0% found this document useful (0 votes)
126 views1 page

Plumbing Layout for Engineers

Uploaded by

Karl Angelo Uy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views1 page

Plumbing Layout for Engineers

Uploaded by

Karl Angelo Uy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1 2 3 4 5 6

A B C

NOTES AND SPECIFICATIONS


PRESSURE
TANK

4 1. ALL PLUMBING WORKS TO BE DONE AND SIZES OF THE PIPES TO BE USED SHALL BE IN
ACCORDANCE WITH THE LATEST EDITION OF UNIFORM PLUMBING CODE OF THE PHILIPPINES
3
4 '' dia. Water
Source Pipe

AND LOCAL REGULATIONS AND ORDINANCES.. A

2. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE WORKING DRAWINGS. ANY RELOCATION
REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE UPON THE APPROVAL OF
3 FCT

SH
SANITARY ENGINEER.

LAV FCT
3. PROVIDE PIPE SLEEVES AT WALL COLUMNS OR SLAB TO PROTECT FROM BREAKAGE.
WC

4. ENGINEER-IN-CHARGE ARE REQUIRED TO VERIFY THE ACTUAL LOCATION AND ELEVATION OF


2
THE STREET DRAINAGE, STREET SEWER, AND STREET WATER MAINS FOR CONNECTION BEFORE
CONSTRUCTION.

5. ALL FIXTURES SHALL BE VENTED INDIVIDUALLY AND WATER LINE SHALL BE VALVE BY GROUP.

1 6. ALL PLUMBING FITTINGS SHALL BE ACCESSIBLE FOR MAINTENANCE PROVIDE MANHOLE IF


SUCH INSTALLATION ARE INSIDE THE CEILING.

7. THE BRAND AND OTHER DETAILED PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH THE
SCHEDULE FURNISHED BY THE ARCHITECT.
01 GROUND FLOOR WATERLINE LAYOUT
P 1 SCALE NTS 8. ALL SLOPES FROM HORIZONTAL DRAINAGE PIPES SHALL MAINTAIN 1% UNLESS OTHERWISE
SPECIFIED.
A B C
9. ALL PLASTERED SURFACES SHALL BE PAINTED.

SH
LEGEND
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
3
FCT
WC

ANGLE VALVE
FLOW INDICATOR

FLOOR DRAIN FAUCET

2
CLEANOUT 90 DEGREE ELBOW

P-TRAP TEE 90 DEGREE

SEWER PIPE LINE TEE 45 DEGREE

1
GATE VALVE WYE

CHECK VALVE

02 SECOND FLOOR WATERLINE LAYOUT


P 1 SCALE NTS

STUDENT'S NAME: PROFESSOR: SUBJECT / TIME: PROJECT TITLE: SHEET CONTENT/S: DRAWING NO.

BCE 413L / 8:00 - 10:00 M


PROPOSED TWO (2) STOREY P-1
YVAN ROSS R. ACLARACION ENGR. GEFFREN BERNARDO RESIDENTIAL BUILDING
1511 (CODE) WATERLINE LAYOUT -SHEET NO.-
& KARL ANGELO A. UY LOCATION:
TIGBAWAN, PIGCAWAYAN, NORTH COTABATO 21 OF 23

You might also like