUCHI)

See Planting Plan for


specifications

“Spathodea campanulata”
(AFRICAN TULIP TREE)

See Planting Plan for


specifications

B. Shrubs
“Crinum xanthophyllum”
(YELLOW CRINUM)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-21
STREET LANDSCAPE K_

“Bougainvillea ‘Mary Palmer’”


(MARY PALMER)

See Planting Plan for


specifications

“Hymenocallis littoralis”
(SPIDERLILY)

See Planting Plan for


specifications

“Philodendron selloum”
(SELLOUM)

See Planting Plan for


specifications

“Calathea lutea”
Detailed Engineering Design of the Construction of Bidding Documents
Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-22
STREET LANDSCAPE K_

(CIGAR PLANT)

See Planting Plan for


specifications

“Iris pseudacorus”
(YELLOW IRIS)

See Planting Plan for


specifications

“Alocasia odora”
(NIGHT FRAGRANT ELEPHANT EAR)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-23
STREET LANDSCAPE K_

“Costus spectabilis”
(RED COSTUS)

See Planting Plan for


specifications

C. Ground Cover
“Wedelia trilobata”
(WEDELIA)

See Planting Plan for


specifications

“Arachis pintoi”
(PEANUT PLANT)

See Planting Plan for


specifications

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-24
STREET LANDSCAPE K_

“Ipomoea pes-caprae”
(BEACH KANGKONG)

See Planting Plan for


specifications

“Paspalum cv.”
(FROG GRASS)

See Planting Plan for


specifications

III LIGHTINGS

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-25
STREET LANDSCAPE K_

Supply
SPL 1200-2
and Supply and Install 6.0m High Pedestrian Lamp Post Double Arms with 70W
Luminaire @ 30m On center. Including Concrete Pedestal and Ground
Rod with Clamp. (Theos by Performance in Lighting)

Theos Mini Lighting Fixture by Performance Lighting/LGC Electric or Approved


Equivalent

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-26
STREET LANDSCAPE K_

IV IRRIGATION

Quick Coupler Valve

Quick Coupling Valve-3RC by Rain Bird or Approved Equivalent

Detailed Engineering Design of the Construction of Bidding Documents


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page K-27
PART J

STREETLIGHTS AND AREA


LIGHTINGS
STREETLIGHTS AND AREA LIGHTINGS J

PART J – STREETLIGHTS AND AREA LIGHTINGS

ITEM 103 STRUCTURAL EXCAVATION

103.1 Description

This Item consists of the necessary excavation for foundation of bridges,


culverts, under drains, and other structures not otherwise provided for in the
Specifications. Except as otherwise provided for pipe culverts, the backfilling
of completed structures and the disposal of all excavated surplus materials,
shall be in accordance with these Specifications and in reasonably close
conformity with the Plans or as established by the Engineer.

This Item shall include necessary diverting of live streams, bailing, pumping,
draining, sheeting, bracing, and the necessary construction of cribs and
cofferdams, and furnishing the materials therefore, and the subsequent
removal of cribs and cofferdams and the placing of all necessary backfill.

It shall also include the furnishing and placing of approved foundation fill
materials to replace unsuitable material encountered below the foundation
elevation of structures.

No allowance will be made for classification of different types of material


encountered.

The Contractor shall be guided by the construction requirements defined


under work sub-items 103.2.1 – 103.2.7 of the DPWH Standard Specifications
for Public Works and Highways, 2013 Edition: Volume II Highways, Bridges
and Airports.

103(1) a - Structure Excavation (For Streetlight Concrete Pedestal)

104 (7) - Structure Backfill (From Common Excavation)

SPL 1000 - Light Pole Concrete Footings (For Streetlight Concrete Pedestal)

All electrical light pole footings shall be reinforced concrete with dimensions
as indicated on the Plans. Concrete shall be Class “A” and together with the
reinforcing steel shall conform to the requirements of the DPWH Standard
Specifications for Public Works and Highways, 2013 Edition: Volume II
Highways, Bridges and Airports.

