Record of non-destructive testing of concrete by the use of rebound hammer
File Ref.: BD __3/9161/21 ________ Date: 04 / 11 / 2024
(Engineering Manual Section 2.4.1)
R1 = 80 R2 = Tested by: KWOK Fu-ho,Elvis(TO/NT4) Page 1 of 2 Pages
Hammer No.: 139640 Range from anvil (79+2) Recorded by: Sidney LEUNG(SE/NT4)
Member Size Date Median Cube strength
Floor Readings as taken Remarks
Mark Measured Approved Cast. Value Equi. Appd.
Block A AW1 300 Thk 27/04/2024 45D
G/F-R/F
Block A AW2 300 Thk 27/04/2024 45D
G/F-R/F
Block A AC4 300 x 950 27/04/2024 45D
G/F-R/F
Block B BC18 300 x 600 20/02/2024 45D
LG/F-G/F
Block B BC7 300 x 600 21/03/2024 45D
G/F-R/F
Block B BC9 300 x 600 21/03/2024 45D
G/F-R/F
Block B BC16 300 x 600 21/03/2024 45D
G/F-R/F
Block C&D CC7 300 x 1000 22/01/2024 45D
G/F-R/F
Block C&D CW9 300 Thk 22/01/2024 45D
G/F-R/F
Block C&D CW10 300 Thk 22/01/2024 45D
G/F-R/F
AP/RSE: Contractor:
SE Form 7 (5/2023)
* size cannot be measured
SE Form 7 (5/2023)
Record of non-destructive testing of concrete by the use of rebound hammer
File Ref.: BD __3/9161/21 ________ Date: 04 / 11 / 2024
(Engineering Manual Section 2.4.1)
R1 = 80 R2 = Tested by: KWOK Fu-ho,Elvis(TO/NT4) Page 2 of 2 Pages
Hammer No.: 139640 Range from anvil (79+2) Recorded by: Sidney LEUNG(SE/NT4)
Member Size Date Median Cube strength
Floor Readings as taken Remarks
Mark Measured Approved Cast. Value Equi. Appd.
Block E EC1 300 x 700 29/01/2024 45D
G/F-R/F
Block E EW3 300 Thk 29/01/2024 45D
G/F-R/F
Block E EW6 300 Thk 29/01/2024 45D
G/F-R/F
Block F FW3 300 Thk 20/12/2023 45D
LG/F-G/F
Block F FW4 300 Thk 20/12/2023 45D
G/F-R/F
Block F FC7 300 x 900 20/12/2023 45D
G/F-R/F
Block G GC1 300 x 600 03/02/2024 45D
G/F-R/F
Block G GW4 300 Thk 03/02/2024 45D
G/F-R/F
Block G GW5 300 Thk 03/02/2024 45D
G/F-R/F
AP/RSE: Contractor:
SE Form 7 (5/2023)
* size cannot be measured