Hamirpur Barrage - Stability Analysis: Input Data
Hamirpur Barrage - Stability Analysis: Input Data
INPUT DATA
1 Density of concrete = 25 kN/m3
2 Density of Submerged Soil= 10 kN/m3
3 Density of water = 10 kN/m3
4 Assumed Residual Cohesion= 0 kPa
5 Angle of internal friction= 25 degree
6 Seismic Zone II,
7 αh=βIαh
8 Basic horizontal seismic coefficient, αo 0.020
9 Importance Factor, I 3.000
10 Foundation Factor, β 1.000
11 αh=βIαh 0.060
12 Horizontal seismic Coefficient, αh= 0.0600
13 Vertical seismic Coefficient, αv=2/3αh 0.040
14 Bottom Slab Width 67.200 m
15 Waterway 50.0 m
16 Slab projection beyond abutment 2.0 m
17 Abutment bottom width 3.0 m
18 Middle pier width 2.4 m
Combination F Fc
Partial Factor of Safety (wrt to friction) F B, & C 1.5 3.6
Partial Factor of Safety (wrt to Cohesion) Fc D, E & M 1.2 2.4
194.2
187
184
183.5
178 178
177.9
175.6 176.2
173 173.8 B
168
0.75 10.25 5.4 34.60 1.00
52.00
Stability Calculations
Hamirpur Barrage, Odisha Page 2 Barrage Stability analysis -Hamirpur
GRAVITY LOADS
Load Arm about B (Bottom of Stilling
Area Width Weight basin slab) Moment
Description
X Y Mx My
sq. m. m kN m m kN-m kN-m
Abutment 866.5 2.5 54156.25 26 11.3 1408062.50 611965.63
Pier 618.10 9.20 142163.00 31.10 9.90 4421269.30 1407413.70
Raft 141.10 67.20 237048.00 24.00 1.40 5689152.00 331867.20
Gate Load 1200.00 40 8.2 48000.00 9840.00
Bridge 4.39 67.2 7375.20 33.5 19.3 247069.20 142341.36
Side cutoff 222.50 4.00 22250.00 22.00 -2.20 489500.00 -48950.00
Total 1630.09 464192.45 26.50 3.97 12303053.00 1842512.26
18567.698
Normal Operating Condition (Radial gates closed)
VERTICAL LOAD
Area Width Weight Load Arm X Moment
Description
sq. m. m kN m kN-m
water b/w piers u/s 48.60 50.00 24300.00 47.10 1144530 From Autocad
water b/w piers d/s 59.80 50.00 29900.00 20.60 615940
Total 54200.00 1760470.00
Stability Calculations
Hamirpur Barrage, Odisha Page 3 Barrage Stability analysis -Hamirpur
Stability Calculations
Hamirpur Barrage, Odisha Page 4 Barrage Stability analysis -Hamirpur
UPLIFT
Normal Operating Condition Uplift
Stability Calculations
Hamirpur Barrage, Odisha Page 5 Barrage Stability analysis -Hamirpur
LOAD Condition A: Construction Condition: Barrage complete but no water in Basin and no tail water
V H M +ve M -ve
kN kN kN-m kN-m
Self weight 464192.45 0 12303053.00
Total 464192.5 0.00 12303053.00 0.00
LOAD Condition B: Normal Operation Condition: Gates Closed, FRL, TWL, Uplift, No silt
Item V H M +ve M -ve
kN kN kN-m kN-m
Self weight 464192.45 0.00 12303053.00 0.00
Water load 54200.00 1760470.00
Uplift -231962.33 -6062276.86
Hydrostatic 22521.91 -71758.30
Total 286430.1 22521.9 14063523.0 -6134035.2
Stability Calculations
Hamirpur Barrage, Odisha Page 6 Barrage Stability analysis -Hamirpur
LOAD Condition C: Flood Discharge Condition: Gates Open, SPF, Flood TWL, Uplift, No silt
Item V H M +ve M -ve
kN kN kN-m kN-m
Self weight 464192.45 0 12303053.00 0
Water load 352381.60 9157653.86
Uplift -533317.16 -13550393.58
Hydrostatic (u/s) 4529.13 -36577.10