SPL1000-1 Removal of Existing Street Light Post (Including Pedestal, Post & Light)

SPL1000-2 Removal and Relocation of Existing Concrete Electrical Post with


Complete Accessories

SPL1000-3 Construction of Steel Pole Concrete Pedestal, 25mm x 762mm Including


Rebars, Anchor Bolts with Nuts & Washers

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-1
STREETLIGHTS AND AREA LIGHTINGS J

ITEM SPL 1100 STREET LIGHTING SYSTEM

SPL 1100.1 Description

The item shall consist of furnishing and installing the street lighting system as
required by the Plans and as described in this Specification. The work shall
include the following:

a. Electrical services, including all conduits, junction boxes, fittings, and


wiring from the Power Utility Company supply and meter to lighting panel
boards, and poles with luminaries.

b. Lighting panels

c. Complete street luminaries

d. Lighting Standard poles and foundation

e. Cable trench, excavation and backfilling

SPL 1100.1.1 Material/Product Requirements

1. General Requirements

All materials and equipment to be used and to be installed shall be new and of
the approved type bearing the stamp of approval of the Underwriter’s
Laboratories, Inc.

From General Notes, power service voltage or Utility transformer shall be


provided by Others, not by the contractor, estimate a “service lateral towards
nearest utility handhole which shall be not more than 30meters away.

But primary distribution line, poles and pole line hardwares are for the
Contractor’s scope of works.

Fungus Control

No substitute will be accepted, unless the materials and equipment specified


herein are not available. Locally manufactured and/or any other substitute
materials and equipment may be accepted, provided they are better or the full
equivalent in design, quality and size of materials and workmanship, and
provided further they carry the written approval before they are installed.

All electrical equipment and materials except otherwise specified shall be


treated to resist moisture and fungus. Electrical components such as switches,
breakers, fuses, contacts, and heater elements shall not be treated. Other
materials and components, which are inherently fungus – resistant or
protected by hermitically sealing, need to be treated.
0
All other circuit elements that have a temperature rise of not more than 30 C
when operating at full load shall be coated with a fungus-resistant varnish.
Circuit elements include but are not limited to cables, wires, contractors,
panels, terminals and terminal junction block capacitors and coils.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-2
STREETLIGHTS AND AREA LIGHTINGS J

Circuit Breakers

The molded case circuit breakers shall be of the thermal magnetic type having
inverse-time tripping characteristics on overload and instantaneous trip on
short circuits, shall be equipped with arc quenches, shall have quick-make
and quick-break toggle mechanism, shall have trip-free operating handles.
Each multi-pole breaker shall have a common trip so that an overload on one
pole will automatically cause all poles of the breakers to

open. The circuit breakers shall have an interrupting rating of not less than
10,000 symmetrical amperes at 400 volts.

2. Street Lighting Poles and Luminaries

Pole

Provide Lighting Standard Poles designated for wind loading of 100 kilometers
per hour determined in accordance with AASHTO LTS-2 while supporting
luminaries having effective projected areas indicated. Poles shall be anchor-
base type designated for use with underground supply conductors.
Galvanizing shall be in accordance with the requirements of ASTM A-120 for
the poles and A-153 for the fittings. Effective height shall be 12.0m, mast
length equals 3.0m, round tapering.

Luminaires

Technical Specifications, 120Watts, LED Road Lighting, Operating Voltage


100-277VAC Volts, 100 lumens per watt or higher; 12,000 lumens; IP66;
Lumen maintenance: 50,000 Hrs; Upgradeable Multi-layer Optics; UV treated;
Thermally hardened tempered glass cover; Auto Dimming Function with a
dimming percentage of 40.00%; High pressure die-cast aluminum with heat
management system; Power Factor: 0.90 or higher; Electrical Insulation:
Class 1; Surge Protection: 10kV; Color Temperature: 3500k to 4000k
Maintenance: Replaceable Gear Tray, upgradeable / replaceable LED
modules, SPD and driver, tool less luminaire opening and gear tray change;
Warranty: 5 years warranty for LED system (LED / driver /optics / luminaire).
Rectangular in shape.

