Scope of Work Uom Qty Rate
Kitchen area
Supply and Installation of kitchen cabinate as per
drawings. The Kitchen shall comprise the following items:
a. Plywood: BWP Grade Architect Ply as per IS-710
(Greenply, Century,Sainik,Ecotec or any equvivalent
brand) b. Laminate: Shutter: 1.0 mm High Gloss
Laminate. Inside: 0.8 mm Laminate c. Cabinets -
Required Cabinets as per Drawing. all accessories. e.
Hardwares: Soft Close hardwares from Ebco / or any
Providing and making of Kitchen Cabinet with equivlanet barand. f. Drawer storage organizer:Plain Tray,
1 Marine ply rate Is including 4 tandem Cutlery Tray. All items are from ebco or any equvivalent Sft 35.31 1650.00
Boxes and cutlery unit brand . g. Profile Handle for shutters and drawers:
Aluminum Profile handle (G Type) as selected by
Architect/Client All shutters shall have PVC Edge Bands
on all four sides. Finish of PVC Edge band shall as per
architects selection. The kitchen shall have a 5 Years
Warantee against Manufacturing defect. The work shall
be complete including all the required accessories for
fixing the kitchen at site as per drawing and to the
satisfaction of client
Providing and fixing of Loft , Rate is including of all
3
labour material etc
Sft 22.18 950.00
Living area
1 Tv Unit Sft 88.00 1050.00
Dining Area
Providng and making of grocery unit ,door to be finis in glass
1 slidng with required fitting and hardware Sft 1150.00
Providing and making of cabinate under washbasin in common
2 washbasin area Rate is including all labour Sft 0.00 1150.00
material etc
Master Bedroom
Providing and fixing of wardrobe with Loft in master
1 bedroom Rate is including all labour Sft 35.52 1150.00
material etc
Providing and fixing of Loft , Rate is including of all
2 labour material etc Sft 8.07 950.00
3 Providing and makin dressing table Sft 62.73 1150.00
4 Providing and making of cabinate under washbasin in bathroom Sft 24.00 1150.00
5 Providing and making of Mirror in bathroom(8*3) Nos 1.00 12000.00
Guest Room
Providing and fixing of wardrobe in ply and laminate
1 with Loft in master bedroom Rate is Sft 35.52 1150.00
including all labour material etc
Providing and fixing of Loft , Rate is including of all
2 labour material etc Sft 8.07 950.00
3 Providing and making of Mirror in bathroom(8*3) Nos 1.00 12000.00
Granite & Quartz
1 Quartz Sft 23.44 950.00
Tile
1 Fixing of tile with adeshive Sft 46 70
Total amount
Sl No Material Make
1 Marine Ply for kitchen Century Sainik /Green ecotec
2 Hardware Hettich
3 Paint Asian
Amount Remarks
58255
21070
92400
0.00
0.00
40849.38
7669.35
72136.29
27600.00
12000.00
40849.38
7669.35
12000.00
22268.72
Tile Suppied
3227.91 By client
417995