Total 283256.89 4529.1 21460706.9 -13586970.7
LOAD Condition D: Load Combination-A + Earthquake(U/s Horizontal Force due to EQ + Downward Vertical)
Item V H M +ve M -ve
kN kN kN-m kN-m
Self weight 464192.5 0 12303053.00
EQ Vertical 18567.7 492122
EQ Horizontal -27851.55 110551
Total 482760.15 -27851.5 12905725.9 0.0
Stability Calculations
Hamirpur Barrage, Odisha Page 7 Barrage Stability analysis -Hamirpur
Stability Calculations
Sono Barrage, Odisha
178 178
E1=a d
C1=c 175.6 177.9
176.2 176.2 C2=h
e
D1=b 173.8 E2=f
173 0.75 10.25 5.4 34.6 1.00
52
168 D2=g
α 10.40
λ (1+SQRT(1+α*α))/2 5.72
ФE 27.45 %
ФD 19.10 %
Corrections
ФE1 No Correction required
ФD1 No Correction required -
ФC1 Floor Thickness correction and Interference of Intermediate cutoff
Before correction
ФE1 100 %
ФD1 80.90 %
ФC1 72.55 %
Slope Proposed 1V 3H
Correction 4.5 %
Length of Slope Portion 5.4 m
Total length 52
% Correction 0.47 %
Stability Calculations
Sono Barrage, Odisha
Corrections
ФE2 FloorThickness correction and Interference of Upstream cutoff
ФD2 No Correction required
ФC2 No Correction required
* Correction for floor thickness
t 4.1 m
Correction 5.0 % "-ve"
Correction for interference of Upatream cutoff
d= Depth of cutoff 9.9
b1= distance between the two cutoff 52
b= total length of the impervious floor 52
D= the depth of the cutoff, influence of which is considered 1
Intrteference correction=19*sqrt(D/b1*(d+D)/b) -1.0690232 "-ve"
Pressure at respective points after correction
Point
ФE2 34% f
ФD2 26% g
ФC2 0% h
Stability Calculations
Sono Barrage, Odisha
178 178
E1=a d
C1=c 175.6 177.9
176.2 176.2 E2=h
e
D1=b 173.8 C2=f
173 0.75 10.25 5.4 34.6 1.00
52
173.8 D2 168 D2=g
α 10.61
λ 5.83
ФE 27.19 %
ФD 18.92 %
Corrections
ФE1 No Correction required
ФD1 No Correction required -
ФC1 Floor Thickness correction and Interference of Intermediate cutoff
Before correction
ФE1 100 %
ФD1 81.08 %
ФC1 72.81 %
Slope Correction:
Slope Proposed 1V 3H
Correction 4.5 %
Length of Slope Portion 5.4 m
Total length 52
% Correction 0.47 %
Stability Calculations
Sono Barrage, Odisha
Corrections
ФE2 Floor Thickness correction and Interference of Intermediate cutoff
ФD2 No Correction required
ФC2 No Correction required
* Correction for floor thickness
t 4.1 m
Correction 5.0 % "-ve"
Pressure at respective points after correction
Point
ФE2 33% f
ФD2 26% g
ФC2 0% h
% Pressure
% Pressure Head with Elevations
Head with slope and Net (m)
Distance thickness % Slope thickness Seepage Hydraulic
Point between points Chainage correction Correction correction head gradient lines
a ФE1=Фa 0 0 100.00% 100.00% 0.48 189.68 178
b ФD1=Фb 0 0.00 81.08% 81.08% 0.39 189.59 173
c ФC1=Фc 0.75 0.75 76.86% 76.86% 0.37 189.57 175.6
d Фd 10.25 11.00 67.91% -0.47% 67.45% 0.32 189.52 175.6
e Фe 5.4 16.40 63.20% -0.47 62.73% 0.30 189.50 173.8
f ФC2=Фf 34.6 51.00 32.99% 32.99% 0.16 189.36 173.8
g ФD2=Фg 1.00 52.00 25.99% 25.99% 0.12 189.32 168
h ФD2=Фg 0.00 52.00 0.00% 0.00% 0.00 189.20 177.9
Stability Calculations