As per the Electrical Drawings, Riser/Lighting Panel Wiring Diagram specified


that the Roadway Luminaires are manually control on individual circuit
breaker; LTG Control Options: Standalone Dimming Program, Telemanaged
City Touch, Star Sense and AmpLight compatible. NEMA and D2 Type PE
Cell must be provided by the Contractor. This feature is already included in
the Modern LED Lighting Luminaire package.

Compliance with the Energy Efficient LED Streetlight Specifications and


with the following LED Quality Industry Standards compliance
requirements:

1. EN 61347-1: general and safety requirements;

2. EN 61347-2-13: particular requirements for DC or AC supplied electronic


control gear for LED modules;

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-3
STREETLIGHTS AND AREA LIGHTINGS J

3. EN 62384: DC or AC supplied electronic control gear for LED modules


performance requirements;

4. EN 55015: 2006 and 2007-Limits and methods of radio disturbance


characteristics of electrical lighting;

5. EN 61547: 1995/+A1: 2000- Equipment for general lighting purpose


EMC immunity requirements;

6. EN 61000-3-2:2006 - Limitation of harmonic current emission;

7. EN 61000-3-2:2008 - Limitation of voltage fluctuation and flicker;

8. IEC 60598-1(Ed7) general requirements for luminaries, incorporating


electric light sources for operation from supply voltages up
to 1000V;

9. IEC 60598-2-3 (Ed 2) - Electric Insulation Class I;

10. IEC 62471 photo-biological safety of lamps and lamp systems;

Compliance with the Test Reports and Certifications from laboratories


that are accredited according to ISO/IEC 17025 and qualified for
pertinent testing of LED products particularly for roadway lighting by a
recognized national or regional accreditation body (ILAC/APLAC) and to
be submitted prior to delivery of streetlights.

1. Technical Data of luminaire and driver.


2. LM-70 Test Report(for luminaire electrical/photometric properties);
3. LM-80 Test Report ( for LED chip properties);
4. Lumen Depreciation Test Report at 1000, 2000 and 3000 burning
hours;
5. IEC 60598 Test Report;
6. Vibration Test Report;
7. EMC Test Report;
8. Salt Spray Test Report;
9. Factory ISO Certificate (ISO 9001: 2008/ISO 14001: 2004/ISO 18001:
2007); and
10. Lux Meter Test Results.

ENERGY EFFICIENT LED STREETLIGHT SPECIFICATIONS

1. LED Streetlight Luminaire Housing

The luminaire shall have a full die cast housing to provide adequate
rigidity and strength and also ensure proper heat dissipation. The
luminaire housing shall have separate Driver and LED lamp cavity to
ensure cooler operation of LED lamps and good electrical separation.

The optical LED compartment shall have a thermally hardened glass


cover and high quality silicon gasket system. The glass cover shall be
tightly secured with the housing. The complete luminaire shall be rated
for IP 66 (Ingress Protection).

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-4
STREETLIGHTS AND AREA LIGHTINGS J

2. Optics

Specially designed lens system with unique inner and outer profile for
high efficiency LED to ensure maximum spacing between the poles and
cover higher road widths. Multi-layer optics designed to ensure adequate
luminance and illuminance uniformity in the unlikely event of individual
LED failure. The luminaire should offer choice of narrow beam, medium
beam and wide beam light distribution.

The luminaire shall offer a composite system efficiency of at least 100


Lumen/Watt and a lumen package of no less than 12,000 lumens. The
luminaire shall use high efficiency LED and optics system to achieve at
least 50% energy savings compared to present High Pressure Sodium
road-lighting system (including ballast).

