SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.
00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
1.00 DOCUMENT REVIEW
PE or CE stamped construction
documents or an approved independent,
See See Ref. SAES-M-100 section Section [Link] Certification
1.01 third-party review letter referencing these
Remarks Remarks of Construction Documents
plans with a PE or CE stamp to LPD and
FrPD.
2.00 RECEIVING INSPECTION
Storage, Handling and Preservation Visual See See SAIC-T-5001 General - Indoor Electronic Equipment
2.01
Inspection Remarks Remarks I S Weekly Inspection by Contractor QC
Fire Alarm System
Control Panel SA PID to be notified on initial delivery of each listed item
2.02
Material Receiving
SAIC-B-6102 SAIC-B-6102 H W (by type or manufacturer)
Visual Inspection
Fire Alarm System
Audible / Visual Annunciator SA PID to be notified on initial delivery of each listed item
2.03
Material Receiving
SAIC-B-6103 SAIC-B-6103 H W (by type or manufacturer)
Visual Inspection
Fire Alarm System
Smoke & Heat Detector SA PID to be notified on initial delivery of each listed item
2.04
Material Receiving
SAIC-B-6104 SAIC-B-6104 H W (by type or manufacturer)
Visual Inspection
Fire Alarm System
Water Flow Switch and
SA PID to be notified on initial delivery of each listed item
2.05 Water Valve Position Switches SAIC-B-6106 SAIC-B-6106 H W (by type or manufacturer)
Material Receiving
Visual Inspection
Fire Alarm System
Manual Pull Station SA PID to be notified on initial delivery of each listed item
2.06
Material Receiving
SAIC-B-6107 SAIC-B-6107 H W (by type or manufacturer)
Visual Inspection
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
Fire Alarm System Accessories include fire alram manufacturer's specialty
Cable and Accessories cable and wire, end-of-line resistors, batteries, and back
2.07
Material Receiving
SAIC-B-6101 SAIC-B-6101 H W boxes. SA PID to be notified on initial delivery of each
Visual Inspection listed item (by type or manufacturer).
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
3.00 INSTALLATION
Fire Alarm System See also SATIP-P-111-01 Grounding and Bonding
Smoke / Heat Detector and SATIP-P-104-04 Enclosures, Boxes & Wireways.
3.01
Installation & Identification
SAIC-B-6105 SAIC-B-6105 H W SA PID to be notified on start of alarm system installation
Visual Inspection by plant area or building.
Fire Alarm System
See also SATIP-P-111-01 Grounding and Bonding
Water Flow Switch and
and SATIP-P-104-04 Enclosures, Boxes & Wireways.
3.02 Water Valve Position Switches SAIC-B-6106 SAIC-B-6106 H W SA PID to be notified on start of alarm system installation
Installation & Identification
by plant area or building.
Visual Inspection
Fire Alarm System See also SATIP-P-111-01 Grounding and Bonding
Manual Pull Station and SATIP-P-104-04 Enclosures, Boxes & Wireways.
3.03
Installation & Identification
SAIC-B-6107 SAIC-B-6107 H W SA PID to be notified on start of alarm system installation
Visual Inspection by plant area or building.
SATIP-P-104-05 A/G Conduit
A/G Conduit Installation See See SATIP-P-111-01 Grounding and Bonding
3.04
Visual Inspection Remarks Remarks SA PID to be notified on start of alarm system conduit
installation by plant area or building.
SATIP-P-104-01 LV Cable and
Cable Pulling / Laying See See SATIP-J-902-01 Inst. and Control Cable
3.05
Visual Inspection Remarks Remarks SA PID to be notified on start of alarm system cable
installation by plant area or building.
SATIP-P-104-01 LV Cable and
SATIP-J-902-01 Inst. and Control Cable
Cable Gland, Cable Dressing,
See See SATIP-P-111-01 Grounding & Bonding
3.06 Cable Identification & Termination
Remarks Remarks In accordance with manufaturer's instructions.
Visual Inspection
SA PID to be notified on start of alarm system testing by
plant area or building
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
4.00 PRE-COMMISSIONING
SATIP-P-104-01 LV Cable and
Cable Continuity SATIP-J-902-01 Inst. and Control Cable
See See
4.01 and Insulation Testing In accordance with manufaturer's instructions.
Remarks Remarks
(Installed Cable) SA PID to be notified on start of alarm system testing by
plant area or building
Cable Termination SATIP-J-902-01 Inst. and Control Cable
See See
4.02 Crimp (wire pull-out) and SA PID to be notified on start of alarm system testing by
Remarks Remarks
Torque Testing plant area or building
SATIP-P-104-01 LV Cable and Wire
SATIP-P-104-04 Enclosures, Boxes & Wireways
Control Panel
SATIP-P-104-05 A/G Conduit and Fittings
Pre-Energization Calibration,
SATIP-P-111-01 Grounding and Bonding
4.03 Functional Testing and SATR-B-6101 SAIC-B-6101 H W As applicable, in accordance with manufaturer's
Visual Inspection
instructions.