3. Future Compatibility

The luminaire shall be fully compatible with future LED upgrades when
they become available. It shall have a modular design to upgrade /
replace with new LED modules or LED drivers at site. All electronic
components/drivers shall be mounted on a separate gear tray with tool-
less access and replacement. The luminaire shall have space available
inside for communications antenna or equipment to be integrated into
the luminaire for future telemanagement control system implementation.
Evidence showing telemanagement capability shall be provided.

4. Surge Protection

The proposed luminaire shall have an in-built 2-stage surge protection


system to protect (1st stage) the electronic driver and (2nd stage) the
LED module with a minimum surge protection rating of 10KV.

5. Ingress Protection (IP) & Impact Resistance

The luminaire shall have Full IP 66 protection to ensure long reliable


performance and to minimize maintenance requirement and an Impact
resistance of IK 08. No chemical glue is to be used as it may cause
breakdown of water-proof and dust-proof seal.

6. Maintenance

The driver compartment cavity and gear tray shall be designed with tool-
less access for maintenance and replacement.

7. Mounting

The mounting of the luminaire will be in axial orientation through Ø 48-


60mm sidearm.

8. Thermal Management

Managing thermal properties in LED luminaires are most critical to


ensure optimum performance of LEDs and reliability of the system.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-5
STREETLIGHTS AND AREA LIGHTINGS J

The housing shell under the circuit board (PCB) should be specially
designed to ensure perfect contact between the board and the luminaire
housing for efficient heat dissipation. The PCB shall be designed to
maximize heat transfer and should be mounted on the
housing using a highly efficient thermal interface material. Use of Silicon
glue is not acceptable.

The housing over the Driver compartment cavity shall have adequate
surface area to ensure fast heat dissipation.

9. Color Rendering Index and Color Temperature

The luminaire should have a minimum color rendering index (Ra) of


70+/- 10 and a color temperature of 4000K. The LED shall have a color
consistency preferably within 5 SDCM at a maximum of 7 SDCM
(standard deviation of color matching) as defined by McAdam. The color
temperature variation of the LEDS should be restricted as per ANSI
C78.377A with CCT variation limiting within 500K for nominal CCT of
4000K.

10. Useful Life Hours

The LED luminaire shall be designed for lumen maintenance of L70 or


70% at the end of useful life at ambient temperature of 35 degree
Celsius. The complete luminaire shall have a useful life of 50,000
burning hours. The luminaire including the driver will include a warranty
of 5 years against manufacturing defects.

11. Standards Conformity

The luminaire should fully conform to the following specifications (please


submit certificate or test report for each):

IEC 60598-2-3 - Part 2: Particular requirements: Sec. Three-Luminaires


for road & street lighting

62471 – Photo-biological safety of lamps and lamp systems

IEC 62493 – Assessment of lighting equipment related to human


exposure to Electromagnetic Fields

EN 55015: 2006 and 2007 – Limits and methods of radio disturbance


characteristics of electrical lighting.

EN 61547:1995 / +A1:2000 – Equipment for general lighting purpose


EMC immunity requirements. EN 61000-3-2:2006 –
Limitation of harmonic current emission.

EN 61000-3-3:2008 – Limitation of voltage fluctuation and flicker.

12. LED Driver Specifications

The LED driver shall be designed to operate large array of high power
LEDs through current controlled output. The driver shall be suitable for
nominal 220V-240V 50/60Hz mains supply.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-6
STREETLIGHTS AND AREA LIGHTINGS J

The LED driver shall incorporate multiple control interfaces for dimming
capability. It shall enable DALI, & 1-10V DC interface dimming control. It
shall also have a programmable feature to allow pre-programming of
step dimming lighting levels based on the ON time.

The LED driver shall fully conform to following specifications (please


submit certificate or test report for each):

IEC61347-1 - General and safety requirements.

IEC61347-2-13 - Particular requirements for DC or AC supplied


electronic control gear for LED modules.

IEC62384 - DC or AC supplied electronic control gear for LED modules

13. Ambient Temperature

The luminaire shall be suitable for ambient temperature range of


between -40 to 55 degrees Celsius. 3rd party IEC60598 Test Report
shall be measured/corrected for Ta = 35 degrees Celsius.

14. Lighting Simulation

To support and establish the performance of the luminaire relative to the


road, a lighting simulation showing compliance to Luminance
measurement of 1 cd/m2 should be submitted. Overall uniformity
measurements shall not be less than 0.40.

a.) Conduit

PVC Conduit shall conform to ANSI Standards. Fittings of types


approved by the Engineer shall be provided as required for connection
to junction, pull and outlet boxes and to equipment.

b.) Insulated Conductors

Conductors in raceway shall be copper with moisture and heat-resistant


rubber or thermoplastic insulation. Wires and cables shall be type THW
with nylon jacket for all wires. All types shall be PAS approved and shall
conform to NEMA Standard Rubber Insulated Wire and Cable for the
Transmission and Distribution of Electrical Energy. Phelps Dodge brand
or approved equal shall be used. For circuit ground wire, use TW type
thermoplastic heat and moisture resistant.

c.) Grounding Installation

All street lighting poles and panel boards shall be effectively grounded.
Conductor and ground wires shall be bare copper as shown and sizes as
indicated in the plans. All connections shall be mechanically and
electrically sound and secured by insulating tape of approved type.
Grounding wire shall be made of bare copper stranded, soft drawn wire
and shall be installed in one continuous length without splices or joints.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-7
STREETLIGHTS AND AREA LIGHTINGS J

Ground rods shall be made of copper-clad steel and shall be driven full
length into the earth, sizes of which shall be as indicated on the plans for
grounding details. Connection to the grounding rod shall be done
exothermic weld.

d.) Backfilling Materials

Backfilling materials should be a suitable soil materials and free from


any objectionable matters and approved by the Engineer.

e.) Power House Building

The Contractor shall propose for the Power House Building Plan with an
area as specified in the specifications as 4.0m x 6m and shall be for
approval of the Engineer. Installation and construction of the Fuel Day
tank is part of the Power House Building Construction

f.) Pedestrian Lamp Post (on Landscaped Sections)

For Item SPL 1200-2, Part L- Street Landscape (Supply and Install
6.0m High Pedestrian Lamp Post Double Arms with 70W Luminaire@
0.30m on center, including Concrete Pedestal & Ground Rod with
Clamp, is part of the Contractor’s scope of work.

The Contractor shall provide for all interconnected wirings, conduits and
necessary lighting control panel. As specified in this Part J, Description
st
1 Paragraph letter “a”.

SPL 1100.1.2 Construction Methods

1. General

a. Codes and Regulations

All works shall be done in accordance with the requirement of the latest
edition of the PHILIPPINE ELECTRICAL CODE and the NATIONAL SAFETY CODE, with
the applicable ordinances of the local government, and with the requirements
of the local power company that will eventually furnish the service. Nothing
contained herein or shown on the plans shall be constructed as to conflict with
the requirements of these codes, which are hereby made part of the work of
this item.

b. Contractor Submittals

The Contractor shall be required to submit shop drawings which shall include
outline dimensions, mounting connections and clearance, ratings, elementary
wiring diagrams, interconnection wiring diagrams, together with catalogs and
descriptive data for the following:

a. Lighting panels
b. Streetlights, including lighting standard poles
c. Photocell switch
d. Manufacturer’s Data.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-8
STREETLIGHTS AND AREA LIGHTINGS J

When data that described more than one type, size, model, or item is
submitted, clearly mark the data to indicate which type, size, model, or
item is being provided. Data shall be sufficient to show conformance to
specified requirements:

1. Luminaires
2. Lighting Standard Poles

e. Shop Drawings:

Luminaires: Include dimension, accessories and installation and


construction details. Photometric data, including Zonal lumen data,
average and minimum ration aiming diagram and computerized
candlepower distribution data shall accompany shop drawings.