(for Energization Certificate)
SA PID to be notified on start of inspection by plant area or
building.
SATIP-P-104-01 LV Cable and Wire
SATIP-P-104-04 Enclosures, Boxes & Wireways
Annunciators
SATIP-P-104-05 A/G Conduit and Fittings
Pre-Energization Calibration,
SATIP-P-111-01 Grounding and Bonding
4.04 Functional Testing and SATR-B-6102 SAIC-B-6102 H W As applicable, in accordance with manufaturer's
Visual Inspection
instructions.
(for Energization Certificate)
SA PID to be notified on start of inspection by plant area or
building.
SATIP-P-104-01 LV Cable and Wire
SATIP-P-104-04 Enclosures, Boxes & Wireways
Smoke / Heat Detector
SATIP-P-104-05 A/G Conduit and Fittings
Pre-Energization Calibration,
SATIP-P-111-01 Grounding and Bonding
4.05 Functional Testing and SATR-B-6103 SAIC-B-6103 H W As applicable, in accordance with manufaturer's
Visual Inspection
instructions.
(for Energization Certificate)
SA PID to be notified on start of inspection by plant area or
building.
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
SATIP-P-104-01 LV Cable and Wire
SATIP-P-104-04 Enclosures, Boxes & Wireways
Water Flow & Valve Position Switches
SATIP-P-104-05 A/G Conduit and Fittings
Pre-Energization Calibration,
SATIP-P-111-01 Grounding and Bonding
4.06 Functional Testing and SATR-B-6104 SAIC-B-6104 H W As applicable, in accordance with manufaturer's
Visual Inspection
instructions.
(for Energization Certificate)
SA PID to be notified on start of inspection by plant area or
building.
SATIP-P-104-01 LV Cable and Wire
SATIP-P-104-04 Enclosures, Boxes & Wireways
Manual Pull Station
SATIP-P-104-05 A/G Conduit and Fittings
Pre-Energization Calibration,
SATIP-P-111-01 Grounding and Bonding
4.07 Functional Testing and SATR-B-6105 SAIC-B-6105 H W As applicable, in accordance with manufaturer's
Visual Inspection
instructions.
(for Energization Certificate)
SA PID to be notified on start of inspection by plant area or
building.
Quality Document Review Engerization
4.08
and Energization Certificate
EIL
Certificate RH RH Review EIL and All Associated Quality Records
Control Panel As applicable, in accordance with manufaturer's
4.09 Energized SATR-B-6101 SAIC-B-6101 instructions. SA PID to be notified on start of inspection by
Functional Testing plant area or building.
As applicable, in accordance with manufaturer's
Annunciators
instructions.
4.10 Energized SATR-B-6102 SAIC-B-6102
SA PID to be notified on start of inspection by plant area or
Functional Testing
building.
As applicable, in accordance with manufaturer's
Smoke / Heat Detector
instructions.
4.11 Energized SATR-B-6103 SAIC-B-6103
SA PID to be notified on start of inspection by plant area or
Functional Testing
building.
As applicable, in accordance with manufaturer's
Water Flow & Valve Position Switches
instructions.
4.12 Energized SATR-B-6104 SAIC-B-6104
SA PID to be notified on start of inspection by plant area or
Functional Testing
building.
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-Oct-2022 - REV.2022.10.00 (Standards Cutoff - Oct 31,2022) Rev 84 31-Oct-22
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 31-Oct-22 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JAFURAH GAS PLANT PHASE 2 TCF CAMP - EXPANSION PKG-09 10-14815-0008 Mobarak Al Salomi Co. Ltd
CHECKLIST INSPECTION RESPONSIBILITY
ITEM and/or QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. TEST RECORD SAUDI
RECORD CNTRCTR
ARAMCO
As applicable, in accordance with manufaturer's
Manual Pull Station
instructions.
4.13 Energized SATR-B-6105 SAIC-B-6105
SA PID to be notified on start of inspection by plant area or
Functional Testing
building.
Hold point prior to PMCC or MCC.
4.14 Final Inspection SAIC-B-6108 SAIC-B-6108 H H Review All Associated Quality Records
Quality Document Review and PMCC or
4.15
Mechanical Completion Certificate
FEIL
MCC RH RH Review FEIL and All Assocated Quality Records
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H 100% Hold Point for QC Inspection or Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-July-2019 - REV.2019.07.00 (Standards Cutoff - July 31,2019)
Saudi Aramco: Company General Use
Rev 2019.07.00 31-Jul-19
###
Saudi Aramco: Company General Use
### 1-Oct-18
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU-31-July-2019 - REV.2019.07.00 (Standards Cutoff - July 31,2019)
Saudi Aramco: Company General Use
Rev 2019.07.00 31-Jul-19
###
Saudi Aramco: Company General Use
### 1-Oct-18
Saudi Aramco: Company General Use