Poles: Include dimensions, wind load determined in accordance with


AASHTO LTS-1, pole deflection, pole class, and other applicable
information and pole design calculations.

f. Certified Test Reports:

Luminaires:

1. Computerized horizontal illumination levels in foot-candles or


lux at ground level, taken every 3 meters. Include average
maintained foot-candle level and maximum ratio. Distribution
data according to IES classification type of M-S-III as defined in
IES Lighting Handbook. Luminaries not conforming to this
standard are not acceptable.

2. Test Guarantee

When the installation is reported as completed and ready for acceptance, the
Contractor, at his own expense, in the presence of the Engineer, shall make
test as directed.

The Contractor shall supply all apparatus, materials and labor required for
making the tests.

The Contractor shall furnish a guarantee covering all labor and materials for a
period of one year from the date of final acceptance of his work and he shall
agree to repair and make good at his expense any and all defects which may
develop during that time, if in the opinion of the Engineer such defects had
raised from defective workmanship or materials.

3. Installation

a.) Lighting Panels

The Contractor shall install the panel boards at the locations in proper position
and shall be completely wired and ready for operation. All power and control
wire and cables shall enter the control equipment enclosure through conduits.

b.) Conduit

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-9
STREETLIGHTS AND AREA LIGHTINGS J

Electrical conduits and fittings shall be installed in their correct positions and
locations as shown on the plans. Conduit and fittings to be embedded in
concrete shall be held securely in position while the concrete is being placed.
All threaded conduit connections shall be painted with red lead sealing
compound or glypical varnish.

All conduit bends shall be of standard radii bent without heating and shall be
free from kinks, indentions, or other deformations, which reduce the cross-
sectional area. Burrs and sharp edges at the end of each piece of conduit
shall be removed with a taper reamer. Bend shall not exceed more than 4
quarter bend in laying conduit from boxes to boxes.
Bushing shall be installed on the ends of conduits at boxes or cabinets to
protect conductors from abrasion, and locknuts and bond nuts shall be
installed to provide tight grounded connections between conduits and boxes.

Conduits emerging from concrete surfaces shall be terminated with conduit


coupling and pipe plugs.
During construction, ends of conduits shall be plugged at all outlets or boxes
to keep the conduits dry and prevent the entrance of foreign matter into the
conduits.

Locknuts and bond nuts shall be installed to provide tight ground connections
between conduits and boxes, control board and cabinets. The ends, if
conduits are terminating at cabinets, control boards or outdoor boxes, shall be
sealed with an approved sealing to prevent air circulation from the conduit into
the panel cabinet boxes.

c.) Concrete Foundations

Comply with details for reinforcement and for anchor bolts, nuts, and washers.
Verify anchor-bolt template by comparing with actual pole bases furnished.

d.) Pole Installation

Use web fabric slings (not chain or cable) to raise poles. Mount pole to
foundation with leveling nuts, and tighten top nuts to torque level
recommended by pole manufacturer. Secure poles with level, plumb and
square. Grout void between pole base and foundation. Use non-shrinking or
expanding concrete grout firmly packed in entire void space. Use a short
piece of 13mm diameter pipe to make a drain hole through grout.

e.) Luminaire Attachment

Fasten to indicate structural supports.


Lamp luminaries with indicated lamps according to manufacturer’s written
instructions. Replace malfunctioning lamps.

f.) Field Quality Control

Testing and commissioning shall be in accordance with the manufacturer’s


recommendations.

Provide necessary testing tools and equipment and to include the following:

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-10
STREETLIGHTS AND AREA LIGHTINGS J

• Measure light intensities at night if specific illumination


performance is indicated. Use photometers with calibration
referenced to NIST standards, or approved equal.

• Check intensity and uniformity of illumination.

• Check excessive noisy ballast.

g.) Excavation and Backfilling

Prior to excavation, all necessary clearance shall be secured in advance for


all underground facilities that can be found along cable trench.

Backfilling shall be done in approved manner using suitable excavated


materials free from any objectionable matter and place in layers to be
compacted thoroughly and evenly using mechanical tamper to a maximum
density.

h.) Conduit under Roadway

Installation shall be such as to avoid pocket in the conduit run. All run shall be
straight as possible and shall be installed in a neat and workmanlike manner.
Conduits under roadway shall be encased in reinforced concrete.

i.) Electrical Conductors and Grounding

Electrical conductors and ground wires shall be furnished and installed by the
Contractor. All insulating tape and compounds, solder, flux and connectors for
making grounding connections shall be mechanically and electrically tight and
secure.

All grounding connectors shall be furnished by the Contractor. The Contractor


shall install electrical conductors and shall make all required connections as
shown on wiring diagrams to be furnished or as directed by the Engineer. The
conductors shall be installed so that there will be no cuts or abrasions in the
insulations or protective covering of the conductor. No splices shall be made
in conductors, except at boxes, outlets or cabinets.

SPL 1100.1.3 Method of Measurement

The works under this item will be paid for each of the items provided in the Bill
of Quantities. Payments shall be full compensation for all materials, labor,
plant, equipment, tools and incidentals, including all necessary tests and
electrical permits that may be required and all other incidentals necessary to
complete the whole electrical lighting system installation and each individual
luminaire as detailed in the project drawings.

SPL 1100.1.4 Basis of Payment

The accepted quantities, measured as prescribed in Method of Measurement,


shall be paid for at the contract unit price for Part J- Streetlights and Area
Lightings for which the price and payment shall be full compensation for
furnishings, and installation and placing all materials, including all labor,
equipment, tools and incidentals necessary to complete the work prescribed in
this Item.

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-11
STREETLIGHTS AND AREA LIGHTINGS J

Payment will be made under:

Pay Item Unit of


Description
Number Measurement

103(1)a Structure Excavation (Streetlight Concrete Pedestal) Cubic Meter

104(7) Structural Backfill (From Common Excavation) Cubic Meter

Construction of Steel Pole Concrete Pedestal, 25mm x 762 mm,


SPL-1000-3 Sets
Including Rebars, Anchor Bolts with Nuts & Washer
Supply and Install, 12.0m High Steel Lighting Pole,3.0m
SPL-1100-1 Sets
Single Arm, Including Ground Rod with Clamp
Supply and Install, 12.0m High Steel Lighting Pole,3.0m
SPL-1100-2 Sets
Double Arm, Including Ground Rod with Clamp
Supply and Install, 120W LED Roadway Luminaire,
SPL-1100-3 Sets
Post Mounting with Copper Split Bolt Connector

SPL-1100-4 Supply and Install, THW Copper Wire, 22mm² Linear Meter

SPL-1100-5 Supply and Install, THW Copper Wire, 8mm² Linear Meter

SPL-1100-6 Supply and Install, THW Copper Wire, 3.5mm² Linear Meter

SPL-1100-7 Supply and Install, 50mm Ф PVC Pipe with Coupling Linear Meter

Supply and Install, Enclosed Circuit Breaker, 2P40A 22KAIC,


SPL-1100-8 Sets
NEMA-4x with 50mm HUB

Supply and Install, Panel Board, MCB:4P100AT; BRS:10-


SPL-1100-9 Sets
2P40AT, NEMA-4x

Supply and Install Synchronizing Panel, 3-45KVA,3Ф, 400V,


SPL-1100-10 Sets
60HZ, PLC
Supply and Install Generator Set, Diesel, 45KVA, 3Ф,400V,
SPL-1100-11 Sets
60HZ Brushless

SPL-1100-12 Construction of Power House Building, 4m x 6.0m Floor Area Units

SPL-1100-13 Standard Electrical Handhole, for Service Lateral Connection Units

Supply and Install, Metered Electric Utility Services for


SPL-1100-14 Units
45KVA,3Ф 400V

SPL-1100-15 Contingency Miscellaneous Lot

Detailed Engineering Design of the Construction of Bidding Document


Airport to NCC Road Sections - Package 3 Volume III, Part IIA
Page J-12

You might also like